JP2011168172A - Train operation prediction system - Google Patents

Train operation prediction system Download PDF

Info

Publication number
JP2011168172A
JP2011168172A JP2010033833A JP2010033833A JP2011168172A JP 2011168172 A JP2011168172 A JP 2011168172A JP 2010033833 A JP2010033833 A JP 2010033833A JP 2010033833 A JP2010033833 A JP 2010033833A JP 2011168172 A JP2011168172 A JP 2011168172A
Authority
JP
Japan
Prior art keywords
train
travel pattern
prediction
pattern
operation prediction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2010033833A
Other languages
Japanese (ja)
Other versions
JP2011168172A5 (en
Inventor
Shugo Kawanari
宗剛 川成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2010033833A priority Critical patent/JP2011168172A/en
Publication of JP2011168172A publication Critical patent/JP2011168172A/en
Publication of JP2011168172A5 publication Critical patent/JP2011168172A5/ja
Pending legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a train operation prediction system predicting a train operation as exactly as possible while reflecting current travel conditions. <P>SOLUTION: In this system, when a train 2 of each of digital ATC devices 5-1 to 5-n is in operation, an expected stop position is transmitted from the nearest one to an on-vehicle information processing device 3 via a digital information communication device 4. In the device 3, a travel pattern corresponding to the transmitted stop position is generated. All the travel patterns are transmitted to the each of devices 5-1 to 5-n via a track circuit 1, and to the train operation prediction device 8 via a central digital ATC device 6 and an ATC network 7. The device 8 calculates a discrepancy from a train timetable based on all the travel patterns, to prepare expected timetables for respective trains. When a delay is detected in the travel pattern, the device 8 causes the device 3 that has transmitted the pattern to recalculate the travel pattern a plurality of times at different passing points of time, and receives the travel patterns obtained in series, to prepare the expected timetable once every plurality of times. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、地上側に設置したデジタル自動列車制御(Automatic Train Control/以下、デジタルATCとする)装置を利用し、列車の走行状況に応じて走行パターンを作成して予測ダイヤに反映させることにより高精度に運行予測を行うことができる列車運行予測システムに関する。   By using a digital automatic train control (Automatic Train Control / hereinafter referred to as digital ATC) device installed on the ground side, the present invention creates a traveling pattern according to the traveling state of the train and reflects it in the prediction diagram. The present invention relates to a train operation prediction system that can perform operation prediction with high accuracy.

従来、一般的な列車の運行管理システムに関連する周知技術としては、例えば予め計画した列車ダイヤからのずれを早期に予測可能な列車運行管理装置(特許文献1)が挙げられる。   Conventionally, as a well-known technique related to a general train operation management system, for example, there is a train operation management device (Patent Document 1) that can predict a deviation from a train schedule planned in advance at an early stage.

この列車運行管理装置では、列車軌道上を走行する列車の位置と速度とを略連続的に検知し、列車位置・速度と列車ダイヤとを比較して列車が遅延している場合には標準の走行パターンに対する列車の現在の遅延時間を算出し、この遅延時間に基づいて次駅到着時刻に対する予測ずれ時間を求めて予測ダイヤを作成する。この運行予測の手法によれば、列車ダイヤの作成に用いた標準の走行パターンと現在の列車走行状況とを略連続的に比較することにより、予め作成した列車ダイヤと実際の列車走行状況とのずれを早期に検出し、予測ダイヤを作成することができる。   In this train operation management device, the position and speed of a train traveling on a train track are detected substantially continuously, and when the train is delayed by comparing the train position / speed and the train schedule, A current delay time of the train with respect to the travel pattern is calculated, and a prediction shift time with respect to the arrival time at the next station is obtained based on the delay time to create a prediction diagram. According to this operation prediction method, by comparing the standard travel pattern used to create the train schedule and the current train travel status substantially continuously, the train schedule created in advance and the actual train travel status can be compared. Deviations can be detected early and a prediction diagram can be created.

具体的に云えば、列車Aが駅を出発してから時間tが経過したとき、標準の走行パターンで走行した場合よりも手前の地点xに存在していると、列車Aが遅延していると判断する。そこで、標準の走行パターンにおける地点xの列車Aの速度Pと現在の列車Aの速度Qとを比較した結果、速度Pと速度Qとが等しければ、後の列車Aの運行が標準の走行パターンに従うとみなし、速度Pと速度Qとが異なれば過去の学習値を遅延時間とする。例えば、過去に地点xにおいて速度Bで走行した場合の遅延時間が記憶されていれば、その際の遅延時間を現在の遅延時間とし、記憶されていなければ、存在する学習値の最も近い値を遅延時間とする。   Specifically, when time t has passed since the train A departed from the station, the train A is delayed if it exists at a point x in front of the case of traveling in the standard traveling pattern. Judge. Therefore, as a result of comparing the speed P of the train A at the point x in the standard travel pattern with the speed Q of the current train A, if the speed P and the speed Q are equal, the operation of the later train A is the standard travel pattern. If the speed P and the speed Q are different, the past learning value is set as the delay time. For example, if the delay time when traveling at the speed B at the point x has been stored in the past, the delay time at that time is set as the current delay time, and if not, the closest value of the existing learning value is set. Delay time.

列車の遅延が検知されたとき、遅延列車の駅到着時刻に対して、各駅毎に予め定義された列車を停車させなければならない最短時間である最小停車時分を加算し、列車の出発予定時刻を求める。ここで、出発予定時刻は、列車ダイヤで定められている出発時刻よりも早くならず、しかも先行列車との間で確保しなければならない出発時隔(出発時間の間隔)が確保されるように決定される。そして、出発予定時刻に駅間における列車の最短走行時間である最小運転時分を加算し、次駅の到着予定時刻を求める。ここで、次駅の到着予定時刻は、先行列車との間で確保しなければならない出発時隔が確保されるように決定される。このように列車の遅延時間、列車の駅到着予定時刻及び駅出発予定時刻が算出されることにより、予測ダイヤが作成される。   When a train delay is detected, add the minimum stop time, which is the shortest time that must be taken for each station to stop, to the station arrival time of the delayed train. Ask for. Here, the scheduled departure time is not earlier than the departure time defined by the train schedule, and the departure time interval (departure time interval) that must be secured with the preceding train is secured. It is determined. And the minimum operation time which is the shortest traveling time of the train between stations is added to the scheduled departure time, and the estimated arrival time of the next station is obtained. Here, the estimated arrival time of the next station is determined so as to ensure a departure time interval that must be ensured with the preceding train. In this way, a prediction diagram is created by calculating the delay time of the train, the estimated arrival time of the train station, and the estimated departure time of the station.

また、列車の運行制御装置に関連する周知技術としては、地上装置から入手した情報に基づいて車上側で速度照査パターンを作成し、この速度照査パターンに基づいて列車を制御する一段制御デジタルATC方式に係る列車制御装置(特許文献2参照)や、地上からブレーキパターンを受信した列車側でそのブレーキパターンに基づいて列車の走行パターンを作成し、その走行パターンを地上側に送信する列車制御装置(特許文献3参照)等が挙げられる。   Moreover, as a well-known technique related to the train operation control device, a one-step control digital ATC system that creates a speed check pattern on the upper side of the vehicle based on information obtained from the ground device and controls the train based on the speed check pattern. Train control device (refer to Patent Document 2), train control device that generates a train travel pattern based on the brake pattern on the train side that received the brake pattern from the ground, and transmits the travel pattern to the ground side ( For example, see Patent Document 3).

その他、デジタルATCに係る基本技術については、例えば「デジタルATCの開発と導入」(非特許文献1参照)に開示されている。このデジタルATCでは、車上情報処理装置を搭載した列車が走行する線路に沿った軌道回路による列車位置情報や連動装置からの進路設定情報の他、地上の設備情報に基づいてATC論理部により列車の停止区間を決定する。デジタルATCからのデジタルATC信号による停止区間情報を受信した車上情報処理装置では、常に認識している自列車位置をキーとして、予め車上情報処理装置のデータベースに格納されている速度照査パターンを検索する。速度照査パターンは、前方の線路勾配、ポイント、曲線半径等による制限速度も考慮して作成されたものが車上情報処理装置のデータベースに格納されている。そこで、検索により該当した速度照査パターンと自列車位置とからその時点での列車の許容速度を求める。   Other basic technologies related to digital ATC are disclosed in, for example, “Development and Introduction of Digital ATC” (see Non-Patent Document 1). In this digital ATC, in addition to the train position information from the track circuit along the track on which the train on which the on-board information processor is mounted travels, the route setting information from the interlocking device, and the train by the ATC logic unit based on the ground facility information Determine the stop section. In the on-board information processing apparatus that has received stop section information from the digital ATC signal from the digital ATC, the speed check pattern stored in the database of the on-board information processing apparatus is stored in advance using the self-recognized train position as a key. Search for. The speed check pattern is stored in the database of the on-board information processing apparatus, taking into account the speed limit due to the forward track gradient, points, curve radius, and the like. Therefore, the permissible speed of the train at that time is obtained from the corresponding speed check pattern and the own train position.

特開2002−249049号公報Japanese Patent Laid-Open No. 2002-249049 特開2005−306145号公報Japanese Patent Laying-Open No. 2005-306145 特開平9−193804号公報JP-A-9-193804

JR東日本テクニカルレビュー No.5 p027−030JR East Technical Review No. 5 p027-030

上述した特許文献1に係る技術は、列車の遅延を検知した際、標準の走行パターンの地点xにおける列車Aの速度Pと現在の地点xにおける列車Aの速度Qとを比較した結果、速度が同じであれば標準の走行パターンに従うとみなしているが、実際のその後の走行パターンが標準の走行パターンに従うとは限らないため、正確に列車の運行予測ができないという欠点がある。また、速度の比較結果が異なる場合においても、過去の学習値に基づいて列車の運行予測を行うため、現在の走行状況を反映した正確な列車の運行予測を行うことができないという弱点がある。   As a result of comparing the speed P of the train A at the point x of the standard travel pattern with the speed Q of the train A at the current point x, the technology according to Patent Document 1 described above detects the delay of the train. If it is the same, it is considered that it follows the standard driving pattern. However, since the actual subsequent driving pattern does not always follow the standard driving pattern, there is a drawback that the train operation cannot be predicted accurately. Even when the speed comparison results are different, since the train operation is predicted based on the past learned value, there is a weakness in that an accurate train operation prediction reflecting the current traveling state cannot be performed.

また、特許文献2に係る技術は、地上装置から入手した情報から車上側で作成した速度照査パターン基づいて列車を制御するものであり、特許文献3に係る技術は、地上からブレーキパターンを受信した列車側がそのブレーキパターンに基づいて作成した列車の走行パターンを地上側に送信するものであり、何れも列車の運行予測に関連する技術やそうした用途への適用とは無関係なものとなっている。   Moreover, the technique which concerns on patent document 2 controls a train based on the speed check pattern produced on the vehicle upper side from the information acquired from the ground apparatus, and the technique which concerns on patent document 3 received the brake pattern from the ground. The train side transmits a train travel pattern created based on the brake pattern to the ground side, and any of them is irrelevant to technology related to train operation prediction and application to such a use.

更に、非特許文献1に係る技術は、デジタルATCを用いて停車すべき駅の通過を防止する機能を構築すると共に、運転台のモニタ装置に先行列車の位置を表示したり、或いは駅のホームや踏切に設置されている列車の非常停止装置の動作等による緊急ブレーキの動作理由についても表示することにより、運転士に対する支援を行う手法を提案したものであり、係る技術についても列車の運行予測に関連する技術やそうした用途への適用とは無関係なものとなっている。   Further, the technology according to Non-Patent Document 1 constructs a function for preventing the passage of a station to be stopped using digital ATC, and displays the position of a preceding train on the monitor device of the cab, or A method of providing assistance to the driver by displaying the reason for the operation of the emergency brake due to the operation of the emergency stop device of the train installed at the railway crossing, etc. It has nothing to do with the technology related to and application to such applications.

本発明は、このような問題点を解決すべくなされたもので、その技術的課題は、現在の走行状況を反映させて可能な限り正確に列車の運行予測を行うことができる列車運行予測システムを提供することにある。   The present invention has been made to solve such a problem, and its technical problem is a train operation prediction system capable of predicting a train operation as accurately as possible by reflecting the current traveling situation. Is to provide.

本発明は、上記技術的課題を解決するため、デジタル情報通信装置及び車上情報処理装置を備えると共に、線路上を運転する1連以上の列車と、地上側で線路に沿った所定箇所に付設される複数のデジタルATC装置と、車上情報処理装置から得られる走行パターンに基づいて列車ダイヤとのずれを算出した結果を示す予想ダイヤを作成可能な列車運行予測装置と、を備えた列車運行予測システムであって、複数のデジタルATC装置は、列車の運転中で接近した最寄りに存在するものからデジタル情報通信装置に対して停止予定位置のデータを送信し、車上情報処理装置は、デジタル情報通信装置で受信された停止予定位置のデータに対応する走行パターンを生成し、列車運行予測装置は、車上情報処理装置から得られた走行パターンの全てのものに基づいて列車別に予想ダイヤを作成することを特徴とする。   In order to solve the above technical problem, the present invention includes a digital information communication device and an on-vehicle information processing device, and is attached to one or more trains operating on the track, and a predetermined location along the track on the ground side. Train operation comprising a plurality of digital ATC devices and a train operation prediction device capable of creating a prediction diagram indicating a result of calculating a deviation from a train diagram based on a traveling pattern obtained from an on-board information processing device In the prediction system, a plurality of digital ATC devices transmit the data of the planned stop position to the digital information communication device from the closest one that is close during the operation of the train. A travel pattern corresponding to the data of the scheduled stop position received by the information communication device is generated, and the train operation prediction device Characterized by creating a predicted diamonds by train on the basis of those.

上記列車運行予測システムの第1の実施態様は、列車運行予測装置は、予想ダイヤが走行パターンについての遅延を検知した場合に当該走行パターンを送信した車上情報処理装置に対して当該走行パターンの再算出を複数回異なる推移時点で繰り返し行わせ、当該車上情報処理装置から順次得られる当該走行パターンを受信して算出した最新の遅延時間に基づいて、当該予想ダイヤをそれぞれ複数回毎に作成することを特徴とする。   In the first embodiment of the train operation prediction system, the train operation prediction device is configured such that when the prediction diagram detects a delay with respect to the travel pattern, the train pattern is transmitted to the on-board information processing device that has transmitted the travel pattern. Repeat the recalculation multiple times at different transition points, and create the expected timetable every multiple times based on the latest delay time calculated by receiving the travel pattern sequentially obtained from the on-board information processing device It is characterized by doing.

上記何れかの列車運行予測システムの第2の実施態様は、列車運行予測装置及び車上情報処理装置は、予想ダイヤを付設される表示装置の表示画面上に表示可能であることを特徴とする。   The second embodiment of any one of the train operation prediction systems described above is characterized in that the train operation prediction device and the on-board information processing device can be displayed on a display screen of a display device provided with a prediction diagram. .

上記何れか1つの列車運行予測システムの第3の実施態様は、列車運行予測装置に接続された列車進路制御装置を備え、列車進路制御装置は、列車運行予測装置から送信された予想ダイヤに応じて列車の進路制御を行うことを特徴とする。   The third embodiment of any one of the train operation prediction systems includes a train route control device connected to the train operation prediction device, and the train route control device responds to the prediction diagram transmitted from the train operation prediction device. Train route control.

上記何れか1つの列車運行予測システムの第4の実施態様は、ATCネットワークを介して複数のデジタルATC装置と列車運行予測装置とに対して接続された中央デジタルATC装置を備え、列車運行予測装置は、予想ダイヤの作成時に走行パターンが遅延を示すときにATCネットワーク及び中央デジタルATC装置を経由して複数のデジタルATC装置における列車の運転中で接近した最寄りに存在するものから当該走行パターンを送信した車上情報処理装置に対して当該走行パターンを再算出する回数を指定して実施させるための指令を送信し、指令がデジタル情報通信装置を介して受信された車上情報処理装置は、当該指令を発令したデジタルATC装置から停止予定位置のデータを順次得て当該停止予定位置までの走行パターンの再算出を指定された回数分行うと共に、当該再算出の結果を示す当該走行パターンを当該デジタルATC装置及び中央デジタルATC装置とATCネットワークとを経由して列車運行予測装置へ順次送信することを特徴とする。   A fourth embodiment of any one of the train operation prediction systems includes a central digital ATC device connected to a plurality of digital ATC devices and a train operation prediction device via an ATC network, and the train operation prediction device. Transmits the travel pattern from the closest one that is close during the operation of the train in the multiple digital ATC devices via the ATC network and the central digital ATC device when the travel pattern shows a delay at the time of creating the forecast diagram The on-board information processing device that transmits the command for specifying and implementing the number of times to recalculate the travel pattern to the on-board information processing device, and the command is received via the digital information communication device, Data on the planned stop position is sequentially obtained from the digital ATC device that issued the command, and the travel pattern to the planned stop position The recalculation is performed for the designated number of times, and the traveling pattern indicating the result of the recalculation is sequentially transmitted to the train operation prediction device via the digital ATC device, the central digital ATC device, and the ATC network. And

上記何れか1つの列車運行予測システムの第5の実施態様は、列車運行予測装置は、車上情報処理装置からの走行パターンを列車別に順次受信する列車走行パターン受信部と、標準走行パターンを格納した標準走行パターンファイル部と、列車ダイヤを格納した列車ダイヤファイル部と、列車走行パターン受信部で受信された走行パターンを列車別に順次標準走行パターンファイル部に格納された標準走行パターンと比較して列車遅延状況を検知する列車遅延検知部と、列車走行パターン受信部で列車別に順次受信された走行パターンと列車遅延検知部で検知された列車遅延状況を示す列車遅延情報とに基づいて、標準走行パターンファイル部に格納された標準走行パターンと列車ダイヤファイル部に格納された列車ダイヤとを参照して当該列車別に予測ダイヤを作成すると共に、当該予想ダイヤの作成時の走行パターンが遅延を示すときに当該走行パターンの再算出を車上情報処理装置に対して指定回数分行わせるための指令を送信し、当該指令の送信後に当該車上情報処理装置から順次得られる当該走行パターンを受信して算出した最新の遅延時間に基づいて、当該予想ダイヤをそれぞれ当該指定回数毎に作成する予測ダイヤ作成部と、作成された予測ダイヤを送信する予測ダイヤ送信部と、を備えたことを特徴とする。   In the fifth embodiment of any one of the above train operation prediction systems, the train operation prediction device stores a train travel pattern receiving unit that sequentially receives a travel pattern from the on-board information processing device for each train, and stores a standard travel pattern Compared to the standard driving pattern stored in the standard driving pattern file part sequentially for each train, the standard driving pattern file part, the train diamond file part storing the train schedule, and the driving pattern received by the train driving pattern receiving part Standard travel based on the train delay detection unit that detects the train delay status, the train pattern received sequentially by the train travel pattern reception unit, and the train delay information that indicates the train delay status detected by the train delay detection unit Refer to the standard travel pattern stored in the pattern file section and the train schedule stored in the train diagram file section. Create a prediction diagram for each vehicle, and send a command to the on-board information processing device to recalculate the travel pattern for the specified number of times when the travel pattern at the time of creation of the prediction diagram indicates a delay. A prediction diagram creation unit that creates the prediction diagram for each specified number of times based on the latest delay time calculated by receiving the travel pattern sequentially obtained from the on-board information processing device after the command is transmitted; And a prediction diamond transmitting unit that transmits the generated prediction diamond.

本発明の列車運行予測システムによれば、実際の列車の走行状況に応じた走行パターンを取得し、各線路区間に対応する各走行パターンを短い周期で予測ダイヤに反映させるため、最新の走行パターンに基づいて作成する予測ダイヤのずれを最小限に抑えることができる。また、走行パターンに遅延を検知した場合にはその走行パターンを送信した車上情報処理装置に対して走行パターンの再算出を複数回異なる推移時点で繰り返し行わせると共に、その車上情報処理装置から順次得られる走行パターンを受信して算出した最新の遅延時間に基づいて、予想ダイヤをそれぞれ複数回毎に作成するため、走行パターンに遅延があるときにも、最新の走行パターンに基づいて精度良く予測ダイヤを作成でき、同様に予測ダイヤのずれを最小限に抑えることができるようになる。この結果、雨天や事故といった突発的な遅延要因が発生し、運転士により急な列車の減速制御が行われたような場合でも、最新の走行パターンから予測ダイヤを精度良く作成することができる。更に、作成した予測ダイヤを指令員や運転士に確認させて運転整理や運転支援を行わせることもできるため、運転士が列車の走行状況に見合った運転を実施し易くなる。   According to the train operation prediction system of the present invention, the latest travel pattern is obtained in order to obtain a travel pattern according to the actual train traveling state and reflect each travel pattern corresponding to each track section in the prediction diagram in a short cycle. It is possible to minimize the deviation of the prediction diagram created based on the above. In addition, when a delay is detected in the travel pattern, the on-board information processing apparatus that has transmitted the travel pattern repeatedly performs the recalculation of the travel pattern at a plurality of different transition times, and from the on-board information processing apparatus. Based on the latest delay time calculated by receiving sequentially obtained travel patterns, each forecast diamond is created multiple times, so even when there is a delay in the travel pattern, it is accurate based on the latest travel pattern A prediction diagram can be created, and similarly, the shift of the prediction diagram can be minimized. As a result, even when a sudden delay factor such as rain or an accident occurs and the driver suddenly controls the deceleration of the train, a prediction diagram can be accurately created from the latest travel pattern. Furthermore, since it is possible to make the commander and the driver confirm the created prediction diagram and perform driving arrangement and driving support, it becomes easier for the driver to carry out driving in accordance with the traveling state of the train.

本発明の実施例1に係る列車運行予測システムの全体構成を示した概略ブロック図である。It is the schematic block diagram which showed the whole structure of the train operation prediction system which concerns on Example 1 of this invention. 図1に示す列車運行予測システムに含まれる車上情報処理装置により生成される走行パターンの変化を説明するために示した図である。It is the figure shown in order to demonstrate the change of the driving | running | working pattern produced | generated by the on-board information processing apparatus contained in the train operation prediction system shown in FIG. 図1に示す列車運行予測システムに含まれる列車運行予測装置の細部構成を示したブロック図である。It is the block diagram which showed the detailed structure of the train operation prediction apparatus contained in the train operation prediction system shown in FIG. 図1に示す列車運行予測システムによる列車運行予測の動作処理を示したフローチャートである。It is the flowchart which showed the operation process of the train operation prediction by the train operation prediction system shown in FIG.

図1は、本発明の実施例1に係る列車運行予測システムの全体構成を示した概略ブロック図である。   FIG. 1 is a schematic block diagram illustrating the overall configuration of the train operation prediction system according to the first embodiment of the present invention.

この列車運行予測システムは、線路上を運転する1連以上の列車2と、地上側で線路に沿った所定箇所に付設される複数のデジタルATC装置5−1〜5−nと、各デジタルATC装置5−1〜5−nに信号線で接続された中央デジタルATC装置6と、ATCネットワーク7を介して中央デジタルATC装置6に対して信号線で接続された列車運行予測装置8と、列車運行予測装置8に対して信号線で接続された列車進路制御装置9と、を備えて構成される。   This train operation prediction system includes one or more trains 2 operating on a track, a plurality of digital ATC devices 5-1 to 5-n attached to predetermined locations along the track on the ground side, and each digital ATC. A central digital ATC device 6 connected to the devices 5-1 to 5-n via signal lines, a train operation prediction device 8 connected to the central digital ATC device 6 via signal lines via the ATC network 7, and a train And a train route control device 9 connected to the operation prediction device 8 by a signal line.

このうち、列車2には車上情報処理装置3とデジタル情報通信装置4とが搭載され、デジタル情報通信装置4が各デジタルATC装置5−1〜5−nとの間で軌道回路1を介して線路上を運転する列車2の運転状態についてのデータを送受信できるようになっている。また、中央デジタルATC装置6及び列車運行予測装置8は、ATCネットワーク7を介して互いに線路上を運転する列車運行状態についてのデータを送受信できるようになっている。   Among these, the on-board information processing device 3 and the digital information communication device 4 are mounted on the train 2, and the digital information communication device 4 communicates with the digital ATC devices 5-1 to 5-n via the track circuit 1. Thus, it is possible to transmit and receive data on the operating state of the train 2 that operates on the track. In addition, the central digital ATC device 6 and the train operation prediction device 8 can transmit and receive data on the train operation state operating on the track via the ATC network 7.

この列車運行予測システムでは、各デジタルATC装置5−1〜5−nにおける列車2の運転中にある接近中の最寄りに存在するものからデジタル情報通信装置4に対してデジタル符号化された停止予定位置のデータを軌道回路1を介して送信する。デジタル情報通信装置4から停止予定位置のデータが伝送された車上情報処理装置3では、停止予定位置のデータに対応する実際に停止するための走行パターンを生成する。車上情報処理装置3で算出される走行パターンは、列車識別番号、列車の停止予定位置、停止予定位置までの列車走行速度を含む構成になっている。   In this train operation prediction system, the digital ATC devices 5-1 to 5-n are scheduled to stop digitally encoded with respect to the digital information communication device 4 from the nearest one that is approaching during the operation of the train 2 The position data is transmitted via the track circuit 1. The on-vehicle information processing device 3 to which the data on the planned stop position is transmitted from the digital information communication device 4 generates a travel pattern for actual stop corresponding to the data on the planned stop position. The travel pattern calculated by the on-vehicle information processing device 3 includes a train identification number, a planned stop position of the train, and a train travel speed up to the planned stop position.

車上情報処理装置3で算出された走行パターンは、軌道回路1を介して各デジタルATC装置5−1〜5−nへ送信される。各デジタルATC装置5−1〜5−nは、車上情報処理装置3から受信した走行パターンの全てを中央デジタルATC装置6へ送信する。中央デジタルATC装置6では、全ての走行パターンをATCネットワーク7を経由して列車運行予測装置8へ送信する。列車運行予測装置8では、車上情報処理装置3から得られた走行パターンの全てのものに基づいて列車ダイヤとのずれを算出し、列車2別に予想ダイヤを作成する。   The traveling pattern calculated by the on-vehicle information processing device 3 is transmitted to the digital ATC devices 5-1 to 5-n via the track circuit 1. Each of the digital ATC devices 5-1 to 5-n transmits all of the travel patterns received from the on-vehicle information processing device 3 to the central digital ATC device 6. The central digital ATC device 6 transmits all travel patterns to the train operation prediction device 8 via the ATC network 7. The train operation prediction device 8 calculates the deviation from the train diagram based on all the travel patterns obtained from the on-board information processing device 3 and creates a prediction diagram for each train 2.

ここで、列車運行予測装置8は、実際の列車2の走行状況に応じた走行パターンを取得し、取得した走行パターンについての遅延を検知した場合にはその走行パターンを送信した車上情報処理装置3に対して走行パターンの再算出を複数回異なる推移時点で繰り返し行わせると共に、その車上情報処理装置3から順次得られる走行パターンを受信して算出される最新の遅延時間に基づいて、予想ダイヤをそれぞれ複数回毎に作成する機能を持っている。   Here, the train operation prediction device 8 acquires a travel pattern according to the actual travel state of the train 2, and when detecting a delay with respect to the acquired travel pattern, the on-vehicle information processing device that transmits the travel pattern. 3, the driving pattern is re-calculated a plurality of times at different transition times, and the prediction is made based on the latest delay time calculated by receiving the driving pattern sequentially obtained from the on-board information processing device 3. It has a function to create a diamond multiple times.

具体的に云えば、列車運行予測装置8は、走行パターンが遅延を示すときにATCネットワーク7及び中央デジタルATC装置6を経由して各デジタルATC装置5−1〜5−nにおける列車2の運転中で接近した最寄りに存在するものからその走行パターンを送信した車上情報処理装置3に対して軌道回路1を介して走行パターンを再算出する回数を指定して実施させるための指令を送信する。これにより、指令がデジタル情報通信装置4を介して受信された車上情報処理装置3は、各デジタルATC装置5−1〜5−nの指令を発令したものから停止予定位置のデータを順次得て、停止予定位置までの走行パターンの再算出を指定された複数回分行い、その再算出の結果を示す走行パターンを軌道回路1を介して各デジタルATC装置5−1〜5−nの指令を発令したもの及び中央デジタルATC装置6とATCネットワーク7とを経由して列車運行予測装置8へ順次送信する。そこで、列車運行予測装置8は、車上情報処理装置3から順次得られる走行パターンを受信して算出した最新の遅延時間に基づいて、予想ダイヤをそれぞれ複数回毎に作成する。   Specifically, the train operation prediction device 8 operates the train 2 in each of the digital ATC devices 5-1 to 5-n via the ATC network 7 and the central digital ATC device 6 when the traveling pattern shows a delay. A command is sent to the on-board information processing device 3 that has transmitted the travel pattern from the nearest nearby one via the track circuit 1 to specify the number of times to recalculate the travel pattern. . As a result, the on-board information processing device 3 that has received the command via the digital information communication device 4 sequentially obtains the data of the planned stop position from the command issued by each of the digital ATC devices 5-1 to 5-n. Then, the re-calculation of the travel pattern up to the planned stop position is performed for the designated number of times, and the travel pattern indicating the result of the re-calculation is transmitted to the commands of the digital ATC devices 5-1 to 5-n via the track circuit 1. It is sequentially transmitted to the train operation prediction device 8 via the issued one and the central digital ATC device 6 and the ATC network 7. Therefore, the train operation prediction device 8 creates a prediction diagram for each of a plurality of times based on the latest delay time calculated by receiving the traveling pattern sequentially obtained from the on-vehicle information processing device 3.

列車運行予測装置8は、その他、付設される表示装置の表示画面等へ予測ダイヤを表示させることで、指令員や運転士に対して列車運行の予測結果を伝えることができる。例えば運転士に対して列車運行の予測結果の予測ダイヤを伝える場合には、ATCネットワーク7を経由して中央デジタルATC装置6から各デジタルATC装置5−1〜5−nへ送信した後、各デジタルATC装置5−1〜5−nの最寄りに存在するものから軌道回路1を介して列車2に搭載されたデジタル情報通信装置4へと送信する。そこで、予測ダイヤを受信したデジタル情報通信装置4に接続される車上情報処理装置3に付設される表示装置の表示画面上に予測ダイヤに表示すれば、運転士が予測ダイヤを確認することができる。因みに、列車運行予測装置8に接続された列車進路制御装置9が存在する線路区間においては、予測ダイヤを受け取った列車進路制御装置9によって、即座に乱れた列車2のダイヤに対応して進路制御を行うことが可能になる。列車進路制御装置9は、運行管理司令室等に配備される。   In addition, the train operation prediction device 8 can transmit a prediction result of the train operation to the commander or the driver by displaying a prediction diagram on a display screen of a display device attached thereto. For example, when transmitting a prediction diagram of the prediction result of train operation to the driver, after transmitting from the central digital ATC device 6 to each digital ATC device 5-1 to 5-n via the ATC network 7, each The digital ATC devices 5-1 to 5-n are transmitted from the nearest one to the digital information communication device 4 mounted on the train 2 via the track circuit 1. Therefore, if the prediction diagram is displayed on the display screen of the display device attached to the on-vehicle information processing device 3 connected to the digital information communication device 4 that has received the prediction diagram, the driver may confirm the prediction diagram. it can. By the way, in the track section where the train route control device 9 connected to the train operation prediction device 8 exists, the route control corresponding to the train 2 train that is immediately disturbed by the train route control device 9 that has received the prediction diagram. It becomes possible to do. The train route control device 9 is deployed in an operation management command room or the like.

即ち、この列車運行予測システムは、全体的な動作として、地上側の各デジタルATC装置5−1〜5−nについての列車2の運転中で接近した最寄りに存在するものから軌道回路1を介して停止予定位置のデータを短い周期でデジタル情報通信装置4を経由して車上情報処理装置3へ送信し、車上情報処理装置3が停止予定位置のデータを受信すると列車2のブレーキ性能や前方の線路勾配等を考慮して停止位置までの停止予定位置のデータに対応する走行パターンを算出生成し、その算出生成した走行パターンを再度軌道回路1を介して各デジタルATC装置5−1〜5−nの停止予定位置のデータを送信したものへ返信する。そこで、各デジタルATC装置5−1〜5−nの走行パターンが送信されたものは、走行パターンを中央デジタルATC装置6へ送信し、中央デジタルATC装置6では各線路区間毎に設置された各デジタルATC装置5−1〜5−nが取得している列車2の走行パターンを全て受信すると、ATCネットワーク7を介して各走行パターンを列車運行予測装置8へ全て送信する。   In other words, this train operation prediction system operates as an overall operation via the track circuit 1 from the nearest one that is approaching during operation of the train 2 for each of the digital ATC devices 5-1 to 5-n on the ground side. When the data on the planned stop position is transmitted to the on-board information processing device 3 via the digital information communication device 4 in a short cycle, and the on-board information processing device 3 receives the data on the planned stop position, A travel pattern corresponding to the data of the planned stop position up to the stop position is calculated in consideration of the forward track gradient and the like, and the calculated travel pattern is again transmitted to each digital ATC device 5-1 through the track circuit 1. A reply is made to the one that has transmitted the data of the 5-n scheduled stop position. Therefore, the traveling pattern of each digital ATC device 5-1 to 5-n is transmitted to the central digital ATC device 6, and the central digital ATC device 6 is installed for each line section. When all the travel patterns of the train 2 acquired by the digital ATC devices 5-1 to 5-n are received, all the travel patterns are transmitted to the train operation prediction device 8 via the ATC network 7.

列車運行予測装置8では、列車2についての停止位置までの全ての走行パターンから列車ダイヤとのずれを算出した予測ダイヤを列車別に作成する。ここで、実際の列車2の走行状況に応じた走行パターンを取得し、取得した走行パターンについての遅延を検知した場合には、該当する列車2が搭載する車上情報処理装置3に対して走行パターンの再算出を複数回異なる推移時点で繰り返し行わせると共に、その車上情報処理装置3から順次得られる走行パターンを受信して算出した最新の遅延時間に基づいて、予想ダイヤをそれぞれ複数回毎に作成する。このため、走行パターンに遅延があるときにも各線路区間に対応する各走行パターンを短い周期で予測ダイヤに反映させることができるようになり、最新の走行パターンに基づいて作成する予測ダイヤのずれを最小限に抑えることができる。   The train operation prediction device 8 creates, for each train, a prediction diagram that calculates a deviation from the train diagram from all travel patterns up to the stop position for the train 2. Here, when a travel pattern corresponding to the actual travel state of the train 2 is acquired and a delay is detected with respect to the acquired travel pattern, the vehicle travels with respect to the on-board information processing device 3 mounted on the corresponding train 2. The pattern recalculation is repeated a plurality of times at different transition times, and the expected diamonds are set each time a plurality of times based on the latest delay time calculated by receiving the traveling pattern sequentially obtained from the on-board information processing device 3. To create. For this reason, even when there is a delay in the travel pattern, each travel pattern corresponding to each track section can be reflected in the prediction diagram in a short cycle, and the deviation of the prediction diagram created based on the latest travel pattern Can be minimized.

この結果、雨天や事故といった突発的な遅延要因が発生し、運転士により急な列車の減速制御が行われたような場合でも、最新の走行パターンから予測ダイヤを精度良く作成することができる。また、例えば作成した予測ダイヤを列車運行予測装置8や車上情報処理装置3に付設される表示装置の表示画面上に表示させれば、指令員や運転士に確認させて運転整理や運転支援を行わせることもできるため、運転士が列車の走行状況に見合った運転を実施し易くなる。   As a result, even when a sudden delay factor such as rain or an accident occurs and the driver suddenly controls the deceleration of the train, a prediction diagram can be accurately created from the latest travel pattern. Further, for example, if the created prediction diagram is displayed on the display screen of a display device attached to the train operation prediction device 8 or the on-board information processing device 3, the commander or driver confirms the operation arrangement and driving support. Therefore, it becomes easy for the driver to carry out driving in accordance with the traveling state of the train.

図2は、この列車運行予測システムに含まれる車上情報処理装置3により生成される走行パターンの変化を説明するために示した図である。   FIG. 2 is a diagram shown for explaining a change in a running pattern generated by the on-board information processing device 3 included in the train operation prediction system.

図2中では、地点Aから地点Bへ列車2の名称の一例を示すAレ14が運転する際、運転状況に応じて走行パターンが変化する流れを示している。通常運行時には、列車ダイヤ作成時に用いた標準走行パターン10に従って列車2は運転する。   In FIG. 2, when A train 14 which shows an example of the name of the train 2 from the point A to the point B drives, the flow from which a driving | running | working pattern changes according to a driving | running condition is shown. During normal operation, the train 2 operates according to the standard travel pattern 10 used when creating the train schedule.

ところが、雨天や突風、若しくは事故の発生等により運転士の判断で列車2の速度が予定運行速度よりも減速されることがある。   However, the speed of the train 2 may be decelerated from the scheduled operation speed at the discretion of the driver due to rain, gusts, or an accident.

図2中に示す具体例では、Aレ14のx1の時点で算出された走行パターン11は、列車ダイヤ作成時に用いた標準走行パターン10よりも速度が遅くなって遅延が発生しており、こうした遅延を示す走行パターン11が列車運行予測装置8により検知された場合には、列車運行予測装置8がATCネットワーク7及び中央デジタルATC装置6を経由して各デジタルATC装置5−1〜5−nにおける列車2の運行中で接近した最寄りに存在するものから軌道回路1を介して走行パターン11を送信した車上情報処理装置3に対して走行パターンを再算出する回数を指定して指令を送信する。この指令がデジタル情報通信装置4を介して受信された車上情報処理装置3では、各デジタルATC装置5−1〜5−nの指令を送信したものから軌道回路1を介して停止予定位置のデータを順次得て、停止予定位置までの走行パターンの再算出を指定された回数分行う。   In the specific example shown in FIG. 2, the travel pattern 11 calculated at the time point x1 of the A train 14 is slower than the standard travel pattern 10 used at the time of creating the train schedule, and a delay occurs. When the traveling pattern 11 indicating the delay is detected by the train operation prediction device 8, the train operation prediction device 8 passes through the ATC network 7 and the central digital ATC device 6 to each digital ATC device 5-1 to 5 -n. A command is sent by specifying the number of times to recalculate the travel pattern to the on-board information processing device 3 that has transmitted the travel pattern 11 via the track circuit 1 from the closest thing that is present during the operation of the train 2 To do. In the on-board information processing device 3 that has received this command via the digital information communication device 4, the stop position of the planned stop position is determined via the track circuit 1 from the command transmitted from each of the digital ATC devices 5-1 to 5-n. Data is obtained sequentially, and recalculation of the running pattern up to the planned stop position is performed for the designated number of times.

これにより、列車ダイヤ作成時に用いた標準走行パターン10に対し、x1の時点で算出されたAレの走行パターン11、x2の時点で算出されたAレの走行パターン12、x3の時点で算出されたAレの走行パターン13という具合に現在のAレの運転(走行)状況に応じた停止位置までの走行パターンが算出され、各走行パターン毎にAレがB地点にまで要する時間B0に対して遅延された時間B1、B2、B3が算出される。x1の時点で算出されたAレの走行パターン11からx2の時点で算出されたAレの走行パターン12への推移と、x2の時点で算出されたAレの走行パターン12からx3の時点で算出されたAレの走行パターン13への推移とは、Aレの走行実績15を示すものとなる。尚、先行する列車2の進行状況等、他の要因によりAレ14の停止位置がより前方に変更される場合には、新たな停止位置までの走行パターンが算出される。   Thus, with respect to the standard travel pattern 10 used at the time of train schedule creation, the A travel pattern 11 calculated at the time x1, the A travel pattern 12, calculated at the time x2, and the time 3 are calculated. The travel pattern up to the stop position corresponding to the current A train driving (running) situation is calculated, such as the travel pattern 13 of the train A, and for the time B0 that the train A takes to the point B for each travel pattern Delayed times B1, B2, and B3 are calculated. The transition from the A travel pattern 11 calculated at the time x1 to the A travel pattern 12 calculated at the time x2, and the time from the A travel pattern 12 calculated at the time x2 to the time x3. The calculated transition to A travel pattern 13 indicates a travel result 15 of A train. In addition, when the stop position of A14 is changed ahead by other factors, such as the progress state of the preceding train 2, the travel pattern to a new stop position is calculated.

ここでは、Aレ14についての現在位置から停止位置までの走行パターンを算出するため、Aレ14の現在の速度だけでなく、停止位置までの走行速度の変化が判る。走行パターンは短い周期で算出し続けるため、列車2の遅延時間を従来よりも正確に算出することができる。   Here, in order to calculate the travel pattern from the current position to the stop position for the A 14, not only the current speed of the A 14, but also a change in the travel speed to the stop position can be known. Since the travel pattern continues to be calculated with a short cycle, the delay time of the train 2 can be calculated more accurately than in the past.

因みに、上述した非特許文献1の技術で説明されているように、車上情報処理装置3がデジタル情報通信装置4を介して一定間隔で設置されたトランスポンダ地上子からの位置情報を列車2上側で受信し、車軸の速度発電機のパルスカウントから移動量を計算するため、軌道回路1の単位でない列車2の現在位置を認識することもできる。   Incidentally, as described in the technology of Non-Patent Document 1 described above, the on-board information processing device 3 receives the position information from the transponder ground unit installed at regular intervals via the digital information communication device 4 on the upper side of the train 2. Therefore, the current position of the train 2 that is not a unit of the track circuit 1 can be recognized because the movement amount is calculated from the pulse count of the speed generator of the axle.

何れにしても、各デジタルATC装置5−1〜5−nは、列車2の運行状態が遅延されている場合でも、車上情報処理装置3により精度良く形成された走行パターンを中央デジタルATC装置6とATCネットワーク7とを経由して列車運行予測装置8へ送信するため、列車運行予測装置8が予測ダイヤを精度高く作成することができる。   In any case, each of the digital ATC devices 5-1 to 5-n can display the traveling pattern accurately formed by the on-board information processing device 3 even if the operation state of the train 2 is delayed. 6 and the ATC network 7 are transmitted to the train operation prediction device 8, the train operation prediction device 8 can create a prediction diagram with high accuracy.

図3は、この列車運行予測システムに含まれる列車運行予測装置8の細部構成を示したブロック図である。   FIG. 3 is a block diagram showing a detailed configuration of the train operation prediction device 8 included in the train operation prediction system.

列車運行予測装置8は、車上情報処理装置3からの走行パターンを各デジタルATC装置5−1〜5−nに接続された中央デジタルATC装置6を通してATCネットワーク7を経由して列車別に順次受信する列車走行パターン受信部16と、標準走行パターンを格納した標準走行パターンファイル部18と、列車ダイヤを格納した列車ダイヤファイル部19と、列車走行パターン受信部16で受信された走行パターンを列車別に順次標準走行パターンファイル部18に格納された標準走行パターンと比較して列車遅延状況を検知する列車遅延検知部17と、列車走行パターン受信部16で列車別に順次受信された走行パターンと列車遅延検知部17で検知された列車遅延状況を示す列車遅延情報とに基づいて、標準走行パターンファイル部18に格納された標準走行パターンと列車ダイヤファイル部19に格納された列車ダイヤとを参照して列車別に予測ダイヤを算出して作成すると共に、予想ダイヤの作成時の走行パターンが遅延を示すときに走行パターンの再算出を指定回数分行わせるための指令をATCネットワーク7を経由して車上情報処理装置3に対して送信し、指令の送信後にその車上情報処理装置3から順次得られる走行パターンを受信して算出した最新の遅延時間に基づいて、予想ダイヤをそれぞれ指定回数毎に作成する予測ダイヤ作成部29と、作成された予測ダイヤを列車進路制御装置9やATCネットワーク7へ送信する予測ダイヤ送信部21と、を備えて構成される。   The train operation prediction device 8 sequentially receives the traveling pattern from the on-board information processing device 3 for each train via the ATC network 7 through the central digital ATC device 6 connected to each digital ATC device 5-1 to 5-n. The train traveling pattern receiving unit 16, the standard traveling pattern file unit 18 storing the standard traveling pattern, the train diagram file unit 19 storing the train diagram, and the traveling pattern received by the train traveling pattern receiving unit 16 for each train. A train delay detection unit 17 that detects a train delay state in comparison with the standard travel pattern stored in the standard travel pattern file unit 18 sequentially, and a travel pattern and train delay detection that are sequentially received by the train in the train travel pattern reception unit 16. Based on the train delay information indicating the train delay state detected by the unit 17, the standard traveling pattern file unit When the predicted schedule is calculated and created for each train with reference to the standard travel pattern stored in FIG. 8 and the train schedule stored in the train diagram file unit 19, and the travel pattern at the time of creating the predicted diagram indicates a delay Is transmitted to the on-board information processing device 3 via the ATC network 7 and is sequentially obtained from the on-board information processing device 3 after the transmission of the command. Based on the latest delay time calculated by receiving the travel pattern, a prediction diagram creation unit 29 that creates a prediction diagram for each specified number of times, and transmits the created prediction diagram to the train route control device 9 and the ATC network 7 And a prediction diamond transmission unit 21 configured to be configured.

尚、列車進路制御装置9は、上述した通りに列車運行予測装置8の予測ダイヤ送信部21から送信された予想ダイヤに応じて、信号制御や転轍機制御を行って列車2の進路制御を自動的に行うことができるものである。   The train route control device 9 automatically performs the route control of the train 2 by performing signal control and switch control in accordance with the prediction diagram transmitted from the prediction diagram transmission unit 21 of the train operation prediction device 8 as described above. Is something that can be done.

図4は、この列車運行予測システムによる列車運行予測の動作処理を示したフローチャートである。   FIG. 4 is a flowchart showing an operation process of train operation prediction by the train operation prediction system.

列車運行予測の動作処理では、各デジタルATC装置5−1〜5−nにおける列車2の運転中で接近した最寄りに存在するものから停止予定位置のデータを軌道回路1を介して列車2へ送信しており、列車2に搭載された車上情報処理装置3ではデジタル情報処理装置4を介して受信した停止予定位置のデータに対応する停止予定位置までの走行パターンを算出する(ステップS1)。   In the operation processing of the train operation prediction, the data of the planned stop position is transmitted to the train 2 via the track circuit 1 from the nearest existing one in the operation of the train 2 in each digital ATC device 5-1 to 5-n. The on-vehicle information processing device 3 mounted on the train 2 calculates a travel pattern to the planned stop position corresponding to the planned stop position data received via the digital information processing device 4 (step S1).

ここでの算出された全ての走行パターンは、各デジタルATC装置5−1〜5−nから中央デジタルATC装置6とATCネットワーク7とを経由して列車運行予測装置8へ送信されるため、列車運行予測装置8の列車走行パターン受信部16が列車の全てについての走行パターンを順次受信する(ステップS2)。   Since all the travel patterns calculated here are transmitted from the digital ATC devices 5-1 to 5-n to the train operation prediction device 8 via the central digital ATC device 6 and the ATC network 7, the train The train travel pattern receiving unit 16 of the operation prediction device 8 sequentially receives travel patterns for all trains (step S2).

更に、列車運行予測装置8では、列車遅延検知部17が列車走行パターン受信部16で列車別に順次受信された現行の列車走行パターンを受信すると、標準走行パターンファイル部18に格納された標準走行パターンと比較照合することにより、列車に遅延が発生しているか否かを判定(ステップS3)する。尚、ここでは、列車遅延検知部17が現行の列車走行パターンから列車2の現在位置vと現在時刻tとを取得すると共に、標準走行パターンファイル部18に格納された標準走行パターンの時刻tにおける列車2の標準位置wと列車2の現在位置vとを比較し、現在位置vの方が標準位置wより手前の位置である場合、遅延が発生したと判断するものである。因みに、列車走行パターンは短い周期で受信されるが、列車運行予測装置8の計算機能のスペック(規格仕様)により受信周期を或る程度調整することが可能である。   Furthermore, in the train operation prediction device 8, when the train delay detection unit 17 receives the current train travel pattern sequentially received by the train travel pattern reception unit 16, the standard travel pattern stored in the standard travel pattern file unit 18. It is determined whether or not there is a delay in the train (step S3). Here, the train delay detection unit 17 obtains the current position v and the current time t of the train 2 from the current train travel pattern, and at the time t of the standard travel pattern stored in the standard travel pattern file unit 18. The standard position w of the train 2 and the current position v of the train 2 are compared. If the current position v is a position before the standard position w, it is determined that a delay has occurred. Incidentally, although the train traveling pattern is received in a short cycle, the reception cycle can be adjusted to some extent by the specification (standard specification) of the calculation function of the train operation prediction device 8.

この判定の結果、列車に遅延が発生していなければ、標準走行パターンに従って走行している状態にあるとみなして動作開始時にリターンし、車上情報処理装置3で算出された列車走行パターンを順次受信して遅延の有無をチェックする動作を繰り返すが、列車に遅延が発生していれば、予測ダイヤ作成部20が現行の列車走行パターンに従って、列車が現在位置vから標準位置wへ進行した場合に要する時間を算出し、遅延時間として記憶する。これにより、列車走行パターンから停止予定位置と停止予定位置到着時刻を算出し、遅延時間として記憶する(ステップS4)処理が行われる。このとき、予測ダイヤ作成部20は、その遅延時間に基づいて予想ダイヤを作成する。   As a result of this determination, if there is no delay in the train, it is assumed that the vehicle is traveling in accordance with the standard traveling pattern, the operation returns to the start of operation, and the train traveling pattern calculated by the onboard information processing device 3 is sequentially applied. The operation of receiving and repeating the check for delay is repeated. If the train has a delay, the prediction diagram creation unit 20 follows the current train travel pattern and the train proceeds from the current position v to the standard position w. Is calculated and stored as a delay time. Thereby, the planned stop position and the planned stop position arrival time are calculated from the train travel pattern and stored as a delay time (step S4). At this time, the prediction diagram creation unit 20 creates a prediction diagram based on the delay time.

この後、予測ダイヤ作成部20は、前処理(ステップS4)を繰り返し、より未来の予測を行うため、列車2がより最新の列車走行パターンに従って標準位置wへ到着し、標準位置wの次の停止予定位置xへ向かって走行すると仮定し、上記した場合と同様の手順で列車2の遅延時間の算出を再起的に繰り返し、列車2の駅出発予定時刻、駅到着予定時刻を算出して行き、予測ダイヤを作成する(ステップS5)。予測ダイヤの作成時に走行パターンに遅れがあって列車2の遅延時間の算出を再起的に繰り返すとき、予測ダイヤ作成部20は、その走行パターンを送信した車上情報処理装置3に対して走行パターンの再算出させるための指令を出力する。   Thereafter, the prediction diagram creation unit 20 repeats the preprocessing (step S4) to perform further prediction, so that the train 2 arrives at the standard position w according to the latest train traveling pattern, and the next to the standard position w. Assuming that the vehicle travels to the planned stop position x, the calculation of the delay time of train 2 is repeated recursively in the same manner as described above, and the estimated departure time and estimated arrival time of train 2 are calculated. A prediction diagram is created (step S5). When the calculation of the delay time of the train 2 is repeated recursively due to a delay in the travel pattern at the time of creation of the prediction diagram, the prediction diagram creation unit 20 sends the travel pattern to the on-vehicle information processing device 3 that has transmitted the travel pattern. Outputs a command to recalculate

この場合の指定回数分の走行パターンの再算出の指令を受信した車上情報処理装置3が再算出の結果の走行パターンを列車運行予測装置8へ順次送信し、列車運行予測装置8がそれらの走行パターンに基づいて算出した遅延時間に応じて、予測ダイヤを指定回数分作成するための動作は上述した通りに行われる。   In this case, the on-board information processing device 3 that has received the recalculation command for the designated number of times of traveling pattern sequentially transmits the traveling pattern as a result of the recalculation to the train operation prediction device 8, and the train operation prediction device 8 In accordance with the delay time calculated based on the running pattern, the operation for creating the predicted diamond for the designated number of times is performed as described above.

その他、予測ダイヤ作成部20では、列車2の駅出発予定時刻を求める際、各駅毎に予め定義された列車2を停車させなければならない最短時間である最小停車時分を加算する。ここで、列車2の駅出発予定時刻は列車ダイヤで定められている出発時刻よりも早くならず、しかも先行列車との間で確保しなければならない出発時隔が確保されるように決定する必要がある。   In addition, when obtaining the scheduled departure time of the train 2 for the train 2, the prediction diagram creation unit 20 adds the minimum stop time, which is the shortest time for which the train 2 defined in advance for each station must be stopped. Here, it is necessary to determine that the scheduled departure time of the train 2 is not earlier than the departure time determined by the train schedule, and that a departure time interval that must be secured with the preceding train is secured. There is.

列車2の駅到着予定時刻については、出発予定時刻に列車2が出発するとみなし、上述した標準位置wから次の停止予定位置xへ移動する場合と同様な手順として、次駅に到着するまでに要する時間を算出し、出発予定時刻にその所要時間を加算することにより求める。ここで、次の駅到着予定時刻は、先行列車との間で確保しなければならない出発時隔が確保されるように決定する必要がある。   As for the scheduled arrival time of the train 2, it is assumed that the train 2 departs at the scheduled departure time, and as a procedure similar to the case of moving from the standard position w to the next scheduled stop position x, The time required is calculated and added to the scheduled departure time. Here, it is necessary to determine the scheduled arrival time for the next station so that a departure time interval that must be secured with respect to the preceding train is secured.

更に、予測ダイヤ送信部21は、予測ダイヤ作成部20が作成した予測ダイヤを列車進路制御装置9へ送信する。これにより、列車進路制御装置9が自動的に運転整理を行うことができる。   Further, the prediction diagram transmission unit 21 transmits the prediction diagram created by the prediction diagram creation unit 20 to the train route control device 9. As a result, the train route control device 9 can automatically organize the operation.

尚、上述した実施例1の列車運行予測システムでは、各デジタルATC装置5−1〜5−nを接続した中央デジタルATC装置6と列車進路制御装置9に接続された列車運行予測装置8とをATCネットワーク7を介して互いに接続することで双方向通信可能な構成とすると共に、列車運行予測装置8が作成した予測ダイヤを列車進路制御装置9へ送信し、列車進路制御運置9により自動運転整理が行われる機能、並びに予測ダイヤを列車運行予測装置8に付設される表示装置の表示画面上に表示したり、或いはATCネットワーク7経由で車上情報処理装置3に付設される表示装置の表示画面上に表示することにより指令員や運転士の運行支援が可能な機能が構築される構成として説明したが、列車運行予測装置8で作成された予測ダイヤを列車無線を利用して車上情報処理装置3へ無線送信しても同様な効果が得られるため、列車運行予測装置8の基本機能を活用したシステム構成は図1に開示したものに限定されない。   In the train operation prediction system of the first embodiment described above, the central digital ATC device 6 connected to each digital ATC device 5-1 to 5-n and the train operation prediction device 8 connected to the train route control device 9 are provided. By connecting to each other via the ATC network 7, the two-way communication is possible, and the prediction schedule created by the train operation prediction device 8 is transmitted to the train route control device 9, and is automatically operated by the train route control device 9. The function of organizing and the prediction diagram are displayed on the display screen of the display device attached to the train operation prediction device 8 or the display device attached to the on-vehicle information processing device 3 via the ATC network 7 Although the explanation has been made as a configuration in which a function capable of supporting the operation of the commander and the driver is constructed by displaying on the screen, the prediction diagram created by the train operation prediction device 8 Since similar effects wireless transmission to the on-board information processing apparatus 3 by using the train radio to obtain a system configuration that utilizes the basic functions of train operation prediction unit 8 is not limited to those disclosed in FIG.

1 軌道回路
2 列車
3 車上情報処理装置
4 デジタル情報通信装置
5−1〜5−n デジタルATC装置
6 中央デジタルATC装置
7 ATCネットワーク
8 列車運行予測装置
9 列車進路制御装置
10 列車ダイヤ作成時に用いた標準走行パターン
11 x1の時点で算出されたAレの走行パターン
12 x2の時点で算出されたAレの走行パターン
13 x3の時点で算出されたAレの走行パターン
14 Aレ
15 Aレの走行実績
16 列車走行パターン受信機能
17 列車遅延検知機能
18 標準走行パターン
19 列車ダイヤ
20 予測ダイヤ作成機能
21 予測ダイヤ送信機能
DESCRIPTION OF SYMBOLS 1 Track circuit 2 Train 3 On-board information processing apparatus 4 Digital information communication apparatus 5-1-5-n Digital ATC apparatus 6 Central digital ATC apparatus 7 ATC network 8 Train operation prediction apparatus 9 Train route control apparatus 10 Used at the time of train schedule creation Standard travel pattern 11 A1 travel pattern calculated at time point x1 12 A2 travel pattern calculated at time point x2 13 A3 travel pattern calculated at time point 13 x3 Travel record 16 Train travel pattern reception function 17 Train delay detection function 18 Standard travel pattern 19 Train diagram 20 Predictive diagram creation function 21 Predictive diagram transmission function

Claims (6)

デジタル情報通信装置及び車上情報処理装置を備えると共に、線路上を運転する1連以上の列車と、地上側で前記線路に沿った所定箇所に付設される複数のデジタル自動列車制御装置と、前記車上情報処理装置から得られる走行パターンに基づいて列車ダイヤとのずれを算出した結果を示す予想ダイヤを作成可能な列車運行予測装置と、を備えた列車運行予測システムであって、
前記複数のデジタル自動列車制御装置は、前記列車の運転中で接近した最寄りに存在するものから前記デジタル情報通信装置に対して停止予定位置のデータを送信し、
前記車上情報処理装置は、前記デジタル情報通信装置で受信された前記停止予定位置のデータに対応する前記走行パターンを生成し、
前記列車運行予測装置は、前記車上情報処理装置から得られた前記走行パターンの全部のものに基づいて前記列車別に前記予想ダイヤを作成することを特徴とする列車運行予測システム。
A digital information communication device and an on-vehicle information processing device, and one or more trains operating on the track, a plurality of digital automatic train control devices attached to a predetermined location along the track on the ground side, A train operation prediction system comprising a train operation prediction device capable of creating a prediction diagram indicating a result of calculating a deviation from a train diagram based on a travel pattern obtained from an on-vehicle information processing device,
The plurality of digital automatic train control devices transmit the data of the planned stop position to the digital information communication device from the nearest existing in the operation of the train,
The on-vehicle information processing device generates the travel pattern corresponding to the planned stop position data received by the digital information communication device,
The train operation prediction system creates the prediction diagram for each train based on all of the travel patterns obtained from the on-board information processing device.
請求項1記載の列車運行予測システムにおいて、前記列車運行予測装置は、前記予想ダイヤの作成時に前記走行パターンについての遅延を検知した場合に当該走行パターンを送信した前記車上情報処理装置に対して当該走行パターンの再算出を複数回異なる推移時点で繰り返し行わせ、当該車上情報処理装置から順次得られる当該走行パターンを受信して算出した最新の遅延時間に基づいて、当該予想ダイヤをそれぞれ複数回毎に作成することを特徴とする列車運行予測システム。   2. The train operation prediction system according to claim 1, wherein the train operation prediction device is configured to transmit the travel pattern to the on-board information processing device when a delay is detected in the travel pattern when the prediction diagram is created. Repeat the calculation of the travel pattern multiple times at different transition points, and receive multiple prediction diagrams based on the latest delay time calculated by receiving the travel pattern sequentially obtained from the on-board information processing device. A train operation prediction system that is created every time. 請求項1又は2記載の列車運行予測システムにおいて、前記列車運行予測装置及び前記車上情報処理装置は、前記予想ダイヤを付設される表示装置の表示画面上に表示可能であることを特徴とする列車運行予測システム。   The train operation prediction system according to claim 1 or 2, wherein the train operation prediction device and the on-board information processing device can be displayed on a display screen of a display device to which the prediction diagram is attached. Train operation prediction system. 請求項1〜3の何れか1項記載の列車運行予測システムにおいて、前記列車運行予測装置に接続された列車進路制御装置を備え、前記列車進路制御装置は、前記列車運行予測装置から送信された前記予想ダイヤに応じて前記列車の進路制御を行うことを特徴とする列車運行予測システム。   The train operation prediction system according to any one of claims 1 to 3, further comprising a train route control device connected to the train operation prediction device, wherein the train route control device is transmitted from the train operation prediction device. A train operation prediction system that performs route control of the train according to the prediction diagram. 請求項1〜4の何れか1項記載の列車運行予測システムにおいて、自動列車制御ネットワークを介して前記複数のデジタル自動列車制御装置と前記列車運行予測装置とに対して接続された中央デジタル自動列車制御装置を備え、
前記列車運行予測装置は、前記予想ダイヤの作成時に前記走行パターンが遅延を示すときに前記自動列車制御ネットワーク及び前記中央デジタル自動列車制御装置を経由して前記複数のデジタル自動列車制御装置における前記列車の運転中で接近した最寄りに存在するものから当該走行パターンを送信した前記車上情報処理装置に対して当該走行パターンを再算出する回数を指定して実施させるための指令を送信し、
前記指令が前記デジタル情報通信装置を介して受信された前記車上情報処理装置は、当該指令を発令した前記デジタル自動列車制御装置から前記停止予定位置のデータを順次得て当該停止予定位置までの前記走行パターンの再算出を前記指定された回数分行うと共に、当該再算出の結果を示す当該走行パターンを当該デジタル自動列車制御装置及び前記中央デジタル自動列車制御装置と前記自動列車制御ネットワークとを経由して前記列車運行予測装置へ順次送信することを特徴とする列車運行予測システム。
The train operation prediction system according to any one of claims 1 to 4, wherein the central digital automatic train is connected to the plurality of digital automatic train control devices and the train operation prediction device via an automatic train control network. Equipped with a control device,
The train operation prediction device is configured such that the train in the plurality of digital automatic train control devices passes through the automatic train control network and the central digital automatic train control device when the travel pattern indicates a delay when the prediction diagram is created. Sending a command to specify and implement the number of times to recalculate the travel pattern to the on-board information processing device that has transmitted the travel pattern from what is close to during driving
The on-board information processing device that has received the command via the digital information communication device sequentially obtains the data of the planned stop position from the digital automatic train control device that has issued the command to the planned stop position. The travel pattern is recalculated for the designated number of times, and the travel pattern indicating the result of the recalculation is transmitted via the digital automatic train control device, the central digital automatic train control device, and the automatic train control network. And the train operation prediction system characterized by transmitting sequentially to the said train operation prediction apparatus.
請求項1〜5の何れか1項記載の列車運行予測システムにおいて、前記列車運行予測装置は、前記車上情報処理装置からの前記走行パターンを前記列車別に順次受信する列車走行パターン受信部と、標準走行パターンを格納した標準走行パターンファイル部と、前記列車ダイヤを格納した列車ダイヤファイル部と、前記列車走行パターン受信部で受信された前記走行パターンを前記列車別に順次前記標準走行パターンファイル部に格納された前記標準走行パターンと比較して列車遅延状況を検知する列車遅延検知部と、前記列車走行パターン受信部で前記列車別に順次受信された前記走行パターンと前記列車遅延検知部で検知された前記列車遅延状況を示す列車遅延情報とに基づいて、前記標準走行パターンファイル部に格納された前記標準走行パターンと前記列車ダイヤファイル部に格納された前記列車ダイヤとを参照して当該列車別に前記予測ダイヤを作成すると共に、当該予想ダイヤの作成時の走行パターンが遅延を示すときに当該走行パターンの再算出を前記車上情報処理装置に対して指定回数分行わせるための指令を送信し、当該指令の送信後に当該車上情報処理装置から順次得られる当該走行パターンを受信して算出した最新の遅延時間に基づいて、当該予想ダイヤをそれぞれ当該指定回数毎に作成する予測ダイヤ作成部と、作成された前記予測ダイヤを送信する予測ダイヤ送信部と、を備えたことを特徴とする列車運行予測システム。   The train operation prediction system according to any one of claims 1 to 5, wherein the train operation prediction device sequentially receives the travel pattern from the on-board information processing device for each train, and A standard travel pattern file section storing a standard travel pattern, a train diagram file section storing the train schedule, and the travel pattern received by the train travel pattern receiving section are sequentially stored in the standard travel pattern file section for each train. A train delay detection unit that detects a train delay state compared to the stored standard travel pattern, and the train travel pattern reception unit that is sequentially received by the train and the travel pattern and the train delay detection unit that are detected. Based on the train delay information indicating the train delay status, the standard stored in the standard travel pattern file portion While creating the prediction diagram for each train with reference to a row pattern and the train diagram stored in the train diagram file part, when the travel pattern at the time of creation of the prediction diagram shows a delay, A command for causing the on-board information processing device to perform recalculation for the specified number of times is transmitted, and the latest driving pattern calculated by receiving the traveling pattern sequentially obtained from the on-board information processing device after the transmission of the command is calculated. A train operation prediction comprising: a prediction diagram creation unit that creates each of the prediction diagrams for each specified number of times based on a delay time; and a prediction diagram transmission unit that transmits the created prediction diagrams. system.
JP2010033833A 2010-02-18 2010-02-18 Train operation prediction system Pending JP2011168172A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010033833A JP2011168172A (en) 2010-02-18 2010-02-18 Train operation prediction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010033833A JP2011168172A (en) 2010-02-18 2010-02-18 Train operation prediction system

Publications (2)

Publication Number Publication Date
JP2011168172A true JP2011168172A (en) 2011-09-01
JP2011168172A5 JP2011168172A5 (en) 2013-02-07

Family

ID=44682733

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010033833A Pending JP2011168172A (en) 2010-02-18 2010-02-18 Train operation prediction system

Country Status (1)

Country Link
JP (1) JP2011168172A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011235681A (en) * 2010-05-07 2011-11-24 Hitachi Ltd On-board schedule arrangement system
JP2014069621A (en) * 2012-09-28 2014-04-21 Hitachi Ltd Power supply and demand system
KR20160080056A (en) * 2014-12-29 2016-07-07 주식회사 엘지씨엔에스 Managing method for service schedule of fleet
JP2020142745A (en) * 2019-03-08 2020-09-10 株式会社日立製作所 Train operation control device and method for the same
CN112800565A (en) * 2021-01-12 2021-05-14 北京交通大学 Method for predicting delay spread of high-speed railway network train
CN114735052A (en) * 2022-04-08 2022-07-12 交控科技股份有限公司 Train control method and system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05193502A (en) * 1991-10-25 1993-08-03 Toshiba Corp Optimum traveling pattern calculating device and system
JPH09193804A (en) * 1996-01-23 1997-07-29 Nippon Signal Co Ltd:The Train control system
JP2002225710A (en) * 2001-02-02 2002-08-14 Hitachi Ltd Control information transmitting system and automatic train control device
JP2004229359A (en) * 2003-01-20 2004-08-12 Mitsubishi Electric Corp Method and apparatus for controlling train traveling
JP2008290645A (en) * 2007-05-28 2008-12-04 Mitsubishi Electric Corp Train operation managing system
JP2010018090A (en) * 2008-07-09 2010-01-28 Hitachi Ltd Train control system
JP2010036722A (en) * 2008-08-05 2010-02-18 Mitsubishi Electric Corp Operation prediction information providing system, ground information processing device, and in-vehicle information processing device
JP2011031697A (en) * 2009-07-31 2011-02-17 Hitachi Ltd Operation management method, operation management apparatus, traveling control apparatus

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05193502A (en) * 1991-10-25 1993-08-03 Toshiba Corp Optimum traveling pattern calculating device and system
JPH09193804A (en) * 1996-01-23 1997-07-29 Nippon Signal Co Ltd:The Train control system
JP2002225710A (en) * 2001-02-02 2002-08-14 Hitachi Ltd Control information transmitting system and automatic train control device
JP2004229359A (en) * 2003-01-20 2004-08-12 Mitsubishi Electric Corp Method and apparatus for controlling train traveling
JP2008290645A (en) * 2007-05-28 2008-12-04 Mitsubishi Electric Corp Train operation managing system
JP2010018090A (en) * 2008-07-09 2010-01-28 Hitachi Ltd Train control system
JP2010036722A (en) * 2008-08-05 2010-02-18 Mitsubishi Electric Corp Operation prediction information providing system, ground information processing device, and in-vehicle information processing device
JP2011031697A (en) * 2009-07-31 2011-02-17 Hitachi Ltd Operation management method, operation management apparatus, traveling control apparatus

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011235681A (en) * 2010-05-07 2011-11-24 Hitachi Ltd On-board schedule arrangement system
JP2014069621A (en) * 2012-09-28 2014-04-21 Hitachi Ltd Power supply and demand system
KR20160080056A (en) * 2014-12-29 2016-07-07 주식회사 엘지씨엔에스 Managing method for service schedule of fleet
KR101696548B1 (en) 2014-12-29 2017-01-23 주식회사 엘지씨엔에스 Managing method for service schedule of fleet
JP2020142745A (en) * 2019-03-08 2020-09-10 株式会社日立製作所 Train operation control device and method for the same
JP7232673B2 (en) 2019-03-08 2023-03-03 株式会社日立製作所 TRAIN OPERATION CONTROL DEVICE AND TRAIN OPERATION CONTROL METHOD
CN112800565A (en) * 2021-01-12 2021-05-14 北京交通大学 Method for predicting delay spread of high-speed railway network train
CN112800565B (en) * 2021-01-12 2023-12-26 北京交通大学 Prediction method for delay propagation of high-speed railway network train
CN114735052A (en) * 2022-04-08 2022-07-12 交控科技股份有限公司 Train control method and system

Similar Documents

Publication Publication Date Title
CN109664923B (en) Urban rail transit train control system based on vehicle-vehicle communication
US9754493B2 (en) Vehicular traffic guidance and coordination system and method
US8818584B2 (en) System and method for modifying schedules of vehicles
US8224510B2 (en) System and method to provide communication-based train control system capabilities
JP2011168172A (en) Train operation prediction system
KR101696548B1 (en) Managing method for service schedule of fleet
US20110051663A1 (en) Communications system and method for a rail vehicle
CN107944797A (en) The monitoring method of transport task, apparatus and system
JP5380193B2 (en) Operation management method
EA038089B1 (en) Vehicle yard planner system and method
KR101255029B1 (en) RouteInformation providing system of complex public transport using public transportation schedules
US20130116916A1 (en) Transportation network scheduling system and method
RU2738779C1 (en) Railway station process control method
EP2821314A2 (en) Train operation control system, train operation simulation device, and train operation simulation method
JP2017112832A (en) Train control system
JP4728713B2 (en) Train operation management system, diamond management device, and train operation information providing method
JP6038693B2 (en) Course control device, course control method, and course control program
JP2012035813A (en) Device for controlling train, and ground device
EP2470408B1 (en) Initialisation of a signalling system
JP2010264869A (en) Crew state presumption device and crew operation support system
JP2011016461A (en) Operation management system
US11318970B2 (en) Vehicle control system
JP2005219707A (en) Train position acquiring system, train position information providing system, and train approach alarm system
JP6158103B2 (en) Train control system
JP2018034610A (en) Travel control system and travel control device

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121217

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121217

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130918

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130924

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20140212