JP2011070262A - Risk management automation method and system - Google Patents

Risk management automation method and system Download PDF

Info

Publication number
JP2011070262A
JP2011070262A JP2009218711A JP2009218711A JP2011070262A JP 2011070262 A JP2011070262 A JP 2011070262A JP 2009218711 A JP2009218711 A JP 2009218711A JP 2009218711 A JP2009218711 A JP 2009218711A JP 2011070262 A JP2011070262 A JP 2011070262A
Authority
JP
Japan
Prior art keywords
danger
monitoring
risk
construction
event
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009218711A
Other languages
Japanese (ja)
Inventor
Junichi Tsuda
順一 津田
Makoto Sakurada
誠 櫻田
Shinsuke Nishikuro
晋輔 西黒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu FSAS Inc
Original Assignee
Fujitsu FSAS Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu FSAS Inc filed Critical Fujitsu FSAS Inc
Priority to JP2009218711A priority Critical patent/JP2011070262A/en
Publication of JP2011070262A publication Critical patent/JP2011070262A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a risk management automation method and system capable of performing risk management at a work site safely and without fail, in relation to risk management automation methods and systems. <P>SOLUTION: The risk management automation method and system are configured, such that a schedule sensor and a risk-monitoring sensor are incorporated into a monitoring object, a risk management server calculates a monitoring reference value from a risk rank of work, an importance of an event, and a parameter α of work type; the risk management server acquires a risk value from the risk monitoring sensor to compare the risk value with the monitoring reference value; and if the risk value exceeds the monitoring reference value, a monitoring computer automatically monitors the event at a work site. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は危険管理自動化方法及びシステムに関し、更に詳しくは危険ランクとイベントの重要度と工事種別のパラメータから監視基準値を算出し、この監視基準値と工事現場の危険値とを比較して監視と指示を行なうようにした危険管理自動化方法及びシステムに関する。   The present invention relates to a risk management automation method and system, and more particularly, calculates a monitoring reference value from a risk rank, the importance of an event, and a construction type parameter, and compares the monitoring reference value with a dangerous value at a construction site for monitoring. The present invention relates to a risk management automation method and system for giving instructions.

危険な作業を行なう場合、監視者がその工事現場に出向いて危険監視を行なうのが通常である。一方、工程危険度を計算し、この危険度が閾値を超えた場合、遅延警告を通知する技術が知られている(例えば特許文献1参照)。また、工事の進捗状況が工程計画と整合しない場合、作業者に警告を発するようにした技術が知られている(例えば特許文献2参照)。   When performing dangerous work, it is normal for a supervisor to go to the construction site to perform danger monitoring. On the other hand, a technique for calculating a process risk and notifying a delay warning when the risk exceeds a threshold is known (see, for example, Patent Document 1). Further, a technique is known in which a warning is given to an operator when the progress of construction does not match the process plan (see, for example, Patent Document 2).

特開2004−185347号公報(段落0011,図5)JP 2004-185347 A (paragraph 0011, FIG. 5) 特開平10−37459号公報(段落0022〜0025,図1,図2)Japanese Patent Laid-Open No. 10-37459 (paragraphs 0022 to 0025, FIGS. 1 and 2)

危険を伴う作業の場合、自席にいる最も当該作業に詳しい監視者が、危険な作業を行なう時は直接監視して危険を防ぎたいという要望がある。また、イベント毎の異なる危険度の危険状況を把握したいという要望がある。また、監視を行なう場合、最も作業に詳しい監視者のカメラ操作で監視すれば、危険な度合いをよりよく監視することができる。また、作業者に目視確認できる画像データや数値データを示して正しく作業させたいという要望がある。また、変化点(イベント)で作業の引き継ぎを行なう場合、次工程へスムーズに引き継ぐことが好ましい。更に、リスク管理(例えば高所作業等)に対するリスクを低減させることが望ましい。   In the case of work involving danger, there is a demand for the supervisor who is most familiar with the work in his / her seat to directly monitor and prevent danger when performing dangerous work. In addition, there is a demand for grasping danger situations having different degrees of danger for each event. In addition, when monitoring is performed, the degree of danger can be better monitored by monitoring by the camera operation of the monitor who is familiar with the work. In addition, there is a demand to display image data and numerical data that can be visually confirmed by an operator so as to work correctly. Further, when taking over work at a change point (event), it is preferable to take over smoothly to the next process. Furthermore, it is desirable to reduce the risk for risk management (for example, work at height).

本発明はこのような課題に鑑みてなされたものであって、作業現場の危険管理を安全確実に行なうことができる危険管理自動化方法及びシステムを提供することを目的としている。   The present invention has been made in view of such problems, and an object of the present invention is to provide a risk management automation method and system capable of safely and reliably performing risk management at a work site.

上記した課題を解決するため、本発明は以下のような構成を採っている。
(1)請求項1記載の発明は、工事の種別とパラメータとイベントを入力する入力部と、データを記憶する記憶部と、外部と通信する通信部と、監視者を指定する監視者指定手段と、イベントの管理を行なう管理手段と、外部から入力される危険監視センサの出力と予め設けられた監視基準値とを比較する比較手段と、これら各構成要素を制御する制御部とを有する危険管理サーバと、スケジュールを認識するスケジュールセンサと、イベントの危険度を監視する危険監視センサと、イベントを撮影するカメラ部と、各種情報を指示表示する指示表示部とを有する工事用コンピュータと、イベントを撮影するカメラ操作部と、イベントの指示データを記憶する指示データ記憶部とを有する監視者用コンピュータと、から構成されるシステムにおいて、監視対象にスケジュールセンサと危険監視センサが組み込まれるステップと、前記危険管理サーバが工事の危険ランクとイベントの重要度と工事種別のパラメータαとから監視基準値を算出するステップと、該危険管理サーバが前記危険監視センサから危険値を得るステップと、該危険管理サーバが該危険値と前記監視基準値とを比較するステップと、前記危険値が監視基準値を超える場合には前記監視者用コンピュータが工事現場のイベントを自動監視するステップと、を有することを特徴とする。
In order to solve the above-described problems, the present invention adopts the following configuration.
(1) The invention described in claim 1 is an input unit for inputting a construction type, a parameter, and an event, a storage unit for storing data, a communication unit for communicating with the outside, and a supervisor designating unit for designating a supervisor. A risk management means for managing the event, a comparison means for comparing the output of the danger monitoring sensor input from the outside with a pre-set monitoring reference value, and a control unit for controlling these components. A construction computer having a management server, a schedule sensor for recognizing a schedule, a danger monitoring sensor for monitoring the degree of risk of the event, a camera unit for photographing the event, and an instruction display unit for instructing and displaying various information, and an event A system comprising: a camera operation unit for photographing an image; and a supervisor computer having an instruction data storage unit for storing event instruction data. A schedule sensor and a risk monitoring sensor are incorporated in the monitoring target, the risk management server calculates a monitoring reference value from the construction risk rank, the importance of the event, and the construction type parameter α, A management server obtaining a danger value from the danger monitoring sensor; a danger management server comparing the danger value with the monitoring reference value; and if the danger value exceeds a monitoring reference value, the supervisor. And a computer for automatically monitoring events at a construction site.

(2)請求項2記載の発明は、前記危険値と監視基準値とを比較し、危険値が前記監視基準値を超える場合には、監視者へ通知すると共に、前記監視者用コンピュータがカメラ操作信号と指示データを工事用コンピュータ側へ送信することを特徴とする。   (2) The invention according to claim 2 compares the danger value with the monitoring reference value, and notifies the supervisor when the danger value exceeds the monitoring reference value, and the supervisor computer uses the camera. An operation signal and instruction data are transmitted to the construction computer side.

(3)請求項3記載の発明は、工事の種別とパラメータとイベントを入力する入力部と、データを記憶する記憶部と、外部と通信する通信部と、監視者を指定する監視者指定手段と、イベントの管理を行なう管理手段と、工事現場に設置された危険度を検知するための危険監視センサと、該危険監視センサの出力と予め設けられた監視基準値とを比較する比較手段と、これら各構成要素を制御する制御部とを有する危険管理サーバと、スケジュールを認識するスケジュールセンサと、イベントの危険度を監視する危険監視センサと、イベントを撮影するカメラ部と、各種情報を指示表示する指示表示部とを有する工事用コンピュータと、イベントを撮影するカメラ操作部と、イベントの指示データを記憶する指示データ記憶部とを有する監視者用コンピュータとから構成されるシステムにおいて、監視対象にスケジュールセンサと危険監視センサを組み込み、前記危険管理サーバが工事の危険ランクとイベントの重要度と工事種別のパラメータαとから監視基準値を算出し、該危険管理サーバが前記危険監視センサから危険値を得て該危険値と前記監視基準値とを比較し、前記危険値が監視基準値を超える場合には前記監視者用コンピュータが工事現場のイベントを自動監視するように構成されることを特徴とする。   (3) The invention according to claim 3 is an input unit for inputting a construction type, a parameter, and an event, a storage unit for storing data, a communication unit for communicating with the outside, and a supervisor designating unit for designating a supervisor. Management means for managing the event, a danger monitoring sensor for detecting the degree of danger installed at the construction site, and a comparison means for comparing the output of the danger monitoring sensor with a preset monitoring reference value A risk management server having a control unit for controlling each of these components, a schedule sensor for recognizing a schedule, a risk monitoring sensor for monitoring the risk level of an event, a camera unit for capturing an event, and instructing various information Surveillance having a construction computer having an instruction display unit for displaying, a camera operation unit for photographing an event, and an instruction data storage unit for storing event instruction data In the system composed of the computer for the operation, the schedule sensor and the danger monitoring sensor are incorporated in the monitoring target, and the danger management server calculates the monitoring reference value from the construction danger rank, the importance of the event, and the construction type parameter α. The danger management server obtains a danger value from the danger monitoring sensor, compares the danger value with the monitoring reference value, and if the danger value exceeds the monitoring reference value, the computer for the supervisor It is configured to automatically monitor events.

(4)請求項4記載の発明は、前記危険管理サーバは、危険監視センサより求めた危険値と監視基準値とを比較し、危険値が前記監視基準値を超える場合は監視者へ通知し、前記監視者用コンピュータがカメラ操作信号と指示データを工事コンピュータ側に送信することを特徴とする。   (4) In the invention according to claim 4, the danger management server compares the danger value obtained from the danger monitoring sensor with the monitoring reference value, and notifies the supervisor if the danger value exceeds the monitoring reference value. The supervisor computer transmits a camera operation signal and instruction data to the construction computer side.

(1)請求項1記載の発明によれば、作業現場の危険管理を安全確実に行なうことができる危険管理自動化方法を提供することができる。
(2)請求項2記載の発明によれば、危険値と監視基準値とを比較し、危険値が前記監視基準値を超える場合には、監視者へ通知すると共に、前記監視者用コンピュータがカメラ操作と指示データを工事用コンピュータ側へ送信することにより、作業現場の危険管理を安全確実に行なうことができる。これにより、監視者は危険値が前記監視基準値を超える場合のみ、監視をすればよいのでマンネリ化を防止することができる。
(1) According to the invention described in claim 1, it is possible to provide a risk management automation method capable of safely and reliably performing risk management at a work site.
(2) According to the invention described in claim 2, when the danger value and the monitoring reference value are compared, and the danger value exceeds the monitoring reference value, the supervisor is notified and the supervisor computer is By sending the camera operation and instruction data to the construction computer side, it is possible to safely and reliably perform risk management at the work site. As a result, the supervisor only needs to monitor when the danger value exceeds the monitoring reference value, so that it is possible to prevent the occurrence of rut.

(3)請求項3記載の発明によれば、作業現場の危険管理を安全確実に行なうことができる危険管理自動化システムを提供することができる。
(4)請求項4記載の発明によれば、危険監視センサより求めた危険値と監視基準値とを比較し、危険値が前記監視基準値を超える場合は監視者へ通知し、前記監視者用コンピュータがカメラ操作と指示データを工事コンピュータ側に送信することにより、作業現場の危険管理を安全確実に行なうことができる。これにより、監視者は危険値が前記監視基準値を超える場合のみ、監視をすればよいのでマンネリ化を防止することができる。
(3) According to the invention described in claim 3, it is possible to provide a risk management automation system capable of safely and reliably performing risk management at a work site.
(4) According to the invention described in claim 4, the danger value obtained from the danger monitoring sensor is compared with the monitoring reference value, and when the danger value exceeds the monitoring reference value, the supervisor is notified, and the supervisor The work computer transmits the camera operation and the instruction data to the construction computer side, so that the danger management at the work site can be performed safely and reliably. As a result, the supervisor only needs to monitor when the danger value exceeds the monitoring reference value, so that it is possible to prevent the occurrence of rut.

本発明の一実施例を示すブロック図である。It is a block diagram which shows one Example of this invention. イベント入力例を示す図Figure showing an example of event input 工事種別パラメータを示す図である。It is a figure which shows a construction classification parameter. 危険監視センサの種類を示す図である。It is a figure which shows the kind of danger monitoring sensor. サーバの動作を示すフローチャートである。It is a flowchart which shows operation | movement of a server. 監視者PCの動作を示すフローチャートである。It is a flowchart which shows operation | movement of supervisor PC. 工事PCの動作を示すフローチャートである。It is a flowchart which shows operation | movement of construction PC. 工事種別入力と危険ランク算出例を示す図である。It is a figure which shows the construction classification input and the danger rank calculation example. 監視責任者を示す図である。It is a figure which shows the supervisor in charge. 危険値予測の説明図である。It is explanatory drawing of danger value prediction.

以下、図面を参照して本発明の実施例について詳細に説明する。図1は本発明の一実施例を示すブロック図である。図において、10は危険管理を行なう危険管理サーバ、30は監視者パソコン(PC)で、図では監視者PC1と監視者PC2が設けられた例を示している。40は工事現場の制御を司る工事パソコン(PC)である。20は危険管理サーバ10と、監視者PC1,監視者PC2と、工事PC間を接続するネットワークである。該ネットワーク20としては、例えばインターネットが好適に用いられる。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a block diagram showing an embodiment of the present invention. In the figure, 10 is a risk management server for performing risk management, 30 is a supervisory personal computer (PC), and the figure shows an example in which a supervisory PC1 and a supervisory PC2 are provided. Reference numeral 40 denotes a construction personal computer (PC) that controls the construction site. A network 20 connects the risk management server 10, the supervisor PC1, the supervisor PC2, and the construction PC. For example, the Internet is preferably used as the network 20.

危険管理サーバ10の制御部は、危険ランク・スケジュールを入力する危険ランク・スケジュール入力手段1と、監視基準値を算出する監視基準値算出手段2と、監視者を指定する監視者指定手段3と、危険値と監視基準値とを比較する比較手段4と、危険監視センサ等のセンサ情報を判断するセンサ情報判断手段5と、監視者指示データを送信する監視者指示データ送信手段6と、カメラ情報を送信するカメラ情報送信手段7と、カメラを操作するカメラ操作手段8と、ステータスを作成するステータス作成手段9と、ネットワーク20と接続され、データの送受信を行なう送受信部10Cから構成されている。   The control unit of the risk management server 10 includes a risk rank / schedule input means 1 for inputting a risk rank / schedule, a monitoring reference value calculation means 2 for calculating a monitoring reference value, and a supervisor specifying means 3 for specifying a supervisor. A comparison means 4 for comparing the danger value with the monitoring reference value, a sensor information judgment means 5 for judging sensor information such as a danger monitoring sensor, a supervisor instruction data transmission means 6 for sending supervisor instruction data, and a camera A camera information transmitting unit 7 for transmitting information, a camera operating unit 8 for operating the camera, a status creating unit 9 for creating a status, and a transmission / reception unit 10C connected to the network 20 for transmitting and receiving data. .

ここで、ステータスとは工事の進捗状況やイベントの準備状況等が考えられる。10Aは危険管理サーバ10に各種のコマンドやデータを入力する入力部、10Bは危険管理サーバ10と接続され、各種の情報を記憶するデータ記憶部である。入力部10Aとしては、例えばキーボードとマウスが用いられ、データ記憶部10Bとしては、例えばハードディスク装置が用いられる。   Here, the status may be the progress of construction or the preparation status of an event. 10A is an input unit for inputting various commands and data to the risk management server 10, and 10B is a data storage unit that is connected to the risk management server 10 and stores various types of information. As the input unit 10A, for example, a keyboard and a mouse are used, and as the data storage unit 10B, for example, a hard disk device is used.

31は監視者PC1と接続されるマイク・スピーカ、32は監視者PC1と接続されるカメラ操作部、33は監視者PC1と接続されるブザー、34は監視者PC1と接続される指示データ(写真)を記憶する指示データ記憶部、35は監視者PC1と接続され、各種情報を表示する表示部である。以上の構成は、監視者PC2側についても同様である。   Reference numeral 31 is a microphone / speaker connected to the supervisor PC1, 32 is a camera operation unit connected to the supervisor PC1, 33 is a buzzer connected to the supervisor PC1, and 34 is instruction data (photo) connected to the supervisor PC1. ) Is a display unit that is connected to the supervisor PC 1 and displays various information. The above configuration is the same for the supervisor PC 2 side.

41は工事PC40と接続され、工事のスケジュールを認識するスケジュールセンサであり、センサ1とセンサ2が接続されている例を示している。42は工事PCと接続され、工事現場の危険度を測定する危険監視センサであり、センサ1とセンサ2が接続されている例を示している。43は工事PCと接続され、各種の情報を表示する指示表示部である。46は工事現場を撮影するカメラ、45は該カメラ46を操作する操作部であり、カメラ1とカメラ2が接続されている例を示している。47は工事PCと接続されるマイク・スピーカ、48は工事PCと接続されるブザーである。このように構成されたシステムを用いて本発明の動作を以下に説明する。   Reference numeral 41 denotes a schedule sensor that is connected to the construction PC 40 and recognizes the construction schedule, and shows an example in which the sensor 1 and the sensor 2 are connected. Reference numeral 42 denotes a danger monitoring sensor that is connected to the construction PC and measures the degree of danger at the construction site, and shows an example in which the sensor 1 and the sensor 2 are connected. An instruction display unit 43 is connected to the construction PC and displays various kinds of information. Reference numeral 46 denotes a camera for photographing a construction site, and 45 denotes an operation unit for operating the camera 46. The camera 1 and the camera 2 are connected to each other. Reference numeral 47 is a microphone / speaker connected to the construction PC, and 48 is a buzzer connected to the construction PC. The operation of the present invention will be described below using the system configured as described above.

図2は危険管理サーバ10の動作を示すフローチャートである。先ず、危険ランク・スケジュール入力手段1からスケジュールを入力する(S1)。次に、イベントを入力する(S2)。ここで、イベントは重要度と時期に関する情報である。次に、環境入力を行なう(S3)。ここで、環境とは作業現場の状況を示し、例えば高所や高圧や火力使用の環境である。次に、危険ランク・スケジュール入力手段1から危険ランクを入力する(S4)。ここでは、危険ランクとしてA〜Hを入力する場合を示しているが、これに限るものではない。危険ランクは危険度に応じて予め決められる値である。   FIG. 2 is a flowchart showing the operation of the risk management server 10. First, a schedule is input from the danger rank / schedule input means 1 (S1). Next, an event is input (S2). Here, the event is information on importance and time. Next, environment input is performed (S3). Here, the environment indicates the situation at the work site, and is, for example, a high place, an environment where high pressure or thermal power is used. Next, the danger rank is input from the danger rank / schedule input means 1 (S4). Here, a case where A to H are input as danger ranks is shown, but the present invention is not limited to this. The danger rank is a value determined in advance according to the degree of danger.

次に、監視基準値算出手段2は監視基準値を算出する(S5)。監視基準閾値は、工事の危険ランク(A〜H)と、イベントの重要度と、工事種別のパラメータαとから所定の演算式を用いて算出される。例えば、工事の危険ランクをL、イベントの重要度をKとすると、監視基準値Qは次式で表される。   Next, the monitoring reference value calculation means 2 calculates a monitoring reference value (S5). The monitoring reference threshold value is calculated using a predetermined arithmetic expression from the construction risk rank (A to H), the importance of the event, and the construction type parameter α. For example, if the construction risk rank is L and the event importance is K, the monitoring reference value Q is expressed by the following equation.

Q=f(L,K,α)
図3はイベント入力例を示す図である。図に示すように、対応工程名と、危険ランクと、イベント名と、重要度と、算出監視基準値とからなる。例えば、高所工事GTは、危険ランクがD、イベント名がBVC、イベントBVCの重要度が45%、算出監視基準値がjjである。このようなイベントの各種の情報は、テーブルとしてデータ記憶部10Bに記憶される。
Q = f (L, K, α)
FIG. 3 is a diagram showing an example of event input. As shown in the figure, it includes a corresponding process name, a risk rank, an event name, an importance level, and a calculated monitoring reference value. For example, in the high place construction GT, the danger rank is D, the event name is BVC, the importance of the event BVC is 45%, and the calculated monitoring reference value is jj. Various types of information on such events are stored in the data storage unit 10B as a table.

図4は工事種別パラメータαを示す図である。図に示すように、工事現場のイベントの種類(例えば高電圧工事,高所工事,火力使用工事,重量工事等)ごとに工事種別のパラメータαを持っている。例えば、高電圧工事の場合、電圧に対してパラメータαの値が変わるようになっている。図の例の場合、電圧がaa0KVの場合のパラメータαはggg0であるが、電圧がccKVの場合のパラメータαはggg3である。このように、パラメータαは、工事の種別毎に定まるもので、判定可能な工事環境値毎に、又は環境値の幅毎に定まる値であって、或いは経験値により定められる。   FIG. 4 is a diagram showing the construction type parameter α. As shown in the figure, each type of construction site event (for example, high voltage construction, high place construction, thermal power construction, heavy construction, etc.) has a construction type parameter α. For example, in the case of high voltage construction, the value of the parameter α changes with respect to the voltage. In the example shown in the figure, the parameter α when the voltage is aa0KV is ggg0, but the parameter α when the voltage is ccKV is ggg3. As described above, the parameter α is determined for each type of construction, and is a value determined for each work environment value that can be determined, or for each width of the environment value, or determined by an experience value.

次に、入力部10Aから監視者名を入力する(S6)。監視者名は、図9に示すように、イベント毎に詳しい人(監視責任者)が指定される。ここで、監視者名は使用するパソコンのナンバ(メールアドレス等)を含むものである。以上のデータが入力され、監視基準値が求まった状態で、危険管理サーバ10はスケジュールの監視を開始する(S7)。この結果、危険管理サーバ10には、複数のスケジュールセンサ41と複数の危険監視センサ42からの検出信号がネットワーク20及び送受信部10Cを介して入力される。これらスケジュールセンサ41と危険監視センサ42からは、スケジュールを認識した時に接点のオン信号が危険管理サーバ10に入力され、危険監視センサ42からは、例えば温度データが危険管理サーバ10に入力される。   Next, a supervisor name is input from the input unit 10A (S6). As shown in FIG. 9, a detailed person (monitoring person in charge) is designated for the name of the monitoring person. Here, the name of the supervisor includes the number (email address, etc.) of the personal computer to be used. With the above data input and the monitoring reference value determined, the risk management server 10 starts monitoring the schedule (S7). As a result, detection signals from the plurality of schedule sensors 41 and the plurality of danger monitoring sensors 42 are input to the risk management server 10 via the network 20 and the transmission / reception unit 10C. From the schedule sensor 41 and the danger monitoring sensor 42, a contact ON signal is input to the danger management server 10 when the schedule is recognized. For example, temperature data is input to the danger management server 10 from the danger monitoring sensor 42.

図5は危険監視センサの種類を示す図である。例えば対応イベントがCCの場合にはセンサ3とセンサ4が使用され、センサ3の場合のイベント内スケジュール位置は30/100であり、定義危険値は30である。センサ4の場合のイベント内スケジュール位置は70/100であり、定義危険値は30である。ここで、イベント内スケジュール位置は、工事の進捗状況を示す値であり、工事完了時のスケジュール位置を100とした時の各イベントの到達度合いを示す。例えば、イベント内スケジュール位置が70/100の場合、進捗状況が70%を示している。定義危険値は、将来の危険値を示すもので、危険監視センサ42で検出した危険値に加算するものである。   FIG. 5 is a diagram showing types of danger monitoring sensors. For example, when the corresponding event is CC, the sensor 3 and the sensor 4 are used. In the case of the sensor 3, the schedule position in the event is 30/100, and the defined risk value is 30. In the case of the sensor 4, the schedule position in the event is 70/100, and the definition risk value is 30. Here, the schedule position in the event is a value indicating the progress of the construction, and indicates the degree of arrival of each event when the schedule position at the completion of the construction is 100. For example, when the schedule position in the event is 70/100, the progress status indicates 70%. The definition danger value indicates a future danger value, and is added to the danger value detected by the danger monitoring sensor 42.

危険管理サーバ10は危険状況を受信する(S8)。危険情報とは、スケジュールセンサ41の出力と危険監視センサ42の出力とを含む。ここで、危険監視センサ42の出力からは危険値が出力される。比較手段4は、危険監視センサ42の出力である危険値と、ステップS5で算出した算出監視基準値とを比較する(S9)。   The danger management server 10 receives the danger situation (S8). The danger information includes the output of the schedule sensor 41 and the output of the danger monitoring sensor 42. Here, a danger value is output from the output of the danger monitoring sensor 42. The comparison unit 4 compares the danger value, which is the output of the danger monitoring sensor 42, with the calculated monitoring reference value calculated in step S5 (S9).

センサ情報判断手段5は、前記比較手段4の比較結果を元に、危険値が監視基準値を超えた(オーバー)したかどうかチェックする(S10)。危険値が監視基準値を超えた場合には、制御部はこの危険監視センサの出力を監視に格上げする(S11)。危険管理サーバ10の制御部は、カメラ46からのカメラ情報を受信し(S12)、カメラ情報送信手段7からカメラ情報を監視者PC30へ送信し(S13)、その後監視者応答待ちになる(S14)。   The sensor information determination means 5 checks whether or not the danger value has exceeded (over) the monitoring reference value based on the comparison result of the comparison means 4 (S10). When the danger value exceeds the monitoring reference value, the control unit upgrades the output of the danger monitoring sensor to monitoring (S11). The control unit of the risk management server 10 receives the camera information from the camera 46 (S12), transmits the camera information from the camera information transmitting means 7 to the supervisor PC 30 (S13), and then waits for a supervisor response (S14). ).

次に、危険管理サーバ10は監視者からOK応答があったかどうかチェックする(S15)。OK応答がなかったステップS12に戻りカメラ情報受信を行なう。全員の監視者からOK応答があった場合には、カメラ監視を止める(S16)。その間も、危険管理サーバ10には、スケジュールセンサ41からの接点信号と、危険監視センサ42からのセンサ出力が入力される。   Next, the risk management server 10 checks whether there is an OK response from the supervisor (S15). The process returns to step S12 where there is no OK response, and camera information is received. If there is an OK response from all the monitoring personnel, camera monitoring is stopped (S16). In the meantime, the contact signal from the schedule sensor 41 and the sensor output from the danger monitoring sensor 42 are input to the danger management server 10.

危険管理サーバ10は危険状況を受信する(S17)。比較手段4は、危険値と監視基準値とを比較して規定外が発生したかどうかチェックする(S18)。規定外が発生した場合には、危険管理サーバ10は、工事PCに信号を送り、指示表示部43に作業の中止指示を行ない(S19)、監視に格上げし(S20)、当該カメラ46からの情報を受信し(S21)、ネットワーク20を介してカメラ情報送信手段7からカメラ情報を監視者PC30に送信する(S22)。監視者PCは、表示部35にカメラ情報を表示させる。ここで、監視者は表示部35に表示された内容を見て、工事現場がどのような状況であるかを詳しく見るために、カメラ操作部32から工事PC側のカメラ46を操作して、危険状態にある工事現場を撮影する。そして、カメラ46から送られてくる情報を見て、危険な状態を監視することになる。シーケンスとしては、最後にエマージェンシイストップをかける(S23)。   The danger management server 10 receives the danger situation (S17). The comparison unit 4 compares the danger value with the monitoring reference value and checks whether or not an out-of-specification has occurred (S18). If an out-of-specification occurs, the risk management server 10 sends a signal to the construction PC, instructs the instruction display unit 43 to stop the work (S19), upgrades to monitoring (S20), The information is received (S21), and the camera information is transmitted from the camera information transmitting means 7 to the supervisor PC 30 via the network 20 (S22). The supervisor PC displays the camera information on the display unit 35. Here, the observer looks at the contents displayed on the display unit 35 and operates the camera 46 on the construction PC side from the camera operation unit 32 in order to see in detail what the construction site is like, Take a picture of the construction site in danger. Then, by watching the information sent from the camera 46, the dangerous state is monitored. As a sequence, emergency stop is applied at the end (S23).

ステップS18において、規定外の状態が起こらなかった場合、ステータス作成手段9がステータスを作成し(S24)、作成したステータスデータをデータ記憶部10Bに記憶する。ここで、ステータスとは工事現場における工事の進捗状況をいう。次に、危険管理サーバ10においては、制御部が逐次危険度報告を監視者PC30に送信する(S25)。そして、工程全て終了したかどうかチェックする(S26)。工程が全て終了していない場合にはステップS7に戻りスケジュール監視を行なう。工程が全て終了していた場合には、処理を終了する。   In step S18, when an unregulated state does not occur, the status creating unit 9 creates a status (S24), and stores the created status data in the data storage unit 10B. Here, the status refers to the progress of construction on the construction site. Next, in the risk management server 10, the control unit sequentially transmits risk reports to the supervisor PC 30 (S25). Then, it is checked whether or not all the processes have been completed (S26). If all the processes are not completed, the process returns to step S7 and the schedule is monitored. If all the steps have been completed, the process is terminated.

図6は監視者PCの動作を示すフローチャートである。先ず、監視モードであるかどうかチェックする(S1)。監視モードであるかどうかは、危険管理サーバ10から監視者指定手段3から監視者PCに監視者指定信号が送出されることで監視者PCは判断することができる。監視モードである場合には、工事PC40からカメラ46で撮影したカメラ情報を受信する(S2)。カメラ情報を受信したらブザー33を鳴動させる(S3)。ブザー33が鳴動すると、監視モードであることが分かる。   FIG. 6 is a flowchart showing the operation of the supervisor PC. First, it is checked whether or not the monitoring mode is set (S1). Whether the monitoring mode is set can be determined by the supervisor PC by sending a supervisor specifying signal from the supervisor specifying means 3 to the supervisor PC from the risk management server 10. If it is in the monitoring mode, the camera information captured by the camera 46 is received from the construction PC 40 (S2). When the camera information is received, the buzzer 33 is sounded (S3). When the buzzer 33 sounds, it is understood that the monitoring mode is set.

次に監視者PCは、監視者が操作しているかどうかチェックする(S4)。監視者が操作しているかどうかは、図示しない操作部から監視者が監視者PCにコマンドやデータを入力しているかどうかで判断することができる。ここで、監視者はその工事現場のイベントについて一番詳しい人である。監視者操作の場合には、監視者がカメラ操作部32を操作する(S5)。操作者は、カメラ操作部32を操作して、ネットワーク20経由で工事PC側の操作部45にアクセスしてカメラの操作信号を送り、カメラ46で所定の工事領域を撮影し、危険判断を行なう(S6)。この場合において、監視者工事現場に個別に電話等で連絡することができる。   Next, the supervisor PC checks whether or not the supervisor is operating (S4). Whether or not the monitor is operating can be determined by whether or not the monitor inputs a command or data to the monitor PC from an operation unit (not shown). Here, the observer is the person who is most familiar with the event at the construction site. In the case of a monitor operation, the monitor operates the camera operation unit 32 (S5). The operator operates the camera operation unit 32, accesses the operation unit 45 on the construction PC side via the network 20, sends a camera operation signal, photographs a predetermined construction area with the camera 46, and makes a risk judgment. (S6). In this case, it is possible to contact the supervisor construction site individually by telephone or the like.

この時、工事現場を指示するためのデータは、指示データ記憶部34に写真データや数値データとして記憶されているので、監視者はこの指示データを危険管理サーバ10に送信する(S7)。危険管理サーバ10は、この指示データを受け取ると、監視者指示データ送信手段6からネットワーク20を介して工事現場側の工事PC40に送信する。工事PCは、この指示データを受けると、指示表示部43に表示する。工事現場の作業者は、指示表示部43の表示を見て作業を行なう。このようにすれば、安全な作業を行なうことができる。   At this time, since the data for instructing the construction site is stored as photo data or numerical data in the instruction data storage unit 34, the supervisor transmits this instruction data to the risk management server 10 (S7). Upon receiving this instruction data, the risk management server 10 transmits the instruction data from the supervisor instruction data transmission means 6 to the construction PC 40 on the construction site side via the network 20. When receiving the instruction data, the construction PC displays it on the instruction display unit 43. A worker on the construction site performs work while viewing the display on the instruction display unit 43. In this way, safe work can be performed.

次に、監視者PCは危険管理サーバ10に対してOK応答を返信する(S8)。そして、またステップS1に戻り、前述した操作を行なうことになる。ステップS1において、監視モードでなかった場合、監視者PCは逐次危険管理サーバ10から逐次危険報告を受信しているかどうかチェックする(S9)。危険報告を受けている場合には、危険状況とコメント返答を図示しない操作部から記入し(S10)、応答を危険管理サーバ10に返信する(S11)。ステップS9において、逐次危険報告を受信していない場合には、ステップS1に戻り、監視モードかどうかをチェックすることになる。   Next, the supervisor PC returns an OK response to the risk management server 10 (S8). Then, returning to step S1, the above-described operation is performed. If the monitoring mode is not set in step S1, the supervisor PC checks whether or not the sequential danger report is received from the sequential danger management server 10 (S9). If a danger report has been received, the danger situation and comment reply are entered from an operation unit (not shown) (S10), and a response is returned to the danger management server 10 (S11). If it is determined in step S9 that a sequential danger report has not been received, the process returns to step S1 to check whether the monitoring mode is set.

図7は工事PCの動作を示すフローチャートである。先ずスケジュールセンサ41が全て動作していることを確認する(S1)。次に、これらスケジュールセンサ41の何れかから報告があったかどうかをチェックする(S2)。報告があった場合には、そのスケジュールセンサの出力を危険管理サーバ10へ通知する(S3)。次に、危険監視センサ42が全て動作していることを確認する(S4)。次に、これら危険監視センサ42の何れかから報告があったかどうかをチェックする(S5)。報告があった場合には、その危険監視センサ42の出力を危険管理サーバ10へ通知する(S6)。   FIG. 7 is a flowchart showing the operation of the construction PC. First, it is confirmed that all the schedule sensors 41 are operating (S1). Next, it is checked whether or not there is a report from any of these schedule sensors 41 (S2). When there is a report, the output of the schedule sensor is notified to the risk management server 10 (S3). Next, it is confirmed that all the danger monitoring sensors 42 are operating (S4). Next, it is checked whether or not there is a report from any of these danger monitoring sensors 42 (S5). If there is a report, the output of the danger monitoring sensor 42 is notified to the danger management server 10 (S6).

次に、監視者PC30からの指示が監視モード指示になっているかどうかチェックする(S7)。監視モード指示になっていない場合には、ステップS1に戻る。監視モード指示になっている場合には、カメラ46の全てを監視モードに設定する(S8)。次に、ブザー48を鳴動させる(S9)。ブザー48が鳴動することにより、監視モードであることを周囲の作業者に知らせることができる。   Next, it is checked whether or not the instruction from the supervisor PC 30 is a monitoring mode instruction (S7). If the monitoring mode instruction has not been given, the process returns to step S1. If the monitor mode instruction is given, all the cameras 46 are set to the monitor mode (S8). Next, the buzzer 48 is sounded (S9). By sounding the buzzer 48, it is possible to notify surrounding workers that the monitoring mode is set.

次に、監視者PC30からの操作の指示があるかどうかチェックする(S10)。操作の指示がある場合には、操作部45は監視者PC側のカメラ操作部32からの指示を受けて、カメラ46の焦点・遠近・方向等を認識し(S11)、カメラ操作部32からの指示に合わせる(S12)。この結果、カメラ46は専門家である監視者からの指示に基づく方向に向き、作業現場を監視することができるようになる。   Next, it is checked whether there is an operation instruction from the supervisor PC 30 (S10). When there is an operation instruction, the operation unit 45 receives an instruction from the camera operation unit 32 on the monitor PC side, recognizes the focus, perspective, direction, and the like of the camera 46 (S11), and from the camera operation unit 32. (S12). As a result, the camera 46 can be directed in a direction based on an instruction from a supervisor who is an expert and can monitor the work site.

次に、監視者PC30から指示データを受信したかどうかチェックする(S13)。指示データを受信した場合には、指示表示部43のディスプレイに指示を表示する(S14)。この結果、作業者はこの指示表示部43に示される指示に従って作業を行なうので、安全確実な作業を行なうことができる。次に、監視モードが解除されたかどうかチェックする(S15)。監視モードが解除された場合には、ステップS1に戻り、スケジュールセンサの動作確認動作に戻る。監視モードが解除されていない場合には、ステップS10に戻り、カメラ監視モードに移行する。なお、ステップS10において、操作がない場合及びステップS13において、監視者PC30からの指示データを受けなかった場合は監視モード解除をチェックするステップに進む。   Next, it is checked whether or not the instruction data is received from the supervisor PC 30 (S13). When the instruction data is received, the instruction is displayed on the display of the instruction display unit 43 (S14). As a result, the worker performs the work in accordance with the instruction shown on the instruction display unit 43, so that a safe and reliable work can be performed. Next, it is checked whether the monitoring mode has been canceled (S15). When the monitoring mode is canceled, the process returns to step S1 and returns to the operation check operation of the schedule sensor. If the monitoring mode has not been canceled, the process returns to step S10 and shifts to the camera monitoring mode. Note that if there is no operation in step S10 and if no instruction data is received from the supervisor PC 30 in step S13, the process proceeds to a step of checking the release of the monitoring mode.

以上、説明したように、工事PC40は、監視者PC30からの指示に基づいて、カメラ46を所定の方向に向けて配置すると共に、指示表示部43に指示内容が画像データや数値データにより表示されるので、作業現場で働く作業者はその指示表示部43に表示された作業指示に従って作業をするので、安全確実に作業を行なうことができる。   As described above, the construction PC 40 arranges the camera 46 in a predetermined direction based on an instruction from the supervisor PC 30, and the instruction content is displayed on the instruction display unit 43 as image data or numerical data. Therefore, the worker who works at the work site works according to the work instruction displayed on the instruction display unit 43, so that the work can be performed safely and reliably.

図8は工事種別入力と危険ランク算出例を示す図である。ここでは、高所工事と高電圧工事の場合について説明する。先ず高所工事の場合、高所環境は地上から何mのところで作業するかを示している。例えば、高所環境が地上ggd m〜ggz mまでのところで、作業期間に応じて定義ランクが与えられる。例えば2ヶ月未満の場合は定義ランクはAであり、3ヶ月以上4ヶ月未満の場合は定義ランクはBであり、4ヶ月以上の場合は定義ランクはCである。高所環境が地上dd m〜ss mまでについても同様にして作業期間に応じた定義ランクが与えられる。   FIG. 8 is a diagram showing an example of construction type input and risk rank calculation. Here, the case of high-altitude construction and high-voltage construction will be described. First, in the case of high-altitude construction, the high-altitude environment indicates how many meters from the ground work. For example, the definition rank is given according to the work period when the high-altitude environment is on the ground ggd m to ggz m. For example, the definition rank is A for less than 2 months, the definition rank is B for 3 months or more and less than 4 months, and the definition rank is C for 4 months or more. Similarly, the definition rank corresponding to the work period is given to the high altitude environment from dd m to ss m on the ground.

次に、高電圧工事の場合、危険電圧がnn KV〜ff KVの場合、作業期間が1ヶ月未満の場合の定義ランクはAである。以下、同様である。
図9は監視責任者(監視者)を示す図である。例えば、田中 元さんは、イベントAが詳しく、今井 一さんはイベントBが詳しい。以下、同様である。このようなテーブルは、予め危険管理サーバ10側のデータ記憶部10Bに記憶させておく。そうすると、特定のイベントの監視モードに入った時に、危険管理サーバ10内の監視者指定手段3はその特定のイベントに詳しい監視者を図9に示すテーブルから読み出して、監視者PC30に通知することができる。監視者PC30側では、指定された監視者が監視者PC30を用いて、作業現場の様子をどのカメラでどの方向に撮影するかを決めて、工事PC40に通知する。
Next, in the case of high voltage construction, when the dangerous voltage is nn KV to ff KV, the definition rank is A when the work period is less than one month. The same applies hereinafter.
FIG. 9 is a diagram showing a person in charge of monitoring (monitoring person). For example, Gen Tanaka is familiar with Event A, and Kazu Imai is familiar with Event B. The same applies hereinafter. Such a table is stored in advance in the data storage unit 10B on the risk management server 10 side. Then, when the monitoring mode for a specific event is entered, the supervisor designating means 3 in the risk management server 10 reads out the supervisor detailed in the particular event from the table shown in FIG. 9 and notifies the supervisor PC 30 of it. Can do. On the supervisor PC 30 side, the designated supervisor uses the supervisor PC 30 to decide which camera and in which direction the state of the work site is to be photographed and notifies the construction PC 40.

工事PC40側では、監視者PC30から送られてきたデータを元に、カメラ46を決定し、方向・焦点とかを設定して所定の作業現場を撮影することができる。また、指示表示部43には、指示データ記憶部34に記憶されている作業現場の好ましい写真が表示されるので、作業者はこの指示表示部43に表示されている内容に従って、作業を行なうので、安全確実な作業を行なうことができる。   On the construction PC 40 side, the camera 46 can be determined based on the data sent from the supervisor PC 30, and a predetermined work site can be photographed by setting the direction and focus. In addition, since a preferable photograph of the work site stored in the instruction data storage unit 34 is displayed on the instruction display unit 43, the worker performs work according to the contents displayed on the instruction display unit 43. Safe and reliable work can be done.

図10は危険値予測の説明図である。例1の場合は高所工事(危険値10)の場合の危険値を示している。ΔはイベントA,B,Cをそれぞれ示している。イベントΔAの危険値は40、イベントΔBの危険値は50、イベントΔCの危険値は30である。この場合において、
(1)イベントA,B,Cは危険値が上がれば自動的に監視対象候補になる。
(2)パラメータα等から求めた危険値70以上は監視対象になる。
(3)イベントBがセンサにより監視対象になったケースを破線で示す。通常は監視基準値70以下のところで作業しているが、突然危険監視センサの出力が70を超えた場合は監視対象になる。
FIG. 10 is an explanatory diagram of risk value prediction. In the case of Example 1, the danger value in the case of high-altitude construction (risk value 10) is shown. Δ indicates events A, B, and C, respectively. The risk value of event ΔA is 40, the risk value of event ΔB is 50, and the risk value of event ΔC is 30. In this case,
(1) Events A, B, and C automatically become candidates for monitoring if the risk value increases.
(2) A risk value of 70 or more obtained from the parameter α or the like is to be monitored.
(3) A case where event B is monitored by a sensor is indicated by a broken line. Normally, the work is performed at a monitoring reference value of 70 or less, but if the output of the danger monitoring sensor suddenly exceeds 70, it becomes a monitoring target.

例2の場合は高所工事の単発イベントFの場合を示している。イベントFの危険値は70である。この場合において、
(1)イベントFは危険値から当初より監視対象である。
(2)イベントが無い平日でも危険値が上がれば自動的に監視対象に変更される。
(3)パラメータα等から求めた監視基準値60以上が監視対象となるものとすると、イベントFは常時監視対象となることがわかる。
In the case of Example 2, the case of a single event F for high-altitude construction is shown. The risk value for event F is 70. In this case,
(1) Event F is a monitoring target from the beginning because of the danger value.
(2) Even if there is no event on weekdays, if the danger value rises, it is automatically changed to a monitoring target.
(3) Assuming that the monitoring reference value 60 or more obtained from the parameter α or the like is to be monitored, it is understood that the event F is always to be monitored.

以上、詳細に説明したように、本発明によれば作業現場の危険管理を安全確実に行なうことができる危険管理自動化方法及びシステムを提供することができ、実用上の効果が大きい。   As described above in detail, according to the present invention, it is possible to provide a risk management automation method and system capable of safely and reliably performing risk management at a work site, which has a great practical effect.

1 危険ランク・スケジュール入力手段
2 監視基準値算出手段
3 監視者指定手段
4 比較手段
5 センサ情報判断手段
6 監視者指示データ送信手段
7 カメラ情報送信手段
8 カメラ操作手段
9 ステータス作成手段
10 危険管理サーバ
10A 入力部
10B データ記憶部
10C 送受信部部
20 ネットワーク
30 監視者PC
31 マイク・スピーカ
32 カメラ操作部
33 ブザー
34 指示データ記憶部
35 表示部
40 工事PC
41 スケジュールセンサ
42 危険監視センサ
43 指示表示部
45 操作部
46 カメラ
47 マイク・スピーカ
48 ブザー
DESCRIPTION OF SYMBOLS 1 Risk rank / schedule input means 2 Monitoring reference value calculation means 3 Monitor designation | designated means 4 Comparison means 5 Sensor information judgment means 6 Monitor instruction | indication data transmission means 7 Camera information transmission means 8 Camera operation means 9 Status creation means 10 Risk management server 10A Input unit 10B Data storage unit 10C Transmission / reception unit 20 Network 30 Monitor PC
31 Microphone / speaker 32 Camera operation unit 33 Buzzer 34 Instruction data storage unit 35 Display unit 40 Construction PC
41 Schedule Sensor 42 Danger Monitoring Sensor 43 Instruction Display Unit 45 Operation Unit 46 Camera 47 Microphone / Speaker 48 Buzzer

Claims (4)

工事の種別とパラメータとイベントを入力する入力部と、データを記憶する記憶部と、外部と通信する通信部と、監視者を指定する監視者指定手段と、イベントの管理を行なう管理手段と、外部から入力される危険監視センサの出力と予め設けられた監視基準値とを比較する比較手段と、これら各構成要素を制御する制御部とを有する危険管理サーバと、
スケジュールを認識するスケジュールセンサと、イベントの危険度を監視する危険監視センサと、イベントを撮影するカメラ部と、各種情報を指示表示する指示表示部とを有する工事用コンピュータと、
イベントを撮影するカメラ操作部と、イベントの指示データを記憶する指示データ記憶部とを有する監視者用コンピュータと、
から構成されるシステムにおいて、
監視対象にスケジュールセンサと危険監視センサが組み込まれるステップと、前記危険管理サーバが工事の危険ランクとイベントの重要度と工事種別のパラメータαとから監視基準値を算出するステップと、該危険管理サーバが前記危険監視センサから危険値を得るステップと、該危険管理サーバが該危険値と前記監視基準値とを比較するステップと、前記危険値が監視基準値を超える場合には前記監視者用コンピュータが工事現場のイベントを自動監視するステップと、
を有することを特徴とする危険管理自動化方法。
An input unit for inputting the type of construction, parameters and events, a storage unit for storing data, a communication unit for communicating with the outside, a supervisor designating unit for designating a supervisor, a management unit for managing events, A risk management server having a comparison means for comparing the output of the danger monitoring sensor input from the outside with a monitoring reference value provided in advance, and a control unit for controlling these components;
A construction computer having a schedule sensor for recognizing a schedule, a danger monitoring sensor for monitoring the degree of risk of the event, a camera unit for photographing the event, and an instruction display unit for instructing and displaying various information;
A computer for a supervisor having a camera operation unit for capturing an event and an instruction data storage unit for storing instruction data of the event;
In a system consisting of
A step in which a schedule sensor and a danger monitoring sensor are incorporated in a monitoring target; a step in which the risk management server calculates a monitoring reference value from a construction risk rank, an event importance level, and a construction type parameter α; and the risk management server Obtaining a danger value from the danger monitoring sensor, the danger management server comparing the danger value with the monitoring reference value, and if the danger value exceeds the monitoring reference value, the computer for the supervisor Automatically monitoring events on the construction site,
A risk management automation method characterized by comprising:
前記危険値と監視基準値とを比較し、危険値が前記監視基準値を超える場合には、監視者へ通知すると共に、前記監視者用コンピュータがカメラ操作信号と指示データを工事用コンピュータ側へ送信することを特徴とする請求項1記載の危険管理自動化方法。   The danger value is compared with the monitoring reference value. If the danger value exceeds the monitoring reference value, the monitoring person is notified and the monitoring computer sends the camera operation signal and the instruction data to the construction computer side. The risk management automation method according to claim 1, wherein transmission is performed. 工事の種別とパラメータとイベントを入力する入力部と、データを記憶する記憶部と、外部と通信する通信部と、監視者を指定する監視者指定手段と、イベントの管理を行なう管理手段と、工事現場に設置された危険度を検知するための危険監視センサと、該危険監視センサの出力と予め設けられた監視基準値とを比較する比較手段と、これら各構成要素を制御する制御部とを有する危険管理サーバと、
スケジュールを認識するスケジュールセンサと、イベントの危険度を監視する危険監視センサと、イベントを撮影するカメラ部と、各種情報を指示表示する指示表示部とを有する工事用コンピュータと、
イベントを撮影するカメラ操作部と、イベントの指示データを記憶する指示データ記憶部とを有する監視者用コンピュータと、
から構成されるシステムにおいて、
監視対象にスケジュールセンサと危険監視センサを組み込み、前記危険管理サーバが工事の危険ランクとイベントの重要度と工事種別のパラメータαとから監視基準値を算出し、該危険管理サーバが前記危険監視センサから危険値を得て該危険値と前記監視基準値とを比較し、前記危険値が監視基準値を超える場合には前記監視者用コンピュータが工事現場のイベントを自動監視するように構成されることを特徴とする危険管理自動化システム。
An input unit for inputting the type of construction, parameters and events, a storage unit for storing data, a communication unit for communicating with the outside, a supervisor designating unit for designating a supervisor, a management unit for managing events, A danger monitoring sensor for detecting the degree of danger installed at the construction site, a comparison means for comparing the output of the danger monitoring sensor and a preset monitoring reference value, and a control unit for controlling these components; A risk management server having
A construction computer having a schedule sensor for recognizing a schedule, a danger monitoring sensor for monitoring the degree of risk of the event, a camera unit for photographing the event, and an instruction display unit for instructing and displaying various information;
A computer for a supervisor having a camera operation unit for capturing an event and an instruction data storage unit for storing instruction data of the event;
In a system consisting of
A schedule sensor and a danger monitoring sensor are incorporated in the monitoring target, and the danger management server calculates a monitoring reference value from the construction danger rank, the importance of the event, and the construction type parameter α, and the danger management server uses the danger monitoring sensor. A risk value is obtained from the result, the risk value is compared with the monitoring reference value, and if the risk value exceeds the monitoring reference value, the computer for monitoring is configured to automatically monitor a construction site event Danger management automation system characterized by that.
前記危険管理サーバは、危険監視センサより求めた危険値と監視基準値とを比較し、危険値が前記監視基準値を超える場合は監視者へ通知し、前記監視者用コンピュータがカメラ操作信号と指示データを工事コンピュータ側に送信することを特徴とする請求項3記載の危険管理自動化システム。   The danger management server compares the danger value obtained from the danger monitoring sensor with a monitoring reference value, and notifies the supervisor if the danger value exceeds the monitoring reference value. 4. The risk management automation system according to claim 3, wherein the instruction data is transmitted to the construction computer side.
JP2009218711A 2009-09-24 2009-09-24 Risk management automation method and system Pending JP2011070262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009218711A JP2011070262A (en) 2009-09-24 2009-09-24 Risk management automation method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009218711A JP2011070262A (en) 2009-09-24 2009-09-24 Risk management automation method and system

Publications (1)

Publication Number Publication Date
JP2011070262A true JP2011070262A (en) 2011-04-07

Family

ID=44015516

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009218711A Pending JP2011070262A (en) 2009-09-24 2009-09-24 Risk management automation method and system

Country Status (1)

Country Link
JP (1) JP2011070262A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015052854A (en) * 2013-09-05 2015-03-19 株式会社シー・エル・エー Occupational health and safety management system, occupational health and safety management method, and occupational health and safety management program
JP2017033047A (en) * 2015-07-28 2017-02-09 株式会社コンピュータシステム研究所 Safety management support device, safety management support program, and storage medium
KR20190040605A (en) * 2017-10-11 2019-04-19 전성남 LPWA network based worker hazard detection system
JP2021089564A (en) * 2019-12-04 2021-06-10 株式会社協和エクシオ Construction environment safety determination system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07336459A (en) * 1994-06-02 1995-12-22 Fujita Corp Safety management system for construction work
JP2003271234A (en) * 2002-03-13 2003-09-26 Mitsubishi Electric Corp Condition remote monitor system
JP2005216137A (en) * 2004-01-30 2005-08-11 Chugoku Electric Power Co Inc:The Maintenance support system and method
JP2006246418A (en) * 2005-03-02 2006-09-14 Shinko Kk Remote monitoring apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07336459A (en) * 1994-06-02 1995-12-22 Fujita Corp Safety management system for construction work
JP2003271234A (en) * 2002-03-13 2003-09-26 Mitsubishi Electric Corp Condition remote monitor system
JP2005216137A (en) * 2004-01-30 2005-08-11 Chugoku Electric Power Co Inc:The Maintenance support system and method
JP2006246418A (en) * 2005-03-02 2006-09-14 Shinko Kk Remote monitoring apparatus

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015052854A (en) * 2013-09-05 2015-03-19 株式会社シー・エル・エー Occupational health and safety management system, occupational health and safety management method, and occupational health and safety management program
JP2017033047A (en) * 2015-07-28 2017-02-09 株式会社コンピュータシステム研究所 Safety management support device, safety management support program, and storage medium
KR20190040605A (en) * 2017-10-11 2019-04-19 전성남 LPWA network based worker hazard detection system
KR102117594B1 (en) 2017-10-11 2020-06-01 전성남 LPWA network based worker hazard detection system
JP2021089564A (en) * 2019-12-04 2021-06-10 株式会社協和エクシオ Construction environment safety determination system

Similar Documents

Publication Publication Date Title
US11164134B2 (en) Systems and methods for improving process safety in an industrial environment
US20160035246A1 (en) Facility operations management using augmented reality
KR101199290B1 (en) Method and System for Plant Management by Augmentation Reality
EP3270242B1 (en) Systems and methods for predicting and displaying site safety metrics
EP2899658B1 (en) Controller and method controlling vital data indicating a state of a plant worker
US20220284366A1 (en) Method and system for managing a crane and/or construction site
TWI442349B (en) Emergency command system and method
EP2947529B1 (en) Information display method, information display apparatus, information display system, and non-transitory computer readable storage medium
KR102219809B1 (en) Safety Work Management System by Image Analysis
JP2007299228A (en) Monitoring control system, monitoring control device, field operation terminal of same, and monitoring method of same system
JP2014167706A (en) Monitoring device and control system
JP2011070262A (en) Risk management automation method and system
KR20220077404A (en) Method and System for Implementation of Multi-level On-site Safety Control of Worker Safety
JP2017097702A (en) Monitor system and monitor control device of the same
KR20200079001A (en) Control system and method using integrated environmental monitoring
WO2017149893A1 (en) Plant-monitoring system and monitoring method
JP2015229224A (en) Industrial robot
KR101377706B1 (en) Local information based wireless ship management system
KR101377052B1 (en) Semiconductor process monitoring system and semiconductor process monitoring method thereof
JP6228254B2 (en) Fire alarm equipment support system
KR102348944B1 (en) Fire management system of switchboard and powerboard and method thereof
KR101080120B1 (en) Security system
WO2021176663A1 (en) Monitoring device
JP2015135626A (en) Control room situation-recording system
JP6577892B2 (en) Maintenance management system, terminal, and maintenance management method

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20111122

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120326

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130424

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130430

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20131001