JP2010235027A - Display device for working machine - Google Patents

Display device for working machine Download PDF

Info

Publication number
JP2010235027A
JP2010235027A JP2009087026A JP2009087026A JP2010235027A JP 2010235027 A JP2010235027 A JP 2010235027A JP 2009087026 A JP2009087026 A JP 2009087026A JP 2009087026 A JP2009087026 A JP 2009087026A JP 2010235027 A JP2010235027 A JP 2010235027A
Authority
JP
Japan
Prior art keywords
work
cumulative
display device
time
operations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009087026A
Other languages
Japanese (ja)
Other versions
JP2010235027A5 (en
Inventor
Yasuhiko Kanari
靖彦 金成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP2009087026A priority Critical patent/JP2010235027A/en
Publication of JP2010235027A publication Critical patent/JP2010235027A/en
Publication of JP2010235027A5 publication Critical patent/JP2010235027A5/ja
Pending legal-status Critical Current

Links

Images

Landscapes

  • Component Parts Of Construction Machinery (AREA)
  • Fittings On The Vehicle Exterior For Carrying Loads, And Devices For Holding Or Mounting Articles (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a display device for a working machine which displays the actual working efficiency while a conventional device displays the fuel consumption per hour. <P>SOLUTION: The display device calculates the accumulated work amount ΣW<SB>ACT</SB>in all actuators (S110) within the working time for the reference to execute a series of predetermined actions, and obtains the accumulated fuel consumption ΣW<SB>FUEL</SB>(S140). The work amount (the unit: joule) per liter of the fuel in the working time by dividing the accumulated work amount ΣW<SB>ACT</SB>by the accumulated fuel consumption ΣW<SB>FUEL</SB>is displayed. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、油圧ショベル等の作業機械の運転室に設置される表示装置に関するものである。   The present invention relates to a display device installed in a cab of a work machine such as a hydraulic excavator.

油圧ショベル等の作業機械に設置される表示装置として、燃費すなわち時間当たりの燃料消費量を数値で表示するものが知られている(特許文献1)。
また、作業前にオペレータが予め設定した目標とする燃費に対して、実際の燃費を比較して表示する装置が知られている(特許文献2)。
As a display device installed on a work machine such as a hydraulic excavator, a display device that displays a fuel consumption, that is, a fuel consumption amount per hour as a numerical value is known (Patent Document 1).
There is also known an apparatus that compares and displays actual fuel consumption with respect to a target fuel consumption preset by an operator before work (Patent Document 2).

特開2006−16915号公報JP 2006-16915 A 特開平2008−62791号公報JP 2008-62791 A

しかしながら、上述した従来の装置は、いずれも燃費(すなわち、時間当たりの燃料消費量)を表示するものであって、実際に行われた作業の効率を表すものではなかった。換言すると、時間当たりに少ない仕事量を行っていれば燃費は良くなるが、その燃費の大小は、作業を効率良く行ったか否かということとは無関係である。   However, any of the conventional devices described above displays fuel consumption (that is, fuel consumption per hour) and does not represent the efficiency of work actually performed. In other words, the fuel consumption is improved if a small amount of work is performed per hour, but the size of the fuel consumption is irrelevant to whether the work is performed efficiently.

請求項1に記載の発明は、予め定めた一連の動作を行うための基準作業時間内において、前記一連の動作を行うために使用したアクチュエータの仕事量を累算し、累積仕事量を出力する累積仕事量算出手段と、前記基準作業時間内における累積燃料消費量を算出する累積燃料消費量算出手段と、前記累積仕事量を前記累積燃料消費量で除算した結果を報知する報知手段とを備えた作業機械の表示装置である。
請求項2に記載の発明は、予め定めた一連の動作を行うための基準作業時間内において、前記一連の動作を行うために使用したアクチュエータの仕事量を累算し、累積仕事量を出力する累積仕事量算出手段と、前記一連の動作を行うために使用したアクチュエータを駆動するために用いるエンジンが前記基準作業時間内において発生した累積エンジン発生仕事量を算出する累積エンジン発生仕事量算出手段と、前記累積エンジン発生仕事量から前記累積仕事量を差し引いた結果を報知する報知手段とを備え作業機械の表示装置である。
According to the first aspect of the present invention, the work amount of the actuator used to perform the series of operations is accumulated within a reference work time for performing a predetermined series of operations, and the accumulated work amount is output. An accumulated work amount calculating means; an accumulated fuel consumption calculating means for calculating an accumulated fuel consumption amount within the reference work time; and an informing means for notifying a result of dividing the accumulated work amount by the accumulated fuel consumption amount. Display device for a working machine.
According to the second aspect of the present invention, the work amount of the actuator used to perform the series of operations is accumulated within a reference work time for performing a predetermined series of operations, and the accumulated work amount is output. Cumulative work calculation means; cumulative engine generated work calculation means for calculating the cumulative engine generated work generated by the engine used to drive the actuator used for performing the series of operations within the reference work time; And a notifying means for notifying a result obtained by subtracting the accumulated work amount from the accumulated engine generated work amount.

本発明に係る作業機械の表示装置によれば、予め定めた作業を効率よく行うことができたか否かを表す判断指標を報知することができる。   According to the display device for a work machine according to the present invention, it is possible to notify a determination index indicating whether or not a predetermined work has been efficiently performed.

本発明を適用した油圧ショベルの全体構成図である。1 is an overall configuration diagram of a hydraulic excavator to which the present invention is applied. 上部旋回体の運転室内図である。It is a driving room figure of an upper revolving structure. 実施の形態で用いる電気的要素を描いたブロック図である。It is a block diagram on which the electrical element used in embodiment was drawn. ISOレバー方式によるショベルの動きを示した説明図である。It is explanatory drawing which showed the movement of the shovel by an ISO lever system. 表示制御装置で行う演算および信号処理を示すフローチャートである。It is a flowchart which shows the calculation and signal processing which are performed with a display control apparatus. サイクルタイムを設定するためのフローチャートである。It is a flowchart for setting cycle time. 表示処理を示すフローチャートである。It is a flowchart which shows a display process. 表示器の表示例を示す図である。It is a figure which shows the example of a display of a display. 表示器の表示例を示す図である。It is a figure which shows the example of a display of a display. その他の表示処理を示すフローチャートである。It is a flowchart which shows another display process. 表示器の表示例を示す図である。It is a figure which shows the example of a display of a display.

以下、図面を参照して、本発明の実施の形態を詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

<実施の形態>
図1は、本発明を適用した油圧ショベルの全体構成図である。本図において、下部走行体10は、一対のクローラ11およびクローラフレーム12、各クローラ11を独立して駆動制御する一対の走行用油圧モータ13,14およびその減速機構(図示せず)を備えている。
<Embodiment>
FIG. 1 is an overall configuration diagram of a hydraulic excavator to which the present invention is applied. In this figure, the lower traveling body 10 includes a pair of crawlers 11 and a crawler frame 12, a pair of traveling hydraulic motors 13 and 14 that independently drive and control each crawler 11, and a speed reduction mechanism (not shown). Yes.

上部旋回体20は、旋回フレーム21と、旋回フレーム21上に設けられたエンジン22と、下部走行体10に対して上部旋回体20を旋回駆動させるための油圧モータ26とを備えている。   The upper swing body 20 includes a swing frame 21, an engine 22 provided on the swing frame 21, and a hydraulic motor 26 that drives the lower swing body 10 to swing the upper swing body 20.

上部旋回体20には、起伏可能なブーム31と、ブーム31を駆動するためのブームシリンダ32と、ブーム31の先端部近傍に回転自在に軸支されたアーム33と、アーム33を駆動するためのアームシリンダ34と、アーム33の先端に回転自在に軸支されたバケット35と、バケット35を駆動するためのバケットシリンダ36とを含んだショベル機構(多関節型フロント作業部)30が搭載されている。   The upper swing body 20 has a boom 31 that can be raised and lowered, a boom cylinder 32 that drives the boom 31, an arm 33 that is rotatably supported near the tip of the boom 31, and an arm 33 that is driven. Is mounted with a shovel mechanism (multi-joint type front working unit) 30 including an arm cylinder 34, a bucket 35 rotatably supported at the tip of the arm 33, and a bucket cylinder 36 for driving the bucket 35. ing.

上部旋回体20の旋回フレーム21上には、ブームシリンダ32,アームシリンダ34,バケットシリンダ36を駆動制御するための油圧ポンプおよび油圧制御弁を備えた油圧制御システム40が搭載されている。   A hydraulic control system 40 including a hydraulic pump and a hydraulic control valve for driving and controlling the boom cylinder 32, the arm cylinder 34, and the bucket cylinder 36 is mounted on the swing frame 21 of the upper swing body 20.

このように、図1に示した油圧ショベルは6個の油圧アクチュエータ(旋回モータ,左右の走行モータ,ブームシリンダ,アームシリンダ,バケットシリンダ)を備えている。6個の油圧アクチュエータのうち、3個の油圧シリンダ(ブームシリンダ,アームシリンダ,バケットシリンダ)には、複動するピストンロッドの位置を検出するためのロッド位置検出器(図示せず)および圧力検出器(図示せず)がそれぞれ取り付けられており、後に詳述する演算処理(図5参照)に基づいて、各油圧シリンダの仕事量(単位:ジュール)を算出する。なお、ロッド位置検出器(図示せず)として、各シリンダの外部に取り付けたワイヤ式ストロークセンサ、あるいは、各シリンダ内部に埋め込んである磁気式センサなど公知のセンサを用いることが可能である。   As described above, the hydraulic excavator shown in FIG. 1 includes six hydraulic actuators (a swing motor, left and right traveling motors, a boom cylinder, an arm cylinder, and a bucket cylinder). Of the six hydraulic actuators, three hydraulic cylinders (boom cylinder, arm cylinder, bucket cylinder) have a rod position detector (not shown) and pressure detection for detecting the position of the double acting piston rod. A unit (not shown) is attached, and the work amount (unit: joule) of each hydraulic cylinder is calculated based on the arithmetic processing (see FIG. 5) described in detail later. As a rod position detector (not shown), it is possible to use a known sensor such as a wire type stroke sensor attached to the outside of each cylinder or a magnetic sensor embedded in each cylinder.

同様に、6個の油圧アクチュエータのうち、3個の油圧モータ(旋回モータ,左右の走行モータ)には、各モータの回転角度を検出するための回転角度検出器(図示せず)および圧力検出器(図示せず)がそれぞれ取り付けられており、後に詳述する演算処理(図5参照)に基づいて、各油圧モータの仕事量(単位:ジュール)を算出する。   Similarly, of the six hydraulic actuators, three hydraulic motors (swing motor, left and right traveling motors) include a rotation angle detector (not shown) and pressure detection for detecting the rotation angle of each motor. A unit (not shown) is attached, and the work (unit: joule) of each hydraulic motor is calculated based on the arithmetic processing (see FIG. 5) described in detail later.

図2は、上部旋回体20の運転席側から見た運転室内図である。この運転室内には、左レバー42および右レバー44などの他に、本実施の形態に特有な表示器50および押しボタン52,54を備えている。この押しボタン52,54を押下することにより、後に詳述する演算手順に従って(図6参照)、サイクルタイムを設定する。ここで言うサイクルタイムとは、予め定めた一連の動作を行うために基準となる作業時間(単位:秒)をいう。さらに換言すると、サイクルタイムとは、予め定義した作業の仕事量(単位:ジュール)を算出するための測定基準時間(単位:秒)をいう。   FIG. 2 is a driver's cab view as seen from the driver seat side of the upper swing body 20. In this cab, in addition to the left lever 42 and the right lever 44, a display device 50 and push buttons 52 and 54 unique to the present embodiment are provided. By depressing the push buttons 52 and 54, the cycle time is set in accordance with a calculation procedure described in detail later (see FIG. 6). The cycle time here refers to a working time (unit: second) that serves as a reference for performing a predetermined series of operations. In other words, the cycle time refers to a measurement reference time (unit: second) for calculating a work amount (unit: joule) of a predefined work.

例えば、掘削作業をする場合には、ブーム31を下げてからバケット35に土を入れ、ダンプカー(図示せず)へ積み込みを行うまでの一連の動作時間(単位:秒)を1サイクルタイムとして設定する。あるいは、最初にブーム31を下げてから1台のダンプカーに積み込みが完了するまでの全所要時間を1サイクルタイムとして設定してもよい。サイクルタイムの設定は、オペレータ自身が設定するほか、作業内容ごとに定められている既定値を選択することにより行うことができる。その具体的設定手順については、図3以降において詳述する。   For example, when performing excavation work, a series of operation time (unit: seconds) from lowering the boom 31 to putting soil in the bucket 35 and loading it into a dump truck (not shown) is set as one cycle time. To do. Alternatively, the total required time from the first lowering of the boom 31 to the completion of loading in one dump truck may be set as one cycle time. The cycle time can be set by the operator himself / herself or by selecting a predetermined value determined for each work content. The specific setting procedure will be described in detail after FIG.

図3は、本実施の形態で用いる電気的要素を描いたブロック図である。本図において、αは油圧シリンダ32,34,36に装着されているロッド位置検出器、βは油圧シリンダ32,34,36に装着されている圧力検出器である。γは油圧モータ13,14,26に装着されている回転角度検出器、δは油圧モータ13,14,26に装着されている圧力検出器である。45は、エンジン22の回転数(rpm)を検出するエンジン回転数検出器である。47は、目標エンジン回転数を維持するためのエンジンコントローラであり、エンジン制御パラメータの一つである燃料噴射量指示値を外部に出力する。50は、運転室に載置されている表示器である(図2参照)。55はサイクルタイム設定部であり、図2に示した押しボタン52および54を備えている。これら押しボタンのうち、一方の押しボタン52は、スタートボタン52Aおよびストップボタン52Bから成っている。他方の押しボタン54は、複数のボタンA〜Gから成っている。これら各ボタンが有する機能については、後に図4を参照しながら説明する。   FIG. 3 is a block diagram depicting electrical elements used in the present embodiment. In this figure, α is a rod position detector mounted on the hydraulic cylinders 32, 34, 36, and β is a pressure detector mounted on the hydraulic cylinders 32, 34, 36. γ is a rotation angle detector attached to the hydraulic motors 13, 14 and 26, and δ is a pressure detector attached to the hydraulic motors 13, 14 and 26. Reference numeral 45 denotes an engine speed detector that detects the speed (rpm) of the engine 22. 47 is an engine controller for maintaining the target engine speed, and outputs a fuel injection amount instruction value, which is one of the engine control parameters, to the outside. Reference numeral 50 denotes an indicator placed in the cab (see FIG. 2). A cycle time setting unit 55 includes the push buttons 52 and 54 shown in FIG. Among these push buttons, one push button 52 includes a start button 52A and a stop button 52B. The other push button 54 includes a plurality of buttons AG. The functions of these buttons will be described later with reference to FIG.

70は表示制御装置であり、先に述べた各要素と通信を行うI/O部70Aと、図5に示す演算を行う演算部70Bと、エンジン22のトルク特性およびその他の演算用パラメータを記憶しておく記憶領域ならびに一般的なワーク領域を有する記憶部70Cと、表示器50に表示する複数種類の画像を記憶すると同時に表示させる画像の選択機能を有する画像出力部70Dと、サイクルタイム設定部55により設定されたサイクルタイムを記憶しておくサイクルタイム入力バッファ70Eとを含んでいる。   Reference numeral 70 denotes a display control device, which stores an I / O unit 70A that communicates with each of the above-described elements, a calculation unit 70B that performs the calculation shown in FIG. 5, a torque characteristic of the engine 22, and other calculation parameters. A storage unit 70C having a storage area and a general work area, an image output unit 70D having a function of selecting an image to be displayed at the same time as storing a plurality of types of images to be displayed on the display 50, and a cycle time setting unit Cycle time input buffer 70E for storing the cycle time set by 55.

次に、サイクルタイム設定部55の操作手順について説明する。
(§1)押しボタン52を用いたサイクルタイムの設定
掘削作業を例にあげて説明していく。この掘削作業例では、バケットからダンプカーへ土を1回だけ積み込むための一連の動作を、1サイクルタイムとして設定する。説明を容易にするために、ISOレバー方式によるショベルの動きを示した図4を参照しながら、サイクルタイムの設定操作を述べる。
Next, an operation procedure of the cycle time setting unit 55 will be described.
(§1) Setting cycle time using push button 52 Excavation work will be described as an example. In this excavation work example, a series of operations for loading soil from the bucket into the dump truck only once is set as one cycle time. For ease of explanation, the cycle time setting operation will be described with reference to FIG. 4 showing the movement of the shovel by the ISO lever method.

先ず、オペレータがショベルを掘削開始位置に移動した後、スタートボタン52Aを押す。次に、ブーム下げ操作(図4:B)、アームクラウド操作(図4:C)、バケットクラウド操作(図4:E)、必要に応じたブーム上げ操作(図4:A)を行って、バケットに土を入れる。その後、必要に応じたブーム操作、アーム操作、バケット操作、および旋回操作(図4:GもしくはH)を行うことにより、バケットをダンプカーの上部に移動する。そして、バケットダンプ操作(図4:F)を行い(必要に応じて、ブーム操作、アーム操作、旋回操作も行う)、放土する。その後、ブーム操作、アーム操作、バケット操作、旋回操作により、バケットを掘削開始位置に移動する。そして、ストップボタン52Bを押す。   First, the operator moves the excavator to the excavation start position, and then presses the start button 52A. Next, perform a boom lowering operation (FIG. 4: B), an arm cloud operation (FIG. 4: C), a bucket cloud operation (FIG. 4: E), and a boom raising operation (FIG. 4: A) as necessary. Put the soil in the bucket. Thereafter, the bucket is moved to the upper part of the dump truck by performing boom operation, arm operation, bucket operation, and turning operation (FIG. 4: G or H) as necessary. Then, the bucket dump operation (FIG. 4: F) is performed (the boom operation, the arm operation, and the turning operation are performed as necessary), and the soil is released. Thereafter, the bucket is moved to the excavation start position by a boom operation, an arm operation, a bucket operation, and a turning operation. Then, the stop button 52B is pressed.

表示制御装置70のサイクルタイム入力バッファ70Eには、スタートボタン52Aが押されてからストップボタン52Bが押されるまでの時間(単位:秒)が記憶される。   The cycle time input buffer 70E of the display control device 70 stores the time (unit: second) from when the start button 52A is pressed until the stop button 52B is pressed.

上記のサイクルタイム設定操作では、ダンプカーに1回の放土が行われるまでの時間を1サイクルタイムとしたが、1台のダンプカーに放土の積み込みが完了するまでの全所要時間を1サイクルタイムとして設定することも可能である。この場合には、ダンプカーが所定の位置に停止したときに、スタートボタン52Aを押す。そして、上述したショベル操作を繰り返してダンプカーへの積み込みが一杯になり、ダンプカーが移動を開始したときにストップボタン52Bを押す。このようにして、1台のダンプカーに積み込みが完了するまでの全所要時間を1サイクルタイムとして設定することができる。   In the above cycle time setting operation, the time until the dump truck is dumped once is set as one cycle time. However, the total time required for the dump truck to be loaded is one cycle time. It is also possible to set as In this case, when the dump truck stops at a predetermined position, the start button 52A is pressed. Then, when the excavator operation described above is repeated and the loading of the dump truck becomes full, and the dump truck starts moving, the stop button 52B is pressed. In this way, the total time required for loading into one dump truck can be set as one cycle time.

その他、オペレータが自由にスタートボタン52Aとストップボタン52Bを押すことにより、任意のサイクルタイムを設定することができる。   In addition, an arbitrary cycle time can be set by the operator freely pressing the start button 52A and the stop button 52B.

(§2)押しボタン54を用いたサイクルタイムの設定
作業内容ごとに定められている既定値を選択するために、ボタンA〜Gのいずれか一つをオペレータが押下する。スタートボタン52Aおよびストップボタン52Bは使用しない。すなわち、作業ごとによるサイクルタイムを予め登録しておき、オペレータは、これから行う作業内容に応じたボタンを押下する。例えば、掘削積込(ダンプ位置90度)、掘削積込(ダンプ位置180度)、ならし作業(5m)、ならし作業(10m)、法面整形作業(5m)、法面整形作業(10m)などのように、作業内容に応じてボタンA〜Gのいずれか一つを押下する。さらに、土の固さなどを考慮してより細かな作業内容を登録しておくことにより、より細かなサイクルタイムを設定することができる。
(§2) Setting cycle time using push button 54 The operator presses one of buttons A to G in order to select a predetermined value determined for each work content. The start button 52A and the stop button 52B are not used. That is, the cycle time for each work is registered in advance, and the operator presses a button corresponding to the work contents to be performed. For example, (degrees dump position 90) drilling loading, digging loading (dumping position 180 degrees), leveling work (5 m 2), leveling work (10 m 2), slope shaping work (5 m 2), slope shaping As in the work (10 m 2 ), one of the buttons A to G is pressed according to the work content. Furthermore, by registering more detailed work contents in consideration of the hardness of the soil, it is possible to set a finer cycle time.

図5は、表示制御装置70で行う演算および信号処理を示すフローチャートである。   FIG. 5 is a flowchart showing computation and signal processing performed by the display control device 70.

図5における最初のステップS50は、サイクルタイムTCYCを設定するためのサブルーチンである。このサブルーチンでは、図6に示すように、まず作業開始ボタン(=スタートボタン52A)の押下を検出してタイマのカウント動作を開始させる(ステップS200,S210)。その後、作業終了ボタン(=ストップボタン52B)の押下を検出してタイマのカウント動作を停止させる(ステップS220,S230)。その結果、タイマのカウント値に対応した秒数がサイクルタイムTCYCとして決定され(ステップS240)、メインルーチンに戻る。 The first step S50 in FIG. 5 is a subroutine for setting the cycle time TCYC . In this subroutine, as shown in FIG. 6, first, pressing of the work start button (= start button 52A) is detected, and the timer counting operation is started (steps S200 and S210). Thereafter, pressing of the work end button (= stop button 52B) is detected, and the timer counting operation is stopped (steps S220 and S230). As a result, the number of seconds corresponding to the count value of the timer is determined as the cycle time T CYC (step S240), and the process returns to the main routine.

ステップS100では、後に述べる演算結果を記憶しておく各バッファを初期化する。より具体的には、記憶部70Cに設けられている
(1)累積仕事量ΣWACT記憶領域
(2)累積仕事量ΣWENG記憶領域
(3)累積燃料消費量ΣWFUEL記憶領域
(4)演算時間TCAL記憶領域
の記憶データを零にリセットする。累積仕事量ΣWACTと累積仕事量ΣWENGと累積燃料消費量ΣWFUELとについては、以下のステップにおいて説明する。
In step S100, each buffer for storing calculation results described later is initialized. More specifically, (1) cumulative work ΣW ACT storage area (2) cumulative work ΣW ENG storage area (3) cumulative fuel consumption ΣW FUEL storage area (4) calculation time The stored data in the T CAL storage area is reset to zero. The accumulated work amount ΣW ACT , the accumulated work amount ΣW ENG and the accumulated fuel consumption amount ΣW FUEL will be described in the following steps.

ステップS105では、それぞれのアクチュエータに取り付けたセンサ(すなわち、図3の検出器α,β,γ,δ)から検出データを取り込み、アクチュエータごとの仕事量WACTを算出する。油圧シリンダ32,34,36における仕事量(単位:ジュール)、および、油圧モータ13,14,26における仕事量(単位:ジュール)は、次のようにして演算する。 In step S105, detection data is fetched from sensors (that is, detectors α, β, γ, and δ in FIG. 3) attached to the respective actuators, and a work amount W ACT for each actuator is calculated. The amount of work (unit: joule) in the hydraulic cylinders 32, 34, and 36 and the amount of work (unit: joule) in the hydraulic motors 13, 14, and 26 are calculated as follows.

(a)油圧シリンダ32,34,36の仕事量演算
各油圧シリンダ32,34,36における仕事量を求めるために、まず次式に従って、シリンダ推力を演算する。
推力(N)=π×シリンダ半径2(mm2)×圧力(MPa)×シリンダ効率
次に、ロッド位置検出器αから得られた位置情報に基づいて、ロッドの移動速度(m/s)を求める。仕事率(J/s)は次式に従って求めることができる。
仕事率(J/s)=推力(N)×移動速度(m/s)
次に、上記仕事率(J/s)に演算周期d(例えば、10ミリ秒)を乗じることにより、演算周期dにおける仕事量(J)を求める。
仕事量(J)=仕事率(J/s)×演算周期d(s)
以上の演算により、油圧シリンダごとの仕事量WACTを算出する。
なお、シリンダ半径およびシリンダ効率は各油圧シリンダにより異なるが、これらの値は記憶部70Cに予め記憶させておく。また、シリンダのボトム側とロッド側でシリンダ半径およびシリンダ効率は異なるが、これらの値も同様に記憶部70Cに記憶させておく。
(A) Calculation of work amount of hydraulic cylinders 32, 34, 36 In order to obtain the work amount of each hydraulic cylinder 32, 34, 36, first, cylinder thrust is calculated according to the following equation.
Thrust (N) = π × Cylinder radius 2 (mm 2 ) × Pressure (MPa) × Cylinder efficiency Next, based on the position information obtained from the rod position detector α, the rod moving speed (m / s) is calculated. Ask. The work rate (J / s) can be obtained according to the following equation.
Work rate (J / s) = Thrust (N) × Movement speed (m / s)
Next, the work amount (J) in the calculation period d is obtained by multiplying the work rate (J / s) by the calculation period d (for example, 10 milliseconds).
Work (J) = Work rate (J / s) × Operation period d (s)
Through the above calculation, the work amount W ACT for each hydraulic cylinder is calculated.
Although the cylinder radius and cylinder efficiency differ depending on each hydraulic cylinder, these values are stored in advance in the storage unit 70C. Further, although the cylinder radius and cylinder efficiency differ between the bottom side and the rod side of the cylinder, these values are also stored in the storage unit 70C.

(b)油圧モータ13,14,26の仕事量演算
油圧モータ13,14,26における仕事量を求めるために、まず次式に従って、出力トルクを演算する。
出力トルク(N・m)=圧力(MPa)×モータ容量(cm3/rev)×効率×ギア比/2π
次に、回転角度検出器γからの検出データに基づき1分間当たりの回転数(rpm)を算出する。仕事率(J/s)は、次式により求める。
仕事率(J/s)=2π×出力トルク(N・m)×回転数(rpm)/60
このようにして求めた仕事率(J/s)に演算周期d(例えば、10ミリ秒)を乗じることにより、演算周期dにおける仕事量(J)を求める。
仕事量(J)=仕事率(J/s)×演算周期d(s)
以上の演算により、油圧モータごとの仕事量WACTを算出する。
なお、モータ容量,効率,ギア比は記憶部70Cに予め記憶させておく。
(B) Calculation of work amount of hydraulic motors 13, 14, and 26 In order to obtain the work amount of the hydraulic motors 13, 14, and 26, first, output torque is calculated according to the following equation.
Output torque (N · m) = Pressure (MPa) x Motor capacity (cm 3 / rev) x Efficiency x Gear ratio / 2π
Next, the number of revolutions per minute (rpm) is calculated based on the detection data from the rotation angle detector γ. The work rate (J / s) is obtained by the following equation.
Power (J / s) = 2π × Output torque (N · m) × Number of revolutions (rpm) / 60
The work rate (J) in the calculation period d is obtained by multiplying the work rate (J / s) thus obtained by the calculation period d (for example, 10 milliseconds).
Work (J) = Work rate (J / s) × Operation period d (s)
Through the above calculation, the work amount W ACT for each hydraulic motor is calculated.
The motor capacity, efficiency, and gear ratio are stored in advance in the storage unit 70C.

ステップS110では、ステップS105で算出した仕事量WACTの累計を求める。そして、記憶部70Cの累積仕事量ΣWACT記憶領域に既に記憶されているデータに加算して、新たな累積仕事量ΣWACTを記憶する。 In step S110, it obtains the cumulative amount of work W ACT calculated in step S105. Then, the new accumulated work ΣW ACT is stored by adding to the data already stored in the accumulated work ΣW ACT storage area of the storage unit 70C.

ステップS120では、エンジン回転数検出器45からエンジン22の回転数(rpm)を取得する。   In step S120, the engine speed detector 45 acquires the engine speed (rpm) of the engine 22.

ステップS130では、エンジン22が発生した累積仕事量ΣWENGを算出する。累積仕事量ΣWENGの演算過程は次の通りである。
エンジンの発生トルクをτとし、回転角速度をωとすると、エンジンの仕事率P(J/s)は、P=τ・ωであるので、ステップS120で検出した回転数に基づいて、記憶部70Cに記憶されているエンジン特性データから発生トルクτを読み出す。この仕事率P(J/s)に演算周期d(例えば、10ミリ秒)を乗じることにより、演算周期dにおける仕事量(J)を求める。そして、記憶部70Cの累積仕事量ΣWENG記憶領域に既に記憶されているデータに加算して、新たな累積仕事量ΣWENGを記憶する。
In step S130, a cumulative work amount ΣW ENG generated by the engine 22 is calculated. The calculation process of the accumulated work amount ΣW ENG is as follows.
Assuming that the generated torque of the engine is τ and the rotational angular velocity is ω, the engine power P (J / s) is P = τ · ω. Therefore, based on the rotational speed detected in step S120, the storage unit 70C The generated torque τ is read from the engine characteristic data stored in. The work rate (J) in the calculation cycle d is obtained by multiplying the work rate P (J / s) by the calculation cycle d (for example, 10 milliseconds). Then, a new accumulated work amount ΣW ENG is stored by adding to the data already stored in the accumulated work amount ΣW ENG storage area of the storage unit 70C.

ステップS140では、エンジンコントローラ47から出力される燃料噴射量指示値に基づいて演算周期d(例えば、10ミリ秒)ぶんの燃料噴射量を算出する。そして、記憶部70Cの累積燃料消費量ΣWFUEL記憶領域に既に記憶されているデータに加算して、新たな累積燃料消費量ΣWFUELを記憶する。 In step S140, the fuel injection amount corresponding to the calculation cycle d (for example, 10 milliseconds) is calculated based on the fuel injection amount instruction value output from the engine controller 47. Then, a new cumulative fuel consumption amount ΣW FUEL is stored by adding to the data already stored in the cumulative fuel consumption amount ΣW FUEL storage area of the storage unit 70C.

ステップS150では、記憶部70Cの演算時間TCAL記憶領域に既に記憶されているデータに演算周期dを加算して、新たな演算時間TCALを記憶する。 In step S150, the calculation period d is added to the data already stored in the calculation time T CAL storage area of the storage unit 70C to store a new calculation time T CAL .

ステップS160では、サイクルタイムTCYC>演算時間TCALとなっているか否かを判別し、演算時間TCALがサイクルタイムTCYC以上になるまで、上記のステップS105〜S150を繰り返す。 In step S160, it is determined whether or not cycle time T CYC > calculation time T CAL, and steps S105 to S150 are repeated until calculation time T CAL is equal to or greater than cycle time T CYC .

ステップS170は表示処理サブルーチンである。図7は、この表示処理サブルーチンを示している。すなわち、ステップS300において(ΣWACT/ΣWFUEL)を演算し、ステップS310においてその演算結果を表示器50に表示する。表示器50の表示例として、図8に示すように、油温計および燃料残量計の右側に数値で演算結果を表示することができる。 Step S170 is a display processing subroutine. FIG. 7 shows this display processing subroutine. That is, (ΣW ACT / ΣW FUEL ) is calculated in step S300, and the calculation result is displayed on the display 50 in step S310. As a display example of the display 50, as shown in FIG. 8, the calculation result can be displayed as a numerical value on the right side of the oil temperature gauge and the fuel remaining amount gauge.

図8の右側に表示してある「8.5J/L」とは、1サイクルタイム内において、1リットル当たり8.5ジュールの仕事を行ったことを示している。したがって、この数値が大きいほど、1サイクルタイム当たりの仕事効率が良いことを示しているので、予め定めた閾値と比較することにより、青・黄・赤といったランプ表示あるいはその他のインジケータ表示をすることも可能である。さらにデジタル式タコグラフなどの運行記録計に演算結果を記録することも可能である。   “8.5 J / L” displayed on the right side of FIG. 8 indicates that the work of 8.5 joules per liter was performed within one cycle time. Therefore, the larger this value, the better the work efficiency per cycle time. By comparing with a predetermined threshold value, lamp indication such as blue, yellow, red, or other indicator display is performed. Is also possible. Furthermore, it is also possible to record the calculation results on an operation recorder such as a digital tachograph.

図8の右側に示した数値は、ある1サイクルタイムにおける仕事効率(J/L)を示しているが、1サイクルタイムの長短については表示されていない。
そこで、図9に示すような棒グラフ表示とすることにより、1サイクルタイムの長短とそれぞれのサイクルタイムにおける仕事効率(J/L)とを時系列的に表示することができる。特に、サイクルタイムの値が途中で変更されたときにも、そのサイクルタイムの変化量を目視することができる。この図9においては、棒グラフの高さが高いほど1サイクルタイム当たりの仕事効率が良いことを示している。
The numerical value shown on the right side of FIG. 8 indicates the work efficiency (J / L) at a certain cycle time, but the length of the cycle time is not displayed.
Therefore, by using a bar graph display as shown in FIG. 9, the length of one cycle time and the work efficiency (J / L) at each cycle time can be displayed in time series. In particular, even when the cycle time value is changed in the middle, the change amount of the cycle time can be visually observed. FIG. 9 shows that the work efficiency per cycle time is better as the height of the bar graph is higher.

図10は、図5のステップS170に示した表示処理サブルーチンの他の例を示している。ステップS400においては、(ΣWENG−ΣWACT)を演算しているので、エンジンが出力した累積仕事量ΣWENGと全アクチュエータでの累積仕事量ΣWACTとの差を算出することができる。この演算結果に基づいて、ステップS410では損失仕事量(ジュール)を表示する。 FIG. 10 shows another example of the display processing subroutine shown in step S170 of FIG. In step S400, since (ΣW ENG −ΣW ACT ) is calculated, the difference between the accumulated work amount ΣW ENG output from the engine and the accumulated work amount ΣW ACT for all actuators can be calculated. Based on the calculation result, the lost work (joule) is displayed in step S410.

図11は、各サイクルタイムごとの損失仕事量(ジュール)を棒グラフで時系列的に示したものである。この図11においては、棒グラフの高さが低いほど1サイクルタイム当たりの仕事効率が良いことを示している。本図においても、サイクルタイムの値が途中で変更されたときには、そのサイクルタイムの変化量を目視することができる。   FIG. 11 shows the loss work (joule) for each cycle time as a bar graph in time series. In FIG. 11, the lower the height of the bar graph, the better the work efficiency per cycle time. Also in this figure, when the value of the cycle time is changed halfway, the change amount of the cycle time can be visually observed.

図8,図9,図11に示した表示形態は、図示しない表示切り替えスイッチにより切り替えて表示することができる。その切り替え表示を可能にするために、画像出力部70D(図3参照)には、指定された画像を出力可能なように、全ての画像を記憶しておく。   The display forms shown in FIGS. 8, 9, and 11 can be switched and displayed by a display changeover switch (not shown). In order to enable the switching display, all images are stored in the image output unit 70D (see FIG. 3) so that the designated image can be output.

<本実施の形態による作用・効果>
本実施の形態によれば、以下のような作用・効果を奏することができる。
<Operations and effects according to this embodiment>
According to the present embodiment, the following actions and effects can be achieved.

(1)予め定めた一連の動作を行うための基準作業時間内(すなわち、1サイクルタイム)において一連の動作を行うために使用したアクチュエータ(油圧シリンダ32,34,36および油圧モータ13,14,26)の仕事量(単位:ジュール)を累算して累積仕事量ΣWACTを演算するすると共に、その基準作業時間内における累積燃料消費量ΣWFUELを算出する演算部70Bと、累積仕事量ΣWACTを累積燃料消費量ΣWFUELで除算した結果(単位:ジュール/リットル)を表示する表示器50とを備えているので、実際に行った作業の効率の程度を直接把握することができる。 (1) Actuators (hydraulic cylinders 32, 34, 36 and hydraulic motors 13, 14, 36) used to perform a series of operations within a reference work time (ie, one cycle time) for performing a predetermined series of operations. 26) accumulating the work amount (unit: joule) of 26) to calculate the cumulative work amount ΣW ACT and calculating the cumulative fuel consumption amount ΣW FUEL within the reference work time, and the cumulative work amount ΣW Since the display 50 displays the result (unit: joule / liter) obtained by dividing ACT by the cumulative fuel consumption ΣW FUEL , it is possible to directly grasp the degree of efficiency of the work actually performed.

(2)予め定めた一連の動作を行うための基準作業時間内(すなわち、1サイクルタイム)において一連の動作を行うために使用したアクチュエータ(油圧シリンダ32,34,36および油圧モータ13,14,26)の仕事量(単位:ジュール)を累算して累積仕事量ΣWACTを演算すると共に、その一連の動作を行うために使用したアクチュエータを駆動するために用いるエンジン22が基準作業時間内において発生したエンジン発生仕事量ΣWENGを算出する演算部70Bと、エンジン発生仕事量ΣWENGから累積仕事量ΣWACTを差し引いた結果を表示する表示器50とを備えているので、1サイクルタイムごとに損失仕事量(ジュール)を表示することができる。その結果、1サイクルタイム内で無駄にしたエネルギーを直接把握することができる。 (2) Actuators (hydraulic cylinders 32, 34, 36 and hydraulic motors 13, 14, 36) used to perform a series of operations within a reference work time (ie, one cycle time) for performing a predetermined series of operations. 26) accumulating the work (unit: joule) of 26) to calculate the cumulative work ΣW ACT and the engine 22 used for driving the actuator used for performing the series of operations within the reference work time. a calculation unit 70B for calculating the engine generator workload .SIGMA.W ENG generated, since a display 50 for displaying the result of subtracting the accumulated workload .SIGMA.W ACT from the engine generator workload .SIGMA.W ENG, every cycle time The loss work (joule) can be displayed. As a result, the wasted energy can be directly grasped within one cycle time.

(3)表示器50は、基準作業時間(サイクルタイム)ごとに生じる演算結果を時系列的に並べた棒グラフとして表示するので、演算結果の時間的推移を視認することができるばかりでなく、作業の途中で基準作業時間(サイクルタイム)が変更された際にもその変化量を容易に把握することができる。   (3) Since the display 50 displays the calculation results generated for each reference work time (cycle time) as a bar graph arranged in time series, not only can the temporal transition of the calculation results be visually recognized, but also the work Even when the reference work time (cycle time) is changed during the process, the amount of change can be easily grasped.

(4)予め定めた一連の動作を行うための基準作業時間(サイクルタイム)を設定するために、スタート/ストップボタン52あるいは作業選択ボタン54を押下することによりサイクルタイムを可変設定することができるので、作業内容に適したサイクルタイムに基づく演算を行うことができる。   (4) The cycle time can be variably set by pressing the start / stop button 52 or the work selection button 54 in order to set a reference work time (cycle time) for performing a predetermined series of operations. Therefore, the calculation based on the cycle time suitable for the work content can be performed.

<その他の変形例>
(1)これまで説明した実施の形態では、オペレータが押しボタンを押すことによりサイクルタイムを設定する構成としたが、サイクルタイムを記憶させた記録媒体を表示制御装置に挿入することにより、あるいは、遠隔操作によりサイクルタイムを設定することができる。
<Other variations>
(1) In the embodiments described so far, the cycle time is set by the operator pressing the push button. However, by inserting a recording medium storing the cycle time into the display control device, or Cycle time can be set by remote control.

(2)油圧アクチュエータの仕事量WACTを演算する際に、各アクチュエータに流れる油量を測定することにより、ピストンロッドの移動量あるいは油圧モータの回転角度を求めることができる。 (2) when calculating the work amount W ACT of the hydraulic actuator, by measuring the amount of oil flowing through the actuator, it is possible to obtain the rotation angle of the movement amount or the hydraulic motor of the piston rod.

(3)油圧シリンダの仕事量WACTを演算する際に、ブーム,アーム,バケットの回転角度を測定することにより、油圧シリンダのロッド移動量を算出することができる。 (3) When calculating the work amount W ACT of the hydraulic cylinder, the rod movement amount of the hydraulic cylinder can be calculated by measuring the rotation angle of the boom, arm, and bucket.

(4)上述した実施の形態では、エンジンの累積仕事量ΣWENGから全アクチュエータでの累積仕事量ΣWACTを差し引くことにより損失仕事量を求めているが、エンジンの累積仕事量ΣWENGを算出する際に機械的エネルギーの伝達損失を考慮することも可能である。 (4) In the embodiment described above, but seeking losses workload by subtracting the cumulative workload .SIGMA.W ACT in all the actuator from the cumulative workload .SIGMA.W ENG of the engine, to calculate the cumulative workload .SIGMA.W ENG of the engine It is also possible to take into account the transmission loss of mechanical energy.

(5)アクチュエータの一つである油圧モータの替わりに、電動モータを用いることも可能である。例えば、上部旋回モータとして電動モータを用いる場合にも、油圧モータと同様な演算手法により仕事量を算出することができる。   (5) It is also possible to use an electric motor instead of the hydraulic motor which is one of the actuators. For example, even when an electric motor is used as the upper swing motor, the work amount can be calculated by the same calculation method as that of the hydraulic motor.

以上の説明はあくまで一例であり、本発明の特徴を損なわない限り、本発明は上述した実施の形態および変形例に限定されるものではない。
実施の形態と変形例の一つとを組み合わせること、もしくは、実施の形態と変形例の複数とを組み合わせることも可能である。
変形例同士をどのように組み合わせることも可能である。
さらに、本発明の技術的思想の範囲内で考えられる他の形態についても、本発明の範囲内に含まれる。
The above description is merely an example, and the present invention is not limited to the above-described embodiments and modifications unless the features of the present invention are impaired.
It is also possible to combine the embodiment and one of the modified examples, or to combine the embodiment and a plurality of modified examples.
It is possible to combine the modified examples in any way.
Furthermore, other forms conceivable within the scope of the technical idea of the present invention are also included in the scope of the present invention.

10 下部走行体
13,14 走行用油圧モータ
20 上部旋回体
22 エンジン
32 ブームシリンダ
34 アームシリンダ
36 バケットシリンダ
40 油圧制御システム
50 表示器
52,54 押しボタン
45 エンジン回転数検出器
47 エンジンコントローラ
55 サイクルタイム設定部
70 表示制御装置
α ロッド位置検出器
β 圧力検出器
γ 回転角度検出器
δ 圧力検出器
DESCRIPTION OF SYMBOLS 10 Lower traveling body 13,14 Traveling hydraulic motor 20 Upper turning body 22 Engine 32 Boom cylinder 34 Arm cylinder 36 Bucket cylinder 40 Hydraulic control system 50 Display 52, 54 Push button 45 Engine rotation speed detector 47 Engine controller 55 Cycle time Setting unit 70 Display control device α Rod position detector β Pressure detector γ Rotation angle detector δ Pressure detector

Claims (5)

予め定めた一連の動作を行うための基準作業時間内において、前記一連の動作を行うために使用したアクチュエータの仕事量を累算し、累積仕事量を出力する累積仕事量算出手段と、
前記基準作業時間内における累積燃料消費量を算出する累積燃料消費量算出手段と、
前記累積仕事量を前記累積燃料消費量で除算した結果を報知する報知手段とを備えたことを特徴とする作業機械の表示装置。
Cumulative work calculation means for accumulating the work of the actuator used for performing the series of operations within a reference work time for performing a predetermined series of operations, and outputting the cumulative work,
A cumulative fuel consumption calculating means for calculating a cumulative fuel consumption within the reference work time;
A display device for a work machine, comprising: a notifying unit for notifying a result of dividing the accumulated work amount by the accumulated fuel consumption amount.
予め定めた一連の動作を行うための基準作業時間内において、前記一連の動作を行うために使用したアクチュエータの仕事量を累算し、累積仕事量を出力する累積仕事量算出手段と、
前記一連の動作を行うために使用したアクチュエータを駆動するために用いるエンジンが前記基準作業時間内において発生した累積エンジン発生仕事量を算出する累積エンジン発生仕事量算出手段と、
前記累積エンジン発生仕事量から前記累積仕事量を差し引いた結果を報知する報知手段とを備えたことを特徴とする作業機械の表示装置。
Cumulative work calculation means for accumulating the work of the actuator used for performing the series of operations within a reference work time for performing a predetermined series of operations, and outputting the cumulative work,
Cumulative engine generated work calculation means for calculating a cumulative engine generated work generated by the engine used to drive the actuator used to perform the series of operations within the reference work time;
A display device for a working machine, comprising: an informing means for informing a result of subtracting the accumulated work amount from the accumulated engine generated work amount.
請求項1または請求項2に記載の作業機械の表示装置において、
前記報知手段は、前記基準作業時間ごと生じる報知結果を時系列的に並べて出力することを特徴とする作業機械の表示装置。
The display device for a work machine according to claim 1 or 2,
The display device for a work machine, wherein the notification means outputs the notification results generated every reference work time in time series.
請求項1ないし3のいずれか一項に記載の作業機械の表示装置において、
前記累積仕事量算出手段は、前記予め定めた一連の動作を行うための基準作業時間内において油圧シリンダのロッド位置検出センサおよび圧力センサから出力される検出値に基づいて算出される仕事量、ならびに、前記予め定めた一連の動作を行うための基準作業時間内において油圧モータの回転角度センサおよび圧力センサから出力される検出値に基づいて算出される仕事量を累算することを特徴とする作業機械の表示装置。
The display device for a work machine according to any one of claims 1 to 3,
The cumulative work amount calculation means is configured to calculate a work amount based on detection values output from a rod position detection sensor and a pressure sensor of a hydraulic cylinder within a reference work time for performing the predetermined series of operations, and The work calculated based on the detection values output from the rotation angle sensor and the pressure sensor of the hydraulic motor within the reference work time for performing the predetermined series of operations is accumulated. Machine display device.
請求項1ないし4のいずれか一項に記載の作業機械の表示装置において、さらに加えて、
前記予め定めた一連の動作を行うための基準作業時間をサイクルタイムとして可変設定するサイクルタイム設定手段を備えることを特徴とする建設機械の表示装置。
In the display device of the work machine according to any one of claims 1 to 4, in addition,
A display device for a construction machine, comprising cycle time setting means for variably setting a reference work time for performing the predetermined series of operations as a cycle time.
JP2009087026A 2009-03-31 2009-03-31 Display device for working machine Pending JP2010235027A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009087026A JP2010235027A (en) 2009-03-31 2009-03-31 Display device for working machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009087026A JP2010235027A (en) 2009-03-31 2009-03-31 Display device for working machine

Publications (2)

Publication Number Publication Date
JP2010235027A true JP2010235027A (en) 2010-10-21
JP2010235027A5 JP2010235027A5 (en) 2011-05-19

Family

ID=43089777

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009087026A Pending JP2010235027A (en) 2009-03-31 2009-03-31 Display device for working machine

Country Status (1)

Country Link
JP (1) JP2010235027A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019117166A1 (en) * 2017-12-11 2019-06-20 住友建機株式会社 Shovel machine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01131982A (en) * 1987-11-17 1989-05-24 Toyo Umpanki Co Ltd Job analysis system for foil loader
JP2000291078A (en) * 1999-04-12 2000-10-17 Hitachi Constr Mach Co Ltd Automatically operated shovel
JP2007197129A (en) * 2006-01-25 2007-08-09 Toyota Industries Corp Control system of industrial vehicle for loading and unloading, control device, and industrial vehicle for loading and unloading
JP2008062791A (en) * 2006-09-07 2008-03-21 Komatsu Ltd Fuel economy display device and working vehicle
JP2009256081A (en) * 2008-04-21 2009-11-05 Toyota Industries Corp Control system of industrial vehicle for cargo handling

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01131982A (en) * 1987-11-17 1989-05-24 Toyo Umpanki Co Ltd Job analysis system for foil loader
JP2000291078A (en) * 1999-04-12 2000-10-17 Hitachi Constr Mach Co Ltd Automatically operated shovel
JP2007197129A (en) * 2006-01-25 2007-08-09 Toyota Industries Corp Control system of industrial vehicle for loading and unloading, control device, and industrial vehicle for loading and unloading
JP2008062791A (en) * 2006-09-07 2008-03-21 Komatsu Ltd Fuel economy display device and working vehicle
JP2009256081A (en) * 2008-04-21 2009-11-05 Toyota Industries Corp Control system of industrial vehicle for cargo handling

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019117166A1 (en) * 2017-12-11 2019-06-20 住友建機株式会社 Shovel machine
KR20200091878A (en) * 2017-12-11 2020-07-31 스미토모 겐키 가부시키가이샤 Shovel
JPWO2019117166A1 (en) * 2017-12-11 2020-12-03 住友建機株式会社 Excavator
US11619028B2 (en) 2017-12-11 2023-04-04 Sumitomo Construction Machinery Co., Ltd. Shovel
JP7344800B2 (en) 2017-12-11 2023-09-14 住友建機株式会社 Excavators and shovel management systems
KR102615982B1 (en) * 2017-12-11 2023-12-19 스미토모 겐키 가부시키가이샤 Shovel and shovel management system

Similar Documents

Publication Publication Date Title
JP4629377B2 (en) Construction machinery
JP4993805B2 (en) A system and method for automatically controlling a work implement of an earthwork machine based on discrete values of torque.
JP5236872B2 (en) Work vehicle
CN1839233B (en) Operating system of construction machinery
US8972124B2 (en) Work vehicle
JP6450268B2 (en) Wheel loader and automatic accumulation method of transportation work information of the wheel loader
US10711436B2 (en) Work machine operation assistance device
JP4579249B2 (en) Control system and control method for fluid pressure actuator and fluid pressure machine
KR20180136959A (en) Shovel&#39;s display
JP6644871B2 (en) Excavator and excavator display device
JP5805692B2 (en) Wheeled work machine
JP4881280B2 (en) Swing control device
JP2019152562A (en) Work vehicle, system including work vehicle, method for calculating superimposed load of work vehicle
KR102402509B1 (en) Electric Construction Machinery
JP2010235027A (en) Display device for working machine
JP5009827B2 (en) Work machine
JP2011157751A (en) Hydraulic work machine
JP5940488B2 (en) Construction machine work judgment system, construction machine and work judgment method
JP6425618B2 (en) Operation support device for work machine
CN112602120A (en) Playback device, analysis support system, and playback method
KR20110127602A (en) Displaying device for construction machine
JP6163126B2 (en) Construction machine operating state recording apparatus and operating state recording method
JP2008169634A (en) Information collection device of construction machine
JP5254262B2 (en) Hydraulic work machine display
JP2021046842A (en) Construction machine

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110404

A621 Written request for application examination

Effective date: 20110404

Free format text: JAPANESE INTERMEDIATE CODE: A621

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121211

A02 Decision of refusal

Effective date: 20130423

Free format text: JAPANESE INTERMEDIATE CODE: A02