JP6425618B2 - Operation support device for work machine - Google Patents

Operation support device for work machine Download PDF

Info

Publication number
JP6425618B2
JP6425618B2 JP2015111726A JP2015111726A JP6425618B2 JP 6425618 B2 JP6425618 B2 JP 6425618B2 JP 2015111726 A JP2015111726 A JP 2015111726A JP 2015111726 A JP2015111726 A JP 2015111726A JP 6425618 B2 JP6425618 B2 JP 6425618B2
Authority
JP
Japan
Prior art keywords
unit
feature
time
value
working machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015111726A
Other languages
Japanese (ja)
Other versions
JP2016223201A5 (en
JP2016223201A (en
Inventor
邦嗣 冨田
邦嗣 冨田
啓範 石井
啓範 石井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP2015111726A priority Critical patent/JP6425618B2/en
Publication of JP2016223201A publication Critical patent/JP2016223201A/en
Publication of JP2016223201A5 publication Critical patent/JP2016223201A5/ja
Application granted granted Critical
Publication of JP6425618B2 publication Critical patent/JP6425618B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Component Parts Of Construction Machinery (AREA)

Description

本発明は、解体作業、建築作業、土木作業等に使用される作業機械の操作を支援するための操作支援装置に係わる。   The present invention relates to an operation support device for supporting the operation of a working machine used for disassembly work, construction work, civil engineering work and the like.

操作者の操作入力に従って機体に備えられているアクチュエータの駆動が指示される油圧ショベルのような作業機械では、操作者のスキルに依存して作業機械の生産性が変化する。そのため、操作者の操作スキルの向上は生産性の向上に繋がる重要な課題である。   In a working machine such as a hydraulic shovel that is instructed to drive an actuator provided on the machine according to the operator's operation input, the productivity of the working machine changes depending on the skill of the operator. Therefore, improvement of the operator's operation skills is an important issue leading to improvement of productivity.

この種の課題を解決する為の技術の一例として、例えば特許文献1には、建設機械の運転者に効率的な運転操作を行うようにアドバイスするシステムを提供する装置が記載されている。   For example, Patent Document 1 describes an apparatus for providing a system that advises the driver of a construction machine to perform efficient driving operation as an example of a technique for solving this type of problem.

この特許文献1に記載の技術では、建設機械の運転状況に関する状態値、例えば油圧又はエンジン回転数等が検出され、各状態値の頻度分布が計算される。油圧やエンジン回転数等の状態値は予め複数の領域に分けられており、領域ごとに頻度分布の設定目標値が予め設定されている。そして、領域ごとに、実測された頻度分布と設定目標値とが比較され、この比較結果に応じて、該当のメッセージが出力されるようになっている。   In the technology described in Patent Document 1, a state value related to the operating condition of the construction machine, such as hydraulic pressure or engine speed, is detected, and the frequency distribution of each state value is calculated. The state values such as the hydraulic pressure and the engine speed are divided into a plurality of areas in advance, and setting target values of the frequency distribution are set in advance for each area. Then, the measured frequency distribution and the set target value are compared for each area, and a corresponding message is output according to the comparison result.

特開2005−98076号公報JP 2005-98076 A

上述した特許文献1に記載の技術では、車体の頻度情報に目標値を設定し、現在値と比較したメッセージを表示することで操作スキルの向上を促すためのシステム及び方法が開示されている。この特許文献1の記載によれば、頻度情報の目標値と現在値に基づいて、操作者は、ショベル操作スキルの改善を図ることが可能となる。しかしながら、頻度情報と生産性の関連が明確になっておらず生産性の向上に十分寄与するかどうか不明である、との問題があった。   In the technology described in Patent Document 1 described above, a system and a method are disclosed for promoting improvement in operation skills by setting a target value in frequency information of a vehicle body and displaying a message compared with the current value. According to the description of the patent document 1, the operator can improve the shovel operation skill based on the target value and the current value of the frequency information. However, there is a problem that it is unclear whether the relationship between frequency information and productivity is clear and whether it sufficiently contributes to improvement of productivity.

本発明は、作業機械の操作者に対して生産性を向上するために必要な情報を適切に提供することが可能な作業機械の操作支援装置を提供することを目的とする。   An object of the present invention is to provide an operation support device for a working machine capable of appropriately providing information necessary for improving productivity to an operator of the working machine.

上記課題を解決するために、例えば特許請求の範囲に記載の構成を採用する。
本発明は、上記課題を解決する手段を複数含んでいるが、その一例を挙げるならば、作業フロントを有する作業機械の関節を駆動する複数のアクチュエータと、この複数のアクチュエータの駆動を指示する複数の操作装置を有する作業機械の操作支援装置において、前記複数の操作装置設けられ、前記複数の操作装置の操作量を検出する複数の第1センサと、前記複数の操作装置の指示による前記複数のアクチュエータの駆動に基づく前記作業フロントの姿勢を検出する複数の第2センサと、前記複数の操作装置による指示により駆動した前記複数のアクチュエータの駆動の圧力を検出する複数の第3センサとを含み、前記作業機械の運転状況に関わる複数の状態量を検出する複数の検出装置と、演算期間の設定を指示する計測オンオフスイッチと、前記複数の検出装置と前記オンオフスイッチからの信号に基づいて前記作業機械の操作支援を行うための演算処理を行うコントローラとを有前記コントローラは、前記計測オンオフスイッチがオンからオフに切り換わる間に前記複数の検出装置で検出した前記複数の状態量に基づいて、前記作業機械の単位時間作業量を含み、前記作業機械の生産性を評価可能な値である生産性評価値を演算する生産性評価値演算部と、前記計測オンオフスイッチがオンからオフに切り換わる間に前記複数の検出装置で検出した前記複数の状態量に基づいて、前記複数のアクチュエータを駆動する複合操作時間、作業停止時間及び高負荷作業時間を含み、前記生産性評価値に影響を及ぼす前記複数の操作装置の操作に係わる複数の特徴量を演算する特徴量演算部と、
前記生産性評価値と前記複数の特徴量のそれぞれの結びつきの強さを相対的に表す数値を算出し、前記生産性評価値に対する前記複数の特徴量の影響度を設定する影響度設定部と、前記生産性評価値演算部で演算された前記生産性評価値および前記特徴量演算部で演算された前記複数の特徴量を記憶する記憶部と、前記生産性評価値および前記複数の特徴量を前記複数の影響度と合わせてモニタに出力する出力部とを備えたことを特徴とする。
In order to solve the above problems, for example, the configuration described in the claims is adopted.
Plurality invention has included a plurality of means for solving the above problems, to instruct if its one example, a plurality of actuators for driving the working machine of the joint with a working front, the driving of the plurality of actuators in the operating device and work machine operation support apparatus having the provided plurality of operation devices, and a plurality of first sensor for detecting an operation amount of said plurality of operating devices, the ordered by the plurality of operation devices a plurality of second sensor for detecting the posture of the work front based on the driving of the plurality of actuators, and a plurality of third sensor for detecting the pressure of the driving of the plurality of actuators driven by an instruction by said plurality of operating devices anda plurality of detection apparatus for detecting a plurality of state quantities related to the operating conditions of the working machine, measuring off to indicate the setting of the operation period Possess a switch, and a controller for performing arithmetic processing for performing operations support the working machine on the basis of a signal from the said on-off switch and a plurality of detection devices, the controller is off the measuring off switch from ON A productivity evaluation value including a unit time work amount of the work machine based on the plurality of state quantities detected by the plurality of detection devices while switching to a productivity evaluation value which is a value capable of evaluating the productivity of the work machine And a compound operation for driving the plurality of actuators based on the plurality of state quantities detected by the plurality of detection devices while the measurement on / off switch switches from on to off. time, including the work stop time and a heavy load operation time, Starring a plurality of feature amounts related to the operation of the productivity rating the plurality of operation devices affect value A feature quantity calculation unit for,
An influence setting unit configured to calculate a numerical value relatively representing the strength of connection between each of the productivity evaluation value and the plurality of feature quantities, and to set an influence degree of the plurality of feature quantities on the productivity evaluation value; a storage unit for storing the plurality of feature amounts calculated by the calculated by the productivity evaluation value calculating unit was the productivity evaluation value and the feature amount calculation unit, before Symbol productivity evaluation value and the plurality of feature And an output unit that outputs the amount to the monitor in combination with the plurality of influence levels.

本発明によれば、生産性評価値と車体の特徴量を影響度と合わせて出力することができ、作業機械の操作者に対して生産性を向上するための特徴量が明示され、操作スキルの向上に寄与し、これに伴う生産性の向上が実現可能となる。   According to the present invention, the productivity evaluation value and the feature amount of the vehicle body can be output together with the influence degree, and the feature amount for improving the productivity is clearly indicated to the operator of the working machine, and the operation skill is obtained. Contributes to the improvement of productivity, and the accompanying improvement in productivity can be realized.

本発明の第1の実施例における作業機械の側面図である。It is a side view of the working machine in the 1st example of the present invention. 本発明の第1の実施例における作業機械の制御回路および油圧回路の構成図である。It is a block diagram of the control circuit and hydraulic circuit of the working machine in the 1st Example of this invention. 本発明の第1の実施例における作業機械の操作装置の概略を示す図である。It is a figure which shows the outline of the operating device of the working machine in the 1st Example of this invention. 本発明の第1の実施例における作業機械の操作支援装置の構成図である。It is a block diagram of the operation assistance apparatus of the working machine in the 1st Example of this invention. 本発明の第1の実施例における駆動信号生成部において行なわれる信号処理に関し、レバー操作量に対するシリンダ速度指令値の関係を示す図である。It is a figure which shows the relationship of the cylinder speed command value with respect to the lever operation amount regarding the signal processing performed in the drive signal production | generation part in the 1st Example of this invention. 本発明の第1の実施例における作業機械の操作支援装置処理のフローチャート図である。It is a flowchart of the operation assistance apparatus process of the working machine in the 1st Example of this invention. 本発明の第1の実施例における作業機械の操作支援装置処理における作業量演算に関する模式図である。It is a schematic diagram regarding the operation amount calculation in the operation assistance apparatus process of the working machine in the 1st Example of this invention. 本発明の第1の実施例における作業機械の操作支援装置の複合操作時間の演算処理のフローチャート図である。It is a flowchart figure of arithmetic processing processing of compound operation time of the operation supporting device of the working machine in the 1st example of the present invention. 本発明の第1の実施例における作業機械の操作支援装置の停止時間の演算処理のフローチャート図である。It is a flowchart figure of arithmetic processing of stop time of an operation support device of a work machine in the 1st example of the present invention. 本発明の第1の実施例における作業機械の操作支援装置の高負荷時間の演算処理のフローチャート図である。It is a flowchart figure of the calculation processing of the high load time of the operation assistance apparatus of the working machine in the 1st Example of this invention. 本発明の第1の実施例における作業機械の操作支援装置のモニタに表示される表示画面の一例を示す図である。It is a figure which shows an example of the display screen displayed on the monitor of the operation assistance apparatus of the working machine in the 1st Example of this invention. 本発明の第2の実施例における作業機械の操作支援装置の構成図である。It is a block diagram of the operation assistance apparatus of the working machine in the 2nd Example of this invention. 本発明の第2の実施例における作業機械の操作支援装置の複合操作時間の演算処理のフローチャート図である。It is a flowchart figure of arithmetic processing processing of compound operation time of the operation supporting device of the working machine in the 2nd example of the present invention. 本発明の第2の実施例における作業機械の操作支援装置の停止時間の演算処理のフローチャート図である。It is a flowchart figure of arithmetic processing of stop time of an operation supporting device of a working machine in a 2nd example of the present invention. 本発明の第2の実施例における作業機械の操作支援装置の高負荷時間の演算処理のフローチャート図である。It is a flowchart figure of the calculation processing of the high load time of the operation assistance apparatus of the working machine in the 2nd example of the present invention. 本発明の第2の実施例における作業機械の操作支援装置のモニタに表示される表示画面の一例を示す図である。It is a figure which shows an example of the display screen displayed on the monitor of the operation assistance apparatus of the working machine in the 2nd Example of this invention. 本発明の第3の実施例における作業機械の操作支援装置の構成図である。It is a block diagram of the operation assistance apparatus of the working machine in the 3rd Example of this invention. 本発明の第3の実施例における作業機械の操作支援装置のモニタに表示される表示画面の一例を示す図である。It is a figure which shows an example of the display screen displayed on the monitor of the operation assistance apparatus of the working machine in the 3rd Example of this invention. 本発明の第4の実施例における作業機械の操作支援装置の構成図である。It is a block diagram of the operation assistance apparatus of the working machine in the 4th Example of this invention. 本発明の第4の実施例における作業機械の操作支援装置のモニタに表示される表示画面の一例を示す図である。It is a figure which shows an example of the display screen displayed on the monitor of the operation assistance apparatus of the working machine in the 4th Example of this invention. 本発明の第5の実施例における作業機械の制御回路および油圧回路の構成図である。It is a block diagram of the control circuit and hydraulic circuit of the working machine in 5th Example of this invention. 本発明の第5の実施例における作業機械の操作支援装置の構成図である。It is a block diagram of the operation assistance apparatus of the working machine in the 5th Example of this invention. 本発明の第5の実施例における作業機械の操作支援装置処理のフローチャート図である。It is a flowchart of the operation assistance apparatus process of the working machine in the 5th Example of this invention. 本発明の第6の実施例における作業機械の操作支援装置のモニタに表示される表示画面の一例を示す図である。It is a figure which shows an example of the display screen displayed on the monitor of the operation assistance apparatus of the working machine in the 6th Example of this invention. 本発明の第6の実施例における作業機械の操作支援装置のモニタに表示される表示画面の一例を示す図である。It is a figure which shows an example of the display screen displayed on the monitor of the operation assistance apparatus of the working machine in the 6th Example of this invention.

<第1の実施例>
本発明の作業機械の操作支援装置の第1の実施例を、図1乃至図11を用いて説明する。なお、図1乃至図11においては、作業機械として油圧ショベルに適用した場合を例に挙げて説明する。また、本実施形態では、生産性評価値として単位時間作業量を、特徴量として複合操作時間、停止時間、高負荷時間の3つを用いる場合について説明する。
First Embodiment
A first embodiment of the operation support device for a work machine according to the present invention will be described with reference to FIGS. In addition, in FIG. 1 thru | or FIG. 11, the case where it applies to a hydraulic shovel as a working machine is mentioned as an example, and is demonstrated. Further, in the present embodiment, a case will be described in which a unit time work amount is used as a productivity evaluation value, and three of combined operation time, stop time, and high load time are used as feature amounts.

<全体構成>
図1は本発明の第1の実施例に係わる操作支援装置が備えられた油圧ショベルの外観の一例を示す側面図である。
<Overall configuration>
FIG. 1 is a side view showing an example of the external appearance of a hydraulic shovel provided with an operation support apparatus according to a first embodiment of the present invention.

図1において、油圧ショベル100は、走行体11Aを備えた車体11と、車体11上に旋回可能に取り付けられた旋回体12とを有し、その旋回体12の前部に運転室13が取り付けられている。旋回体12の後部には図示しないエンジンやポンプ等が設けられている。また、旋回体12の前部には上下方向に回動する作業フロント101が取り付けられている。   In FIG. 1, a hydraulic shovel 100 has a car body 11 provided with a traveling body 11A and a swing body 12 pivotally mounted on the car body 11, and a cab 13 is attached to the front of the swing body 12 It is done. An engine, a pump, etc. which are not shown in figure are provided in the rear part of the revolving unit 12. In addition, a work front 101 which is pivoted in the vertical direction is attached to the front of the swing body 12.

<フロント構成>
作業フロント101は旋回体12に対して上下方向に回動するように取り付けられたブーム14と、このブーム14に上下方向に回動するように取り付けられたアーム15と、このアーム15に上下方向に回動するように取り付けられた作業具102を備えている。このうち、ブーム14は、旋回体12とブーム14とに連結されたブームシリンダ16によって上下方向に回動する。アーム15は、ブーム14とアーム15とに連結されたアームシリンダ17によって上下方向に回動する。作業具102は、アーム15と作業具102とに連結された作業具シリンダ18によって上下方向に回動する。
<Front configuration>
The work front 101 has a boom 14 attached to pivot in the vertical direction with respect to the swing body 12, an arm 15 attached to the boom 14 to pivot in the vertical direction, and a vertical direction to the arm 15 The work tool 102 is attached so as to turn. Among these, the boom 14 is pivoted up and down by a boom cylinder 16 connected to the revolving unit 12 and the boom 14. The arm 15 is pivoted up and down by an arm cylinder 17 connected to the boom 14 and the arm 15. The work implement 102 is pivoted up and down by a work implement cylinder 18 connected to the arm 15 and the work implement 102.

ここで、作業具102は油圧ショベル100の作業内容に応じて、図1に示すようなバケットに替えて、カッタ、ブレーカ、グラップル等に任意に交換可能である。   Here, the work tool 102 can be arbitrarily replaced with a cutter, a breaker, a grapple or the like in place of the bucket as shown in FIG. 1 according to the work content of the hydraulic shovel 100.

<制御回路の基本構成>
図1の油圧ショベル100が備える制御回路を図2に示す。
<Basic configuration of control circuit>
The control circuit with which the hydraulic shovel 100 of FIG. 1 is provided is shown in FIG.

図2に示した制御回路において、メインポンプ22は図示しないエンジンにより駆動される。メインポンプ22から吐出された圧油は、コントロール弁24を経て、ブームシリンダ16、アームシリンダ17、作業具シリンダ18、旋回モータ19に対して各々供給される。これにより、各アクチュエータ16、17、18、19が動作し、ブーム14、アーム15、作業具102が上下方向に回動し、旋回体12が旋回するようになっている。なお、符号23は作動油を貯蔵する作動油タンクである。   In the control circuit shown in FIG. 2, the main pump 22 is driven by an engine (not shown). The pressure oil discharged from the main pump 22 is supplied to the boom cylinder 16, the arm cylinder 17, the work implement cylinder 18, and the turning motor 19 through the control valve 24. As a result, the actuators 16, 17, 18, 19 operate, and the boom 14, the arm 15, and the work implement 102 rotate in the vertical direction, and the swing body 12 swings. In addition, the code | symbol 23 is a hydraulic fluid tank which stores hydraulic fluid.

<操作系>
コントロール弁24a,24b,24cは、コントローラ200によって、ブーム操作レバー30、アーム操作レバー31、作業具操作レバー32の操作量に応じた弁位置(スプール位置)に制御される。図3に、各操作レバーの配置を表す模式図を示す。
<Operation system>
The control valves 24a, 24b, 24c are controlled by the controller 200 to valve positions (spool positions) according to the operation amounts of the boom control lever 30, the arm control lever 31, and the work tool control lever 32. FIG. 3 is a schematic view showing the arrangement of each operation lever.

図3に示す右操作レバー300Aは、ブーム操作レバー30および作業具操作レバー32を兼ねている。右操作レバー300Aが図3中30(a)の方向へ操作されると、操作量に応じた流量の圧油がブームシリンダ16のボトム側油室16aへ供給される。反対に、右操作レバー300Aが図3中30(b)の方向へ操作されると、操作量に応じた流量の圧油がブームシリンダ16のロッド側油室16bへ供給される。 The right control lever 300A shown in FIG. 3 doubles as the boom control lever 30 and the work tool control lever 32. When the right control lever 300A is operated in the direction of 30 (a) in FIG. 3, pressure oil at a flow rate corresponding to the amount of operation is supplied to the bottom oil chamber 16a of the boom cylinder 16. Conversely, when the right control lever 300A is operated in the direction of 30 (b) in FIG. 3, pressure oil at a flow rate corresponding to the amount of operation is supplied to the rod side oil chamber 16b of the boom cylinder 16.

右操作レバー300Aが図3中32(a)の方向に操作されると、操作量に応じた流量の圧油が作業具シリンダ18のボトム側油室18aへ供給される。反対に、右操作レバー300Aが図3中32(b)の方向に操作されると、操作量に応じた流量の圧油が作業具シリンダ18のロッド側油室18bへ供給される。 When the right control lever 300A is operated in the direction of 32 (a) in FIG. 3, pressure oil at a flow rate corresponding to the amount of operation is supplied to the bottom side oil chamber 18a of the work implement cylinder 18. Conversely, when the right control lever 300A is operated in the direction of 32 (b) in FIG. 3, pressure oil at a flow rate corresponding to the amount of operation is supplied to the rod side oil chamber 18b of the work implement cylinder 18.

図3に示す左操作レバー300Bは、アーム操作レバー31および旋回操作レバー33を兼ねている。左操作レバー300Bが図3中31(a)の方向に操作されると、操作量に応じた流量の圧油がアームシリンダ17のボトム側油室17aへ供給される。反対に、左操作レバー300Bが図3中31(b)の方向に操作されると、操作量に応じた流量の圧油がアームシリンダ17のロッド側油室17bへ供給される。 The left operation lever 300B shown in FIG. 3 serves as the arm operation lever 31 and the turning operation lever 33. When the left control lever 300B is operated in the direction of 31 (a) in FIG. 3, pressure oil at a flow rate corresponding to the amount of operation is supplied to the bottom side oil chamber 17a of the arm cylinder 17. Conversely, when the left control lever 300B is operated in the direction of 31 (b) in FIG. 3, pressure oil at a flow rate corresponding to the amount of operation is supplied to the rod side oil chamber 17b of the arm cylinder 17.

左操作レバー300Bの前後方向の操作については、旋回体12の車体11に対する旋回動作に割り当てられている。左操作レバー300Bが図3中「旋回右方向」に操作されると、操作量に応じた流量の圧油が旋回モータ19のポート19aへ供給されて、旋回体12は車体11に対して右方向に旋回する。反対に、左操作レバー300Bが図3中「旋回左方向」へ操作されると、操作量に応じた流量の圧油が旋回モータ19のポート19bへ供給されて、旋回体12は車体11に対して左方向に旋回する。 The operation in the front-rear direction of the left operation lever 300B is assigned to the turning operation of the turning body 12 with respect to the vehicle body 11. When the left operation lever 300B is operated in the “rightward turning” direction in FIG. 3, pressure oil at a flow rate corresponding to the amount of operation is supplied to the port 19a of the turning motor 19, and the turning body 12 is right with respect to the vehicle body 11. Turn in the direction. Conversely, when the left operating lever 300 B is operated in the “turning left direction” in FIG. 3, pressure oil at a flow rate corresponding to the amount of operation is supplied to the port 19 b of the turning motor 19, and the rotating body 12 is transmitted to the vehicle body 11. Turn to the left.

<制御システム構成(操作系)>
図4は、図2に示したコントローラ200の制御システムを表す模式図である。
<Control system configuration (operation system)>
FIG. 4 is a schematic view showing a control system of the controller 200 shown in FIG.

図4において、ブーム操作レバー30、アーム操作レバー31、作業具操作レバー32、旋回操作レバー33の操作量に応じた信号を出力するレバー操作量検出器301,311,321,331からの信号がコントローラ200に入力される。コントローラ200内には、各レバー操作量信号を参照してコントロール弁24への出力信号を演算するためのブーム駆動信号生成部50、アーム駆動信号生成部51、作業具駆動信号生成部52、旋回駆動信号生成部53が設けられている。   In FIG. 4, the signals from lever operation amount detectors 301, 311, 321, and 331 that output signals according to the operation amounts of boom operation lever 30, arm operation lever 31, work implement operation lever 32, and turn operation lever 33 It is input to the controller 200. In the controller 200, a boom drive signal generation unit 50, an arm drive signal generation unit 51, a work implement drive signal generation unit 52, and a turn for computing an output signal to the control valve 24 with reference to each lever operation amount signal. A drive signal generation unit 53 is provided.

図5は、各駆動信号生成部50〜53において行なわれる信号処理に関わる模式図である。図5に示すように、各駆動信号生成部50〜53では、各操作レバー30〜33の操作量に比例したシリンダ速度指令値が駆動信号として算出される。なお、レバー操作が有効となる操作量を規定するため、不感帯が設定されている。   FIG. 5 is a schematic diagram related to signal processing performed in each of the drive signal generation units 50 to 53. As shown in FIG. 5, in each of the drive signal generation units 50 to 53, a cylinder speed command value proportional to the operation amount of each of the operation levers 30 to 33 is calculated as a drive signal. A dead zone is set to define an operation amount at which the lever operation is effective.

<制御システム構成(センサ系)>
図2に示すように、作業フロント101の姿勢を検出するためのブーム角度センサ40、アーム角度センサ41、作業具角度センサ42が設けられている。作業フロント101の姿勢を検出する各角度センサ40,41,42からの各検出信号はコントローラ200へ入力される。
<Control system configuration (sensor system)>
As shown in FIG. 2, a boom angle sensor 40, an arm angle sensor 41, and a work tool angle sensor 42 for detecting the posture of the work front 101 are provided. Detection signals from the angle sensors 40, 41, 42 for detecting the attitude of the work front 101 are input to the controller 200.

また、図2に示すように、ブームシリンダ16は、ブームシリンダ16内のボトム側の圧力を計測する圧力センサ44a、ロッド側の圧力を計測する圧力センサ44bを備えている。同様に、アームシリンダ17は、アームシリンダ17内のボトム側の圧力を計測する圧力センサ45a、ロッド側の圧力を計測する圧力センサ45bを備えている。同様に、作業具シリンダ18は、作業具シリンダ18内のボトム側の圧力を計測する圧力センサ46a、ロッド側の圧力を計測する圧力センサ46bを備えている。各シリンダの油室の圧力を検出する圧力センサ44a,44b,45a,45b,46a,46bからの各検出信号はコントローラ200へ入力される。   Further, as shown in FIG. 2, the boom cylinder 16 includes a pressure sensor 44 a that measures the pressure on the bottom side in the boom cylinder 16 and a pressure sensor 44 b that measures the pressure on the rod side. Similarly, the arm cylinder 17 includes a pressure sensor 45a that measures the pressure on the bottom side in the arm cylinder 17, and a pressure sensor 45b that measures the pressure on the rod side. Similarly, the work implement cylinder 18 includes a pressure sensor 46a that measures the pressure on the bottom side in the work implement cylinder 18, and a pressure sensor 46b that measures the pressure on the rod side. Detection signals from pressure sensors 44a, 44b, 45a, 45b, 46a, 46b for detecting the pressure in the oil chamber of each cylinder are input to the controller 200.

また、コントローラ200には、計測オンオフスイッチ47とモニタ201が各々接続されている。計測オンオフスイッチ47とモニタ201の作用効果については後述する。   Further, a measurement on / off switch 47 and a monitor 201 are connected to the controller 200. The effects of the measurement on / off switch 47 and the monitor 201 will be described later.

<生産性評価演算部>
図4に示す単位時間作業量演算部60は、本発明の生産性評価値演算部に該当する。単位時間作業量演算部60による演算処理について図6に示す。図6のフローチャートはコントローラ200において予め定められたサンプリングタイム毎に処理が実行される。例えば、サンプリングタイムが0.1[s]の場合、0.1[s]毎に図6の処理が1回実行される。
<Productivity Evaluation Unit>
The unit time work amount calculation unit 60 shown in FIG. 4 corresponds to the productivity evaluation value calculation unit of the present invention. The calculation processing by the unit time work amount calculation unit 60 is shown in FIG. In the flowchart of FIG. 6, the process is executed in the controller 200 every predetermined sampling time. For example, when the sampling time is 0.1 [s], the process of FIG. 6 is executed once every 0.1 [s].

図6の手順600では、計測オンオフスイッチ47がオンであるかの判定が行われる。オンと判定された場合は手順601へ処理が移行する。これに対し、オフと判定された場合は手順608へ処理が移行する。   In the procedure 600 of FIG. 6, it is determined whether the measurement on / off switch 47 is on. If it is determined that the switch is on, the process proceeds to step 601. On the other hand, when it is determined to be off, the process proceeds to step 608.

手順601では、計測オンオフスイッチ47がオンとなっている時間を積算する処理が行われる。   In step 601, processing is performed to integrate the time during which the measurement on / off switch 47 is on.

手順602では、各センサ情報の取得が行われる。具体的には、ブーム操作レバー操作量検出器301、アーム操作レバー操作量検出器311、作業具操作レバー操作量検出器321、旋回操作レバー操作量検出器331、ブーム角度センサ40、アーム角度センサ41、作業具角度センサ42、ブームシリンダ圧力センサ44の各センサの情報が取得される。   In step 602, acquisition of each sensor information is performed. Specifically, boom operation lever operation amount detector 301, arm operation lever operation amount detector 311, work tool operation lever operation amount detector 321, turn operation lever operation amount detector 331, boom angle sensor 40, arm angle sensor Information of each of the sensors 41, the work implement angle sensor 42, and the boom cylinder pressure sensor 44 is acquired.

手順603では、旋回操作時間判定が行われる。具体的には、旋回操作レバー33の合計操作時間が予め定めた値以上であったと判定された場合、処理は手順604へ移行する。例えば、当該値を5[s]とした場合、旋回操作レバー33の操作時間の積算が5[s]以上となった場合、手順604へ処理が移行する。これに対し、予め定めた値未満であったと判定された場合、処理は終了する。   In step 603, the turning operation time determination is performed. Specifically, when it is determined that the total operation time of the turning operation lever 33 is equal to or greater than a predetermined value, the process proceeds to step 604. For example, in the case where the value is 5 [s], when the integration of the operation time of the turning operation lever 33 is 5 [s] or more, the process proceeds to step 604. On the other hand, when it is determined that the value is less than the predetermined value, the process ends.

手順604では、作業フロント101の動作により掘削された作業具102内の土量を演算する、作業量演算処理が行われる。図7は作業量演算に関る模式図である。   In step 604, a workload calculation process is performed to calculate the amount of soil in the work tool 102 excavated by the operation of the work front 101. FIG. 7 is a schematic diagram concerning work amount calculation.

図7において、Fは作業具102内の土量に応じて変動し、重力方向に作用する力であるが、本説明では、この作用力を便宜的に「作業量」と記す。この作業量Fはブーム回動中心のモーメントMの釣り合い式を解くことで演算される。作業量Fに伴って発生するモーメントMは、荷重点とブーム回動中心の水平距離Lを用いて、M=F・Lで表される。一方、ブームシリンダ16の推力fに伴って発生するモーメントMは、ブーム回動中心までの水平距離lを用いて、M=f・lで表される。水平距離L及びlは、ブーム角度センサ40、アーム角度センサ41、作業具角度センサ42の検出値を用いて演算可能である。また推力fは、ブームシリンダ圧力センサ44の検出値を用いて演算可能である。これらより、未知数である作業量Fは、F=f・l/Lにより算出される。   In FIG. 7, F is a force that changes in accordance with the amount of soil in the work tool 102 and acts in the direction of gravity, but in the present description, this action force is conveniently described as “work amount”. The amount of work F is calculated by solving the balance equation of the moment M at the boom pivot center. The moment M generated with the amount of work F is expressed as M = F · L, using the horizontal distance L between the load point and the boom rotation center. On the other hand, the moment M generated with the thrust f of the boom cylinder 16 is expressed by M = f · l using the horizontal distance l to the boom rotation center. The horizontal distances L and l can be calculated using detection values of the boom angle sensor 40, the arm angle sensor 41, and the work implement angle sensor 42. The thrust force f can be calculated using the detection value of the boom cylinder pressure sensor 44. From these, the amount of work F which is an unknown number is calculated by F = f · l / L.

手順605では、作業具操作レバー32の操作により作業具シリンダ18が縮短しているか判定する、作業具操作判定が行われる。作業具操作レバー32の操作により、作業具シリンダが縮短したと判定された場合は、処理は手順606に移行する。これに対し、縮短しなかったと判定された場合は、処理は終了する。   In step 605, a working tool operation determination is performed to determine whether or not the working tool cylinder 18 is contracted by the operation of the working tool control lever 32. If it is determined that the work implement cylinder has been shortened by the operation of the work implement control lever 32, the process proceeds to step 606. On the other hand, if it is determined that the reduction has not occurred, the process ends.

手順606では、作業量積算が行われる。具体的には、手順604の演算結果である作業量を現在の作業量に積算する処理が行われる。この作業量積算値は一時的に単位時間作業量演算部60内にて記憶しておく。   In step 606, work accumulation is performed. Specifically, processing for integrating the amount of work, which is the calculation result of step 604, to the current amount of work is performed. The integrated work amount value is temporarily stored in the unit time work amount calculation unit 60.

手順607では、旋回操作時間をリセットする処理が行われる。   In step 607, processing is performed to reset the turning operation time.

一般に、油圧ショベル100のように作業具がバケットである場合は、掘削、旋回、放土のサイクルを繰り返すことで作業を遂行する。所定の時間の旋回操作、及び、放土操作を検出するステップである手順602〜607の処理により、作業量(掘削した土量)の合計を演算することができる。   Generally, when the work implement is a bucket as in the hydraulic shovel 100, the work is performed by repeating a cycle of digging, turning, and releasing earth. The sum of the work amount (the amount of excavated soil) can be calculated by the processing of steps 602 to 607 which is a step of detecting the turning operation and the earth releasing operation for a predetermined time.

手順608では、計測オンオフスイッチ47の前回値がオンであったか否かの判定が行われる。計測オンオフスイッチ47がオンからオフに切り替わったと判定された場合、すなわち、手順608においてオンオフスイッチの前回値がオンであった場合は、処理は手順609に移行する。これに対し、オフに切り替わらなかったと判定された場合は、処理は手順610に移行する。   In step 608, it is determined whether the previous value of the measurement on / off switch 47 is on. If it is determined that the measurement on / off switch 47 is switched from on to off, that is, if the previous value of the on / off switch is on in step 608, the process proceeds to step 609. On the other hand, if it is determined that the switch has not been switched off, the process proceeds to step 610.

手順609では単位時間作業量の演算が行われる。単位時間作業量は、手順606の演算結果であり、単位時間作業量演算部60内にて一時的に記憶されている作業量の積算値を手順601の演算結果である計測オン時間の積算値で除することで演算される。その後の手順611では、手順609における単位時間作業量の演算結果を、図4に示した演算データ記憶部81に記憶する処理が行われる。   In step 609, calculation of unit time work amount is performed. The unit time work amount is the calculation result of the procedure 606, and the integrated value of the work amount temporarily stored in the unit time work amount calculation unit 60 is the integrated value of the measurement on time which is the calculation result of the step 601. It is calculated by dividing by. In the subsequent procedure 611, a process of storing the calculation result of the unit time work amount in the procedure 609 in the calculation data storage unit 81 shown in FIG. 4 is performed.

手順610では、計測オン時間の積算値と作業量の積算値をゼロにリセットする処理が行われる。   In step 610, the integrated value of the measurement on time and the integrated value of the amount of work are reset to zero.

<特徴量演算部(複合操作時間)>
図4の複合操作時間演算部70、停止時間演算部71、高負荷時間演算部72は、本発明の特徴量演算部に該当する。以下、特徴量のうち、複合操作時間を演算する複合操作時間演算部70の作用について図8に示す。
<Feature amount calculation unit (compound operation time)>
The combined operation time calculation unit 70, the stop time calculation unit 71, and the high load time calculation unit 72 of FIG. 4 correspond to the feature amount calculation unit of the present invention. Hereinafter, the function of the combined operation time calculation unit 70 which calculates the combined operation time among the feature amounts is shown in FIG.

図8の手順700では、計測オンオフスイッチ47がオンであるか否かの判定が行われる。オンと判定された場合は手順701へ処理が移行する。これに対しオフと判定された場合は手順704へ処理が移行する。   In the procedure 700 of FIG. 8, it is determined whether the measurement on / off switch 47 is on. If it is determined to be on, the process proceeds to step 701. On the other hand, if it is determined that the process is off, the process proceeds to step 704.

手順701では、ブーム操作レバー30、アーム操作レバー31、作業具操作レバー32、旋回操作レバー33の操作情報が取得される。   In step 701, operation information of the boom control lever 30, the arm control lever 31, the work tool control lever 32, and the turning control lever 33 is acquired.

手順702では、複合操作が行われているか否かについての判定が行われる。具体的には、ブーム操作レバー30、アーム操作レバー31、作業具操作レバー32、旋回操作レバー33の何れか2つ以上の操作レバーが同時に、図5に示した不感帯を超えて操作されていると判定された場合には、複合操作有りと見なして手順703へ処理が移行する。これに対し、不感帯を超えて操作されていないと判定された場合、処理は終了する。   In step 702, a determination is made as to whether a compound operation is being performed. Specifically, any two or more control levers of the boom control lever 30, the arm control lever 31, the work tool control lever 32, and the turning control lever 33 are simultaneously operated beyond the dead zone shown in FIG. If it is determined that the combination operation is determined, the process proceeds to step 703, assuming that the combined operation is present. On the other hand, if it is determined that the operation is not performed beyond the dead zone, the process ends.

手順703では、複合操作時間の積算が行われる。コントローラ200において予め定められたサンプリングタイムが0.1[s]の場合には、手順703の通過毎に複合操作時間が0.1[s]だけ積算される。複合操作時間積算値は一時的に複合操作時間演算部70内に記憶される。   In step 703, integration of combined operation time is performed. When the sampling time predetermined in the controller 200 is 0.1 [s], the combined operation time is integrated by 0.1 [s] each time the procedure 703 is passed. The combined operation time integrated value is temporarily stored in the combined operation time calculation unit 70.

次いで、手順704では、計測オンオフスイッチ47の前回値がオンであったか否かの判定が行われる。計測オンオフスイッチ47がオンからオフに切り替わったと判定された場合、すなわち、手順704においてオンオフスイッチの前回値がオンであった場合は、処理は手順706に移行する。これに対し切り替わっていないと判定された場合、すなわち、手順704において、オンオフスイッチの前回値がオフであった場合は、手順705に処理が移行する。   Next, in step 704, it is determined whether the previous value of the measurement on / off switch 47 is on. If it is determined that the measurement on / off switch 47 is switched from on to off, that is, if the previous value of the on / off switch is on in step 704, the process proceeds to step 706. On the other hand, if it is determined that the on / off switch has not been switched, that is, if the previous value of the on / off switch is off in step 704, the process proceeds to step 705.

手順706では、一時的に記憶されていた手順703の演算結果である複合操作時間の積算値を、図4に示した演算データ記憶部81に記憶する処理が行われる。手順705では、一時的に複合操作時間演算部70内に記憶された複合操作時間の積算値をゼロにリセットする処理が行われる。   In step 706, processing of storing the integrated value of the combined operation time which is the calculation result of the step 703 temporarily stored in the calculation data storage unit 81 shown in FIG. 4 is performed. In procedure 705, processing is performed to reset the integrated value of the combined operation time temporarily stored in the combined operation time calculation unit 70 to zero.

<特徴量演算部(停止時間)>
次に、特徴量のうち、停止時間を演算する停止時間演算部71の作用について図9に示す。
<Feature amount calculation unit (stop time)>
Next, the operation of the stop time calculation unit 71 that calculates the stop time among the feature amounts is shown in FIG.

図9の手順710では、計測オンオフスイッチ47がオンであるか否かの判定が行われる。オンと判定された場合は手順711へ処理が移行する。これに対しオフと判定された場合は手順714へ処理が移行する。   In step 710 of FIG. 9, it is determined whether the measurement on / off switch 47 is on. If it is determined to be on, the process proceeds to step 711. On the other hand, if it is determined that the process is off, the process proceeds to step 714.

手順711では、ブーム操作レバー30、アーム操作レバー31、作業具操作レバー32、旋回操作レバー33の操作情報が取得される。   In step 711, operation information of the boom control lever 30, the arm control lever 31, the work tool control lever 32, and the turning control lever 33 is acquired.

手順712では、停止状態であるか否かの判定が行われる。具体的には、ブーム操作レバー30、アーム操作レバー31、作業具操作レバー32、旋回操作レバー33の全ての操作レバーが、図5に示した不感帯を超えて操作されていないと判定された場合には、停止状態と見なして手順713へ処理が移行する。これに対し、図5に示した不感帯を超えて操作されていると判定された場合、処理は終了する。   In step 712, it is determined whether or not it is in the stop state. Specifically, it is determined that all the operation levers of the boom operation lever 30, the arm operation lever 31, the work tool operation lever 32, and the turning operation lever 33 are not operated beyond the dead zone shown in FIG. The process proceeds to step 713, assuming that the process is stopped. On the other hand, if it is determined that the operation has been performed beyond the dead zone shown in FIG. 5, the process ends.

手順713では、停止時間の積算が行われる。コントローラ200において予め定められたサンプリングタイムが0.1[s]の場合には、手順713の通過毎に停止時間が0.1[s]だけ積算される。この停止時間積算値は一時的に停止時間演算部71内に記憶される。   In step 713, integration of stop time is performed. When the sampling time predetermined in the controller 200 is 0.1 [s], the stop time is integrated by 0.1 [s] each time the procedure 713 is performed. The stop time integrated value is temporarily stored in the stop time calculator 71.

次いで、手順714では、計測オンオフスイッチ47の前回値がオンであったか否かの判定が行われる。計測オンオフスイッチ47がオンからオフに切り替わったと判定された場合、すなわち、手順714においてオンオフスイッチの前回値がオンであった場合は、処理は手順716に移行する。これに対し切り替わっていないと判定された場合、すなわち、手順714において、オンオフスイッチの前回値がオフであった場合は、処理は手順715に移行する。   Next, in step 714, it is determined whether the previous value of the measurement on / off switch 47 is on. If it is determined that the measurement on / off switch 47 is switched from on to off, that is, if the previous value of the on / off switch is on in step 714, the process proceeds to step 716. On the other hand, if it is determined that the on / off switch has not been switched, that is, if the previous value of the on / off switch is off in step 714, the process proceeds to step 715.

手順716では、一時的に記憶されていた手順713の演算結果である停止時間の積算値を、図4に示した演算データ記憶部81に記憶する処理が行われる。手順715では、一時的に停止時間演算部71内に記憶された停止時間の積算値をゼロにリセットする処理が行われる。   In the procedure 716, processing of storing the integrated value of the stop time which is the calculation result of the procedure 713 temporarily stored in the calculation data storage unit 81 shown in FIG. 4 is performed. In procedure 715, processing is performed to reset the integrated value of the stop time temporarily stored in the stop time calculation unit 71 to zero.

<特徴量演算部(高負荷時間)>
次に、特徴量のうち、高負荷時間を演算する高負荷時間演算部72の作用について図10に示す。
<Feature amount calculation unit (high load time)>
Next, the function of the high load time calculation unit 72 that calculates the high load time of the feature amounts is shown in FIG.

図10の手順720では、計測オンオフスイッチ47がオンであるか否かの判定が行われる。オンと判定された場合は手順721へ処理が移行する。これに対しオフと判定された場合は手順724へ処理が移行する。   In step 720 of FIG. 10, it is determined whether the measurement on / off switch 47 is on. If it is determined that the process is on, the process proceeds to step 721. On the other hand, if it is determined that the process is off, the process proceeds to step 724.

手順721では、ブームシリンダ圧力センサ44、アームシリンダ圧力センサ45、作業具シリンダ圧力センサ46の各圧力センサ情報が取得される。   In procedure 721, each pressure sensor information of the boom cylinder pressure sensor 44, the arm cylinder pressure sensor 45, and the work implement cylinder pressure sensor 46 is acquired.

手順722では、高負荷状態であるか否かの判定が行われる。具体的には各圧力センサの何れか1つの検出値が、コントローラ200内で予め定めた閾値を超えたと判定された場合には、高負荷状態と見なして手順723へ処理が移行する。例えば、図示しないメインリリーフ弁の設定値が30[MPa]の場合、例えば当該閾値を28[MPa]程度とすることで、高負荷状態であるかの判定を行うことができる。これに対し、各圧力センサの検出値が予め定めた閾値をいずれも超えていないと判定された場合、処理は終了する。   In step 722, a determination is made as to whether a high load condition is present. Specifically, when it is determined that any one detection value of each pressure sensor has exceeded a predetermined threshold in the controller 200, the processing is shifted to step 723 considering that the load is high. For example, when the set value of the main relief valve (not shown) is 30 [MPa], for example, by setting the threshold value to about 28 [MPa], it can be determined whether the load is high. On the other hand, when it is determined that the detection values of the pressure sensors do not exceed any of the predetermined threshold values, the process ends.

手順723では、高負荷時間の積算が行われる。コントローラ200において予め定められたサンプリングタイムが0.1[s]の場合には、手順723の通過毎に高負荷時間が0.1[s]だけ積算される。この高負荷時間積算値を一時的に高負荷時間演算部72内にて記憶しておく。   In step 723, high load time integration is performed. When the sampling time predetermined in the controller 200 is 0.1 [s], the high load time is integrated by 0.1 [s] each time the procedure 723 is performed. The high load time integrated value is temporarily stored in the high load time calculation unit 72.

次いで、手順724では、計測オンオフスイッチ47の前回値がオンであったか否かの判定が行われる。計測オンオフスイッチ47がオンからオフに切り替わったと判定された場合、すなわち、手順724においてオンオフスイッチの前回値がオンであった場合は、処理は手順726に移行する。これに対し切り替わっていないと判定された場合、すなわち、手順724において、オンオフスイッチの前回値がオフであった場合は、処理は手順725に移行する。   Next, in step 724, it is determined whether the previous value of the measurement on / off switch 47 is on. If it is determined that the measurement on / off switch 47 is switched from on to off, that is, if the previous value of the on / off switch is on in step 724, the process proceeds to step 726. On the other hand, if it is determined that the on / off switch has not been switched, that is, if the previous value of the on / off switch is off in step 724, the process proceeds to step 725.

手順726では、一時的に記憶されていた手順723の演算結果である高負荷時間の積算値を、図4に示した演算データ記憶部81に記憶する処理が行われる。手順725では、一時的に記憶した高負荷時間演算部72の高負荷時間の積算値をゼロにリセットする処理が行われる。   In step 726, processing of storing the integrated value of high load time which is the calculation result of step 723 temporarily stored in the calculation data storage unit 81 shown in FIG. 4 is performed. In step 725, processing is performed to reset the integrated value of the high load time of the high load time calculation unit 72 temporarily stored to zero.

<記憶装置>
図4の影響度設定部80には、生産性評価値(単位時間作業量)に対する各特徴量(複合操作時間、停止時間、高負荷時間)の影響度が予めオペレータ等によって設定され、記憶されている。影響度は、生産性評価値と特徴量の結び付きの強さを相対的に表現可能な数値であれば良く、任意の方法で決定することができる。例えば、設計者やユーザが経験に基づいて主観的に決定しても良く、あるいは実験データの統計的分析に基づいて客観的に決定しても良い。影響度設定部80にて設定された各特徴量(複合操作時間、停止時間、高負荷時間)の影響度は出力部92を介してモニタ201に対して出力される。
<Storage device>
In the influence degree setting unit 80 in FIG. 4, the influence degree of each feature amount (compound operation time, stop time, high load time) with respect to the productivity evaluation value (per unit time work) is set in advance by an operator or the like and stored. ing. The degree of influence may be a numerical value that can relatively express the strength of the connection between the productivity evaluation value and the feature amount, and can be determined by any method. For example, a designer or a user may make a subjective determination based on experience, or may make an objective determination based on statistical analysis of experimental data. The influence degree of each feature amount (compound operation time, stop time, high load time) set by the influence degree setting unit 80 is output to the monitor 201 through the output unit 92.

本実施例では、各特徴量の影響度が合計100[%]となるように数値配分を行う。影響度の設定を、複合操作時間(60[%])、停止時間(30[%])、高負荷時間(10[%])とした場合、単位時間作業量に最も影響を及ぼす特徴量は複合操作時間であることが、モニタ201によって操作者に明示される。   In the present embodiment, numerical values are distributed so that the degree of influence of each feature amount is 100% in total. When the setting of influence is set to combined operation time (60 [%]), stop time (30 [%]), high load time (10 [%]), the feature quantity that most affects unit time work amount is The monitor 201 clearly indicates to the operator that it is a combined operation time.

演算データ記憶部81は、単位時間作業量演算部60で演算された単位時間作業量の演算結果、複合操作時間演算部70で演算された複合操作時間の演算結果、停止時間演算部71で演算された停止時間の演算結果、高負荷時間演算部72で演算された高負荷時間の演算結果が格納されており、各演算結果は出力部92を介してモニタ201に対して出力される。   The calculation data storage unit 81 calculates the result of calculation of the unit time work calculated by the unit time work calculation unit 60, the calculation result of the combined operation time calculated by the combined operation time calculation unit 70, and the calculation by the stop time calculation unit 71. The calculation result of the stop time, the calculation result of the high load time calculated by the high load time calculation unit 72 is stored, and each calculation result is output to the monitor 201 through the output unit 92.

<モニタ>
図11にモニタ201の外観を示す。図11に示すように、モニタ201の画面上には、単位時間作業量表示部210、複合操作時間表示部211、停止時間表示部212、高負荷時間表示部213、複合操作時間影響度表示部214、停止時間影響度表示部215、高負荷時間影響度表示部216が各々配置されている。
<Monitor>
The external appearance of the monitor 201 is shown in FIG. As shown in FIG. 11, on the screen of the monitor 201, a unit time work amount display unit 210, a combined operation time display unit 211, a stop time display unit 212, a high load time display unit 213, and a combined operation time influence degree display unit A stop time influence degree display unit 215 and a high load time influence degree display unit 216 are arranged.

単位時間作業量表示部210、複合操作時間表示部211、停止時間表示部212、高負荷時間表示部213の表示値は、図4の演算データ記憶部81からの出力値であり、複合操作時間影響度表示部214、停止時間影響度表示部215、高負荷時間影響度表示部216の表示値は影響度設定部80からの出力値である。   The display values of the unit time work amount display unit 210, the combined operation time display unit 211, the stop time display unit 212, and the high load time display unit 213 are output values from the calculation data storage unit 81 of FIG. The display values of the influence degree display unit 214, the stop time influence degree display unit 215, and the high load time influence degree display unit 216 are output values from the influence degree setting unit 80.

各表示部の表示値は、図6及び図8〜10のフローチャートに従って更新される。すなわち、計測オンオフスイッチ47のオンオフに伴って、最新の各演算結果が表示されることとなる。   The display value of each display unit is updated according to the flowcharts of FIGS. That is, with the on / off of the measurement on / off switch 47, the latest calculation results are displayed.

<第1の実施例のメリット>
上記の構成によれば、生産性評価値と車体の特徴量を影響度と合わせて出力する作業機械の操作支援装置が提供される。従って、生産性を向上するための特徴量が操作者に明示されることとなり、操作者の操作改善を促すことによる操作スキル向上に伴う生産性の向上が容易に実現可能となる。
<The merit of the first embodiment>
According to the above configuration, an operation support device for a working machine that outputs the productivity evaluation value and the feature amount of the vehicle body together with the degree of influence is provided. Therefore, the feature amount for improving the productivity is clearly indicated to the operator, and the productivity can be easily improved along with the improvement of the operation skill by promoting the operation improvement of the operator.

<第2の実施例>
本発明の作業機械の操作支援装置の第2の実施例を図12乃至図16を用いて説明する。以下に記述する内容以外の第2の実施例における構成及び作用は、第1の実施例におけるものと同様である。
Second Embodiment
A second embodiment of the operation support device for a working machine according to the present invention will be described with reference to FIGS. 12 to 16. The configuration and operation of the second embodiment other than the contents described below are the same as those of the first embodiment.

<特徴量基準値演算部>
図12は、第2の実施例における制御システムを表す模式図である。図4に示す構成との相違は、特徴量基準値設定部82が新たに備えられている点である。
<Feature Reference Value Calculator>
FIG. 12 is a schematic view showing a control system in the second embodiment. The difference from the configuration shown in FIG. 4 is that a feature quantity reference value setting unit 82 is newly provided.

図12において、特徴量基準値設定部82には、複合操作時間演算部70によって演算される複合操作時間、停止時間演算部71によって演算される停止時間、高負荷時間演算部72によって演算される高負荷時間の各特徴量を基準化するための数値(特徴量基準値)をオペレータが設定でき、記憶している。また、設定された数値は、図12の複合操作時間演算部70、停止時間演算部71、高負荷時間演算部72へ入力される。   In FIG. 12, the feature amount reference value setting unit 82 is calculated by the complex operation time calculated by the compound operation time calculation unit 70, the stop time calculated by the stop time calculation unit 71, and the high load time calculation unit 72. The operator can set and store numerical values (feature amount reference values) for standardizing each feature amount of high load time. Further, the set numerical values are input to the combined operation time calculating unit 70, the stop time calculating unit 71, and the high load time calculating unit 72 of FIG.

<特徴量演算部(複合操作時間)>
本実施例の複合操作時間演算部70の作用について図13に示す。手順700〜手順705の処理は図8に示す第1の実施例における処理と同じであり、図8に示すフローチャートとの相違は手順707における複合操作時間基準化処理が追加された点と、手順706Aにおける基準化した複合操作時間を記憶することである。
<Feature amount calculation unit (compound operation time)>
The operation of the combined operation time calculation unit 70 of this embodiment is shown in FIG. The process of the procedure 700 to the procedure 705 is the same as the process in the first embodiment shown in FIG. 8, and the difference from the flowchart shown in FIG. 8 is that the compound operation time scaling process in the procedure 707 is added And storing the scaled combined operation time at 706A.

図13において、手順704で、計測オンオフスイッチ47がオンからオフに切り替わったと判定された場合、すなわち、手順704においてオンオフスイッチの前回値がオンであった場合は、処理は手順707に移行する。これに対し切り替わっていないと判定された場合、すなわち、手順704において、オンオフスイッチの前回値がオフであった場合は、手順705に処理が移行する。   In FIG. 13, when it is determined in step 704 that the measurement on / off switch 47 is switched from on to off in step 704, that is, when the previous value of the on / off switch is on in step 704, the process proceeds to step 707. On the other hand, if it is determined that the on / off switch has not been switched, that is, if the previous value of the on / off switch is off in step 704, the process proceeds to step 705.

手順707では、一時的に記憶されていた手順703の演算結果である複合操作時間を特徴量基準値設定部82において設定されている基準値で基準化する演算が行われる。複合操作時間は増加により単位時間作業量が増加することが予測されるため、複合操作時間を基準値で除することで基準化を行う。その後、手順706Aに処理が移行する。換言すると、複合操作時間の基準値、すなわち、オペレータの定めた目標値に対する実際の複合操作の割合を演算する。   In step 707, calculation is performed to standardize the combined operation time, which is the calculation result of the temporarily stored step 703, using the reference value set in the feature amount reference value setting unit 82. Since it is predicted that the unit operation time work amount will increase as the combined operation time increases, the standardization is performed by dividing the combined operation time by the reference value. Thereafter, the process proceeds to step 706A. In other words, the reference value of the combined operation time, that is, the ratio of the actual combined operation to the target value determined by the operator is calculated.

手順706Aでは、一時的に記憶されていた手順703の演算結果である複合操作時間の積算値に加えて、手順707で演算された基準化された複合操作時間を、図12に示した演算データ記憶部81に記憶する処理が行われる。   In step 706A, in addition to the integrated value of the combined operation time which is the calculation result of the step 703 temporarily stored, the scaled combined operation time calculated in the step 707 is the calculated data shown in FIG. A process of storing in storage unit 81 is performed.

<特徴量演算部(停止時間)>
停止時間演算部71の作用について図14に示す。手順710〜手順715の処理は図9に示す第1の実施例における処理と同じであり、図9に示すフローチャートとの相違は手順717における停止時間基準化処理が追加された点と、手順716Aにおける基準化した停止時間を記憶することである。
<Feature amount calculation unit (stop time)>
The operation of the stop time calculation unit 71 is shown in FIG. The processing of procedure 710 to procedure 715 is the same as the processing in the first embodiment shown in FIG. 9, and the difference from the flowchart shown in FIG. 9 is that stop time scaling processing in procedure 717 is added; Storing the standardized stop time in

図14において、手順714で、計測オンオフスイッチ47がオンからオフに切り替わったと判定された場合、すなわち、手順714においてオンオフスイッチの前回値がオンであった場合は、処理は手順717に移行する。これに対し切り替わっていないと判定された場合、すなわち、手順714において、オンオフスイッチの前回値がオフであった場合は、手順715に処理が移行する。   In FIG. 14, when it is determined in step 714 that the measurement on / off switch 47 is switched from on to off, that is, when the previous value of the on / off switch is on in step 714, the process proceeds to step 717. On the other hand, if it is determined that the on / off switch has not been switched, that is, if the previous value of the on / off switch is off in step 714, the process proceeds to step 715.

手順717では、一時的に記憶されていた手順713の演算結果である停止時間を特徴量基準値設定部82において設定されている基準値で基準化する演算が行われる。停止時間は減少により単位時間作業量が増加することが予測されるため、基準値を停止時間で除することで基準化を行う。その後、手順716Aに処理が移行する。   In step 717, calculation is performed to standardize the stop time, which is the calculation result of the temporarily stored step 713, with the reference value set in the feature amount reference value setting unit 82. Since it is predicted that the unit time workload will increase due to the decrease, the stop time is standardized by dividing the reference value by the stop time. Thereafter, the process proceeds to step 716A.

手順716Aでは、一時的に記憶されていた手順713の演算結果である停止時間の積算値に加えて、手順717で演算された基準化された停止時間を、図12に示した演算データ記憶部81に記憶する処理が行われる。   In step 716A, in addition to the integrated value of the stop time which is the operation result of step 713 temporarily stored, the operation data storage unit shown in FIG. 12 is the standardized stop time calculated in step 717. Processing to be stored in 81 is performed.

<特徴量演算部(高負荷時間)>
高負荷時間演算部72の作用について図15に示す。手順720〜手順725の処理は図10に示す第1の実施例における処理と同じであり、図10に示すフローチャートとの相違は手順727における高負荷時間基準化処理が追加された点と、手順726Aにおける基準化した高負荷時間を記憶することである。
<Feature amount calculation unit (high load time)>
The operation of the high load time operation unit 72 is shown in FIG. The process of procedure 720 to procedure 725 is the same as the process in the first embodiment shown in FIG. 10, and the difference from the flowchart shown in FIG. 10 is that the high load time scaling process in procedure 727 is added It is to store the standardized high load time in 726A.

図15において、手順724で、計測オンオフスイッチ47がオンからオフに切り替わったと判定された場合、すなわち、手順724においてオンオフスイッチの前回値がオンであった場合は、処理は手順727に移行する。これに対し切り替わっていないと判定された場合、すなわち、手順724において、オンオフスイッチの前回値がオフであった場合は、手順725に処理が移行する。   In FIG. 15, when it is determined in step 724 that the measurement on / off switch 47 is switched from on to off, that is, when the previous value of the on / off switch is on in step 724, the process proceeds to step 727. On the other hand, if it is determined that the on / off switch has not been switched, that is, if the previous value of the on / off switch is off in step 724, the process proceeds to step 725.

手順727では、一時的に記憶された手順723の演算結果である高負荷時間を特徴量基準値設定部82において設定されている基準値で基準化する演算(基準値で実際の値を除する)が行われる。高負荷時間は増加により単位時間作業量が増加することが予測されるため、高負荷時間を基準値で除することで基準化を行う。その後、手順726Aに処理が移行する。   In step 727, an operation of standardizing the high load time, which is the calculation result of step 723 temporarily stored in the feature amount reference value setting unit 82, by the reference value (dividing the actual value by the reference value) ) Is done. Since the high load time is expected to increase per unit time work amount due to the increase, standardization is performed by dividing the high load time by the reference value. Thereafter, the process proceeds to step 726A.

手順726Aでは、一時的に記憶されていた手順723の演算結果である高負荷時間の積算値に加えて、手順727で演算された基準化された高負荷時間を、図12に示した演算データ記憶部81に記憶する処理が行われる。   In step 726A, in addition to the integrated value of high load time which is the operation result of step 723 temporarily stored, the normalized high load time calculated in step 727 is the calculation data shown in FIG. A process of storing in storage unit 81 is performed.

<モニタ>
図16にモニタ201の外観を示す。図11に示す第1の実施例における表示との相違は、複合操作時間表示部221、停止時間表示部222、高負荷時間表示部223において、特徴量基準値設定部82の設定値により基準化された特徴量(基準値で実際の値を除した割合)が更に表示される点である。
<Monitor>
The external appearance of the monitor 201 is shown in FIG. The differences between the display in the first embodiment shown in FIG. 11 and the display in the combined operation time display unit 221, the stop time display unit 222, and the high load time display unit 223 are standardized by the setting values of the feature amount reference value setting unit 82. The feature amount (a ratio obtained by dividing the actual value by the reference value) is further displayed.

<効果>
上記の構成によれば、第1の実施例において得られた効果の他に、基準化された特徴量が操作者に提示されるといった効果が得られる。これにより、当該特徴量の基準に対する割合を把握することができるため、生産性向上のために優先して改善すべき特徴量を知ることが可能となる。例えば、熟練操作者の特徴量を基準値として用いることで、操作スキル向上に伴う生産性の向上が容易に実現可能となる。
<Effect>
According to the above configuration, in addition to the effects obtained in the first embodiment, an effect that the standardized feature amount is presented to the operator can be obtained. As a result, since the ratio of the feature amount to the reference can be grasped, it is possible to know the feature amount to be improved in order to improve the productivity. For example, by using the feature amount of a skilled operator as a reference value, it is possible to easily realize improvement in productivity accompanying improvement in operation skills.

なお、本実施例では、モニタ201に基準化された特徴量が表示される態様について説明したが、モニタ201に表示するのは基準化された特徴量に限られず、特徴量基準値もしくは特徴量基準値によって基準化された基準化特徴量のうち少なくともいずれか一方が表示されればよい。   In the present embodiment, the aspect in which the standardized feature quantity is displayed on the monitor 201 has been described, but the display on the monitor 201 is not limited to the standardized feature quantity, and a feature quantity reference value or feature quantity At least one of the scaled feature values scaled by the reference value may be displayed.

<第3の実施例>
本発明の作業機械の操作支援装置の第3の実施例を図17および図18を用いて説明する。以下に記述する内容以外の第3の実施例における構成及び作用は、第2の実施例におけるものと同様である。
Third Embodiment
A third embodiment of the operation support device for a working machine of the present invention will be described with reference to FIGS. 17 and 18. The configuration and operation of the third embodiment other than the contents described below are the same as those of the second embodiment.

<優先順位判定部、モニタ>
図17は、第3の実施例における制御システムを表す模式図である。図12に示す構成との相違は、優先順位判定部90が新たに備えられている点である。
<Priority judgment unit, monitor>
FIG. 17 is a schematic view showing a control system in the third embodiment. The difference from the configuration shown in FIG. 12 is that a priority determination unit 90 is newly provided.

図17に示す優先順位判定部90では、基準化された特徴量と特徴量基準値との差分に対して影響度を乗算した結果を大小比較することで、優先して改善すべき特徴量の順位付けを行う。優先順位判定部90の判定結果は、出力部92を介してモニタ201に出力される。   The priority determination unit 90 shown in FIG. 17 compares the size of the result of multiplying the difference between the standardized feature amount and the feature amount reference value by the degree of influence, thereby comparing the magnitude of the feature amount to be preferentially improved. Make rankings. The determination result of the priority determination unit 90 is output to the monitor 201 via the output unit 92.

図18にモニタ201の外観を示す。図16に示す第2の実施例における表示との相違点は、優先順位表示部230が追加された点である。   The appearance of the monitor 201 is shown in FIG. The difference from the display in the second embodiment shown in FIG. 16 is that a priority display unit 230 is added.

図18に表示される優先順位は、優先順位判定部90において、例えば以下の演算式(1)〜(3)の結果を大小比較して決定されたものである。
複合操作時間:
影響度(60[%])×{(基準値(100[%])−基準化特徴量(90[%])}=600…(1)
停止時間:
影響度(30[%])×{(基準値(100[%])−基準化特徴量(30[%])}=2100…(2)
高負荷時間:
影響度(10[%])×{(基準値(100[%])−基準化特徴量(80[%])}=200…(3)
この例の場合には、基準値に対し停止時間が3倍強となっており(停止時間の場合には、基準値を実際の停止時間で除した値が特徴量)、影響度30%を考慮しても複合操作時間及び高負荷時間に比べ生産性評価(単位時間作業量)に大きく影響している事がわかる。
The priority order displayed in FIG. 18 is determined, for example, by comparing the magnitudes of the results of the following arithmetic expressions (1) to (3) in the priority order determination unit 90.
Combined operation time:
Degree of influence (60 [%]) x {(reference value (100 [%])-standardized feature value (90 [%])} = 600 ... (1)
Stop time:
Degree of influence (30 [%]) x {(reference value (100 [%])-standardized feature value (30 [%])} = 2100 ... (2)
High load time:
Degree of influence (10 [%]) x {(reference value (100 [%])-standardized feature value (80 [%])} = 200 (3)
In the case of this example, the stop time is more than 3 times the reference value (in the case of the stop time, the value obtained by dividing the reference value by the actual stop time is the feature amount), and the degree of influence is 30%. Even if it considers, it turns out that productivity evaluation (unit time operation amount) is greatly affected compared with combined operation time and high load time.

<第3の実施例に固有のメリット>
上記の構成によれば、影響度と各特徴量の伸び代を踏まえた優先順位が操作者に提示される。生産性向上のために優先して改善すべき特徴量が順位付けされて操作者に明示されるため、前述の実施例以上に、操作スキル向上に伴う生産性の向上が容易となる。
<Benefits inherent to the third embodiment>
According to the above configuration, the operator is presented with a priority based on the degree of influence and the expansion of each feature amount. Since the feature quantities to be improved in order to improve the productivity are prioritized and clearly indicated to the operator, the productivity can be easily improved with the improvement of the operation skill more than in the above-described embodiment.

<第4の実施例>
本発明の作業機械の操作支援装置の第4の実施例を図19および図20を用いて説明する。以下に記述する内容以外の第4の実施例における構成及び作用は、第3の実施例におけるものと同様である。
Fourth Embodiment
A fourth embodiment of the operation support device for a working machine of the present invention will be described with reference to FIGS. 19 and 20. FIG. The configuration and operation of the fourth embodiment other than the contents described below are the same as those of the third embodiment.

<メッセージ設定部、モニタ>
図19は、第4の実施例における制御システムを表す模式図である。図17に示す第3の実施例との相違点は、メッセージ設定部83が新たに備えられている点である。
<Message setting unit, monitor>
FIG. 19 is a schematic view showing a control system in the fourth embodiment. The difference with the third embodiment shown in FIG. 17 is that a message setting unit 83 is newly provided.

図19において、メッセージ設定部83には、各特徴量に応じた改善メッセージが予め設定されている。優先順位判定部90で最も優先順位が高かった特徴量に対する改善メッセージが選択され、出力部92を介してモニタ201に対して出力される。   In FIG. 19, in the message setting unit 83, an improvement message corresponding to each feature amount is set in advance. An improvement message for the feature amount having the highest priority is selected by the priority determination unit 90 and is output to the monitor 201 through the output unit 92.

図20にモニタ201の外観を示す。図18に示す第3の実施例における表示との相違は、改善メッセージ表示部240が追加された点である。   The external appearance of the monitor 201 is shown in FIG. The difference from the display in the third embodiment shown in FIG. 18 is that an improvement message display unit 240 is added.

<第4の実施例に固有のメリット>
上記の構成によれば、操作者に具体的な特徴量の改善メッセージが提示されるため、前述の実施例以上に、操作スキル向上に伴う生産性の向上が容易となる。
<Inherent merit to the fourth embodiment>
According to the above configuration, since the improvement message of the specific feature amount is presented to the operator, the productivity can be easily improved along with the improvement of the operation skill more than the above-described embodiment.

<第5の実施例>
本発明の作業機械の操作支援装置の第5の実施例を図21乃至図23を用いて説明する。以下に記述する内容以外の第5の実施例における構成および作用は、第4の実施例におけるものと同様である。
Fifth Embodiment
A fifth embodiment of the operation support device for a work machine according to the present invention will be described with reference to FIGS. The configuration and operation of the fifth embodiment other than the contents described below are the same as those of the fourth embodiment.

<制御回路の構成>
本実施例の作業機械の制御回路を図21に示す。図2に示す第1の実施例との相違は、影響度更新スイッチ48が追加された点である。
<Configuration of control circuit>
The control circuit of the working machine of this embodiment is shown in FIG. The difference from the first embodiment shown in FIG. 2 is that an influence degree update switch 48 is added.

<近似式演算部>
図22は、第5の実施例における制御システムを表す模式図である。図19に示す構成との相違は、近似式演算部91が新たに備えられている点である。
<Approximation Expression Calculation Unit>
FIG. 22 is a schematic view showing a control system in the fifth embodiment. The difference from the configuration shown in FIG. 19 is that an approximate expression calculation unit 91 is newly provided.

近似式演算部91は、演算データ記憶部81に記憶されている複数組の単位時間作業量と複合操作時間、停止時間、高負荷時間とから、単位時間作業量に対する複合操作時間、停止時間、高負荷時間の近似式を演算する。また、この近似式の傾きについても演算する。近似式演算部91は、演算結果を基にして求めた影響度更新値を影響度設定部80に出力し、影響度設定部80は入力された影響度更新値を新たな影響度として記憶する。 The approximate expression calculation unit 91 determines the combined operation time and the stop time for the unit time work amount from the plurality of sets of unit time work amounts, the combined operation time, the stop time, and the high load time stored in the calculation data storage unit 81. Calculate the approximate expression of high load time. Also, the inclination of this approximate expression is calculated. The approximate expression calculation unit 91 outputs the influence degree update value obtained based on the calculation result to the influence degree setting unit 80, and the influence degree setting unit 80 stores the input influence degree update value as a new influence degree. .

上述したように、影響度は、生産性評価値と特徴量の結び付きの強さを相対的に表現可能な数値である。例えば、単位時間作業量に対する複合操作時間、停止時間、高負荷時間の近似式を演算する場合、近似式の傾きが大きいほど当該複合操作時間、停止時間、高負荷時間の増加に対して単位時間作業量が大きく増加することになる。すなわち、当該特徴量(複合操作時間、停止時間、高負荷時間)の変化が生産性評価値(単位時間作業量)に与える影響が大きいことになる。逆に、近似式の傾きが小さいほど当該特徴量が増加しても生産性評価値はさほど増加しない、すなわち当該特徴量の変化が生産性評価値に与える影響は小さいことになる。これらのことから、演算した近似式の傾きを用いることによって、蓄積データに基づいた新たな影響度を求めることができる。   As described above, the degree of influence is a numerical value that can relatively express the strength of the connection between the productivity evaluation value and the feature value. For example, in the case of computing an approximate expression of combined operation time, stop time, and high load time for unit time work amount, the larger the inclination of the approximate expression is, the unit time for the increase of the combined operation time, stop time, and high load time The amount of work will be greatly increased. That is, the change of the feature amount (the combined operation time, the stop time, the high load time) has a large influence on the productivity evaluation value (per unit time work amount). Conversely, as the inclination of the approximate expression decreases, the productivity evaluation value does not increase so much even if the feature amount increases, that is, the change in the feature amount has less influence on the productivity evaluation value. From these, it is possible to obtain a new degree of influence based on accumulated data by using the slope of the calculated approximate expression.

近似式演算部91の作用について図23に示す。   The operation of the approximate expression calculator 91 is shown in FIG.

図23において、手順910では、影響度更新スイッチ48の押下判定が行われる。影響度更新スイッチ48が押下されたと判定された場合には、処理は手順911へ移行する。これに対し、影響度更新スイッチ48が押下されなかったと判定された場合には、処理は終了する。   In FIG. 23, in step 910, the depression determination of the influence degree update switch 48 is performed. If it is determined that the influence degree update switch 48 is pressed, the process proceeds to step 911. On the other hand, when it is determined that the influence degree update switch 48 has not been pressed, the process ends.

手順911では、演算データ記憶部81に記憶されている、複数組の単位時間作業量と各特徴量の演算結果情報を取得する。   In step 911, calculation results information of a plurality of sets of unit time work amounts and feature amounts stored in the calculation data storage unit 81 is acquired.

手順912では、最小二乗法を適用し、単位時間作業量と複合操作時間、単位時間作業量と停止時間、単位時間作業量と高負荷時間の各近似式を導出する。   In step 912, the least squares method is applied to derive approximate expressions of unit time work and combined operation time, unit time work and stop time, and unit time work and high load time.

手順913では、手順912で導出された各近似式の傾きの絶対値を参照し、影響度の更新値を演算する。例えば、各近似式の傾きaの絶対値が以下の通り導出されたとする。
単位時間作業量と複合操作時間:a=2.5
単位時間作業量と停止時間:a=2.0
単位時間作業量と高負荷時間:a=0.5
各特徴量の影響度が合計100[%]となるように比例配分を行うと、各影響度の演算結果は、複合操作時間(2.5/(2.5+2.0+0.5)=50[%])、停止時間(2.0/(2.5+2.0+0.5)=40[%])、高負荷時間(0.5/(2.5+2.0+0.5)=10[%])となる。
In step 913, the absolute value of the slope of each approximate expression derived in step 912 is referenced to calculate the updated value of the degree of influence. For example, it is assumed that the absolute value of the slope a of each approximate expression is derived as follows.
Unit time work volume and combined operation time: a = 2.5
Unit time work and stop time: a = 2.0
Unit time work and high load time: a = 0.5
If proportional distribution is performed so that the influence degree of each feature amount is 100 [%] in total, the calculation result of each influence degree is the combined operation time (2.5 / (2.5 + 2.0 + 0.5) = 50 [ %], Stop time (2.0 / (2.5 + 2.0 + 0.5) = 40 [%]), high load time (0.5 / (2.5 + 2.0 + 0.5) = 10 [%]) It becomes.

手順914では、影響度設定部80で予め設定されている影響度を、手順913で演算された更新値で上書きする処理が行われる。   In step 914, processing of overwriting the degree of influence set in advance by the degree of influence setting unit 80 with the update value calculated in step 913 is performed.

<第5の実施例に固有のメリット>
上記の構成によれば、作業機械の使用に伴って蓄積される生産性評価値と特徴量を使用して、影響度の更新が可能となる。作業機械の実用に則した影響度が導出可能となることから、前述の実施例以上に、操作スキル向上に伴う生産性の向上が容易となる。
<Inherent merit to the fifth embodiment>
According to the above configuration, the degree of influence can be updated using the productivity evaluation value and the feature value accumulated with use of the work machine. Since the degree of influence according to the practical use of the working machine can be derived, it is possible to easily improve the productivity accompanying the improvement of the operation skill more than the above-mentioned embodiment.

なお、本実施例では、近似式演算に最小二乗法を用いたが、近似式の演算方法はこれに限られず、あらゆる手法が該当する。例えば最大と最小2点で近似式を導出することもできる。   In the present embodiment, the least squares method is used for the approximate expression calculation, but the calculation method of the approximate expression is not limited to this, and any method is applicable. For example, it is also possible to derive an approximate expression with two points of maximum and minimum.

<第6の実施例>
本発明の作業機械の操作支援装置の第6の実施例を図24および図25を用いて説明する。以下に記述する内容以外の第6の実施例における構成および作用は、第5の実施例におけるものと同様である。
Sixth Embodiment
A sixth embodiment of the operation support device for a working machine according to the present invention will be described with reference to FIG. 24 and FIG. The configuration and operation of the sixth embodiment other than the contents described below are the same as those of the fifth embodiment.

<モニタ>
図24にモニタ201の外観を示す。図20に示す第4の実施例における表示との相違は、時間履歴表示スイッチ250が追加された点である。時間履歴表示スイッチ250が押下されると、モニタ201の画面が図25に示した表示に切り替わる。
<Monitor>
The external appearance of the monitor 201 is shown in FIG. The difference from the display in the fourth embodiment shown in FIG. 20 is that a time history display switch 250 is added. When the time history display switch 250 is pressed, the screen of the monitor 201 is switched to the display shown in FIG.

図25には、時間履歴表示部251および図24に示した初期画面に復帰するための復帰スイッチ252が各々配置されている。   In FIG. 25, a time history display unit 251 and a return switch 252 for returning to the initial screen shown in FIG. 24 are arranged.

時間履歴表示スイッチ250の押下に伴い、図22の演算データ記憶部81から過去複数組の単位時間作業量と各特徴量の演算結果がモニタ201に出力され、時間履歴表示部251にグラフ表示される。   With the pressing of the time history display switch 250, the calculation data of the past multiple sets of unit time work amounts and feature amounts are output from the calculation data storage unit 81 of FIG. 22 to the monitor 201 and displayed graphically on the time history display unit 251. Ru.

<第6の実施例に固有のメリット>
上記の構成によれば、過去複数組の生産性評価値と各特徴量の演算結果が操作者に提示される。前述の実施例の効果に加えて、特徴量の改善に伴う生産性の向上を操作者が容易に確認可能となり、ユーザビリティが向上する。
<Inherent merit to the sixth embodiment>
According to the above configuration, the operator is presented with the calculation results of the plurality of sets of productivity evaluation values in the past and the feature amounts. In addition to the effects of the above-described embodiment, the operator can easily confirm the improvement in productivity accompanying the improvement in the feature value, and the usability is improved.

<その他>
なお、本発明は、上記の実施例に限定されるものではなく、様々な変形例が含まれる。上記の実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることも可能であり、また、ある実施例の構成に他の実施例の構成を加えることも可能である。また、各実施例の構成の一部について、他の構成の追加・削除・置換をすることも可能である。
<Others>
The present invention is not limited to the above embodiments, and includes various modifications. The above embodiments have been described in detail in order to explain the present invention in an easy-to-understand manner, and are not necessarily limited to those having all the configurations described. In addition, part of the configuration of one embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of one embodiment. Moreover, it is also possible to add, delete, and replace other configurations for part of the configuration of each embodiment.

例えば、上記の実施例では作業機械を図1に示した油圧ショベルの構成としたが、作業機械は最低限1つのアクチュエータを有する構成であればよく、フロント数やフロント関節数、作業具の種類など、その構成は任意である。また、作業機械としては、油圧ショベルの他にはホイールローダやダンプトラック、ブルドーザーなどが挙げられる。   For example, although the working machine is configured as the hydraulic shovel shown in FIG. 1 in the above embodiment, the working machine may be configured to have at least one actuator, and the number of fronts, the number of front joints, the type of work tools The configuration is optional. Moreover, as a working machine, a wheel loader, a dump truck, a bulldozer, etc. are mentioned besides a hydraulic shovel.

また、上記の実施例では操作装置を図3に示した構成としたが、本発明の適用はこの限りではない。操作装置は各アクチュエータの駆動を指示可能な操作デバイスであれば良く、その幾何配置も任意である。また、操作レバーの操作方向と作業フロントの動作アクチュエータの関係についても任意の構成が取りうる。   Further, although the operating device is configured as shown in FIG. 3 in the above embodiment, the application of the present invention is not limited to this. The operating device may be any operating device capable of instructing the drive of each actuator, and the geometrical arrangement is also arbitrary. In addition, any configuration can be taken as to the relationship between the operation direction of the operation lever and the operation actuator of the work front.

更に、上記の実施例では、検出装置として操作レバー操作量検出器、角度センサ、圧力センサにより作業機械の運転状況を検出したが、本発明の適用はこの限りでない。検出装置は、生産性評価値と特徴量を演算可能なあらゆる検出機構が該当する。 Further, in the above embodiment, the operating lever operating amount detector as a detection device, the angle sensor has been detecting the operating situation of the working machine by the pressure sensor, the application of the present invention shall not apply. The detection device corresponds to any detection mechanism that can calculate the productivity evaluation value and the feature value.

また、上記の実施例では、演算期間設定部として、計測オンオフスイッチ47のオンオフにより演算期間の設定を行ったが、本発明の適用はこの限りではない。演算期間設定部は、例えば、図示しないエンジンの始動後、一定時間毎に自動的に演算が行われるように構成しても良い。   In the above embodiment, the calculation period is set by turning on and off the measurement on / off switch 47 as the calculation period setting unit, but the application of the present invention is not limited to this. The calculation period setting unit may be configured, for example, so that calculation is automatically performed at predetermined time intervals after the start of an engine (not shown).

更に、上記の実施例では出力部92の出力先としてモニタ201を使用したが、本発明の適用はこの限りではない。例えば、出力先をプリンタに置き換えることでも、同様の情報を操作者に提供可能である。また、出力部92を演算結果を外部送信できるよう構成し、モニタ201と同様の情報を、操作者が作業機械外で確認できるよう構成しても良い。更には、モニタ201と同様の情報を、作業機械が稼働する現場の現場監督の所有する表示端末や現場事務所内の表示装置、遠隔地に存在する管理センターの表示装置などに出力する構成としても良い。   Furthermore, although the monitor 201 is used as an output destination of the output unit 92 in the above embodiment, the application of the present invention is not limited to this. For example, replacing the output destination with a printer can provide the operator with similar information. Further, the output unit 92 may be configured to transmit the calculation result to the outside, and the operator may confirm the same information as the monitor 201 outside the work machine. Furthermore, it is possible to output information similar to that of the monitor 201 to a display terminal owned by the site supervisor of the site where the work machine operates, a display device in the site office, or a display device of a control center located at a remote location. good.

また、上記の実施例では生産性評価値を単位時間作業量としたが、本発明の適用はこの限りではなく、作業機械の生産性を評価可能なあらゆる評価値が該当する。例えば、単純に作業所要時間あるいは作業量としても良い。また、作業機械の燃料消費量を検出することで、燃料消費量、単位燃料あたりの作業量とすることもできる。   Moreover, although productivity evaluation value was made into unit time operation amount in said Example, the application of this invention is not this limitation, and all the evaluation values which can evaluate productivity of a working machine correspond. For example, the time required for work or the amount of work may be simply used. Further, by detecting the fuel consumption of the working machine, it is possible to set the fuel consumption and the working amount per unit fuel.

更に、上記の実施例では特徴量を、複合操作時間、停止時間、高負荷時間としたが、本発明の適用はこの限りではなく、作業機械の生産性に関るあらゆる車体の特徴量が該当する。例えば、作業フロントの移動距離や移動速度、操作レバーが不感帯を超えて操作された回数など、任意の選択・設定が可能である。   Furthermore, in the above embodiment, the feature quantities are combined operation time, stop time, and high load time, but the application of the present invention is not limited to this, and all vehicle feature quantities related to the productivity of the working machine are applicable. Do. For example, arbitrary selection and setting can be made, such as the movement distance and movement speed of the work front, and the number of times the operation lever is operated beyond the dead zone.

また、上記の実施例では生産性評価値を1つ、特徴量を3つとしたが、本発明の適用はこの限りではない。各々の個数、その組合せは任意の構成を取り得る。   Further, although the productivity evaluation value is one and the feature quantity is three in the above embodiment, the application of the present invention is not limited to this. The number of each and the combination thereof may take any configuration.

更に、上記の実施例では、第5の実施例を除いて、影響度がコントローラ200内で予め設定されている構成としたが、本発明の適用はこの限りではない。例えば、コントローラ200に外部入力装置を新たに接続し、影響度をユーザが任意に変更可能な構成としても良い。   Furthermore, in the above embodiment, except for the fifth embodiment, the influence degree is set in advance in the controller 200, but the application of the present invention is not limited to this. For example, an external input device may be newly connected to the controller 200, and the influence degree may be arbitrarily changed by the user.

また、上記の実施例の影響度は合計100[%]を各特徴量に配分する手法としたが、本発明の適用はこの限りでなく、特徴量間の相対比較が可能なあらゆる手法が該当する。例えば、大・中・小のように影響度を定性的に提示することも可能である。第3の実施例のように優先順位を決定する際には、定性的傾向に合わせて、大(3.0)・中(2.0)・小(1.0)のように数値を割り振れば良い。   In addition, although the influence degree of the above embodiment is a method of allocating a total of 100 [%] to each feature amount, the application of the present invention is not limited to this, and any method capable of relative comparison between feature amounts is applicable. Do. For example, it is also possible to present the degree of influence qualitatively, such as large, medium, and small. When determining the priority as in the third embodiment, the numerical values are divided into large (3.0), middle (2.0), small (1.0) according to the qualitative tendency. Just shake it.

更に、上記の実施例では操作者の個人を特定する装置は備えられていないが、本発明の適用はこの限りではない。コントローラ200に個人認証装置を新たに接続し、演算データ記憶部81において、個人毎にデータ記憶を行っても良い。   Furthermore, although the above embodiment does not have a device for identifying the individual of the operator, the application of the present invention is not limited to this. A personal identification device may be newly connected to the controller 200, and data may be stored in the calculation data storage unit 81 for each individual.

また、単位時間作業量の演算は図6、図7の通りとしたが、本発明の適用はこの限りではない。当然ではあるが、単位時間作業量が演算可能なあらゆる演算方法が該当する。   Moreover, although calculation of unit time work amount was as FIG. 6, FIG. 7, application of this invention is not this limitation. Naturally, any calculation method that can calculate the unit time work amount is applicable.

更に、複合操作時間、停止時間、高負荷時間の演算は図8〜図10の通りとしたが、本発明の適用はこの限りではない。当然ではあるが、当該特徴量が演算可能なあらゆる演算方法が該当する。   Furthermore, although the calculations of the combined operation time, the stop time, and the high load time are as shown in FIGS. 8 to 10, the application of the present invention is not limited to this. It goes without saying that any calculation method that can calculate the feature amount is applicable.

また、モニタ表示画面は図11、図16、図18、図20、図24、図25に示した通りとしたが、本発明の適用はこの限りではない。レイアウト、数値表現方法など、当然ながら任意の構成構成を取り得る。   Although the monitor display screen is as shown in FIG. 11, FIG. 16, FIG. 18, FIG. 20, FIG. 24, and FIG. 25, the application of the present invention is not limited to this. Naturally, any configuration can be taken, such as layout and numerical expression method.

更に、上記の実施例では、特徴量基準値がコントローラ200内で予め設定されている構成としたが、本発明の適用はこの限りではない。例えば、コントローラ200に外部入力装置を新たに接続し、ユーザが任意に変更可能な構成としても良い。   Furthermore, in the above embodiment, the feature amount reference value is set in advance in the controller 200, but the application of the present invention is not limited to this. For example, an external input device may be newly connected to the controller 200 so that the user can arbitrarily change it.

16…ブームシリンダ(アクチュエータ)
17…アームシリンダ(アクチュエータ)
18…作業具シリンダ(アクチュエータ)
19…旋回モータ(アクチュエータ)
30…ブーム操作レバー(操作装置
31…アーム操作レバー(操作装置
32…作業具操作レバー(操作装置
33…旋回操作レバー(操作装置
40…ブーム角度センサ(第2センサ;検出装置)
41…アーム角度センサ(第2センサ;検出装置)
42…作業具角度センサ(第2センサ;検出装置)
44…ブームシリンダ圧力センサ(第3センサ;検出装置)
45…アームシリンダ圧力センサ(第3センサ;検出装置)
46…作業具シリンダ圧力センサ(第3センサ;検出装置)
47…計測オンオフスイッ
60…単位時間作業量演算部(生産性評価値演算部)
70…複合操作時間演算部(特徴量演算部)
71…停止時間演算部(特徴量演算部)
72…高負荷時間演算部(特徴量演算部)
80…影響度設定部
81…演算データ記憶部(記憶部)
82…特徴量基準値設定部
83…メッセージ設定部(メッセージ出力部)
90…優先順位判定部
91…近似式演算部
92…出力部
100…油圧ショベル(作業機械)
200…コントローラ
201…モニタ
301…ブーム操作レバー操作量検出器(第1センサ;検出装置)
311…アーム操作レバー操作量検出器(第1センサ;検出装置)
321…作業具操作レバー操作量検出器(第1センサ;検出装置)
331…旋回操作レバー操作量検出器(第1センサ;検出装置)
16: Boom cylinder (actuator)
17 ... Arm cylinder (actuator)
18 ... Work implement cylinder (actuator)
19: Turning motor (actuator)
30: Boom control lever (operating device )
31 ... Arm control lever (operating device )
32 ... Work implement control lever (operation device )
33: Turning control lever (operating device )
40: Boom angle sensor (second sensor; detection device)
41 ... Arm angle sensor (second sensor; detection device)
42 ... Work implement angle sensor (second sensor; detection device)
44: Boom cylinder pressure sensor (third sensor; detection device)
45 ... Arm cylinder pressure sensor (third sensor; detection device)
46 ... Work implement cylinder pressure sensor ( third sensor; detection device)
47 ... measurement On'ofusui' Chi 60 ... unit time workload calculation section (productivity evaluation value calculation unit)
70 ... complex operation time operation unit (feature amount operation unit)
71 ... stop time calculation unit (feature amount calculation unit)
72 ... High load time operation unit (feature amount operation unit)
80 Influence degree setting unit 81 Operation data storage unit (storage unit)
82 ... feature amount reference value setting unit 83 ... message setting unit (message output unit)
90 ... priority order determination unit 91 ... approximate expression calculation unit 92 ... output unit 100 ... hydraulic excavator (work machine)
200 ... controller
201 ... Monitor
301: Boom operation lever operation amount detector (first sensor; detection device)
311 ... Arm operation lever operation amount detector (first sensor; detection device)
321 ... Work implement operation lever operation amount detector (first sensor; detection device)
331: Turning control lever operation amount detector (first sensor; detection device)

Claims (6)

作業フロントを有する作業機械の関節を駆動する複数のアクチュエータと、
この複数のアクチュエータの駆動を指示する複数の操作装置を有する作業機械の操作支援装置において
前記複数の操作装置設けられ、前記複数の操作装置の操作量を検出する複数の第1センサと、前記複数の操作装置の指示による前記複数のアクチュエータの駆動に基づく前記作業フロントの姿勢を検出する複数の第2センサと、前記複数の操作装置による指示により駆動した前記複数のアクチュエータの駆動の圧力を検出する複数の第3センサとを含み、前記作業機械の運転状況に関わる複数の状態量を検出する複数の検出装置と、
演算期間の設定を指示する計測オンオフスイッチと、
前記複数の検出装置と前記オンオフスイッチからの信号に基づいて前記作業機械の操作支援を行うための演算処理を行うコントローラとを有
前記コントローラは、
前記計測オンオフスイッチがオンからオフに切り換わる間に前記複数の検出装置で検出した前記複数の状態量に基づいて、前記作業機械の単位時間作業量を含み、前記作業機械の生産性を評価可能な値である生産性評価値を演算する生産性評価値演算部と、
前記計測オンオフスイッチがオンからオフに切り換わる間に前記複数の検出装置で検出した前記複数の状態量に基づいて、前記複数のアクチュエータを駆動する複合操作時間、作業停止時間及び高負荷作業時間を含み、前記生産性評価値に影響を及ぼす前記複数の操作装置の操作に係わる複数の特徴量を演算する特徴量演算部と、
前記生産性評価値と前記複数の特徴量のそれぞれの結びつきの強さを相対的に表す数値を算出し、前記生産性評価値に対する前記複数の特徴量の影響度を設定する影響度設定部と、
前記生産性評価値演算部で演算された前記生産性評価値および前記特徴量演算部で演算された前記複数の特徴量を記憶する記憶部と、
記生産性評価値および前記複数の特徴量を前記複数の影響度と合わせてモニタに出力する出力部とを備えた
ことを特徴とする作業機械の操作支援装置。
A plurality of actuators for driving joints of a working machine having a working front ;
In an operation support device of a working machine having a plurality of operation devices instructing the drive of the plurality of actuators,
Provided in the plurality of operation devices, and a plurality of first sensor for detecting an operation amount of said plurality of operating devices, the working front of the posture based on the driving of the plurality of actuators by instruction of said plurality of operating devices detected plurality of states includes a plurality of second sensors, and a plurality of third sensor for detecting the pressure of the driving of the plurality of actuators driven by an instruction by said plurality of operating devices, related to operating conditions of the working machine to A plurality of detection devices for detecting the quantity ,
Measurement on / off switch to instruct setting of calculation period,
Have a controller that performs arithmetic processing for performing operations support the working machine on the basis of a signal from the on-off switch and the plurality of detection devices,
The controller
The productivity of the working machine can be evaluated including the unit time workload of the working machine based on the plurality of state quantities detected by the plurality of detection devices while the measurement on / off switch is switched from on to off A productivity evaluation value calculation unit that calculates a productivity evaluation value which is a random value,
A combined operation time, an operation stop time and a high load operation time for driving the plurality of actuators based on the plurality of state quantities detected by the plurality of detection devices while the measurement on / off switch is switched from on to off wherein the feature quantity calculator for calculating a plurality of feature amounts related to the operation of the productivity rating the plurality of operation devices affecting value,
An influence setting unit configured to calculate a numerical value relatively representing the strength of connection between each of the productivity evaluation value and the plurality of feature quantities, and to set an influence degree of the plurality of feature quantities on the productivity evaluation value; ,
A storage unit for storing the plurality of feature amounts calculated by the calculated by the productivity evaluation value calculating unit was the productivity evaluation value and the feature amount calculation unit,
Before Symbol Productivity evaluation value and the plurality of operation support apparatus for a working machine, characterized in that an output unit for the feature quantity and outputs to the monitor together with the plurality of impact.
請求項1に記載の作業機械の操作支援装置において、
前記コントローラは、
前記特徴量演算部によって演算される前記複数の特徴量のそれぞれの基準となる複数の特徴量基準値を設定する特徴量基準値設定部を更に備え、
前記出力部は、前記特徴量基準値設定部により設定された前記複数の特徴量基準値もしくは前記特徴量演算部によって演算される前記複数の特徴量を前記複数の特徴量基準値によって除することで基準化された複数の基準化特徴量のうち少なくともいずれか一方を前記モニタに更に出力する
ことを特徴とする作業機械の操作支援装置。
In the operation support device for a work machine according to claim 1,
The controller
The image processing apparatus further comprises a feature amount reference value setting unit that sets a plurality of feature amount reference values to be a reference of each of the plurality of feature amounts calculated by the feature amount calculation unit.
And the output unit, dividing the feature amount reference value setting said plurality of feature quantity reference value set by the unit, or a plurality of feature amounts calculated by the feature calculation unit by the plurality of feature quantity reference value work machine operation support device, characterized in that the at least one further output to the monitor of the scaled plurality of reference feature value by.
請求項2に記載の作業機械の操作支援装置において、
前記コントローラは、
前記特徴量基準値設定部で設定された前記複数の特徴量基準値と前記複数の特徴量とのそれぞれの差分に前記複数の影響度を乗算し,前記乗算結果の大小を比較して前記乗算結果が大きいほど優先順位が高く、前記特徴量を改善する余地があるとすることで前記複数の特徴量の優先順位を判定する優先順位判定部を更に備え、
前記出力部は、前記優先順位判定部によって判定された前記優先順位を前記モニタに更に出力する
ことを特徴とする作業機械の操作支援装置。
In the operation support device for a work machine according to claim 2,
The controller
The difference between each of the plurality of feature amount reference values set by the feature amount reference value setting unit and each of the plurality of feature amounts is multiplied by the plurality of influence degrees, and the magnitude of the multiplication result is compared to obtain the multiplication The higher the result is, the higher the priority is, and there is room to improve the feature amount, further comprising a priority determination unit that determines the priority of the plurality of feature amounts.
The output support unit further outputs the priority determined by the priority determination unit to the monitor .
請求項3に記載の作業機械の操作支援装置において、
前記コントローラは、
前記優先順位判定部によって判定された優先順位に応じて予め用意されたメッセージを前記出力部に対して出力するメッセージ出力部を更に備え
前記出力部は、前記メッセージを前記モニタに更に出力する
ことを特徴とする作業機械の操作支援装置。
In the operation support device for a work machine according to claim 3,
The controller
It further comprises a message output unit that outputs a message prepared in advance according to the priority determined by the priority determination unit to the output unit .
The operation support apparatus for a working machine, wherein the output unit further outputs the message to the monitor .
請求項1に記載の作業機械の操作支援装置において、
前記コントローラは、
前記記憶部に記憶されている複数組の前記生産性評価値と前記複数の特徴量とから、前記生産性評価値に対する前記複数の特徴量のそれぞれの関係を示す複数の近似式を導出し、かつこの複数の近似式の接線の傾きを演算する近似式演算部を更に備え、
前記影響度設定部は、前記近似式演算部によって演算された前記複数の近似式の接線の傾きの絶対値を前記複数の特徴量の全てについて加算し、得られた加算値によって前記複数の特徴量を除して新たな複数の影響度を算出し、この新たな複数の影響度に基づいて前記複数の影響度を更新する
ことを特徴とする作業機械の操作支援装置。
In the operation support device for a work machine according to claim 1,
The controller
Wherein a plurality of sets of the productivity evaluation value stored in the storage unit and said plurality of features, deriving a plurality of approximate expression indicating the respective relationship of the plurality of features with respect to the productivity evaluation value, And an approximate expression operation unit that calculates the inclination of tangents of the plurality of approximate expressions,
The influence degree setting unit adds the absolute value of the slope of the tangent of the plurality of approximate expressions calculated by the approximate expression calculation unit with respect to all of the plurality of feature amounts, and the plurality of features An operation support apparatus for a working machine, which calculates a plurality of new influence levels by dividing a quantity and updates the plurality of influence levels based on the new plurality of influence levels .
請求項1に記載の作業機械の操作支援装置において、
前記出力部は、前記記憶部に記憶されている複数組の前記生産性評価値と前記特徴量の時間履歴を前記モニタに更に出力する
ことを特徴とする作業機械の操作支援装置。
In the operation support device for a work machine according to claim 1,
The output supporting unit further outputs, to the monitor, a plurality of sets of productivity evaluation values stored in the storage unit and a time history of the feature amount.
JP2015111726A 2015-06-01 2015-06-01 Operation support device for work machine Active JP6425618B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015111726A JP6425618B2 (en) 2015-06-01 2015-06-01 Operation support device for work machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015111726A JP6425618B2 (en) 2015-06-01 2015-06-01 Operation support device for work machine

Publications (3)

Publication Number Publication Date
JP2016223201A JP2016223201A (en) 2016-12-28
JP2016223201A5 JP2016223201A5 (en) 2017-11-24
JP6425618B2 true JP6425618B2 (en) 2018-11-21

Family

ID=57747613

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015111726A Active JP6425618B2 (en) 2015-06-01 2015-06-01 Operation support device for work machine

Country Status (1)

Country Link
JP (1) JP6425618B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6777613B2 (en) * 2017-09-26 2020-10-28 日立建機株式会社 Transporter stop position direction guidance system
KR102615982B1 (en) * 2017-12-11 2023-12-19 스미토모 겐키 가부시키가이샤 Shovel and shovel management system

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4173121B2 (en) * 2003-09-02 2008-10-29 株式会社小松製作所 Construction machine operation system
JP4353476B2 (en) * 2004-08-18 2009-10-28 日産ディーゼル工業株式会社 Fuel consumption evaluation system
JP4954173B2 (en) * 2008-09-30 2012-06-13 本田技研工業株式会社 Device for instructing the driver on driving operation to improve fuel efficiency
JP2011126341A (en) * 2009-12-15 2011-06-30 Fuji Heavy Ind Ltd Vehicular information display device
US8340873B2 (en) * 2010-01-20 2012-12-25 Caterpillar Trimble Control Technologies, Llc Machine control and guidance system incorporating a portable digital media device
DE102010041544B4 (en) * 2010-09-28 2023-05-04 Bayerische Motoren Werke Aktiengesellschaft Driver assistance system to support the driver in consumption-controlled driving
JP5646267B2 (en) * 2010-09-30 2014-12-24 株式会社小松製作所 Guidance output device and guidance output method
JP2015040422A (en) * 2013-08-22 2015-03-02 日立建機株式会社 Display device of construction machine
JP6430272B2 (en) * 2015-01-29 2018-11-28 日立建機株式会社 Operation support device for work machine

Also Published As

Publication number Publication date
JP2016223201A (en) 2016-12-28

Similar Documents

Publication Publication Date Title
KR102126772B1 (en) Working machine
KR101755362B1 (en) Control system for work vehicle, control method and work vehicle
CN103890273B (en) Control system and method of construction machine
AU2009221767B2 (en) Adaptive payload monitoring system
CN104619920B (en) Working truck
US10711436B2 (en) Work machine operation assistance device
US20150002303A1 (en) System to display remaining payload weight for a truck
CN108368690B (en) Actuator drive control system in construction machine
CN108713084B (en) Construction machine
CN108603360A (en) Excavator
JPWO2015129932A1 (en) Wheel loader
CN103339327A (en) Control system for a machine
WO2020049821A1 (en) Work machine
JP4634760B2 (en) Work machine display system
JP6841784B2 (en) Work machine
WO2019088065A1 (en) Work machine
JP7234398B2 (en) motion identification device
CN109689978A (en) Work machine
JP6425618B2 (en) Operation support device for work machine
US20180313063A1 (en) Work machine with bucket monitoring
JP2017186875A5 (en)
JP7306201B2 (en) working machine
JP2014227676A (en) Work determination system for construction machine, construction machine and work determination method
JP6163126B2 (en) Construction machine operating state recording apparatus and operating state recording method
CN113502861A (en) Control method for construction machine

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171010

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171010

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180718

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180724

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180925

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181016

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181023

R150 Certificate of patent or registration of utility model

Ref document number: 6425618

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150