JP2008263762A - Ground fault protective relay system - Google Patents

Ground fault protective relay system Download PDF

Info

Publication number
JP2008263762A
JP2008263762A JP2007106587A JP2007106587A JP2008263762A JP 2008263762 A JP2008263762 A JP 2008263762A JP 2007106587 A JP2007106587 A JP 2007106587A JP 2007106587 A JP2007106587 A JP 2007106587A JP 2008263762 A JP2008263762 A JP 2008263762A
Authority
JP
Japan
Prior art keywords
test
ground fault
zero
ground
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2007106587A
Other languages
Japanese (ja)
Inventor
Koichi Nakanishi
康一 中西
Yoshiaki Date
義明 伊達
Akiharu Kamimoto
明春 神本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2007106587A priority Critical patent/JP2008263762A/en
Publication of JP2008263762A publication Critical patent/JP2008263762A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a ground fault protective relay system equipped with a capability of testing a ground fault direction relay having no danger of electric shock of an operator and capable of remarkably reducing a working time. <P>SOLUTION: First-third switches 11<SB>1</SB>-11<SB>3</SB>are provided in series on a capacitor C of each of phases of a surge absorber 10 provided on a secondary side of a voltage transformer 105. An integrated relay 200 with a testing capability consists of a relay unit provided with ground fault direction relays 210<SB>1</SB>-210<SB>3</SB>, and a test unit for testing the ground fault direction relays 210<SB>1</SB>-210<SB>3</SB>on the basis of a zero-phase voltage V<SB>0</SB>from a voltage transformer 103 for a grounding type gauge, a ground current I<SB>g</SB>from the surge absorber 10 and zero-phase currents I<SB>01</SB>-I<SB>03</SB>from zero-phase current transformers 134<SB>1</SB>-134<SB>3</SB>. There is executed a ground fault test on the ground fault direction relays 210<SB>1</SB>-210<SB>3</SB>by opening at least one of the first-third switches 11<SB>1</SB>-11<SB>3</SB>of the surge absorber 10 to break the balance of anti-ground electrostatic capacity of power distribution lines 102<SB>1</SB>-102<SB>3</SB>. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、地絡保護継電器システムに関し、特に、変圧器2次側に設置されているサージアブソーバを利用して複数の地絡方向継電器の1次試験を行う機能を備えた地絡保護継電器システムに関する。   The present invention relates to a ground fault protection relay system, and in particular, a ground fault protection relay system having a function of performing a primary test of a plurality of ground fault direction relays using a surge absorber installed on a secondary side of a transformer. About.

配電線に地絡事故が発生した場合に遮断器(CB)を動作させるための地絡保護継電器である地絡方向継電器(DG)の整定値(動作点)は対地線路特性に基づいて決められているが、配電線の亘長は毎年変わるため、地絡方向継電器の整定値も調整する必要がある。そのため、電力会社では、配電線人工地絡試験を毎年1回行って、地絡方向継電器の整定値を調整している。   The settling value (operating point) of the ground fault relay (DG), which is a ground fault protective relay for operating the circuit breaker (CB) in the event of a ground fault in the distribution line, is determined based on the characteristics of the ground line However, since the length of the distribution line changes every year, it is necessary to adjust the set value of the ground fault direction relay. Therefore, the electric power company conducts a distribution line artificial ground fault test once a year to adjust the set value of the ground fault direction relay.

従来、このような配電線人工地絡試験は、図6に示すように、地絡発生装置110と試験器120と接続線130とを用いて行われている。   Conventionally, such a distribution line artificial ground fault test has been performed using a ground fault generator 110, a tester 120, and a connection line 130, as shown in FIG.

地絡発生装置110は、3相(赤相R、白相Wおよび青相B)の母線101の1相(ここでは、赤相R)に地絡を人工的に発生させるためのものであり、接触棒111と、入力端子が接触棒111に接続されたスイッチ112と、一方の端子がスイッチ112の出力端子に接続されたパワーフューズ113と、一方の端子がパワーフューズ113の他方の端子に接続された地絡抵抗器114(地絡抵抗=3,000Ω)と、変流器からなる接地回路115とを備える。   Ground fault generator 110 is for artificially generating a ground fault in one phase (here, red phase R) of bus 101 of three phases (red phase R, white phase W and blue phase B), Contact rod 111, switch 112 with an input terminal connected to contact rod 111, power fuse 113 with one terminal connected to the output terminal of switch 112, and one terminal connected to the other terminal of power fuse 113 The ground fault resistor 114 (ground fault resistance = 3,000Ω) and a ground circuit 115 including a current transformer are provided.

試験器120は、第1乃至第3の地絡方向継電器2101〜2103の内部方向試験(自回線事故時の試験)および外部方向試験(他回線事故時の試験)時の母線101に設けられた接地形計器用変圧器(GPT)103から入力される零相電圧V0、地絡発生装置110の接地回路115から入力される地絡電流Igおよび第1乃至第3の零相変流器(ZCT)1341〜1343から入力される第1乃至第3の零相電流I01〜I03に基づいて、第1乃至第3の地絡方向継電器2101〜2103の試験を行うためのものである。 The tester 120 is provided on the bus 101 during the internal direction test (test at the time of own line fault) and the external direction test (test at the time of other line fault) of the first to third ground fault direction relays 210 1 to 210 3. was grounded potential transformer (GPT) 103 zero-phase voltage V 0 which is input from the ground fault current I g and the first to third zero-phase inputted from the ground circuit 115 of the earth絡発generating device 110 first through based on the third zero-phase current I 01 ~I 03 inputted from Nagareki (ZCT) 134 1 ~134 3, a test of the first to third ground directional relay 210 1-210 3 Is to do.

まず、第1の地絡方向継電器2101の内部方向試験を行うために、作業員は、地絡電流Igが母線101から第1の配電線1021の末端に向けて(すなわち、図示右方向に)流れるように、接続線130を第1の零相変流器1341の第1の試験用貫通線1371に接続する。ここで、第1の零相変流器1341は2つの断路器(DS)1311,1312の間に設けられており、また、第1の遮断器1331が母線101側の断路器1311と第1の零相変流器1341との間に設けられている。 First, in order to perform the internal direction test of the first earth fault directional relay 210 1, worker, toward the first end of the distribution line 102 1 ground fault current I g is from bus 101 (i.e., rightward The connecting wire 130 is connected to the first test through wire 137 1 of the first zero-phase current transformer 134 1 so as to flow. Here, the first zero-phase current transformer 134 1 is provided between the two disconnectors (DS) 131 1 and 131 2 , and the first circuit breaker 133 1 is the disconnector on the bus bar 101 side. It is provided between 131 1 and the first zero-phase current transformer 134 1 .

その後、作業員は、地絡発生装置110の接触棒111を母線101の赤相Rに接触させたのち、スイッチ112を瞬時の間だけ押す。これにより、母線101の赤相Rが人工的に地絡されて、第1乃至第3の配電線1021〜1023には、第1乃至第3の1次電流I1〜I3が第1乃至第3の配電線1021〜1023の末端から母線101に向けて(すなわち、図示左方向に)それぞれ流れる。
また、第1乃至第3の1次電流I1〜I3の合成電流である地絡電流Ig(=I1+I2+I3)が母線101→接触棒111→スイッチ112→パワーフューズ113→地絡抵抗器114→接続線130→第1の試験用貫通線1371→接続線130→接地回路115という電流経路を流れる。
このとき、第1の零相変流器1341には地絡電流Igとは逆方向に第1の1次電流I1が流れるため、地絡電流Igから第1の1次電流I1を引いた電流Ig−I1(=I2+I3)に相当する第1の零相電流I01が第1の地絡方向継電器2101に入力される。
Thereafter, the worker brings the contact bar 111 of the ground fault generating device 110 into contact with the red phase R of the bus 101 and then presses the switch 112 only for an instant. As a result, the red phase R of the bus 101 is artificially grounded, and the first to third primary currents I 1 to I 3 are supplied to the first to third distribution lines 102 1 to 102 3 . The first to third distribution lines 102 1 to 102 3 flow toward the bus 101 (ie, in the left direction in the figure), respectively.
Further, the ground fault current I g (= I 1 + I 2 + I 3 ), which is a combined current of the first to third primary currents I 1 to I 3 , is generated from the bus 101 → the contact bar 111 → the switch 112 → the power fuse 113 → It flows through a current path of ground fault resistor 114 → connection line 130 → first test through wire 137 1 → connection line 130 → ground circuit 115.
At this time, since the first zero-phase current transformer 134 1 first primary current I 1 flows in the direction opposite to the ground fault current I g, the first primary current I from the ground fault current I g A first zero-phase current I 01 corresponding to the current I g −I 1 (= I 2 + I 3 ) minus 1 is input to the first ground fault direction relay 210 1 .

試験器120は、接地回路115から入力される地絡電流Igと、接地形計器用変圧器103から入力される零相電圧V0と、第1の零相変流器1341から第1の地絡方向継電器2101を介して入力される第1の零相電流I01とを測定する。 Tester 120 includes a ground fault current I g is inputted from the ground circuit 115, the zero-phase voltage V 0 which is input from the earth type potential transformer 103, first from the first zero-phase current transformer 134 1 The first zero-phase current I 01 inputted through the ground fault direction relay 210 1 is measured.

このようにして第1の地絡方向継電器2101の内部方向試験が終了すると、作業員は、接触棒111を母線101の赤相Rから離すとともに、接続線130を第1の試験用貫通線1371から外す。 When the internal direction test of the first ground fault relay 2101 is completed in this way, the worker separates the contact bar 111 from the red phase R of the bus bar 101 and also connects the connection line 130 to the first test penetration line. remove from the 137 1.

続いて、第1の地絡方向継電器2101の外部方向試験を行うために、作業員は、接続線130の両端を接続して、地絡抵抗器114と接地回路115とを直接接続する。
その後、作業員は、接触棒111を母線101の赤相Rに所定の時間だけ接触させたのち、スイッチ112を瞬時の間だけ押す。これにより、母線101の赤相Rが人工的に地絡されて、第1乃至第3の配電線1021〜1023には、第1乃至第3の1次電流I1〜I3が第1乃至第3の配電線1021〜1023の末端から母線101に向けてそれぞれ流れる。
また、第1乃至第3の1次電流I1〜I3の合成電流である地絡電流Ig(=I1+I2+I3)が母線101→接触棒111→スイッチ112→パワーフューズ113→地絡抵抗器114→接続線130→接地回路115という電流経路を流れる。
このとき、第1の零相変流器1341には第1の1次電流I1しか流れないため、第1の1次電流I1に相当する第1の零相電流I01が第1の地絡方向継電器2101に入力される。
Subsequently, in order to perform an external direction test of the first ground fault direction relay 2101, the worker connects both ends of the connection line 130 and directly connects the ground fault resistor 114 and the ground circuit 115.
Thereafter, the worker brings the contact bar 111 into contact with the red phase R of the bus bar 101 for a predetermined time, and then presses the switch 112 for an instant. As a result, the red phase R of the bus 101 is artificially grounded, and the first to third primary currents I 1 to I 3 are supplied to the first to third distribution lines 102 1 to 102 3 . The first to third distribution lines 102 1 to 102 3 flow from the ends toward the bus bar 101, respectively.
Further, the ground fault current I g (= I 1 + I 2 + I 3 ), which is a combined current of the first to third primary currents I 1 to I 3 , is generated from the bus 101 → the contact bar 111 → the switch 112 → the power fuse 113 → The current path of the ground fault resistor 114 → the connection line 130 → the ground circuit 115 flows.
At this time, since only the first primary current I 1 flows through the first zero-phase current transformer 134 1 , the first zero-phase current I 01 corresponding to the first primary current I 1 is the first input of the earth fault direction relay 210 1.

試験器120は、接地回路115から入力される地絡電流Igと、接地形計器用変圧器103から入力される零相電圧V0と、第1の零相変流器1341から第1の地絡方向継電器2101を介して入力される第1の零相電流I01とを測定する。
試験器120は、内部方向試験において測定した地絡電流Ig、零相電圧V0および第1の零相電流I01と、外部方向試験において測定した地絡電流Ig、零相電圧V0および第1の零相電流I01とに基づいて、第1の地絡方向継電器2101の整定値を調整する。試験器120は、調整した整定値に対応する試験用零相電圧V0’および第1の試験用零相電流I01’を第1の地絡方向継電器2101に出力して、第1の地絡方向継電器2101から入力されるリレー接点動作信号S1に基づいて第1の地絡方向継電器2101の応答動作を確認する。
Tester 120 includes a ground fault current I g is inputted from the ground circuit 115, the zero-phase voltage V 0 which is input from the earth type potential transformer 103, first from the first zero-phase current transformer 134 1 The first zero-phase current I 01 inputted through the ground fault direction relay 210 1 is measured.
Tester 120 is ground fault current I g were measured in the inward direction test, the zero-phase voltage V 0 and the first zero-phase current I 01, the ground fault current I g as measured in an external direction test, the zero-phase voltage V 0 And the set value of the first ground fault direction relay 210 1 is adjusted based on the first zero-phase current I 01 . The tester 120 outputs the test zero-phase voltage V 0 ′ and the first test zero-phase current I 01 ′ corresponding to the adjusted set value to the first ground fault direction relay 210 1 , and to verify the first response behavior of earth fault directional relay 210 1 based on the relay contact operation signals S 1 inputted from the ground directional relay 210 1.

このようにして第1の地絡方向継電器2101の試験が終了すると、作業員は、第2の地絡方向継電器2102の内部方向試験および外部方向試験を同様にして行うことにより第2の地絡方向継電器2102の試験を行ったのち、第3の地絡方向継電器2103の内部方向試験および外部方向試験を同様にして行うことにより第3の地絡方向継電器2103の試験を行う。 When the test of the first ground fault direction relay 210 1 is completed in this manner, the worker performs the second test by performing the internal direction test and the external direction test of the second ground fault direction relay 210 2 in the same manner. After testing the ground fault direction relay 210 2 , the third ground fault direction relay 210 3 is tested by performing the internal direction test and the external direction test of the third ground fault direction relay 210 3 in the same manner. .

なお、下記の特許文献1には、人工地絡試験を半自動化し、作業量の低減と試験時間の短縮および危険防止を促進するために、配電線路を人工地絡させる地絡装置の開閉制御を行う地絡装置制御部と、零相電圧、地絡電流などの高速サンプリングを行う測定部と、地絡保護リレーの試験信号として模擬零相電圧および模擬地絡電流を発生し、地絡保護リレーの動作値を測定するリレー試験回路部と、これら各部を制御するとともに、測定部の出力データに対して所定の演算を行い、試験信号発生のための基礎データとなる線路の地絡特性を求めるマイクロコンピュータ部とを具備した、配電線を瞬時的に人工地絡させて対地線路特性の測定と地絡保護継電器の動作試験を行う配電線人工地絡試験装置が開示されている。
特開平2−105073号公報
In addition, in the following Patent Document 1, the artificial ground fault test is semi-automated, and the open / close control of the ground fault device that causes the distribution line to artificially ground is performed in order to reduce the amount of work, shorten the test time, and prevent danger. A ground fault device control unit, a measurement unit that performs high-speed sampling of zero phase voltage, ground fault current, etc., and generates a simulated zero phase voltage and simulated ground fault current as a ground fault protection relay test signal. The relay test circuit unit that measures the operating value of the circuit, and controls each of these units, performs predetermined calculations on the output data of the measurement unit, and determines the ground fault characteristics of the line that is the basic data for generating the test signal There is disclosed a distribution line artificial ground fault testing apparatus that includes a microcomputer section and instantaneously grounds a distribution line to measure ground line characteristics and perform an operation test of a ground fault protection relay.
Japanese Patent Laid-Open No. 2-105073

しかしながら、上述したような配電線人工地絡試験方法では、1つの配電線の外部方向試験をこの配電線以外の配電線の内部方向試験と兼ねて行うことができるが、それでも合計で配電線数と同じ回数ほど地絡を人工的に発生させる必要があるため、運転中の配電線に何度も対地電圧の変動を与えるとともに作業員の感電の危険性があるという問題があった。
また、地絡方向継電器の内部方向試験を行う際に、地絡発生装置の接続線を各配電線の零相変流器の試験用貫通線に接続するのに時間を要して効率的でないほか、誤配線の恐れもあるという問題があった。
さらに、地絡方向継電器は配電線ごとに設けられているため、地絡方向継電器のロック操作および接点取込みの配線接続に時間がかかり、作業時間が長くなるという問題があった。
However, in the distribution line artificial ground fault test method as described above, the external direction test of one distribution line can be performed in combination with the internal direction test of distribution lines other than this distribution line. Because there is a need to artificially generate a ground fault as many times as there are, there has been a problem in that the voltage on the ground is repeatedly applied to the operating distribution line and there is a risk of electric shock of the worker.
In addition, when performing an internal direction test of a ground fault direction relay, it takes time to connect the connection line of the ground fault generator to the test through line of the zero-phase current transformer of each distribution line, which is not efficient. In addition, there was a problem of miswiring.
Further, since the ground fault direction relay is provided for each distribution line, there is a problem that it takes time to perform the locking operation of the ground fault direction relay and the wiring connection for taking in the contacts, and the work time becomes long.

本発明の目的は、作業員の感電の危険性がなくかつ作業時間の大幅な短縮を図ることができる地絡方向継電器の試験機能を備えた地絡保護継電器システムを提供することにある。   An object of the present invention is to provide a ground fault protection relay system having a test function of a ground fault direction relay that can reduce the work time without risk of electric shock of an operator.

本発明の地絡保護継電器システムは、母線(101)に設けられた変圧器(105)の2次側に設置されたかつ各相のコンデンサ(C)に直列にそれぞれ設けられた第1乃至第3のスイッチ(111〜113,511〜513)を備えたサージアブソーバ(10,50)と、前記母線に設けられた接地形計器用変圧器(103)から入力される零相電圧(V0)、前記サージアブソーバから入力される接地電流(IG)および前記複数の配電線にそれぞれ設けられた複数の零相変流器(1341〜1343)から入力される零相電流(I01〜I03)に基づいて前記複数の地絡方向継電器の試験を行うための試験部とを具備し、前記第1乃至第3のスイッチの少なくとも1つを開いて前記複数の配電線の対地静電容量のバランスを崩すことにより、前記母線の系統の複数の配電線(1021〜1023)に地絡事故が発生した場合に該複数の配電線にそれぞれ設けられた複数の遮断器(1331〜1333)をそれぞれ動作させるための複数の地絡方向継電器(2101〜2103)の地絡試験を行うことを特徴とする。
ここで、前記試験部と、前記複数の地絡方向継電器を備える継電器部とからなる試験機能付一体型継電器(200)を具備してもよい。
両端が前記サージアブソーバの出力端子および前記試験部にそれぞれ接続されたかつ前記複数の零相変流器を貫通する直列貫通線(20)をさらに具備してもよい。
前記直列貫通線が、前記複数の零相変流器内を前記母線から前記複数の配電線の末端に向けて前記接地電流がそれぞれ流れるように、該複数の零相変流器をそれぞれ貫通していてもよい。
前記試験機能付一体型継電器の前記継電器部が、前記接地形計器用変圧器から入力される前記零相電圧に基づいて動作する地絡過電圧継電器(211)をさらに備えてもよい。
前記試験部が、前記複数の零相変流器からそれぞれ入力される前記複数の零相電流を測定する零相電流測定部(221)と、前記接地形計器用変圧器から入力される前記零相電圧を測定する零相電圧測定部(222)と、前記サージアブソーバから入力される前記接地電流を測定する接地電流測定部(223)と、前記零相電流測定部によって測定された前記複数の零相電流、前記零相電圧測定部によって測定された前記零相電圧および前記接地電流測定部によって測定された前記接地電流に基づいて前記複数の地絡方向継電器の整定値を調整するとともに、該調整した整定値に対応する試験用零相電圧(V0’)および複数の試験用零相電流(I01’〜I03’)を前記複数の地絡方向継電器に出力する整定値調整部(224)と、該整定値調整部から前記試験用零相電圧および前記複数の試験用零相電流を出力したときに前記複数の地絡方向継電器から入力される複数のリレー接点動作信号(S1〜S3)に基づいて、該複数の地絡方向継電器の応答動作を確認する制御部(230)とを備えてもよい。
前記整定値調整部が、前記複数の試験用零相電流を前記複数の地絡方向継電器に直列に出力してもよい。
The ground fault protection relay system according to the present invention includes first to second capacitors installed on the secondary side of the transformer (105) provided on the bus (101) and provided in series with the capacitors (C) of the respective phases. Surge absorber (10, 50) having three switches (11 1 to 11 3 , 51 1 to 51 3 ), and a zero-phase voltage input from a grounded instrument transformer (103) provided on the bus (V 0 ), ground current (I G ) input from the surge absorber, and zero-phase currents input from a plurality of zero-phase current transformers (134 1 to 134 3 ) provided in the plurality of distribution lines, respectively. A test section for testing the plurality of ground fault direction relays based on (I 01 to I 03 ), and at least one of the first to third switches is opened, and the plurality of distribution lines To break the balance of ground capacitance Ri, wherein the plurality of distribution lines of the system of the bus (102 1 to 102 3) to a plurality of circuit breakers which are provided respectively to the plurality of distribution lines when the ground fault occurs (the 133 1-133 3) respectively It is characterized by conducting a ground fault test of a plurality of ground fault direction relays (210 1 to 210 3 ) for operation.
Here, you may comprise the integrated relay (200) with a test function which consists of the said test part and a relay part provided with the said several earth fault direction relay.
You may further comprise the serial penetration line (20) which the both ends were respectively connected to the output terminal of the said surge absorber, and the said test part, and penetrated the said several zero phase current transformer.
The series through-wires respectively penetrate the plurality of zero-phase current transformers so that the ground current flows through the plurality of zero-phase current transformers from the bus line toward the ends of the plurality of distribution lines. It may be.
The relay unit of the integrated relay with the test function may further include a ground fault overvoltage relay (211) that operates based on the zero-phase voltage input from the grounded instrument transformer.
The test unit measures a plurality of zero-phase currents inputted from the plurality of zero-phase current transformers, and the zeros inputted from the grounded-type instrument transformer. A zero-phase voltage measuring unit (222) for measuring a phase voltage, a ground current measuring unit (223) for measuring the ground current input from the surge absorber, and the plurality of zero-phase current measuring units measured by the zero-phase current measuring unit. Adjusting set values of the plurality of ground fault direction relays based on the zero-phase current, the zero-phase voltage measured by the zero-phase voltage measuring unit and the ground current measured by the ground current measuring unit; A settling value adjusting unit (outputting a plurality of test zero phase voltages (V 0 ′) and a plurality of test zero phase currents (I 01 ′ to I 03 ′) corresponding to the adjusted set values to the plurality of ground fault direction relays ( 224) and the settling value Based on a plurality of relay contact operation signals input from said plurality of earth fault directional relay when outputting the zero-phase voltage and the plurality of zero-phase current for testing the test (S 1 ~S 3) from parts, You may provide the control part (230) which confirms the response operation | movement of this some earth fault direction relay.
The settling value adjustment unit may output the plurality of test zero-phase currents in series to the plurality of ground fault direction relays.

前記試験部が、外部からの試験・整定指令信号に基づいて、前記複数の地絡方向継電器の試験機能およびモード変更の要求を前記制御部に出力する試験・整定指令入力部(228)をさらに備えてもよい。
前記試験部が、外部から前記試験・整定指令信号を受信して前記試験・整定指令入力部に出力するとともに、前記試験・整定結果出力部からの試験結果および整定結果を整理した試験・整定結果データを外部に送信する伝送制御部(231)をさらに備えてもよい。
前記試験部が、前記複数の地絡方向継電器の試験の開始時に複数のトリップ信号(T1〜T3)の該複数の地絡方向継電器からの出力をロックするトリップ出力ロック部(225)と、前記複数の地絡方向継電器から入力される前記複数のリレー接点動作信号に基づいて、前記サージアブソーバの前記第1乃至第3のスイッチの少なくとも1つを開いたときから前記複数の地絡方向継電器が動作するまでの時間を算出する動作時間算出部(226)と、前記制御部から入力される試験結果および整定結果を整理して外部に出力する試験・整定結果出力部(229)とをさらに備えてもよい。
前記第1乃至第3のスイッチ(111〜113)が、前記試験部によって開閉制御される2端子スイッチであってもよい。
前記第1乃至第3のスイッチ(111〜113)が、前記試験部によって開閉制御される3端子スイッチであり、前記第1乃至第3のスイッチの第1の出力端子(a)が接地されており、前記第1乃至第3のスイッチの第2の出力端子(b)が接続されていてもよい。
入力端子が前記サージアブソーバに接続された試験切替用スイッチ(13)と、該試験切替用スイッチの第2の出力端子に接続された接地回路(12)とをさらに具備し、前記直列貫通線の一端が前記試験切替用スイッチの第1の出力端子に接続され、該直列貫通線の他端が該試験切替用スイッチの前記第2の出力端子に接続され、前記接地電流が前記接地回路から前記試験部に出力されてもよい。
入力端子が前記サージアブソーバに接続された試験切替用スイッチ(33)と、該試験切替用スイッチの出力端子に接続された接地回路(12)とをさらに具備し、前記直列貫通線の一端が前記試験切替用スイッチの前記入力端子に接続され、該直列貫通線の他端が該試験切替用スイッチの前記出力端子に接続され、前記接地電流が前記接地回路から前記試験部に出力されてもよい。
リアクトル接地方式の配電線がある場合には、前記母線のペテンゼルコイルのリアクタンスを変えることができるとともに該リアクタンスの値を認識できるリアクタンス可変・認識手段をさらに具備してもよい。
前記サージアブソーバが、前記第1乃至第3のスイッチの代わりに、代表相のコンデンサに直列に設けられた1個のスイッチを備えてもよい。
The test unit further includes a test / settling command input unit (228) for outputting a test function and mode change request of the plurality of ground fault direction relays to the control unit based on an external test / settling command signal You may prepare.
The test unit receives the test / settling command signal from the outside and outputs the test / settling command input unit to the test / settling command input unit, and also arranges the test result and the settling result from the test / settling result output unit. You may further provide the transmission control part (231) which transmits data outside.
The test unit, trip output lock portion for locking the output from said plurality of earth fault directional relay in a plurality of trip signal at the start of the test of the plurality of ground directional relay (T 1 through T 3) and (225) The plurality of ground fault directions from when at least one of the first to third switches of the surge absorber is opened based on the plurality of relay contact operation signals input from the plurality of ground fault direction relays An operation time calculation unit (226) that calculates the time until the relay operates, and a test / setting result output unit (229) that arranges the test results and settling results input from the control unit and outputs them to the outside. Further, it may be provided.
The first to third switches (11 1 to 11 3 ) may be two-terminal switches that are controlled to open and close by the test unit.
The first to third switches (11 1 to 11 3 ) are three-terminal switches whose opening / closing is controlled by the test unit, and the first output terminals (a) of the first to third switches are grounded. The second output terminals (b) of the first to third switches may be connected.
A test switch (13) having an input terminal connected to the surge absorber; and a ground circuit (12) connected to a second output terminal of the test switch; One end is connected to the first output terminal of the test switching switch, the other end of the series through wire is connected to the second output terminal of the test switching switch, and the ground current is supplied from the ground circuit to the second output terminal. You may output to a test part.
A test changeover switch (33) whose input terminal is connected to the surge absorber, and a ground circuit (12) connected to the output terminal of the test changeover switch, wherein one end of the series through-wire is The test switching switch may be connected to the input terminal, the other end of the series through wire may be connected to the output terminal of the test switching switch, and the ground current may be output from the ground circuit to the test unit. .
When there is a reactor grounding distribution line, reactance variable / recognition means that can change the reactance of the petenzel coil of the bus and recognize the value of the reactance may be further provided.
The surge absorber may include one switch provided in series with a representative phase capacitor instead of the first to third switches.

本発明の地絡保護継電器システムは、以下の効果を奏する。
(1)活線作業を不要とすることができるので、作業員が感電する危険性をなくすことができる。
(2)図6に示した接続線130を第1乃至第3の試験用貫通線1371〜1373に接続したり外したりする必要がなく、サージアブソーバに設けられた第1乃至第3のスイッチの制御をするだけで複数の地絡方向継電器の内部方向試験および外部方向試験を行うことができるので、作業時間の大幅な短縮を図ることができる。
(3)既設の設備を利用することができるので、設備投資の軽減が図れる。
(4)試験開始時に零相電圧に直流分が含まれないので、直流分の減衰を待たずに試験を行うことができる。
(5)上記特許文献1に開示されている配電線人工地絡試験装置のように、作業の安全性を確保するために切替母線に地絡を発生させる必要は必ずしもない。
(6)複数の地絡方向継電器を一体化しているため、地絡方向継電器のロック操作および接点取込みを容易に行うことができるので、作業時間の大幅な短縮が図れる。
The ground fault protection relay system of the present invention has the following effects.
(1) Since the hot wire work can be eliminated, the danger of an electric shock to the worker can be eliminated.
(2) It is not necessary to connect or disconnect the connection line 130 shown in FIG. 6 to the first to third test through-lines 137 1 to 1373, and the first to third third lines provided in the surge absorber Since the internal direction test and the external direction test of a plurality of ground fault direction relays can be performed only by controlling the switch, the working time can be greatly shortened.
(3) Since existing facilities can be used, capital investment can be reduced.
(4) Since the DC component is not included in the zero-phase voltage at the start of the test, the test can be performed without waiting for the attenuation of the DC component.
(5) Unlike the distribution line artificial ground fault test apparatus disclosed in Patent Document 1, it is not always necessary to generate a ground fault in the switching bus in order to ensure work safety.
(6) Since a plurality of ground fault direction relays are integrated, the ground fault direction relay can be easily locked and contacts can be taken in, so that the working time can be greatly reduced.

上記の目的を、変圧器2次側に設置されたサージアブソーバの各相のコンデンサに直列に第1乃至第3のスイッチをそれぞれ設け、複数の地絡方向継電器を備える継電器部と、接地形計器用変圧器から入力される零相電圧、サージアブソーバから入力される接地電流および複数の零相変流器から入力される零相電流に基づいて複数の地絡方向継電器の試験を行うための試験部とからなる試験機能付一体型継電器を用いて、第1乃至第3のスイッチの少なくとも1つを開いて複数の配電線の対地静電容量のバランスを崩すことにより複数の地絡方向継電器の地絡試験を行うことにより実現した。   For the above purpose, a relay part having a plurality of ground fault direction relays provided with a first to a third switch in series with a capacitor of each phase of a surge absorber installed on the secondary side of the transformer, and a grounding type meter For testing multiple ground fault relays based on zero phase voltage input from transformer, ground current input from surge absorber and zero phase current input from multiple zero phase current transformers A plurality of ground fault direction relays by opening at least one of the first to third switches and breaking the balance of the ground capacitances of the plurality of distribution lines. Realized by conducting a ground fault test.

以下、本発明の地絡保護継電器システムの実施例について、図面を参照して説明する。なお、母線101の系統として3つの配電線(第1乃至第3の配電線1021〜1023)がある場合を例として説明する。 Hereinafter, embodiments of the ground fault protection relay system of the present invention will be described with reference to the drawings. In addition, the case where there are three distribution lines (first to third distribution lines 102 1 to 102 3 ) as a system of the bus bar 101 will be described as an example.

本発明の一実施例による地絡保護継電器システム1は、図1に示すように、母線101に設けられた変圧器105の2次側に設置されたかつ各相のコンデンサCに直列にそれぞれ設けられた第1乃至第3のスイッチ111〜113を備えたサージアブソーバ(SA)10と、試験機能付一体型継電器200と、直列貫通線20とを具備する。
ここで、サージアブソーバ10は、雷サージ電圧を除去するための従来の零相電圧移行防止用サージアブソーバに第1乃至第3のスイッチ111〜113を設けたものである。サージアブソーバ10のコンデンサCの容量値は、たとえば、6.6kV系統では0.3μFであり、22kV系統では0.15μFである。
第1乃至第3のスイッチ111〜113は、試験機能付一体型継電器200のスイッチ制御表示部227(図2参照)から入力される第1乃至第3のスイッチ制御信号SW1〜SW3によってそれぞれ開閉制御される2端子スイッチである。サージアブソーバ10の出力端子は、試験切替用スイッチ13の入力端子に接続されている。
As shown in FIG. 1, the ground fault protection relay system 1 according to one embodiment of the present invention is provided on the secondary side of the transformer 105 provided on the bus 101 and provided in series with the capacitors C of the respective phases. The surge absorber (SA) 10 having the first to third switches 11 1 to 11 3 , the integrated relay 200 with a test function, and the series through wire 20 are provided.
Here, the surge absorber 10 is obtained by providing first to third switches 11 1 to 11 3 to a conventional surge absorber for preventing zero-phase voltage transition for removing a lightning surge voltage. The capacitance value of the capacitor C of the surge absorber 10 is, for example, 0.3 μF for the 6.6 kV system and 0.15 μF for the 22 kV system.
First to third switches 11 1 to 11 3, the first to third switching control signals SW 1 to SW 3 are inputted from the switch control display unit 227 of the test function with integrated relay 200 (see FIG. 2) Are two-terminal switches that are controlled to open and close respectively. The output terminal of the surge absorber 10 is connected to the input terminal of the test switching switch 13.

試験機能付一体型継電器200は、継電器部と試験部とから構成されている。
継電器部は、図2に示すように、第1乃至第3の地絡方向継電器2101〜2103と、地絡過電圧継電器211とを備える。
第1乃至第3の地絡方向継電器2101〜2103は、母線101に設けられた接地形計器用変圧器103から入力される零相電圧V0と、第1乃至第3の配電線1021〜1023にそれぞれ設けられた第1乃至第3の零相変流器1341〜1343(図1参照)から入力される第1乃至第3の零相電流I01〜I03とに基づいて、第1乃至第3の配電線1021〜1023にそれぞれ設けられた第1乃至第3の遮断器1331〜1333(図1参照)に出力する第1乃至第3のトリップ信号T1〜T3をそれぞれ生成する。
地絡過電圧継電器211は、接地形計器用変圧器103から入力される零相電圧V0に基づいて動作する。
The integrated relay 200 with a test function includes a relay unit and a test unit.
As shown in FIG. 2, the relay unit includes first to third ground fault direction relays 210 1 to 210 3 and a ground fault overvoltage relay 211.
The first to third ground fault direction relays 210 1 to 210 3 include a zero-phase voltage V 0 input from the grounded instrument transformer 103 provided on the bus 101 and the first to third distribution lines 102. First to third zero-phase currents I 01 to I 03 input from first to third zero-phase current transformers 134 1 to 134 3 (see FIG. 1) provided in 1 to 102 3, respectively . Based on the first to third trip signals to be output to the first to third circuit breakers 133 1 to 133 3 (see FIG. 1) provided in the first to third distribution lines 102 1 to 102 3 , respectively. T 1 to T 3 are generated respectively.
The ground fault overvoltage relay 211 operates based on the zero-phase voltage V 0 input from the grounded instrument transformer 103.

試験部は、第1乃至第3の地絡方向継電器2101〜2103の試験を行うためのものであり、零相電流測定部221と、零相電圧測定部222と、接地電流測定部223と、整定値調整部224と、トリップ出力ロック部225と、動作時間算出部226と、スイッチ制御表示部227と、試験・整定指令入力部228と、試験・整定結果出力部229と、制御部230と、伝送制御部231とを備える。
零相電流測定部221は、第1乃至第3の零相変流器1341〜1343から入力される第1乃至第3の零相電流I01〜I03を測定して記憶する。
零相電圧測定部222は、接地形計器用変圧器103から入力される零相電圧V0を測定して記憶する。
接地電流測定部223は、サージアブソーバ10から直列貫通線20および接地回路12を介して入力される接地電流IGを測定して記憶する。
The test unit is for testing the first to third ground fault direction relays 210 1 to 210 3 , and includes a zero-phase current measurement unit 221, a zero-phase voltage measurement unit 222, and a ground current measurement unit 223. A set value adjustment unit 224, a trip output lock unit 225, an operation time calculation unit 226, a switch control display unit 227, a test / settling command input unit 228, a test / settling result output unit 229, and a control unit. 230 and a transmission control unit 231.
Zero-phase current measurement unit 221 measures and stores the first to third zero-phase current I 01 ~I 03 is input from the first to third zero-phase current transformer 134 1-134 3.
The zero-phase voltage measuring unit 222 measures and stores the zero-phase voltage V 0 input from the grounded instrument transformer 103.
Ground current measuring unit 223 measures and stores the ground current I G to be inputted from the surge absorber 10 via the series through lines 20 and grounding circuit 12.

整定値調整部224は、零相電流測定部221によって測定された第1乃至第3の零相電流I01〜I03と零相電圧測定部222によって測定された零相電圧V0と接地電流測定部223によって測定された接地電流IGとに基づいて第1乃至第3の地絡方向継電器2101〜2103の整定値を調整するとともに、調整した整定値に対応する試験用零相電圧V0’および第1乃至第3の試験用零相電流I01’〜I03’を生成して、生成した第1乃至第3の試験用零相電流I01’〜I03’を第1乃至第3の地絡方向継電器2101〜2103にそれぞれ出力する。 The set value adjustment unit 224 includes first to third zero phase currents I 01 to I 03 measured by the zero phase current measurement unit 221, zero phase voltage V 0 measured by the zero phase voltage measurement unit 222, and ground current. with adjusting the setting value of the first to third ground directional relay 210 1-210 3 based on the measured ground current I G by the measuring unit 223, zero-phase voltage test that corresponds to the adjusted set point V 0 ′ and first to third test zero-phase currents I 01 ′ to I 03 ′ are generated, and the generated first to third test zero-phase currents I 01 ′ to I 03 ′ are first To the third ground fault direction relays 210 1 to 210 3 , respectively.

トリップ出力ロック部225は、第1乃至第3の地絡方向継電器2101〜2103の試験の開始時にトリップロック信号TLを第1乃至第3の地絡方向継電器2101〜2103に出力して、第1乃至第3のトリップ信号T1〜T3の出力をロックする。なお、トリップ出力ロック部225は、トリップロック指令が外部から入力されると、トリップロック信号TLを第1乃至第3の地絡方向継電器2101〜2103に出力することにより、現地で手動でトリップロックを行うことができるようにもされている。 Trip output lock unit 225 outputs a trip lock signal TL at the beginning of the test of the first to third ground directional relay 210 1-210 3 to the first to third ground directional relay 210 1-210 3 Thus, the outputs of the first to third trip signals T 1 to T 3 are locked. When a trip lock command is input from the outside, the trip output lock unit 225 outputs the trip lock signal TL to the first to third ground fault direction relays 210 1 to 210 3 , thereby manually Trip locks are also available.

動作時間算出部226は、第1乃至第3の地絡方向継電器2101〜2103から入力される第1乃至第3のリレー接点動作信号S1〜S3に基づいて、サージアブソーバ10の第1乃至第3のスイッチ111〜113の少なくとも1つを開いたときから第1乃至第3の地絡方向継電器2101〜2103が動作するまでの時間を算出して記憶する。 The operation time calculation unit 226 performs the first operation of the surge absorber 10 based on the first to third relay contact operation signals S 1 to S 3 input from the first to third ground fault direction relays 210 1 to 210 3 . The time from when at least one of the first to third switches 11 1 to 11 3 is opened to when the first to third ground fault relays 210 1 to 210 3 operate is calculated and stored.

スイッチ制御表示部227は、制御部230の制御の下、サージアブソーバ10の第1乃至第3のスイッチ111〜113の開閉制御をするための第1乃至第3のスイッチ制御信号SW1〜SW3を出力するとともに、試験切替用スイッチ13(図1参照)の切替制御をするための第4のスイッチ制御信号SW4を出力する。また、スイッチ制御表示部227は、第1乃至第3のスイッチ111〜113および試験切替用スイッチ13から入力されるかつ第1乃至第3のスイッチ111〜113および試験切替用スイッチ13の状態を表わす第1乃至第4のスイッチ状態信号に基づいて、第1乃至第3のスイッチ111〜113および試験切替用スイッチ13の状態を監視するとともに外部に表示する。 The switch control display unit 227 controls the first to third switch control signals SW 1 to SW 1 for controlling the opening and closing of the first to third switches 11 1 to 11 3 of the surge absorber 10 under the control of the control unit 230. SW 3 is output and a fourth switch control signal SW 4 for controlling the switching of the test switching switch 13 (see FIG. 1) is output. The switch control display unit 227, first to third switches 11 1 to 11 3 and and input from the test switching switch 13 first to third switches 11 1 to 11 3 and the test switching switch 13 On the basis of the first to fourth switch state signals representing the states of the above, the states of the first to third switches 11 1 to 11 3 and the test switching switch 13 are monitored and displayed externally.

試験・整定指令入力部228は、外部から入力される試験・整定指令信号に基づいて、第1乃至第3の地絡方向継電器2101〜2103の各試験機能およびモード変更(試験、整定、運転など)の要求を制御部230に出力する。
試験・整定結果出力部229は、制御部230から入力される試験結果および整定結果を整理して外部(たとえば、プリンタやパーソナルコンピュータなど)に出力する。
The test / settling command input unit 228 changes each test function and mode of the first to third ground fault direction relays 210 1 to 210 3 based on a test / settling command signal input from the outside (test, settling, The operation request is output to the control unit 230.
The test / settling result output unit 229 arranges the test results and settling results input from the control unit 230 and outputs them to the outside (for example, a printer, a personal computer, or the like).

制御部230は、整定値調整部224から試験用零相電圧V0’および第1乃至第3の試験用零相電流I01’〜I03’を出力したときに第1乃至第3の地絡方向継電器2101〜2103から動作時間算出部226を介して入力される第1乃至第3のリレー接点動作信号S1〜S3に基づいて、第1乃至第3の地絡方向継電器2101〜2103の応答動作を確認する。また、制御部230は、試験結果および整定結果(調整後の整定値、動作時間および応答動作確認結果など)を試験・整定結果出力部229に出力する。さらに、制御部230は、試験・整定指令入力部228から入力される第1乃至第3の地絡方向継電器2101〜2103の各試験機能およびモード変更の要求に応じて、零相電流測定部221、零相電圧測定部222、接地電流測定部223、整定値調整部224、トリップ出力ロック部225、動作時間算出部226、スイッチ制御表示部227、試験・整定指令入力部228および試験・整定結果出力部229を制御する。 When the control unit 230 outputs the test zero-phase voltage V 0 ′ and the first to third test zero-phase currents I 01 ′ to I 03 ′ from the set value adjustment unit 224, the control unit 230 outputs the first to third grounds. Based on the first to third relay contact operation signals S 1 to S 3 input from the winding direction relays 210 1 to 210 3 via the operation time calculation unit 226, the first to third ground fault direction relays 210 are provided. to check the response operation of 1-210 3. Further, the control unit 230 outputs the test result and the settling result (such as the adjusted set value, the operation time, and the response operation check result) to the test / settling result output unit 229. Further, the control unit 230, in response to the requirements of each test function and mode change of the first to third ground directional relay 210 1-210 3 is input from the test-settling command input unit 228, zero-phase current measurement Unit 221, zero-phase voltage measurement unit 222, ground current measurement unit 223, settling value adjustment unit 224, trip output lock unit 225, operation time calculation unit 226, switch control display unit 227, test / setting command input unit 228, and test / The settling result output unit 229 is controlled.

伝送制御部231は、外部から試験・整定指令信号を受信して試験・整定指令入力部228に出力したり、試験・整定結果出力部229からの試験結果および整定結果を整理した試験・整定結果データを外部に送信したりする。   The transmission control unit 231 receives a test / setting command signal from the outside and outputs it to the test / setting command input unit 228, or a test / setting result obtained by organizing the test result and the setting result from the test / setting result output unit 229. Send data to the outside.

図1に示した直列貫通線20の一端は試験切替用スイッチ13の第1の出力端子に接続され、直列貫通線20の他端は試験切替用スイッチ13の第2の出力端子に接続されている。また、直列貫通線20は、試験切替用スイッチ13の第1の出力端子から出力される接地電流IGが第1乃至第3の零相変流器1341〜1343を母線101から第1乃至第3の配電線1021〜1023の末端に向けて(すなわち、図示右方向に)それぞれ流れるように、第1乃至第3の零相変流器1341〜1343を貫通している。 One end of the series through-wire 20 shown in FIG. 1 is connected to the first output terminal of the test switching switch 13, and the other end of the series through-wire 20 is connected to the second output terminal of the test switching switch 13. Yes. Also, the series through line 20, a first output ground current I G output from the terminal first to third zero-phase current transformer 134 1-134 3 from the bus 101 first test switching switch 13 or toward the third end of the distribution line 102 1-102 3 penetrates to flow (i.e., rightward direction), respectively, the first to third zero-phase current transformer 134 1-134 3 .

次に、本実施例による地絡保護継電器システム1の通常時の動作について説明する。
試験機能付一体型継電器200の制御部230は、サージアブソーバ10の第1乃至第3のスイッチ111〜113を閉じさせる第1乃至第3のスイッチ制御信号SW1〜SW3と、試験切替用スイッチ13を中立位置にさせる第4のスイッチ制御信号SW4とを出力するように、スイッチ制御表示部227を制御する。
Next, the normal operation of the ground fault protection relay system 1 according to the present embodiment will be described.
Control unit 230 of the test function with integrated relay 200 includes first to third switches 11 1 to 11 3 first to third to close the switch control signals SW 1 to SW 3 of the surge absorber 10, the test switch The switch control display unit 227 is controlled so as to output the fourth switch control signal SW 4 that causes the switch 13 to be in the neutral position.

試験機能付一体型継電器200の地絡過電圧継電器211は、第1乃至第3の配電線1021〜1023に地絡事故が発生して接地形計器用変圧器103からの零相電圧V0が所定の電圧以上になると動作する。 The ground fault overvoltage relay 211 of the integrated relay with test function 200 is a zero-phase voltage V 0 from the grounded instrument transformer 103 when a ground fault occurs in the first to third distribution lines 102 1 to 102 3. Operates when the voltage exceeds a predetermined voltage.

試験機能付一体型継電器200の第1乃至第3の地絡方向継電器2101〜2103は、接地形計器用変圧器103からの零相電圧V0と第1乃至第3の零相変流器1341〜1343からの第1乃至第3の零相電流I01〜I03とに基づいて第1乃至第3の配電線1021〜1023に地絡事故が発生したことを検出すると、第1乃至第3のトリップ信号T1〜T3を生成して第1乃至第3の遮断器1331〜1333に出力する。このとき、第1乃至第3のトリップ信号T1〜T3は、第1乃至第3の地絡方向継電器2101〜2103および地絡過電圧継電器211の両方が動作したら第1乃至第3の遮断器1331〜1333にそれぞれ出力される(図2の3つの論理積回路参照)。 The first to third ground directional relay 210 1-210 3 of the test function with integrated relay 200, first to the zero-phase voltage V 0 which from earth type potential transformer 103 third zero-phase current transformer When it is detected that a ground fault has occurred in the first to third distribution lines 102 1 to 102 3 based on the first to third zero-phase currents I 01 to I 03 from the devices 134 1 to 134 3 First to third trip signals T 1 to T 3 are generated and output to the first to third circuit breakers 133 1 to 133 3 . At this time, the first to third trip signals T 1 to T 3 are used as the first to third trip signals when both the first to third ground fault direction relays 210 1 to 210 3 and the ground fault overvoltage relay 211 are operated. It is output to each of the circuit breakers 133 1 to 133 3 (see the three AND circuits in FIG. 2).

次に、本実施例による地絡保護継電器システム1の試験時の動作について説明する。
試験機能付一体型継電器200の試験・整定指令入力部228は、内部方向試験および外部方向試験の開始を指示する試験・整定指令信号が外部または伝送制御部231から入力されると、第1乃至第3の地絡方向継電器2101〜2103の試験開始の要求を制御部230に出力する。
試験機能付一体型継電器200の制御部230は、この要求を試験・整定指令入力部228から受け取ると、第1乃至第3のトリップ信号T1〜T3の出力をロックさせるトリップロック信号TLを第1乃至第3の地絡方向継電器2101〜2103に出力するようにトリップ出力ロック部225を制御する。
Next, the operation | movement at the time of the test of the ground fault protection relay system 1 by a present Example is demonstrated.
When the test / setting command input unit 228 of the integrated relay 200 with a test function is input from the outside or the transmission control unit 231 to instruct the start of the internal direction test and the external direction test, the first through The test start request of the third ground fault direction relays 210 1 to 210 3 is output to the control unit 230.
Upon receiving this request from the test / settling command input unit 228, the control unit 230 of the integrated relay with test function 200 generates a trip lock signal TL that locks the outputs of the first to third trip signals T 1 to T 3. The trip output lock unit 225 is controlled to output to the first to third ground fault direction relays 210 1 to 210 3 .

また、制御部230は、第1乃至第3の地絡方向継電器2101〜2103の内部方向試験を行うために、入力端子と第1の出力端子とを接続させる第4のスイッチ制御信号SW4を試験切替用スイッチ13に出力するように、スイッチ制御表示部227を制御する。これにより、試験切替用スイッチ13は、中立位置から入力端子・第1の出力端子接続位置に切り換えられる。 Further, the control unit 230 performs a fourth switch control signal SW for connecting the input terminal and the first output terminal in order to perform the internal direction test of the first to third ground fault direction relays 210 1 to 210 3. The switch control display unit 227 is controlled so that 4 is output to the test switching switch 13. As a result, the test switching switch 13 is switched from the neutral position to the input terminal / first output terminal connection position.

続いて、制御部230は、サージアブソーバ10の第1のスイッチ111を瞬時の間だけ開かせる第1のスイッチ制御信号SW1を第1のスイッチ111に出力するように、スイッチ制御表示部227を制御する。
これにより、第1乃至第3の配電線1021〜1023の赤相Rの対地静電容量のバランスが崩されて、第1乃至第3の配電線1021〜1023には、第1乃至第3の1次電流I1〜I3が第1乃至第3の配電線1021〜1023の末端から母線101に向けて(すなわち、図示左方向に)それぞれ流れる。
また、第1乃至第3の1次電流I1〜I3の合成電流に相当する接地電流IG(=I1+I2+I3)が、サージアブソーバ10→試験切替用スイッチ13の入力端子→試験切替用スイッチ13の第1の出力端子→直列貫通線20→第1の零相変流器1341→直列貫通線20→第2の零相変流器1342→直列貫通線20→第3の零相変流器1343→直列貫通線20→試験切替用スイッチ13の第2の出力端子→接地回路12という電流経路を流れる。なお、接地電流IGは、試験機能付一体型継電器200の接地電流測定部223によって測定されたのち記憶される。
Subsequently, the control unit 230 outputs a first switch control signal SW 1 that opens the first switch 11 1 of the surge absorber 10 only for an instant to the first switch 11 1. 227 is controlled.
Thus, first to third and the balance of the earth capacitance of the red phase R of the distribution line 102 1-102 3 is collapsed, the first to third distribution line 102 1-102 3, first The third primary currents I 1 to I 3 flow from the ends of the first to third distribution lines 102 1 to 102 3 toward the bus bar 101 (that is, in the left direction in the drawing).
Further, the ground current I G (= I 1 + I 2 + I 3 ) corresponding to the combined current of the first to third primary currents I 1 to I 3 is the surge absorber 10 → the input terminal of the test switching switch 13 → The first output terminal of the test switching switch 13 → the series through line 20 → the first zero-phase current transformer 134 1 → the series through line 20 → the second zero-phase current transformer 134 2 → the series through line 20 → the first 3 zero-phase current transformer 134 3 → the series through-line 20 → the second output terminal of the test switching switch 13 → the ground circuit 12. The ground current IG is stored after being measured by the ground current measuring unit 223 of the integrated relay 200 with a test function.

このとき、第1の零相変流器1341には接地電流IGとは逆方向に第1の1次電流I1が流れるため、接地電流IGから第1の1次電流I1を引いた電流IG−I1(=I2+I3)に相当する第1の零相電流I01が試験機能付一体型継電器200の零相電流測定部221に入力される。
また、第2の零相変流器1342には接地電流IGとは逆方向に第2の1次電流I2が流れるため、接地電流IGから第2の1次電流I2を引いた電流IG−I2(=I3+I1)に相当する第2の零相電流I02が零相電流測定部221に入力される。
さらに、第3の零相変流器1343には接地電流IGとは逆方向に第3の1次電流I3が流れるため、接地電流IGから第3の1次電流I3を引いた電流IG−I3(=I1+I2)に相当する第3の零相電流I03が零相電流測定部221に入力される。
なお、第1乃至第3の零相電流I01〜I03は、試験機能付一体型継電器200の零相電流測定部221によって測定されたのち記憶される。
At this time, since the first zero-phase current transformer 134 1 first primary current I 1 flows in a direction opposite to the ground current I G, the first primary current I 1 from the ground current I G A first zero-phase current I 01 corresponding to the drawn current I G −I 1 (= I 2 + I 3 ) is input to the zero-phase current measuring unit 221 of the integrated relay 200 with a test function.
Further, since the second primary current I 2 flows in the opposite direction to the ground current I G, minus the second primary current I 2 from the ground current I G in Paragraph 2 of ZCT 134 The second zero-phase current I 02 corresponding to the current I G −I 2 (= I 3 + I 1 ) is input to the zero-phase current measuring unit 221.
Further, the third zero-phase current transformer 134 3 to flow the third primary current I 3 in a direction opposite to the ground current I G, minus the third primary current I 3 from the ground current I G The third zero-phase current I 03 corresponding to the current I G −I 3 (= I 1 + I 2 ) is input to the zero-phase current measuring unit 221.
The first to third zero-phase currents I 01 to I 03 are stored after being measured by the zero-phase current measuring unit 221 of the integrated relay 200 with a test function.

接地形計器用変圧器103から試験機能付一体型継電器200に入力される零相電圧V0は、零相電圧測定部223によって測定されたのち記憶される。 The zero-phase voltage V 0 input from the grounded-type instrument transformer 103 to the integrated relay with test function 200 is measured by the zero-phase voltage measuring unit 223 and stored.

その後、制御部230は、第1乃至第3の地絡方向継電器2101〜2103の外部方向試験を行うために、入力端子と第2の出力端子とを接続させる第4のスイッチ制御信号SW4を試験切替用スイッチ13に出力するように、スイッチ制御表示部227を制御する。これにより、試験切替用スイッチ13は、入力端子・第1の出力端子接続位置から入力端子・第2の出力端子接続位置に切り換えられる。 Thereafter, the control unit 230 performs a fourth switch control signal SW for connecting the input terminal and the second output terminal in order to perform the external direction test of the first to third ground fault direction relays 210 1 to 210 3. The switch control display unit 227 is controlled so that 4 is output to the test switching switch 13. Thus, the test switching switch 13 is switched from the input terminal / first output terminal connection position to the input terminal / second output terminal connection position.

続いて、制御部230は、サージアブソーバ10の第1のスイッチ111を瞬時の間だけ開かせる第1のスイッチ制御信号SW1を第1のスイッチ111に出力するように、スイッチ制御表示部227を制御する。
これにより、第1乃至第3の配電線1021〜1023の赤相Rの対地静電容量のバランスが崩されて、第1乃至第3の配電線1021〜1023には、第1乃至第3の1次電流I1〜I3が第1乃至第3の配電線1021〜1023の末端から母線101に向けて(すなわち、図示左方向に)それぞれ流れる。
また、第1乃至第3の1次電流I1〜I3の合成電流に相当する接地電流IG(=I1+I2+I3)が、サージアブソーバ10→試験切替用スイッチ13の入力端子→試験切替用スイッチ13の第2の出力端子→接地回路12という電流経路を流れる。なお、接地電流IGは、試験機能付一体型継電器200の接地電流測定部223によって測定されたのち記憶される。
Subsequently, the control unit 230 outputs a first switch control signal SW 1 that opens the first switch 11 1 of the surge absorber 10 only for an instant to the first switch 11 1. 227 is controlled.
Thus, first to third and the balance of the earth capacitance of the red phase R of the distribution line 102 1-102 3 is collapsed, the first to third distribution line 102 1-102 3, first The third primary currents I 1 to I 3 flow from the ends of the first to third distribution lines 102 1 to 102 3 toward the bus bar 101 (that is, in the left direction in the drawing).
Further, the ground current I G (= I 1 + I 2 + I 3 ) corresponding to the combined current of the first to third primary currents I 1 to I 3 is the surge absorber 10 → the input terminal of the test switching switch 13 → The test switching switch 13 flows through the current path of the second output terminal → the ground circuit 12. The ground current IG is stored after being measured by the ground current measuring unit 223 of the integrated relay 200 with a test function.

このとき、接地電流IGは、直列貫通線20には出力されないので、第1乃至第3の零相変流器1341〜1343には流れない。
したがって、第1の零相変流器1341には第1の1次電流I1しか流れないため、第1の1次電流I1に相当する第1の零相電流I01が零相電流測定部221に入力される。
また、第2の零相変流器1342には第2の1次電流I2しか流れないため、第2の1次電流I2に相当する第2の零相電流I02が零相電流測定部221に入力される。
さらに、第3の零相変流器1343には第3の1次電流I3しか流れないため、第3の1次電流I3に相当する第3の零相電流I03が零相電流測定部221に入力される。
なお、第1乃至第3の零相電流I01〜I03は、試験機能付一体型継電器200の零相電流測定部221によって測定されたのち記憶される。
At this time, the ground current I G, since not output in series through line 20, does not flow through the first to third zero-phase current transformer 134 1-134 3.
Accordingly, since only the first primary current I 1 flows through the first zero-phase current transformer 134 1 , the first zero-phase current I 01 corresponding to the first primary current I 1 is the zero-phase current. Input to the measurement unit 221.
Further, since only the second primary current I 2 flows through the second zero-phase current transformer 134 2 , the second zero-phase current I 02 corresponding to the second primary current I 2 is the zero-phase current. Input to the measurement unit 221.
Further, since only the third primary current I 3 flows through the third zero-phase current transformer 134 3 , the third zero-phase current I 03 corresponding to the third primary current I 3 becomes the zero-phase current. Input to the measurement unit 221.
The first to third zero-phase currents I 01 to I 03 are stored after being measured by the zero-phase current measuring unit 221 of the integrated relay 200 with a test function.

接地形計器用変圧器103から試験機能付一体型継電器200に入力される零相電圧V0は、零相電圧測定部223によって測定されたのち記憶される。 The zero-phase voltage V 0 input from the grounded-type instrument transformer 103 to the integrated relay with test function 200 is measured by the zero-phase voltage measuring unit 223 and stored.

整定値調整部224は、内部方向試験において零相電流測定部221、零相電圧測定部222および接地電流測定部223によってそれぞれ測定された第1乃至第3の零相電流I01〜I03、零相電圧V0および接地電流IGと、外部方向試験において零相電流測定部221、零相電圧測定部222および接地電流測定部223によってそれぞれ測定された第1乃至第3の零相電流I01〜I03、零相電圧V0および接地電流IGとに基づいて、第1乃至第3の地絡方向継電器2101〜2103の整定値を調整したのち、調整した整定値に対応する試験用零相電圧V0’および第1乃至第3の試験用零相電流I01’〜I03’を第1乃至第3の地絡方向継電器2101〜2103に出力する。 The set value adjustment unit 224 includes first to third zero-phase currents I 01 to I 03 measured by the zero-phase current measurement unit 221, the zero-phase voltage measurement unit 222, and the ground current measurement unit 223 in the internal direction test, respectively. zero-phase voltage V 0 and ground current I G, zero-phase current measuring unit 221 in the external direction test, the first to third zero-phase current I measured respectively by the zero phase voltage measuring unit 222 and the ground current measuring unit 223 01 ~I 03, on the basis of a zero-phase voltage V 0 and ground current I G, after adjusting the first to third setting value of earth fault directional relay 210 1-210 3, corresponding to the adjusted set point The test zero-phase voltage V 0 ′ and the first to third test zero-phase currents I 01 ′ to I 03 ′ are output to the first to third ground fault direction relays 210 1 to 210 3 .

動作時間算出部226は、第1乃至第3の地絡方向継電器2101〜2103からそれぞれ入力される第1乃至第3のリレー接点動作信号S1〜S3に基づいて第1乃至第3の地絡方向継電器2101〜2103の応答動作を確認する。これにより、第1乃至第3の地絡方向継電器2101〜2103の試験を一括して行うことができる。 The operation time calculation unit 226 performs the first to third relay contact operation signals S 1 to S 3 input from the first to third ground fault direction relays 210 1 to 210 3 , respectively. The response operation of the ground fault direction relays 210 1 to 210 3 is confirmed. This makes it possible to collectively test of the first to third ground directional relay 210 1-210 3.

以上の説明においては、サージアブソーバ10の第1のスイッチ111を開いて第1乃至第3の配電線1021〜1023の赤相Rについて第1乃至第3の地絡方向継電器1351〜1353の試験を行ったが、第1乃至第3の配電線1021〜1023の白相Wおよび青相Bについても、第1乃至第3の地絡方向継電器1351〜1353の試験を同様にしてそれぞれ行うことができる。
また、第1のスイッチ111を開いただけでは第1乃至第3の配電線1021〜1023の赤相R、白相Wおよび青相Bの対地静電容量のバランスが崩れずに第1乃至第3の地絡方向継電器1351〜1353が動作しない場合には、サージアブソーバ10の第2のスイッチ112を開かせる第2のスイッチ制御信号SW2を第2のスイッチ112に出力し、それでも第1乃至第3の地絡方向継電器1351〜1353が動作しない場合には、サージアブソーバ10の第3のスイッチ113を開かせる第3のスイッチ制御信号SW3を第3のスイッチ113に出力し第1乃至第3のスイッチ111〜113のすべてを開いてサージアブソーバ10を母線101から切り離すことにより、第1乃至第3の地絡方向継電器1351〜1353の試験をそれぞれ行うことができる。
In the above description, the first switch 11 1 of the surge absorber 10 is opened, and the first to third ground fault direction relays 135 1 to 135 1 for the red phase R of the first to third distribution lines 102 1 to 102 3. 135 were subjected to 3 tests, for the first through third white phase W and Aosho B distribution lines 102 1 to 102 3, the test of the first to third ground directional relay 135 1-135 3 Each can be performed similarly.
Further, if the first switch 11 1 is opened, the first to third distribution lines 102 1 to 102 3 do not lose the balance of the ground capacitances of the red phase R, the white phase W, and the blue phase B. When the third ground fault direction relays 135 1 to 135 3 do not operate, the second switch control signal SW 2 for opening the second switch 11 2 of the surge absorber 10 is output to the second switch 11 2. still in the case where the first to third ground directional relay 135 1-135 3 does not work, the third switch of the third switch control signal SW 3 to open the third switch 11 3 of the surge absorber 10 11 by disconnecting the surge absorber 10 by opening all the first to third switches 11 1 to 11 3 output from the bus 101 to 3, the first to third ground directional relay 135 1-135 3 test It Can be carried out it is.

以上説明したように、本実施例による配電線人工地絡試験装置1によれば、サージアブソーバ10の第1乃至第3のスイッチ111〜113を開くだけで第1乃至第3の地絡方向継電器1351〜1353の試験を行うことができるので、作業時間の大幅な短縮を図ることができる。また、接触棒を用いて母線101の赤相Rに地絡を発生させる必要はないので、作業員が感電する危険性をなくすことができる。 As described above, according to the distribution line artificial ground fault test apparatus 1 according to the present embodiment, the first to third ground faults can be obtained simply by opening the first to third switches 11 1 to 11 3 of the surge absorber 10. Since the direction relays 135 1 to 135 3 can be tested, the working time can be greatly reduced. In addition, since it is not necessary to generate a ground fault in the red phase R of the bus bar 101 using the contact rod, it is possible to eliminate the risk of an operator being electrocuted.

また、図1に示したように、第1乃至第4のスイッチ制御信号SW1〜SW4を試験機能付一体型継電器200のスイッチ制御表示部227から第1乃至第3のスイッチ111〜113および試験切替用スイッチ13にそれぞれ出力して、スイッチ制御表示部227により第1乃至第3のスイッチ111〜113および試験切替用スイッチ13を制御することにより、作業時間のさらなる短縮を図ることができる。このとき、第1乃至第3のスイッチ111〜113および試験切替用スイッチ13の状態を表わす第1乃至第4のスイッチ状態信号を第1乃至第3のスイッチ111〜113および試験切替用スイッチ13からスイッチ制御表示部227に出力することにより、第1乃至第3のスイッチ111〜113および試験切替用スイッチ13の状態を外部に表示できるようにしてもよい。 Further, as shown in FIG. 1, the first to fourth switch control signals SW 1 to SW 4 are sent from the switch control display unit 227 of the integrated relay 200 with a test function to the first to third switches 11 1 to 11. 3 and the test switching switch 13, and the first to third switches 11 1 to 11 3 and the test switching switch 13 are controlled by the switch control display unit 227, thereby further reducing the work time. be able to. At this time, first to third switches 11 1 to 11 3 and the first to fourth switch state signal indicative of the state of the test switching switch 13 first to third switches 11 1 to 11 3 and the test switch The state of the first to third switches 11 1 to 11 3 and the test switching switch 13 may be externally displayed by outputting the switch 13 to the switch control display unit 227.

さらに、図3(a),(b)にシミュレーション結果の一例を示すように、サージアブソーバ10の2相のコンデンサを開放した場合および1相を地絡抵抗3000Ωで地絡させた場合における零相電圧V0の時間変化を比較すると、前者では零相電圧V0に直流分が含まれていないが、後者では試験開始時に零相電圧V0に直流分が含まれている。したがって、1相を地絡抵抗3000Ωで地絡させて試験を行う場合には零相電圧V0の直流分の減衰を待って試験を行う必要があるが、サージアブソーバ10のコンデンサを開放して試験を行う場合には零相電圧V0の直流分の減衰を待って試験を行う必要がないため、作業時間の短縮を図ることができる。 Further, as shown in FIG. 3 (a) and FIG. 3 (b), as an example of simulation results, the zero phase when the two-phase capacitor of the surge absorber 10 is opened and when one phase is grounded with a ground fault resistance of 3000Ω. When comparing the time variation of the voltage V 0, but does not include a DC component to zero-phase voltage V 0 in the former, the latter contains a DC component in the zero-phase voltage V 0 at the start of the study. Therefore, when a test is performed with one phase grounded with a ground resistance of 3000Ω, it is necessary to wait for the DC component of the zero-phase voltage V 0 to decay, but the capacitor of the surge absorber 10 is opened. When performing the test, it is not necessary to wait for the DC component of the zero-phase voltage V 0 to be attenuated, so that the working time can be shortened.

以上の説明においては、3個のスイッチ(第1乃至第3のスイッチ111〜113)を備えたサージアブソーバ10を用いたが、第1乃至第3のスイッチ111〜113の代わりに、代表相のコンデンサCに直列に設けられた1個のスイッチを備えたサージアブソーバを用いることにより、試験設備のスリム化を図るようにしてもよい。
また、2端子スイッチである第1乃至第3のスイッチ111〜113を備えたサージアブソーバ10を用いたが、図4に示すように3端子スイッチである第1乃至第3のスイッチ511〜513を備えたサージアブソーバ50を用いてもよい。この場合には、第1乃至第3のスイッチ511〜513の第1の出力端子aを接地するとともに、直列貫通線20の一端を第1乃至第3のスイッチ511〜513の第2の出力端子bに接続することにより、試験切替用スイッチ13を不要とすることができる。また、図4に一点鎖線で示すように、第1乃至第3のスイッチ511〜513をすべて中立の位置に制御できるようにすれば、サージアブソーバ50を開放させることもできる。
In the above description, the surge absorber 10 having three switches ( first to third switches 11 1 to 11 3 ) is used, but instead of the first to third switches 11 1 to 11 3 . By using a surge absorber provided with one switch provided in series with the capacitor C of the representative phase, the test equipment may be made slim.
Further, although the surge absorber 10 including the first to third switches 11 1 to 11 3 that are two-terminal switches is used, the first to third switches 51 1 that are three-terminal switches as shown in FIG. to 51 3 may be used a surge absorber 50 provided with. In this case, the first output terminal a of the first to third switches 51 1 to 51 3 is grounded, and one end of the series through wire 20 is connected to the first of the first to third switches 51 1 to 51 3 . By connecting to the two output terminals b, the test switching switch 13 can be dispensed with. In addition, as shown by a one-dot chain line in FIG. 4, the surge absorber 50 can be opened if all the first to third switches 51 1 to 51 3 can be controlled to neutral positions.

試験切替用スイッチ13として3端子スイッチを使用したが、図5に示すように2端子スイッチである試験切替用スイッチ33を用いて、直列貫通線20の一端を試験切替用スイッチ33の入力端子に接続し、直列貫通線20の他端を試験切替用スイッチ33の出力端子に接続しておくようにしてもよい。この場合には、第1乃至第3の地絡方向継電器1351〜1353の内部方向試験を行うときには試験切替用スイッチ33を開き、第1乃至第3の地絡方向継電器1351〜1353の外部方向試験を行うときには試験切替用スイッチ33を閉じるようにする。
なお、試験機能付一体型継電器200のスイッチ制御表示部227が、制御部230の制御の下、第4のスイッチ制御信号SW4を試験切替用スイッチ33に出力することにより、試験切替用スイッチ33の開閉制御を行う。
Although a three-terminal switch is used as the test switching switch 13, one end of the series through wire 20 is used as an input terminal of the test switching switch 33 by using the test switching switch 33 that is a two-terminal switch as shown in FIG. The other end of the series through wire 20 may be connected to the output terminal of the test switching switch 33. In this case, opening the first to third ground directional relay 135 1-135 3 test changeover switch 33 when making an internal direction test, the first to third ground directional relay 135 1-135 3 When the external direction test is performed, the test switching switch 33 is closed.
The switch control display unit 227 of the integrated relay 200 with a test function outputs the fourth switch control signal SW 4 to the test switching switch 33 under the control of the control unit 230, so that the test switching switch 33 is output. Open / close control is performed.

直列貫通線20を使用したが、直列貫通線20の代わりに、図6に示した接続線130を使用してもよい。
第1乃至第3の試験用零相電流I01’〜I03’は、第1乃至第3の地絡方向継電器2101〜2103の試験を同時に行って試験の効率化を図るために、整定値調整部224から第1乃至第3の地絡方向継電器2101〜2103に直列に入力してもよい。
試験機能付一体型継電器200は、リアクトル接地方式の配電線がある場合には、リアクタンス制御信号を用いて母線のペテンゼルコイルのリアクタンスを変えることができるとともに、リアクタンス値データを受け取ってこのリアクタンスの値を認識できるリアクタンス可変・認識装置をさらに具備してもよい。
Although the serial through wire 20 is used, the connecting wire 130 shown in FIG. 6 may be used instead of the serial through wire 20.
The first to third test zero-phase currents I 01 ′ to I 03 ′ are used for simultaneously testing the first to third ground fault direction relays 210 1 to 210 3 to improve the efficiency of the test. The set value adjustment unit 224 may input the first to third ground fault direction relays 210 1 to 210 3 in series.
When there is a reactor grounding distribution line, the integrated relay 200 with a test function can change the reactance of the bus petenzel coil by using the reactance control signal, and can also receive the reactance value data and A reactance variable / recognition device that can recognize the value may be further provided.

地絡保護継電器システム1,1’は、継電器部と試験部とを備えた試験機能付一体型継電器200を具備したが、図6に示した試験器120の代わりに、上述した試験部のみを備えた試験器を用いてもよい。   The ground fault protection relay system 1, 1 ′ includes the integrated relay 200 with a test function including the relay unit and the test unit, but instead of the tester 120 illustrated in FIG. 6, only the test unit described above is provided. An equipped tester may be used.

以上説明したように、本発明の地絡保護継電器システムは、地絡保護継電器として利用することができるほか、変圧器2次側に設置されているサージアブソーバを用いて複数の地絡方向継電器の1次試験を行うのにも利用することができる。   As described above, the ground fault protection relay system according to the present invention can be used as a ground fault protection relay, and a plurality of ground fault direction relays can be used by using a surge absorber installed on the secondary side of the transformer. It can also be used to perform primary tests.

本発明の一実施例による地絡保護継電器システム1の構成を示す図である。It is a figure which shows the structure of the ground fault protection relay system 1 by one Example of this invention. 図1に示した試験機能付一体型継電器200の構成を示す図である。It is a figure which shows the structure of the integrated relay 200 with a test function shown in FIG. シミュレーション結果の一例を示す図であり、(a)はサージアブソーバ10の2相のコンデンサを開放した場合における零相電圧V0の時間変化をシミュレーションした結果の一例を示す図であり、(b)は1相を地絡抵抗3000Ωで地絡させた場合における零相電圧V0の時間変化をシミュレーションした結果の一例を示す図である。Is a diagram illustrating an example of a simulation result, (a) is a diagram showing an example of a simulation result of the time variation of the zero-phase voltage V 0 in the case of capacitors opened two-phase surge absorber 10, (b) is a diagram showing an example of a simulation result of the time variation of the zero-phase voltage V 0 in the case where is ground one phase ground fault resistance 3000 ohms. 3端子スイッチである第1乃至第3のスイッチ511〜513を備えたサージアブソーバ50の構成を示す図である。First, a three-terminal switch is a diagram showing a configuration of a surge absorber 50 provided with a third switch 51 1 to 51 3. 2端子スイッチである試験切替用スイッチ33を用いた場合の地絡保護継電器システム1’の構成を示す図である。It is a figure which shows the structure of the ground fault protection relay system 1 'at the time of using the test switch 33 which is a 2 terminal switch. 従来の配電線人工地絡試験方法を説明するための図である。It is a figure for demonstrating the conventional distribution line artificial ground fault test method.

符号の説明Explanation of symbols

1,1’ 地絡保護継電器システム
10,50 サージアブソーバ
111,511 第1のスイッチ
112,512 第2のスイッチ
113,513 第3のスイッチ
12 接地回路
13,33 試験切替用スイッチ
20 直列貫通線
101 母線
1021〜1023 第1乃至第3の配電線
103 接地形計器用変圧器
105 変圧器
120 試験器
1311〜1313,1321〜1323 断路器
1331〜1333 第1乃至第3の遮断器
1341〜1343 第1乃至第3の零相変流器
1351〜1353 第1乃至第3の地絡方向継電器
136 地絡過電圧継電器
200 試験機能付一体型継電器
2101〜2103 第1乃至第3の地絡方向継電器
211 地絡過電圧継電器
221 零相電流測定部
222 零相電圧測定部
223 接地電流測定部
224 整定値調整部
225 トリップ出力ロック部
226 動作時間算出部
227 スイッチ制御表示部
228 試験・整定指令入力部
229 試験・整定結果出力部
230 制御部
231 伝送制御部
R 赤相
W 白相
B 青相
C コンデンサ
0 零相電圧
0’ 試験用零相電圧
01〜I03 第1乃至第3の零相電流
01’〜I03’ 第1乃至第3の試験用零相電流
g 地絡電流
G 接地電流
1〜S3 第1乃至第3のリレー接点動作信号
SW1〜SW4 第1乃至第4のスイッチ制御信号
1〜T3 第1乃至第3のトリップ信号
TL トリップロック信号
1,1 'ground fault protection relay system 10, 50 surge absorber 11 1, 51 1 the first switch 11 2, 51 2 second switch 11 3, 51 3 third switch 12 grounding circuit 13 and 33 tests switching Switch 20 Serial through wire 101 Busbars 102 1 to 102 3 First to third distribution lines 103 Grounded instrument transformer 105 Transformer 120 Test devices 131 1 to 131 3 , 132 1 to 132 3 Disconnectors 133 1 to 133 3 First to third circuit breakers 134 1 to 134 3 First to third zero-phase current transformers 135 1 to 135 3 First to third ground fault direction relay 136 Ground fault overvoltage relay 200 integrated relay 210 1-210 3 first to third ground directional relay 211 locations fault over voltage relay 221 zero-phase current measurement unit 222 zero-phase voltage measuring unit 223 ground current measuring unit 224 set point adjuster 225 Lip output lock unit 226 operating time calculating unit 227 switches control the display unit 228 the test-settling command input unit 229 test-settling result transmission control output unit 230 control unit 231 unit R red phase W white phase B Blue Phase C capacitor V 0 the zero-phase voltage V 0 'zero-phase voltage for testing I 01 ~I 03 first to third zero-phase current I 01' ~I 03 'first to third zero-phase current test I g grounding current I G ground current S 1 to S 3 first to third relay contact operation signal SW 1 to SW 4 first through fourth switch control signals T 1 through T 3 first to third trip signal TL trip lock signal

Claims (16)

母線(101)に設けられた変圧器(105)の2次側に設置された、かつ、各相のコンデンサ(C)に直列にそれぞれ設けられた第1乃至第3のスイッチ(111〜113,511〜513)を備えたサージアブソーバ(10,50)と、
前記母線に設けられた接地形計器用変圧器(103)から入力される零相電圧(V0)、前記サージアブソーバから入力される接地電流(IG)および前記複数の配電線にそれぞれ設けられた複数の零相変流器(1341〜1343)から入力される零相電流(I01〜I03)に基づいて前記複数の地絡方向継電器の試験を行うための試験部と、
を具備し、
前記第1乃至第3のスイッチの少なくとも1つを開いて前記複数の配電線の対地静電容量のバランスを崩すことにより、前記母線の系統の複数の配電線(1021〜1023)に地絡事故が発生した場合に該複数の配電線にそれぞれ設けられた複数の遮断器(1331〜1333)をそれぞれ動作させるための複数の地絡方向継電器(2101〜2103)の地絡試験を行う、
ことを特徴とする、地絡保護継電器システム。
First to third switches (11 1 to 11) provided on the secondary side of the transformer (105) provided on the bus (101) and provided in series with the capacitors (C) of the respective phases. 3 , 51 1 to 51 3 ), and a surge absorber (10, 50),
The zero-phase voltage (V 0 ) input from the grounded instrument transformer (103) provided on the bus bar, the ground current (I G ) input from the surge absorber, and the plurality of distribution lines, respectively. A test unit for testing the plurality of ground fault direction relays based on zero phase currents (I 01 to I 03 ) input from the plurality of zero phase current transformers (134 1 to 134 3 );
Comprising
By opening at least one of the first to third switches to disrupt the balance of the ground capacitance of the plurality of distribution lines, a plurality of distribution lines (102 1 to 102 3 ) of the bus system are connected to the ground. ground fault of a plurality of ground directional relay (210 1 to 210 3) for operating a plurality of circuit breakers which are provided respectively to the plurality of distribution lines (133 1 to 133 3) respectively when the fault accident occurs Do the test,
A ground fault protection relay system characterized by that.
前記試験部と、前記複数の地絡方向継電器を備える継電器部とからなる試験機能付一体型継電器(200)を具備することを特徴とする、請求項1記載の地絡保護継電器システム。   2. The ground fault protection relay system according to claim 1, further comprising an integrated relay with a test function (200) including the test section and a relay section including the plurality of ground fault direction relays. 両端が前記サージアブソーバの出力端子および前記試験部にそれぞれ接続された、かつ、前記複数の零相変流器を貫通する直列貫通線(20)をさらに具備することを特徴とする、請求項1または2記載の地絡保護継電器システム。   The apparatus further comprises a series through wire (20) having both ends connected to the output terminal of the surge absorber and the test section and penetrating the plurality of zero-phase current transformers. Or the earth fault protection relay system of 2 description. 前記直列貫通線が、前記複数の零相変流器内を前記母線から前記複数の配電線の末端に向けて前記接地電流がそれぞれ流れるように、該複数の零相変流器をそれぞれ貫通していることを特徴とする、請求項3記載の地絡保護継電器システム。   The series through-wires respectively penetrate the plurality of zero-phase current transformers so that the ground current flows in the plurality of zero-phase current transformers from the bus toward the ends of the plurality of distribution lines. The ground fault protection relay system according to claim 3, wherein the ground fault protection relay system is provided. 前記試験機能付一体型継電器の前記継電器部が、前記接地形計器用変圧器から入力される前記零相電圧に基づいて動作する地絡過電圧継電器(211)をさらに備えることを特徴とする、請求項2乃至4いずれかに記載の地絡保護継電器システム。   The relay unit of the integrated relay with a test function further includes a ground fault overvoltage relay (211) that operates based on the zero-phase voltage input from the grounded instrument transformer. Item 5. A ground fault protection relay system according to any one of Items 2 to 4. 前記試験部が、
前記複数の零相変流器からそれぞれ入力される前記複数の零相電流を測定する零相電流測定部(221)と、
前記接地形計器用変圧器から入力される前記零相電圧を測定する零相電圧測定部(222)と、
前記サージアブソーバから入力される前記接地電流を測定する接地電流測定部(223)と、
前記零相電流測定部によって測定された前記複数の零相電流、前記零相電圧測定部によって測定された前記零相電圧および前記接地電流測定部によって測定された前記接地電流に基づいて前記複数の地絡方向継電器の整定値を調整するとともに、該調整した整定値に対応する試験用零相電圧(V0’)および複数の試験用零相電流(I01’〜I03’)を前記複数の地絡方向継電器に出力する整定値調整部(224)と、
該整定値調整部から前記試験用零相電圧および前記複数の試験用零相電流を出力したときに前記複数の地絡方向継電器から入力される複数のリレー接点動作信号(S1〜S3)に基づいて、該複数の地絡方向継電器の応答動作を確認する制御部(230)と、
を備えることを特徴とする、請求項1乃至5いずれかに記載の地絡保護継電器システム。
The test section is
A zero phase current measuring unit (221) for measuring the plurality of zero phase currents respectively input from the plurality of zero phase current transformers;
A zero-phase voltage measuring unit (222) for measuring the zero-phase voltage input from the grounded instrument transformer;
A ground current measuring unit (223) for measuring the ground current input from the surge absorber;
The plurality of zero phase currents measured by the zero phase current measurement unit, the zero phase voltage measured by the zero phase voltage measurement unit, and the ground current measured by the ground current measurement unit. While adjusting the set value of the ground fault direction relay, the test zero-phase voltage (V 0 ′) and the test zero-phase currents (I 01 ′ to I 03 ′) corresponding to the adjusted set value are A settling value adjustment unit (224) for outputting to the ground fault direction relay of
A plurality of relay contact operation signals (S 1 to S 3 ) input from the plurality of ground fault direction relays when the test zero-phase voltage and the plurality of test zero-phase currents are output from the set value adjustment unit. A control unit (230) for confirming response operations of the plurality of ground fault direction relays based on
The ground fault protection relay system according to claim 1, wherein the ground fault protection relay system is provided.
前記整定値調整部が、前記複数の試験用零相電流を前記複数の地絡方向継電器に直列に出力することを特徴とする、請求項6記載の地絡保護継電器システム。   The ground fault protection relay system according to claim 6, wherein the set value adjustment unit outputs the plurality of test zero-phase currents in series to the plurality of ground fault direction relays. 前記試験部が、外部からの試験・整定指令信号に基づいて、前記複数の地絡方向継電器の試験機能およびモード変更の要求を前記制御部に出力する試験・整定指令入力部(228)をさらに備えることを特徴とする、請求項6または7記載の地絡保護継電器システム。   The test unit further includes a test / settling command input unit (228) for outputting a test function and mode change request of the plurality of ground fault direction relays to the control unit based on an external test / settling command signal The ground fault protection relay system according to claim 6, wherein the ground fault protection relay system is provided. 前記試験部が、外部から前記試験・整定指令信号を受信して前記試験・整定指令入力部に出力するとともに、前記試験・整定結果出力部からの試験結果および整定結果を整理した試験・整定結果データを外部に送信する伝送制御部(231)をさらに備えることを特徴とする、請求項8記載の地絡保護継電器システム。   The test unit receives the test / settling command signal from the outside and outputs the test / settling command input unit to the test / settling command input unit, and also arranges the test result and the settling result from the test / settling result output unit. The ground fault protection relay system according to claim 8, further comprising a transmission control unit (231) for transmitting data to the outside. 前記試験部が、
前記複数の地絡方向継電器の試験の開始時に複数のトリップ信号(T1〜T3)の該複数の地絡方向継電器からの出力をロックするトリップ出力ロック部(225)と、
前記複数の地絡方向継電器から入力される前記複数のリレー接点動作信号に基づいて、前記サージアブソーバの前記第1乃至第3のスイッチの少なくとも1つを開いたときから前記複数の地絡方向継電器が動作するまでの時間を算出する動作時間算出部(226)と、
前記制御部から入力される試験結果および整定結果を整理して外部に出力する試験・整定結果出力部(229)と、
をさらに備えることを特徴とする、請求項6乃至9いずれかに記載の地絡保護継電器システム。
The test section is
Trip output lock portion for locking the output from said plurality of earth fault directional relay in a plurality of trip signal at the start of the test of the plurality of ground directional relay (T 1 through T 3) and (225),
The plurality of ground fault direction relays when at least one of the first to third switches of the surge absorber is opened based on the plurality of relay contact operation signals input from the plurality of ground fault direction relays. An operation time calculation unit (226) for calculating a time until the
A test / setting result output unit (229) for organizing the test results and settling results input from the control unit and outputting them to the outside;
The ground fault protection relay system according to claim 6, further comprising:
前記第1乃至第3のスイッチ(111〜113)が、前記試験部によって開閉制御される2端子スイッチであることを特徴とする、請求項1乃至10いずれかに記載の地絡保護継電器システム。 The ground fault protection relay according to any one of claims 1 to 10, wherein the first to third switches (11 1 to 11 3 ) are two-terminal switches controlled to be opened and closed by the test unit. system. 前記第1乃至第3のスイッチ(111〜113)が、前記試験部によって開閉制御される3端子スイッチであり、
前記第1乃至第3のスイッチの第1の出力端子(a)が接地されており、
前記第1乃至第3のスイッチの第2の出力端子(b)が接続されている、
ことを特徴とする、請求項1乃至10いずれかに記載の地絡保護継電器システム。
The first to third switches (11 1 to 11 3 ) are three-terminal switches controlled to be opened and closed by the test unit;
The first output terminals (a) of the first to third switches are grounded;
A second output terminal (b) of the first to third switches is connected;
The ground fault protection relay system according to any one of claims 1 to 10, wherein
入力端子が前記サージアブソーバに接続された試験切替用スイッチ(13)と、
該試験切替用スイッチの第2の出力端子に接続された接地回路(12)と、
をさらに具備し、
前記直列貫通線の一端が前記試験切替用スイッチの第1の出力端子に接続され、該直列貫通線の他端が該試験切替用スイッチの前記第2の出力端子に接続され、
前記接地電流が前記接地回路から前記試験部に出力される、
ことを特徴とする、請求項3乃至12いずれかに記載の地絡保護継電器システム。
A test changeover switch (13) whose input terminal is connected to the surge absorber;
A ground circuit (12) connected to the second output terminal of the test switching switch;
Further comprising
One end of the series through wire is connected to the first output terminal of the test switching switch, and the other end of the series through wire is connected to the second output terminal of the test switching switch,
The ground current is output from the ground circuit to the test unit.
The ground fault protection relay system according to any one of claims 3 to 12, wherein
入力端子が前記サージアブソーバに接続された試験切替用スイッチ(33)と、
該試験切替用スイッチの出力端子に接続された接地回路(12)と、
をさらに具備し、
前記直列貫通線の一端が前記試験切替用スイッチの前記入力端子に接続され、該直列貫通線の他端が該試験切替用スイッチの前記出力端子に接続され、
前記接地電流が前記接地回路から前記試験部に出力される、
ことを特徴とする、請求項3乃至13いずれかに記載の地絡保護継電器システム。
A test changeover switch (33) having an input terminal connected to the surge absorber;
A ground circuit (12) connected to the output terminal of the test switching switch;
Further comprising
One end of the series through wire is connected to the input terminal of the test switching switch, and the other end of the series through wire is connected to the output terminal of the test switching switch,
The ground current is output from the ground circuit to the test unit.
The ground fault protection relay system according to any one of claims 3 to 13, wherein the ground fault protection relay system is provided.
リアクトル接地方式の配電線がある場合には、前記母線のペテンゼルコイルのリアクタンスを変えることができるとともに該リアクタンスの値を認識できるリアクタンス可変・認識手段をさらに具備することを特徴とする、請求項1乃至14いずれかに記載の地絡保護継電器システム。   The reactor further comprises a reactance variable / recognition means capable of changing the reactance of the petenzel coil of the busbar and recognizing the value of the reactance when there is a reactor grounding distribution line. The ground fault protection relay system in any one of 1 thru | or 14. 前記サージアブソーバが、前記第1乃至第3のスイッチの代わりに、代表相のコンデンサに直列に設けられた1個のスイッチを備えることを特徴とする、請求項1乃至15いずれかに記載の地絡保護継電器システム。   16. The ground according to claim 1, wherein the surge absorber includes one switch provided in series with a capacitor of a representative phase instead of the first to third switches. Fault protection relay system.
JP2007106587A 2007-04-13 2007-04-13 Ground fault protective relay system Withdrawn JP2008263762A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007106587A JP2008263762A (en) 2007-04-13 2007-04-13 Ground fault protective relay system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007106587A JP2008263762A (en) 2007-04-13 2007-04-13 Ground fault protective relay system

Publications (1)

Publication Number Publication Date
JP2008263762A true JP2008263762A (en) 2008-10-30

Family

ID=39985836

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007106587A Withdrawn JP2008263762A (en) 2007-04-13 2007-04-13 Ground fault protective relay system

Country Status (1)

Country Link
JP (1) JP2008263762A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011227020A (en) * 2010-04-23 2011-11-10 Chugoku Electric Power Co Inc:The Ground fault detecting system for distribution transformer secondary side
WO2015015831A1 (en) * 2013-08-01 2015-02-05 株式会社 東芝 Current-limiting reactor device
WO2020255440A1 (en) * 2019-06-21 2020-12-24 有限会社ライフテクノス General-purpose leakage detection device
CN117420377A (en) * 2023-12-18 2024-01-19 西安现代控制技术研究所 Multichannel relay array monitoring method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011227020A (en) * 2010-04-23 2011-11-10 Chugoku Electric Power Co Inc:The Ground fault detecting system for distribution transformer secondary side
WO2015015831A1 (en) * 2013-08-01 2015-02-05 株式会社 東芝 Current-limiting reactor device
WO2020255440A1 (en) * 2019-06-21 2020-12-24 有限会社ライフテクノス General-purpose leakage detection device
CN117420377A (en) * 2023-12-18 2024-01-19 西安现代控制技术研究所 Multichannel relay array monitoring method
CN117420377B (en) * 2023-12-18 2024-04-26 西安现代控制技术研究所 Multichannel relay array monitoring method

Similar Documents

Publication Publication Date Title
JP5726047B2 (en) Operation test apparatus and operation test method for high-voltage system protection equipment
CN107966633A (en) The one-phase earthing failure in electric distribution network circuit quick judgment method and system of a kind of electric power system
CN111337790A (en) Distribution network real mirror test platform and detection method for primary and secondary fusion power distribution equipment
JP4770403B2 (en) Operation test method for ground fault direction relay
JP2008263762A (en) Ground fault protective relay system
DE102010060333B4 (en) Decentralized generation plant, in particular wind energy plant, test circuit and test method
US4634981A (en) Method for testing a circuit breaker using a three terminal current transformer
JP2008263761A (en) Power line artificial ground fault testing system and method
JP2007192756A (en) Power line artificial ground fault testing system and power line artificial ground fault testing method
CN112415456A (en) Physical simulation platform for detecting power distribution fault indicator and detection method
JP2003189425A (en) Apparatus for testing protection of power receiving and distributing facility system
KR101917057B1 (en) Actual ground and short fault verification system for directional protective relay
Codino et al. Cross-country fault protection in ENEL Distribuzione's experimental MV loop lines
EP3143417B1 (en) Method and system for testing a switching installation for power transmission installations
Varetsky Overvoltages in MV industrial grid under ground faults
KR20230091560A (en) Perorming method of low-voltage primary injection test and verifciation system of power facility reliability for low-voltage primary injection test
JP2007195374A (en) Grounding protective relay system
JP2001258145A (en) Protective relay system
EP3422514B1 (en) Method and assembly for detecting a winding defect in a transformer
Kokor et al. Effects of neutral point grounding methods on single-phase short circuit fault characteristics
CN102005737A (en) Automatic jump selection method of electrified railway feeder line started by external contacts
JP5247164B2 (en) Protective relay device
EP1134865B1 (en) Detecting wire break in electrical network
RU2311711C1 (en) Method for building and adjusting current cutoff
Kuzmin et al. Comprehensive Investigations of Transient Processes in Medium Voltage Distribution Networks with Long-Distance Power Transmission

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20100706