JP2008088696A - Tunnel lining construction method - Google Patents

Tunnel lining construction method Download PDF

Info

Publication number
JP2008088696A
JP2008088696A JP2006270631A JP2006270631A JP2008088696A JP 2008088696 A JP2008088696 A JP 2008088696A JP 2006270631 A JP2006270631 A JP 2006270631A JP 2006270631 A JP2006270631 A JP 2006270631A JP 2008088696 A JP2008088696 A JP 2008088696A
Authority
JP
Japan
Prior art keywords
concrete
tunnel
top end
mold
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006270631A
Other languages
Japanese (ja)
Inventor
Hidetoshi Hara
秀利 原
Yukihisa Inagawa
雪久 稲川
Tomihiro Tanase
富弘 棚瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Gifu Industry Co Ltd
Original Assignee
Maeda Corp
Gifu Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp, Gifu Industry Co Ltd filed Critical Maeda Corp
Priority to JP2006270631A priority Critical patent/JP2008088696A/en
Publication of JP2008088696A publication Critical patent/JP2008088696A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a construction method for filling a form for tunnel lining with concrete at a high density to form a tunnel lining having excellent durability. <P>SOLUTION: In a process for placing concrete for the lining by installing the form in a tunnel, the pressure of concrete filled into the form 1 is measured by pressure measuring means 15, 16 to adjust the pressure of the concrete 9 filled into the form 1 to such a range that prevents the deformation or breakage of the form 1. Concrete is pressed in through a first blow-up port 11 in a crest formed at the lap side 24 of a space partitioned by the form 1, and the concrete 9 is compacted by a vibrator 8 after filling the form 1 with the concrete. Then, the concrete is further pressed in through a second blow-up port 11c in a crest formed at the end side 25 of the form. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明はトンネル覆工の施工方法に関し、特にコンクリートの高密度充填が可能なコンクリート打設方法を含むものに関する。   The present invention relates to a tunnel lining construction method, and more particularly to a method including a concrete placing method capable of high-density filling of concrete.

一般に、トンネル工事では、各種掘削重機や発破作業による地山掘削が所定区間行われた後に、コンクリート吹付け作業を掘削壁面に対し実施することで、一次覆工が施される。
次に、適宜間隔をおいてトンネル地山内壁面に沿うように、セントルフォームと呼ばれる可動式のトンネル覆工用型枠(以下、型枠)を用いて、掘削壁面と型枠との間に覆工コンクリートを打設し、二次覆工が施される。
前記セントルフォームは、トンネル内壁面に適応する断面を備え、フォーム自体がトンネル断面方向に適宜、分割可動する構造となっている。
Generally, in tunnel construction, after ground excavation by various excavating heavy machines and blasting operations is performed for a predetermined section, a concrete blasting operation is performed on the excavation wall surface to perform primary lining.
Next, a movable tunnel lining formwork (hereinafter referred to as a formwork) called a centrform is used to cover the wall between the excavation wall and the formwork along the inner wall of the tunnel ground at an appropriate interval. Concrete is placed and secondary lining is applied.
The centru foam has a cross section adapted to the inner wall surface of the tunnel, and the foam itself can be divided and moved appropriately in the tunnel cross section direction.

前記セントルフォームの頂部(天端部付近に対応)には、フォーム外方(トンネル一次覆工面と型枠の間)へのコンクリート注入用の注入口が設けられており、この注入口にコンクリートポンプ等と接続されたコンクリート供給管を接続し、セントルフォームとトンネル一次覆工面との間の二次覆工領域へコンクリートを打設していた。前記コンクリート注入口からセントルフォーム外方の二次覆工領域に流入したコンクリートは、フォーム外方を左右のトンネル壁面方向に分岐して流下して型枠内に充填される。   The top of the centle foam (corresponding to the vicinity of the top end) is provided with an inlet for pouring concrete into the outside of the foam (between the primary lining surface of the tunnel and the formwork). The concrete supply pipes connected to each other were connected, and the concrete was placed in the secondary lining area between the centrform and the tunnel primary lining surface. The concrete that has flowed from the concrete inlet into the secondary lining area outside the centle foam branches off the foam in the direction of the left and right tunnel walls and flows down to be filled in the mold.

このセントルフォームの頂部の注入口からのコンクリート注入は、天端部に覆工を形成するためのものである。天端部に至る型枠下部(アーチ部等)内へのコンクリート打設は、作業窓からコンクリートを注入することで終了しているため、天端部へのコンクリート打設は覆工施工において最終的な作業となる。   The concrete injection from the top inlet of the centrufoam is for forming a lining at the top end. Since concrete placement in the lower part of the formwork (arch part, etc.) reaching the top end is completed by pouring concrete from the work window, the concrete placement at the top end is the final in the lining work. Work.

打設したコンクリートに対してはバイブレータを使用して締め固めをするが、使用するコンクリートの流動性はあまり高くないので、覆工コンクリートを天端部の間隙内部に均一に打設し難いことに鑑み、バイブレータの振動によって、コンクリートの締め固めをして、型枠内に流入したコンクリートを均一に広げるようにしている。   The concrete placed is compacted using a vibrator, but the fluidity of the concrete used is not very high, so it is difficult to place the lining concrete uniformly inside the gap at the top edge. In view of this, the vibration of the vibrator is used to compact the concrete so that the concrete that has flowed into the mold is evenly spread.

そして、コンクリートをラップ側のコンクリート注入口から注入し、それが妻側の開口
部(図示せず)から排出されるのを確認したときは、充填作業を終了していた。その理由は、型枠内にコンクリートが一応行き渡たり充填がされたものと考えられ、これ以上コンクリートの注入作業を続行すると型枠に大きな荷重負担を強いる場合があり、その結果、型枠が変形する等の不都合が生じる虞があるからである。
When the concrete was poured from the concrete inlet on the lap side and it was confirmed that it was discharged from the opening (not shown) on the wife side, the filling operation was finished. The reason is that the concrete is once spread or filled in the formwork, and if the concrete pouring operation is continued further, the formwork may be subjected to a heavy load, resulting in deformation of the formwork. This is because there is a risk of inconveniences such as the occurrence of a problem.

しかし、上記のような場合、ラップ側に比べて妻側の覆工の品質が低下した状態となり易く、その結果、妻側付近に空隙やクラックが生じやすい等の不都合が予想される。   However, in the above case, the quality of the lining on the wife side tends to be lower than that on the lap side, and as a result, inconveniences such as voids and cracks near the wife side are likely to occur.

そこで、コンクリートを加圧することで、コンクリートを少しでも型枠内の隅々まで充填させるようにしたものがある(特許文献1及び特許文献2)。
特開平11−81892号公報 特開平11−247600号公報
Therefore, there is one in which concrete is filled up to every corner in the mold by pressurizing the concrete (Patent Document 1 and Patent Document 2).
Japanese Patent Laid-Open No. 11-81892 JP 11-247600 A

しかしながら、上記のような加圧による方法でよっても、全体に均一なコンクリートの高密度充填の達成は容易ではなく、また、特許文献1,2に記載の発明では、型枠を含むコンクリート打設装置が大がかりになる問題がある。   However, even with the above-described method using pressurization, it is not easy to achieve high-density filling of uniform concrete throughout, and in the inventions described in Patent Documents 1 and 2, concrete placement including a formwork is performed. There is a problem that the device becomes large-scale.

特に、トンネルの天端部の覆工形成では、コンクリート打設時に充填状態を視認することが困難である反面、トンネルの耐久性や安全性向上のため、天端部の覆工に対してはきわめて高品質な施工が求められる。したがって、覆工施工では、コンクリートを容易かつ確実に、高密度充填することが可能な、さらなる技術の提供が望まれている。   In particular, it is difficult to visually check the filling state when placing concrete at the top end of the tunnel, but to improve the durability and safety of the tunnel, An extremely high quality construction is required. Therefore, in the lining construction, it is desired to provide a further technique that can easily and reliably fill the concrete with a high density.

本発明は上記のような事情に鑑みてされたものであり、トンネル覆工において、コンクリートを型枠内に高密度充填でき、耐久性に優れたトンネル覆工が形成可能な施工方法を提供することを課題とする。   The present invention has been made in view of the circumstances as described above, and provides a construction method capable of forming a tunnel lining excellent in durability, capable of filling concrete into a mold at high density in tunnel lining. This is the issue.

本発明は、上記の課題を達成するために次のような構成とした。すなわち、トンネル内に型枠を設置して覆工用のコンクリートを打設する工程において、
圧力測定手段によって型枠内におけるコンクリートの充填圧を計測して、コンクリートの前記充填圧を型枠の変形または破壊が生じない範囲に調整しつつ、前記型枠で仕切られた空間のラップ側に設けた天端部第1吹上口からコンクリートを圧入し、コンクリートを型枠内に充填した後、コンクリートの締め固め作業を実施し、その後、さらに型枠の妻側に設けた天端部第2吹上口からコンクリートを圧入することで、少なくともトンネル最上部である天端部の覆工を形成することを特徴とする。
The present invention has the following configuration in order to achieve the above-described problems. That is, in the process of placing the formwork in the tunnel and placing concrete for lining,
By measuring the filling pressure of the concrete in the mold by means of pressure measurement, and adjusting the filling pressure of the concrete to a range where deformation or destruction of the mold does not occur, on the lap side of the space partitioned by the mold The concrete is pressed from the first top opening at the top end and the concrete is filled into the mold, and then the concrete is compacted. It is characterized by forming a lining at the top of the tunnel, which is at the top of the tunnel, by press-fitting concrete from the air outlet.

本発明は、覆工施工において、目視できない空間に向けて下方からコンクリートを充填する天端部の覆工に適している。型枠内に密充填圧入されたコンクリートは、圧力を開放するとコンクリート量が増大することから、コンクリートをできるだけ加圧して充填度を高くすれば型枠内の隅々にコンクリートが行き渡る。したがって、コンクリート品質が向上し、ひび割れの発生等が抑制できる。   INDUSTRIAL APPLICABILITY The present invention is suitable for lining a top end portion in which concrete is filled from below toward a space that cannot be seen in lining construction. When the pressure is released, the amount of concrete increases when the concrete is tightly packed and pressed into the mold. Therefore, if the concrete is pressed as much as possible to increase the filling degree, the concrete spreads to every corner of the mold. Therefore, the concrete quality is improved and the occurrence of cracks can be suppressed.

圧力測定手段としては、天端部第1吹上口及び第2吹上口の近傍にそれぞれ設置した土圧計を使用することができる。また、コンクリートの充填圧力は、型枠の変形等の支障が生じない範囲で、最大限高い圧力とすることが望ましい。   As the pressure measuring means, earth pressure gauges installed in the vicinity of the top end first air outlet and the second air outlet can be used. In addition, it is desirable that the concrete filling pressure be set to a maximum pressure within a range in which trouble such as deformation of the mold does not occur.

この場合、天端部以外の側部及びアーチ部の覆工は、従来の方法によって形成してもよいが、次のような方法で施工することが好ましい。
すなわち、型枠のアーチ部に複数箇所のコンクリートの吹上口を設け、型枠の天端部付近に設けた作業窓から目視可能な高さまで、コンクリートを前記吹上口から上方に噴き上げて打設することで、吹上口より上方までコンクリートを打設する。すなわち、アーチ部に設けられている吹上口から供給されたコンクリートの打設面を、前記天端部の最上位付近まで到達させて、天端部のコンクリートが未打設の空間ができるだけ小さくなるようにする。前記アーチ部に設けられている吹上口は、天端部を囲繞するように複数配置し、コンクリート打設面をできるだけ水平にすることが好ましい。
In this case, the side cover other than the top end part and the arching of the arch part may be formed by a conventional method, but it is preferable to construct by the following method.
That is, a plurality of concrete blow-up openings are provided in the arch portion of the mold, and the concrete is sprayed upward from the blow-up opening to a height that is visible from a work window provided near the top end of the mold. In this way, the concrete is laid from the top of the air outlet to the top. That is, the concrete placement surface supplied from the air outlet provided in the arch portion is made to reach the vicinity of the topmost position of the top end portion, and the space where the concrete at the top end portion has not been placed becomes as small as possible. Like that. It is preferable that a plurality of air outlets provided in the arch portion are arranged so as to surround the top end portion, and the concrete placing surface is made as horizontal as possible.

上記の方法によれば、覆工の天端部以外のアーチ部のコンクリート充填が短時間に、確実に行われるので充填密度が向上する。それに加え、その後に施工する天端部のコンクリートの打設量、打設時間が大幅に減少するので、天端部の施工が容易になる。   According to said method, since concrete filling of arch parts other than the top edge part of lining is performed reliably in a short time, a filling density improves. In addition, since the amount and time of placing concrete at the top end to be constructed thereafter are greatly reduced, the construction of the top end is facilitated.

天端部は、コンクリートを下方から充填するので充填密度が疎になりやすいが、上記の方法によって天端部への打設量を少なくし、打設時間を短くした上で、本発明の方法を併せて使用すれば、型枠内の全体に、高密度にコンクリートを充填することができる。   Since the top end portion is filled with concrete from below, the packing density tends to be sparse, but the amount of placement on the top end portion is reduced by the above method, and the placement time is shortened. If used together, concrete can be filled in the entire formwork with high density.

なお、天端部に打設したコンクリートの締固め作業は、次の方法によることが望ましい。すなわち、長尺な牽引部の先端に振動部を備え、牽引に適した素材からなる振動部材を、型枠とトンネル内壁面との間に、その基端を巻揚機構に装着して型枠の長さ方向に沿わせて配設する。次に、型枠とトンネル内壁面との間へのコンクリートを打設後またはコンクリートの打設時に、振動部材を振動させる。このとき、巻揚機構を介して振動部材を巻揚、繰出すことにより、型枠の長さ方向に沿わせて移動させる。   In addition, it is desirable that the concrete compaction work placed on the top end is performed by the following method. In other words, a vibration part is provided with a vibration part at the tip of a long traction part, and a vibration member made of a material suitable for traction is mounted between the formwork and the inner wall surface of the tunnel, and its base end is attached to the hoisting mechanism to form It is arranged along the length direction. Next, the vibration member is vibrated after placing concrete between the formwork and the inner wall surface of the tunnel or when placing concrete. At this time, the vibrating member is wound and fed through the winding mechanism to be moved along the length direction of the mold.

このような締固め作業によって高密度に充填されたコンクリートは密度が均一化する。締固めにより、偏って密となっている部分の圧力が開放されると、コンクリートが型枠内の空間の隅々に拡がる。なお、高密度に充填されているため締固めによって打設面が低下することはない。   The density of the concrete filled with high density by such compaction work becomes uniform. When the pressure in the part that is unevenly dense is released by compaction, the concrete spreads to every corner of the space in the mold. In addition, since it is filled with high density, the placement surface does not decrease due to compaction.

本発明によれば、トンネル覆工において、コンクリートを型枠内に高密度充填できるので、耐久性に優れたトンネル覆工を形成することができる。   According to the present invention, in the tunnel lining, the concrete can be filled with high density into the mold, so that the tunnel lining excellent in durability can be formed.

特に、天端部へのコンクリート打設では、目視できない空間に下方からコンクリートを充填する必要があるが、高密度充填によって地山とコンクリートとの間に空隙が生じるのを抑制しつつ、密度が均一な高品質な覆工が得られる利点がある。   In particular, in placing concrete at the top edge, it is necessary to fill the space where it cannot be seen from below, but the density is reduced while suppressing the formation of voids between the ground and the concrete due to high density filling. There is an advantage that a uniform high quality lining can be obtained.

以下、図面を参照して本発明に係るトンネル覆工の実施形態を説明する。
なお、一次覆工の施工は従来工法により施工されるので、所定の型枠とトンネル内壁面との間へ二次覆工用のコンクリートを打設する方法を以下に詳述する。
Hereinafter, embodiments of a tunnel lining according to the present invention will be described with reference to the drawings.
In addition, since the construction of the primary lining is performed by a conventional construction method, a method for placing concrete for secondary lining between a predetermined formwork and the inner wall surface of the tunnel will be described in detail below.

まず、公知の施工順序に従い、型枠をトンネル内の所定位置、すなわち覆工を施すべき位置まで移動させ、型枠のラップ側24をラップ板(図示せず)により、妻側25を妻板(図示せず)によりそれぞれ被覆する。このようなラップ板と妻板による被覆によってコンクリートが打設される空間が画定される。   First, in accordance with a well-known construction sequence, the mold is moved to a predetermined position in the tunnel, that is, a position where lining is to be performed, the wrap side 24 of the mold is moved by a wrap plate (not shown), and the wife side 25 is moved by a wavy plate ( (Not shown). A space in which concrete is placed is defined by the covering with the lap plate and the end plate.

型枠1は、一般的には9〜12m程度の長さのものが用いられ、図1、図9に示すように、側面に複数の開閉自在な作業窓(検査窓)5が設けられる。この作業窓5は、検測やコンクリートの打込み状況の確認のほか、バイブレータ8による締固め作業、型枠清掃作業等のため使用されるもので、通常、型枠1の強度等を考慮しつつ可能な限り多く設けることが望ましい。ただし、アーチ部付近の覆工については、後述するように、これら作業窓5を利用せずに、トンネルのアーチ部13に対応する型枠アーチ部13aして設けた合計4個の吹上口40(図2)を使用してコンクリート打設する方法を採用することもできる(この方法は、他の実施の形態において述べる)。   The mold 1 generally has a length of about 9 to 12 m. As shown in FIGS. 1 and 9, a plurality of openable / closable work windows (inspection windows) 5 are provided on the side surface. This work window 5 is used for inspection and confirmation of concrete placing conditions, as well as for compaction work by the vibrator 8, work for cleaning the formwork, etc. Usually, while taking into account the strength of the formwork 1 and the like. It is desirable to provide as many as possible. However, as for the lining near the arch part, as will be described later, a total of four air outlets 40 provided as the formwork arch part 13a corresponding to the arch part 13 of the tunnel without using these work windows 5. A method of placing concrete using (FIG. 2) can also be employed (this method is described in other embodiments).

また、型枠1の最上部には、ラップ側24に天端部第1吹上口11が設けられる一方、妻側25に天端部第2吹き上げ口11aが設けられる。それぞれの天端部第1吹上口11及び天端部第2吹上口11aの近傍には、それぞれ土圧計15、16が設置されている。   In addition, the top end of the mold 1 is provided with the top end first blowing port 11 on the lap side 24, while the top end second blowing port 11 a is provided on the wife side 25. Soil pressure gauges 15 and 16 are installed in the vicinity of the top end first blowing port 11 and the top end second blowing port 11a, respectively.

本実施の形態では、図4等に示すように、型枠1の妻側外方の巻揚機構28に、振動部材であるバイブレータ8の牽引部の基端を装着させ、型枠1内の別の巻揚機構(図示せず)に、牽引材を介してバイブレータ8の先端を装着させて、このバイブレータ8を型枠1の長さ方向に沿わせて複数配設している(図9)。このように、天端部10の締固めのために、長尺棒状のバイブレータ8を移動可能に設置することで、締固め不足に起因する品質低下を抑制している。   In the present embodiment, as shown in FIG. 4 and the like, the base end of the pulling portion of the vibrator 8 that is a vibrating member is attached to the hoisting mechanism 28 on the outer side of the wife 1 of the mold 1, The tip of vibrator 8 is attached to another hoisting mechanism (not shown) via a traction material, and a plurality of vibrators 8 are arranged along the length direction of mold 1 (FIG. 9). ). In this way, for the compaction of the top end 10, the long bar-shaped vibrator 8 is movably installed, thereby suppressing quality deterioration due to insufficient compaction.

コンクリートの打設は、図1に示すように、トンネルの下方の両側壁部から順次、上方の天端部10に向けて実施する。最初に型枠1とトンネル内壁面3との間へ、コンクリート9を打設する。このとき、型枠1の各コンクリート打設口である作業窓5からコンクリート9を、型枠1とトンネル内壁面3との間へ打設する。このような作業は周知であり、コンクリートの圧送管から分岐した複数の注入管7(図3)の先端部を、開閉可能に形成された複数の作業窓5のうち、下方に位置する作業窓5に挿入して打設を開始する。   As shown in FIG. 1, concrete placement is performed sequentially from the lower side wall portions of the tunnel toward the upper top end portion 10. First, concrete 9 is placed between the mold 1 and the inner wall surface 3 of the tunnel. At this time, concrete 9 is placed between the formwork 1 and the tunnel inner wall surface 3 from the work window 5 which is each concrete placement opening of the formwork 1. Such work is well known, and a work window located below a plurality of work windows 5 formed such that the tip ends of a plurality of injection pipes 7 (FIG. 3) branched from a concrete pressure feeding pipe can be opened and closed. Insert into 5 and start placing.

さらに、コンクリートの注入管7が挿入された作業窓5とは別の作業窓5からバイブレータ8を挿入し、打設されたコンクリート9を締固める。
この際、型枠1に設けた複数の作業窓5を介してトンネル内側から、コンクリートの打設状況を視認することができる。ここで、コンクリートの打設状況とは、例えば、どの程度の高さまで打設がされたのか、コンクリートが充填されていない箇所があるか否か、または、バイブレータによる締固めが不充分な箇所があるか否か等である。
Further, a vibrator 8 is inserted from a work window 5 different from the work window 5 into which the concrete injection pipe 7 is inserted, and the placed concrete 9 is compacted.
At this time, the concrete placement condition can be visually recognized from the inside of the tunnel through the plurality of work windows 5 provided in the mold 1. Here, the concrete placement status refers to, for example, how high the concrete has been placed, whether there is a portion that is not filled with concrete, or where there is insufficient compaction by a vibrator. Whether or not there is.

コンクリートが一定高さまで打設されたことを確認し、その作業窓5からの打設が完了したと判断したら注入管7を当該作業窓5から取り出して、その作業窓5を閉じる。そして、その作業窓5よりも上方(天端部側)に位置する別の作業窓5に再び注入管7を挿入し、前記と同様にしてコンクリートを打設を続行する。   After confirming that the concrete has been placed to a certain height and determining that the placement from the work window 5 has been completed, the injection tube 7 is taken out of the work window 5 and the work window 5 is closed. Then, the injection pipe 7 is inserted again into another work window 5 located above (the top end side) of the work window 5 and the concrete is continuously placed in the same manner as described above.

上記作業を繰り返し、打設位置を上方に移動させてトンネルの天端部10を残し、図3に示すように、アーチ部13の上方までコンクリート打設が進んだら上記作業を終了する。
このとき、符号Aで示す範囲は、最上位にある窓部5よりも高い位置になるため、注入管7による流し込みによるコンクリート打設はできない。符号Tは、型枠1の天井面のレベルを示すが、このレベルが注入管7による打設の限界となる。
そして、符号Tが示すレベルより上部の天端部10のコンクリート打設は次のような方法によって実施する。
なお、Cは正中線であり、天端部10及び型枠天端部10aの最上部を通過し、天端部第1吹上口11及び天端部第2吹上口11aの中心を通る。
The above operation is repeated, and the pouring position is moved upward to leave the top end portion 10 of the tunnel, and as shown in FIG.
At this time, since the range indicated by the symbol A is higher than the uppermost window 5, concrete pouring by pouring with the injection pipe 7 cannot be performed. The symbol T indicates the level of the ceiling surface of the mold 1, and this level is the limit for placing by the injection pipe 7.
And the concrete placement of the top edge part 10 above the level which the code | symbol T shows is implemented by the following methods.
In addition, C is a median line, passes through the top of the top end 10 and the formwork top end 10a, and passes through the center of the top end first blowing port 11 and the top end second blowing port 11a.

まず、図4に示されるように、天端部10に対応する型枠天端部10aに設けた天端部第1吹上口11に注入管7を接続して、所定の圧力を付加しながら天端部10へのコンクリート9を打設する。この際、土圧計15によって土圧計近辺の型枠内のコンクリート充填圧力を測定する。そして、型枠1に過度の圧力負荷が生じないように前記充填圧力をコントロールしながら打設作業を続ける。なお、クラウン窓5cは作業開始前に閉じられ、コンクリートの打設状況の視認はできない。。   First, as shown in FIG. 4, the injection tube 7 is connected to the top end first blow-up port 11 provided in the mold top end 10a corresponding to the top end 10, and a predetermined pressure is applied. The concrete 9 is placed on the top end 10. At this time, the concrete filling pressure in the mold near the earth pressure gauge is measured by the earth pressure gauge 15. Then, the placing operation is continued while controlling the filling pressure so as not to cause an excessive pressure load on the mold 1. Note that the crown window 5c is closed before the work starts, and the concrete placement state cannot be visually confirmed. .

一般的に、型枠1の耐荷重は1m2/10t程度である。そのような場合は、コンクリ
ートの充填作業において、土圧計15によって型枠1内のコンクリート充填圧を管理し、それが10トンを超えることがないようにして充填作業を進める。
Generally, load capacity of the mold 1 is about 1 m 2 / 10t. In such a case, in the concrete filling operation, the concrete filling pressure in the mold 1 is managed by the earth pressure gauge 15, and the filling operation is advanced so as not to exceed 10 tons.

第1吹上口11からの打設により、天端部10にコンリートが充填されるが、型枠1が耐え得る範囲において最も高い圧力でコンクリート打設を行うことが好ましい。このようにすれば、コンクリートが型枠1内に高密度に充填される。このとき、妻側25に、第1吹上口11から打設されたコンクリートが排出された時点で、一旦、打設作業を中止する。この場合の型枠1内の充填圧は、図5に示すように、第1吹上口11付近が最も高く、妻側25に向かうに従って低くなる。しかし、締固め前の圧力は、図5中の点線(締固め前)で示されるように、第1吹上口11から妻側25に向かって急激に低下した後、再びわずかに上昇してから徐々に低下している。   Although the top end 10 is filled with the concrete by the placement from the first blow-up port 11, it is preferable to perform the concrete placement at the highest pressure within the range that the mold 1 can withstand. If it does in this way, concrete will be filled in mold 1 with high density. At this time, when the concrete cast from the first air outlet 11 is discharged to the wife side 25, the placing work is temporarily stopped. In this case, as shown in FIG. 5, the filling pressure in the mold 1 is highest in the vicinity of the first blow-up port 11 and decreases toward the wife side 25. However, after the pressure before compaction suddenly decreases from the first air outlet 11 toward the wife side 25 as indicated by the dotted line (before compaction) in FIG. It is gradually decreasing.

そして、バイブレータ8による締固め作業を実施すると、コンクリートが均されるので、図5中の実線で示す曲線(締固め後)で示されるような圧力分布となる。なお、コンクリート充填圧の測定は、型枠1内においてラップ側24から妻側25向けて所定間隔で設置した複数の土圧計により、計測されたものである。   Then, when the compacting operation by the vibrator 8 is performed, the concrete is leveled, so that the pressure distribution as shown by the solid line in FIG. 5 (after compaction) is obtained. The concrete filling pressure was measured by a plurality of earth pressure gauges installed at predetermined intervals from the lap side 24 toward the wife side 25 in the mold 1.

第1吹上口11のみからの充填では、型枠1内のラップ側24の充填圧力が妻側25に比べて高く、ラップ側24にコンクリートが密に充填され、妻側25に向かうにつれて充填度が低下していることが理解される。
この状態では、ラップ側24に比べ妻側25のコンクリート品質が低下しているため、妻側25に近い覆工にクラック等が生じるおそれがある。
In the filling from only the first blow-up port 11, the filling pressure on the wrap side 24 in the mold 1 is higher than that on the wife side 25, and the concrete is densely filled on the lap side 24, and the degree of filling increases toward the wife side 25. It is understood that is decreasing.
In this state, since the concrete quality of the wife side 25 is lower than that of the lap side 24, cracks or the like may occur in the lining near the wife side 25.

そこで続いて、第2吹上口11aにコンクリートの注入管7を接続し、所定の充填圧でコンクリート打設を実施する。この場合、加圧してコンクリートを妻側24の型枠1内に圧入する。
なお、従来は第2吹上口11aが設けられる場合でも、通常は、これを利用した打設作業は実施されることはなかった。第2吹上口11aは、あくまで非常用のものと位置付けられ、第1吹上口11からの打設に何らかの不都合が生じたような場合(コンクリートの詰まりの発生等)に、初めて使用されるものであった。
Then, the concrete injection pipe 7 is connected to the 2nd blowing outlet 11a, and concrete placement is implemented with a predetermined filling pressure. In this case, the concrete is pressed into the mold 1 on the wife side 24 under pressure.
Conventionally, even when the second blow-up port 11a is provided, the placing work using this is not usually performed. The second blow-up port 11a is positioned as an emergency one, and is used for the first time when there is some inconvenience in placing from the first blow-up port 11 (occurrence of clogging of concrete, etc.). there were.

本実施の形態の方法では、第2吹上口11aからの打設を追加的に実施することで、妻側24のコンクリートの充填密度を上昇させることができる。第2吹上口11aからの打設を実施すると、図7に示すように、型枠1内部の圧力分布が変化する。すなわち、第2吹上口11a近傍のコンクリート充填圧が上昇し、型枠1内において妻側24の充填密度がラップ側25のそれに近づく。したがって、第1吹上口11からの充填時における充填密度のアンバランスが解消され、型枠1内全体のコンクリートの充填度が上昇し、高密度充填が実現される。   In the method of the present embodiment, the concrete filling density of the wife side 24 can be increased by additionally performing the placement from the second blow-up port 11a. When the placement from the second blow-up port 11a is carried out, the pressure distribution inside the mold 1 changes as shown in FIG. That is, the concrete filling pressure in the vicinity of the second blow-up port 11 a increases, and the filling density on the wife side 24 approaches that on the lap side 25 in the mold 1. Therefore, the imbalance of the filling density at the time of filling from the first blow-up port 11 is eliminated, the concrete filling degree in the entire mold 1 is increased, and high density filling is realized.

上記のようなコンクリート打設の完了後、図4、図6、図9に示すように、バイブレータ8を振動させると共に、巻揚機構28を介して巻揚げることにより、各バイブレータ22を型枠1の妻側24へ順次移動させる。   After completion of the concrete placing as described above, as shown in FIGS. 4, 6, and 9, the vibrator 8 is vibrated and wound through the winding mechanism 28, so that each vibrator 22 is moved to the formwork 1. Are moved sequentially to the wife side 24.

ここで、前記バイブレータ8には巻揚機構28及びシリンダ29により張力が付与されているため、バイブレータ8が、打設完了後のコンクリート内の中間部位に保持された状態となり、この状態のまま妻側25に順次移動するので、締固めたコンクリートが流動することなく、打設コンクリート全体を均一に振動させて締固めると共に、バイブレータ8の型枠1とトンネル内壁面3との間に配設した補強材への衝突(不快音の発生)あるいは接触(不快音の発生、補強材と打設コンクリートとの密着低下、補強材の結束緩み)を防止することができる。しかもバイブレータ8の損傷をも防止できるため、打設コンクリートの強度、品質が向上する。   Here, since tension is applied to the vibrator 8 by the hoisting mechanism 28 and the cylinder 29, the vibrator 8 is held at an intermediate portion in the concrete after the placement is completed, and the wife 8 remains in this state. Since the concrete is sequentially moved to the side 25, the entire compacted concrete is uniformly vibrated and compacted without flowing the compacted concrete, and is disposed between the mold 1 of the vibrator 8 and the inner wall surface 3 of the tunnel. Collision (occurrence of unpleasant noise) or contact (occurrence of unpleasant noise, decrease in adhesion between the reinforcing material and cast concrete, loose binding of the reinforcing material) to the reinforcing material can be prevented. Moreover, since the vibrator 8 can be prevented from being damaged, the strength and quality of the cast concrete are improved.

このような構成によって、天端部10の締固めを確実に実施し、従来のような狭隘部での苦渋作業である締固めを自動化によって排除した。   With such a configuration, the top end portion 10 is reliably compacted, and compaction, which is a difficult work in a narrow portion as in the past, is eliminated by automation.

なお、打設コンクリートの締固め完了後は、バイブレータ8を巻揚機構28により妻部25の外方まで巻揚後、バイブレータ8を取外す。   After completion of the compaction of the cast concrete, the vibrator 8 is wound up to the outside of the end portion 25 by the winding mechanism 28, and then the vibrator 8 is removed.

以上のようにして、コンクリート打設を実施して、所定期間の養生の後に脱型を行う。
その後、掘削機構によって前方の地山を掘削する掘削工程と、走行レール上を前方に移動させたセントルの型枠にコンクリートを打設するコンクリート打設工程とを繰り返して
、断続的にトンネルを覆工していく。
As described above, concrete placement is performed, and demolding is performed after curing for a predetermined period.
After that, the excavation mechanism excavates the ground in front and the concrete placement process in which concrete is placed on the form of the centle moved forward on the traveling rail to cover the tunnel intermittently. I will continue to work.

(他の実施の形態)
天端部を除くアーチ部までの覆工を形成するには、上述した従来の方法の他、次のような方法によってもよい。覆工全体のコンクリートの充填性を向上させるには、この方法による施工を併用することが好ましい。以下、天端部10を除くアーチ部までの覆工の施工について説明する。
(Other embodiments)
In order to form the lining up to the arch portion excluding the top end portion, the following method may be used in addition to the conventional method described above. In order to improve the concrete filling property of the entire lining, it is preferable to use this method together. Hereinafter, the construction of the lining up to the arch part excluding the top end part 10 will be described.

図2に示すように、型枠天端部10aよりも下方に位置する左右の型枠アーチ部13aに、コンクリート9を高圧で噴出する吹上口40を型枠天端部10aの左右両側に2つずつ、合計四箇所に設けている。
図8に示すように、吹上口40から供給されるコンクリート9は加圧され、その重力に抗して、型枠1Aの上方へ噴出する(吹上口40から上方に向かう矢印a)。
As shown in FIG. 2, the left and right mold arch portions 13a located below the mold top end 10a have two blow-off ports 40 for jetting concrete 9 at high pressure on the left and right sides of the mold top end 10a. A total of four locations are provided.
As shown in FIG. 8, the concrete 9 supplied from the blowing port 40 is pressurized and sprayed upward of the mold 1 </ b> A against the gravity (an arrow a pointing upward from the blowing port 40).

これら4つの吹上口40からコンクリートを噴出させるにあたり、天端部10の周辺において、コンクリートがほぼ均一に充填されるように噴出量を調整する。4つの吹上口40は、それらが同時にコンクリートを供給するものではなく、この実施の形態では、切り替えによって1つずつ別個にコンクリートを噴出する。   When the concrete is ejected from these four air outlets 40, the amount of ejection is adjusted so that the concrete is almost uniformly filled around the top end portion 10. The four air outlets 40 do not supply concrete at the same time. In this embodiment, concrete is ejected separately one by one by switching.

本実施形態に係る覆工の施工は、次のようにして行う。
トンネルの下方の側壁部(アーチ部13よりも下部)については、流下するコンクリートの分離防止のため、吹上口40を使用せずに下方の作業窓5からコンクリートの注入管7を型枠内に入れ、コンクリートを充填した後、必要な締固め作業を実施する。
側壁部への充填がされた後、アーチ部13への打設では、吹上口40から供給されるコンクリート9を、天端部10の最上位付近まで打設する(図8参照)。
Construction of the lining according to the present embodiment is performed as follows.
For the side wall portion below the tunnel (below the arch portion 13), the concrete injection pipe 7 is put into the mold from the lower work window 5 without using the blow-up port 40 in order to prevent separation of the flowing concrete. After filling and filling with concrete, the necessary compaction work is carried out.
After the side wall portion is filled, the concrete 9 supplied from the blow-up port 40 is driven to the vicinity of the topmost portion of the top end portion 10 (see FIG. 8).

前記吹上口40から供給されたコンクリート9による打設面が、天端部10の最上位付近に到達したことを、天端部のクラウン窓5cから確認する。   It is confirmed from the crown window 5c at the top end that the placement surface of the concrete 9 supplied from the blowing port 40 has reached the vicinity of the top of the top end 10.

上述のように、吹上口40からコンクリート9を噴出させる場合は、4つの吹上口40を切り替えて、型枠1内にコンクリート9がほぼ均一に供給されるようにする。複数の吹上口40から同時にコンクリートを供給してもよいが、この例では、使用する吹上口40を切り替え、一つずつの吹上口40からコンクリートを供給している。この場合、打設面が水平になるように、それぞれの吹上口40から吐出されるコンクリート9の噴出量及び/又は噴出時間を調整しながら吐出する。   As described above, when the concrete 9 is ejected from the air outlet 40, the four air outlets 40 are switched so that the concrete 9 is supplied into the mold 1 almost uniformly. Although concrete may be simultaneously supplied from a plurality of air outlets 40, in this example, the air outlet 40 to be used is switched and the concrete is supplied from each air outlet 40. In this case, discharge is performed while adjusting the ejection amount and / or ejection time of the concrete 9 ejected from the respective blowing ports 40 so that the placement surface is horizontal.

コンクリート9による打設面が、図8に示すように型枠1の天井面付近に達したときは、型枠天端部10aのクラウン窓5cから、当該打設部分にバイブレータ8を挿入して締固めをする。このとき、コンクリート打設面は、図3に示す符号Tのレベルを超えているので、未打設の天端部10の空間は、図3に示す例よりも小さくなる。   When the placement surface of the concrete 9 reaches the vicinity of the ceiling surface of the mold 1 as shown in FIG. 8, the vibrator 8 is inserted into the placement portion from the crown window 5c of the mold top end portion 10a. Compact. At this time, since the concrete placement surface exceeds the level of the symbol T shown in FIG. 3, the space of the top end portion 10 that has not been placed becomes smaller than the example shown in FIG.

すなわち、この実施の形態では、型枠アーチ部13aに設けられている吹上口40から吐出されるコンクリート9は、重力に抗して上方に噴出するので、型枠1の最上部に近いレベルまでコンクリートを打設することが可能である。したがって、最終的に施工される天端部10の空間がわずかになるまで、コンクリートを充填することができる。   That is, in this embodiment, the concrete 9 discharged from the air outlet 40 provided in the formwork arch part 13a is ejected upward against gravity, so that the level close to the uppermost part of the formwork 1 is reached. It is possible to cast concrete. Therefore, concrete can be filled until the space of the top end portion 10 to be finally constructed becomes small.

上記のような施工により、天端部10の周辺において、それぞれの吹上口40から吐出されるコンクリート9は、作業者がクラウン窓5cから一望したときに、型枠1の最上部付近まで、ほぼ水平に充填されていることを容易に確認できる(図8参照)。そして、この状態が確認できれば、一応、その下方の型枠1内にはコンクリート9が全て充填されて
いるものと判断できる。
By the construction as described above, the concrete 9 discharged from each of the air outlets 40 around the top end portion 10 is almost up to the vicinity of the uppermost portion of the mold 1 when the operator has a view from the crown window 5c. It can be easily confirmed that it is horizontally filled (see FIG. 8). And if this state can be confirmed, it can be judged that the concrete 9 is filled in the mold 1 below.

上記のように、加圧したコンクリートを噴出する吹上口40を設けたことで、型枠1の吹上口40の下方のみならず上方にもコンクリートを打設できるので、この方法による打設可能範囲が大きく広がる。
その結果、打設状態が視認できない天端部へのコンクリート打設量が減少し(従来工法に比べて、1/3程度まで打設量を減少させることが可能)、かつ打設時間も短縮される。
これらを実現することで、天端部へのコンクリートの充填性が大きく向上する。よって、天端部が高品質なコンクリートで形成されるので、トンネルの安全性、耐久性が向上し、かつ、天端部の仕上がりにむらが生じにくく、美観にも優れたものとなる。
As described above, by providing the blow-up opening 40 through which the pressurized concrete is ejected, the concrete can be placed not only below but also above the blow-up opening 40 of the mold 1. Will spread greatly.
As a result, the amount of concrete placed on the top edge where the placement is not visible is reduced (it can be reduced to about 1/3 compared to the conventional method), and the placement time is also shortened. Is done.
By realizing these, the filling property of the concrete to the top end portion is greatly improved. Therefore, since the top end portion is formed of high-quality concrete, the safety and durability of the tunnel are improved, the unevenness of the finish of the top end portion hardly occurs, and the appearance is excellent.

また、従来のコンクリートの自然流下による流し込みによる打設に比較して、傾斜角度が緩やかなアーチ部上方においてもコンクリートの打設時間が短縮され、かつコンクリートの充填性も向上する。   In addition, compared to the conventional placement by pouring of natural concrete, the concrete placement time is shortened and the concrete filling property is improved even above the arch portion where the inclination angle is gentle.

以上のように、本実施の形態の方法によって天端部以外の覆工を形成し、この上で天端部について、天端部第1吹上口からコンクリートを圧入してコンクリートを型枠内に充填した後、さらに天端部第2吹上口からコンクリートを圧入する本発明の方法を実施すれば、天端部のコンクリートの充填性が著しく向上する。したがって、覆工全体のコンクリートの充填密度が高くなり、覆工の品質を格段に向上させることが可能である。   As described above, a lining other than the top end is formed by the method of the present embodiment, and then the concrete is pressed into the formwork from the first top outlet of the top end with respect to the top end. After the filling, if the method of the present invention in which the concrete is further press-fitted from the top end second blow-up port, the filling property of the concrete at the top end is remarkably improved. Therefore, the concrete filling density of the entire lining increases, and the quality of the lining can be significantly improved.

本発明のトンネル覆工の施工方法において、アーチ部までの覆工状態を示すトンネル断面図である。In the construction method of the tunnel lining of this invention, it is a tunnel sectional view which shows the lining state to an arch part. 型枠の平面図であり、コンクリートの吹上口等の配置状態を示す図である。It is a top view of a formwork, and is a figure which shows arrangement | positioning states, such as a concrete outlet. 覆工のアーチ部上方までの施工状態を示す断面図である。It is sectional drawing which shows the construction state to the arch part upper part of lining. 天端部の施工において、第1吹上口からコンクリートを打設する状態を示す概略図である。It is the schematic which shows the state which casts concrete from the 1st blowing outlet in the construction of a top end part. 天端部第1吹上口からコンクリートを打設した場合の型枠内のコンクリートの充填圧の分布を示す図である。It is a figure which shows the distribution of the filling pressure of the concrete in a formwork at the time of placing concrete from a top end 1st blowing outlet. 天端部の施工において、天端部第2吹上口からコンクリートを打設する状態を示す概略図である。In construction of a top end part, it is the schematic which shows the state which casts concrete from a top end part 2nd blowing-up mouth. 天端部第2吹上口からコンクリートを追加して打設した場合の型枠内のコンクリートの充填圧の分布を示す図である。It is a figure which shows the distribution of the filling pressure of the concrete in a formwork at the time of adding and casting concrete from a top end 2nd blowing-up opening. 別の実施の形態による覆工のアーチ部上方までの施工状態を示す図である。It is a figure which shows the construction state to the arch part upper part of the lining by another embodiment. コンクリート打設後にバイブレータを移動させる状態を示す型枠の斜視図である。It is a perspective view of the formwork which shows the state which moves a vibrator after concrete placement.

符号の説明Explanation of symbols

1 型枠
5 作業窓
7 コンクリート供給管
8 バイブレータ
9 コンクリート
10 天端部
10a 型枠天端部
11 天端部第1吹上口
11a 天端部第2吹上口
13 アーチ部
13a 型枠アーチ部
15、16 土圧計(圧力測定手段)
DESCRIPTION OF SYMBOLS 1 Formwork 5 Work window 7 Concrete supply pipe 8 Vibrator 9 Concrete 10 Top end part 10a Formwork top end part 11 Top end part 1st blowing port 11a Ceiling end 2nd blowing port 13 Arch part 13a Formwork arch part 15, 16 Earth pressure gauge (pressure measuring means)

Claims (3)

トンネル内に型枠を設置して覆工用のコンクリートを打設する工程において、
圧力測定手段によって型枠内におけるコンクリートの充填圧を計測して、コンクリートの前記充填圧を型枠の変形または破壊が生じない範囲に調整しつつ、前記型枠で仕切られた空間のラップ側に設けた天端部第1吹上げ口からコンクリートを圧入し、コンクリートを型枠内に充填した後、型枠の妻側に設けた天端部第2吹上げ口からコンクリートをさらに圧入することで、少なくともトンネル最上部である天端部の覆工を形成することを特徴とするトンネル覆工の施工方法。
In the process of placing the formwork in the tunnel and placing concrete for lining,
By measuring the filling pressure of the concrete in the mold by means of pressure measurement, and adjusting the filling pressure of the concrete to a range where deformation or destruction of the mold does not occur, on the lap side of the space partitioned by the mold By pressing the concrete from the top end of the first air outlet, filling the mold with concrete, and then pressing the concrete from the top end of the second air outlet on the end of the form. A tunnel lining construction method characterized by forming a lining at the top of the tunnel that is at least the top of the tunnel.
型枠のアーチ部に複数箇所のコンクリートの吹上口を設け、天端部付近に設けた型枠の作業窓から目視可能な高さまで加圧したコンクリートを前記吹上口から噴出させ、前記吹上口の下方及び上方にコンクリートを打設し、前記アーチ部の覆工を形成することを特徴とする請求項1に記載のトンネル覆工の施工方法。   A plurality of concrete outlets are provided at the arch portion of the formwork, and concrete pressed to a height that can be seen from the work window of the formwork provided in the vicinity of the top end is ejected from the outlet, 2. The tunnel lining construction method according to claim 1, wherein concrete is placed below and above to form a lining for the arch portion. コンクリート打設後の締固め作業は、長尺な牽引部の先端に振動部を備え、牽引に適した素材からなる振動部材を、型枠とトンネル内壁面との間に、その基端を巻揚機構に装着して型枠の長さ方向に沿わせて配設し、次に、型枠とトンネル内壁面との間へのコンクリートを打設後またはコンクリートの打設時に振動部材を振動させ、巻揚機構を介して振動部材を巻揚、繰出すことにより、型枠の長さ方向に沿わせて移動させることを特徴とする請求項1または2に記載のトンネル覆工の施工方法。   The compaction work after placing concrete is equipped with a vibrating part at the tip of a long towing part, and a vibrating member made of a material suitable for towing is wound between the formwork and the inner wall surface of the tunnel. Installed in the lifting mechanism and arranged along the length of the formwork, and then vibrates the vibration member after or after placing concrete between the formwork and the tunnel inner wall. The tunnel lining construction method according to claim 1 or 2, wherein the vibrating member is wound and unwound through a winding mechanism to be moved along the length direction of the formwork.
JP2006270631A 2006-10-02 2006-10-02 Tunnel lining construction method Pending JP2008088696A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006270631A JP2008088696A (en) 2006-10-02 2006-10-02 Tunnel lining construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006270631A JP2008088696A (en) 2006-10-02 2006-10-02 Tunnel lining construction method

Publications (1)

Publication Number Publication Date
JP2008088696A true JP2008088696A (en) 2008-04-17

Family

ID=39373127

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006270631A Pending JP2008088696A (en) 2006-10-02 2006-10-02 Tunnel lining construction method

Country Status (1)

Country Link
JP (1) JP2008088696A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009127230A (en) * 2007-11-21 2009-06-11 Okumura Corp Placing management method for tunnel lining concrete
JP2011184934A (en) * 2010-03-08 2011-09-22 Shimizu Corp Method of lining of tunnel
JP2013108242A (en) * 2011-11-18 2013-06-06 Maeda Corp Construction method of tunnel lining and form for tunnel lining
JP2013108243A (en) * 2011-11-18 2013-06-06 Maeda Corp Construction method of tunnel lining
JP2015094167A (en) * 2013-11-13 2015-05-18 鹿島建設株式会社 Concrete placing method
JP2015132049A (en) * 2014-01-09 2015-07-23 株式会社奥村組 vibration compaction method of tunnel lining concrete
EP3216979A1 (en) * 2016-03-07 2017-09-13 Kern Tunneltechnik SA Shuttering system
KR101902626B1 (en) * 2016-08-24 2018-10-01 현대건설주식회사 Concrete Cast-in Apparatus Using A Slip Form with a Pressure sensor and Method Thereof
CN109162738A (en) * 2018-11-09 2019-01-08 中铁二十四局集团福建铁路建设有限公司 Realize that concrete delamination enters the mechanism and its casting craft that mould pours by window
JP2021021279A (en) * 2019-07-30 2021-02-18 前田建設工業株式会社 Automatic operation device of pulling-out vibrator used for construction of tunnel lining

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001280094A (en) * 2000-01-27 2001-10-10 Nishimatsu Constr Co Ltd Tunnel lining device and tunnel lining method
JP2003003795A (en) * 2001-06-27 2003-01-08 Sato Kogyo Co Ltd Tunnel lining concrete compacting apparatus, and compacting method using the same
JP2005002730A (en) * 2003-06-13 2005-01-06 Daiei Koki Kk Concrete compaction method and device for tunnel zenith section
JP2006241800A (en) * 2005-03-02 2006-09-14 Japan Railway Construction Transport & Technology Agency Tunnel construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001280094A (en) * 2000-01-27 2001-10-10 Nishimatsu Constr Co Ltd Tunnel lining device and tunnel lining method
JP2003003795A (en) * 2001-06-27 2003-01-08 Sato Kogyo Co Ltd Tunnel lining concrete compacting apparatus, and compacting method using the same
JP2005002730A (en) * 2003-06-13 2005-01-06 Daiei Koki Kk Concrete compaction method and device for tunnel zenith section
JP2006241800A (en) * 2005-03-02 2006-09-14 Japan Railway Construction Transport & Technology Agency Tunnel construction method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009127230A (en) * 2007-11-21 2009-06-11 Okumura Corp Placing management method for tunnel lining concrete
JP2011184934A (en) * 2010-03-08 2011-09-22 Shimizu Corp Method of lining of tunnel
JP2013108242A (en) * 2011-11-18 2013-06-06 Maeda Corp Construction method of tunnel lining and form for tunnel lining
JP2013108243A (en) * 2011-11-18 2013-06-06 Maeda Corp Construction method of tunnel lining
JP2015094167A (en) * 2013-11-13 2015-05-18 鹿島建設株式会社 Concrete placing method
JP2015132049A (en) * 2014-01-09 2015-07-23 株式会社奥村組 vibration compaction method of tunnel lining concrete
EP3216979A1 (en) * 2016-03-07 2017-09-13 Kern Tunneltechnik SA Shuttering system
US9945229B2 (en) 2016-03-07 2018-04-17 Kern Tunneltechnik Sa Formwork system
KR101902626B1 (en) * 2016-08-24 2018-10-01 현대건설주식회사 Concrete Cast-in Apparatus Using A Slip Form with a Pressure sensor and Method Thereof
CN109162738A (en) * 2018-11-09 2019-01-08 中铁二十四局集团福建铁路建设有限公司 Realize that concrete delamination enters the mechanism and its casting craft that mould pours by window
JP2021021279A (en) * 2019-07-30 2021-02-18 前田建設工業株式会社 Automatic operation device of pulling-out vibrator used for construction of tunnel lining
JP7289240B2 (en) 2019-07-30 2023-06-09 前田建設工業株式会社 Automatic operation device for pull-out vibrator used for construction of tunnel lining

Similar Documents

Publication Publication Date Title
JP2008088696A (en) Tunnel lining construction method
JP4931777B2 (en) Tunnel lining concrete placement management method
JP2008088691A (en) Tunnel lining form and tunnel lining construction method
JP4389237B1 (en) Pressure receiving device for anchor method and anchor method
JP7076363B2 (en) How to place tunnel lining concrete
CN105064500A (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
JP4904072B2 (en) Manufacturing method of pretension member
EP3003664B1 (en) A method of making a building element and an apparatus for making the building element
KR100902753B1 (en) Tunnel Lining Forms provided with apparatus for exhausting air and Working Method of Tunnel Lining
CN213898998U (en) Grouting device for preventing secondary lining vault of hydraulic tunnel from coming to nothing
KR101270533B1 (en) Discharge inducing apparatus of coal saved in silo
JP4566891B2 (en) Tunnel lining concrete placement method
JP2010163830A (en) Mold for tunnel lining
JP4815262B2 (en) Tunnel lining method and formwork apparatus
JP2019073853A (en) Compacting method of construction joint in tunnel lining
CN105926782A (en) Concrete post-pouring strip construction method
JP5861272B2 (en) How to drain excess water and air from cast concrete
CN213471639U (en) Be applied to protective shroud device of PCCP core concrete placement awl
KR20130137420A (en) Concrete charge tools for column
CN109372131A (en) A kind of prefabricated bank platform assembly construction method
JP5608060B2 (en) Housing construction method and formwork for following housing
JP2003301698A (en) Method and device for placing concrete for tunnel
JP2009114824A (en) Method for placing freshly mixed concrete for seismic strengthening of bridge pier
JP5777050B2 (en) Side wall construction method for concrete structures
CN214423347U (en) Manual hole digging pile with pouring function

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090925

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110121

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110201

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110330

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20110927