JP2006280025A - Apparatus quality judging system and apparatus quality judging method - Google Patents

Apparatus quality judging system and apparatus quality judging method Download PDF

Info

Publication number
JP2006280025A
JP2006280025A JP2005091040A JP2005091040A JP2006280025A JP 2006280025 A JP2006280025 A JP 2006280025A JP 2005091040 A JP2005091040 A JP 2005091040A JP 2005091040 A JP2005091040 A JP 2005091040A JP 2006280025 A JP2006280025 A JP 2006280025A
Authority
JP
Japan
Prior art keywords
relay
time
ground fault
trip signal
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2005091040A
Other languages
Japanese (ja)
Inventor
Satoshi Kimura
智 木村
Teruo Katayama
照雄 片山
Yoshifumi Mizote
義史 溝手
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2005091040A priority Critical patent/JP2006280025A/en
Publication of JP2006280025A publication Critical patent/JP2006280025A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a system and a method for judging the quality of an apparatus, which can automatically judge whether an overcurrent relay, etc. have normally operated or not at occurrence of short circuit or grounding in a wireway. <P>SOLUTION: An apparatus quality judging system 1 is provided with an overcurrent relay 4 which has an anti-time limit property, a relay 5 in grounding direction where the operation time limit is fixed, a breaker 6 which breaks the corresponding phase of a wireway 3, based on the first trip signal V<SB>OC</SB>outputted from the overcurrent relay 4 of the corresponding phase and the second trip signal V<SB>DG</SB>outputted from the relay 5 in grounding direction, an under-voltage relay 7 which starts its operation when the voltage drop value of the corresponding phase in a bus 2 comes a specified value or under, and an apparatus quality judging means 11 which judges the quality of the overcurrent relay 4, the relay 5 in grounding direction, and the breaker 6, based on the first trip signal V<SB>OC</SB>of each overcurrent relay 4, the second trip signal V<SB>DG</SB>of the relay in grounding direction, and the output signal S<SB>UV</SB>of each under-voltage relay. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、機器良否判定システムおよび機器良否判定方法に関し、特に、配電線などの電線路における短絡事故や地絡事故の発生時に過電流継電器,地絡方向継電器および遮断器が正常に動作したか否かを判定するのに好適な機器良否判定システムおよび機器良否判定方法に関する。   The present invention relates to a device quality determination system and a device quality determination method, and in particular, whether an overcurrent relay, a ground fault direction relay, and a circuit breaker have operated normally when a short circuit accident or a ground fault occurs in a power line such as a distribution line. The present invention relates to a device quality determination system and a device quality determination method suitable for determining whether or not.

従来、送電線を含む電力系統において発生した短絡事故の事故点を標定する装置として、フォールト・ロケーター(FL:fault locator)と称される装置が知られている。フォールト・ロケーターは、送電線などにおける短絡事故を検出すると、事故発生時の電圧データおよび電流データを取り込んで、予め整定済みの送電線のインピーダンスを用いて、事故点までの距離を算出する装置である。   2. Description of the Related Art Conventionally, a device called a fault locator (FL) is known as a device for locating an accident point of a short circuit accident that has occurred in a power system including a transmission line. A fault locator is a device that, when a short-circuit accident is detected in a transmission line, etc., takes the voltage data and current data at the time of the accident and calculates the distance to the accident point using the impedance of the transmission line that has been set in advance. is there.

下記の特許文献1には、事故時のリレー動作の復帰により、系統事故の除去を検出し、標定演算の起動信号とすることで事故継続時間による標定距離の誤差大になることを防止し、また、遮断器開放から起動ポイントを決定していることとなり、事故電流の安定したポイントのデータにより演算が可能となる、フォールト・ロケーターを用いた故障点標定装置が開示されている。   In Patent Document 1 below, by detecting the removal of a system fault by returning the relay operation at the time of an accident, it is possible to prevent an increase in the error of the standardization distance due to the accident duration by using the activation signal of the standardization calculation, In addition, a failure point locating device using a fault locator is disclosed, in which a starting point is determined after the circuit breaker is opened, and calculation is possible based on data of a stable point of an accident current.

また、配電線などの電線路において地絡状態が発生したときに、地絡状態の発生した配電線および区間を認識する装置も多数提案されている。
たとえば、配電線などの電線路において微小な零相電流しか流れない微地絡状態が発生したときに、微地絡状態の発生した配電線および区間を認識する装置として、以下に示すような装置などが提案されている。
Many devices have also been proposed for recognizing a distribution line and a section in which a ground fault has occurred when a ground fault occurs in a power line such as a distribution line.
For example, when a fine ground fault state in which only a minute zero-phase current flows in a power line such as a distribution line occurs, a device as shown below as a device for recognizing a distribution line and a section in which the fine ground fault state has occurred Etc. have been proposed.

下記の特許文献2には、微地絡区間標定装置の信頼性を向上するために、高圧配電線上に子局を分散配置し、かつ、子局に微地絡発生回路を設け、親局からの指令により微地絡を発生させることにより、各子局の動作点検を行うようした微地絡区間標定装置が開示されている。   In Patent Document 2 below, in order to improve the reliability of the micro ground fault section locating device, the slave stations are distributed on the high voltage distribution line, and the slave station is provided with a micro ground fault generating circuit. A micro ground fault section locating device is disclosed in which the operation check of each slave station is performed by generating a micro ground fault in accordance with the above command.

下記の特許文献3には、配電線において微地絡発生から微地絡発生区間の特定までを短時間で行えるようにするために、配電線の微地絡発生の有無を常時監視する微地絡検出手段と、微地絡検出用の開閉器制御手順を過去の負荷実績を考慮して事前に作成する手順事前計算手段と、微地絡検出手段により検出した微地絡発生配電線に対し手順事前計算手段で作成した手順を適宜実行し微地絡発生区間を順次絞り込む微地絡判定手段と、前記特定された微地絡区間で無停電で切替える開閉器制御手段とから構成された配電線微地絡区間探索装置が開示されている。   In Patent Document 3 below, in order to be able to perform in a short time from the occurrence of a fine ground fault to the identification of a fine ground fault occurrence section in the distribution line, a fine ground that constantly monitors the occurrence of a fine ground fault in the distribution line is disclosed. For the fault detection means, the pre-calculation means for creating the switch control procedure for detecting the fine ground fault in advance in consideration of the past load results, and the fine ground fault generating distribution line detected by the fine ground fault detection means A procedure composed of a fine ground fault determination means for appropriately narrowing down the fine ground fault occurrence section by appropriately executing the procedure created by the procedure pre-calculation means and a switch control means for switching in the specified fine ground fault section without interruption. An electric wire fine ground fault section searching device is disclosed.

下記の特許文献4には、微地絡回線を特定するにあたって、補助ブスによる電力融通時においても各配電線の試開放動作を可能とするために、各配電線毎に地絡順序開閉器を設け、これらの地絡順序開閉器が補助ブスに設けられた遮断器が導通されているか否かによって試開放動作の開始タイミングから自線の遮断器の試開放タイミングまでの時間を変更することによって、同時に2つの配電線が遮断されることはなく、したがって正確に微地絡の発生した配電線を特定することができる微地絡回線検知方法が開示されている。
特開2002−243788号公報 特開平5−276652号公報 特開平6−209521号公報 特開平9−103026号公報
In Patent Document 4 below, in order to identify a micro ground fault line, a ground fault sequence switch is provided for each distribution line in order to enable a trial opening operation of each distribution line even at the time of power interchange with an auxiliary bus. By changing the time from the start timing of the trial opening operation to the trial opening timing of the own circuit breaker depending on whether the circuit breaker provided in the auxiliary bus is conductive or not In addition, there is disclosed a method of detecting a fine ground fault line in which two power distribution lines are not interrupted at the same time.
JP 2002-243788 A Japanese Patent Laid-Open No. 5-276652 JP-A-6-209521 JP-A-9-103026

しかしながら、配電線などの電線路における短絡事故や地絡事故の波及および拡大を防止するためには、短絡事故や地絡事故の発生時に配電線を確実に遮断する必要があり、過電流継電器,地絡方向継電器および遮断器が正常に動作することが不可欠であるが、これらの機器の点検は人手により定期的に行われているだけである。そこで、機器動作の確実性を高めるために、短絡や地絡の発生時にこれらの機器の良否判定を自動的に行うことができるようにすることが要請されている。   However, in order to prevent the spread and expansion of short-circuit accidents and ground faults in power lines such as distribution lines, it is necessary to reliably shut off the distribution lines when short-circuit accidents or ground faults occur. It is essential that the ground fault direction relay and circuit breaker operate normally, but these devices are only inspected regularly by hand. Therefore, in order to increase the reliability of the device operation, it is required that the quality of these devices can be automatically determined when a short circuit or a ground fault occurs.

本発明の目的は、配電線などの電線路における短絡や地絡の発生時に過電流継電器,地絡方向継電器および遮断器が正常に動作したか否かを自動的に判定することができる機器良否判定システムおよび機器良否判定方法を提供することにある。   The object of the present invention is to determine whether or not an overcurrent relay, a ground fault direction relay, and a circuit breaker have operated normally when a short circuit or a ground fault occurs in a power line such as a distribution line. The object is to provide a determination system and a device quality determination method.

本発明の機器良否判定システムは、母線(2)から分岐された電線路(3)の各相にそれぞれ設けられた変流器(8)と、前記電線路に設けられた零相変流器(9)と、前記母線の各相にそれぞれ設けられた変成器(10)と、前記電線路の各相にそれぞれ設けられた、かつ、対応する相の前記変流器に接続された過電流継電器(4)と、前記零相変流器および前記変成器に接続された地絡継電器(5)と、前記電線路の各相にそれぞれ設けられた、かつ、対応する相の前記過電流継電器の動作時間経過後に該過電流継電器から出力される第1のトリップ信号(VOC)および前記地絡継電器の動作時間経過後に該地絡継電器から出力される第2のトリップ信号(VDG)に基づいて前記電線路の対応する相を遮断する遮断器(6)と、前記母線の各相にそれぞれ設けられた、かつ、対応する相の前記変成器に接続された、かつ、前記母線の対応する相の電圧に応じて動作を開始する電圧検出用継電器(7)と、前記各過電流継電器の第1のトリップ信号と前記地絡継電器の第2のトリップ信号と前記各電圧検出用継電器の出力信号(SUV)とに基づいて、前記過電流継電器,前記地絡継電器および前記遮断器の良否判定を行う機器良否判定手段(11,21,23,24)とを具備することを特徴とする。
ここで、前記機器良否判定手段が、所定の時間間隔で、前記各過電流継電器の第1のトリップ信号,前記地絡継電器の第2のトリップ信号および前記各電圧検出用継電器の出力信号を取得して、該取得した第1のトリップ信号と該取得した第2のトリップ信号と該取得した出力信号とに基づいて、前記過電流継電器,前記地絡継電器および前記遮断器の良否判定を行う機器良否判定部(11)であってもよい。
前記機器良否判定手段が、所定の時間間隔で、前記各過電流継電器の第1のトリップ信号,前記地絡継電器の第2のトリップ信号および前記各電圧検出用継電器の出力信号を取得する子局側遠方監視制御装置(21)と、該子局側遠方監視制御装置と通信回線(22)を介して相互接続された親局側遠方監視制御装置(23)であって、前記電線路において短絡または地絡が発生すると、短絡または地絡の継続時間を含む時間範囲の前記第1のトリップ信号,前記第2のトリップ信号および前記出力信号のデータの送信を前記子局側遠方監視制御装置に要求する要求信号を前記通信回線を介して該子局側遠方監視制御装置に送信し、該子局側遠方監視制御装置から前記第1のトリップ信号,前記第2のトリップ信号および前記出力信号のデータを受信する親局側遠方監視制御装置(23)と、該親局側遠方監視制御装置から入力される前記第1のトリップ信号,前記第2のトリップ信号および前記出力信号のデータに基づいて、前記過電流継電器,前記地絡継電器および前記遮断器の良否判定を行う親局端末装置(24)とを備えてもよい。
前記過電流継電器が反時限特性(電流−時限)を有し、前記地絡継電器が、動作時限が固定された地絡方向継電器であり、前記電圧検出用継電器が、前記母線の対応する相の電圧降下値が所定の値以下になったときに動作を開始する不足電圧継電器であってもよい。
The apparatus quality determination system of the present invention includes a current transformer (8) provided in each phase of the electric line (3) branched from the bus (2), and a zero-phase current transformer provided in the electric line. (9), a transformer (10) provided in each phase of the busbar, and an overcurrent provided in each phase of the electric line and connected to the current transformer of the corresponding phase Relay (4), ground fault relay (5) connected to the zero-phase current transformer and the transformer, and the overcurrent relay of the corresponding phase provided in each phase of the electric line The first trip signal (V OC ) output from the overcurrent relay after the lapse of the operation time of the second and the second trip signal (V DG ) output from the ground fault relay after the lapse of the operation time of the ground fault relay A circuit breaker (6) for interrupting the corresponding phase of the electrical line on the basis thereof, A voltage detection relay (7) provided for each phase of the wire and connected to the transformer of the corresponding phase and starting operation in accordance with the voltage of the corresponding phase of the bus; Based on the first trip signal of each overcurrent relay, the second trip signal of the ground fault relay, and the output signal (S UV ) of each voltage detection relay, the overcurrent relay, the ground fault relay And a device pass / fail judgment means (11, 21, 23, 24) for judging pass / fail of the circuit breaker.
Here, the device pass / fail judgment means obtains a first trip signal of each overcurrent relay, a second trip signal of the ground fault relay, and an output signal of each voltage detection relay at predetermined time intervals. Then, based on the acquired first trip signal, the acquired second trip signal, and the acquired output signal, a device that determines pass / fail of the overcurrent relay, the ground fault relay, and the circuit breaker The quality determination unit (11) may be used.
The device quality determining unit obtains a first trip signal of each overcurrent relay, a second trip signal of the ground fault relay, and an output signal of each voltage detection relay at predetermined time intervals. A remote remote control device (21), and a remote remote control device (23) connected to the remote remote control device (22) via a communication line (22); Alternatively, when a ground fault occurs, transmission of data of the first trip signal, the second trip signal, and the output signal in a time range including a duration of a short circuit or a ground fault is transmitted to the remote monitoring control device on the slave station side. A request signal to be requested is transmitted to the remote monitoring control device on the slave station side via the communication line, and the first trip signal, the second trip signal, and the output signal of the remote monitoring control device on the slave station side are transmitted. Day Based on the data of the first trip signal, the second trip signal, and the output signal input from the master station side remote monitoring and control device (23), You may provide the master station terminal device (24) which performs the quality determination of the said overcurrent relay, the said ground fault relay, and the said circuit breaker.
The overcurrent relay has an anti-time characteristic (current-timed), the ground fault relay is a ground fault direction relay with a fixed operating time, and the voltage detection relay has a corresponding phase of the bus. An undervoltage relay that starts operation when the voltage drop value becomes a predetermined value or less may be used.

本発明の機器良否判定方法は、機器良否判定手段(11;21,23,24)が、母線(2)の対応する相の電圧に応じて動作を開始する電圧検出用継電器(7)の出力信号(SUV)を取得する第1のステップ(S11;S21)と、前記機器良否判定手段が、前記母線から分岐された電線路(3)の相に短絡または地絡が発生すると、所定の動作時間経過後に、短絡または地絡が発生した前記電線路の相に設けられた過電流継電器(4)から該電線路の相に設けられた遮断器(5)に出力される第1のトリップ信号(VOC)、または、所定の動作時間経過後に、前記電線路に設けられた地絡継電器(5)から前記遮断器(5)に出力される第2のトリップ信号(VDG)を取得する第2のステップ(S12;S22)と、前記機器良否判定手段が、前記遮断器が前記電線路の相を遮断することにより、前記電圧検出用継電器の出力信号が出力されなくなったことを検出する第3のステップ(S13;S23)と、前記機器良否判定手段が、前記過電流継電器の第1のトリップ信号と前記地絡継電器の第2のトリップ信号と前記電圧検出用継電器の出力信号とに基づいて、前記過電流継電器,前記地絡継電器および前記遮断器の良否判定を行う第4のステップ(S14,S15:S24,S25)とを具備することを特徴とする。
ここで、前記第2のステップにおいて、前記機器良否判定手段が、前記電圧検出用継電器の出力信号に基づいて、前記母線の短絡相の電圧が整定値よりも低下した時刻である電圧低下発生時刻と、前記母線の短絡相の電圧が回復した時刻である電圧回復時刻とを求め、前記機器良否判定手段が、前記求めた電圧回復時刻から前記求めた電圧低下発生時刻を引いて短絡継続時間(T)を求め、前記機器良否判定手段が、前記過電流継電器の第1のトリップ信号に基づいて、該第1のトリップ信号が入力されてきた時刻であるトリップ信号入力時刻を求め、前記機器良否判定手段が、前記求めた短絡継続時間から、前記求めたトリップ信号入力時刻から前記求めた電圧回復時刻までの時間を引くことにより、前記過電流継電器が動作を開始してから前記第1のトリップ信号を出力するまでの動作時間(y)を求め、前記機器良否判定部が、前記求めた過電流継電器の動作時間と前記過電流継電器の動作時限とを比較して、該過電流継電器の良否を判定し、前記機器良否判定部が、前記求めたトリップ信号入力時刻から前記求めた電圧回復時刻までの時間を算出することにより、前記遮断器の動作時間(z)を求め、前記機器良否判定部が、前記求めた遮断器の動作時間(z)に基づいて前記遮断器の良否を判定してもよい。
前記第2のステップにおいて、前記機器良否判定手段が、前記電圧検出用継電器の出力信号に基づいて、前記母線の地絡相に電圧降下が発生した時刻である地絡相電圧降下発生時刻と、前記母線の地絡相の地絡電圧が回復して電圧が復帰した時刻である地絡相電圧復帰時刻とを求め、前記機器良否判定手段が、前記求めた地絡相電圧復帰時刻から前記求めた地絡相電圧降下発生時刻を引いて地絡継続時間(x)を求め、前記機器良否判定手段が、前記地絡継電器の第2のトリップ信号に基づいて、該第2のトリップ信号が入力されてきた時刻であるトリップ信号入力時刻を求め、前記機器良否判定手段が、前記求めた地絡継続時間から、前記求めたトリップ信号入力時刻から前記求めた地絡相電圧復帰時刻までの時間を引くことにより、前記地絡継電器が動作を開始してから前記トリップ信号を出力するまでの動作時間(y)を求め、前記機器良否判定部が、前記求めた地絡継電器の動作時間と前記地絡継電器の動作時限とを比較して、該地絡継電器の良否を判定し、前記機器良否判定部が、前記求めたトリップ信号入力時刻から前記求めた地絡相電圧復帰時刻までの時間を算出することにより、前記遮断器の動作時間(z)を求め、前記機器良否判定部が、前記求めた遮断器の動作時間(z)に基づいて前記遮断器の良否を判定してもよい。
前記第1,第2および第3のステップが、子局側遠方監視制御装置(21)によって行われ、前記第4のステップの前に、前記子局側遠方監視制御装置と通信回線(22)を介して相互接続された親局側遠方監視制御装置(23)から、前記電線路の相において短絡または地絡が発生すると、短絡または地絡の継続時間を含む時間範囲の、短絡または地絡が発生した前記電線路の相に設けられた前記過電流継電器の第1のトリップ信号または前記電線路に設けられた前記地絡継電器の第2のトリップ信号および前記電圧検出用継電器の出力信号のデータの送信を前記子局側遠方監視制御装置に要求する要求信号を前記通信回線を介して該子局側遠方監視制御装置に送信する第5のステップをさらに備え、該第5のステップ後に、前記第4のステップが、前記過電流継電器の第1のトリップ信号または前記地絡継電器の第2のトリップ信号および前記電圧検出用継電器の出力信号のデータに基づいて、前記親局側遠方監視制御装置に接続された親局側端末装置(24)によって行われてもよい。
According to the device quality determination method of the present invention, the device quality determination means (11; 21, 23, 24) outputs the voltage detection relay (7) that starts operation according to the voltage of the corresponding phase of the bus (2). When the first step (S11; S21) for acquiring the signal (S UV ) and the equipment quality determination means cause a short circuit or a ground fault in the phase of the electrical line (3) branched from the bus, The first trip output from the overcurrent relay (4) provided in the phase of the electric wire line in which the short circuit or the ground fault has occurred to the circuit breaker (5) provided in the phase of the electric line after the operation time has elapsed. A signal (V OC ) or a second trip signal (V DG ) output to the circuit breaker (5) from the ground fault relay (5) provided on the electric line after a predetermined operating time has elapsed A second step (S12; S22), and the device pass / fail judgment A third step (S13; S23) of detecting that the output signal of the voltage detection relay is no longer output when the circuit breaker interrupts the phase of the electric line; Based on the first trip signal of the overcurrent relay, the second trip signal of the ground fault relay, and the output signal of the voltage detection relay, the determination means is based on the overcurrent relay, the ground fault relay, and the And a fourth step (S14, S15: S24, S25) for determining whether the circuit breaker is good or bad.
Here, in the second step, the device pass / fail judgment means determines that the voltage drop occurrence time is a time when the voltage of the short circuit phase of the bus has dropped below the set value based on the output signal of the voltage detection relay. And a voltage recovery time that is a time when the voltage of the short-circuited phase of the bus is recovered, and the equipment quality determination unit subtracts the determined voltage drop occurrence time from the determined voltage recovery time to determine a short-circuit duration ( T), and the device pass / fail judgment means obtains a trip signal input time which is a time when the first trip signal is input based on the first trip signal of the overcurrent relay, and the device pass / fail is determined. Whether the overcurrent relay has started to operate by subtracting the time from the determined trip signal input time to the determined voltage recovery time from the determined short-circuit continuation time. The operation time (y) until the first trip signal is output is obtained, and the equipment quality determination unit compares the obtained operation time of the overcurrent relay with the operation time limit of the overcurrent relay, The device quality determination unit determines whether or not the overcurrent relay is good, and calculates the operation time (z) of the circuit breaker by calculating the time from the obtained trip signal input time to the obtained voltage recovery time. The device pass / fail determination unit may determine pass / fail of the circuit breaker based on the obtained operation time (z) of the circuit breaker.
In the second step, the equipment quality determining means is a ground fault voltage drop occurrence time that is a time when a voltage drop occurs in the ground fault phase of the bus, based on the output signal of the voltage detection relay; A ground fault phase voltage return time which is a time when the ground fault voltage of the ground fault phase of the bus is recovered and the voltage is restored, and the device pass / fail judgment means calculates the ground fault phase voltage from the obtained ground fault phase voltage return time. The ground fault duration time (x) is obtained by subtracting the ground fault phase voltage drop occurrence time, and the equipment quality determination means inputs the second trip signal based on the second trip signal of the ground fault relay. The trip signal input time, which is the time that has been generated, is obtained, and the device quality determination means calculates the time from the obtained ground fault continuation time to the obtained ground fault phase voltage return time from the obtained trip signal input time. By pulling The operation time (y) until the trip signal is output after the start of the operation of the relay is obtained, and the equipment quality determination unit determines the operation time of the ground relay and the operation time limit of the ground relay. To determine whether the ground fault relay is good or bad, and the equipment good / bad judgment unit calculates the time from the obtained trip signal input time to the obtained ground fault phase voltage return time, thereby The device operating time (z) may be obtained, and the device quality determining unit may determine the quality of the circuit breaker based on the obtained circuit breaker operating time (z).
The first, second, and third steps are performed by the slave station side remote monitoring control device (21), and before the fourth step, the slave station side remote monitoring control device and the communication line (22) When a short circuit or a ground fault occurs in the phase of the electric line from the remote monitoring control device (23) on the master station side interconnected via the network, a short circuit or a ground fault in the time range including the duration of the short circuit or the ground fault The first trip signal of the overcurrent relay provided in the phase of the electric wire line in which the occurrence of the fault or the second trip signal of the ground fault relay provided in the electric wire line and the output signal of the voltage detection relay A fifth step of transmitting a request signal for requesting the transmission of data to the remote monitoring control device on the slave station side to the remote monitoring control device on the slave station side via the communication line, and after the fifth step, The fourth scan Is connected to the remote monitoring control device on the master station side based on the data of the first trip signal of the overcurrent relay or the second trip signal of the ground fault relay and the output signal of the voltage detection relay It may be performed by the master station side terminal device (24).

本発明の機器良否判定システムおよび機器良否判定方法は、以下に示す効果を奏する。
(1)短絡の発生時の過電流継電器および遮断器の動作時間を過電流継電器のトリップ信号と不足電圧継電器の出力信号とに基づいて求めることができるので、短絡発生時に過電流継電器および遮断器が正常に動作したか否かを自動的にかつ頻繁に判定することができる。
(2)微地絡を含めた地絡の発生時の地絡方向継電器および遮断器の動作時間を地絡方向継電器のトリップ信号と不足電圧継電器の出力信号とに基づいて求めることができるので、地絡発生時に地絡方向継電器および遮断器が正常に動作したか否かを自動的にかつ頻繁に判定することができる。
(3)不足電圧継電器の出力信号に基づいて短絡継続時間および地絡継続時間と事故相も自動的に収集することができるため、給電オシロ装置と同じような事故解析に活用することができる。
The device quality determination system and the device quality determination method of the present invention have the following effects.
(1) Since the operation time of the overcurrent relay and circuit breaker when a short circuit occurs can be obtained based on the trip signal of the overcurrent relay and the output signal of the undervoltage relay, the overcurrent relay and circuit breaker when a short circuit occurs It is possible to automatically and frequently determine whether or not the device operates normally.
(2) Since the operation time of the ground fault direction relay and the circuit breaker at the time of occurrence of the ground fault including the micro ground fault can be obtained based on the trip signal of the ground fault direction relay and the output signal of the undervoltage relay, It is possible to automatically and frequently determine whether or not the ground fault direction relay and the circuit breaker have normally operated when a ground fault occurs.
(3) Since the short-circuit continuation time, the ground fault continuation time, and the accident phase can be automatically collected based on the output signal of the undervoltage relay, it can be used for accident analysis similar to the power feeding oscilloscope device.

配電線などの電線路における短絡や地絡の発生時に過電流継電器,地絡方向継電器および遮断器が正常に動作したか否かを自動的に判定するという目的を、過電流継電器のトリップ信号と地絡方向継電器のトリップ信号と不足電圧継電器の出力信号とに基づいて過電流継電器,地絡方向継電器および遮断器の良否判定を行うことにより実現した。   The overcurrent relay trip signal is used to automatically determine whether the overcurrent relay, ground fault direction relay, and circuit breaker have operated normally when a short circuit or ground fault occurs in a distribution line. This was realized by judging whether the overcurrent relay, ground fault direction relay and circuit breaker were good or bad based on the trip signal of the ground fault direction relay and the output signal of the undervoltage relay.

以下、本発明の機器良否判定システムおよび機器良否判定方法の実施例について図面を参照して説明する。
本発明の第1の実施例による機器良否判定システム1は、図1に示すように、分岐点において母線2(3相3線式送電)から分岐された配電線(電線路)3の各相にそれぞれ設けられた過電流継電器4(図1には、1個の過電流継電器4のみ図示)と、配電線3に設けられた地絡方向継電器5と、配電線3の各相にそれぞれに設けられた、かつ、対応する相の過電流継電器4のトリップ信号VOC(第1のトリップ信号)および地絡方向継電器5のトリップ信号VDG(第2のトリップ信号)に基づいて配電線3の対応する相を遮断する遮断器(CB)6(図1には、1個の遮断器6のみ図示)と、母線2の各相にそれぞれに設けられた不足電圧継電器(UV)7(図1には、1個の不足電圧継電器7のみ図示)と、機器良否判定部11とを備えている。
Embodiments of a device quality determination system and a device quality determination method according to the present invention will be described below with reference to the drawings.
As shown in FIG. 1, the equipment quality determination system 1 according to the first embodiment of the present invention has each phase of a distribution line (electric line) 3 branched from a bus 2 (three-phase three-wire power transmission) at a branch point. The overcurrent relays 4 (only one overcurrent relay 4 is shown in FIG. 1), the ground fault direction relay 5 provided on the distribution line 3, and the phases of the distribution line 3 respectively. The distribution line 3 based on the trip signal V OC (first trip signal) of the overcurrent relay 4 of the corresponding phase provided and the trip signal V DG (second trip signal) of the ground fault direction relay 5 Circuit breaker (CB) 6 (only one circuit breaker 6 is shown in FIG. 1), and undervoltage relay (UV) 7 provided for each phase of bus 2 (FIG. 1). 1 includes only one undervoltage relay 7) and a device pass / fail judgment unit 11. Eteiru.

ここで、配電線3の各相には変流器(CT)8がそれぞれ設けられており(図1には、1個の変流器8のみ図示)、当該配電線3(1次側)の各相を流れる大電流を変流器8により小電流に変換して、対応する相の過電流継電器4(2次側)に供給するようにしている。
また、配電線3には零相変流器(ZCT)9が設けられており、当該配電線3(1次側)において地絡が生じると零相変流器9により地絡方向継電器5に零相電流(以下、「I0電流」と称する。)を供給するようにしている。
さらに、母線2の各相には変成器(PT)10がそれぞれ設けられており(図1には、1個の変成器10のみ図示)、母線2側(1次側)の各相の高電圧を変成器10により低電圧に変換して、対応する不足電圧継電器7(2次側)および地絡方向継電器5(2次側)に出力する。
Here, each phase of the distribution line 3 is provided with a current transformer (CT) 8 (only one current transformer 8 is shown in FIG. 1), and the distribution line 3 (primary side). The large current flowing through each phase is converted into a small current by the current transformer 8 and supplied to the overcurrent relay 4 (secondary side) of the corresponding phase.
Further, the distribution line 3 is provided with a zero-phase current transformer (ZCT) 9. When a ground fault occurs in the distribution line 3 (primary side), the zero-phase current transformer 9 causes the ground-fault direction relay 5 to be connected. A zero-phase current (hereinafter referred to as “I 0 current”) is supplied.
Further, each phase of the bus 2 is provided with a transformer (PT) 10 (only one transformer 10 is shown in FIG. 1), and the phase of each phase on the bus 2 side (primary side) is high. The voltage is converted into a low voltage by the transformer 10 and output to the corresponding undervoltage relay 7 (secondary side) and the ground fault direction relay 5 (secondary side).

過電流継電器4は、変流器8から供給される電流の電流値が所定の整定値よりも大きくなると動作を開始する。なお、過電流継電器4は、反時限特性(電流−時限)を有する。すなわち、過電流継電器4は、電流と時限とが反比例特性(反時限特性(電流−時限))となっており、電流値が大きいほど時限は短くなり、過電流継電器4の最小動作時間が瞬時で200msとなるように設計されている。   The overcurrent relay 4 starts operation when the current value of the current supplied from the current transformer 8 becomes larger than a predetermined set value. The overcurrent relay 4 has an anti-time characteristic (current-time limit). In other words, the overcurrent relay 4 has an inversely proportional characteristic between the current and the time (anti-time characteristic (current-time)). The larger the current value, the shorter the time, and the minimum operating time of the overcurrent relay 4 is instantaneous. It is designed to be 200 ms.

地絡方向継電器5は、地絡事故が発生すると動作を開始するが、0.5秒以上の地絡事故に対応するために動作時限は0.5秒に固定されている。
また、地絡方向継電器5は、2つの要素の零相電圧(以下、「V0電圧」と称する。)およびI0電流の大きさおよび位相により動作し、V0電圧が約8VかつI0電流が約3mAで位相が90度といったような整定は、実際に6,000Ωの地絡を基準に地絡させてそれぞれの特性により整定が行われている。
The ground fault direction relay 5 starts operation when a ground fault occurs, but the operation time limit is fixed to 0.5 seconds in order to cope with a ground fault of 0.5 seconds or more.
The ground fault direction relay 5 operates according to the magnitude and phase of the zero-phase voltage (hereinafter referred to as “V 0 voltage”) and the I 0 current of the two elements, and the V 0 voltage is about 8 V and I 0. The settling such that the current is about 3 mA and the phase is 90 degrees is actually set according to the respective characteristics by causing a ground fault on the basis of a ground fault of 6,000Ω.

不足電圧継電器7は、変成器10の2次側電圧の電圧降下値が所定の電圧降下値(整定値59V)よりも小さくなるとほぼ同時に動作し、変成器10の2次側電圧が所定の電圧値(整定値59V)に回復するとほぼ同時に動作を停止する。すなわち、配電線3のある相(以下、「短絡相」と称する。)において短絡が発生すると、配電線3のこの短絡相に対応する母線2の相(以下、「短絡相」と称する。)の対地間電圧が低下するため、母線2の短絡相に設けられた不足電圧継電器7の動作時間により短絡継続時間を検出することができる。また、配電線3のある相(以下、「地絡相」と称する。)において地絡が発生すると、配電線3の地絡相に対応する母線2の相(以下、「地絡相」と称する。)の対地間電圧が低下するため、母線2の地絡相に設けられた不足電圧継電器7の動作時間により地絡継続時間を検出することができる。
ただし、非接地系などのように上記と異なる場合は、人工接地により検出パターンを設定して整定する(接地系が違うと電圧降下パターンが変わるため)。
The undervoltage relay 7 operates almost simultaneously when the voltage drop value of the secondary side voltage of the transformer 10 becomes smaller than a predetermined voltage drop value (setting value 59V), and the secondary side voltage of the transformer 10 becomes a predetermined voltage. When it recovers to the value (settling value 59V), the operation stops almost simultaneously. That is, when a short circuit occurs in a certain phase of the distribution line 3 (hereinafter referred to as “short circuit phase”), the phase of the bus 2 corresponding to the short circuit phase of the distribution line 3 (hereinafter referred to as “short circuit phase”). Therefore, the short-circuit continuation time can be detected from the operation time of the undervoltage relay 7 provided in the short-circuit phase of the bus 2. Further, when a ground fault occurs in a certain phase of the distribution line 3 (hereinafter referred to as “ground fault phase”), the phase of the bus 2 corresponding to the ground fault phase of the distribution line 3 (hereinafter referred to as “ground fault phase”). The ground-to-ground voltage can be detected from the operating time of the undervoltage relay 7 provided in the ground-fault phase of the bus 2.
However, if it is different from the above, such as a non-grounding system, the detection pattern is set by artificial grounding and settling (because the voltage drop pattern changes if the grounding system is different).

機器良否判定部11は、図1に示すように、所定の時間間隔(たとえば、10ms間隔)で、各過電流継電器4から出力されるトリップ信号VOC,地絡方向継電器5から出力されるトリップ信号VDGと、各不足電圧継電器7の出力信号SUV(地絡相電圧降下出力信号)とを取得して、電圧低下発生時刻,電圧回復時刻,地絡相電圧降下発生時刻,地絡相電圧復帰時刻およびトリップ信号入力時刻を求め、求めた電圧低下発生時刻,電圧回復時刻,地絡相電圧降下発生時刻,地絡相電圧復帰時刻およびトリップ信号入力時刻に基づいて各過電流継電器4,地絡方向継電器5および各遮断器6が正常に動作したか否かを判定する。 As shown in FIG. 1, the device pass / fail judgment unit 11 performs trip signals V OC output from each overcurrent relay 4 and trips output from the ground fault direction relay 5 at predetermined time intervals (for example, at intervals of 10 ms). The signal V DG and the output signal S UV (ground fault voltage drop output signal) of each undervoltage relay 7 are acquired, voltage drop occurrence time, voltage recovery time, earth fault phase voltage drop occurrence time, earth fault phase The voltage return time and trip signal input time are obtained, and each overcurrent relay 4, based on the obtained voltage drop occurrence time, voltage recovery time, ground fault voltage drop occurrence time, ground fault voltage return time and trip signal input time. It is determined whether the ground fault direction relay 5 and each circuit breaker 6 operate | moved normally.

次に、本実施例による機器良否判定システム1の動作(本発明の第1の実施例による機器良否判定方法)について説明する。
まず、配電線3において短絡が発生したときの機器良否判定システム1の動作について、図2に示すフローチャートおよび図3に示すタイミングチャートを参照して説明する。
図3に示す時刻t1に配電線3のある相(短絡相)において短絡が発生すると、配電線3の短絡相には通常の電流値よりも大きな電流値の電流が流れるとともに、母線2の短絡相に大きな電圧降下が生じる。その結果、短絡の発生とほぼ同時に、配電線3の短絡相に設けられた過電流継電器4および母線2の短絡相に設けられた不足電圧継電器7が動作を開始する(図4のステップS11)。
Next, the operation of the device quality determination system 1 according to this embodiment (device quality determination method according to the first embodiment of the present invention) will be described.
First, operation | movement of the apparatus quality determination system 1 when a short circuit generate | occur | produces in the distribution line 3 is demonstrated with reference to the flowchart shown in FIG. 2, and the timing chart shown in FIG.
When a short circuit occurs in a phase (short circuit phase) of the distribution line 3 at time t1 shown in FIG. 3, a current having a current value larger than the normal current flows in the short circuit phase of the distribution line 3 and the bus line 2 is short-circuited. A large voltage drop occurs in the phase. As a result, almost simultaneously with the occurrence of the short circuit, the overcurrent relay 4 provided in the short circuit phase of the distribution line 3 and the undervoltage relay 7 provided in the short circuit phase of the bus 2 start operation (step S11 in FIG. 4). .

配電線3の短絡相に設けられた過電流継電器4が動作を開始すると、配電線3の短絡相に設けられた遮断器6に配電線3の短絡相を遮断させるトリップ信号VOCが、この過電流継電器4からこの遮断器6および機器良否判定部11に出力される(ステップS12)。このとき、トリップ信号VOCは、過電流継電器4の反時限特性により、過電流継電器4の動作時間x(過電流継電器4が正常に動作している場合には、200ms)が経過した時刻t2にこの遮断器6に出力される。 When the overcurrent relay 4 provided in the short circuit phase of the distribution line 3 starts operating, the trip signal V OC that causes the circuit breaker 6 provided in the short circuit phase of the distribution line 3 to interrupt the short circuit phase of the distribution line 3 is The overcurrent relay 4 outputs the circuit breaker 6 and the equipment quality determination unit 11 (step S12). At this time, the trip signal V OC has a time t2 when the operation time x of the overcurrent relay 4 (200 ms when the overcurrent relay 4 is operating normally) has elapsed due to the anti-time characteristic of the overcurrent relay 4. Is output to the circuit breaker 6.

この遮断器6は、過電流継電器4からトリップ信号VOCが入力されると、配電線3の短絡相を遮断する動作を開始するが、遮断器6に固有の一定の動作時間z(たとえば、50ms)が経過した時刻t3に、配電線3の短絡相の遮断を完了する(ステップS13)。 When the trip signal V OC is input from the overcurrent relay 4, the circuit breaker 6 starts an operation for interrupting the short-circuited phase of the distribution line 3, but the circuit breaker 6 has a certain operation time z (for example, At the time t3 when 50 ms) elapses, the short circuit phase of the distribution line 3 is completely blocked (step S13).

この遮断器6により配電線3の短絡相が遮断されると、配電線3の短絡相を流れる電流が遮断されると同時に母線2の短絡相の電圧が回復する。短絡継続時間Tは、配電線3の短絡相に短絡が発生した時刻t1から遮断器6により配電線3の短絡相が遮断される時刻t3までの時間(すなわち、T=t3−t1)である。   When the short circuit phase of the distribution line 3 is interrupted by the circuit breaker 6, the current flowing through the short circuit phase of the distribution line 3 is interrupted and at the same time the voltage of the short circuit phase of the bus 2 is recovered. The short-circuit continuation time T is a time from time t1 when a short circuit occurs in the short-circuit phase of the distribution line 3 to time t3 when the short-circuit phase of the distribution line 3 is interrupted by the circuit breaker 6 (that is, T = t3-t1). .

また、時刻t3で母線2の電圧が回復すると同時に、不足電圧継電器7は動作を停止するため、不足電圧継電器7の出力信号SUVは機器良否判定部11に出力されなくなる(ステップS13)。 At the same time when the voltage of the bus 2 is restored at time t3, under voltage relay 7 for stopping the operation, the output signal S UV undervoltage relay 7 is not output to the device quality determination unit 11 (step S13).

機器良否判定部11は、過電流継電器4のトリップ信号VOCおよび不足電圧継電器7の出力信号SUVに基づいて、以下のようにして過電流継電器4および遮断器6が正常に動作したか否かを判定する。 Equipment quality judgment unit 11, whether on the basis of the output signal S UV trip signal V OC and under voltage relay 7 of overcurrent relay 4, or in the following overcurrent relay 4 and the breaker 6 is operating normally Determine whether.

機器良否判定部11は、不足電圧継電器7の出力信号SUVに基づいて、母線2の短絡相の電圧が整定値よりも低下した時刻である電圧低下発生時刻(=t1)と、母線2の短絡相の電圧が回復した時刻である電圧回復時刻(=t3)とを求める(ステップS14)。すなわち、機器良否判定部11は、時刻t1において出力信号SUVが不足電圧継電器7から入力される(すなわち、図3に示すように、出力信号SUVがロウレベルからハイレベルになる)と、その時刻(電圧低下発生時刻=t1)に配電線3の短絡相に短絡が発生したと判断する。また、機器良否判定部11は、時刻t3において出力信号SUVが不足電圧継電器7から入力されなくなる(すなわち、図3に示すように、出力信号SUVがハイレベルからロウレベルになる)と、母線2の電圧が回復したと判断して、電圧回復時刻(=t3)を求める。 Based on the output signal S UV of the undervoltage relay 7, the device pass / fail judgment unit 11 determines the voltage drop occurrence time (= t 1), which is the time when the short-circuit voltage of the bus 2 is lower than the set value, and the bus 2 The voltage recovery time (= t3), which is the time when the short-circuit voltage is recovered, is obtained (step S14). That is, when the output signal SUV is input from the undervoltage relay 7 at time t1 (that is, the output signal SUV is changed from the low level to the high level as shown in FIG. 3), It is determined that a short circuit has occurred in the short circuit phase of the distribution line 3 at time (voltage drop occurrence time = t1). Further, when the output signal SUV is not input from the undervoltage relay 7 at time t3 (that is, the output signal SUV is changed from the high level to the low level as shown in FIG. 3), the device pass / fail judgment unit 11 2 is recovered, and a voltage recovery time (= t3) is obtained.

また、機器良否判定部11は、電圧回復時刻(=t3)から電圧低下発生時刻(=t1)を引いて、短絡継続時間T(=t3−t1)を求める(ステップS14)。
ただし、厳密に言えば、短絡発生から不足電圧継電器7が出力信号SUVを出力するまでには過渡時間があり、また、母線2の電圧の回復から不足電圧継電器7が出力信号SUVを出力しなくなるまでには過渡時間があるため、不足電圧継電器7の出力信号SUVの出力発生時刻(電圧低下発生時刻)と短絡発生時刻とは一致せず、また、不足電圧継電器7の出力信号SUVの出力停止時刻と電圧回復時刻とは一致しない。しかしながら、一般には、これらの過渡時間がほぼ同じであるため、また、短絡継続時間Tに比べて不足電圧継電器7の過渡時間は非常に短いため、不足電圧継電器7が出力信号SUVを出力している時間(図3の出力信号SUVがハイレベルである時間)と短絡継続時間Tとは等しいと言える。
なお、これらの過渡時間が予め分かっている場合には、過渡時間を考慮して短絡継続時間Tを算出するようにしてもよい。
Further, the device pass / fail judgment unit 11 subtracts the voltage drop occurrence time (= t1) from the voltage recovery time (= t3) to obtain the short-circuit duration T (= t3−t1) (step S14).
However, strictly speaking, there is a transient time to until the undervoltage relay 7 from short circuit outputs an output signal S UV, also, undervoltage relay 7 outputs an output signal S UV from the recovery of the voltage of the bus 2 Since there is a transitional time until it stops , the output occurrence time (voltage drop occurrence time) of the output signal SUV of the undervoltage relay 7 does not coincide with the short circuit occurrence time, and the output signal S of the undervoltage relay 7 The UV output stop time does not coincide with the voltage recovery time. In general, however, for these transit time is approximately the same, also very short transition time of under voltage relay 7 as compared with the short-circuit continuation time T, under voltage relay 7 outputs an output signal S UV It can be said that the time during which the output signal SUV in FIG. 3 is at the high level is equal to the short-circuit duration T.
If these transient times are known in advance, the short-circuit duration T may be calculated in consideration of the transient times.

さらに、機器良否判定部11は、過電流継電器4のトリップ信号VOCに基づいて、トリップ信号VOCが入力されてきた時刻(図3で、トリップ信号VOCがロウレベルからハイレベルになる時刻)であるトリップ信号入力時刻(=t2)を求める(ステップS14)。 Moreover, equipment quality judgment unit 11, based on the trip signal V OC of the overcurrent relay 4, a trip signal V OC has been input time (in FIG. 3, the time the trip signal V OC is changed from the low level to the high level) A trip signal input time (= t2) is obtained (step S14).

(1)過電流継電器4の良否判定
続いて、機器良否判定部11は、短絡継続時間T(=t3−t1)から、トリップ信号入力時刻(=t2)から電圧回復時刻(=t3)までの時間(=t3−t2)を引くことにより、過電流継電器4が動作を開始してからトリップ信号VOCを出力するまでの動作時間y(=(t3−t1)−(t3−t2)=t2−t1)を求める。機器良否判定部11は、求めた過電流継電器4の動作時間y(=t2−t1)と過電流継電器4の整定動作時間(200ms)とを比較して両者が等しければ、過電流継電器4は正常に動作していると判定する(ステップS15)。
(1) Pass / fail judgment of overcurrent relay 4 Subsequently, the equipment pass / fail judgment unit 11 starts from the short circuit duration T (= t3−t1) to the trip signal input time (= t2) to the voltage recovery time (= t3). By subtracting the time (= t3−t2), the operation time y (= (t3−t1) − (t3−t2) = t2) from when the overcurrent relay 4 starts to operate until the trip signal V OC is output. -T1) is obtained. The device pass / fail judgment unit 11 compares the obtained operation time y (= t2−t1) of the overcurrent relay 4 with the settling operation time (200 ms) of the overcurrent relay 4 and if both are equal, the overcurrent relay 4 It determines with operating normally (step S15).

(2)遮断器6の良否判定
機器良否判定部11は、トリップ信号入力時刻(=t2)から電圧回復時刻(=t3)までの時間を算出することにより、遮断器6の動作時間z(=t3−t2)を求める。機器良否判定部11は、求めた遮断器6の動作時間z(=t3−t2)が50msであれば、遮断器6は正常に動作していると判定する。
(2) Pass / Fail Judgment of Circuit Breaker 6 The equipment pass / fail judgment unit 11 calculates the time from the trip signal input time (= t2) to the voltage recovery time (= t3), thereby operating time z (= t3-t2) is obtained. If the determined operation time z (= t3−t2) of the circuit breaker 6 is 50 ms, the device pass / fail determination unit 11 determines that the circuit breaker 6 is operating normally.

次に、配電線3において地絡が発生したときの機器良否判定システム1の動作について、図4に示すフローチャートおよび図5に示すタイミングチャートを参照して説明する。
図5に示す時刻t1に配電線3のある相(地絡相)において地絡が発生すると、地絡が発生した配電線3においては他の回線からのI0電流が流れ込むとともに、母線2にはV0電圧が発生する。その結果、地絡の発生とほぼ同時に、地絡方向継電器5が零相変流器(ZCT)からのI0電流と各変成器10からの電圧に基づいて生成されたV0電圧とにより動作を開始するとともに、母線2の地絡相に設けられた不足電圧継電器7が、母線2の地絡相の対地間電圧の低下を検出して、出力信号SUVを機器良否判定部11に出力する(ステップS21)。
Next, operation | movement of the apparatus quality determination system 1 when a ground fault generate | occur | produces in the distribution line 3 is demonstrated with reference to the flowchart shown in FIG. 4, and the timing chart shown in FIG.
When a ground fault occurs in a phase (ground fault phase) of the distribution line 3 at time t1 shown in FIG. 5, an I 0 current from another line flows into the distribution line 3 where the ground fault has occurred and V 0 voltage is generated. As a result, almost simultaneously with the occurrence of the ground fault, the ground fault direction relay 5 operates with the I 0 current from the zero-phase current transformer (ZCT) and the V 0 voltage generated based on the voltage from each transformer 10. starts the undervoltage relay 7 provided on the ground絡相busbar 2 which detects a reduction in the ground voltage of the ground of the bus 2絡相, outputs an output signal S UV to the device quality judgment unit 11 (Step S21).

地絡方向継電器5が動作を開始すると、配電線3の地絡相に設けられた遮断器6に配電線3の地絡相を遮断させるトリップ信号VDGが、地絡方向継電器5からこの遮断器6および機器良否判定部11に出力される。このとき、トリップ信号VDGは、地絡が発生した時刻t1から地絡方向継電器5の動作時間y(地絡方向継電器5が正常動作している場合には、地絡方向継電器5の動作時限である0.5秒)経過後の時刻t2に、遮断器6および機器良否判定部11に出力される(ステップS22)。 When the ground fault direction relay 5 starts operation, a trip signal V DG that causes the circuit breaker 6 provided in the ground fault phase of the distribution line 3 to shut down the ground fault phase of the distribution line 3 is disconnected from the ground fault direction relay 5. Is output to the device 6 and the device quality determination unit 11. At this time, the trip signal V DG is generated from the time t1 when the ground fault occurs, the operation time y of the ground fault direction relay 5 (when the ground fault direction relay 5 is operating normally, the operation time limit of the ground fault direction relay 5 is Is output to the circuit breaker 6 and the equipment pass / fail judgment unit 11 at time t2 after elapse (step S22).

遮断器6は、地絡方向継電器5からトリップ信号VDGが入力されると、配電線3の地絡相を遮断する動作を開始するが、遮断機5に固有の一定の動作時間z(たとえば、50ms)が経過した時刻t3に、配電線3の地絡相の遮断を完了する(ステップS23)。 When the trip signal V DG is input from the ground fault direction relay 5, the circuit breaker 6 starts an operation of interrupting the ground fault phase of the distribution line 3, but a certain operation time z (for example, specific to the circuit breaker 5) , 50 ms) at time t3, the interruption of the ground fault phase of the distribution line 3 is completed (step S23).

遮断器6により配電線3の地絡相が遮断されると、配電線3の地絡相を流れる電流が遮断されると同時に母線2のV0電圧が、残留電圧がないとすると0ボルト(以下、説明の簡単のため、残留電圧はないものとする。)に回復する。その結果、不足電圧継電器7から機器良否判定部11に出力信号SUVが出力されなくなる(ステップS23)。 When the ground fault phase of the distribution line 3 is interrupted by the circuit breaker 6, the current flowing through the ground fault phase of the distribution line 3 is interrupted, and at the same time, the V 0 voltage of the bus 2 is 0 volts if there is no residual voltage ( Hereinafter, for the sake of simplicity, it is assumed that there is no residual voltage.) As a result, the output signal SUV is not output from the undervoltage relay 7 to the device pass / fail determination unit 11 (step S23).

機器良否判定部11は、地絡方向継電器5からのトリップ信号VDGおよび不足電圧継電器7からの出力信号SUVに基づいて、以下のようにして地絡方向継電器5および遮断器6が正常に動作したか否かを判定する。 On the basis of the trip signal V DG from the ground fault direction relay 5 and the output signal S UV from the undervoltage relay 7, the equipment pass / fail judgment unit 11 properly operates the ground fault direction relay 5 and the circuit breaker 6 as follows. It is determined whether it has operated.

機器良否判定部11は、不足電圧継電器7からの出力信号SUVに基づいて、母線2の地絡相に電圧降下が発生した時刻である地絡相電圧降下発生時刻(=t1)と、母線2の地絡相の地絡電圧が0ボルトに回復して電圧が復帰した時刻である地絡相電圧復帰時刻(=t3)とを求める(ステップS24)。すなわち、機器良否判定部11は、時刻t1において出力信号SUVが不足電圧継電器7から入力される(すなわち、図5に示すように、出力信号SUVがロウレベルからハイレベルになる)と、その時刻(地絡相電圧降下発生時刻=t1)に配電線3に地絡が発生したと判断する。また、機器良否判定部11は、時刻t3において出力信号SUVが不足電圧継電器7から入力されなくなる(すなわち、図5に示すように、出力信号SUVがハイレベルからロウレベルになる)と、母線2の地絡電圧が復帰したと判断して、地絡相電圧復帰時刻(=t3)を求める。 Equipment quality judgment unit 11, based on the output signal S UV from under voltage relay 7, a ground絡相voltage drop generation time is the time when the voltage drop in the land絡相the bus 2 occurs (= t1), bus The ground fault phase voltage return time (= t3), which is the time when the ground fault voltage of the second ground fault phase is restored to 0 volts and the voltage is restored, is obtained (step S24). That is, when the output signal SUV is input from the undervoltage relay 7 at time t1 (that is, the output signal SUV is changed from the low level to the high level as shown in FIG. 5), It is determined that a ground fault has occurred in the distribution line 3 at time (ground fault phase voltage drop occurrence time = t1). Further, when the output signal SUV is not input from the undervoltage relay 7 at time t3 (that is, the output signal SUV is changed from the high level to the low level as shown in FIG. 5), the device pass / fail judgment unit 11 2 is determined to have returned, and the ground fault phase voltage return time (= t3) is obtained.

また、機器良否判定部11は、地絡相電圧復帰時刻(=t3)から地絡相電圧降下発生時刻(=t1)を引いて、地絡継続時間x(=t3−t1)を求める(ステップS24)。
ただし、厳密に言えば、地絡発生から不足電圧継電器7が出力信号SUVを出力するまでには過渡時間があり、また、母線2の地絡電圧の回復から不足電圧継電器7が出力信号SUVを出力しなくなるまでには過渡時間があるため、不足電圧継電器7の出力信号SUVの出力発生時刻(地絡相電圧降下発生時刻)と地絡発生時刻とは一致せず、また、不足電圧継電器7の出力信号SUVの出力停止時刻と地絡相電圧復帰時刻とは一致しない。しかしながら、一般には、これらの過渡時間がほぼ同じであるため、また、地絡継続時間xに比べて不足電圧継電器の過渡時間は非常に短いため、不足電圧継電器7が出力信号SUVを出力している時間(図5の出力信号SUVがハイレベルである時間)と地絡継続時間xとは等しいと言える。
なお、これらの過渡時間が予め分かっている場合には、過渡時間を考慮して地絡継続時間xを算出するようにしてもよい。
In addition, the device pass / fail determination unit 11 subtracts the ground fault phase voltage drop occurrence time (= t1) from the ground fault phase voltage recovery time (= t3) to obtain the ground fault duration x (= t3−t1) (step S1). S24).
However, strictly speaking, the land shortage from絡発raw voltage relay 7 there is a transient time until the output of the output signal S UV, also, the output signal is undervoltage relay 7 from the recovery of the ground voltage of the bus 2 S since the until no outputs UV certain transient time does not match the output signal S UV output time of occurrence of the undervoltage relay 7 and (earth絡相voltage drop generation time) and ground絡発production time, also, lack does not coincide with the output signal S output stop time and the earth絡相voltage return time of the UV of the voltage relay 7. In general, however, for these transit time is approximately the same, also very short transition time of under voltage relay as compared with the ground fault duration x, under voltage relay 7 outputs an output signal S UV It can be said that the time during which the output signal SUV in FIG. 5 is at the high level is equal to the ground fault duration x.
If these transition times are known in advance, the ground fault duration x may be calculated in consideration of the transition time.

さらに、機器良否判定部11は、地絡方向継電器5からのトリップ信号VDGに基づいて、トリップ信号VDGが入力されてきた時刻(図5で、トリップ信号VDGがロウレベルからハイレベルになる時刻)であるトリップ信号入力時刻(=t2)を求める(ステップS24)。 Furthermore, the device pass / fail judgment unit 11 determines the time when the trip signal V DG is input based on the trip signal V DG from the ground fault direction relay 5 (in FIG. 5, the trip signal V DG changes from low level to high level). The trip signal input time (= t2) which is (time) is obtained (step S24).

(1)地絡方向継電器5の良否判定
続いて、機器良否判定部11は、地絡継続時間x(=t3−t1)から、トリップ信号入力時刻(=t2)から地絡相電圧復帰時刻(=t3)までの時間(=t3−t2)を引くことにより、地絡方向継電器5が動作を開始してからトリップ信号VDGを出力するまでの動作時間y(=(t3−t1)−(t3−t2)=t2−t1)を求める。機器良否判定部11は、求めた地絡方向継電器5の動作時間y(=t2−t1)と地絡方向継電器5の動作時限(0.5秒)とを比較して両者が等しければ、地絡方向継電器5は正常に動作していると判定する(ステップS25)。
(1) Pass / Fail Judgment of Ground Fault Direction Relay 5 Subsequently, the equipment pass / fail judgment unit 11 starts from the ground fault continuation time x (= t3−t1), from the trip signal input time (= t2) to the ground fault phase voltage return time ( = T3) minus the time (= t3−t2), the operation time y (= (t3−t1) − () from when the ground fault direction relay 5 starts operating until the trip signal V DG is output. t3-t2) = t2-t1) is obtained. The device pass / fail judgment unit 11 compares the obtained operation time y (= t2−t1) of the ground fault direction relay 5 with the operation time limit (0.5 seconds) of the ground fault direction relay 5 and if both are equal, It is determined that the tangential relay 5 is operating normally (step S25).

(2)遮断器6の良否判定
機器良否判定部11は、トリップ信号入力時刻(=t2)から地絡相電圧復帰時刻(=t3)までの時間を算出することにより、遮断器6の動作時間z(=t3−t2)を求める。機器良否判定部11は、求めた遮断器6の動作時間z(=t3−t2)が50msであれば、遮断器6は正常に動作していると判定する(ステップS25)。
(2) Pass / Fail Judgment of Circuit Breaker 6 The equipment pass / fail judgment unit 11 calculates the time from the trip signal input time (= t2) to the ground fault phase voltage return time (= t3), thereby operating the circuit breaker 6 on time. z (= t3-t2) is obtained. If the determined operation time z (= t3−t2) of the circuit breaker 6 is 50 ms, the device pass / fail determination unit 11 determines that the circuit breaker 6 is operating normally (step S25).

次に、本発明の第2の実施例による機器良否判定システム20について、図6を参照して説明する。
本実施例による機器良否判定システム20は、遠方監視制御装置(テレコン)を用いて機器の良否判定を行うものである。
機器良否判定システム20は、機器良否判定部11の代わりに、子局側遠方監視制御装置(以下、「子局側テレコン」と称する。)21と、子局側テレコン21と通信回線22を介して接続された親局側遠方監視制御装置(以下、「親局側テレコン」と称する。)23と、親局側テレコン23に接続された親局端末装置24とを備える点で、図1に示した第1の実施例による機器良否判定システム1と異なる。
Next, an equipment quality determination system 20 according to a second embodiment of the present invention will be described with reference to FIG.
The equipment quality determination system 20 according to the present embodiment performs equipment quality determination using a remote monitoring control device (telecom).
The device pass / fail judgment system 20 replaces the equipment pass / fail judgment unit 11 via a slave station side remote monitoring control device (hereinafter referred to as “slave station telecon”) 21, a slave station side telecom 21 and a communication line 22. FIG. 1 is provided with a remote station control device (hereinafter referred to as “parent station side telecon”) 23 and a master station terminal device 24 connected to the master station side telecon 23. It differs from the apparatus quality determination system 1 according to the first embodiment shown.

子局側テレコン21は、所定の時間間隔(たとえば、10ms)で、各過電流継電器4から出力されるトリップ信号VOCおよび地絡方向継電器5から出力されるトリップ信号VDGを取り込むとともに各不足電圧継電器7の出力信号SUVを取り込んで、取り込んだトリップ信号VOC,トリップ信号VDGおよび出力信号SUVのデータを格納する。また、子局側テレコン21は、SOE(Sequence of Events)機能を備えており、親局側テレコン23のSOE要求に応じて、トリップ信号VOC,トリップ信号VDGおよび出力信号SUVのデータのうちの要求された時間範囲のものを親局側テレコン23に通信回線22を介して伝送(たとえば、パケット伝送)する。 The slave station side telecon 21 takes in the trip signal V OC output from each overcurrent relay 4 and the trip signal V DG output from the ground fault direction relay 5 at a predetermined time interval (for example, 10 ms), and each shortage. The output signal S UV of the voltage relay 7 is taken in, and the taken trip signal V OC , trip signal V DG and data of the output signal S UV are stored. Further, the slave station side telecon 21 has an SOE (Sequence of Events) function, and the data of the trip signal V OC , trip signal V DG, and output signal S UV is received in response to the SOE request of the master station side telecon 23. Of the requested time range, it is transmitted (for example, packet transmission) via the communication line 22 to the master station side tele-computer 23.

親局側テレコン23は、監視所に設置されており、トリップ信号VOC,トリップ信号VDGおよび出力信号SUVのデータの送信を子局側テレコン21に要求するSOE要求信号を子局側テレコン21に送信することによって、子局側テレコン21からトリップ信号VOC,トリップ信号VDGおよび出力信号SUVのデータを取得する。
親局端末装置24は、親局側テレコン23から入力されるトリップ信号VOC,トリップ信号VDGおよび出力信号SUVのデータに基づいて、各過電流継電器4,地絡方向継電器5および各遮断器6の良否を判定する。
The master station side teleconverter 23 is installed in the monitor station, trip signal V OC, trip signals V DG and the output signal S SOE request signal daughter tele requesting transmission of UV data into daughter Telecom 21 21, the data of the trip signal V OC , the trip signal V DG, and the output signal S UV is acquired from the slave station side telecon 21.
Based on the data of the trip signal V OC , trip signal V DG and output signal S UV input from the master station side telecon 23, the master station terminal device 24 is connected to each overcurrent relay 4, ground fault direction relay 5, and each cutoff. The quality of the vessel 6 is judged.

次に、本実施例による機器良否判定システム20の動作(本発明の第2の実施例による機器良否判定方法)について説明する。
まず、配電線3のある相(短絡相)において短絡が発生したときの機器良否判定システム20の動作について説明する。
配電線3の短絡相において短絡が発生したときの各過電流継電器4および各不足電圧継電器7の動作は、上述した第1の実施例による機器良否判定システム1におけるそれらの動作と同様であるため、その説明は省略する。
Next, the operation of the device quality determination system 20 according to the present embodiment (device quality determination method according to the second embodiment of the present invention) will be described.
First, operation | movement of the apparatus quality determination system 20 when a short circuit generate | occur | produces in the phase (short circuit phase) of the distribution line 3 is demonstrated.
The operations of the overcurrent relays 4 and the undervoltage relays 7 when a short circuit occurs in the short circuit phase of the distribution line 3 are the same as those operations in the device quality determination system 1 according to the first embodiment described above. The description is omitted.

子局側テレコン21は、各過電流継電器4から出力されるトリップ信号VOCおよび各不足電圧継電器7の出力信号SUVを所定の時間間隔で常時取り込んで、取り込んだトリップ信号VOCおよび出力信号SUVのデータを格納する。 Daughter Telecom 21 takes in constantly output signal S UV trip signal V OC and the under voltage relay 7 is outputted from the overcurrent relay 4 at predetermined time intervals, trip signal V OC and the output signal taken Stores SUV data.

配電線3の短絡相において短絡が発生すると、親局側テレコン23は、トリップ信号VOCおよび出力信号SUVのデータの送信を子局側テレコン21に要求するSOE要求信号を、通信回線22を介して子局側テレコン21に送信する。
子局側テレコン21は、このSOE要求信号を受信すると、保管されている要求された時間範囲のトリップ信号VOCおよび出力信号SUVのデータを親局側テレコン23に通信回線22を介してパケット伝送する。
When a short circuit occurs in the short circuit phase the distribution line 3, the master station side teleconverter 23, the SOE request signal for requesting to the daughter Telecom 21 the transmission of the trip signal V OC and the output signal S UV data, the communication line 22 To the slave station side tele-con.
Daughter Telecom 21 receives this SOE request signal via the communication line 22 a trip signal V OC and the output signal S UV data of the requested time range are stored in the parent station teleconverter 23 packets To transmit.

親局側テレコン23は、このトリップ信号VOCおよび出力信号SUVのデータを受信すると、親局側端末装置24に出力する。
親局側端末装置24は、このトリップ信号VOCおよび出力信号SUVのデータに基づいて、上述した第1の実施例による機器良否判定システム1の機器良否判定部11と同様の動作(図2のステップS14,S15参照)を行うことにより、過電流継電器4および遮断器6の良否を判定する。
When receiving the trip signal V OC and the output signal SUV data, the master station side telecon 23 outputs the data to the master station side terminal device 24.
Master station terminal apparatus 24, based on the trip signal V OC and the output signal S UV data, the same operation as the device quality determination unit 11 of device quality determination system 1 according to the first embodiment described above (FIG. 2 Steps S14 and S15) are performed to determine whether the overcurrent relay 4 and the circuit breaker 6 are good or bad.

次に、配電線3のある相(地絡相)において地絡が発生したときの機器良否判定システム20の動作について説明する。
配電線3の地絡相において地絡が発生したときの地絡方向継電器5および各不足電圧継電器7の動作は、上述した第1の実施例による機器良否判定システム1におけるそれらの動作と同様であるため、その説明は省略する。
Next, the operation of the equipment quality determination system 20 when a ground fault occurs in a phase (ground fault phase) of the distribution line 3 will be described.
The operations of the ground fault direction relay 5 and each undervoltage relay 7 when a ground fault occurs in the ground fault phase of the distribution line 3 are the same as those operations in the device quality determination system 1 according to the first embodiment described above. Therefore, the description thereof is omitted.

子局側テレコン21は、地絡方向継電器5から出力されるトリップ信号VDGおよび各不足電圧継電器7の出力信号SUVを所定の時間間隔で常時取り込んで、取り込んだトリップ信号VDGおよび出力信号SUVのデータを格納する。 Daughter Telecom 21 takes in constantly output signal S UV trip signal V DG and the undervoltage relay 7 is output from the ground directional relay 5 at predetermined time intervals, trip signal V DG and the output signal taken Stores SUV data.

配電線3の地絡相において地絡が発生すると、親局側テレコン23は、トリップ信号VDGおよび出力信号SUVのデータの送信を子局側テレコン21に要求するSOE要求信号を、通信回線22を介して子局側テレコン21に送信する。
子局側テレコン21は、このSOE要求信号を受信すると、保管されている要求された時間範囲のトリップ信号VDGおよび出力信号SUVのデータを親局側テレコン23に通信回線22を介してパケット伝送する。
When a ground fault occurs in the land絡相distribution line 3, the master station side teleconverter 23, the SOE request signal for requesting to the daughter Telecom 21 the transmission of the trip signal V DG and the output signal S UV data communication line The data is transmitted to the slave station side telecon 21 via 22.
Daughter Telecom 21 receives this SOE request signal via the communication line 22 a trip signal V DG and the output signal S UV data of the requested time range are stored in the parent station teleconverter 23 packets To transmit.

親局側テレコン23は、このトリップ信号VDGおよび出力信号SUVのデータを受信すると、親局側端末装置24に出力する。
親局側端末装置24は、このトリップ信号VDGおよび出力信号SUVのデータに基づいて、上述した第1の実施例による機器良否判定システム1の機器良否判定部11と同様の動作(図4のステップS24,S25参照)を行うことにより、地絡方向継電器5および遮断器6の良否を判定する。
When receiving the trip signal V DG and the output signal S UV , the master station side tele-computer 23 outputs the data to the master station side terminal device 24.
Based on the data of the trip signal V DG and the output signal S UV , the master station side terminal device 24 operates in the same manner as the device pass / fail judgment unit 11 of the device pass / fail judgment system 1 according to the first embodiment described above (FIG. 4). (See steps S24 and S25), the quality of the ground fault direction relay 5 and the circuit breaker 6 is determined.

したがって、本実施例による機器良否判定システム20では、遠隔地の監視所に設けられた親局側テレコン23および親局側端末装置24において過電流継電器4,地絡方向継電器5および遮断器6の良否を判定することができるため、過電流継電器4,地絡方向継電器5および遮断器6に関する情報を一括管理することができる。   Therefore, in the equipment quality determination system 20 according to the present embodiment, the overcurrent relay 4, the ground fault direction relay 5, and the circuit breaker 6 in the master station side telecon 23 and the master station side terminal device 24 provided at a remote monitoring station are provided. Since the quality can be determined, information on the overcurrent relay 4, the ground fault direction relay 5 and the circuit breaker 6 can be collectively managed.

なお、本発明の機器良否判定システムおよび機器良否判定方法は、6.6kVおよび22kVなどの配電線に限らず、22kV以上の送電線にも適用することができる。
また、配電線で現在用いられているDM遠方制御装置(配電自動化装置)を組み合わせDM開閉器の機器良否判定を行うこともできる。
さらに、不足電圧継電器を用いて機器良否判定を行う実施例を説明したが、不足電圧継電器の代わりに地絡過電圧継電器や地絡表示といった補助継電器を用いて機器良否判定を行ってもよい。
In addition, the apparatus quality determination system and the apparatus quality determination method of the present invention can be applied not only to distribution lines such as 6.6 kV and 22 kV but also to transmission lines of 22 kV or higher.
In addition, it is possible to determine whether the DM switch is good or bad by combining a DM remote control device (distribution automation device) currently used in distribution lines.
Furthermore, although the example which performs apparatus quality determination using an undervoltage relay was demonstrated, you may perform apparatus quality determination using auxiliary relays, such as a ground fault overvoltage relay and a ground fault display, instead of an undervoltage relay.

以上説明したように、本発明の機器良否判定システムおよび機器良否判定方法は、配電線などの電線路における短絡および地絡の発生時に過電流継電器,地絡方向継電器および遮断器が正常に動作したか否かを判定するのに利用することができる。   As described above, the device quality determination system and the device quality determination method according to the present invention are such that the overcurrent relay, the ground fault direction relay, and the circuit breaker operated normally when a short circuit and a ground fault occur in a power line such as a distribution line. It can be used to determine whether or not.

本発明の第1の実施例による機器良否判定システムの構成を示す図である。(実施例1)It is a figure which shows the structure of the apparatus quality determination system by the 1st Example of this invention. Example 1 図1に示した機器良否判定システム1の短絡発生時の動作を説明するためのフローチャートである。(実施例1)It is a flowchart for demonstrating the operation | movement at the time of the short circuit generation | occurrence | production of the apparatus quality determination system 1 shown in FIG. Example 1 図1に示した機器良否判定システム1の短絡発生時の動作を説明するためのタイミングチャートである。(実施例1)It is a timing chart for demonstrating the operation | movement at the time of the short circuit generation | occurrence | production of the apparatus quality determination system 1 shown in FIG. Example 1 図1に示した機器良否判定システム1の地絡発生時の動作を説明するためのフローチャートである。(実施例1)It is a flowchart for demonstrating the operation | movement at the time of the earth fault generation | occurrence | production of the apparatus quality determination system 1 shown in FIG. Example 1 図1に示した機器良否判定システム1の地絡発生時の動作を説明するためのタイミングチャートである。(実施例1)It is a timing chart for demonstrating the operation | movement at the time of the earth fault generation | occurrence | production of the apparatus quality determination system 1 shown in FIG. Example 1 本発明の第2の実施例による機器良否判定システムの構成を示す図である。(実施例2)It is a figure which shows the structure of the apparatus quality determination system by the 2nd Example of this invention. (Example 2)

符号の説明Explanation of symbols

1,20 機器良否判定システム
2 母線
3 配電線
4 過電流継電器
5 地絡方向継電器
6 遮断器
7 不足電圧継電器
8 変流器(CT)
9 零相変流器(ZCT)
10 変成器(PT)
11 機器良否判定部
21 子局側テレコン
22 通信回線
23 親局側テレコン
24 親局側端末装置
S11〜S15,S21〜S25 ステップ
1,20 Equipment pass / fail judgment system 2 Bus 3 Distribution line 4 Overcurrent relay 5 Ground fault relay 6 Breaker 7 Undervoltage relay 8 Current transformer (CT)
9 Zero-phase current transformer (ZCT)
10 Transformer (PT)
11 equipment pass / fail judgment unit 21 slave station side telecon 22 communication line 23 master station side telecon 24 master station side terminal devices S11 to S15, S21 to S25

Claims (8)

母線(2)から分岐された電線路(3)の各相にそれぞれ設けられた変流器(8)と、
前記電線路に設けられた零相変流器(9)と、
前記母線の各相にそれぞれ設けられた変成器(10)と、
前記電線路の各相にそれぞれ設けられた、かつ、対応する相の前記変流器に接続された過電流継電器(4)と、
前記零相変流器および前記変成器に接続された地絡継電器(5)と、
前記電線路の各相にそれぞれ設けられた、かつ、対応する相の前記過電流継電器の動作時間経過後に該過電流継電器から出力される第1のトリップ信号(VOC)および前記地絡継電器の動作時間経過後に該地絡継電器から出力される第2のトリップ信号(VDG)に基づいて前記電線路の対応する相を遮断する遮断器(6)と、
前記母線の各相にそれぞれ設けられた、かつ、対応する相の前記変成器に接続された、かつ、前記母線の対応する相の電圧に応じて動作を開始する電圧検出用継電器(7)と、
前記各過電流継電器の第1のトリップ信号と前記地絡継電器の第2のトリップ信号と前記各電圧検出用継電器の出力信号(SUV)とに基づいて、前記過電流継電器,前記地絡継電器および前記遮断器の良否判定を行う機器良否判定手段(11,21,23,24)と、
を具備することを特徴とする、機器良否判定システム。
A current transformer (8) provided in each phase of the electrical line (3) branched from the bus (2);
A zero-phase current transformer (9) provided in the electric line;
A transformer (10) provided for each phase of the bus;
An overcurrent relay (4) provided for each phase of the electrical line and connected to the current transformer of the corresponding phase;
A ground fault relay (5) connected to the zero-phase current transformer and the transformer;
A first trip signal (V OC ) provided in each phase of the electric line and output from the overcurrent relay after the operation time of the overcurrent relay of the corresponding phase has elapsed, and the ground fault relay A circuit breaker (6) for interrupting a corresponding phase of the electric line based on a second trip signal (V DG ) output from the ground fault relay after an operating time has elapsed;
A voltage detection relay (7) provided for each phase of the bus and connected to the transformer of the corresponding phase and starting operation according to the voltage of the corresponding phase of the bus; ,
Based on the first trip signal of each overcurrent relay, the second trip signal of the ground fault relay, and the output signal (S UV ) of each voltage detection relay, the overcurrent relay, the ground fault relay And device quality judgment means (11, 21, 23, 24) for judging quality of the circuit breaker,
An apparatus quality determination system comprising:
前記機器良否判定手段が、所定の時間間隔で、前記各過電流継電器の第1のトリップ信号,前記地絡継電器の第2のトリップ信号および前記各電圧検出用継電器の出力信号を取得して、該取得した第1のトリップ信号と該取得した第2のトリップ信号と該取得した出力信号とに基づいて、前記過電流継電器,前記地絡継電器および前記遮断器の良否判定を行う機器良否判定部(11)であることを特徴とする、請求項1記載の機器良否判定システム。   The device pass / fail judgment means obtains a first trip signal of each overcurrent relay, a second trip signal of the ground fault relay and an output signal of each voltage detection relay at predetermined time intervals, A device pass / fail judgment unit that judges pass / fail of the overcurrent relay, the ground fault relay, and the circuit breaker based on the acquired first trip signal, the acquired second trip signal, and the acquired output signal. The apparatus quality determination system according to claim 1, wherein the apparatus quality determination system is (11). 前記機器良否判定手段が、
所定の時間間隔で、前記各過電流継電器の第1のトリップ信号,前記地絡継電器の第2のトリップ信号および前記各電圧検出用継電器の出力信号を取得する子局側遠方監視制御装置(21)と、
該子局側遠方監視制御装置と通信回線(22)を介して相互接続された親局側遠方監視制御装置(23)であって、前記電線路において短絡または地絡が発生すると、短絡または地絡の継続時間を含む時間範囲の前記第1のトリップ信号,前記第2のトリップ信号および前記出力信号のデータの送信を前記子局側遠方監視制御装置に要求する要求信号を前記通信回線を介して該子局側遠方監視制御装置に送信し、該子局側遠方監視制御装置から前記第1のトリップ信号,前記第2のトリップ信号および前記出力信号のデータを受信する親局側遠方監視制御装置(23)と、
該親局側遠方監視制御装置から入力される前記第1のトリップ信号,前記第2のトリップ信号および前記出力信号のデータに基づいて、前記過電流継電器,前記地絡継電器および前記遮断器の良否判定を行う親局端末装置(24)と、
を備える、請求項1記載の機器良否判定システム。
The device pass / fail judgment means
Remote station side remote monitoring and control device (21) for obtaining a first trip signal of each overcurrent relay, a second trip signal of the ground fault relay, and an output signal of each voltage detection relay at a predetermined time interval )When,
The master station side remote monitoring and control device (23) interconnected to the slave station side remote monitoring and control device via a communication line (22), and when a short circuit or ground fault occurs in the electric line, A request signal for requesting transmission of data of the first trip signal, the second trip signal, and the output signal in a time range including a continuation time to the slave station side remote monitoring control device via the communication line The remote monitoring control device for transmitting data to the remote monitoring control device on the slave station side and receiving the data of the first trip signal, the second trip signal and the output signal from the remote monitoring control device on the slave station side A device (23);
Based on data of the first trip signal, the second trip signal, and the output signal input from the remote monitoring control device on the master station side, the pass / fail of the overcurrent relay, the ground fault relay, and the circuit breaker are determined. A master station terminal device (24) for performing the determination;
The apparatus quality determination system according to claim 1, comprising:
前記過電流継電器が反時限特性(電流−時限)を有し、
前記地絡継電器が、動作時限が固定された地絡方向継電器であり、
前記電圧検出用継電器が、前記母線の対応する相の電圧降下値が所定の値以下になったときに動作を開始する不足電圧継電器である、
ことを特徴とする、請求項1乃至3いずれかに記載の機器良否判定システム。
The overcurrent relay has anti-time characteristics (current-time limit);
The ground fault relay is a ground fault direction relay with a fixed operation time limit,
The voltage detection relay is an undervoltage relay that starts operation when a voltage drop value of a corresponding phase of the bus is equal to or lower than a predetermined value;
The apparatus quality determination system according to any one of claims 1 to 3, wherein
機器良否判定手段(11;21,23,24)が、母線(2)の対応する相の電圧に応じて動作を開始する電圧検出用継電器(7)の出力信号(SUV)を取得する第1のステップ(S11;S21)と、
前記機器良否判定手段が、前記母線から分岐された電線路(3)の相に短絡または地絡が発生すると、所定の動作時間経過後に、短絡または地絡が発生した前記電線路の相に設けられた過電流継電器(4)から該電線路の相に設けられた遮断器(5)に出力される第1のトリップ信号(VOC)、または、所定の動作時間経過後に、前記電線路に設けられた地絡継電器(5)から前記遮断器(5)に出力される第2のトリップ信号(VDG)を取得する第2のステップ(S12;S22)と、
前記機器良否判定手段が、前記遮断器が前記電線路の相を遮断することにより、前記電圧検出用継電器の出力信号が出力されなくなったことを検出する第3のステップ(S13;S23)と、
前記機器良否判定手段が、前記過電流継電器の第1のトリップ信号と前記地絡継電器の第2のトリップ信号と前記電圧検出用継電器の出力信号とに基づいて、前記過電流継電器,前記地絡継電器および前記遮断器の良否判定を行う第4のステップ(S14,S15:S24,S25)と、
を具備することを特徴とする、機器良否判定方法。
The device pass / fail judgment means (11; 21, 23, 24) obtains the output signal (S UV ) of the voltage detection relay (7) that starts its operation in accordance with the voltage of the corresponding phase of the bus (2). 1 step (S11; S21),
When the equipment pass / fail judgment means causes a short circuit or a ground fault to occur in the phase of the electrical line (3) branched from the bus, it is provided in the phase of the electrical line in which the short circuit or the ground fault has occurred after a predetermined operating time. The first trip signal (V OC ) output from the overcurrent relay (4) provided to the circuit breaker (5) provided in the phase of the electric line, or after a predetermined operating time has passed to the electric line A second step (S12; S22) for obtaining a second trip signal (V DG ) output from the provided ground fault relay (5) to the circuit breaker (5);
A third step (S13; S23) of detecting that the output signal of the voltage detection relay is no longer output when the circuit breaker interrupts the phase of the electric line, the device quality determination means;
The device pass / fail determination means is configured to provide the overcurrent relay, the ground fault based on a first trip signal of the overcurrent relay, a second trip signal of the ground fault relay, and an output signal of the voltage detection relay. A fourth step (S14, S15: S24, S25) for determining pass / fail of the relay and the circuit breaker;
A device quality determination method comprising:
前記第2のステップにおいて、
前記機器良否判定手段が、前記電圧検出用継電器の出力信号に基づいて、前記母線の短絡相の電圧が整定値よりも低下した時刻である電圧低下発生時刻と、前記母線の短絡相の電圧が回復した時刻である電圧回復時刻とを求め、
前記機器良否判定手段が、前記求めた電圧回復時刻から前記求めた電圧低下発生時刻を引いて短絡継続時間(T)を求め、
前記機器良否判定手段が、前記過電流継電器の第1のトリップ信号に基づいて、該第1のトリップ信号が入力されてきた時刻であるトリップ信号入力時刻を求め、
前記機器良否判定手段が、前記求めた短絡継続時間から、前記求めたトリップ信号入力時刻から前記求めた電圧回復時刻までの時間を引くことにより、前記過電流継電器が動作を開始してから前記第1のトリップ信号を出力するまでの動作時間(y)を求め、
前記機器良否判定部が、前記求めた過電流継電器の動作時間と前記過電流継電器の動作時限とを比較して、該過電流継電器の良否を判定し、
前記機器良否判定部が、前記求めたトリップ信号入力時刻から前記求めた電圧回復時刻までの時間を算出することにより、前記遮断器の動作時間(z)を求め、
前記機器良否判定部が、前記求めた遮断器の動作時間(z)に基づいて前記遮断器の良否を判定する、
ことを特徴とする、請求項5記載の機器良否判定方法。
In the second step,
Based on the output signal of the voltage detection relay, the device pass / fail determination means includes a voltage drop occurrence time that is a time when the voltage of the short circuit phase of the bus is lower than a set value, and a voltage of the short circuit phase of the bus. Find the voltage recovery time that is the recovery time,
The device pass / fail judgment means obtains a short-circuit duration (T) by subtracting the obtained voltage drop occurrence time from the obtained voltage recovery time,
The device pass / fail determination means obtains a trip signal input time which is a time when the first trip signal is input based on the first trip signal of the overcurrent relay,
The device pass / fail determination means subtracts the time from the determined trip signal input time to the determined voltage recovery time from the determined short-circuit continuation time, so that the overcurrent relay starts operating. The operation time (y) until the trip signal 1 is output is obtained.
The device pass / fail judgment unit compares the obtained overcurrent relay operation time and the overcurrent relay operation time period to determine the overcurrent relay pass / fail,
By calculating the time from the obtained trip signal input time to the obtained voltage recovery time, the device pass / fail judgment unit obtains the operation time (z) of the circuit breaker,
The device pass / fail determination unit determines the pass / fail of the circuit breaker based on the obtained circuit breaker operating time (z).
The apparatus quality determination method according to claim 5, wherein:
前記第2のステップにおいて、
前記機器良否判定手段が、前記電圧検出用継電器の出力信号に基づいて、前記母線の地絡相に電圧降下が発生した時刻である地絡相電圧降下発生時刻と、前記母線の地絡相の地絡電圧が回復して電圧が復帰した時刻である地絡相電圧復帰時刻とを求め、
前記機器良否判定手段が、前記求めた地絡相電圧復帰時刻から前記求めた地絡相電圧降下発生時刻を引いて地絡継続時間(x)を求め、
前記機器良否判定手段が、前記地絡継電器の第2のトリップ信号に基づいて、該第2のトリップ信号が入力されてきた時刻であるトリップ信号入力時刻を求め、
前記機器良否判定手段が、前記求めた地絡継続時間から、前記求めたトリップ信号入力時刻から前記求めた地絡相電圧復帰時刻までの時間を引くことにより、前記地絡継電器が動作を開始してから前記トリップ信号を出力するまでの動作時間(y)を求め、
前記機器良否判定部が、前記求めた地絡継電器の動作時間と前記地絡継電器の動作時限とを比較して、該地絡継電器の良否を判定し、
前記機器良否判定部が、前記求めたトリップ信号入力時刻から前記求めた地絡相電圧復帰時刻までの時間を算出することにより、前記遮断器の動作時間(z)を求め、
前記機器良否判定部が、前記求めた遮断器の動作時間(z)に基づいて前記遮断器の良否を判定する、
ことを特徴とする、請求項5記載の機器良否判定方法。
In the second step,
Based on the output signal of the voltage detection relay, the equipment pass / fail judgment means is a time of occurrence of a ground fault voltage drop, which is a time when a voltage drop occurs in the ground fault phase of the bus, and a ground fault phase of the bus Find the ground fault voltage return time, which is the time when the ground fault voltage recovers and the voltage returns,
The device pass / fail determination means obtains a ground fault duration (x) by subtracting the calculated ground fault phase voltage drop occurrence time from the determined ground fault phase voltage return time,
The device pass / fail determination means obtains a trip signal input time which is a time when the second trip signal is input based on the second trip signal of the ground fault relay,
The equipment quality determination means subtracts the time from the determined trip signal input time to the determined ground fault phase voltage return time from the determined ground fault continuation time, whereby the ground fault relay starts operating. The operation time (y) from when the trip signal is output until the trip signal is output,
The equipment pass / fail judgment unit compares the obtained ground fault relay operation time and the ground fault relay operation time period to determine pass / fail of the ground fault relay,
By calculating the time from the determined trip signal input time to the determined ground fault voltage return time, the device pass / fail determination unit determines the operation time (z) of the circuit breaker,
The device pass / fail determination unit determines the pass / fail of the circuit breaker based on the obtained circuit breaker operating time (z).
The apparatus quality determination method according to claim 5, wherein:
前記第1,第2および第3のステップが、子局側遠方監視制御装置(21)によって行われ、
前記第4のステップの前に、前記子局側遠方監視制御装置と通信回線(22)を介して相互接続された親局側遠方監視制御装置(23)から、前記電線路の相において短絡または地絡が発生すると、短絡または地絡の継続時間を含む時間範囲の、短絡または地絡が発生した前記電線路の相に設けられた前記過電流継電器の第1のトリップ信号または前記電線路に設けられた前記地絡継電器の第2のトリップ信号および前記電圧検出用継電器の出力信号のデータの送信を前記子局側遠方監視制御装置に要求する要求信号を前記通信回線を介して該子局側遠方監視制御装置に送信する第5のステップをさらに備え、
該第5のステップ後に、前記第4のステップが、前記過電流継電器の第1のトリップ信号または前記地絡継電器の第2のトリップ信号および前記電圧検出用継電器の出力信号のデータに基づいて、前記親局側遠方監視制御装置に接続された親局側端末装置(24)によって行われる、
ことを特徴とする、請求項5乃至7いずれかに記載の機器良否判定方法。
The first, second and third steps are performed by the slave station side remote monitoring control device (21),
Before the fourth step, a short circuit or a short circuit occurs in the phase of the electric line from the master station remote monitoring control device (23) interconnected with the slave station remote monitoring control device via the communication line (22). When a ground fault occurs, the first trip signal of the overcurrent relay provided in the phase of the electrical line in which the short circuit or the ground fault has occurred in the time range including the duration of the short circuit or the ground fault or the electrical line A request signal for requesting transmission of data of the second trip signal of the ground fault relay provided and the output signal of the voltage detection relay to the remote monitoring control device on the slave station side is provided via the communication line. And further comprising a fifth step of transmitting to the side remote monitoring control device,
After the fifth step, the fourth step is based on data of the first trip signal of the overcurrent relay or the second trip signal of the ground fault relay and the output signal of the voltage detection relay. Performed by the master station side terminal device (24) connected to the master station side remote monitoring and control device,
The apparatus quality determination method according to claim 5, wherein the apparatus is good.
JP2005091040A 2005-03-28 2005-03-28 Apparatus quality judging system and apparatus quality judging method Withdrawn JP2006280025A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005091040A JP2006280025A (en) 2005-03-28 2005-03-28 Apparatus quality judging system and apparatus quality judging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005091040A JP2006280025A (en) 2005-03-28 2005-03-28 Apparatus quality judging system and apparatus quality judging method

Publications (1)

Publication Number Publication Date
JP2006280025A true JP2006280025A (en) 2006-10-12

Family

ID=37214175

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005091040A Withdrawn JP2006280025A (en) 2005-03-28 2005-03-28 Apparatus quality judging system and apparatus quality judging method

Country Status (1)

Country Link
JP (1) JP2006280025A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021001917A1 (en) * 2019-07-02 2021-01-07 株式会社東芝 Protection relay device and accident duration time acquiring method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021001917A1 (en) * 2019-07-02 2021-01-07 株式会社東芝 Protection relay device and accident duration time acquiring method

Similar Documents

Publication Publication Date Title
US20200412167A1 (en) Method and system for fast reconfiguration of power supply network in tens of milliseconds after power grid failure
US8649131B2 (en) Method and device for supervising secondary circuit of instrument transformer in power system
EP2206208B1 (en) Differential protection method, system and device
KR20140135795A (en) Method of fault clearance
CN109061378A (en) Small current neutral grounding system ground fault checks method
JP2008263744A (en) Equipment management system and equipment management method
CN108134376B (en) High-voltage bus fault rapid protection device and protection method
KR100920946B1 (en) Apparatus and method for fault detection and fault location decision on a distribution line using load current
JP2013207990A (en) Power distribution automation system
JP2006280024A (en) Apparatus automatic test system and apparatus automatic test method
CN108627795B (en) Method and device for monitoring open circuit of voltage transformer in measuring circuit of power equipment
JP2006280025A (en) Apparatus quality judging system and apparatus quality judging method
US11114892B2 (en) Electric power system transducer failure monitor and measurement recovery
JP2008259327A (en) Reclosing method
JP4667002B2 (en) Accident point location system and accident location method
JP2010115006A (en) System for determining bus line accident section
RU2437193C1 (en) Method, system and device of differential protection
CN110808568A (en) Method and protection device for preventing protection misoperation caused by direct-current voltage offset
KR19990083046A (en) Bus protection system for spot network type electric power receiving in stallation
JP2006300529A (en) Lead wire and method for measuring and testing apparatus
CN112039083B (en) Control method and device for load transfer across bypass buses
JP2012196047A (en) Changeover method of terminal board and apparatus
JP5247164B2 (en) Protective relay device
JP2016152741A (en) Ground directional relay
JP2008118763A (en) System and method for determining quality of busbar characteristics

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300