JP2008263744A - Equipment management system and equipment management method - Google Patents

Equipment management system and equipment management method Download PDF

Info

Publication number
JP2008263744A
JP2008263744A JP2007105582A JP2007105582A JP2008263744A JP 2008263744 A JP2008263744 A JP 2008263744A JP 2007105582 A JP2007105582 A JP 2007105582A JP 2007105582 A JP2007105582 A JP 2007105582A JP 2008263744 A JP2008263744 A JP 2008263744A
Authority
JP
Japan
Prior art keywords
time
ground fault
ovg
pallet
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2007105582A
Other languages
Japanese (ja)
Inventor
Satoshi Kimura
智 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2007105582A priority Critical patent/JP2008263744A/en
Publication of JP2008263744A publication Critical patent/JP2008263744A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/20Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Keying Circuit Devices (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an equipment management system and equipment management method, for managing equipment installed on a power line in real time. <P>SOLUTION: An equipment management system 1 comprises an earth fault protective relay 4 equipped with an earth fault direction relay 4a connected to a zero-phase current transformer 8 and zero-phase transformer 9 as well as an earth fault overvoltage relay 4b connected to the zero-phase transformer 9. It also comprises a circuit breaker 5 which disconnects a power distribution line 3 based on a trip signal S<SB>DG</SB>(earth fault indicator) of the earth fault protective relay 4, and an earth fault overvoltage detector 6 connected to the zero-phase transformer 9. It also comprises an equipment management device 24 which determines soundness of the earth fault protective relay 4 and the circuit breaker 5 based on a pallet contact signal S<SB>P</SB>representing the state of a pallet contact of the circuit breaker 5, OVG operation signal S<SB>OVG</SB>representing operation time of the earth fault overvoltage relay 4b, the trip signal S<SB>DG</SB>of the earth fault protective relay 4, and an earth fault overvoltage detector output signal S<SB>V1</SB>indicated by the earth fault overvoltage detector 6 that a zero-phase voltage value of a bus line 2 has become a specified value or higher. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、機器管理システムおよび機器管理方法に関し、特に、配電線などの電線路に設置された地絡保護継電器や遮断器などをリアルタイムで管理するのに好適な機器管理システムおよび機器管理方法に関する。   The present invention relates to a device management system and a device management method, and more particularly, to a device management system and a device management method suitable for managing, in real time, a ground fault protective relay or a circuit breaker installed in a power line such as a distribution line. .

一般に、電力系統に用いられている保護継電器および遮断器などの機器の管理は、給電オシロ装置によって記録された電圧・電流波形データや、停電点検による点検データに基づいて機器の異常の有無を検査することにより行われている。   In general, the management of devices such as protective relays and circuit breakers used in the power system is checked for the presence or absence of device abnormalities based on the voltage / current waveform data recorded by the power supply oscilloscope and the inspection data from the power failure inspection. Is done by doing.

なお、本出願人は、下記の特許文献1において、発変電所機器の状態を自動監視するために、遠方操作機器については、たとえば、変電所に設置された遮断器を切るための切指令信号を遠制装置から遮断器に入力し、切指令信号に対する遮断器の応動時間を測定するための補助スイッチの出力信号を遮断器から遠制装置に入力し、遠制装置が補助スイッチの出力信号に応じて遮断器の状態を判定し、また、現地自動操作機器については、たとえば、変電所に設置されたタップ切換器が動作していることを示すタップ切換モータ用の駆動信号をタップ切換器から遠制装置に入力し、遠制装置がこの駆動信号に応じてタップ切換器の状態を判定するようにした、変電所機器の遠方監視方法およびシステムを提案している。   In addition, in the following patent document 1, the applicant of the present application is, for example, a turn command signal for turning off a circuit breaker installed in a substation for a remote operation device in order to automatically monitor the state of the power generation substation equipment. Is input to the circuit breaker from the distance control device, the output signal of the auxiliary switch for measuring the response time of the circuit breaker to the turn command signal is input from the circuit breaker to the distance control device, and the distance control device outputs the output signal of the auxiliary switch. The state of the circuit breaker is determined according to the condition, and for the field automatic operation equipment, for example, a tap switch motor drive signal indicating that the tap switch installed in the substation is operating is a tap switch. A remote monitoring method and system for substation equipment is proposed in which the distance control device determines the state of the tap changer according to the drive signal.

また、下記の特許文献2には、必要な状変情報のみをSOE情報として取り出すことができ、SOE情報分析の効率向上を図るために、電力系統の制御所と被制御所との間で情報を送受信し、被制御所の電力設備を監視制御する遠方監視制御装置の被制御所は、制御所からの制御信号が電力設備の操作指令であるときはその電力設備を操作する制御信号出力手段と、制御信号出力手段により電気設備が操作されたときはその旨を操作応動状変として記憶するための応動監視ファイルと、電力設備の状変が応動監視ファイルに記憶された操作応動状変でないときはその状変のSOE情報を作成するSOE情報作成手段と、SOE情報作成手段で作成されたSOE情報を記憶するSOE原始ファイルとを備えた遠方監視制御装置が開示されている。
特開2005−168121号公報 特開平8−223826号公報
Further, in Patent Document 2 below, only necessary state change information can be extracted as SOE information, and in order to improve the efficiency of SOE information analysis, information between the control station of the power system and the controlled station is provided. The controlled station of the remote monitoring and control device that monitors and controls the power equipment of the controlled station is a control signal output means for operating the power equipment when the control signal from the control station is an operation instruction of the power equipment When the electrical equipment is operated by the control signal output means, the response monitoring file for storing the fact as the operation response status change, and the status change of the power equipment is not the operation response status change stored in the response monitoring file. In some cases, a remote monitoring and control device is disclosed that includes SOE information creation means for creating SOE information of the state change and an SOE source file for storing SOE information created by the SOE information creation means.
JP 2005-168121 A JP-A-8-223826

しかしながら、給電オシロ装置の電圧・電流波形データに基づく機器管理では、給電オシロ装置は高価であるため電力系統の主要線路にしか設置されておらず配電線などの電線路には設置されていないのが現状であるため、電線路に設置された機器の管理を行うことができないという問題がある。
また、停電点検時の点検データに基づく機器管理では、常時の動作管理がなされていないため、リアルタイムの機器管理を行うことができないという問題がある。
However, in equipment management based on the voltage and current waveform data of the power supply oscilloscope, the power supply oscilloscope is expensive, so it is installed only on the main line of the power system and not installed on the electric lines such as distribution lines. However, there is a problem that it is impossible to manage the equipment installed in the electric line.
In addition, device management based on inspection data at the time of power outage inspection has a problem that real-time device management cannot be performed because normal operation management is not performed.

本発明の目的は、電線路に設置された機器の管理をリアルタイムで行うことができる機器管理システムおよび機器管理方法を提供することにある。   An object of the present invention is to provide a device management system and a device management method capable of managing a device installed in an electric line in real time.

本発明の機器管理システムは、母線(2)から分岐された電線路(3)に設けられた零相変流器(8)および該母線に設けられた零相変成器(9)に接続された地絡方向継電器(4a)と該零相変成器に接続された地絡過電圧継電器(4b)とを備えた地絡保護継電器(4)と、該地絡保護継電器から出力されるトリップ信号(SDG)に基づいて前記電線路を遮断する遮断器(5)と、前記零相変成器に接続された地絡過電圧検出器(6)と、前記遮断器のパレット接点の状態を表わすパレット接点信号(SP)、前記地絡過電圧継電器の動作時間を表わすOVG動作信号(SOVG)、前記地絡保護継電器の前記トリップ信号および前記母線の零相電圧値が所定の値以上になったことを前記地絡過電圧検出器が示す地絡過電圧検出器出力信号(SV1)に基づいて、前記地絡保護継電器および前記遮断器の良否を判定する機器管理手段(21,23,24;24’)とを具備することを特徴とする。
ここで、前記機器管理手段が、所定の時間間隔で前記パレット接点信号、前記OVG動作信号、前記トリップ信号および前記地絡過電圧検出器出力信号を取り込んで、該取り込んだパレット接点信号、OVG動作信号、トリップ信号および地絡過電圧検出器出力信号の状変情報を保管する子局側遠方監視制御装置(21)と、該子局側遠方監視制御装置と通信回線(22)を介して相互接続された親局側遠方監視制御装置(23)であって、前記電線路において地絡事故が発生すると、該地絡事故の継続時間を含む時間範囲の前記パレット接点信号、前記OVG動作信号、前記トリップ信号および前記地絡過電圧検出器出力信号の状変情報の送信を要求する要求信号を前記子局側遠方監視制御装置に前記通信回線を介して送信し、該子局側遠方監視制御装置から前記要求した時間範囲のパレット接点信号、OVG動作信号、トリップ信号および地絡過電圧検出器出力信号の状変情報を受信する親局側遠方監視制御装置(23)と、該親局側遠方監視制御装置から入力される前記パレット接点信号、前記OVG動作信号、前記トリップ信号および前記地絡過電圧検出器出力信号の状変情報に基づいて、前記地絡保護継電器および前記遮断器の良否を判定する機器管理装置(24)とを備えてもよい。
前記機器管理装置(24)が、前記地絡過電圧検出器出力信号の状変情報によって表わされるV0発生時刻(t1)、前記OVG動作信号の状変情報によって表わされるOVG表示時刻(t3)、前記トリップ信号の状変情報によって表わされる地絡表示時刻(t4)、前記パレット接点信号の状変情報によって表わされるパレット切時刻(t5)および前記OVG動作信号の状変情報によって表わされるOVG復帰時刻(t6)に基づいて、パレット事故継続時間(T1)、パレット遮断時間(T2)、事故継続時間(T3)、継電器指令時間(T4)、OVG動作時間(T5)およびV0−OVG差時間(T6)を算出し、該算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて、前記地絡保護継電器および前記遮断器の良否を判定してもよい。
前記機器管理装置(24)が、前記パレット切時刻(t5)から前記V0発生時刻(t1)を引くことにより、前記パレット事故継続時間(T1)を算出し、前記パレット切時刻(t5)から前記地絡表示時刻(t4)を引くとともに前記地絡保護継電器の表示動作遅延時間(D3)を足すことにより、前記パレット遮断時間(T2)を算出し、前記OVG復帰時刻(t6)から前記V0発生時刻(t1)および前記地絡過電圧継電器の復帰遅延時間(D2)を引くことにより、前記事故継続時間(T3)を算出し、前記地絡表示時刻(t4)から前記V0発生時刻(t1)および前記地絡保護継電器の表示動作遅延時間(D3)を引くことにより、前記継電器指令時間(T4)を算出し、前記OVG復帰時刻(t6)から前記OVG表示時刻(t3)を引き前記地絡過電圧継電器の動作時限(D4)および前記地絡過電圧継電器の表示動作遅延時間(D1)を足すとともに前記地絡過電圧継電器の復帰遅延時間(D2)を引くことにより、前記OVG動作時間(T5)を算出し、前記OVG復帰時刻(t6)から前記V0発生時刻(t1)、前記地絡過電圧継電器の復帰遅延時間(D2)および前記OVG動作時間(T5)を引くことにより、前記V0−OVG差時間(T6)を算出してもよい。
前記トリップ信号と前記パレット接点信号との時間差を検出する時間差検出回路(31)と、該時間差検出回路の出力信号の時間軸を所定の倍数に伸張する伸張回路(32)とを備える時間軸拡大装置(30)が、前記子局側遠方監視制御装置に設けられており、前記子局側遠方監視制御装置が、時間軸拡大装置出力信号の状変情報を保管し、前記機器管理装置が、前記要求した時間範囲の前記時間軸拡大装置出力信号の状変情報に基づいて前記パレット切時刻(t5)と前記地絡表示時刻(t4)との拡大差時間を求め、該求めた拡大差時間から前記時間差検出回路によって検出された時間差を復元したのち、該復元した時間差に前記地絡保護継電器の表示動作遅延時間(D3)を足すことにより、前記パレット遮断時間(T2)を算出してもよい。
前記機器管理手段が、前記遮断器から入力される前記パレット接点信号、前記地絡過電圧継電器から入力される前記OVG動作信号、前記地絡保護継電器から入力される前記トリップ信号および前記地絡過電圧検出器から入力される前記地絡過電圧検出器出力信号に基づいて、パレット事故継続時間(T1)、パレット遮断時間(T2)、事故継続時間(T3)、継電器指令時間(T4)、OVG動作時間(T5)およびV0−OVG差時間(T6)を算出し、該算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて前記地絡保護継電器および前記遮断器の良否を判定する機器管理装置(24’)を備えてもよい。
前記機器管理装置(24’)が、前記地絡過電圧検出器出力信号からV0発生時刻(t1)を求め、前記OVG動作信号からOVG表示時刻(t3)を求め、前記トリップ信号から地絡表示時刻(t4)を求め、前記パレット接点信号からパレット切時刻(t5)を求め、前記OVG動作信号からOVG復帰時刻(t6)を求め、前記パレット切時刻(t5)から前記V0発生時刻(t1)を引くことにより、前記パレット事故継続時間(T1)を算出し、前記パレット切時刻(t5)から前記地絡表示時刻(t4)を引くとともに前記地絡保護継電器の表示動作遅延時間(D3)を足すことにより、前記パレット遮断時間(T2)を算出し、前記OVG復帰時刻(t6)から前記V0発生時刻(t1)および前記地絡過電圧継電器の復帰遅延時間(D2)を引くことにより、前記事故継続時間(T3)を算出し、前記地絡表示時刻(t4)から前記V0発生時刻(t1)および前記地絡保護継電器の表示動作遅延時間(D3)を引くことにより、前記継電器指令時間(T4)を算出し、前記OVG復帰時刻(t6)から前記OVG表示時刻(t3)を引き前記地絡過電圧継電器の動作時限(D4)および前記地絡過電圧継電器の表示動作遅延時間(D1)を足すとともに前記地絡過電圧継電器の復帰遅延時間(D2)を引くことにより、前記OVG動作時間(T5)を算出し、前記OVG復帰時刻(t6)から前記V0発生時刻(t1)、前記地絡過電圧継電器の復帰遅延時間(D2)および前記OVG動作時間(T5)を引くことにより、前記V0−OVG差時間(T6)を算出してもよい。
前記機器管理装置(24,24’)が、前記パレット事故継続時間(T1)に基づいて全体の地絡事故時間を把握して、前記地絡保護継電器および前記遮断器の機構部が正常であるか否かを確認し、前記パレット遮断時間(T2)に基づいて前記遮断器の機構部が正常であるか否かを確認し、前記事故継続時間(T3)に基づいて地絡事故継続時間を確認することにより、実系統で事故が正常に遮断されたか否かを確認し、前記継電器指令時間(T4)に基づいて前記地絡保護継電器のトリップ指令時間を確認することにより、該地絡保護継電器の指令時間が正常であるか否かを確認し、前記OVG動作時間(T5)に基づいて前記地絡過電圧継電器の継続時間を推定することにより、該地絡過電圧継電器が正常であるか否かを確認し、前記V0−OVG差時間(T6)に基づいて零相電圧の発生から前記地絡過電圧検出器および前記地絡過電圧継電器が動作するまでの差時間を把握することにより、前記地絡過電圧継電器の整定および動作が正常であるか否かを確認してもよい。
The equipment management system of the present invention is connected to a zero-phase current transformer (8) provided in the electric line (3) branched from the bus (2) and a zero-phase transformer (9) provided in the bus. A ground fault protection relay (4) having a ground fault direction relay (4a) and a ground fault overvoltage relay (4b) connected to the zero-phase transformer, and a trip signal output from the ground fault protection relay ( A circuit breaker (5) for breaking the electric line based on SDG ), a ground fault overvoltage detector (6) connected to the zero-phase transformer, and a pallet contact representing the state of the pallet contact of the breaker The signal (S P ), the OVG operation signal (S OVG ) indicating the operation time of the ground fault overvoltage relay, the trip signal of the ground fault protection relay, and the zero-phase voltage value of the bus have exceeded a predetermined value. The ground fault overvoltage detector output signal indicated by the ground fault overvoltage detector Based on the S V1), device management means for determining the quality of the ground fault protection relay and the circuit breaker (21, 23, 24; characterized by comprising a 24 ').
Here, the device management means captures the pallet contact signal, the OVG operation signal, the trip signal, and the ground fault overvoltage detector output signal at predetermined time intervals, and the captured pallet contact signal and OVG operation signal. A remote monitoring control device (21) for storing the state change information of the trip signal and the output signal of the ground fault overvoltage detector, and the remote monitoring control device (21) connected to the slave station remote monitoring control device via the communication line (22). When the ground fault occurs in the electric line, the pallet contact signal, the OVG operation signal, the trip in the time range including the duration of the ground fault is generated. A request signal for requesting transmission of a signal and state change information of the ground fault overvoltage detector output signal is transmitted to the remote monitoring control device on the slave station side via the communication line, A master station side remote monitoring control device (23) for receiving state change information of the palette contact signal, OVG operation signal, trip signal and ground fault overvoltage detector output signal in the requested time range from the monitoring control device; The ground fault protection relay and the circuit breaker pass / fail based on the pallet contact signal, the OVG operation signal, the trip signal and the ground fault overvoltage detector output signal state information input from the side remote monitoring control device And a device management device (24) for determining whether or not.
The equipment management device (24) has a V 0 generation time (t1) represented by the state change information of the ground fault overvoltage detector output signal, an OVG display time (t3) represented by the state change information of the OVG operation signal, Ground fault display time (t4) represented by the trip signal state change information, pallet cut time (t5) represented by the pallet contact signal state change information, and OVG return time represented by the OVG operation signal state change information. Based on (t6), the pallet accident duration (T 1 ), pallet cut-off time (T 2 ), accident duration (T 3 ), relay command time (T 4 ), OVG operation time (T 5 ) and V 0 -OVG difference time (T 6 ) is calculated, and the calculated pallet accident duration, pallet cut-off time, accident duration, relay command time, OVG operation time and V 0 The quality of the ground fault protection relay and the circuit breaker may be determined based on the -OVG difference time.
The equipment management device (24) calculates the pallet accident duration (T 1 ) by subtracting the V 0 occurrence time (t1) from the pallet cut time (t5), and the pallet cut time (t5). By subtracting the ground fault display time (t4) from the ground and adding the display operation delay time (D3) of the ground fault protection relay, the pallet shutoff time (T 2 ) is calculated, and the OVG return time (t6) is calculated. by subtracting the V 0 generation time (t1) and the ground fault over-voltage relay return delay time (D2), the calculated fault duration of (T 3), said from the ground fault display time (t4) V 0 by subtracting occurrence time (t1) and the ground fault protection relay display operation delay time (D3), calculates the relay instruction time (T 4), said OVG display time from the OVG return time (t6) By subtracting t3) and adding the operation time limit (D4) of the ground fault overvoltage relay and the display operation delay time (D1) of the ground fault overvoltage relay and subtracting the return delay time (D2) of the ground fault overvoltage relay, The OVG operation time (T 5 ) is calculated, and the V 0 generation time (t 1), the ground fault overvoltage relay recovery delay time (D 2), and the OVG operation time (T 5 ) are calculated from the OVG recovery time (t 6 ). The V 0 -OVG difference time (T 6 ) may be calculated by subtraction.
A time axis expansion circuit comprising a time difference detection circuit (31) for detecting a time difference between the trip signal and the pallet contact signal, and an expansion circuit (32) for expanding the time axis of the output signal of the time difference detection circuit to a predetermined multiple. The device (30) is provided in the slave station side remote monitoring and control device, the slave station side remote monitoring and control device stores state change information of the time axis expansion device output signal, the device management device, Based on the change information of the output signal of the time axis expansion device in the requested time range, an expansion difference time between the palette cut time (t5) and the ground fault display time (t4) is obtained, and the obtained expansion difference time After restoring the time difference detected by said time difference detecting circuit from by adding the ground fault protection relay of the display operation delay time to the time difference and the restored (D3), and calculates the pallet interruption time (T 2) It may be.
The device management means includes the pallet contact signal input from the circuit breaker, the OVG operation signal input from the ground fault overvoltage relay, the trip signal input from the ground fault protection relay, and the ground fault overvoltage detection. Based on the output signal of the ground fault overvoltage detector input from the device, the pallet accident duration (T 1 ), the pallet cutoff time (T 2 ), the accident duration (T 3 ), the relay command time (T 4 ), The OVG operation time (T 5 ) and the V 0 -OVG difference time (T 6 ) are calculated, and the calculated pallet accident duration, pallet shut-off time, accident duration, relay command time, OVG operation time, and V 0 -OVG You may provide the equipment management apparatus (24 ') which determines the quality of the said ground fault protective relay and the said circuit breaker based on difference time.
The equipment management device (24 ′) obtains a V 0 generation time (t1) from the ground fault overvoltage detector output signal, obtains an OVG display time (t3) from the OVG operation signal, and displays a ground fault from the trip signal. A time (t4) is obtained, a pallet cut time (t5) is obtained from the pallet contact signal, an OVG return time (t6) is obtained from the OVG operation signal, and the V 0 generation time (t1) is obtained from the pallet cut time (t5). ) To calculate the pallet accident duration (T 1 ), subtract the ground fault display time (t 4) from the pallet cut time (t 5), and display operation delay time (D 3) of the ground fault protection relay ) To calculate the pallet cut-off time (T 2 ), and from the OVG return time (t6) to the V 0 generation time (t1) and the return delay time of the ground fault overvoltage relay By subtracting the interval (D2), the accident duration (T 3 ) is calculated. From the ground fault display time (t4), the V 0 occurrence time (t1) and the display operation delay time of the ground fault protection relay ( The relay command time (T 4 ) is calculated by subtracting D3), the OVG display time (t3) is subtracted from the OVG return time (t6), and the operation time limit (D4) of the ground fault overvoltage relay and the ground By adding the display operation delay time (D1) of the fault overvoltage relay and subtracting the return delay time (D2) of the ground fault overvoltage relay, the OVG operation time (T 5 ) is calculated, and the OVG return time (t6) The V 0 -OVG difference time (T 6 ) is calculated by subtracting the V 0 occurrence time (t 1), the return delay time (D 2) of the ground fault overvoltage relay and the OVG operation time (T 5 ) from The Also good.
The equipment management device (24, 24 ') grasps the entire ground fault accident time based on the pallet accident duration (T 1 ), and the ground fault protection relay and the circuit breaker mechanism are normal. It is confirmed whether there is a fault, and based on the pallet breaking time (T 2 ), it is confirmed whether the mechanical part of the circuit breaker is normal, and a ground fault is caused based on the accident duration (T 3 ). By confirming the duration time, it is confirmed whether or not the accident is normally shut off in the actual system, and by checking the trip command time of the ground fault protection relay based on the relay command time (T 4 ), By checking whether the command time of the ground fault protection relay is normal and estimating the duration of the ground fault overvoltage relay based on the OVG operation time (T 5 ), the ground fault overvoltage relay is Check whether it is normal and Based on the 0- OVG difference time (T 6 ), by grasping the difference time from the generation of the zero-phase voltage to the operation of the ground fault overvoltage detector and the ground fault overvoltage relay, the ground fault overvoltage relay is settled. Further, it may be confirmed whether or not the operation is normal.

本発明の機器管理方法は、母線(2)から分岐された電線路(3)に設けられた零相変流器(8)および該母線に設けられた零相変成器(9)に接続された地絡方向継電器(4a)と該零相変成器に接続された地絡過電圧継電器(4b)とを備えた地絡保護継電器(4)と、該地絡保護継電器から出力されるトリップ信号(SDG)に基づいて前記電線路を遮断する遮断器(5)との良否を判定する機器管理方法であって、機器管理手段(21,23,24;24’)が、前記母線の零相電圧値が所定の値以上になったことを前記零相変成器に接続された前記地絡過電圧検出器が示す地絡過電圧検出器出力信号(SV1)によって表わされるV0発生時刻(t1)、前記地絡過電圧継電器の動作時間を表わすOVG動作信号(SOVG)によって表わされるOVG表示時刻(t3)、前記地絡保護継電器の前記トリップ信号によって表わされる地絡表示時刻(t4)、前記遮断器のパレット接点の状態を表わすパレット接点信号(SP)によって表わされるパレット切時刻(t5)、および、前記OVG動作信号によって表わされるOVG復帰時刻(t6)に基づいて、パレット事故継続時間(T1)、パレット遮断時間(T2)、事故継続時間(T3)、継電器指令時間(T4)、OVG動作時間(T5)およびV0−OVG差時間(T6)を算出する第1のステップ(S15)と、前記機器管理手段が、前記算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて、前記地絡保護継電器および前記遮断器の良否を判定する第2のステップ(S16)とを具備することを特徴とする。
ここで、前記第1のステップの前に、子局側遠方監視制御装置(21)が、所定の時間間隔で前記パレット接点信号、前記OVG動作信号、前記トリップ信号および前記地絡過電圧検出器出力信号を取り込んで、該取り込んだパレット接点信号、OVG動作信号、トリップ信号および地絡過電圧検出器出力信号の状変情報を保管する第3のステップと、前記子局側遠方監視制御装置と通信回線(22)を介して相互接続された親局側遠方監視制御装置(23)が、前記電線路において地絡事故が発生すると、該地絡事故の継続時間を含む時間範囲の前記パレット接点信号、前記OVG動作信号、前記トリップ信号および前記地絡過電圧検出器出力信号の状変情報の送信を要求する要求信号を前記子局側遠方監視制御装置に前記通信回線を介して送信し、該子局側遠方監視制御装置から前記要求した時間範囲のパレット接点信号、OVG動作信号、トリップ信号および地絡過電圧検出器出力信号の状変情報を受信する第4のステップ(S14)とをさらに具備し、前記第1のステップにおいて、前記親局側遠方監視制御装置に接続された機器管理装置(24)が、前記地絡過電圧検出器出力信号の状変情報によって表わされる前記V0発生時刻、前記OVG動作信号の状変情報によって表わされる前記OVG表示時刻、前記トリップ信号の状変情報によって表わされる前記地絡表示時刻、前記パレット接点信号の状変情報によって表わされる前記パレット切時刻および前記OVG動作信号の状変情報によって表わされる前記OVG復帰時刻に基づいて、前記パレット事故継続時間、前記パレット遮断時間、前記事故継続時間、前記継電器指令時間、前記OVG動作時間および前記V0−OVG差時間を算出し、
前記第2のステップにおいて、前記機器管理装置(24)が、前記算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて、前記地絡保護継電器および前記遮断器の良否を判定してもよい。
前記トリップ信号と前記パレット接点信号との時間差を検出する時間差検出回路(31)と、該時間差検出回路の出力信号の時間軸を所定の倍数に伸張する伸張回路(32)とを備える時間軸拡大装置(30)が、前記子局側遠方監視制御装置に設けられており、前記第3のステップにおいて、前記子局側遠方監視制御装置が、時間軸拡大装置出力信号の状変情報を保管し、前記第1のステップにおいて、前記機器管理装置(24)が、前記要求した時間範囲の前記時間軸拡大装置出力信号の状変情報に基づいて前記パレット切時刻(t5)と前記地絡表示時刻(t4)との拡大差時間を求め、該求めた拡大差時間から前記時間差検出回路によって検出された時間差を復元したのち、該復元した時間差に前記地絡保護継電器の表示動作遅延時間(D3)を足すことにより、前記パレット遮断時間(T2)を算出してもよい。
前記第1のステップにおいて、前記地絡保護継電器、前記遮断器および前記地絡過電圧検出器に接続された機器管理装置(24’)が、前記地絡過電圧検出器出力信号からV0発生時刻(t1)を求め、前記OVG動作信号からOVG表示時刻(t3)を求め、前記トリップ信号から地絡表示時刻(t4)を求め、前記パレット接点信号からパレット切時刻(t5)を求め、前記OVG動作信号からOVG復帰時刻(t6)を求め、該求めたV0発生時刻、OVG表示時刻、地絡表示時刻、パレット切時刻およびOVG復帰時刻に基づいて前記パレット事故継続時間、前記パレット遮断時間、前記事故継続時間、前記継電器指令時間、前記OVG動作時間および前記V0−OVG差時間を算出し、前記第2のステップにおいて、前記機器管理装置(24’)が、前記算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて、前記地絡保護継電器および前記遮断器の良否を判定してもよい。
The device management method of the present invention is connected to a zero-phase current transformer (8) provided in the electric line (3) branched from the bus (2) and a zero-phase transformer (9) provided in the bus. A ground fault protection relay (4) having a ground fault direction relay (4a) and a ground fault overvoltage relay (4b) connected to the zero-phase transformer, and a trip signal output from the ground fault protection relay ( S DG ) is a device management method for determining pass / fail with the circuit breaker (5) that shuts off the electric wire path, wherein the device management means (21, 23, 24; 24 ') is a zero phase of the bus V 0 generation time (t1) represented by the ground fault overvoltage detector output signal (S V1 ) indicated by the ground fault overvoltage detector connected to the zero phase transformer that the voltage value is equal to or greater than a predetermined value. , Represented by an OVG operation signal (S OVG ) representing the operation time of the ground fault overvoltage relay. OVG display time that is (t3), the ground fault display time represented by the trip signal of the ground fault protection relay (t4), the pallet represented by the breaker of the pallet contact states pallet contact signal indicative of (S P) Based on the turn-off time (t5) and the OVG return time (t6) represented by the OVG operation signal, the pallet accident duration (T 1 ), the pallet cut-off time (T 2 ), the accident duration (T 3 ), relay instruction time (T 4), and OVG operation time (T 5) and V 0 -OVG difference time first step (S15) for calculating a (T 6), the device management means, pallet accident continuations the calculated time, pallets interruption time, accidents duration, relay instruction time, based on the OVG operation time and V 0 -OVG difference time, the ground fault protection relay and the blocking Characterized by comprising a second step of acceptability determining (S16).
Here, before the first step, the slave station side remote monitoring control device (21) causes the pallet contact signal, the OVG operation signal, the trip signal, and the ground fault overvoltage detector output at predetermined time intervals. A third step of capturing a signal and storing state change information of the captured pallet contact signal, OVG operation signal, trip signal, and ground fault overvoltage detector output signal; and the slave station side remote monitoring and control device and communication line (22) When the master station side remote monitoring and control device (23) interconnected via (22) causes a ground fault in the electric line, the pallet contact signal in a time range including the duration of the ground fault A request signal for requesting transmission of state change information of the OVG operation signal, the trip signal, and the ground fault overvoltage detector output signal is transmitted to the remote monitoring control device on the slave station side via the communication line. A fourth step of transmitting and receiving state change information of the pallet contact signal, OVG operation signal, trip signal and ground fault overvoltage detector output signal in the requested time range from the remote monitoring device on the slave station side (S14) And in the first step, the device management device (24) connected to the remote monitoring control device on the master station side represents the V represented by the state change information of the output signal of the ground fault overvoltage detector. 0 Occurrence time, OVG display time represented by state change information of the OVG operation signal, ground fault display time represented by state change information of the trip signal, pallet cut-off state represented by state change information of the pallet contact signal Based on the time and the OVG return time represented by the state change information of the OVG operation signal, the pallet accident duration time, Calculating a pallet cut-off time, the accident duration, the relay command time, the OVG operation time, and the V 0 -OVG difference time;
In the second step, the equipment management device (24), based on the calculated pallet accident continuation time, pallet interruption time, accident continuation time, relay command time, OVG operation time, and V 0 -OVG difference time, The quality of the ground fault protection relay and the circuit breaker may be determined.
A time axis expansion circuit comprising a time difference detection circuit (31) for detecting a time difference between the trip signal and the pallet contact signal, and an expansion circuit (32) for expanding the time axis of the output signal of the time difference detection circuit to a predetermined multiple. A device (30) is provided in the slave station side remote monitoring and control device, and in the third step, the slave station side remote monitoring and control device stores the state change information of the time axis expansion device output signal. In the first step, the device management device (24) determines that the pallet cut time (t5) and the ground fault display time based on the state change information of the time axis expansion device output signal in the requested time range. After obtaining the expansion difference time from (t4) and restoring the time difference detected by the time difference detection circuit from the obtained expansion difference time, the display operation delay time of the ground fault protection relay is added to the restored time difference. By adding the (D3), it may calculate the pallet interruption time (T 2).
In the first step, the equipment management device (24 ′) connected to the ground fault protection relay, the circuit breaker, and the ground fault overvoltage detector receives a V 0 generation time ( t1), an OVG display time (t3) from the OVG operation signal, a ground fault display time (t4) from the trip signal, a pallet cut time (t5) from the pallet contact signal, and the OVG operation signal obtains the OVG return time (t6) from the obtained V 0 occurrence time, OVG display time, ground fault display time, the pallet accident duration based on the pallet changeover time and OVG return time, the pallet interruption time, wherein accident duration, the relay instruction time, calculates the OVG operating time and the V 0 -OVG difference time, in the second step, the device management instrumentation (24 ') is, the calculated pallet accident duration, pallet interruption time, accidents duration, relay instruction time, based on the OVG operation time and V 0 -OVG difference time, the ground fault protection relay and the circuit breaker Good or bad may be determined.

本発明の機器管理システムおよび機器管理方法は、電線路の現状の設備を用いて事故継続時間、遮断器の遮断時間および保護継電器の動作時間を常時測定することができるので、電線路に設置された機器の管理をリアルタイムで行うことができる。   The device management system and the device management method of the present invention can always measure the accident continuation time, the circuit breaker shut-off time, and the protective relay operating time using the existing equipment of the wireway, and are therefore installed in the wireway. Can manage the devices in real time.

上記の目的を、機器管理手段が、母線の零相電圧値が所定の値以上になったことを地絡過電圧検出器が示す地絡過電圧検出器出力信号によって表わされるV0発生時刻、地絡過電圧継電器の動作時間を表わすOVG動作信号によって表わされるOVG表示時刻、地絡保護継電器のトリップ信号によって表わされる地絡表示時刻、遮断器のパレット接点の状態を表わすパレット接点信号によって表わされるパレット切時刻およびOVG動作信号によって表わされるOVG復帰時刻に基づいて、パレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間を算出し、算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて地絡保護継電器および遮断器の良否を判定することにより実現した。 For the purpose described above, the equipment management means has a V 0 occurrence time, a ground fault represented by a ground fault overvoltage detector output signal indicated by the ground fault overvoltage detector that the zero-phase voltage value of the bus is equal to or higher than a predetermined value. OVG display time represented by an OVG operation signal representing the operation time of the overvoltage relay, ground fault display time represented by a trip signal for the ground fault protection relay, pallet cut time represented by a pallet contact signal representing the state of the pallet contact of the circuit breaker Based on the OVG return time represented by the OVG operation signal, the pallet accident continuation time, pallet shut-off time, accident continuation time, relay command time, OVG operation time and V 0 -OVG difference time are calculated, and the pallet accident continuation calculated time, pallets interruption time, accidents duration, relay instruction time, OVG operation time and V 0 -ov It was achieved by determining the quality of the ground fault protection relay and circuit breakers based on the difference time.

以下、本発明の機器管理システムおよび機器管理方法の実施例について図面を参照して説明する。
本発明の第1の実施例による機器管理システム1は、遠制情報を用いた機器管理システムであり、図1に示すように、母線2から分岐された配電線(電線路)3に設けられたかつ地絡方向継電器(DG)4aおよび地絡過電圧継電器(OVG)4bを備える地絡保護継電器4と、配電線3に設けられたかつ地絡保護継電器4のトリップ信号SDG(地絡表示)に基づいて配電線3を遮断する遮断器(パレット遮断器)5と、母線2に設けられた段階式地絡過電圧検出器6(段階式地絡過電圧継電器)と、子局側遠方監視制御装置(以下、「子局側テレコン」と称する。)21と、子局側テレコン21と通信回線22を介して接続された親局側遠方監視制御装置(以下、「親局側テレコン」と称する。)23と、親局側テレコン23に接続された機器管理装置24とを具備する。
Embodiments of a device management system and a device management method according to the present invention will be described below with reference to the drawings.
The device management system 1 according to the first embodiment of the present invention is a device management system using distance control information, and is provided on a distribution line (electric line) 3 branched from a bus 2 as shown in FIG. In addition, a ground fault protection relay 4 having a ground fault direction relay (DG) 4a and a ground fault overvoltage relay (OVG) 4b, and a trip signal S DG (ground fault display) provided on the distribution line 3 and of the ground fault protection relay 4 are provided. ) Based on the circuit breaker (pallet circuit breaker) 5, the stepped ground fault overvoltage detector 6 (stepped ground fault overvoltage relay) provided on the bus 2, and the slave station side remote monitoring control A device (hereinafter referred to as “slave station side telecon”) 21 and a master station side remote monitoring control device (hereinafter referred to as “master station side telecon”) connected to the slave station side telecon 21 via a communication line 22. .) 23 and the master station side telecon 23 And a device management device 24.

ここで、配電線3には零相変流器(ZCT)8が設けられており、当該配電線3(1次側)において地絡事故が生じると零相変流器8により地絡保護継電器4の地絡方向継電器4aに零相電流(以下、「I0電流」と称する。)を供給するようにしている。また、母線2には零相変成器(GPT)9が設けられており、母線2の零相電圧(以下、「V0電圧」と称する。)を零相変成器(GPT)9により低電圧に変換して地絡保護継電器4の地絡方向継電器4aおよび地絡過電圧継電器4bと段階式地絡過電圧検出器6とに(2次側に)出力するようにしている。 Here, the distribution line 3 is provided with a zero-phase current transformer (ZCT) 8. When a ground fault occurs in the distribution line 3 (primary side), the zero-phase current transformer 8 causes a ground fault protection relay. The zero- phase current (hereinafter referred to as “I 0 current”) is supplied to the four ground fault direction relays 4a. The bus 2 is provided with a zero-phase transformer (GPT) 9, and the zero-phase voltage (hereinafter referred to as “V 0 voltage”) of the bus 2 is reduced by the zero-phase transformer (GPT) 9. To the ground fault direction relay 4a, the ground fault overvoltage relay 4b, and the stepped ground fault overvoltage detector 6 (to the secondary side).

地絡保護継電器4は、2つの要素のV0電圧およびI0電流の大きさおよび位相により動作し、V0電圧が約8VかつI0電流が約3mAで位相が90度といったような整定は、実際に6,000Ωの地絡を基準に地絡させてそれぞれの特性により整定が行われている。 The ground fault protection relay 4 operates according to the magnitude and phase of the V 0 voltage and I 0 current of the two elements, and the settling such that the V 0 voltage is about 8 V, the I 0 current is about 3 mA, and the phase is 90 degrees is not possible. Actually, grounding is performed on the basis of a ground fault of 6,000Ω, and settling is performed according to each characteristic.

地絡保護継電器4の地絡過電圧継電器4bは、地絡事故が発生すると動作を開始するが、500ms以上の地絡事故に対応するために動作時限D4が500msに固定されている(図3参照)。
また、地絡過電圧継電器4bの復帰遅延時間D2(復帰時限)は、V0電圧の値および動作時間に関係なく常に一定(たとえば、60ms)となるようにされている。
さらに、地絡過電圧継電器4bは、地絡過電圧継電器4bが動作している時間(動作時間)を表わすOVG動作信号SOVGを子局側テレコン21に出力する。
The ground fault overvoltage relay 4b of the ground fault protection relay 4 starts operating when a ground fault occurs, but the operation time limit D4 is fixed to 500 ms in order to cope with a ground fault of 500 ms or longer (see FIG. 3). ).
Further, the return delay time D2 (return time limit) of the ground fault overvoltage relay 4b is always constant (for example, 60 ms) regardless of the value of the V 0 voltage and the operation time.
Furthermore, the ground fault overvoltage relay 4 b outputs an OVG operation signal S OVG indicating the time (operation time) during which the ground fault overvoltage relay 4 b is operating to the slave station side telecon 21.

段階式地絡過電圧検出器6は、V0電圧(オープンデルタ)で動作し、たとえば、V0電圧が8V以上であることを示すV1出力信号SV1と、V0電圧が50V以上であることを示すV2出力信号SV2と、V0電圧が150V以上であることを示すV3出力信号SV3とを出力する。
なお、機器管理システム1では、V1出力信号SV1(地絡過電圧検出器出力信号)を用いて地絡方向継電器4および遮断器5の動作管理を行うため、段階式地絡過電圧検出器6はV1出力信号SV1のみを子局側テレコン21に出力する。
The staged ground fault overvoltage detector 6 operates with a V 0 voltage (open delta). For example, the V 1 output signal S V1 indicating that the V 0 voltage is 8 V or more and the V 0 voltage is 50 V or more. and V2 output signal S V2 indicating the, V 0 voltage output and V3 output signal S V3 indicating that this is 150V or more.
In the device management system 1, since the operation management of the ground fault direction relay 4 and the circuit breaker 5 is performed using the V1 output signal S V1 (ground fault overvoltage detector output signal), the stepped ground fault overvoltage detector 6 is Only the V1 output signal S V1 is output to the slave station side tele-con.

子局側テレコン21は、SOE(Sequence of Events)機能を備えており、所定の時間間隔(たとえば、10ms)で、遮断器5からのパレット接点信号SPと、地絡保護継電器4の地絡過電圧継電器4bからのOVG動作信号SOVGと、地絡保護継電器4からのトリップ信号SDGと、段階式地絡過電圧検出器6からのV1出力信号SV1とを取り込んで、取り込んだパレット接点信号SP、OVG動作信号SOVG、トリップ信号SDGおよびV1出力信号SV1の状変情報を作成して保管し、親局側テレコン23のSOE要求に応じて、パレット接点信号SP、OVG動作信号SOVG、トリップ信号SDGおよびV1出力信号SV1の状変情報のうちの要求された時間範囲のものを表わすSOE状変記録信号SSOEを親局側テレコン23に通信回線22を介して伝送(たとえば、パケット伝送)する。 Daughter Telecom 21 is provided with a SOE (Sequence of Events) function, at predetermined time intervals (e.g., 10 ms), the pallet contact signal S P output from the circuit breaker 5, a ground fault of the ground fault protection relay 4 Captures the OVG operation signal S OVG from the overvoltage relay 4 b, the trip signal S DG from the ground fault protection relay 4, and the V1 output signal S V1 from the stepped ground fault overvoltage detector 6. S P , OVG operation signal S OVG , trip signal S DG and V1 output signal S V1 state change information is created and stored, and pallet contact signal S P , OVG operation according to the SOE request of the master station side telecon 23 signal S OVG, via a trip signal S DG and V1 communication line 22 the SOE state change recording signal S SOE representing those that requested time range of the state change information of the output signal S V1 to the master station side teleconverter 23 Transport (e.g., packet transmission) to.

親局側テレコン23は、監視制御所に設置されており、指定する時間範囲のパレット接点信号SP、OVG動作信号SOVG、トリップ信号SDGおよびV1出力信号SV1の状変情報の送信を子局側テレコン21に要求するSOE要求信号を子局側テレコン21に送信することによって、子局側テレコン21からSOE状変記録信号SSOEを取得する。
機器管理装置24は、監視制御所に設置されており、親局側テレコン23から入力されるSOE状変記録信号SSOEに基づいて地絡保護継電器4および遮断器5に異常がないか否かを判定する。
The master station side tele-computer 23 is installed in the monitoring control station, and transmits the state change information of the pallet contact signal S P , OVG operation signal S OVG , trip signal S DG and V1 output signal S V1 in the designated time range. By transmitting the SOE request signal requested to the slave station side telecon 21 to the slave station side telecon 21, the SOE-like recording signal S SOE is obtained from the slave station side telecon 21.
The equipment management device 24 is installed in the monitoring control station, and whether or not there is any abnormality in the ground fault protection relay 4 and the circuit breaker 5 based on the SOE-like change recording signal S SOE input from the master station side telecon 23. Determine.

次に、本実施例による機器管理システム1の動作(本発明の第1の実施例による機器管理方法)について、図2に示すフローチャートおよび図3に示すタイミングチャートを参照して説明する。   Next, the operation of the device management system 1 according to this embodiment (device management method according to the first embodiment of the present invention) will be described with reference to the flowchart shown in FIG. 2 and the timing chart shown in FIG.

図3に示すV0発生時刻t1に配電線3において地絡事故が発生すると、地絡事故が発生した配電線3においては他の回線からのI0電流が流れ込むとともに、母線2にはV0電圧が発生する。その結果、地絡事故の発生とほぼ同時に、地絡保護継電器4の地絡方向継電器4aが零相変流器8からのI0電流と零相変成器9からのV0電圧とにより動作を開始し、地絡保護継電器4の地絡過電圧継電器4bが零相変成器9からのV0電圧により動作を開始する。また、V1出力信号SV1が段階式地絡過電圧検出器6から子局側テレコン21に出力されるとともに、OVG動作信号SOVGが地絡過電圧継電器4bから子局側テレコン21に出力される(ステップS11)。 When a ground fault occurs in the distribution line 3 at the V 0 occurrence time t1 shown in FIG. 3, an I 0 current from another line flows into the distribution line 3 in which the ground fault has occurred, and the bus 2 has V 0. Voltage is generated. As a result, almost simultaneously with the occurrence of the ground fault, the ground fault direction relay 4a of the ground fault protection relay 4 operates by the I 0 current from the zero phase current transformer 8 and the V 0 voltage from the zero phase transformer 9. The ground fault overvoltage relay 4b of the ground fault protection relay 4 starts operation by the V 0 voltage from the zero phase transformer 9. Further, the V1 output signal S V1 is output from the stepped ground fault overvoltage detector 6 to the slave station side telecon 21 and the OVG operation signal S OVG is output from the ground fault overvoltage relay 4 b to the slave station side telecon 21 ( Step S11).

このとき、OVG動作信号SOVGは、図3に示すように、後述するトリップ指令時刻t2には立ち上らずに、地絡過電圧継電器4bの表示動作遅延時間D1後に立ち上る。また、OVG動作信号SOVGは、後述するパレット切時刻t5には立ち下らずに、地絡過電圧継電器4bの復帰遅延時間D2後に立ち下る。 At this time, as shown in FIG. 3, the OVG operation signal S OVG does not rise at a trip command time t2, which will be described later, but rises after the display operation delay time D1 of the ground fault overvoltage relay 4b. Further, the OVG operation signal S OVG does not fall at a pallet cut time t5 described later, but falls after the return delay time D2 of the ground fault overvoltage relay 4b.

地絡保護継電器4は、地絡事故が発生したV0発生時刻t1から地絡保護継電器4の動作時間(地絡保護継電器4が正常動作している場合には、地絡過電圧継電器4bの動作時限D4)経過後のトリップ指令時刻t2に、動作を開始する(すなわち、トリップ指令を発生する)。これにより、遮断器5に配電線3を遮断させるトリップ信号SDGが地絡保護継電器4から遮断器5および子局側テレコン21に出力される。このとき、トリップ信号SDGは、図3に示すように、トリップ指令時刻t2から地絡保護継電器4の表示動作遅延時間D3経過後の地絡表示時刻t4に、遮断器5および子局側テレコン21に出力される(ステップS12)。 The ground fault protection relay 4 operates the operation time of the ground fault protection relay 4 from the V 0 occurrence time t1 when the ground fault occurs (if the ground fault protection relay 4 is operating normally, the operation of the ground fault overvoltage relay 4b The operation is started at the trip command time t2 after the time period D4) has elapsed (that is, a trip command is generated). As a result, a trip signal S DG that causes the circuit breaker 5 to interrupt the distribution line 3 is output from the ground fault protection relay 4 to the circuit breaker 5 and the slave station side telecon 21. At this time, as shown in FIG. 3, the trip signal S DG is transmitted from the trip command time t2 to the ground fault display time t4 after the display operation delay time D3 of the ground fault protection relay 4 has elapsed. 21 (step S12).

遮断器5は、地絡保護継電器4からトリップ信号SDGが入力されると、配電線3を遮断する動作を開始するが、遮断器5に固有の一定の動作時間(たとえば、50ms)が経過したパレット切時刻t5に、パレット接点が開いて配電線3の遮断を完了する(ステップS13)。
なお、パレット切時刻t5に配電線3の遮断が完了すると、遮断器5から子局側テレコン21に常時出力されているかつパレット接点の状態を表わすパレット接点信号SPは、図3に示すように、立ち下がる。
When the trip signal S DG is input from the ground fault protection relay 4, the circuit breaker 5 starts the operation of interrupting the distribution line 3, but a certain operation time (for example, 50 ms) unique to the circuit breaker 5 has elapsed. At the pallet cutting time t5, the pallet contact is opened and the disconnection of the distribution line 3 is completed (step S13).
Incidentally, the cutoff of the distribution line 3 to the pallet changeover time t5 is complete, pallet contact signal S P representing the state always output and are pallets contact the breaker 5 slave station side Telecom 21 is as shown in FIG. 3 Fall down.

遮断器5により配電線3が遮断されると、配電線3を流れる電流が遮断されると同時に母線2のV0電圧が、残留電圧がないとすると0ボルト(以下、説明の簡単のため、残留電圧はないものとする。)に回復する。その結果、段階式地絡過電圧検出器6のV0電圧表示の復帰遅延時間(たとえば、10s)後に、段階式地絡過電圧検出器6から子局側テレコン21にV1出力信号SV1が出力されなくなる。 When the distribution line 3 is cut off by the circuit breaker 5, the current flowing through the distribution line 3 is cut off, and at the same time the V 0 voltage of the bus 2 is 0 volts (hereinafter, for the sake of simplicity, if there is no residual voltage). It is assumed that there is no residual voltage.) As a result, the V1 output signal S V1 is output from the staged ground fault overvoltage detector 6 to the slave station side telecon 21 after the return delay time (for example, 10 s) of the V 0 voltage display of the staged ground fault overvoltage detector 6. Disappear.

子局側テレコン21は、パレット接点信号SP、OVG動作信号SOVG、トリップ信号SDGおよびV1出力信号SV1を所定の時間間隔(たとえば、10ms)で常時取り込んで、取り込んだパレット接点信号SP、OVG動作信号SOVG、トリップ信号SDGおよびV1出力信号SV1の状変情報を作成して保管している。 The slave station side telecon 21 always captures the pallet contact signal S P , OVG operation signal S OVG , trip signal S DG, and V1 output signal S V1 at a predetermined time interval (for example, 10 ms). State change information of P , OVG operation signal S OVG , trip signal S DG and V1 output signal S V1 is created and stored.

配電線3において地絡事故が発生すると、親局側テレコン23は、地絡事故の継続時間を含む時間範囲のパレット接点信号SP、OVG動作信号SOVG、トリップ信号SDGおよびV1出力信号SV1の状変情報の送信を子局側テレコン21に要求するSOE要求信号を子局側テレコン21に通信回線22を介して送信する。
子局側テレコン21は、このSOE要求信号を受信すると、保管されている要求された時間範囲のパレット接点信号SP、OVG動作信号SOVG、トリップ信号SDGおよびV1出力信号SV1の状変情報を表わすSOE状変記録信号SSOEを親局側テレコン23に通信回線22を介してパケット伝送する。親局側テレコン23は、SOE状変記録信号SSOEを受信すると、機器管理装置24に出力する(以上、ステップS14)。
When a ground fault occurs in the distribution line 3, the master station side telecom 23 causes the pallet contact signal S P , OVG operation signal S OVG , trip signal S DG and V1 output signal S in the time range including the duration of the ground fault to occur. An SOE request signal for requesting the slave station side telecon 21 to transmit the state change information of V1 is transmitted to the slave station side telecon 21 via the communication line 22.
When receiving the SOE request signal, the slave station side telecon 21 changes the state of the stored pallet contact signal S P , OVG operation signal S OVG , trip signal S DG and V1 output signal S V1 in the requested time range. The SOE-like change recording signal S SOE representing the information is packet-transmitted via the communication line 22 to the master station side telecon 23. When receiving the SOE-like change recording signal S SOE , the master station side tele-computer 23 outputs it to the device management device 24 (step S14).

機器管理装置24は、親局側テレコン23から受け取ったSOE状変記録信号SSOEによって表わされるパレット接点信号SP、OVG動作信号SOVG、トリップ信号SDGおよびV1出力信号SV1の状変情報に基づいて、パレット事故継続時間T1、パレット遮断時間T2、事故継続時間T3、継電器指令時間T4、OVG動作時間T5およびV0−OVG差時間T6を以下のようにして算出する(ステップS15)。 The device management device 24 changes the pallet contact signal S P , the OVG operation signal S OVG , the trip signal S DG, and the V1 output signal S V1 , which are represented by the SOE change recording signal S SOE received from the master station side telecon 23. Based on the above, the pallet accident duration time T 1 , pallet cut-off time T 2 , accident duration time T 3 , relay command time T 4 , OVG operation time T 5 and V 0 -OVG difference time T 6 are calculated as follows: (Step S15).

(1)パレット事故継続時間T1の算出
機器管理装置24は、パレット接点信号SPの状変情報によって表わされるパレット切時刻t5からV1出力信号SV1の状変情報によって表わされるV0発生時刻t1を引くことにより、パレット事故継続時間T1(=t5−t1)を算出する。
(2)パレット遮断時間T2の算出
機器管理装置24は、パレット接点信号SPの状変情報によって表わされるパレット切時刻t5からトリップ信号SDGの状変情報によって表わされる地絡表示時刻t4を引くとともに地絡保護継電器4の表示動作遅延時間D3を足すことにより、精度の高いパレット遮断時間T2(=t5−t4+D3)を算出する。
(3)事故継続時間T3の算出
機器管理装置24は、OVG動作信号SOVGの状変情報によって表わされるOVG復帰時刻t6からV1出力信号SV1の状変情報によって表わされるV0発生時刻t1および地絡過電圧継電器4bの復帰遅延時間D2を引くことにより、事故継続時間T3(=t6−t1−D2)を算出する。
(4)継電器指令時間T4の算出
機器管理装置24は、トリップ信号SDGの状変情報によって表わされる地絡表示時刻t4からV1出力信号SV1の状変情報によって表わされるV0発生時刻t1および地絡保護継電器4の表示動作遅延時間D3を引くことにより、継電器指令時間T4(=t4−t1−D3)を算出する。
(5)OVG動作時間T5の算出
機器管理装置24は、OVG動作信号SOVGの状変情報によって表わされるOVG復帰時刻t6からOVG動作信号SOVGの状変情報によって表わされるOVG表示時刻t3を引き地絡過電圧継電器4bの動作時限D4および地絡過電圧継電器4bの表示動作遅延時間D1を足すとともに地絡過電圧継電器4bの復帰遅延時間D2を引くことにより、OVG動作時間T5(=t6−t3+D4+D1−D2)を算出する。
(6)V0−OVG差時間T6の算出
機器管理装置24は、OVG動作信号SOVGの状変情報によって表わされるOVG復帰時刻t6からV1出力信号SV1の状変情報によって表わされるV0発生時刻t1、地絡過電圧継電器4bの復帰遅延時間D2およびOVG動作時間T5を引くことにより、V0−OVG差時間T6(=t6−t1−D2−T5=t6−t1−D2−(t6−t3+D4+D1−D2)=t3−(t1+D4+D1))を算出する。
(1) calculating device management apparatus 24 of pallet accident duration T 1 is, V 0 generation time represented by the state change information from the palette switching time t5 represented by the state change information of the pallet contact signal S P V1 output signal S V1 By subtracting t1, the pallet accident duration T 1 (= t5−t1) is calculated.
(2) Pallet interruption time T 2 of the calculation device management apparatus 24, the ground fault display time t4 represented by the state change information of the trip signal S DG from the pallet switching time t5 represented by the state change information of the pallet contact signal S P by adding the display operation delay time D3 of ground fault protection relay 4 with pulling to calculate the accurate pallet interruption time T 2 (= t5-t4 + D3).
(3) Calculation of the accident duration T 3 The equipment management device 24 detects the V 0 occurrence time t 1 represented by the state change information of the V1 output signal S V1 from the OVG return time t 6 represented by the state change information of the OVG operation signal S OVG. and by subtracting the return delay time D2 of the earth fault over voltage relay 4b, and calculates the accident duration T 3 a (= t6-t1-D2) .
(4) Calculation of Relay Command Time T 4 The equipment management device 24 detects the V 0 generation time t 1 represented by the state change information of the V1 output signal S V1 from the ground fault display time t 4 represented by the state change information of the trip signal S DG. and by subtracting the display operation delay time D3 of ground fault protection relay 4, calculated relay instruction time T 4 the (= t4-t1-D3) .
(5) calculating the device management apparatus 24 of OVG operation time T 5 is a OVG display time t3 represented from OVG return time t6 represented by the state change information of the OVG operation signal S OVG by OVG operation signal S OVG the state change information By adding the operation time limit D4 of the ground fault overvoltage relay 4b and the display operation delay time D1 of the ground fault overvoltage relay 4b and subtracting the return delay time D2 of the ground fault overvoltage relay 4b, the OVG operation time T 5 (= t6-t3 + D4 + D1 -D2) is calculated.
(6) calculating device management apparatus 24 of V 0 -OVG difference time T 6 is, V 0, represented by the state change information of the OVG operation signal S V1 output signal from OVG return time t6 represented by the state change information of OVG S V1 by subtracting the occurrence time t1, the ground fault over return delay time D2 and OVG operation time T 5 of the voltage relay 4b, V 0 -OVG difference time T 6 (= t6-t1- D2-T 5 = t6-t1-D2- (T6-t3 + D4 + D1-D2) = t3- (t1 + D4 + D1)) is calculated.

続いて、機器管理装置24は、算出したパレット事故継続時間T1、パレット遮断時間T2、事故継続時間T3、継電器指令時間T4、OVG動作時間T5およびV0−OVG差時間T6に基づいて、以下のようにして地絡保護継電器4および遮断器5の良否を判定する(ステップS16)。
(1)パレット事故継続時間T1に基づく良否判定
機器管理装置24は、算出したパレット事故継続時間T1に基づいて全体の地絡事故時間を把握する。ただし、パレット接点信号SPの状変情報からパレット事故継続時間T1を算出しているため、実際に遮断器5が遮断されたかを判断することはできないが、地絡保護継電器4および遮断器5の機構部が正常であるか否かを確認することはできる。
(2)パレット遮断時間T2に基づく良否判定
機器管理装置24は、算出したパレット遮断時間T2に基づいて遮断器5の機構部が正常であるか否かを確認する。
(3)事故継続時間T3に基づく良否判定
機器管理装置24は、算出した事故継続時間T3に基づいて地絡事故継続時間を確認することにより、実系統で事故が正常に遮断されたか否かを確認する(異常時には事故継続時間T3が長くなる。)。
(4)継電器指令時間T4に基づく良否判定
機器管理装置24は、算出した継電器指令時間T4に基づいて地絡保護継電器4のトリップ指令時間を確認することにより、地絡保護継電器4の指令時間が正常であるか否かを確認する(異常時には継電器指令時間T4が長くなる。)。
(5)OVG動作時間T5に基づく良否判定
機器管理装置24は、算出したOVG動作時間T5に基づいて地絡過電圧継電器4bの継続時間を推定することにより、地絡過電圧継電器4bが正常であるか否かを確認する(異常時にはOVG動作時間T5が長くなる。)。
(6)V0−OVG差時間T6に基づく良否判定
機器管理装置24は、段階式地絡過電圧検出器6をV0電圧発生基準として算出したV0−OVG差時間T6に基づいてV0電圧の発生から段階式地絡過電圧検出器6および地絡過電圧継電器4bが動作するまでの差時間を把握することにより、地絡過電圧継電器4bの整定および動作が正常であるか否かを確認する。なお、機器管理装置24は、地絡過電圧継電器4bおよび段階式地絡過電圧検出器6の動作整定が同一であるとしているため、V0−OVG差時間T6が基準値と大幅に異なる場合には、地絡過電圧継電器4bの整定値および母線特性が不良であると推定できる。
Subsequently, the equipment management device 24 calculates the calculated pallet accident duration T 1 , pallet cutoff time T 2 , accident duration T 3 , relay command time T 4 , OVG operation time T 5, and V 0 -OVG difference time T 6. Based on the above, the quality of the ground fault protection relay 4 and the circuit breaker 5 is determined as follows (step S16).
(1) Pass / Fail Judgment Based on Pallet Accident Continuation Time T 1 The equipment management device 24 grasps the entire ground fault time based on the calculated pallet accident continuation time T 1 . However, since the calculated pallet accident duration T 1 from the state change information of the pallet contact signal S P, it is not possible to determine actual breaker 5 is cut off, ground fault protection relay 4 and breakers It is possible to confirm whether the mechanism unit 5 is normal.
(2) Pass / Fail Judgment Based on Pallet Breaking Time T 2 The equipment management device 24 checks whether the mechanical part of the circuit breaker 5 is normal based on the calculated pallet breaking time T 2 .
(3) Pass / Fail Judgment Based on Accident Continuation Time T 3 The equipment management device 24 confirms the ground fault accident continuation time based on the calculated accident continuation time T 3, and whether or not the accident is normally shut off in the actual system. check the (abnormal accident duration T 3 becomes longer at the time.).
(4) Pass / fail judgment based on relay command time T 4 The equipment management device 24 confirms the trip command time of the ground fault protection relay 4 based on the calculated relay command time T 4 , thereby determining the command of the ground fault protection relay 4. time to confirm whether or not normal (abnormal relay instruction time T 4 becomes longer at the time.).
(5) Pass / fail judgment based on OVG operation time T 5 The equipment management device 24 estimates the duration of the ground fault overvoltage relay 4 b based on the calculated OVG operation time T 5 , so that the ground fault over voltage relay 4 b is normal. checks whether or not there (abnormality OVG operation time T 5 becomes longer at the time.).
(6) Pass / Fail Judgment Based on V 0 -OVG Difference Time T 6 The equipment management device 24 determines V based on the V 0 -OVG difference time T 6 calculated using the stepped ground fault overvoltage detector 6 as the V 0 voltage generation reference. Confirm whether the ground fault overvoltage relay 4b is normal or not by grasping the time difference between the generation of the zero voltage and the staged ground fault overvoltage detector 6 and the ground fault overvoltage relay 4b. To do. Note that the equipment management device 24 assumes that the ground fault overvoltage relay 4b and the stepped ground fault overvoltage detector 6 have the same operation setting, so that the V 0 -OVG difference time T 6 is significantly different from the reference value. Can be estimated that the settling value and bus characteristics of the ground fault overvoltage relay 4b are poor.

図4に、地絡過電圧継電器4bの表示動作遅延時間D1を30msとし、地絡過電圧継電器4bの復帰遅延時間D2を60msとし、地絡保護継電器4の表示動作遅延時間D3を30msとし、地絡過電圧継電器4bの動作時限D4を500msとしたときの地絡保護継電器4および遮断器5の良否判定結果の一例を示す。ただし、パレット事故継続時間T1の基準値を550msとし、パレット遮断時間T2の基準値を50msとし、事故継続時間T3の基準値を550msとし、継電器指令時間T4の基準値を500msとし、OVG動作時間T5の基準値を550msとし、遮断時間の基準値を50msとしている。 In FIG. 4, the display operation delay time D1 of the ground fault overvoltage relay 4b is set to 30 ms, the return delay time D2 of the ground fault overvoltage relay 4b is set to 60 ms, the display operation delay time D3 of the ground fault protection relay 4 is set to 30 ms, An example of the pass / fail judgment result of the ground fault protection relay 4 and the circuit breaker 5 when the operation time limit D4 of the overvoltage relay 4b is 500 ms is shown. However, the reference value for the pallet accident duration T 1 is 550 ms, the reference value for the pallet interruption time T 2 is 50 ms, the reference value for the accident duration T 3 is 550 ms, and the reference value for the relay command time T 4 is 500 ms. , the reference value of OVG operation time T 5 and 550 ms, is set to 50ms the reference value of the breaking time.

以上の説明では、パレット遮断時間T2をパレット切時刻t5から地絡表示時刻t4を引くとともに表示動作遅延時間D3を足すことにより算出したが、SOE機能の精度がたとえば±30msでありパレット遮断時間T2(たとえば、基準値が50ms)を算出するのに十分でない場合には、図5に示すように、トリップ信号SDGの立上り時間とパレット接点信号SPの立下り時間との時間差を検出する時間差検出回路31と時間差検出回路31の出力信号の時間軸を所定の倍数(たとえば、10倍)に伸張する伸張回路32とを備える時間軸拡大装置30を子局側テレコン21に設けて、時間軸拡大装置出力信号(パレット切時刻t5と地絡表示時刻t4との差時間(=t5−t4)を所定の倍数だけ倍した時間を表わす。)の状変情報を子局側テレコン21が作成して保管するようにしてもよい。
この場合には、機器管理装置24は、親局側テレコン23から受け取ったSOE状変記録信号SSOEに含まれる時間軸拡大装置出力信号(時間軸拡大装置30の出力信号)の状変情報に基づいてパレット切時刻t5と地絡表示時刻t4との拡大差時間を求め、求めた拡大差時間を縮小して時間差検出回路31によって検出された時間差(=t5−t4)を復元したのち、復元した時間差に表示動作遅延時間D3を足すことにより、パレット遮断時間T2を算出する。
In the above description has been calculated by adding the display operation delay time D3 with catching ground fault display time t4 the pallet interruption time T 2 from the pallet switching time t5, and the pallet interruption time and precise, for example, ± 30 ms of SOE function T 2 (e.g., the reference value is 50 ms) in case not enough to calculate the, as shown in FIG. 5, detects the time difference between the fall time of the rise time and the pallet contact signal S P output trip signal S DG A time axis expanding device 30 including a time difference detecting circuit 31 and a decompression circuit 32 that expands a time axis of an output signal of the time difference detecting circuit 31 to a predetermined multiple (for example, 10 times) State change information of the time axis expansion device output signal (representing a time obtained by multiplying a difference time (= t5−t4) between the palette cut time t5 and the ground fault display time t4 by a predetermined multiple). Station side Telecom 21 may be stored to create.
In this case, the device management device 24 uses the state change information of the time axis expansion device output signal (the output signal of the time axis expansion device 30) included in the SOE state change recording signal S SOE received from the master station side telecon 23. The expansion difference time between the pallet cut time t5 and the ground fault display time t4 is obtained based on the time, the obtained expansion difference time is reduced, and the time difference (= t5−t4) detected by the time difference detection circuit 31 is restored. it allows to calculate the pallet interruption time T 2 adding the display operation delay time D3 in the time difference was.

次に、本発明の第2の実施例による機器管理システム1’について、図6を参照して説明する。
本実施例による機器管理システム1’は、図6に示すように、子局側テレコン21、親局側テレコン23および機器管理装置24の代わりに、遮断器5から入力されるパレット接点信号SP、地絡過電圧継電器4bから入力されるOVG動作信号SOVG、地絡保護継電器4から入力されるトリップ信号SDGおよび段階式地絡過電圧検出器6から入力されるV1出力信号SV1に基づいて、パレット事故継続時間T1、パレット遮断時間T2、事故継続時間T3、継電器指令時間T4、OVG動作時間T5およびV0−OVG差時間T6を以下のようにして算出し、算出したパレット事故継続時間T1、パレット遮断時間T2、事故継続時間T3、継電器指令時間T4、OVG動作時間T5およびV0−OVG差時間T6に基づいて地絡保護継電器4および遮断器5の良否を判定する機器管理装置24’を具備する点で、図1に示した第1の実施例による機器管理システム1と異なる。
Next, a device management system 1 ′ according to a second embodiment of the present invention will be described with reference to FIG.
As shown in FIG. 6, the device management system 1 ′ according to the present embodiment has a pallet contact signal S P input from the circuit breaker 5 instead of the slave station side telecon 21, the master station side telecon 23, and the device management device 24. Based on the OVG operation signal S OVG input from the ground fault overvoltage relay 4b, the trip signal S DG input from the ground fault protection relay 4, and the V1 output signal S V1 input from the stepped ground fault over voltage detector 6. , Pallet accident duration time T 1 , pallet shutoff time T 2 , accident duration time T 3 , relay command time T 4 , OVG operation time T 5 and V 0 -OVG difference time T 6 are calculated as follows: pallet accident duration T 1 that, pallet interruption time T 2, the accident duration T 3, relay instruction time T 4, OVG operation time T 5 and ground fault protection relay 4, based on V 0 -OVG difference time T 6 In that comprising a pre-breaker 5 of acceptability determining device management apparatus 24 'differs from the device management system 1 according to the first embodiment shown in FIG.

(1)パレット事故継続時間T1の算出
機器管理装置24は、パレット接点信号SPの立下りエッジからパレット切時刻t5を求めるとともに、V1出力信号SV1の立上りエッジからV0発生時刻t1を求め、求めたパレット切時刻t5から求めたV0発生時刻t1を引くことにより、パレット事故継続時間T1(=t5−t1)を算出する。
(2)パレット遮断時間T2の算出
機器管理装置24は、パレット接点信号SPの立下りエッジからパレット切時刻t5を求めるとともに、トリップ信号SDGの立上りエッジから地絡表示時刻t4を求め、求めたパレット切時刻t5から求めた地絡表示時刻t4を引くとともに地絡保護継電器4の表示動作遅延時間D3を足すことにより、精度の高いパレット遮断時間T2(=t5−t4+D3)を算出する。
(3)事故継続時間T3の算出
機器管理装置24は、OVG動作信号SOVGの立下りエッジからOVG復帰時刻t6を求めるとともにV1出力信号SV1の立上りエッジからV0発生時刻t1を求め、求めたOVG復帰時刻t6から求めたV0発生時刻t1および地絡過電圧継電器4bの復帰遅延時間D2を引くことにより、事故継続時間T3(=t6−t1−D2)を算出する。
(4)継電器指令時間T4の算出
機器管理装置24は、トリップ信号SDGの立上りエッジから地絡表示時刻t4を求めるとともに、V1出力信号SV1の立上りエッジからV0発生時刻t1を求め、求めた地絡表示時刻t4から求めたV0発生時刻t1および地絡保護継電器4の表示動作遅延時間D3を引くことにより、継電器指令時間T4(=t4−t1−D3)を算出する。
(5)OVG動作時間T5の算出
機器管理装置24は、OVG動作信号SOVGの立下りエッジからOVG復帰時刻t6を求めるとともに、OVG動作信号SOVGの立上りエッジからOVG表示時刻t3を求め、求めたOVG復帰時刻t6から求めたOVG表示時刻t3を引き地絡過電圧継電器4bの動作時限D4および地絡過電圧継電器4bの表示動作遅延時間D1を足すとともに地絡過電圧継電器4bの復帰時限時間D2を引くことにより、OVG動作時間T5(=t6−t3+D4+D1−D2)を算出する。
(6)V0−OVG差時間T6の算出
機器管理装置24は、OVG動作信号SOVGの立下りエッジからOVG復帰時刻t6を求めるとともに、V1出力信号SV1の立上りエッジからV0発生時刻t1を求め、求めたOVG復帰時刻t6から求めたV0発生時刻t1、地絡過電圧継電器4bの復帰時限時間D2および上記(5)で算出したOVG動作時間T5を引くことにより、V0−OVG差時間T6(=t6−t1−D2−T5=t6−t1−D2−(t6−t3+D4+D1−D2)=t3−(t1+D4+D1))を算出する。
(1) Pallet accident duration T 1 of the calculation device management apparatus 24, as well as obtaining the pallet changeover time t5 from the falling edge of the pallet contact signal S P, the V 0 generation time t1 from the rising edge of the V1 output signal S V1 The pallet accident duration T 1 (= t5−t1) is calculated by subtracting the V 0 occurrence time t1 obtained from the obtained pallet cut time t5.
(2) calculation device management apparatus 24 of pallet interruption time T 2 are, together with obtaining the pallet changeover time t5 from the falling edge of the pallet contact signal S P, determine the ground fault display time t4 from the rising edge of the trip signal S DG, By subtracting the obtained ground fault display time t4 from the obtained pallet cut time t5 and adding the display operation delay time D3 of the ground fault protection relay 4, a highly accurate pallet cut-off time T 2 (= t5−t4 + D3) is calculated. .
(3) Calculation of accident duration T 3 The device management device 24 obtains the OVG return time t6 from the falling edge of the OVG operation signal S OVG and obtains the V 0 occurrence time t1 from the rising edge of the V1 output signal S V1 . The accident duration T 3 (= t6-t1-D2) is calculated by subtracting the V 0 occurrence time t1 obtained from the obtained OVG return time t6 and the return delay time D2 of the ground fault overvoltage relay 4b.
(4) calculating the device management apparatus 24 of the relay instruction time T 4, as well as determine the ground fault display time t4 from the rising edge of the trip signal S DG, seeking V 0 generation time t1 from the rising edge of the V1 output signal S V1, By subtracting the V 0 occurrence time t1 obtained from the obtained ground fault display time t4 and the display operation delay time D3 of the ground fault protection relay 4, the relay command time T 4 (= t4-t1-D3) is calculated.
(5) Calculation of OVG operation time T 5 The device management apparatus 24 obtains the OVG return time t6 from the falling edge of the OVG operation signal S OVG and obtains the OVG display time t3 from the rising edge of the OVG operation signal S OVG . The OVG display time t3 obtained from the obtained OVG return time t6 is added to the operation time limit D4 of the ground fault overvoltage relay 4b and the display operation delay time D1 of the ground fault overvoltage relay 4b, and the return time period D2 of the ground fault overvoltage relay 4b is obtained. it allows calculating OVG operation time T 5 the (= t6-t3 + D4 + D1-D2) draw.
(6) Calculation of V 0 -OVG Difference Time T 6 The device management apparatus 24 obtains the OVG return time t6 from the falling edge of the OVG operation signal S OVG , and V 0 generation time from the rising edge of the V1 output signal S V1. seeking t1, by subtracting V 0 generation time t1, OVG operation time T 5 calculated in the land fault over voltage relay 4b return timed time D2 and the (5) obtained from OVG return time t6 obtained, V 0 - OVG difference time T 6 (= t6-t1- D2-T 5 = t6-t1-D2- (t6-t3 + D4 + D1-D2) = t3- (t1 + D4 + D1)) is calculated.

なお、本実施例による機器管理システム1’の動作(本発明の第2の実施例による機器管理方法)については、上述した機器管理装置24’におけるパレット事故継続時間T1、パレット遮断時間T2、事故継続時間T3、継電器指令時間T4、OVG動作時間T5およびV0−OVG差時間T6の算出方法を除いては、図1に示した第1の実施例による機器管理システム1の動作と同様であるので、その説明を省略する。 As for the operation of the device management system 1 ′ according to the present embodiment (the device management method according to the second embodiment of the present invention), the pallet accident duration T 1 and the pallet cut-off time T 2 in the above-described device management apparatus 24 ′ Except for the calculation method of the accident duration T 3 , the relay command time T 4 , the OVG operation time T 5 and the V 0 -OVG difference time T 6 , the device management system 1 according to the first embodiment shown in FIG. Since the operation is the same as that in FIG.

以上説明したように、本発明による機器管理システムおよび機器管理方法では、遠隔地の監視制御所に設けられた親局側テレコン23および機器管理装置24において地絡保護継電器4および遮断器5の管理をリアルタイムで行うことができるとともに、地絡保護継電器4および遮断器5に関する情報を一括管理することもできる。   As described above, in the device management system and the device management method according to the present invention, the ground fault protection relay 4 and the circuit breaker 5 are managed in the master station side telecon 23 and the device management device 24 provided in the remote monitoring control station. Can be performed in real time, and information related to the ground fault protection relay 4 and the circuit breaker 5 can be collectively managed.

また、本発明の機器管理システムおよび機器管理方法は、6.6kVおよび22kVなどの配電線に限らず、22kV以上の送電線にも適用することができる。
さらに、配電線で現在用いられているDM遠方制御装置(配電自動化装置)を組み合わせることもできる。
In addition, the device management system and the device management method of the present invention can be applied not only to distribution lines such as 6.6 kV and 22 kV but also to transmission lines of 22 kV or higher.
Furthermore, it is possible to combine a DM remote control device (distribution automation device) currently used in distribution lines.

本発明の第1の実施例による機器管理システム1の構成を示す図である。It is a figure which shows the structure of the apparatus management system 1 by 1st Example of this invention. 図1に示した機器管理システム1の動作を説明するためのフローチャートである。3 is a flowchart for explaining the operation of the device management system 1 shown in FIG. 1. 図1に示した機器管理システム1の動作を説明するためのタイミングチャートである。3 is a timing chart for explaining the operation of the device management system 1 shown in FIG. 1. 地絡保護継電器4および遮断器5の良否判定結果の一例を示す図である。It is a figure which shows an example of the quality determination result of the ground fault protection relay 4 and the circuit breaker 5. FIG. SOE機能の精度がパレット遮断時間T2を算出するのに十分でない場合に使用する時間軸拡大装置30の構成を示す図である。Accuracy of SOE function is a diagram illustrating a structure of the time axis expansion device 30 to be used if it is not sufficient to calculate the pallet interruption time T 2. 本発明の第2の実施例による機器管理システム1’の構成を示す図である。It is a figure which shows the structure of the apparatus management system 1 'by the 2nd Example of this invention.

符号の説明Explanation of symbols

1,1’ 機器管理システム
2 母線
3 配電線
4 地絡保護継電器
4a 地絡方向継電器
4b 地絡過電圧継電器
5 遮断器
6 段階式地絡過電圧検出器
8 零相変流器(ZCT)
9 零相変成器(GPT)
21 子局側テレコン
22 通信回線
23 親局側テレコン
24,24’ 機器管理装置
30 時間軸拡大装置
31 時間差検出回路
32 伸張回路
D1,D3 表示動作遅延時間
D2 復帰遅延時間
D4 動作時限
P パレット接点信号
OVG OVG動作信号
DG トリップ信号
V1 V1出力信号
SOE SOE状変記録信号
S11〜S16 ステップ
t1 V0発生時刻
t2 トリップ指令時刻
t3 OVG表示時刻
t4 地絡表示時刻
t5 パレット切時刻
t6 OVG復帰時刻
1 パレット事故継続時間
2 パレット遮断時間
3 事故継続時間
4 継電器指令時間
5 OVG動作時間
60−OVG差時間
1, 1 'Device management system 2 Bus 3 Distribution line 4 Ground fault protection relay 4a Ground fault direction relay 4b Ground fault over voltage relay 5 Circuit breaker 6 Stage ground fault over voltage detector 8 Zero phase current transformer (ZCT)
9 Zero phase transformer (GPT)
21 Slave station side telecon 22 Communication line 23 Master station side telecon 24, 24 'Device management device 30 Time axis expansion device 31 Time difference detection circuit 32 Expansion circuit D1, D3 Display operation delay time D2 Return delay time D4 Operation time limit SP Pallet contact Signal S OVG OVG operation signal S DG trip signal S V1 V1 output signal S SOE SOE change recording signal S11 to S16 Step t1 V 0 generation time t2 Trip command time t3 OVG display time t4 Ground fault display time t5 Pallet cut time t6 OVG Return time T 1 Pallet accident duration T 2 Pallet interruption time T 3 Accident duration T 4 Relay command time T 5 OVG operation time T 6 V 0- OVG difference time

Claims (12)

母線(2)から分岐された電線路(3)に設けられた零相変流器(8)および該母線に設けられた零相変成器(9)に接続された地絡方向継電器(4a)と該零相変成器に接続された地絡過電圧継電器(4b)とを備えた地絡保護継電器(4)と、
該地絡保護継電器から出力されるトリップ信号(SDG)に基づいて前記電線路を遮断する遮断器(5)と、
前記零相変成器に接続された地絡過電圧検出器(6)と、
前記遮断器のパレット接点の状態を表わすパレット接点信号(SP)、前記地絡過電圧継電器の動作時間を表わすOVG動作信号(SOVG)、前記地絡保護継電器の前記トリップ信号および前記母線の零相電圧値が所定の値以上になったことを前記地絡過電圧検出器が示す地絡過電圧検出器出力信号(SV1)に基づいて、前記地絡保護継電器および前記遮断器の良否を判定する機器管理手段(21,23,24;24’)と、
を具備することを特徴とする、機器管理システム。
A zero-phase current transformer (8) provided on the electric line (3) branched from the bus (2) and a ground fault direction relay (4a) connected to the zero-phase transformer (9) provided on the bus. And a ground fault protection relay (4) comprising a ground fault overvoltage relay (4b) connected to the zero phase transformer;
A circuit breaker (5) for cutting off the electric line based on a trip signal (S DG ) output from the ground fault protection relay;
A ground fault overvoltage detector (6) connected to the zero phase transformer;
Pallet contact signal (S P ) representing the state of the pallet contact of the circuit breaker, OVG operation signal (S OVG ) representing the operating time of the ground fault overvoltage relay, the trip signal of the ground fault protection relay, and the bus zero Based on the ground fault overvoltage detector output signal (S V1 ) indicated by the ground fault overvoltage detector that the phase voltage value is equal to or higher than a predetermined value, the pass / fail of the ground fault protection relay and the circuit breaker is judged. Device management means (21, 23, 24; 24 ');
A device management system comprising:
前記機器管理手段が、
所定の時間間隔で前記パレット接点信号、前記OVG動作信号、前記トリップ信号および前記地絡過電圧検出器出力信号を取り込んで、該取り込んだパレット接点信号、OVG動作信号、トリップ信号および地絡過電圧検出器出力信号の状変情報を保管する子局側遠方監視制御装置(21)と、
該子局側遠方監視制御装置と通信回線(22)を介して相互接続された親局側遠方監視制御装置(23)であって、前記電線路において地絡事故が発生すると、該地絡事故の継続時間を含む時間範囲の前記パレット接点信号、前記OVG動作信号、前記トリップ信号および前記地絡過電圧検出器出力信号の状変情報の送信を要求する要求信号を前記子局側遠方監視制御装置に前記通信回線を介して送信し、該子局側遠方監視制御装置から前記要求した時間範囲のパレット接点信号、OVG動作信号、トリップ信号および地絡過電圧検出器出力信号の状変情報を受信する親局側遠方監視制御装置(23)と、
該親局側遠方監視制御装置から入力される前記パレット接点信号、前記OVG動作信号、前記トリップ信号および前記地絡過電圧検出器出力信号の状変情報に基づいて、前記地絡保護継電器および前記遮断器の良否を判定する機器管理装置(24)と、
を備えることを特徴とする、請求項1記載の機器管理システム。
The device management means is
The pallet contact signal, the OVG operation signal, the trip signal, and the ground fault overvoltage detector output signal are captured at a predetermined time interval, and the captured pallet contact signal, OVG operation signal, trip signal, and ground fault overvoltage detector are captured. A remote monitoring and control device (21) on the side of the slave station for storing status change information of the output signal;
The master station side remote monitoring and control device (23) interconnected with the slave station side remote monitoring and control device via a communication line (22), and when a ground fault occurs in the electric line, the ground fault The slave station remote monitoring and control device sends a request signal requesting transmission of state change information of the pallet contact signal, the OVG operation signal, the trip signal, and the ground fault overvoltage detector output signal in a time range including the duration of the slave station Is transmitted via the communication line, and the pallet contact signal, OVG operation signal, trip signal and ground fault overvoltage detector output signal state change information in the requested time range are received from the remote monitoring control device on the slave station side. A master station side remote monitoring control device (23);
Based on the pallet contact signal, the OVG operation signal, the trip signal, and the status change information of the ground fault overvoltage detector output signal input from the remote monitoring control device on the master station side, the ground fault protection relay and the cutoff A device management device (24) for determining the quality of the vessel;
The device management system according to claim 1, further comprising:
前記機器管理装置(24)が、
前記地絡過電圧検出器出力信号の状変情報によって表わされるV0発生時刻(t1)、前記OVG動作信号の状変情報によって表わされるOVG表示時刻(t3)、前記トリップ信号の状変情報によって表わされる地絡表示時刻(t4)、前記パレット接点信号の状変情報によって表わされるパレット切時刻(t5)および前記OVG動作信号の状変情報によって表わされるOVG復帰時刻(t6)に基づいて、パレット事故継続時間(T1)、パレット遮断時間(T2)、事故継続時間(T3)、継電器指令時間(T4)、OVG動作時間(T5)およびV0−OVG差時間(T6)を算出し、
該算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて、前記地絡保護継電器および前記遮断器の良否を判定する、
ことを特徴とする、請求項2記載の機器管理システム。
The device management device (24)
V 0 occurrence time (t1) represented by the state change information of the ground fault overvoltage detector output signal, OVG display time (t3) represented by the state change information of the OVG operation signal, and state change information of the trip signal. Pallet accident based on the ground fault display time (t4), the pallet cut time (t5) represented by the state change information of the pallet contact signal, and the OVG return time (t6) represented by the state change information of the OVG operation signal. The duration (T 1 ), pallet cut-off time (T 2 ), accident duration (T 3 ), relay command time (T 4 ), OVG operation time (T 5 ), and V 0 -OVG difference time (T 6 ) Calculate
Based on the calculated pallet accident continuation time, pallet interruption time, accident continuation time, relay command time, OVG operation time, and V 0 -OVG difference time, the pass / fail of the ground fault protection relay and the circuit breaker is determined.
The device management system according to claim 2, wherein:
前記機器管理装置(24)が、
前記パレット切時刻(t5)から前記V0発生時刻(t1)を引くことにより、前記パレット事故継続時間(T1)を算出し、
前記パレット切時刻(t5)から前記地絡表示時刻(t4)を引くとともに前記地絡保護継電器の表示動作遅延時間(D3)を足すことにより、前記パレット遮断時間(T2)を算出し、
前記OVG復帰時刻(t6)から前記V0発生時刻(t1)および前記地絡過電圧継電器の復帰遅延時間(D2)を引くことにより、前記事故継続時間(T3)を算出し、
前記地絡表示時刻(t4)から前記V0発生時刻(t1)および前記地絡保護継電器の表示動作遅延時間(D3)を引くことにより、前記継電器指令時間(T4)を算出し、
前記OVG復帰時刻(t6)から前記OVG表示時刻(t3)を引き前記地絡過電圧継電器の動作時限(D4)および前記地絡過電圧継電器の表示動作遅延時間(D1)を足すとともに前記地絡過電圧継電器の復帰遅延時間(D2)を引くことにより、前記OVG動作時間(T5)を算出し、
前記OVG復帰時刻(t6)から前記V0発生時刻(t1)、前記地絡過電圧継電器の復帰遅延時間(D2)および前記OVG動作時間(T5)を引くことにより、前記V0−OVG差時間(T6)を算出する、
ことを特徴とする、請求項3記載の機器管理システム。
The device management device (24)
The pallet accident duration (T 1 ) is calculated by subtracting the V 0 occurrence time (t1) from the pallet cut time (t5),
By subtracting the ground fault display time (t4) from the pallet cut time (t5) and adding the display operation delay time (D3) of the ground fault protection relay, the pallet cut-off time (T 2 ) is calculated,
The accident duration (T 3 ) is calculated by subtracting the V 0 occurrence time (t1) and the return delay time (D2) of the ground fault overvoltage relay from the OVG return time (t6),
By subtracting the V 0 occurrence time (t1) and the display operation delay time (D3) of the ground fault protection relay from the ground fault display time (t4), the relay command time (T 4 ) is calculated,
The OVG display time (t3) is subtracted from the OVG return time (t6) to add the operation time limit (D4) of the ground fault overvoltage relay and the display operation delay time (D1) of the ground fault overvoltage relay and the ground fault overvoltage relay. The OVG operation time (T 5 ) is calculated by subtracting the return delay time (D2) of
By subtracting the V 0 occurrence time (t1), the return delay time (D2) of the ground fault overvoltage relay and the OVG operation time (T 5 ) from the OVG return time (t6), the V 0 -OVG difference time (T 6 ) is calculated,
The device management system according to claim 3, wherein:
前記トリップ信号と前記パレット接点信号との時間差を検出する時間差検出回路(31)と、該時間差検出回路の出力信号の時間軸を所定の倍数に伸張する伸張回路(32)とを備える時間軸拡大装置(30)が、前記子局側遠方監視制御装置に設けられており、
前記子局側遠方監視制御装置が、時間軸拡大装置出力信号の状変情報を保管し、
前記機器管理装置が、前記要求した時間範囲の前記時間軸拡大装置出力信号の状変情報に基づいて前記パレット切時刻(t5)と前記地絡表示時刻(t4)との拡大差時間を求め、該求めた拡大差時間から前記時間差検出回路によって検出された時間差を復元したのち、該復元した時間差に前記地絡保護継電器の表示動作遅延時間(D3)を足すことにより、前記パレット遮断時間(T2)を算出する、
ことを特徴とする、請求項4記載の機器管理システム。
A time axis expansion circuit comprising a time difference detection circuit (31) for detecting a time difference between the trip signal and the pallet contact signal, and an expansion circuit (32) for expanding the time axis of the output signal of the time difference detection circuit to a predetermined multiple. A device (30) is provided in the slave station side remote monitoring and control device,
The slave station side remote monitoring and control device stores the state change information of the time axis expansion device output signal,
The device management apparatus obtains an expansion difference time between the pallet cut time (t5) and the ground fault display time (t4) based on state change information of the time axis expansion device output signal in the requested time range, After restoring the time difference detected by the time difference detection circuit from the obtained expansion difference time, the display operation delay time (D3) of the ground fault protection relay is added to the restored time difference, whereby the pallet cutoff time (T 2 ) Calculate,
The device management system according to claim 4, wherein:
前記機器管理手段が、前記遮断器から入力される前記パレット接点信号、前記地絡過電圧継電器から入力される前記OVG動作信号、前記地絡保護継電器から入力される前記トリップ信号および前記地絡過電圧検出器から入力される前記地絡過電圧検出器出力信号に基づいて、パレット事故継続時間(T1)、パレット遮断時間(T2)、事故継続時間(T3)、継電器指令時間(T4)、OVG動作時間(T5)およびV0−OVG差時間(T6)を算出し、該算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて前記地絡保護継電器および前記遮断器の良否を判定する機器管理装置(24’)を備えることを特徴とする、請求項1記載の機器管理システム。 The device management means includes the pallet contact signal input from the circuit breaker, the OVG operation signal input from the ground fault overvoltage relay, the trip signal input from the ground fault protection relay, and the ground fault overvoltage detection. Based on the output signal of the ground fault overvoltage detector input from the device, the pallet accident duration (T 1 ), the pallet cutoff time (T 2 ), the accident duration (T 3 ), the relay command time (T 4 ), The OVG operation time (T 5 ) and the V 0 -OVG difference time (T 6 ) are calculated, and the calculated pallet accident duration, pallet shut-off time, accident duration, relay command time, OVG operation time, and V 0 -OVG The device management system according to claim 1, further comprising a device management device (24 ') that determines whether the ground fault protection relay and the circuit breaker are good or bad based on a difference time. Mu. 前記機器管理装置(24’)が、
前記地絡過電圧検出器出力信号からV0発生時刻(t1)を求め、前記OVG動作信号からOVG表示時刻(t3)を求め、前記トリップ信号から地絡表示時刻(t4)を求め、前記パレット接点信号からパレット切時刻(t5)を求め、前記OVG動作信号からOVG復帰時刻(t6)を求め、
前記パレット切時刻(t5)から前記V0発生時刻(t1)を引くことにより、前記パレット事故継続時間(T1)を算出し、
前記パレット切時刻(t5)から前記地絡表示時刻(t4)を引くとともに前記地絡保護継電器の表示動作遅延時間(D3)を足すことにより、前記パレット遮断時間(T2)を算出し、
前記OVG復帰時刻(t6)から前記V0発生時刻(t1)および前記地絡過電圧継電器の復帰遅延時間(D2)を引くことにより、前記事故継続時間(T3)を算出し、
前記地絡表示時刻(t4)から前記V0発生時刻(t1)および前記地絡保護継電器の表示動作遅延時間(D3)を引くことにより、前記継電器指令時間(T4)を算出し、
前記OVG復帰時刻(t6)から前記OVG表示時刻(t3)を引き前記地絡過電圧継電器の動作時限(D4)および前記地絡過電圧継電器の表示動作遅延時間(D1)を足すとともに前記地絡過電圧継電器の復帰遅延時間(D2)を引くことにより、前記OVG動作時間(T5)を算出し、
前記OVG復帰時刻(t6)から前記V0発生時刻(t1)、前記地絡過電圧継電器の復帰遅延時間(D2)および前記OVG動作時間(T5)を引くことにより、前記V0−OVG差時間(T6)を算出する、
ことを特徴とする、請求項6記載の機器管理システム。
The device management device (24 ′)
The ground fault over-voltage detector obtains the V 0 generation time (t1) from the output signal, the seeking OVG display time (t3) from OVG operation signal, determine the ground fault display time (t4) from the trip signal, the pallet contact A pallet cutting time (t5) is obtained from the signal, an OVG return time (t6) is obtained from the OVG operation signal,
The pallet accident duration (T 1 ) is calculated by subtracting the V 0 occurrence time (t1) from the pallet cut time (t5),
By subtracting the ground fault display time (t4) from the pallet cut time (t5) and adding the display operation delay time (D3) of the ground fault protection relay, the pallet cut-off time (T 2 ) is calculated,
The accident duration (T 3 ) is calculated by subtracting the V 0 occurrence time (t1) and the return delay time (D2) of the ground fault overvoltage relay from the OVG return time (t6),
By subtracting the V 0 occurrence time (t1) and the display operation delay time (D3) of the ground fault protection relay from the ground fault display time (t4), the relay command time (T 4 ) is calculated,
The OVG display time (t3) is subtracted from the OVG return time (t6) to add the operation time limit (D4) of the ground fault overvoltage relay and the display operation delay time (D1) of the ground fault overvoltage relay and the ground fault overvoltage relay. The OVG operation time (T 5 ) is calculated by subtracting the return delay time (D2) of
By subtracting the V 0 occurrence time (t1), the return delay time (D2) of the ground fault overvoltage relay and the OVG operation time (T 5 ) from the OVG return time (t6), the V 0 -OVG difference time (T 6 ) is calculated,
The device management system according to claim 6, wherein:
前記機器管理装置(24,24’)が、
前記パレット事故継続時間(T1)に基づいて全体の地絡事故時間を把握して、前記地絡保護継電器および前記遮断器の機構部が正常であるか否かを確認し、
前記パレット遮断時間(T2)に基づいて前記遮断器の機構部が正常であるか否かを確認し、
前記事故継続時間(T3)に基づいて地絡事故継続時間を確認することにより、実系統で事故が正常に遮断されたか否かを確認し、
前記継電器指令時間(T4)に基づいて前記地絡保護継電器のトリップ指令時間を確認することにより、該地絡保護継電器の指令時間が正常であるか否かを確認し、
前記OVG動作時間(T5)に基づいて前記地絡過電圧継電器の継続時間を推定することにより、該地絡過電圧継電器が正常であるか否かを確認し、
前記V0−OVG差時間(T6)に基づいて零相電圧の発生から前記地絡過電圧検出器および前記地絡過電圧継電器が動作するまでの差時間を把握することにより、前記地絡過電圧継電器の整定および動作が正常であるか否かを確認する、
ことを特徴とする、請求項3乃至7いずれかに記載の機器管理システム。
The device management device (24, 24 ′)
Based on the pallet accident continuation time (T 1 ), grasp the entire ground fault time, and confirm whether the ground fault protection relay and the circuit breaker mechanism are normal,
Check whether the mechanical part of the circuit breaker is normal based on the pallet breaking time (T 2 ),
By confirming the ground fault accident duration based on the accident duration (T 3 ), it is confirmed whether the accident has been normally shut off in the actual system,
Confirming whether the command time of the ground fault protection relay is normal by checking the trip command time of the ground fault protection relay based on the relay command time (T 4 ),
Confirming whether the ground fault overvoltage relay is normal by estimating the duration of the ground fault overvoltage relay based on the OVG operating time (T 5 ),
Based on the V 0 -OVG difference time (T 6 ), by grasping the difference time from the generation of the zero-phase voltage to the operation of the ground fault overvoltage detector and the ground fault overvoltage relay, the ground fault overvoltage relay Check if the settling and operation of the
The device management system according to claim 3, wherein the device management system is a device management system.
母線(2)から分岐された電線路(3)に設けられた零相変流器(8)および該母線に設けられた零相変成器(9)に接続された地絡方向継電器(4a)と該零相変成器に接続された地絡過電圧継電器(4b)とを備えた地絡保護継電器(4)と、該地絡保護継電器から出力されるトリップ信号(SDG)に基づいて前記電線路を遮断する遮断器(5)との良否を判定する機器管理方法であって、
機器管理手段(21,23,24;24’)が、前記母線の零相電圧値が所定の値以上になったことを前記零相変成器に接続された前記地絡過電圧検出器が示す地絡過電圧検出器出力信号(SV1)によって表わされるV0発生時刻(t1)、前記地絡過電圧継電器の動作時間を表わすOVG動作信号(SOVG)によって表わされるOVG表示時刻(t3)、前記地絡保護継電器の前記トリップ信号によって表わされる地絡表示時刻(t4)、前記遮断器のパレット接点の状態を表わすパレット接点信号(SP)によって表わされるパレット切時刻(t5)、および、前記OVG動作信号によって表わされるOVG復帰時刻(t6)に基づいて、パレット事故継続時間(T1)、パレット遮断時間(T2)、事故継続時間(T3)、継電器指令時間(T4)、OVG動作時間(T5)およびV0−OVG差時間(T6)を算出する第1のステップ(S15)と、
前記機器管理手段が、前記算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて、前記地絡保護継電器および前記遮断器の良否を判定する第2のステップ(S16)と、
を具備することを特徴とする、機器管理方法。
A zero-phase current transformer (8) provided on the electric line (3) branched from the bus (2) and a ground fault direction relay (4a) connected to the zero-phase transformer (9) provided on the bus. And a ground fault protection relay (4) having a ground fault overvoltage relay (4b) connected to the zero phase transformer, and the electric wire based on a trip signal (S DG ) output from the ground fault protection relay A device management method for determining pass / fail with a circuit breaker (5) that interrupts a road,
The equipment management means (21, 23, 24; 24 ′) indicates that the ground fault overvoltage detector connected to the zero phase transformer indicates that the zero phase voltage value of the bus has become a predetermined value or more. V 0 generation time (t1) represented by a fault overvoltage detector output signal (S V1 ), OVG display time (t3) represented by an OVG operation signal (S OVG ) representing the operation time of the ground fault overvoltage relay, The ground fault display time (t4) represented by the trip signal of the fault protection relay, the pallet cut time (t5) represented by the pallet contact signal (S P ) representing the state of the pallet contact of the circuit breaker, and the OVG operation based on OVG return time (t6) represented by the signal, the pallet accident duration (T 1), pallet interruption time (T 2), the accident duration (T 3), relay command upon And (T 4), a first step of calculating OVG operation time (T 5) and V 0 -OVG difference time (T 6) (S15),
Based on the calculated pallet accident duration time, pallet interruption time, accident duration time, relay command time, OVG operation time, and V 0 -OVG difference time, the equipment management means determines whether the ground fault protection relay and the circuit breaker A second step (S16) for determining pass / fail;
A device management method comprising the steps of:
前記第1のステップの前に、
子局側遠方監視制御装置(21)が、所定の時間間隔で前記パレット接点信号、前記OVG動作信号、前記トリップ信号および前記地絡過電圧検出器出力信号を取り込んで、該取り込んだパレット接点信号、OVG動作信号、トリップ信号および地絡過電圧検出器出力信号の状変情報を保管する第3のステップと、
前記子局側遠方監視制御装置と通信回線(22)を介して相互接続された親局側遠方監視制御装置(23)が、前記電線路において地絡事故が発生すると、該地絡事故の継続時間を含む時間範囲の前記パレット接点信号、前記OVG動作信号、前記トリップ信号および前記地絡過電圧検出器出力信号の状変情報の送信を要求する要求信号を前記子局側遠方監視制御装置に前記通信回線を介して送信し、該子局側遠方監視制御装置から前記要求した時間範囲のパレット接点信号、OVG動作信号、トリップ信号および地絡過電圧検出器出力信号の状変情報を受信する第4のステップ(S14)と、
をさらに具備し、
前記第1のステップにおいて、前記親局側遠方監視制御装置に接続された機器管理装置(24)が、前記地絡過電圧検出器出力信号の状変情報によって表わされる前記V0発生時刻、前記OVG動作信号の状変情報によって表わされる前記OVG表示時刻、前記トリップ信号の状変情報によって表わされる前記地絡表示時刻、前記パレット接点信号の状変情報によって表わされる前記パレット切時刻および前記OVG動作信号の状変情報によって表わされる前記OVG復帰時刻に基づいて、前記パレット事故継続時間、前記パレット遮断時間、前記事故継続時間、前記継電器指令時間、前記OVG動作時間および前記V0−OVG差時間を算出し、
前記第2のステップにおいて、前記機器管理装置(24)が、前記算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて、前記地絡保護継電器および前記遮断器の良否を判定する、
ことを特徴とする、請求項9記載の機器管理方法。
Before the first step,
The slave station side remote monitoring and control device (21) captures the pallet contact signal, the OVG operation signal, the trip signal and the ground fault overvoltage detector output signal at a predetermined time interval, and the captured pallet contact signal, A third step of storing state change information of the OVG operation signal, trip signal and ground fault overvoltage detector output signal;
When the master station side remote monitoring and control device (23) interconnected with the slave station side remote monitoring and control device via a communication line (22) causes a ground fault in the electric line, the ground fault is continued. A request signal for requesting transmission of state change information of the pallet contact signal, the OVG operation signal, the trip signal, and the ground fault overvoltage detector output signal in a time range including time is sent to the slave station side remote monitoring and control device. A fourth information is transmitted via the communication line, and the state change information of the palette contact signal, OVG operation signal, trip signal, and ground fault overvoltage detector output signal in the requested time range is received from the remote monitoring control device on the slave station side. Step (S14),
Further comprising
In the first step, the equipment management device (24) connected to the remote monitoring control device on the master station side transmits the V 0 generation time, the OVG represented by the state change information of the ground fault overvoltage detector output signal. The OVG display time represented by the state change information of the operation signal, the ground fault display time represented by the state change information of the trip signal, the pallet cut time represented by the state change information of the pallet contact signal, and the OVG operation signal Based on the OVG return time represented by the state change information, the pallet accident duration, the pallet shutoff time, the accident duration, the relay command time, the OVG operation time, and the V 0 -OVG difference time are calculated. And
In the second step, the equipment management device (24), based on the calculated pallet accident continuation time, pallet interruption time, accident continuation time, relay command time, OVG operation time, and V 0 -OVG difference time, Determining whether the ground fault protection relay and the circuit breaker are good or bad.
The device management method according to claim 9, wherein:
前記トリップ信号と前記パレット接点信号との時間差を検出する時間差検出回路(31)と、該時間差検出回路の出力信号の時間軸を所定の倍数に伸張する伸張回路(32)とを備える時間軸拡大装置(30)が、前記子局側遠方監視制御装置に設けられており、
前記第3のステップにおいて、前記子局側遠方監視制御装置が、時間軸拡大装置出力信号の状変情報を保管し、
前記第1のステップにおいて、前記機器管理装置(24)が、前記要求した時間範囲の前記時間軸拡大装置出力信号の状変情報に基づいて前記パレット切時刻(t5)と前記地絡表示時刻(t4)との拡大差時間を求め、該求めた拡大差時間から前記時間差検出回路によって検出された時間差を復元したのち、該復元した時間差に前記地絡保護継電器の表示動作遅延時間(D3)を足すことにより、前記パレット遮断時間(T2)を算出する、
ことを特徴とする、請求項10記載の機器管理方法。
A time axis expansion circuit comprising a time difference detection circuit (31) for detecting a time difference between the trip signal and the pallet contact signal, and an expansion circuit (32) for expanding the time axis of the output signal of the time difference detection circuit to a predetermined multiple. A device (30) is provided in the slave station side remote monitoring and control device,
In the third step, the remote monitoring control device on the slave station side stores the state change information of the time axis expansion device output signal,
In the first step, the device management device (24) determines the palette cut time (t5) and the ground fault display time (based on the state change information of the time axis expansion device output signal in the requested time range). t4) is calculated, and after the time difference detected by the time difference detection circuit is restored from the obtained time difference, the display operation delay time (D3) of the ground fault protection relay is added to the restored time difference. The pallet cut-off time (T 2 ) is calculated by adding
The device management method according to claim 10, wherein:
前記第1のステップにおいて、前記地絡保護継電器、前記遮断器および前記地絡過電圧検出器に接続された機器管理装置(24’)が、前記地絡過電圧検出器出力信号からV0発生時刻(t1)を求め、前記OVG動作信号からOVG表示時刻(t3)を求め、前記トリップ信号から地絡表示時刻(t4)を求め、前記パレット接点信号からパレット切時刻(t5)を求め、前記OVG動作信号からOVG復帰時刻(t6)を求め、該求めたV0発生時刻、OVG表示時刻、地絡表示時刻、パレット切時刻およびOVG復帰時刻に基づいて前記パレット事故継続時間、前記パレット遮断時間、前記事故継続時間、前記継電器指令時間、前記OVG動作時間および前記V0−OVG差時間を算出し、
前記第2のステップにおいて、前記機器管理装置(24’)が、前記算出したパレット事故継続時間、パレット遮断時間、事故継続時間、継電器指令時間、OVG動作時間およびV0−OVG差時間に基づいて、前記地絡保護継電器および前記遮断器の良否を判定する、
ことを特徴とする、請求項9記載の機器管理方法。
In the first step, the equipment management device (24 ′) connected to the ground fault protection relay, the circuit breaker, and the ground fault overvoltage detector receives a V 0 generation time ( t1), an OVG display time (t3) from the OVG operation signal, a ground fault display time (t4) from the trip signal, a pallet cut time (t5) from the pallet contact signal, and the OVG operation signal obtains the OVG return time (t6) from the obtained V 0 occurrence time, OVG display time, ground fault display time, the pallet accident duration based on the pallet changeover time and OVG return time, the pallet interruption time, wherein Calculate the accident duration, the relay command time, the OVG operation time and the V 0 -OVG difference time,
In the second step, the equipment management device (24 ') is based on the calculated pallet accident continuation time, pallet interruption time, accident continuation time, relay command time, OVG operation time, and V 0 -OVG difference time. , Determining the quality of the ground fault protection relay and the circuit breaker,
The device management method according to claim 9, wherein:
JP2007105582A 2007-04-13 2007-04-13 Equipment management system and equipment management method Withdrawn JP2008263744A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007105582A JP2008263744A (en) 2007-04-13 2007-04-13 Equipment management system and equipment management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007105582A JP2008263744A (en) 2007-04-13 2007-04-13 Equipment management system and equipment management method

Publications (1)

Publication Number Publication Date
JP2008263744A true JP2008263744A (en) 2008-10-30

Family

ID=39985820

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007105582A Withdrawn JP2008263744A (en) 2007-04-13 2007-04-13 Equipment management system and equipment management method

Country Status (1)

Country Link
JP (1) JP2008263744A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101917064A (en) * 2010-08-05 2010-12-15 河南省电力公司许昌供电公司 Back-up protection processing method of digital substation transformer based on GOOSE mode
CN101958579A (en) * 2010-09-19 2011-01-26 河南省电力公司许昌供电公司 Method of treating information loss in centralized protection device of digitalized substation
CN103792448A (en) * 2014-01-22 2014-05-14 国家电网公司 Digitized protective device automatic test control system and control method thereof
CN107465174A (en) * 2017-10-11 2017-12-12 广东电网有限责任公司电力科学研究院 A kind of fault protecting method and device of the distribution system containing energy storage
CN107799341A (en) * 2016-08-30 2018-03-13 西门子公司 Switching device and method for turn-on current
CN108649539A (en) * 2018-04-23 2018-10-12 天津大学 AC/DC interconnected system failure sorted cutting method based on VSC
JP2019068645A (en) * 2017-10-02 2019-04-25 中国電力株式会社 Ground fault protection relay system
WO2021001917A1 (en) * 2019-07-02 2021-01-07 株式会社東芝 Protection relay device and accident duration time acquiring method
WO2022183646A1 (en) * 2021-03-04 2022-09-09 中国电建集团河北省电力勘测设计研究院有限公司 Direct current distribution network fault protection and recovery system and method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101917064A (en) * 2010-08-05 2010-12-15 河南省电力公司许昌供电公司 Back-up protection processing method of digital substation transformer based on GOOSE mode
CN101958579A (en) * 2010-09-19 2011-01-26 河南省电力公司许昌供电公司 Method of treating information loss in centralized protection device of digitalized substation
CN103792448A (en) * 2014-01-22 2014-05-14 国家电网公司 Digitized protective device automatic test control system and control method thereof
CN107799341A (en) * 2016-08-30 2018-03-13 西门子公司 Switching device and method for turn-on current
US11225155B2 (en) 2016-08-30 2022-01-18 Siemens Aktiengesellschaft Switching apparatus and method for switching a current
JP2019068645A (en) * 2017-10-02 2019-04-25 中国電力株式会社 Ground fault protection relay system
JP7218497B2 (en) 2017-10-02 2023-02-07 中国電力株式会社 Ground fault protection relay system
CN107465174A (en) * 2017-10-11 2017-12-12 广东电网有限责任公司电力科学研究院 A kind of fault protecting method and device of the distribution system containing energy storage
CN108649539A (en) * 2018-04-23 2018-10-12 天津大学 AC/DC interconnected system failure sorted cutting method based on VSC
CN108649539B (en) * 2018-04-23 2019-07-30 天津大学 AC/DC interconnected system failure sorted cutting method based on VSC
WO2021001917A1 (en) * 2019-07-02 2021-01-07 株式会社東芝 Protection relay device and accident duration time acquiring method
WO2022183646A1 (en) * 2021-03-04 2022-09-09 中国电建集团河北省电力勘测设计研究院有限公司 Direct current distribution network fault protection and recovery system and method

Similar Documents

Publication Publication Date Title
JP2008263744A (en) Equipment management system and equipment management method
KR102035351B1 (en) Electric installation maintenance method and device
KR101621653B1 (en) Switchboard Using Expert System for Automatic Recovering Based On Bi-direction Communication and Operating Method thereof
KR101090425B1 (en) Protection Coordination system in ungrounded distribution system and its operating method
CA3116929A1 (en) Tie switch restoration
JP5317724B2 (en) Switch remote monitoring method, switch remote monitoring system
KR100920946B1 (en) Apparatus and method for fault detection and fault location decision on a distribution line using load current
JP2009273245A (en) Power system monitor control system
JP2006280024A (en) Apparatus automatic test system and apparatus automatic test method
JP2011101453A (en) Method and device for evaluating protective relay system
CN105676119A (en) Power distribution network switch state testing method and device
KR101069637B1 (en) Apparatus and method for protecting overcurrent
JP5075590B2 (en) Bus-ground fault protection relay device and sequence interruption method
JP2013132114A (en) Automatic recovery device
JP4667002B2 (en) Accident point location system and accident location method
KR20210094786A (en) Real Time Failure Analysis System and Determination Method
JP2010115006A (en) System for determining bus line accident section
Apostolov et al. Maintenance testing of multifunctional distance protection ieds
JP2009118678A (en) Power line earth fault protection system
WO2008067299A2 (en) Method and system for isolating disturbances to the power distribution system
CN104965154A (en) Wire fault positioning method and system
JP2003032874A (en) Automatic resetting apparatus
JP2008278662A (en) Bus protective relaying device
KR20150031204A (en) Management system for traffic signal controller and Server provided in the same
JP6219085B2 (en) Power system stabilization system and power system stabilization method

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20100706