JP2005208893A - Earthquake disaster restoration support device, earthquake disaster restoration support system, earthquake disaster restoration support method and earthquake disaster restoration support program - Google Patents

Earthquake disaster restoration support device, earthquake disaster restoration support system, earthquake disaster restoration support method and earthquake disaster restoration support program Download PDF

Info

Publication number
JP2005208893A
JP2005208893A JP2004014226A JP2004014226A JP2005208893A JP 2005208893 A JP2005208893 A JP 2005208893A JP 2004014226 A JP2004014226 A JP 2004014226A JP 2004014226 A JP2004014226 A JP 2004014226A JP 2005208893 A JP2005208893 A JP 2005208893A
Authority
JP
Japan
Prior art keywords
construction
survey
information
earthquake disaster
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2004014226A
Other languages
Japanese (ja)
Inventor
Hitoshi Seya
均 瀬谷
Mutsuhiro Yoshizawa
睦博 吉澤
Teruo Segawa
輝夫 瀬川
Hidenobu Matsumoto
秀信 松元
Yoshio Tomatsu
良夫 戸松
Masaru Fujimura
勝 藤村
Toshiya Kashimura
俊也 樫村
Michinao Masuda
道直 増田
Katsunobu Shukuri
勝信 宿里
Keisuke Kuroda
啓介 黒田
Akira Sumi
彰 角
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2004014226A priority Critical patent/JP2005208893A/en
Publication of JP2005208893A publication Critical patent/JP2005208893A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an earthquake disaster restoration support device, an earthquake disaster restoration support system, an earthquake disaster restoration support method and an earthquake disaster restoration support program, capable of improving efficiency of restoration work of disaster to a building by an earthquake. <P>SOLUTION: Damage degrees of a plurality of buildings that are targets of restoration support are predicted (steps 104, 106), investigation direction information for directing execution of investigation of a damage situation in preference of a building having a high predicted damage degree is outputted (step 114), investigation result information showing an investigation result according to the outputted investigation direction information is inputted (steps 118, 120), and the inputted investigation result information is stored in a storage means (step 122). <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

本発明は、地震災害復旧支援装置、地震災害復旧支援システム、地震災害復旧支援方法及び地震災害復旧支援プログラムに係り、より詳しくは、地震が発生した際に当該地震による建物に対する災害の復旧を支援する地震災害復旧支援装置、地震災害復旧支援システム、地震災害復旧支援方法及び地震災害復旧支援プログラムに関する。   The present invention relates to an earthquake disaster recovery support device, an earthquake disaster recovery support system, an earthquake disaster recovery support method, and an earthquake disaster recovery support program. More specifically, when an earthquake occurs, the present invention supports disaster recovery for a building caused by the earthquake. The present invention relates to an earthquake disaster recovery support device, an earthquake disaster recovery support system, an earthquake disaster recovery support method, and an earthquake disaster recovery support program.

地震動による建物の被害状況の高精度な予測を可能とするために適用できる従来の技術として、既存建物の地震に対する被害率及び被害額を精度よく予測できるようにすることを目的として、評価対象建物の構造体に関する耐震診断結果である構造耐震指標を入力する過程と、前記入力された構造耐震指標をもとに、予め過去に起きた地震の被害データから算定された破壊確率算出条件を用いて、地震入力レベルに応じた破壊確率を算出する過程と、算出された破壊確率に基づき、評価対象建物の被害予測情報を算定し出力する過程とを有する技術があった(例えば、特許文献1参照。)。   As a conventional technology that can be applied to enable highly accurate prediction of building damage due to earthquake motion, the target building is evaluated for the purpose of accurately predicting the damage rate and amount of damage to existing buildings. Using the process of inputting the structural seismic index, which is the seismic diagnosis result for the structure of, and the failure probability calculation condition calculated from the damage data of earthquakes that occurred in the past based on the input structural seismic index There is a technology that includes a process of calculating a failure probability according to an earthquake input level and a process of calculating and outputting damage prediction information of an evaluation target building based on the calculated failure probability (see, for example, Patent Document 1) .)

また、任意の位置に、任意の大きさで発生した地震の被害予測が可能になる模擬予測装置を提供することを目的として、所定距離間隔で格子状に区画されたメッシュ状地図を表示手段により表示させた状態で表示画面上の任意の位置に震源地及び地震の大きさを設定させ、設定された地震の大きさ、及び、前記震源地と前記メッシュ状地図の各区画との間の距離と、前記震源地と前記各区画との間に存在する地盤の性質を示す地質データとに基づいて前記メッシュ状地図の各区画毎の加速度を演算すると共に、得られた加速度と、前記メッシュ状地図中に表示される建物構造物の建築年度、構造種別、階数等の建物データとに基づいて前記建築構造物の被害度を演算し、前記加速度及び被害度を前記メッシュ状地図上に表示させる技術もあった(例えば、特許文献2参照。)。   In addition, for the purpose of providing a simulation prediction device capable of predicting the damage of an earthquake occurring at an arbitrary size at an arbitrary position, a mesh map partitioned in a grid pattern at predetermined distance intervals is displayed by display means. In the displayed state, the epicenter and the magnitude of the earthquake are set at an arbitrary position on the display screen, and the set seismic magnitude and the distance between the epicenter and each section of the mesh map are set. And calculating the acceleration for each section of the mesh map based on the geological data indicating the nature of the ground existing between the epicenter and each section, and the obtained acceleration and the mesh shape The damage level of the building structure is calculated based on the building data of the building structure displayed in the map, such as the building year, the structure type, and the floor number, and the acceleration and the damage level are displayed on the mesh map. There is also technology (E.g., see Patent Document 2.).

更に、地震リスクを精度よく算出することができる地震リスク診断システムを提供することを目的として、フラジリティ曲線作成手段と、フラジリティ曲線と施設を構成する構成要素が損傷を受けた場合の損害額とから、所定の地動加速度の地震が発生した場合に施設に発生する予想損害額を算出する予想損害額算出手段と、所定の地動加速度の地震が発生する確率を算出する地震発生確率算出手段と、所定の地動加速度の地震が発生した場合に施設に発生する予想損害額と、所定の地動加速度の地震が発生する確率とから施設に所定の予想損害額が発生する確率を算出する被害発生確率算出手段と、を有する地震リスク診断システムにおいて、フラジリティ曲線作成手段は、構成要素が建物である場合のフラジリティ曲線を、建物の耐震性能を示すIs値に応じて作成するようにした技術もあった(例えば、特許文献3参照。)。   Furthermore, for the purpose of providing an earthquake risk diagnosis system capable of calculating earthquake risk with high accuracy, from the fragility curve creation means and the damage amount when the fragility curve and the components constituting the facility are damaged An expected damage amount calculating means for calculating an expected damage amount occurring in the facility when an earthquake with a predetermined ground motion acceleration occurs, an earthquake occurrence probability calculating means for calculating a probability that an earthquake with a predetermined ground motion acceleration will occur, and a predetermined Damage occurrence probability calculation means to calculate the probability of occurrence of a predetermined expected damage amount in a facility from the expected damage amount that will occur in the facility when an earthquake with a ground motion acceleration occurs and the probability that an earthquake with a predetermined ground motion acceleration will occur In the earthquake risk diagnosis system, the fragility curve creating means calculates the fragility curve when the component is a building, and the earthquake resistance of the building. It was also techniques to be created according to Is value indicating (e.g., see Patent Document 3.).

一方、地震が発生した際に当該地震による建物に対する災害の復旧を支援するために適用できる技術として、画像情報と目視情報を組み合わせた、より精度の高い被災度判定と、被害情報の効率的収集を行い、これらの情報を即座に表示することができる情報収集表示システムを提供することを目的として、現地において画像入力装置及びGPS装置を用いて構造物の画像情報と位置情報を可搬型パーソナルコンピュータに入力し、構造物の被害調査票を作成し、当該被害調査票等の情報を携帯電話を利用して対策本部のホストコンピュータへ送信する一方、ホストコンピュータにより、被害調査票等の情報を被害調査票データベース等に登録し、ディスプレイ上に地図を表示し、地図上に対象となる構造物の位置を識別できるように表示する技術があった(例えば、特許文献4参照。)。
特開2003−132296公報 特開平8−329043号公報 特開2003−27626公報 特開2001−167133公報
On the other hand, as a technology that can be applied to support disaster recovery for buildings caused by an earthquake, more accurate assessment of damage level by combining image information and visual information and efficient collection of damage information In order to provide an information collection and display system that can immediately display such information, a portable personal computer can store image information and position information of a structure using an image input device and a GPS device in the field. To create a damage survey form for the structure and send the information on the damage survey form etc. to the host computer of the countermeasures headquarters using a mobile phone, while the host computer damages the information on the damage survey form etc. Register in the survey form database, display the map on the display, and display the map so that the position of the target structure can be identified. Had art (e.g., see Patent Document 4.).
JP 2003-132296 A JP-A-8-329043 JP 2003-27626 A JP 2001-167133 A

ところで、地震が発生した際に当該地震による建物に対する災害の復旧作業を効率よく行うためには、地震発生時からの経過時間ができる限り短いうちに被災した建物の被害状況を調査することが極めて重要であることは言うまでもない。特に、被害程度が高い建物ほど、地震発生時からの経過期間が短期間で当該調査を行うことが必要である。   By the way, in order to efficiently perform disaster recovery work for buildings caused by an earthquake, it is extremely important to investigate the damage status of the damaged building within the shortest possible time since the earthquake occurred. It goes without saying that it is important. In particular, it is necessary to conduct the survey for buildings with a higher degree of damage with a shorter period of time since the occurrence of the earthquake.

しかしながら、上述した特許文献1〜特許文献3に記載の技術では、建物の被害状況の予測を精度よく行うことはできるものの、地震が発生した際における建物に対する災害の復旧作業についてまでは考慮されておらず、必ずしも当該復旧作業を高効率化することができるとは言えない、という問題点があった。   However, with the technologies described in Patent Documents 1 to 3, the damage status of the building can be accurately predicted, but the disaster recovery work for the building when an earthquake occurs is taken into consideration. In other words, there is a problem that it cannot be said that the restoration work can be made highly efficient.

また、上述した特許文献4に記載の技術では、GPS装置を用いたことにより被災地の位置を示す位置情報を自動的に登録することができるため、当該登録作業を短時間化することはできるものの、被災した建物に対する被害状況の調査までの期間短縮に関しては考慮されておらず、この技術においても必ずしも当該復旧作業を高効率化することができるとは言えない、という問題点があった。   Moreover, in the technique described in Patent Document 4 described above, since the position information indicating the position of the disaster area can be automatically registered by using the GPS device, the registration work can be shortened. However, there is a problem that the shortening of the period until the investigation of the damage situation on the damaged building is not considered, and even with this technology, it cannot be said that the restoration work can be made highly efficient.

本発明は上記問題点を解消するためになされたものであり、地震による建物に対する災害の復旧作業の効率を向上させることのできる地震災害復旧支援装置、地震災害復旧支援システム、地震災害復旧支援方法及び地震災害復旧支援プログラムを提供することを目的とする。   The present invention has been made to solve the above-described problems, and an earthquake disaster recovery support device, an earthquake disaster recovery support system, and an earthquake disaster recovery support method capable of improving the efficiency of disaster recovery work on a building caused by an earthquake. And to provide an earthquake disaster recovery support program.

上記目的を達成するために、請求項1記載の地震災害復旧支援装置は、地震による複数の建物への災害に対する復旧作業を支援する地震災害復旧支援装置であって、前記複数の建物の被害程度を予測する被害程度予測手段と、前記被害程度予測手段により予測された前記被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報を出力する調査指示出力手段と、前記調査指示出力手段により出力された前記調査指示情報に応じた調査結果を示す調査結果情報を入力する調査結果入力手段と、前記調査結果入力手段により入力された前記調査結果情報を記憶する記憶手段と、を備えている。   In order to achieve the above object, an earthquake disaster recovery support apparatus according to claim 1 is an earthquake disaster recovery support apparatus that supports recovery work for a disaster to a plurality of buildings due to an earthquake, and the degree of damage to the plurality of buildings A damage degree prediction means for predicting a damage, and a survey instruction output means for outputting investigation instruction information for instructing that a building having a higher damage degree predicted by the damage degree prediction means to conduct a damage state investigation with priority. , A survey result input unit for inputting survey result information indicating a survey result according to the survey instruction information output by the survey instruction output unit, and a memory for storing the survey result information input by the survey result input unit Means.

請求項1記載の地震災害復旧支援装置によれば、被害程度予測手段により複数の建物の被害程度が予測される。なお、上記被害程度予測手段による被害程度の予測は、建物に対する被害程度を予測することのできる従来既知のあらゆる予測手法を適用することができる。   According to the earthquake disaster recovery support apparatus of the first aspect, the damage level prediction unit predicts the damage level of the plurality of buildings. In addition, the prediction of the damage level by the above-mentioned damage level prediction means can be applied to any conventionally known prediction method capable of predicting the level of damage to the building.

ここで、本発明では、前記被害程度予測手段により予測された前記被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報が調査指示出力手段によって出力される。なお、上記調査指示出力手段による調査指示情報の出力には、ディスプレイ装置による表示による出力やプリンタによる印刷による出力の他、ローカル・エリア・ネットワーク、インターネット、イントラネット等の通信回線を介した外部装置への出力が含まれる。   Here, in the present invention, the survey instruction output unit is configured to output the survey instruction information instructing to preferentially conduct the survey of the damage status for the building having a higher damage level predicted by the damage level prediction unit. The survey instruction information output by the survey instruction output means is output to the external device via a communication line such as a local area network, the Internet, an intranet, etc. Output.

更に、本発明では、前記調査指示出力手段により出力された前記調査指示情報に応じた調査結果を示す調査結果情報が調査結果入力手段によって入力され、当該調査結果情報が記憶手段によって記憶される。なお、上記調査結果入力手段による調査結果情報の入力には、キーボード、ポインティング・デバイス等の入力装置を介した入力の他、ローカル・エリア・ネットワーク、インターネット、イントラネット等の通信回線を介した外部装置からの入力が含まれる。また、上記記憶手段には、RAM(Random Access Memory)、EEPROM(Electrically Erasable and Programmable Read Only Memory)、フラッシュEEPROM(Flash EEPROM)等の半導体記憶素子、スマート・メディア(SmartMedia(R))、xDピクチャーカード(xD-Picture Card)、コンパクト・フラッシュ(CompactFlash)、ATA(AT Attachment)カード、マイクロドライブ、フロッピィディスク、CD−R(Compact Disc-Recordable)、CD−RW(Compact Disc-ReWritable)、光磁気ディスク等の可搬記録媒体やハードディスク等の固定記録媒体、或いはネットワークに接続されたサーバ・コンピュータ等に設けられた外部記憶装置が含まれる。   Further, in the present invention, the survey result information indicating the survey result according to the survey instruction information output by the survey instruction output unit is input by the survey result input unit, and the survey result information is stored by the storage unit. The survey result information input by the survey result input means is input via an input device such as a keyboard or a pointing device, or an external device via a communication line such as a local area network, the Internet, or an intranet. Input from. The storage means includes a RAM (Random Access Memory), an EEPROM (Electrically Erasable and Programmable Read Only Memory), a semiconductor storage element such as a flash EEPROM (Flash EEPROM), a smart media (SmartMedia®), and an xD picture. Card (xD-Picture Card), compact flash (CompactFlash), ATA (AT Attachment) card, micro drive, floppy disk, CD-R (Compact Disc-Recordable), CD-RW (Compact Disc-ReWritable), magneto-optical Examples include a portable recording medium such as a disk, a fixed recording medium such as a hard disk, or an external storage device provided in a server computer connected to a network.

すなわち、本発明では、予測された被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報を出力しており、これによって地震による被害程度が高く、早急に被害状況の調査が必要な建物に対する当該調査を地震発生時から短期間で行うことができ、この結果として地震による建物に対する災害の復旧作業の効率を向上させることができる。   In other words, in the present invention, the survey instruction information instructing to conduct the survey of the damage status is given priority to the building having a higher predicted damage level, and thus the damage level due to the earthquake is high, and the damage is quickly caused. The survey for the building requiring the survey of the situation can be performed in a short period from the time of the occurrence of the earthquake, and as a result, the efficiency of the disaster recovery work for the building due to the earthquake can be improved.

また、本発明では、前記調査指示情報に応じた調査結果を示す調査結果情報を入力すると共に、当該調査結果情報を記憶手段に記憶するようにしており、これによって記憶手段に記憶された調査情報を参照することによって当該調査結果に応じた効率的な応急工事、復旧工事等の工事を行うことができ、この結果として地震による建物に対する災害の復旧作業の効率を向上させることができるようにしている。   Further, in the present invention, the survey result information indicating the survey result according to the survey instruction information is input, and the survey result information is stored in the storage unit, whereby the survey information stored in the storage unit is stored. By referring to, it is possible to carry out efficient emergency work, restoration work, etc. according to the survey results, and as a result, to improve the efficiency of disaster restoration work for buildings due to earthquakes Yes.

このように、請求項1記載の地震災害復旧支援装置によれば、復旧支援の対象とする複数の建物の被害程度を予測し、予測した前記被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報を出力し、出力した前記調査指示情報に応じた調査結果を示す調査結果情報を入力し、入力した前記調査結果情報を記憶手段に記憶しているので、地震による建物に対する災害の復旧作業の効率を向上させることができる。   Thus, according to the earthquake disaster recovery support apparatus according to claim 1, the damage level of a plurality of buildings subject to recovery support is predicted, and the predicted damage status is given priority to a building having a higher predicted level of damage. Since the survey instruction information instructing to perform is output, the survey result information indicating the survey result according to the output of the survey instruction information is input, and the input the survey result information is stored in the storage unit, It is possible to improve the efficiency of disaster recovery work for buildings caused by earthquakes.

なお、本発明は、請求項2に記載の発明のように、前記調査結果入力手段により前記調査結果情報が入力された際に前記調査が終了したことを示す調査終了情報を前記記憶手段に記憶する調査終了記憶手段を更に備えることが好ましい。これにより、前記記憶手段に前記調査終了情報が記憶されているか否かを参照することのみによって容易に被害状況の調査が終了したか否かを判断することができる。   In the present invention, as in the invention described in claim 2, when the survey result information is input by the survey result input unit, the survey end information indicating that the survey is completed is stored in the storage unit. It is preferable to further include a survey end storage means. As a result, it is possible to easily determine whether or not the investigation of the damage situation has ended simply by referring to whether or not the investigation end information is stored in the storage unit.

ところで、地震災害に対する復旧作業の効率を向上させるためには、応急工事や復旧工事等の各種工事を要する建物については当該工事の短期間での実施が不可欠である。   By the way, in order to improve the efficiency of restoration work for earthquake disasters, it is indispensable to implement the work in a short period of time for buildings that require various kinds of work such as emergency work and restoration work.

そこで、本発明は、請求項3に記載の発明のように、前記調査結果入力手段により調査対象とした建物に対する工事を要することを示す調査結果情報が入力された場合に、当該建物に対する工事の実施を指示する工事指示情報を出力する工事指示出力手段を更に備えることが好ましい。これにより、応急工事や復旧工事等の各種工事を要する建物に対する当該工事を短期間で実施することができる。なお、上記工事指示出力手段による工事指示情報の出力には、ディスプレイ装置による表示による出力やプリンタによる印刷による出力の他、ローカル・エリア・ネットワーク、インターネット、イントラネット等の通信回線を介した外部装置への出力が含まれる。   Therefore, as in the invention described in claim 3, when the survey result information indicating that the survey target input requires construction for the building to be surveyed is input by the survey result input means, It is preferable to further include construction instruction output means for outputting construction instruction information for instructing execution. Thereby, the said construction with respect to the building which requires various constructions, such as emergency construction and restoration construction, can be implemented in a short period of time. The construction instruction information output by the construction instruction output means is not only output by display on a display device or output by a printer, but also to an external device via a communication line such as a local area network, the Internet, or an intranet. Output.

更に、請求項3に記載の発明は、請求項4に記載の発明のように、前記工事指示出力手段により出力された前記工事指示情報に応じた工事が終了したことを示す工事終了情報を入力する工事終了入力手段と、前記工事終了入力手段により前記工事終了情報が入力された際に前記工事が終了したことを示す工事終了情報を前記記憶手段に記憶する工事終了記憶手段と、を更に備えることが好ましい。これにより、前記記憶手段に前記工事終了情報が記憶されているか否かを参照することのみによって容易に工事が終了したか否かを判断することができる。なお、上記工事終了入力手段による工事終了情報の入力には、キーボード、ポインティング・デバイス等の入力装置を介した入力の他、ローカル・エリア・ネットワーク、インターネット、イントラネット等の通信回線を介した外部装置からの入力が含まれる。   Further, in the invention described in claim 3, as in the invention described in claim 4, construction completion information indicating that construction according to the construction instruction information output by the construction instruction output means is completed is input. Construction completion input means, and construction completion storage means for storing, in the storage means, construction completion information indicating that the construction has been completed when the construction completion information is input by the construction completion input means. It is preferable. Accordingly, it can be easily determined whether or not the construction has been completed only by referring to whether or not the construction completion information is stored in the storage unit. The construction completion information input by the construction completion input means is not only input via an input device such as a keyboard or pointing device, but also an external device via a communication line such as a local area network, the Internet, or an intranet. Input from.

また、本発明は、請求項5に記載の発明のように、前記被害程度予測手段により予測された被害程度を複数の段階に区分し、各区分段階別に異なる状態で提示する予測被害程度提示手段を更に備えることが好ましい。これにより、提示された予測被害程度を参照することによって被害状況の分布状態を視覚的かつ直感的に把握することができる。なお、上記予測被害程度提示手段による被害程度の提示には、ディスプレイ装置による表示による提示やプリンタによる印刷による提示の他、ローカル・エリア・ネットワーク、インターネット、イントラネット等の通信回線を介した外部装置への提示が含まれる。   Further, according to the present invention, as in the invention according to claim 5, the degree of damage predicted by the degree-of-damage prediction means is divided into a plurality of stages, and a predicted damage degree presentation means for presenting in a different state for each division stage. Is preferably further provided. Thereby, it is possible to visually and intuitively grasp the distribution state of the damage situation by referring to the presented predicted damage degree. In addition to the presentation by the display device or the printing by the printer, the presentation of the degree of damage by the above-mentioned predicted damage degree presentation means may be made to an external device via a communication line such as a local area network, the Internet, or an intranet. Is included.

一方、上記目的を達成するために、請求項6記載の地震災害復旧支援システムは、請求項1乃至請求項5の何れか1項記載の地震災害復旧支援装置と、前記地震災害復旧支援装置から出力された指示情報に基づく情報を表示する表示手段を備えたクライアント装置と、前記地震災害復旧支援装置と前記クライアント装置との間に介在された通信回線と、を含むものである。   On the other hand, in order to achieve the above object, an earthquake disaster recovery support system according to claim 6 includes the earthquake disaster recovery support device according to any one of claims 1 to 5 and the earthquake disaster recovery support device. A client device including display means for displaying information based on the output instruction information; and a communication line interposed between the earthquake disaster recovery support device and the client device.

請求項6記載の地震災害復旧支援システムによれば、本発明の地震災害復旧支援装置により指示情報が出力される。なお、上記指示情報には、少なくとも前記調査指示情報が含まれ、請求項3に係る地震災害復旧支援装置を適用した場合には、前記工事指示情報も含まれる。   According to the earthquake disaster recovery support system of the sixth aspect, the instruction information is output by the earthquake disaster recovery support device of the present invention. The instruction information includes at least the survey instruction information. When the earthquake disaster recovery support apparatus according to claim 3 is applied, the construction instruction information is also included.

一方、本発明では、クライアント装置により、前記地震災害復旧支援装置から出力された指示情報に基づく情報が表示手段によって表示される。なお、上記表示手段には、CRTディスプレイ、液晶ディスプレイ、プラズマ・ディスプレイ、有機ELディスプレイ等のディスプレイ装置が含まれる。   On the other hand, in the present invention, information based on the instruction information output from the earthquake disaster recovery support apparatus is displayed on the display unit by the client apparatus. The display means includes a display device such as a CRT display, a liquid crystal display, a plasma display, and an organic EL display.

ここで、地震災害復旧支援装置とクライアント装置との間には通信回線が介在されており、前記指示情報は、地震災害復旧支援装置からクライアント装置に対し、当該通信回線を介して出力される。なお、上記通信回線には、ローカル・エリア・ネットワーク、インターネット、イントラネット等の各種ネットワークが含まれる。   Here, a communication line is interposed between the earthquake disaster recovery support apparatus and the client apparatus, and the instruction information is output from the earthquake disaster recovery support apparatus to the client apparatus via the communication line. Note that the communication line includes various networks such as a local area network, the Internet, and an intranet.

このように、請求項6記載の地震災害復旧支援システムでは、本発明の地震災害復旧支援装置により出力された指示情報を、地震災害復旧支援装置に通信回線を介して接続されたクライアント装置によって表示するようにしているので、当該クライアント装置を地震による被災地に比較的接近した位置に設置されているものとすることにより、比較的短時間で被害状況の調査や、当該調査結果に応じた工事等を行うことができるようになり、この結果として、地震による建物に対する災害の復旧作業の効率を向上させることができる。   Thus, in the earthquake disaster recovery support system according to claim 6, the instruction information output by the earthquake disaster recovery support device of the present invention is displayed by the client device connected to the earthquake disaster recovery support device via the communication line. Because the client device is installed at a position relatively close to the stricken area due to the earthquake, the damage situation can be investigated in a relatively short period of time, and construction according to the result of the investigation. As a result, it is possible to improve the efficiency of disaster recovery work for buildings caused by earthquakes.

一方、上記目的を達成するために、請求項7記載の地震災害復旧支援方法は、地震による複数の建物への災害に対する復旧作業を支援する地震災害復旧支援方法であって、前記複数の建物の被害程度を予測し、予測した前記被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報を出力し、出力した前記調査指示情報に応じた調査結果を示す調査結果情報を入力し、入力した前記調査結果情報を記憶手段に記憶するものである。   On the other hand, in order to achieve the above object, an earthquake disaster recovery support method according to claim 7 is an earthquake disaster recovery support method for supporting a recovery operation for a disaster to a plurality of buildings due to an earthquake. Survey indication that predicts the degree of damage, outputs survey instruction information instructing that the higher damage level of the predicted building is to be preferentially investigated, and indicates the survey result according to the output survey instruction information Result information is inputted, and the inputted investigation result information is stored in a storage means.

従って、請求項7記載の地震災害復旧支援方法は、請求項1記載の発明と同様に作用するので、請求項1記載の発明と同様に、地震による建物に対する災害の復旧作業の効率を向上させることができる。   Therefore, since the earthquake disaster recovery support method according to claim 7 operates in the same manner as the invention according to claim 1, the efficiency of disaster recovery work for a building caused by an earthquake is improved as in the invention according to claim 1. be able to.

なお、請求項7記載の発明は、請求項8に記載の発明のように、前記調査結果情報を入力した際に前記調査が終了したことを示す調査終了情報を前記記憶手段に記憶することが好ましい。これにより、前記記憶手段に前記調査終了情報が記憶されているか否かを参照することのみによって容易に被害状況の調査が終了したか否かを判断することができる。   According to the seventh aspect of the invention, as in the eighth aspect of the invention, when the survey result information is input, the survey end information indicating that the survey is completed is stored in the storage unit. preferable. As a result, it is possible to easily determine whether or not the investigation of the damage situation has ended simply by referring to whether or not the investigation end information is stored in the storage unit.

また、請求項7又は請求項8に記載の発明は、請求項9に記載の発明のように、調査対象とした建物に対する工事を要することを示す調査結果情報を入力した場合に、当該建物に対する工事の実施を指示する工事指示情報を出力することが好ましい。これにより、応急工事や復旧工事等の各種工事を要する建物に対する当該工事を短期間で実施することができる。   In addition, the invention according to claim 7 or claim 8 is the same as the invention according to claim 9, and when the survey result information indicating that the construction of the building to be investigated is required is input, It is preferable to output construction instruction information instructing execution of construction. Thereby, the said construction with respect to the building which requires various constructions, such as emergency construction and restoration construction, can be implemented in a short period of time.

更に、請求項9に記載の発明は、請求項10に記載の発明のように、出力した前記工事指示情報に応じた工事が終了したことを示す工事終了情報が入力された際に前記工事が終了したことを示す工事終了情報を前記記憶手段に記憶することが好ましい。これにより、前記記憶手段に前記工事終了情報が記憶されているか否かを参照することのみによって容易に工事が終了したか否かを判断することができる。   Further, in the invention according to claim 9, as in the invention according to claim 10, the construction is performed when construction completion information indicating that construction according to the outputted construction instruction information is completed is input. It is preferable to store construction completion information indicating completion in the storage means. Accordingly, it can be easily determined whether or not the construction has been completed only by referring to whether or not the construction completion information is stored in the storage unit.

一方、上記目的を達成するために、請求項11記載の地震災害復旧支援プログラムは、地震による複数の建物への災害に対する復旧作業を支援する地震災害復旧支援プログラムであって、前記複数の建物の被害程度を予測する被害程度予測ステップと、前記被害程度予測ステップにより予測された前記被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報を出力する調査指示出力ステップと、前記調査指示出力ステップにより出力された前記調査指示情報に応じた調査結果を示す調査結果情報を入力する調査結果入力ステップと、前記調査結果入力ステップにより入力された前記調査結果情報を記憶手段に記憶する記憶ステップと、をコンピュータに実行させるものである。   On the other hand, in order to achieve the above object, an earthquake disaster recovery support program according to claim 11 is an earthquake disaster recovery support program for supporting recovery work for a disaster to a plurality of buildings due to an earthquake, A damage degree prediction step for predicting a damage degree, and a survey instruction output for outputting a survey instruction information instructing that a building having a higher damage degree predicted by the damage degree prediction step has a higher priority for a damage state investigation. A step, a survey result input step for inputting survey result information indicating a survey result according to the survey instruction information output by the survey instruction output step, and the survey result information input by the survey result input step And a storage step stored in the means.

従って、請求項11記載の地震災害復旧支援プログラムは、コンピュータに対して請求項1記載の発明と同様に作用させることができるので、請求項1記載の発明と同様に、地震による建物に対する災害の復旧作業の効率を向上させることができる。   Therefore, since the earthquake disaster recovery support program according to claim 11 can be made to act on the computer in the same manner as the invention according to claim 1, as in the invention according to claim 1, The efficiency of restoration work can be improved.

なお、請求項11記載の発明は、請求項12に記載の発明のように、前記調査結果入力ステップにより前記調査結果情報が入力された際に前記調査が終了したことを示す調査終了情報を前記記憶手段に記憶する調査終了記憶ステップを更に有することが好ましい。これにより、前記記憶手段に前記調査終了情報が記憶されているか否かを参照することのみによって容易に被害状況の調査が終了したか否かを判断することができる。   The invention according to claim 11 is characterized in that, as in the invention according to claim 12, the survey end information indicating that the survey is completed when the survey result information is input by the survey result input step. It is preferable to further include a survey end storing step for storing in the storing means. As a result, it is possible to easily determine whether or not the investigation of the damage situation has ended simply by referring to whether or not the investigation end information is stored in the storage unit.

また、請求項11又は請求項12に記載の発明は、請求項13に記載の発明のように、前記調査結果入力ステップにより調査対象とした建物に対する工事を要することを示す調査結果情報が入力された場合に、当該建物に対する工事の実施を指示する工事指示情報を出力する工事指示出力ステップを更に有することが好ましい。これにより、応急工事や復旧工事等の各種工事を要する建物に対する当該工事を短期間で実施することができる。   Further, in the invention described in claim 11 or claim 12, as in the invention described in claim 13, survey result information indicating that construction for the surveyed building is required in the survey result input step is input. In this case, it is preferable to further include a construction instruction output step for outputting construction instruction information for instructing execution of construction for the building. Thereby, the said construction with respect to the building which requires various constructions, such as emergency construction and restoration construction, can be implemented in a short period of time.

更に、請求項13に記載の発明は、請求項14に記載の発明のように、前記工事指示出力ステップにより出力された前記工事指示情報に応じた工事が終了したことを示す工事終了情報を入力する工事終了入力ステップと、前記工事終了入力ステップにより前記工事終了情報が入力された際に前記工事が終了したことを示す工事終了情報を前記記憶手段に記憶する工事終了記憶ステップと、を更に有することが好ましい。これにより、前記記憶手段に前記工事終了情報が記憶されているか否かを参照することのみによって容易に工事が終了したか否かを判断することができる。   Furthermore, in the invention described in claim 13, as in the invention described in claim 14, the construction completion information indicating that the construction according to the construction instruction information output by the construction instruction output step is completed is input. A construction completion input step, and a construction completion storage step of storing in the storage means construction completion information indicating that the construction has been completed when the construction completion information is input in the construction completion input step. It is preferable. Accordingly, it can be easily determined whether or not the construction has been completed only by referring to whether or not the construction completion information is stored in the storage unit.

本発明によれば、復旧支援の対象とする複数の建物の被害程度を予測し、予測した前記被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報を出力し、出力した前記調査指示情報に応じた調査結果を示す調査結果情報を入力し、入力した前記調査結果情報を記憶手段に記憶しているので、地震による建物に対する災害の復旧作業の効率を向上させることができる、という効果が得られる。   According to the present invention, the degree of damage of a plurality of buildings targeted for restoration support is predicted, and survey instruction information is output that instructs that a building having a higher predicted degree of damage is prioritized to investigate the damage situation. Since the survey result information indicating the survey result according to the output survey instruction information is input and the input survey result information is stored in the storage means, the efficiency of the disaster recovery work for the building due to the earthquake is improved. The effect that it can be made is acquired.

以下、図面を参照して、本発明を実施するための最良の形態について詳細に説明する。なお、ここでは、本発明を、総合建設会社(所謂ゼネコン)における過去に建設を請け負った建物に対する地震災害の復旧を支援する地震災害復旧支援システムに適用した場合について説明する。   The best mode for carrying out the present invention will be described below in detail with reference to the drawings. Here, a case will be described in which the present invention is applied to an earthquake disaster recovery support system that supports recovery of an earthquake disaster for a building under construction in the past in a general construction company (so-called general contractor).

まず、図1を参照して、本発明が適用された地震災害復旧支援システム10の構成を説明する。   First, the configuration of an earthquake disaster recovery support system 10 to which the present invention is applied will be described with reference to FIG.

同図に示すように、本実施の形態に係る地震災害復旧支援システム10は、上記総合建設会社における当該システム10の運営部門(ここでは、地震情報管理部門)が所有すると共に、地震災害の災害対策本部内に設置されたサーバ装置20と、上記総合建設会社における日本全国各地に設けられている現場事務所の各々に設置されたクライアント装置40と、が各々モデム、ルータ、TA(Terminal Adapter:ターミナル・アダプタ)等の接続装置70を介してネットワーク12(本実施の形態では、インターネット)に接続されると共に、現場事務所の各々に所属すると共に、地震が発生したときに当該地震による建物に対する被害状況を調査する調査者や、当該調査により応急工事や復旧工事が必要となると判断された場合に当該工事を実施する工事実施者が各々所有する携帯電話器30、PDA(Personal Digital Assistant、携帯情報端末)32等の携帯型の情報端末装置を含んで構成されている。   As shown in the figure, the earthquake disaster recovery support system 10 according to the present embodiment is owned by the operation department (here, the earthquake information management department) of the system 10 in the general construction company, and the earthquake disaster disaster A server device 20 installed in the countermeasure headquarters and a client device 40 installed in each of the field offices provided in various locations throughout Japan in the general construction company are respectively a modem, a router, and a TA (Terminal Adapter). It is connected to the network 12 (in this embodiment, the Internet) through a connection device 70 such as a terminal adapter, and belongs to each of the field offices. Investigators who investigate the damage situation, and if the investigation determines that emergency work or restoration work is required, the work will be carried out The mobile phone 30 and the PDA (Personal Digital Assistant, personal digital assistant) 32, etc., which are owned by the contractor, are included.

なお、本実施の形態では、錯綜を回避するために、上記現場事務所が、上記調査者が所属する事務所と、上記工事実施者が所属する事務所とに区分されている場合について説明するが、これに限定されず、同一の現場事務所に調査者及び工事実施者が所属するものとしてもよいことは言うまでもない。   In this embodiment, in order to avoid complications, a case will be described in which the site office is divided into an office to which the investigator belongs and an office to which the construction operator belongs. However, the present invention is not limited to this, and it goes without saying that the investigator and the construction operator may belong to the same site office.

クライアント装置40には、各種情報を入力するためのキーボード、マウス等の入力装置、各種メニュー画面や処理結果等を表示するためのモニタ(ディスプレイ)、及び各種情報を印刷するためのプリンタが備えられている。なお、このハードウェア構成は一般的なものであるので、ここでの詳細な説明は省略する。   The client device 40 includes an input device such as a keyboard and a mouse for inputting various information, a monitor (display) for displaying various menu screens and processing results, and a printer for printing various information. ing. Since this hardware configuration is general, a detailed description thereof is omitted here.

本実施の形態に係るサーバ装置20はWWW(World Wide Web)サーバとして機能し、クライアント装置40はWWWクライアントとして機能する。   The server device 20 according to the present embodiment functions as a WWW (World Wide Web) server, and the client device 40 functions as a WWW client.

すなわち、クライアント装置40には、WWWブラウザがインストールされており、このWWWブラウザを起動することにより、ネットワーク12を介してサーバ装置20に任意にアクセスすることができる。このとき、アクセス位置はURL(Uniform Resource Locator)で指定される。なお、クライアント装置40の識別には、IP(Internet Protocol)アドレスが用いられるが、URL等の他の位置指定のコードを用いてもよい。   That is, a WWW browser is installed in the client device 40, and the server device 20 can be arbitrarily accessed via the network 12 by starting the WWW browser. At this time, the access position is specified by a URL (Uniform Resource Locator). For identification of the client device 40, an IP (Internet Protocol) address is used, but another location designation code such as a URL may be used.

一方、ネットワーク12には、各国又は各地域の電話会社が構築・提供する公衆電話網14がゲートウェイ・システム50によって相互接続されている。なお、公衆電話網14には、例えば、PSTN(Public Switched Telephone Network)やISDN(Integrated Service Digital Network)が含まれる。   On the other hand, a public telephone network 14 constructed and provided by a telephone company in each country or each region is interconnected to the network 12 by a gateway system 50. The public telephone network 14 includes, for example, a PSTN (Public Switched Telephone Network) and an ISDN (Integrated Service Digital Network).

また、電話網として、さらに、PDC(Personal Digital Cellular)やPHS(Personal Handy-phone System)など各種形式の無線電話網14A、14Bを含んでいる。なお、無線電話網14A、14Bは、携帯電話器30やPDA32に対するデータの送受信機能、発信番号の認証機能等の機能サービスを提供することができる。   The telephone network further includes various types of wireless telephone networks 14A and 14B such as PDC (Personal Digital Cellular) and PHS (Personal Handy-phone System). The wireless telephone networks 14A and 14B can provide functional services such as a data transmission / reception function and a calling number authentication function for the cellular phone 30 and the PDA 32.

このように、ネットワーク12と、無線電話網14A又は無線電話網14Bを通信回線として利用すると共に、携帯電話器30やPDA32を携帯することによって、各現場事務所の調査者や工事実施者は、モバイル環境下において各種情報をサーバ装置20に登録することができると共に、サーバ装置20に登録されている各種情報を参照することができる。   As described above, by using the network 12 and the radio telephone network 14A or the radio telephone network 14B as a communication line, and carrying the mobile phone 30 and the PDA 32, the investigator and the construction operator of each field office can Various information can be registered in the server device 20 in the mobile environment, and various information registered in the server device 20 can be referred to.

次に、図2を参照して、本地震災害復旧支援システム10において特に重要な役割を有するサーバ装置20(本発明における「地震災害復旧支援装置」に相当。)の電気系の主要構成を説明する。   Next, with reference to FIG. 2, the main configuration of the electrical system of the server device 20 (corresponding to the “earthquake disaster recovery support device” in the present invention) having a particularly important role in the earthquake disaster recovery support system 10 will be described. To do.

同図に示すように、本実施の形態に係るサーバ装置20は、サーバ装置20全体の動作を司るCPU(中央処理装置)20Aと、CPU20Aによる各種処理プログラムの実行時のワークエリア等として用いられるRAM(Random Access Memory)20Bと、各種制御プログラムや各種パラメータ等が予め記憶されたROM(Read Only Memory)20Cと、各種情報を記憶するために用いられるハードディスク20Dと、各種情報を入力するために用いられるキーボード20Eと、各種情報を表示するために用いられるディスプレイ20Fと、ネットワーク12を介して外部装置との各種情報の授受を行う入出力ポート20Gと、が備えられており、これら各部はシステムバスBUSにより相互に接続されている。   As shown in the figure, the server device 20 according to the present embodiment is used as a CPU (central processing unit) 20A that controls the operation of the entire server device 20, a work area when the CPU 20A executes various processing programs, and the like. A RAM (Random Access Memory) 20B, a ROM (Read Only Memory) 20C in which various control programs, various parameters, and the like are stored in advance, a hard disk 20D used for storing various information, and various information input A keyboard 20E used, a display 20F used for displaying various types of information, and an input / output port 20G for exchanging various types of information with an external device via the network 12 are provided. They are connected to each other by a bus BUS.

従って、CPU20Aは、RAM20B、ROM20C、及びハードディスク20Dに対するアクセス、キーボード20Eを介した各種入力情報の取得、ディスプレイ20Fに対する各種情報の表示、及び入出力ポート20Gを介したネットワーク12に接続された装置との間の各種情報の授受、を各々行うことができる。   Therefore, the CPU 20A has access to the RAM 20B, ROM 20C, and hard disk 20D, obtains various input information via the keyboard 20E, displays various information on the display 20F, and a device connected to the network 12 via the input / output port 20G. Various types of information can be exchanged between the two.

一方、図3には、サーバ装置20に備えられたハードディスク20Dの主な記憶内容が模式的に示されている。同図に示すように、ハードディスク20Dには、各種データベースを記憶するためのデータベース領域DBと、サーバ装置20によって各種処理を行うための処理プログラム等を予め記憶したプログラム領域PGと、が設けられている。   On the other hand, FIG. 3 schematically shows main storage contents of the hard disk 20D provided in the server device 20. As shown in the figure, the hard disk 20D is provided with a database area DB for storing various databases and a program area PG in which processing programs for performing various processes by the server device 20 are stored in advance. Yes.

また、データベース領域DBには、上記総合建設会社が過去に建設を請け負った建物に関する情報を記憶するための建物情報データベースDB1と、当該建物において復旧作業を要する地震被害が生じた際の復旧状況に関する情報を記憶するための復旧情報データベースDB2と、上記現場事務所に関する情報を記憶するための現場事務所情報データベースDB3と、が含まれる。以下、これらのデータベースの構成について、図面を参照しつつ詳細に説明する。   In addition, the database area DB includes a building information database DB1 for storing information related to a building that the general construction company has undertaken in the past, and a restoration status when an earthquake damage requiring restoration work has occurred in the building. A recovery information database DB2 for storing information and a site office information database DB3 for storing information on the site office are included. Hereinafter, the configuration of these databases will be described in detail with reference to the drawings.

図4(A)に示すように、本実施の形態に係る建物情報データベースDB1は、管理番号情報、所有者名情報、建物基本情報、及び建築地情報の各情報が記憶されるように構成されている。   As shown in FIG. 4A, the building information database DB1 according to the present embodiment is configured to store each information of management number information, owner name information, basic building information, and building site information. ing.

なお、上記管理番号情報は、過去に建設を請け負った建物を識別するために各建物毎に異なるデータ(本実施の形態では、数値データ)として予め付与されるものである。また、上記所有者情報は、対応する建物の所有者の名称を示す情報である。   The management number information is given in advance as different data (numerical data in the present embodiment) for each building in order to identify a building that has been under construction in the past. The owner information is information indicating the name of the owner of the corresponding building.

また、上記建物基本情報は、対応する建物の基本的な条件を示す情報であり、同図に示すように、当該建物の階数、RC造(鉄筋コンクリート造)やS造(鉄骨造)といった当該建物の構造、当該建物の構造耐震指標値であるIs値等の情報が含まれる。   The basic building information is information indicating basic conditions of the corresponding building. As shown in the figure, the building number such as the number of floors, RC structure (reinforced concrete structure) or S structure (steel structure). And information such as Is value, which is the structural earthquake resistance index value of the building.

更に、上記建築地情報は、対応する建物が建設されている位置を示す情報であり、同図に示すように、本実施の形態では住所を示す情報と緯度及び経度を示す情報とが含まれている。   Furthermore, the building site information is information indicating the position where the corresponding building is constructed, and as shown in the figure, in the present embodiment, information indicating an address and information indicating latitude and longitude are included. ing.

一方、図4(B)に示すように、本実施の形態に係る復旧情報データベースDB2は、管理番号情報、応急工事情報、及び復旧工事情報の各情報が記憶されるように構成されている。   On the other hand, as shown in FIG. 4B, the recovery information database DB2 according to the present embodiment is configured to store each information of management number information, emergency construction information, and restoration construction information.

なお、上記管理番号情報は、上述した建物情報データベースDB1における管理番号情報と同一のものである。   The management number information is the same as the management number information in the building information database DB1 described above.

また、上記応急工事情報は、被災した建物に対する応急工事に関する作業の進捗状況を示すものであり、対応する建物に対する被害状況の調査の指示が行われたか否かを示す情報(「調査手配情報」)と、当該調査が終了したか否かを示す情報(「調査終了情報」)と、当該調査により応急工事が必要であるものと判断されたか否かを示す情報(「工事要情報」)と、当該応急工事が必要である場合に当該応急工事の実施の指示が行われたか否かを示す情報(「工事手配情報」)と、当該応急工事が終了したか否かを示す情報(「工事終了情報」)と、が含まれている。   In addition, the above emergency construction information indicates the progress of work related to the emergency work on the damaged building, and indicates whether or not an instruction to investigate the damage status on the corresponding building has been issued ("survey arrangement information" ), Information indicating whether or not the survey has been completed (“Survey End Information”), information indicating whether or not emergency survey is required by the survey (“Construction Required Information”), , When the emergency work is necessary, information indicating whether or not an instruction to perform the emergency work has been given ("construction arrangement information") and information indicating whether or not the emergency work has been completed ("construction End information ").

同様に、上記復旧工事情報は、被災した建物に対する復旧工事に関する作業の進捗状況を示すものであり、対応する建物に対する被害状況の調査の指示が行われたか否かを示す情報(「調査手配情報」)と、当該調査が終了したか否かを示す情報(「調査終了情報」)と、当該調査により復旧工事が必要であるものと判断されたか否かを示す情報(「工事要情報」)と、当該復旧工事が必要である場合に当該復旧工事の実施の指示が行われたか否かを示す情報(「工事手配情報」)と、当該復旧工事が終了したか否かを示す情報(「工事終了情報」)と、が含まれている。   Similarly, the restoration work information indicates the progress of work related to the restoration work on the damaged building, and indicates whether or not an instruction to investigate the damage situation on the corresponding building has been issued ("survey arrangement information" )), Information indicating whether or not the investigation has been completed ("survey completion information"), and information indicating whether or not restoration work is required by the investigation ("construction required information") Information indicating whether or not the restoration work has been instructed ("construction arrangement information") and information indicating whether or not the restoration work has been completed (" Construction completion information ”).

なお、本実施の形態に係る地震災害復旧支援システム10では、建物に対する被害状況の調査の指示を応急工事及び復旧工事の別にかかわらず一括して行っており、応急工事情報及び復旧工事情報の各々における上記調査手配情報は同一の情報が記憶されることになる。また、同図では、便宜上、各情報における肯定状態を‘○’、否定状態を‘×’で各々記号により表現しているが、実際には、肯定状態を‘1’、否定状態を‘0’で各々数値情報として記憶している。更に、本実施の形態に係る復旧情報データベースDB2では、記憶される各情報のデフォルト情報として、否定状態を示す情報が記憶されている。   In addition, in the earthquake disaster recovery support system 10 according to the present embodiment, the instruction for the investigation of the damage status to the building is performed collectively regardless of the emergency work and the recovery work, and each of the emergency work information and the recovery work information is provided. The same information is stored in the survey arrangement information in FIG. Further, in the figure, for the sake of convenience, the positive state in each information is represented by “○” and the negative state by “×”, but in reality, the positive state is “1” and the negative state is “0”. 'Is stored as numerical information. Furthermore, in the recovery information database DB2 according to the present embodiment, information indicating a negative state is stored as default information of each stored information.

一方、図4(C)に示すように、本実施の形態に係る現場事務所情報データベースDB3は、事務所コード情報、管轄地域情報、及び部門情報の各情報が記憶されるように構成されている。   On the other hand, as shown in FIG. 4C, the field office information database DB3 according to the present embodiment is configured to store each information of office code information, jurisdiction area information, and department information. Yes.

なお、上記事務所コード情報は、上記総合建設会社が有する全ての現場事務所を識別するために各現場事務所毎に異なるデータ(本実施の形態では、数値データ)として予め付与されるものである。   The office code information is given in advance as different data (in this embodiment, numerical data) for each site office in order to identify all the site offices possessed by the general construction company. is there.

また、上記管轄地域情報は、対応する現場事務所の管轄地域を示す情報である。なお、同図に示すように、本実施の形態に係る地震災害復旧支援システム10では、上記管轄地域を都道府県単位としているが、市区町村単位等の都道府県より狭い地域単位とすることもでき、東北地方、関東地方等の都道府県単位より広い地域単位とすることもできる。   Moreover, the said jurisdiction area information is information which shows the jurisdiction area of the corresponding field office. As shown in the figure, in the earthquake disaster recovery support system 10 according to the present embodiment, the above-mentioned jurisdiction area is a prefecture unit, but may be an area unit narrower than a prefecture such as a municipality unit. It can also be a regional unit wider than the prefectural unit such as Tohoku and Kanto regions.

更に、上記部門情報は、対応する現場事務所の担当する地震被害復旧に関する役割を示す情報である。なお、本実施の形態に係る地震災害復旧支援システム10では、上述したように、上記現場事務所が上記調査者が所属する事務所と、上記工事実施者が所属する事務所とに区分されているため、各現場事務所における部門情報としては「調査」を表す情報と「工事」を表す情報の何れか一方のみが記憶されることになる。   Further, the department information is information indicating a role related to earthquake damage recovery handled by the corresponding field office. In the earthquake disaster recovery support system 10 according to the present embodiment, as described above, the site office is divided into the office to which the investigator belongs and the office to which the construction operator belongs. Therefore, only one of the information indicating “investigation” and the information indicating “construction” is stored as the department information in each field office.

なお、ハードディスク20Dのデータベース領域DBには、以上のデータベースの他、日本全国の地図を示す地図情報データベース等の各種データベースが記憶されている。   In the database area DB of the hard disk 20D, various databases such as a map information database showing maps of Japan are stored in addition to the above databases.

次に、本実施の形態に係る地震災害復旧支援システム10の作用を説明する。   Next, the operation of the earthquake disaster recovery support system 10 according to the present embodiment will be described.

まず、図5を参照して、所定レベル(本実施の形態では、震源地に最も近い建物に被害が生じた可能性のあるレベル)以上の地震動が発生した際のサーバ装置20の動作を説明する。なお、図5は、上記所定レベル以上の地震動が発生して、キーボード20E等を介して実行の指示入力が行われたときにサーバ装置20のCPU20Aにおいて実行される地震災害復旧支援プログラムの処理の流れを示すフローチャートであり、当該プログラムはハードディスク20Dのプログラム領域PGに予め記憶されている。   First, with reference to FIG. 5, the operation of the server device 20 when a seismic motion of a predetermined level or higher (in this embodiment, a level at which the building closest to the epicenter is likely to be damaged) has occurred will be described. To do. Note that FIG. 5 shows the process of the earthquake disaster recovery support program executed in the CPU 20A of the server device 20 when the seismic motion of the predetermined level or more occurs and the execution instruction is input through the keyboard 20E or the like. It is a flowchart showing the flow, and the program is stored in advance in the program area PG of the hard disk 20D.

まず、ステップ100では、予め定められた地震情報入力画面をディスプレイ20Fに表示し、次のステップ102にて所定情報の入力待ちを行う。   First, in step 100, a predetermined earthquake information input screen is displayed on the display 20F, and the next step 102 waits for input of predetermined information.

図6には、上記ステップ100の処理によってディスプレイ20Fに表示された地震情報入力画面の表示状態が示されている。同図に示すように、本実施の形態に係る地震情報入力画面は、発生した地震の震源位置(緯度、経度、深さ)及びマグニチュードが入力できるものとして構成されている。   FIG. 6 shows a display state of the earthquake information input screen displayed on the display 20 </ b> F by the process of step 100. As shown in the figure, the earthquake information input screen according to the present embodiment is configured so that the location of the earthquake that occurred (latitude, longitude, depth) and magnitude can be input.

同図に示すような地震情報入力画面がディスプレイ20Fに表示されると、サーバ装置20のユーザ(本実施の形態では、地震情報管理部門に所属する人)は、発生した地震の震源位置(緯度、経度、深さ)及びマグニチュードを示す情報を対応する矩形領域内に入力した後、当該画面の最下に表示されている「入力終了」ボタンを不図示のマウスにてポインティング指定する。これに応じて上記ステップ102が肯定判定となってステップ104に移行する。   When the earthquake information input screen as shown in the figure is displayed on the display 20F, the user of the server device 20 (in this embodiment, a person who belongs to the earthquake information management department) determines the location of the earthquake that occurred (latitude , Longitude, depth) and magnitude information are input into the corresponding rectangular area, and then the “input end” button displayed at the bottom of the screen is designated with a mouse (not shown). In response to this, step 102 becomes affirmative and the process proceeds to step 104.

ステップ104では、登録されている全ての建物に関する建物基本情報及び建築地情報を建物情報データベースDB1から読み出し、次のステップ106において、読み出した情報と、上記地震情報入力画面によって入力された地震の震源位置(緯度、経度、深さ)及びマグニチュードと、に基づいて、全ての登録建物に対する被害程度の予測値を示す情報(以下、「被害程度情報」という。)を、一例として上記特許文献1に記載されている手法等の従来既知の手法で導出する。ここで、本実施の形態に係る地震災害復旧支援プログラムでは、上記被害程度情報として、各建物の被害額、及び当該被害額の当該建物の再調達価格に対する割合として表される被害率の予測値を導出する。従って、上記建物基本情報には、これらの予測値を導出する際に必要とされる各種情報(一例として、対応する建物が建築されている位置の地盤の強さを示す情報や、上記再調達価格を示す情報等)が記憶されている。   In step 104, building basic information and building site information relating to all registered buildings are read from the building information database DB1, and in the next step 106, the read information and the earthquake epicenter input on the earthquake information input screen are displayed. Information indicating predicted values of damage levels for all registered buildings based on the position (latitude, longitude, depth) and magnitude (hereinafter referred to as “damage level information”) is described in Patent Document 1 as an example. Derived by a conventionally known method such as the method described. Here, in the earthquake disaster recovery support program according to the present embodiment, as the damage degree information, the damage value of each building and the predicted value of the damage rate expressed as a ratio of the damage value to the replacement cost of the building Is derived. Therefore, the building basic information includes various information required when deriving these predicted values (for example, information indicating the strength of the ground where the corresponding building is built, Information indicating the price) is stored.

各建物に関する被害程度情報の導出が終了すると、次のステップ108では、導出した被害程度情報をハードディスク20Dの所定領域に記憶し、次のステップ110では、全ての現場事務所についての管轄地域情報及び部門情報を現場事務所情報データベースDB3から読み出す。   When the derivation of the damage level information regarding each building is completed, in the next step 108, the derived damage level information is stored in a predetermined area of the hard disk 20D, and in the next step 110, the jurisdiction area information about all the field offices and Department information is read from the field office information database DB3.

次のステップ112では、上記ステップ106において導出された被害程度情報により示される被害程度の平均値(以下、「平均被害程度」という。)を、予め定められた区画単位(ここでは、都道府県単位)の地域別に算出し、算出した平均被害程度が高い順に各地域をソーティングする。なお、本実施の形態に係る地震災害復旧支援プログラムでは、上記被害程度として各建物の上記被害率を適用しているが、当該被害率に代えて上記被害額を適用することもできる。   In the next step 112, the average value of the damage level (hereinafter referred to as “average damage level”) indicated by the damage level information derived in step 106 is set to a predetermined division unit (here, the prefecture unit). ) For each region, and sort the regions in descending order of the calculated average damage. In the earthquake disaster recovery support program according to the present embodiment, the damage rate of each building is applied as the damage level, but the damage amount can be applied instead of the damage rate.

次のステップ114では、上記ステップ112の処理結果に基づいて、平均被害程度が所定値以上である地域(以下、「対象地域」という。)を管轄地域とし、かつ上記調査者が所属している現場事務所(以下、「対象現場事務所」という。)を上記ステップ110において読み出した各情報に基づいて特定し、当該対象現場事務所に設置されているクライアント装置40に対して、管轄地域内における各建物の地震被害状況(主として応急工事の要否と復旧工事の要否に関わる被害状況)の調査を指示する指示情報(以下、「調査指示情報」という。)を送信する。これに応じて、対象現場事務所に設置されているクライアント装置40のディスプレイには、当該調査の実施を促す旨の画面表示(図示省略。)が行われる。当該画面表示が行われると、当該クライアント装置40が設置されている現場事務所に所属する調査者は、管轄地域内の各建物について地震被害状況の調査を行う。   In the next step 114, based on the processing result of the above step 112, the area where the average damage degree is a predetermined value or more (hereinafter referred to as “target area”) is set as the jurisdiction area and the investigator belongs. A site office (hereinafter referred to as “target site office”) is identified based on each information read in step 110 above, and the client device 40 installed in the target site office is within the jurisdiction area. Sends instruction information (hereinafter referred to as “investigation instruction information”) instructing the investigation of the earthquake damage status of each building (mainly the damage status related to the necessity of emergency construction and the necessity of restoration work). In response to this, a screen display (not shown) is displayed on the display of the client device 40 installed in the target site office to prompt the implementation of the investigation. When the screen display is performed, the investigator who belongs to the field office where the client device 40 is installed investigates the earthquake damage situation for each building in the jurisdiction area.

また、本ステップ114では、復旧情報データベースDB2における上記調査指示情報による調査の対象とする全ての建物に対応する応急工事情報及び復旧工事情報の各々の調査手配情報を、手配済みを示す情報に更新する。   In this step 114, the investigation arrangement information of the emergency construction information and the restoration construction information corresponding to all the buildings subject to the investigation by the investigation instruction information in the restoration information database DB2 is updated to information indicating that the arrangement has been completed. To do.

なお、本ステップ114では、上記調査指示情報に対して、対象地域内に含まれる建物を示す情報を、上記ステップ106において導出した被害率又は被害額の高い順に表示可能とする情報を含めるようにする。これにより、対象現場事務所に設置されているクライアント装置40のディスプレイには、調査対象とする建物を示す情報が、被害率又は被害額の高い順に表示されるので、当該表示を参照することにより、表示順位の高い建物、すなわち、被害程度が高い建物から優先して被害状況の調査を行うことができる。   In this step 114, information indicating that the buildings included in the target area can be displayed in the order of the damage rate or damage amount derived in step 106 is included in the survey instruction information. To do. As a result, information indicating the buildings to be surveyed is displayed in the descending order of damage rate or damage amount on the display of the client device 40 installed in the target site office. Therefore, it is possible to conduct a survey of the damage status with priority given to a building with a high display order, that is, a building with a high degree of damage.

そして、地震被害状況の調査が終了した際に、調査者は、所持している情報端末装置(携帯電話器30又はPDA32)を用いて、調査対象とする建物(以下、「調査対象建物」という。)の調査結果を示す情報(以下、「調査結果情報」という。)をサーバ装置20に対して送信することになるが、この際に調査者は、当該情報端末装置により、調査結果の入力を行うことを指示する指示情報をサーバ装置20に対して送信する。   Then, when the survey of the earthquake damage situation is completed, the investigator uses the information terminal device (mobile phone 30 or PDA 32) possessed by the investigator (hereinafter referred to as “survey target building”). )) Indicating the survey result (hereinafter referred to as “survey result information”) is transmitted to the server device 20. At this time, the investigator inputs the survey result using the information terminal device. Instruction information for instructing to perform is transmitted to the server device 20.

そこで、次のステップ116では、当該指示情報が受信されたか否かを判定し、肯定判定となった場合はステップ118に移行し、否定判定となった場合にはステップ132に移行する。   Therefore, in the next step 116, it is determined whether or not the instruction information is received. If the determination is affirmative, the process proceeds to step 118. If the determination is negative, the process proceeds to step 132.

ステップ118では、予め定められた調査結果入力画面を上記指示情報の送信元である情報端末装置のディスプレイに表示させ、次のステップ120にて所定情報の入力待ちを行う。   In step 118, a predetermined survey result input screen is displayed on the display of the information terminal device that is the transmission source of the instruction information, and in step 120, input of predetermined information is awaited.

図7には、上記ステップ118の処理によって上記指示情報の送信元である情報端末装置(ここでは、携帯電話器30)のディスプレイに表示された調査結果入力画面の表示状態が示されている。同図に示すように、本実施の形態に係る調査結果入力画面は、現地(調査地)において短時間で調査結果を送信することができるようにすることや、情報端末装置のディスプレイの表示サイズが小さいこと等を考慮して、調査対象建物に対して応急工事が必要か否かを示す情報、復旧工事が必要か否かを示す情報、及び何れの工事も不要であることを示す情報の3つの情報のみを指示入力するものとして構成されている。   FIG. 7 shows the display state of the survey result input screen displayed on the display of the information terminal device (here, mobile phone 30) that is the transmission source of the instruction information by the processing of step 118. As shown in the figure, the survey result input screen according to the present embodiment allows the survey result to be transmitted in a short time at the site (survey site) and the display size of the display of the information terminal device. Information indicating whether or not emergency construction is necessary for the surveyed building, information indicating whether or not restoration work is necessary, and information indicating that no construction is required Only three pieces of information are designated and input.

同図に示すような調査結果入力画面がディスプレイに表示されると、調査者は、調査対象建物について、応急工事が必要である場合は「応急工事が必要」との表示を、復旧工事が必要である場合は「復旧工事が必要」との表示を、何れの工事も不要である場合には「工事不要」との表示を、当該携帯電話器30に設けられているテンキーの操作によって指定し、その後に調査結果入力画面の最下に表示されている「指定終了」ボタンを同テンキーの操作によって指定する。これに応じてサーバ装置20には上記調査結果情報が送信され、上記ステップ120が肯定判定となってステップ122に移行する。なお、図7では、「応急工事が必要」及び「復旧工事が必要」の2つの項目が指定された状態が示されている。   When the survey result input screen as shown in the figure is displayed on the display, the investigator needs to display the message “Emergency work is required” for the surveyed building, if it needs emergency work, and restoration work is required. If it is, the indication "Restoration work is required" is displayed, and if any work is not required, the indication "Construction is not required" is specified by operating the numeric keypad provided on the mobile phone 30. After that, the “designation end” button displayed at the bottom of the survey result input screen is designated by operating the numeric keypad. In response to this, the investigation result information is transmitted to the server device 20, and the determination at step 120 is affirmative, and the routine proceeds to step 122. FIG. 7 shows a state in which two items, “emergency work is necessary” and “recovery work is necessary”, are designated.

ステップ122では、送信されてきた調査結果情報をハードディスク20Dの所定領域に記憶すると共に、復旧情報データベースDB2における調査対象建物に対応する応急工事情報及び復旧工事情報の各々の調査終了情報を、調査終了を示す情報に更新し、更に、調査結果情報によって応急工事が必要であることが示される場合には、当該建物に対応する応急工事情報の工事要情報を、工事が必要であることを示す情報に更新し、調査結果情報によって復旧工事が必要であることが示される場合には、当該建物に対応する復旧工事情報の工事要情報を、工事が必要であることを示す情報に更新する。   In step 122, the transmitted survey result information is stored in a predetermined area of the hard disk 20D, and the survey completion information of each of the emergency construction information and the restoration construction information corresponding to the survey target building in the restoration information database DB2 is completed. If the survey result information indicates that an emergency work is required, information indicating that the work is required is included in the emergency work information corresponding to the building. If the survey result information indicates that the restoration work is necessary, the construction necessity information of the restoration work information corresponding to the building is updated to information indicating that the construction is necessary.

次のステップ124では、上記ステップ122において記憶した調査結果情報により調査対象建物に応急工事が必要であることが示されているか否かを判定し、肯定判定となった場合はステップ126に移行して、調査対象建物が建築されている地域を管轄地域とし、かつ上記工事実施者が所属している現場事務所を上記ステップ110において読み出した各情報に基づいて特定し、当該現場事務所に設置されているクライアント装置40に対して、調査対象建物の応急工事の実施を指示する指示情報(以下、「応急工事指示情報」という。)を送信すると共に、復旧情報データベースDB2における当該建物に対応する応急工事情報の工事手配情報を、工事手配が終了したことを示す情報に更新した後、ステップ128に移行する。上記応急工事指示情報を受信したクライアント装置40では、当該クライアント装置40のディスプレイに応急工事の実施を促す旨の画面表示(図示省略。)が行われる。当該画面表示が行われると、当該クライアント装置40が設置されている現場事務所に所属する工事実施者は、調査対象建物に対して応急工事を行う。   In the next step 124, it is determined whether or not the survey target building indicates that the construction subject to investigation requires the emergency work, and if the determination is affirmative, the process proceeds to step 126. The site office where the surveyed building is built is the jurisdiction, and the site office to which the construction operator belongs is identified based on the information read in step 110 and installed in the site office. In addition to transmitting the instruction information (hereinafter referred to as “emergency work instruction information”) for instructing the implementation of the emergency work of the surveyed building to the client device 40, the corresponding response to the building in the recovery information database DB2 After the construction arrangement information in the emergency construction information is updated to information indicating that the construction arrangement has been completed, the process proceeds to step 128. In the client device 40 that has received the emergency work instruction information, a screen display (not shown) is displayed on the display of the client device 40 to prompt the execution of the emergency work. When the screen display is performed, the construction worker belonging to the site office where the client device 40 is installed performs emergency work on the surveyed building.

そして、応急工事が終了した際に、当該工事実施者は、所持している情報端末装置(携帯電話器30又はPDA32)を用いて、応急工事が終了したことを示す情報(以下、「応急工事終了情報」という。)をサーバ装置20に対して送信することになる。   When the emergency work is completed, the construction operator uses the information terminal device (mobile phone 30 or PDA 32) that he possesses to indicate that the emergency work has been completed (hereinafter referred to as “emergency work”). "End information") is transmitted to the server device 20.

一方、上記ステップ124において否定判定となった場合には上記ステップ126の処理を実行することなくステップ128に移行する。   On the other hand, if a negative determination is made in step 124, the process proceeds to step 128 without executing the process of step 126.

ステップ128では、上記ステップ122において記憶した調査結果情報により調査対象建物に復旧工事が必要であることが示されているか否かを判定し、肯定判定となった場合はステップ130に移行して、調査対象建物が建築されている地域を管轄地域とし、かつ上記工事実施者が所属している現場事務所を上記ステップ110において読み出した各情報に基づいて特定し、当該現場事務所に設置されているクライアント装置40に対して、調査対象建物の復旧工事の実施を指示する指示情報(以下、「復旧工事指示情報」という。)を送信すると共に、復旧情報データベースDB2における当該建物に対応する復旧工事情報の工事手配情報を、工事手配が終了したことを示す情報に更新した後、ステップ132に移行する。上記復旧工事指示情報を受信したクライアント装置40では、当該クライアント装置40のディスプレイに復旧工事の実施を促す旨の画面表示(図示省略。)が行われる。当該画面表示が行われると、当該クライアント装置40が設置されている現場事務所に所属する工事実施者は、調査対象建物に対して復旧工事を行う。   In step 128, it is determined whether or not the survey target building indicates that the construction subject to the survey needs to be restored by the survey result information stored in step 122. If the determination is affirmative, the process proceeds to step 130. The area where the surveyed building is built is the jurisdiction area, and the field office to which the construction operator belongs is specified based on the information read in step 110 above, and installed in the field office. In addition to transmitting instruction information (hereinafter referred to as “recovery work instruction information”) to instruct execution of restoration work on the surveyed building to the client apparatus 40, the restoration work corresponding to the building in the restoration information database DB2 After the construction arrangement information in the information is updated to information indicating that the construction arrangement has been completed, the process proceeds to step 132. In the client device 40 that has received the restoration work instruction information, a screen display (not shown) is displayed on the display of the client device 40 to prompt the execution of the restoration work. When the screen display is performed, the construction worker belonging to the site office where the client device 40 is installed performs the restoration work on the surveyed building.

そして、復旧工事が終了した際に、当該工事実施者は、所持している情報端末装置(携帯電話器30又はPDA32)を用いて、復旧工事が終了したことを示す情報(以下、「復旧工事終了情報」という。)をサーバ装置20に対して送信することになる。   Then, when the restoration work is completed, the construction operator uses the information terminal device (mobile phone 30 or PDA 32) that he possesses to indicate that the restoration work has been completed (hereinafter referred to as “recovery work”). "End information") is transmitted to the server device 20.

一方、上記ステップ128において否定判定となった場合には上記ステップ130の処理を実行することなくステップ132に移行する。   On the other hand, if the determination in step 128 is negative, the process proceeds to step 132 without executing the process in step 130.

ステップ132では、上記応急工事終了情報が何れかの情報端末装置から受信されたか否かを判定し、肯定判定となった場合はステップ134に移行して、復旧情報データベースDB2における受信した応急工事終了情報により応急工事の終了が示された建物に対応する応急工事情報の工事終了情報を、工事が終了したことを示す情報に更新した後にステップ136に移行する。一方、上記ステップ132において否定判定となった場合には、上記ステップ134の処理を実行することなくステップ136に移行する。   In step 132, it is determined whether or not the above emergency work completion information has been received from any of the information terminal devices. If the determination is affirmative, the process proceeds to step 134 and the received emergency work completion in the recovery information database DB2 is completed. After the construction end information of the emergency construction information corresponding to the building whose end of the emergency work is indicated by the information is updated to information indicating that the construction is finished, the process proceeds to step 136. On the other hand, if the determination in step 132 is negative, the process proceeds to step 136 without executing the process in step 134.

ステップ136では、上記復旧工事終了情報が何れかの情報端末装置から受信されたか否かを判定し、肯定判定となった場合はステップ138に移行して、復旧情報データベースDB2における受信した復旧工事終了情報により復旧工事の終了が示された建物に対応する復旧工事情報の工事終了情報を、工事が終了したことを示す情報に更新した後にステップ140に移行する。一方、上記ステップ136において否定判定となった場合には、上記ステップ138の処理を実行することなくステップ140に移行する。   In step 136, it is determined whether or not the restoration work completion information has been received from any of the information terminal devices. If the determination is affirmative, the process proceeds to step 138 and the restoration work completion received in the restoration information database DB2 is completed. After the construction completion information of the restoration construction information corresponding to the building whose completion is indicated by the information is updated to information indicating that the construction has been completed, the process proceeds to step 140. On the other hand, if a negative determination is made in step 136, the process proceeds to step 140 without executing the process of step 138.

ステップ140では、対象地域に建築されている全ての建物の復旧が終了したか否かを、復旧情報データベースDB2における工事要情報が肯定状態となっている全ての建物についての工事終了情報が肯定状態となっているか否かを判定することによって判定し、否定判定となった場合は上記ステップ116に戻り、肯定判定となった時点で本地震災害復旧支援プログラムを終了する。   In step 140, whether or not the restoration of all the buildings constructed in the target area has been completed, the construction completion information for all the buildings in which the construction necessary information in the restoration information database DB2 is in an affirmative state is affirmative. If the determination is negative, the process returns to step 116, and the earthquake disaster recovery support program is terminated when the determination is affirmative.

以上の地震災害復旧支援プログラムにおけるステップ116〜ステップ140の繰り返し処理により、対象地域に建築されている全ての建物について、地震被害状況の調査と、当該調査の結果に応じた応急工事及び復旧工事を速やかに実施することができる。   By repeating the steps 116 to 140 in the above earthquake disaster recovery support program, we will investigate the earthquake damage status for all buildings built in the target area, and perform emergency work and recovery work according to the results of the investigation. It can be implemented promptly.

地震災害復旧支援プログラムのステップ106が本発明の被害程度予測ステップに、ステップ114が本発明の調査指示出力ステップに、ステップ118及びステップ120が本発明の調査結果入力ステップに、ステップ122が本発明の記憶ステップ及び調査終了記憶ステップに、ステップ126及びステップ130が本発明の工事指示出力ステップに、ステップ132及びステップ136が本発明の工事終了入力ステップに、ステップ134及びステップ138が本発明の工事終了記憶ステップに、各々相当する。   Step 106 of the earthquake disaster recovery support program is the damage degree prediction step of the present invention, step 114 is the survey instruction output step of the present invention, steps 118 and 120 are the survey result input step of the present invention, and step 122 is the present invention. Steps 126 and 130 are the work instruction output step of the present invention, steps 132 and 136 are the work end input step of the present invention, and steps 134 and 138 are the work of the present invention. Each corresponds to an end storage step.

ところで、本実施の形態に係る地震災害復旧支援システム10では、ネットワーク12に接続されたクライアント装置を用いて、各現場事務所に所属する調査者や工事実施者が詳細な調査結果ないし工事結果をサーバ装置20に登録したり、上記総合建設会社における営業部門や資材調達部門等の地震災害に関係する部門に所属する者が発生した地震に関する情報を参照したりすることができる。   By the way, in the earthquake disaster recovery support system 10 according to the present embodiment, by using a client device connected to the network 12, an investigator or a construction operator who belongs to each site office provides detailed survey results or construction results. It is possible to register in the server device 20 and to refer to information relating to an earthquake that occurred by a person belonging to a department related to an earthquake disaster such as a sales department or a material procurement department in the general construction company.

次に、図8を参照して、このときのサーバ装置20の動作について説明する。なお、図8は、予めアクセスが許可された何れかのクライアント装置からの指示入力に応じてサーバ装置20のCPU20Aにより実行される地震災害提示プログラムの処理の流れを示すフローチャートであり、当該プログラムもハードディスク20Dのプログラム領域PGに予め記憶されている。   Next, the operation of the server device 20 at this time will be described with reference to FIG. FIG. 8 is a flowchart showing the flow of processing of the earthquake disaster presentation program executed by the CPU 20A of the server device 20 in response to an instruction input from any of the client devices permitted to access in advance. It is stored in advance in the program area PG of the hard disk 20D.

まず、ステップ200では、予め定められたトップ画面をアクセス元のクライアント装置におけるディスプレイに表示させ、次のステップ202にて所定指示情報の入力待ちを行う。   First, in step 200, a predetermined top screen is displayed on the display in the client device of the access source, and in the next step 202, input of predetermined instruction information is waited.

図9には、上記ステップ200の処理によってアクセス元のクライアント装置におけるディスプレイに表示されたトップ画面の表示状態が示されている。   FIG. 9 shows the display state of the top screen displayed on the display in the client device that is the access source by the processing of step 200 described above.

同図に示すように、本実施の形態に係るトップ画面では、上記地震災害復旧支援プログラム(図5も参照。)のステップ108の処理によって記憶された被害程度情報により示される各建物の予想被害率を示す地図(以下、「予想被害率地図」という。)が地図表示領域MAに表示されると共に、当該地震に関する情報が地震情報表示領域JAに表示される。なお、上記予想被害率地図は、表示対象とする地震の震源位置を中心として表示される。また、上記予想被害率地図は、ハードディスク20Dのデータベース領域DBに予め記憶されている前述した地図情報データベースに基づいて表示される。   As shown in the figure, on the top screen according to the present embodiment, the expected damage of each building indicated by the damage degree information stored by the process of step 108 of the earthquake disaster recovery support program (see also FIG. 5). A map indicating the rate (hereinafter referred to as “expected damage rate map”) is displayed in the map display area MA, and information relating to the earthquake is displayed in the earthquake information display area JA. Note that the predicted damage rate map is displayed centering on the epicenter position of the earthquake to be displayed. The predicted damage rate map is displayed based on the map information database stored in advance in the database area DB of the hard disk 20D.

また、トップ画面では、予想被害率地図に表示すべき予想被害率の区分を選択指定するための表示被害率指定領域HAと、予想被害率地図を表示する地域を指定するための表示地域指定領域TAと、予想した被害程度を一覧形式で表示させるための一覧表示指定領域IAと、予想被害率地図の縮尺度を選択指定するための縮尺度指定領域SAと、が設けられている。   In addition, on the top screen, a display damage rate designation area HA for selecting and designating a predicted damage rate category to be displayed on the expected damage rate map, and a display area designating area for designating an area for displaying the predicted damage rate map TA, a list display designation area IA for displaying the predicted damage level in a list format, and a reduced scale designation area SA for selecting and specifying a reduced scale of the expected damage rate map are provided.

なお、同図に示すように、本実施の形態に係るトップ画面では、予想被害率地図に表示する予想被害率を、予想被害率が50%以上である建物の被害程度を‘大破’とし、予想被害率が50%未満20%以上である建物の被害程度を‘中破’とし、予想被害率が20%未満10%以上である建物の被害程度を‘小破’とし、予想被害率が10%未満である建物の被害程度を‘軽微’として4段階に区分し、各区分毎に異なる表示状態とするようにしている。これによって、被害程度の分布状態を視覚的かつ直感的に把握することができる。   As shown in the figure, on the top screen according to the present embodiment, the predicted damage rate displayed on the predicted damage rate map is set to “damage” as the damage level of a building with an expected damage rate of 50% or more, The degree of damage to buildings with an expected damage rate of less than 50% and 20% or more is defined as “medium damage”, and the degree of damage to buildings with an expected damage rate of less than 20% and greater than 10% is defined as “small damage”. The damage level of a building that is less than 10% is classified as “minor” and divided into 4 levels, and the display state is different for each category. This makes it possible to visually and intuitively grasp the distribution state of the degree of damage.

更に、トップ画面には、地震被害状況の調査状況を表示させる際に指定される「調査状況」ボタン、応急工事や復旧工事の状況を表示させる際に指定される「工事状況」ボタン、及び地震災害提示プログラムを終了させる際に指定される「終了」ボタンが表示されている。   Furthermore, on the top screen, an “investigation status” button designated when displaying the survey status of earthquake damage status, a “construction status” button designated when displaying the status of emergency work and restoration work, and an earthquake An “End” button is displayed which is designated when the disaster presentation program is ended.

なお、本実施の形態に係るトップ画面では、縮尺度が‘1/40万’〜‘1/2.5万’の範囲内とされた状態で表示している予想被害率地図の何れかの円形枠を不図示のマウスにてポインティング指定することにより、当該円形枠に対応する建物に関する情報を表示させることができる。   In the top screen according to the present embodiment, any one of the predicted damage rate maps displayed in a state where the scale of reduction is in the range of “1 / 400,000” to “1 / 25,000”. By designating pointing of the circular frame with a mouse (not shown), it is possible to display information regarding the building corresponding to the circular frame.

以上のようなトップ画面がディスプレイに表示されると、アクセス元のクライアント装置のユーザは、所望の処理に応じた指定操作を当該クライアント装置に設けられた不図示のマウス等を用いて行う。これに応じて上記ステップ202が肯定判定となってステップ204に移行する。   When the top screen as described above is displayed on the display, the user of the access source client device performs a designation operation corresponding to a desired process using a mouse (not shown) provided in the client device. Accordingly, step 202 is affirmative and the process proceeds to step 204.

ステップ204では、ユーザによって「終了」ボタンが指定されたか否かを判定し、肯定判定となった場合は本地震災害提示プログラムを終了し、否定判定となった場合にはステップ206に移行する。   In step 204, it is determined whether or not the “end” button has been designated by the user. If the determination is affirmative, the earthquake disaster presentation program is terminated, and if the determination is negative, the process proceeds to step 206.

ステップ206では、予想被害率地図の縮尺度が‘1/40万’〜‘1/2.5万’の範囲内とされていると共に、当該予想被害率地図上で何れかの建物が指定されたか否かを判定し、否定判定となった場合はステップ208に移行して、ユーザによる指定操作に応じた処理を実行した後に上記ステップ202に戻る。   In step 206, the scale of the predicted damage rate map is set within the range of “1 / 400,000” to “1 / 25,000”, and any building is designated on the predicted damage rate map. If the determination is negative, the process proceeds to step 208, and after executing processing according to the designation operation by the user, the process returns to step 202.

上記ステップ208では、例えば、ユーザによって表示地域指定領域TAにおける所望の都道府県名が指定された場合には、一例として図10に示すように、指定された都道府県の予想被害率地図が拡大された状態で表示される。   In the above step 208, for example, when a desired prefecture name in the display area designation area TA is designated by the user, as shown in FIG. 10 as an example, an expected damage rate map of the designated prefecture is enlarged. It is displayed in the state.

一方、上記ステップ206において肯定判定となった場合はステップ210に移行し、予め定められた建物情報表示画面をアクセス元のクライアント装置におけるディスプレイに表示させ、次のステップ212にて所定情報の入力待ちを行う。   On the other hand, if the determination in step 206 is affirmative, the process proceeds to step 210 where a predetermined building information display screen is displayed on the display of the access source client device, and the next step 212 waits for input of predetermined information. I do.

図11には、上記ステップ210の処理によってアクセス元のクライアント装置におけるディスプレイに表示された建物情報表示画面の表示状態が示されている。   FIG. 11 shows the display state of the building information display screen displayed on the display of the access source client device by the processing of step 210 described above.

同図に示すように、本実施の形態に係る建物情報表示画面では、工事名称、建築地名、建築規模、構造種別等のユーザによって指定された建物(以下、「表示対象建物」という。)に関する基本的な情報が表示されると共に、表示対象建物の地震による被害率及び被害程度が表示される。   As shown in the figure, the building information display screen according to the present embodiment relates to a building (hereinafter referred to as “display target building”) designated by a user such as a construction name, a building place name, a building scale, and a structure type. The basic information is displayed, and the damage rate and damage level of the display target building due to the earthquake are displayed.

また、当該建物情報表示画面では、表示対象建物についての復旧作業の進捗状態等を示す情報が対応段階領域DAに表示されると共に、詳細な調査結果をサーバ装置20に登録する際に指定される「応急調査」ボタン及び「復旧調査」ボタンが調査段階領域CAに表示され、工事に関する情報をサーバ装置20に登録する際に指定される「応急工事」ボタン及び「復旧工事」ボタンが工事情報領域KAに表示される。   Further, on the building information display screen, information indicating the progress status of the restoration work for the display target building is displayed in the corresponding stage area DA and specified when registering a detailed survey result in the server device 20. The “Emergency Survey” button and the “Recovery Survey” button are displayed in the survey stage area CA, and the “Emergency Work” button and the “Recovery Work” button specified when registering information related to the construction in the server device 20 are the construction information area. Displayed on KA.

ここで、ユーザは、応急工事に関する調査を行った際の詳細な調査結果をサーバ装置20に登録する際には「応急調査」ボタンを、復旧工事に関する調査を行った際の詳細な調査結果をサーバ装置20に登録する際には「復旧調査」ボタンを、応急工事に関する情報をサーバ装置20に登録する際には「応急工事」ボタンを、復旧工事に関する情報をサーバ装置20に登録する際には「復旧工事」ボタンを、各々不図示のマウス等によりポインティング指定する。   Here, when the user registers the detailed survey result when the survey on the emergency work is registered in the server device 20, the user presses the "Emergency survey" button and displays the detailed survey result when the survey on the recovery work is performed. When registering in the server device 20, click the “Recovery investigation” button, when registering information related to the emergency work in the server device 20, click on the “Emergency work” button, and when registering information related to the recovery work in the server device 20. Designates the “recovery work” button by pointing with a mouse (not shown).

また、ユーザは、表示対象建物についての復旧作業の進捗状態等を更新する際には、対応段階領域DAに対して当該更新のための指定操作をマウス等により行う。   Further, when updating the progress status of the restoration work for the display target building, the user performs a designation operation for the update with respect to the corresponding stage area DA using a mouse or the like.

建物情報表示画面における以上のような指定操作がユーザによって行われると上記ステップ212が肯定判定となってステップ214に移行する。   When the above-described designation operation on the building information display screen is performed by the user, step 212 is affirmed and the process proceeds to step 214.

ステップ214では、ユーザによる指定操作に応じた処理を実行した後に上記ステップ202に戻る。   In step 214, the process returns to the above step 202 after executing a process corresponding to the designation operation by the user.

上記ステップ214では、例えば、ユーザによって調査段階領域CAにおける「応急調査」ボタンがポインティング指定された場合には、図12に示すような調査結果入力画面がアクセス元のクライアント装置におけるディスプレイに表示させる。   In step 214 described above, for example, when the user designates the “Emergency Survey” button in the survey stage area CA, a survey result input screen as shown in FIG. 12 is displayed on the display in the access source client device.

同図に示すように、当該調査結果入力画面は、調査日時、修正日時、調査者、調査方法といった調査の前提条件に関する情報が入力ないし指定できると共に、総合判定、応急工事の要否、被災度ランク、建物傾斜、基礎被害等の表示対象建物についての被害状況の調査結果に関する情報が入力ないし指定できるものとして構成されている。   As shown in the figure, the survey result input screen allows you to enter or specify information related to survey prerequisites such as survey date / time, modification date / time, surveyor, and survey method, as well as comprehensive judgment, necessity of emergency construction, degree of damage It is configured to be able to input or specify information related to the survey results of damage status for the display target buildings such as rank, building inclination, and foundation damage.

同図に示すような調査結果入力画面がディスプレイに表示されると、ユーザは、可能な限り、各項目について入力ないし指定を行った後に当該画面の下部に表示されている「保存」ボタンをマウス等にて指定する。これによりサーバ装置20は、ユーザによって入力ないし指定された情報をハードディスク20Dの所定領域に記憶し、その後に上記ステップ202に戻る。なお、調査結果入力画面上の操作をキャンセルする際にユーザは当該画面の下部に表示されている「閉じる」ボタンを指定する。これにより、サーバ装置20は、当該画面上で入力ないし指定された情報を記憶することなく上記ステップ202に戻る。   When a survey result input screen such as that shown in the figure is displayed on the display, the user can enter and specify each item as much as possible and then click the “Save” button displayed at the bottom of the screen. Specify with etc. As a result, the server device 20 stores information input or designated by the user in a predetermined area of the hard disk 20D, and then returns to step 202. When canceling the operation on the survey result input screen, the user designates a “Close” button displayed at the bottom of the screen. As a result, the server device 20 returns to step 202 without storing the information input or designated on the screen.

なお、一例として図13に示すトップ画面において「調査状況」ボタン又は「工事状況」ボタンがユーザによって指定された場合には、地震災害提示プログラムのステップ208の処理により、一例として図14に示すように、調査結果を示す状態や工事の進捗状況を示す状態が、各状態別に識別可能に区分されて予想被害率地図上に表示される。なお、図14は、調査結果を示す状態として、調査未対応である状態と、調査結果が大破であった状態と、調査結果が中破であった状態と、調査結果が小破であった状態と、の4種類の状態が識別可能に表示された場合を例示している。当該表示画面を参照することにより、ユーザは、これらの状態の分布状態を視覚的かつ直感的に把握することができる。   As an example, when the “investigation status” button or the “construction status” button is designated by the user on the top screen shown in FIG. 13, as shown in FIG. In addition, the state indicating the survey result and the state indicating the progress of the construction are displayed on the predicted damage rate map in such a manner that each state can be identified. In addition, FIG. 14 shows the state of the investigation result as a state in which the investigation is not supported, the state in which the investigation result is severely damaged, the state in which the investigation result is moderately damaged, and the result of the investigation is minor. The case where four types of states are displayed so as to be identifiable is illustrated. By referring to the display screen, the user can grasp the distribution state of these states visually and intuitively.

以上詳細に説明したように、本実施の形態では、復旧支援の対象とする複数の建物の被害程度を予測し、予測した前記被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報を出力し、出力した前記調査指示情報に応じた調査結果を示す調査結果情報を入力し、入力した前記調査結果情報を記憶手段(ハードディスク20D)に記憶しているので、地震による建物に対する災害の復旧作業の効率を向上させることができる。   As described above in detail, in this embodiment, the damage level of a plurality of buildings subject to restoration support is predicted, and the damage status is preferentially investigated for a building having a higher predicted damage level. The survey instruction information is output, the survey result information indicating the survey result according to the output survey instruction information is input, and the input survey result information is stored in the storage means (hard disk 20D). It is possible to improve the efficiency of disaster recovery work for buildings caused by earthquakes.

また、本実施の形態では、前記調査結果情報が入力された際に前記調査が終了したことを示す調査終了情報を前記記憶手段に記憶しているので、前記記憶手段に前記調査終了情報が記憶されているか否かを参照することのみによって容易に被害状況の調査が終了したか否かを判断することができる。   In the present embodiment, since the survey end information indicating that the survey is completed is stored in the storage unit when the survey result information is input, the survey end information is stored in the storage unit. It is possible to easily determine whether or not the investigation of the damage situation has ended simply by referring to whether or not it has been done.

また、本実施の形態では、調査対象とした建物に対する工事を要することを示す調査結果情報が入力された場合に、当該建物に対する工事の実施を指示する工事指示情報を出力しているので、応急工事や復旧工事等の各種工事を要する建物に対する当該工事を短期間で実施することができる。   In this embodiment, when survey result information indicating that construction is required for the surveyed building is input, construction instruction information for instructing the construction of the building is output. This construction can be carried out in a short period of time for buildings that require various construction such as construction and restoration work.

また、本実施の形態では、前記工事指示情報に応じた工事が終了したことを示す工事終了情報が入力された際に前記工事が終了したことを示す工事終了情報を前記記憶手段に記憶しているので、前記記憶手段に前記工事終了情報が記憶されているか否かを参照することのみによって容易に工事が終了したか否かを判断することができる。   In the present embodiment, construction completion information indicating that the construction has been completed is stored in the storage means when construction completion information indicating that the construction according to the construction instruction information has been completed is input. Therefore, it is possible to easily determine whether or not the construction is completed only by referring to whether or not the construction completion information is stored in the storage unit.

また、本実施の形態では、予測した被害程度を複数の段階に区分し、各区分段階別に異なる状態で提示しているので、提示された予測被害程度を参照することによって被害状況の分布状態を視覚的かつ直感的に把握することができる。   Also, in this embodiment, the predicted damage level is divided into a plurality of stages and presented in different states for each stage, so the damage status distribution state can be determined by referring to the predicted predicted damage level. It can be grasped visually and intuitively.

更に、本実施の形態では、サーバ装置により出力された指示情報を、サーバ装置にネットワーク12を介して接続されたクライアント装置によって表示するようにしているので、当該クライアント装置を地震による被災地に比較的接近した位置に設置されているものとすることにより、比較的短時間で被害状況の調査や、当該調査結果に応じた工事等を行うことができるようになり、この結果として、地震による建物に対する災害の復旧作業の効率を向上させることができる。   Furthermore, in this embodiment, since the instruction information output by the server device is displayed by the client device connected to the server device via the network 12, the client device is compared with the disaster area caused by the earthquake. As a result, it will be possible to investigate the damage situation and perform construction according to the results of the investigation in a relatively short time. Can improve the efficiency of disaster recovery work.

なお、本実施の形態では、サーバ装置20を災害対策本部内に設置した場合について説明したが、本発明はこれに限定されるものではなく、他の場所に設置する形態とすることもできる。この場合も、本実施の形態と同様の効果を奏することができる。   In the present embodiment, the case where the server device 20 is installed in the disaster countermeasure headquarters has been described. However, the present invention is not limited to this, and the server device 20 may be installed in another location. Also in this case, the same effects as in the present embodiment can be obtained.

また、本実施の形態では、地震被害状況の詳細な調査結果を調査結果入力画面(図12参照。)により、所属する現場事務所に設けられているクライアント装置40を介して登録する場合について説明したが、本発明はこれに限定されるものではなく、例えば、調査を行った現場で、所持している情報端末装置を介して登録する形態とすることもできる。この場合、サーバ装置20によって当該調査結果入力画面を当該情報端末装置に表示させ、当該画面上で入力された各種情報を登録することになる。この場合、調査現場での調査者に対する調査結果の登録作業の負荷は増加するものの、クライアント装置40を介して登録する場合に比較して、詳細な調査結果を短時間でサーバ装置20に登録できるようになる。   Further, in the present embodiment, a case where a detailed survey result of the earthquake damage situation is registered through the survey result input screen (see FIG. 12) via the client device 40 provided in the site office to which the user belongs is described. However, the present invention is not limited to this. For example, the present invention may be configured to register via an information terminal device possessed at the site where the survey is performed. In this case, the server device 20 displays the survey result input screen on the information terminal device, and registers various information input on the screen. In this case, although the load of the survey result registration work for the investigator at the survey site increases, the detailed survey result can be registered in the server device 20 in a short time compared to the case of registering via the client device 40. It becomes like this.

また、本実施の形態では、震源位置(緯度、経度、深さ)及びマグニチュードを示す地震情報を人手によって入力する場合について説明したが、本発明はこれに限定されるものではなく、当該情報が気象庁により発表されることを利用して、気象庁により発表された情報をネットワーク12を介して直接入力する形態とすることもできる。この場合、人手による入力作業を省略することができるので、利便性が向上できる。   In the present embodiment, the case where the earthquake information indicating the epicenter position (latitude, longitude, depth) and magnitude is manually input has been described. However, the present invention is not limited to this and the information is not limited to this. The information announced by the Meteorological Agency can be directly input via the network 12 by using the announcement by the Meteorological Agency. In this case, manual input work can be omitted, and convenience can be improved.

また、本実施の形態では、総合建設会社における過去に建設を請け負った建物を復旧支援の対象とした場合について説明したが、本発明はこれに限定されるものではなく、例えば、要望に応じて他の建物を復旧支援の対象として追加登録することができる形態とすることもできる。この場合の具体的な形態としては、例えば、図11に示した建物情報表示画面上で当該建物に関する情報を建物情報データベースDB1に登録できるようにする形態を例示できる。これにより、復旧支援の対象を拡大することができ、地震災害復旧支援システムの適用範囲を拡大することができる。   Further, in the present embodiment, a case has been described where a building that has been under construction in the past in a general construction company is targeted for restoration support, but the present invention is not limited to this, for example, according to a request It can also be set as the form which can additionally register another building as an object of restoration assistance. As a specific form in this case, for example, a form in which information related to the building can be registered in the building information database DB1 on the building information display screen shown in FIG. Thereby, the object of recovery assistance can be expanded and the application range of an earthquake disaster recovery assistance system can be expanded.

また、本実施の形態では、建物の耐震性能を示す値として構造耐震指標値であるIs値を適用した場合について説明したが、本発明はこれに限定されるものではなく、例えば、保有水平耐力等の他の耐震性能を示す値を適用することもできる。この場合も、本実施の形態と同様の効果を奏することができる。   In the present embodiment, the case where the Is value, which is the structural earthquake resistance index value, is applied as the value indicating the earthquake resistance performance of the building has been described. However, the present invention is not limited to this, for example, the retained horizontal strength Other values indicating the seismic performance can also be applied. Also in this case, the same effects as in the present embodiment can be obtained.

その他、本実施の形態で説明した地震災害復旧支援システム10の構成(図1〜図3参照。)は一例であり、本発明の主旨を逸脱しない範囲内において適宜変更可能であることは言うまでもない。   In addition, the configuration (see FIGS. 1 to 3) of the earthquake disaster recovery support system 10 described in the present embodiment is an example, and it is needless to say that the configuration can be appropriately changed without departing from the gist of the present invention. .

また、本実施の形態で示した地震災害復旧支援プログラム及び地震災害提示プログラムの処理の流れ(図5及び図8参照。)も一例であり、本発明の主旨を逸脱しない範囲内において適宜変更可能であることは言うまでもない。   The process flow (see FIGS. 5 and 8) of the earthquake disaster recovery support program and the earthquake disaster presentation program shown in the present embodiment is also an example, and can be changed as appropriate without departing from the gist of the present invention. Needless to say.

また、本実施の形態で示した各種画面の構成(図6、図7、図9〜図14参照。)も一例であり、本発明の主旨を逸脱しない範囲内において適宜変更可能であることは言うまでもない。   The configurations of the various screens shown in this embodiment (see FIGS. 6, 7, and 9 to 14) are also examples, and can be appropriately changed without departing from the gist of the present invention. Needless to say.

実施の形態に係る地震災害復旧支援システム10の構成を示す模式図である。It is a mimetic diagram showing composition of earthquake disaster recovery support system 10 concerning an embodiment. 実施の形態に係るサーバ装置20の電気系の主要構成を示すブロック図である。It is a block diagram which shows the main structures of the electric system of the server apparatus 20 which concerns on embodiment. 実施の形態に係るサーバ装置20に備えられたハードディスク20Dの主な記憶内容を示す模式図である。It is a schematic diagram which shows the main memory content of the hard disk 20D with which the server apparatus 20 which concerns on embodiment was equipped. (A)は実施の形態に係る建物情報データベースDB1の構成を示す模式図であり、(B)は実施の形態に係る復旧情報データベースDB2の構成を示す模式図であり、(C)は実施の形態に係る現場事務所情報データベースDB3の構成を示す模式図である。(A) is a schematic diagram which shows the structure of building information database DB1 which concerns on embodiment, (B) is a schematic diagram which shows the structure of recovery information database DB2 which concerns on embodiment, (C) is implementation It is a schematic diagram which shows the structure of the field office information database DB3 which concerns on a form. 実施の形態に係る地震災害復旧支援プログラムの処理の流れを示すフローチャートである。It is a flowchart which shows the flow of a process of the earthquake disaster recovery assistance program which concerns on embodiment. 実施の形態に係る地震情報入力画面の表示状態を示す概略図である。It is the schematic which shows the display state of the earthquake information input screen which concerns on embodiment. 実施の形態に係る調査結果入力画面の表示状態を示す概略図である。It is the schematic which shows the display state of the investigation result input screen which concerns on embodiment. 実施の形態に係る地震災害提示プログラムの処理の流れを示すフローチャートである。It is a flowchart which shows the flow of a process of the earthquake disaster presentation program which concerns on embodiment. 実施の形態に係るトップ画面の表示状態を示す概略図である。It is the schematic which shows the display state of the top screen which concerns on embodiment. 実施の形態に係る予想被害率地図が拡大された状態のトップ画面の表示状態を示す概略図である。It is the schematic which shows the display state of the top screen of the state where the prediction damage rate map which concerns on embodiment was expanded. 実施の形態に係る建物情報表示画面の表示状態を示す概略図である。It is the schematic which shows the display state of the building information display screen which concerns on embodiment. 実施の形態に係る調査結果入力画面の表示状態を示す概略図である。It is the schematic which shows the display state of the investigation result input screen which concerns on embodiment. 「調査状況」ボタン又は「工事状況」ボタンがユーザによって指定された場合の動作の説明に供するトップ画面の表示状態を示す概略図である。It is the schematic which shows the display state of the top screen with which it uses for description of operation | movement when the "investigation status" button or the "construction status" button is designated by the user. 実施の形態に係る調査結果を示す画面の表示状態を示す概略図である。It is the schematic which shows the display state of the screen which shows the investigation result which concerns on embodiment.

符号の説明Explanation of symbols

10 地震災害復旧支援システム
12 ネットワーク(通信回線)
20 サーバ装置(地震災害復旧支援装置)
20A CPU(被害程度予測手段、調査指示出力手段、調査結果入力手段、調査終了記憶手段、工事指示出力手段、工事終了入力手段、工事終了記憶手段、予測被害程度提示手段)
20D ハードディスク(記憶手段)
20G 入出力ポート
30 携帯電話器
32 PDA
40 クライアント装置
DB1 建物情報データベース
DB2 復旧情報データベース
DB3 現場事務所情報データベース
10 Earthquake disaster recovery support system 12 Network (communication line)
20 Server device (Earthquake disaster recovery support device)
20A CPU (damage degree prediction means, investigation instruction output means, investigation result input means, investigation end storage means, construction instruction output means, construction end input means, construction end storage means, predicted damage degree presentation means)
20D hard disk (storage means)
20G I / O port 30 Mobile phone 32 PDA
40 Client device DB1 Building information database DB2 Recovery information database DB3 Site office information database

Claims (14)

地震による複数の建物への災害に対する復旧作業を支援する地震災害復旧支援装置であって、
前記複数の建物の被害程度を予測する被害程度予測手段と、
前記被害程度予測手段により予測された前記被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報を出力する調査指示出力手段と、
前記調査指示出力手段により出力された前記調査指示情報に応じた調査結果を示す調査結果情報を入力する調査結果入力手段と、
前記調査結果入力手段により入力された前記調査結果情報を記憶する記憶手段と、
を備えた地震災害復旧支援装置。
An earthquake disaster recovery support device that supports recovery work for disasters to multiple buildings due to an earthquake,
Damage degree prediction means for predicting the damage degree of the plurality of buildings;
A survey instruction output means for outputting survey instruction information instructing to conduct a survey of damage status with priority for a building having a higher damage level predicted by the damage level prediction means;
Survey result input means for inputting survey result information indicating a survey result according to the survey instruction information output by the survey instruction output means;
Storage means for storing the investigation result information input by the investigation result input means;
Earthquake disaster recovery support device equipped with.
前記調査結果入力手段により前記調査結果情報が入力された際に前記調査が終了したことを示す調査終了情報を前記記憶手段に記憶する調査終了記憶手段
を更に備えた請求項1記載の地震災害復旧支援装置。
The earthquake disaster recovery according to claim 1, further comprising: a survey end storage unit that stores, in the storage unit, survey end information indicating that the survey is completed when the survey result information is input by the survey result input unit. Support device.
前記調査結果入力手段により調査対象とした建物に対する工事を要することを示す調査結果情報が入力された場合に、当該建物に対する工事の実施を指示する工事指示情報を出力する工事指示出力手段
を更に備えた請求項1又は請求項2記載の地震災害復旧支援装置。
A construction instruction output means for outputting construction instruction information for instructing the construction of the building when the investigation result information indicating that the construction of the subject building is required is inputted by the investigation result input means; The earthquake disaster recovery support apparatus according to claim 1 or 2.
前記工事指示出力手段により出力された前記工事指示情報に応じた工事が終了したことを示す工事終了情報を入力する工事終了入力手段と、
前記工事終了入力手段により前記工事終了情報が入力された際に前記工事が終了したことを示す工事終了情報を前記記憶手段に記憶する工事終了記憶手段と、
を更に備えた請求項3記載の地震災害復旧支援装置。
Construction completion input means for inputting construction completion information indicating that construction according to the construction instruction information output by the construction instruction output means has been completed;
Construction completion storage means for storing, in the storage means, construction completion information indicating that the construction has been completed when the construction completion information is input by the construction completion input means;
The earthquake disaster recovery support apparatus according to claim 3, further comprising:
前記被害程度予測手段により予測された被害程度を複数の段階に区分し、各区分段階別に異なる状態で提示する予測被害程度提示手段
を更に備えた請求項1乃至請求項4の何れか1項記載の地震災害復旧支援装置。
The damage degree predicted by the damage degree prediction means is divided into a plurality of stages, and further provided is a predicted damage degree presentation means for presenting in different states for each division stage. Earthquake disaster recovery support equipment.
請求項1乃至請求項5の何れか1項記載の地震災害復旧支援装置と、
前記地震災害復旧支援装置から出力された指示情報に基づく情報を表示する表示手段を備えたクライアント装置と、
前記地震災害復旧支援装置と前記クライアント装置との間に介在された通信回線と、
を含む地震災害復旧支援システム。
The earthquake disaster recovery support device according to any one of claims 1 to 5,
A client device comprising display means for displaying information based on the instruction information output from the earthquake disaster recovery support device;
A communication line interposed between the earthquake disaster recovery support device and the client device;
Earthquake disaster recovery support system including
地震による複数の建物への災害に対する復旧作業を支援する地震災害復旧支援方法であって、
前記複数の建物の被害程度を予測し、
予測した前記被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報を出力し、
出力した前記調査指示情報に応じた調査結果を示す調査結果情報を入力し、
入力した前記調査結果情報を記憶手段に記憶する、
地震災害復旧支援方法。
An earthquake disaster recovery support method that supports recovery work for disasters to multiple buildings due to an earthquake,
Predicting the degree of damage to the plurality of buildings,
Output the survey instruction information instructing to conduct the survey of the damage status with higher priority for the building with the higher predicted damage level,
Enter the survey result information indicating the survey result according to the output of the survey instruction information,
Storing the inputted survey result information in a storage means;
Earthquake disaster recovery support method.
前記調査結果情報を入力した際に前記調査が終了したことを示す調査終了情報を前記記憶手段に記憶する
請求項7記載の地震災害復旧支援方法。
The earthquake disaster recovery support method according to claim 7, wherein when the survey result information is input, survey completion information indicating that the survey is completed is stored in the storage unit.
調査対象とした建物に対する工事を要することを示す調査結果情報を入力した場合に、当該建物に対する工事の実施を指示する工事指示情報を出力する
請求項7又は請求項8記載の地震災害復旧支援方法。
The earthquake disaster recovery support method according to claim 7 or claim 8, wherein when the survey result information indicating that the construction of the building subject to the survey is required is input, the construction instruction information for instructing the construction of the building is output. .
出力した前記工事指示情報に応じた工事が終了したことを示す工事終了情報が入力された際に前記工事が終了したことを示す工事終了情報を前記記憶手段に記憶する
請求項9記載の地震災害復旧支援方法。
The earthquake disaster according to claim 9, wherein construction completion information indicating that the construction has been completed is stored in the storage means when construction completion information indicating that the construction corresponding to the output construction instruction information has been completed is input. Recovery support method.
地震による複数の建物への災害に対する復旧作業を支援する地震災害復旧支援プログラムであって、
前記複数の建物の被害程度を予測する被害程度予測ステップと、
前記被害程度予測ステップにより予測された前記被害程度が高い建物ほど優先して被害状況の調査を実施することを指示する調査指示情報を出力する調査指示出力ステップと、
前記調査指示出力ステップにより出力された前記調査指示情報に応じた調査結果を示す調査結果情報を入力する調査結果入力ステップと、
前記調査結果入力ステップにより入力された前記調査結果情報を記憶手段に記憶する記憶ステップと、
をコンピュータに実行させる地震災害復旧支援プログラム。
An earthquake disaster recovery support program that supports recovery work for disasters to multiple buildings due to an earthquake,
A damage degree prediction step for predicting the damage degree of the plurality of buildings;
A survey instruction output step for outputting survey instruction information instructing to conduct a survey of the damage status with priority for a building having a higher damage level predicted by the damage level prediction step;
Survey result input step for inputting survey result information indicating a survey result according to the survey instruction information output by the survey instruction output step;
A storage step of storing in the storage means the survey result information input in the survey result input step;
Earthquake disaster recovery support program that runs on a computer.
前記調査結果入力ステップにより前記調査結果情報が入力された際に前記調査が終了したことを示す調査終了情報を前記記憶手段に記憶する調査終了記憶ステップ
を更に有する請求項11記載の地震災害復旧支援プログラム。
The earthquake disaster recovery support according to claim 11, further comprising: a survey end storage step for storing in the storage means survey end information indicating that the survey has ended when the survey result information is input in the survey result input step. program.
前記調査結果入力ステップにより調査対象とした建物に対する工事を要することを示す調査結果情報が入力された場合に、当該建物に対する工事の実施を指示する工事指示情報を出力する工事指示出力ステップ
を更に有する請求項11又は請求項12記載の地震災害復旧支援プログラム。
A construction instruction output step for outputting construction instruction information for instructing execution of construction for the building when the investigation result information indicating that the construction of the building to be investigated is required in the investigation result input step; The earthquake disaster recovery support program according to claim 11 or 12.
前記工事指示出力ステップにより出力された前記工事指示情報に応じた工事が終了したことを示す工事終了情報を入力する工事終了入力ステップと、
前記工事終了入力ステップにより前記工事終了情報が入力された際に前記工事が終了したことを示す工事終了情報を前記記憶手段に記憶する工事終了記憶ステップと、
を更に有する請求項13記載の地震災害復旧支援プログラム。
A construction end input step for inputting construction end information indicating that the construction according to the construction instruction information output in the construction instruction output step is completed;
A construction completion storage step of storing construction completion information indicating that the construction has been completed when the construction completion information is input in the construction completion input step;
The earthquake disaster recovery support program according to claim 13, further comprising:
JP2004014226A 2004-01-22 2004-01-22 Earthquake disaster restoration support device, earthquake disaster restoration support system, earthquake disaster restoration support method and earthquake disaster restoration support program Pending JP2005208893A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004014226A JP2005208893A (en) 2004-01-22 2004-01-22 Earthquake disaster restoration support device, earthquake disaster restoration support system, earthquake disaster restoration support method and earthquake disaster restoration support program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004014226A JP2005208893A (en) 2004-01-22 2004-01-22 Earthquake disaster restoration support device, earthquake disaster restoration support system, earthquake disaster restoration support method and earthquake disaster restoration support program

Publications (1)

Publication Number Publication Date
JP2005208893A true JP2005208893A (en) 2005-08-04

Family

ID=34900078

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004014226A Pending JP2005208893A (en) 2004-01-22 2004-01-22 Earthquake disaster restoration support device, earthquake disaster restoration support system, earthquake disaster restoration support method and earthquake disaster restoration support program

Country Status (1)

Country Link
JP (1) JP2005208893A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007328632A (en) * 2006-06-08 2007-12-20 Chugoku Electric Power Co Inc:The Information providing apparatus
JP2011095904A (en) * 2009-10-28 2011-05-12 Sumitomo Mitsui Banking Corp Suffering situation management system
JPWO2011055720A1 (en) * 2009-11-04 2013-03-28 株式会社エヌ・ティ・ティ・ドコモ Disaster information providing system and disaster information providing method
JP2017069610A (en) * 2015-09-28 2017-04-06 株式会社構造計画研究所 Disaster prevention support system
JP2020098582A (en) * 2018-12-18 2020-06-25 旭化成ホームズ株式会社 Disaster response server, method for responding to disaster, and program
JP2021033731A (en) * 2019-08-27 2021-03-01 三菱スペース・ソフトウエア株式会社 Damage grasp system, processing device, and program
KR102269142B1 (en) * 2020-02-19 2021-06-23 연세대학교 산학협력단 Urban Earthquake Evacuation Simulation Apparatus Based on Graphical User Interface and Method Thereof
KR20210123603A (en) * 2020-04-03 2021-10-14 인플랩 주식회사 Building hazard map generation method and Earthquake disaster building hazard map provision system using the same
WO2022059604A1 (en) * 2020-09-18 2022-03-24 富士フイルム株式会社 Assessment result estimation device, assessment result estimation method, and program
JP2022120778A (en) * 2021-02-05 2022-08-18 旭化成ホームズ株式会社 Disaster response support device, disaster response support program, and disaster response support method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08329043A (en) * 1995-06-02 1996-12-13 Ohbayashi Corp Simulation and prediction device for earthquake damage
JP2002328970A (en) * 2001-04-27 2002-11-15 Asahi Kasei Corp System and method for managing maintenance program of building
JP2003173384A (en) * 2001-12-05 2003-06-20 Sumitomo Forestry Co Ltd Post-disaster restoration system
JP2003281324A (en) * 2002-03-22 2003-10-03 Ntt Data Corp Disaster correspondence supporting system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08329043A (en) * 1995-06-02 1996-12-13 Ohbayashi Corp Simulation and prediction device for earthquake damage
JP2002328970A (en) * 2001-04-27 2002-11-15 Asahi Kasei Corp System and method for managing maintenance program of building
JP2003173384A (en) * 2001-12-05 2003-06-20 Sumitomo Forestry Co Ltd Post-disaster restoration system
JP2003281324A (en) * 2002-03-22 2003-10-03 Ntt Data Corp Disaster correspondence supporting system

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4597096B2 (en) * 2006-06-08 2010-12-15 中国電力株式会社 Information provision device
JP2007328632A (en) * 2006-06-08 2007-12-20 Chugoku Electric Power Co Inc:The Information providing apparatus
JP2011095904A (en) * 2009-10-28 2011-05-12 Sumitomo Mitsui Banking Corp Suffering situation management system
JPWO2011055720A1 (en) * 2009-11-04 2013-03-28 株式会社エヌ・ティ・ティ・ドコモ Disaster information providing system and disaster information providing method
JP2017069610A (en) * 2015-09-28 2017-04-06 株式会社構造計画研究所 Disaster prevention support system
JP2020098582A (en) * 2018-12-18 2020-06-25 旭化成ホームズ株式会社 Disaster response server, method for responding to disaster, and program
JP2020098581A (en) * 2018-12-18 2020-06-25 旭化成ホームズ株式会社 Disaster response server, method for responding to disaster, and program
JP7445410B2 (en) 2018-12-18 2024-03-07 旭化成ホームズ株式会社 Disaster response server, disaster response method and program
JP7118942B2 (en) 2018-12-18 2022-08-16 旭化成ホームズ株式会社 DISASTER RESPONSE SERVER, DISASTER RESPONSE METHOD AND PROGRAM
JP7072247B2 (en) 2019-08-27 2022-05-20 三菱電機ソフトウエア株式会社 Damage grasping system, processing equipment and programs
JP2021033731A (en) * 2019-08-27 2021-03-01 三菱スペース・ソフトウエア株式会社 Damage grasp system, processing device, and program
KR102269142B1 (en) * 2020-02-19 2021-06-23 연세대학교 산학협력단 Urban Earthquake Evacuation Simulation Apparatus Based on Graphical User Interface and Method Thereof
KR102407159B1 (en) * 2020-04-03 2022-06-10 인플랩 주식회사 Building hazard map generation method and Earthquake disaster building hazard map provision system using the same
KR20210123603A (en) * 2020-04-03 2021-10-14 인플랩 주식회사 Building hazard map generation method and Earthquake disaster building hazard map provision system using the same
WO2022059604A1 (en) * 2020-09-18 2022-03-24 富士フイルム株式会社 Assessment result estimation device, assessment result estimation method, and program
JP2022120778A (en) * 2021-02-05 2022-08-18 旭化成ホームズ株式会社 Disaster response support device, disaster response support program, and disaster response support method
JP7139508B2 (en) 2021-02-05 2022-09-20 旭化成ホームズ株式会社 DISASTER RESPONSE SUPPORT DEVICE, DISASTER RESPONSE SUPPORT PROGRAM AND DISASTER RESPONSE SUPPORT METHOD

Similar Documents

Publication Publication Date Title
US20100153151A1 (en) Method and Apparatus for Determining Applicable Permits and Permitting Agencies for a Construction Project
US20090024437A1 (en) Methods, Systems, and Computer-Readable Media for Providing A Ratio of Tasks Per Technician
AU2017310715B2 (en) Management device, construction management system, and position information management method
JP2005208893A (en) Earthquake disaster restoration support device, earthquake disaster restoration support system, earthquake disaster restoration support method and earthquake disaster restoration support program
JP2013148962A (en) Service engineer dispatch support device, service engineer dispatch support method, and service engineer dispatch support program
Masudi et al. Waste quantification models for estimation of construction and demolition waste generation: a review
JP5210058B2 (en) Earthquake damage prediction device and earthquake damage prediction program
JP2011053806A (en) Management device, construction work management system, construction work management method, and construction work management program
JP2003147970A (en) Aseismatic performance evaluation method for building, and modification cost evaluation method based on aseismatic performance evaluation values by the method
JP2006258639A (en) System for predicting earthquake damage
CN114064829A (en) Method and device for carrying out aggregation display on positioning points and electronic equipment
JP2006259940A (en) Statistical information presentation device
JP6195585B2 (en) Information processing apparatus, information processing method, and program
US10824969B2 (en) System and method for locate request entry configured for defining multiple excavation sites as part of a single locate request
JP5665767B2 (en) Information distribution apparatus, information distribution system, information distribution method, and program
JP2009259172A (en) Housing information providing device and housing information providing method
JP2009042809A (en) Pricing system, pricing method and pricing program
JP4896172B2 (en) Crisis management method, crisis management system, and crisis management support server
US20180266841A1 (en) Information processing device, information processing system, navigation system, information processing method, and program
JP3909840B2 (en) Building loss assessment program
JP2003323540A (en) Method for supporting creation of facility visit schedule
JP2012230576A (en) Fire fighting instruction system and dispatch plan generation method
KR101516285B1 (en) Bridges information system of augmented reality using mobile
WO2020059321A1 (en) System for communicating information relating to long period ground motion, server for communicating information relating to long period ground motion, mobile terminal, and method for communicating information relating to long period ground motion
JP6528285B2 (en) Crisis response management device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061227

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090428

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090512

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090706

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090804

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091104

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20091111

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20091218