JP2004059321A - Climbing crane and its climbing method - Google Patents

Climbing crane and its climbing method Download PDF

Info

Publication number
JP2004059321A
JP2004059321A JP2003156993A JP2003156993A JP2004059321A JP 2004059321 A JP2004059321 A JP 2004059321A JP 2003156993 A JP2003156993 A JP 2003156993A JP 2003156993 A JP2003156993 A JP 2003156993A JP 2004059321 A JP2004059321 A JP 2004059321A
Authority
JP
Japan
Prior art keywords
crane
mast
climbing
main body
receiving beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003156993A
Other languages
Japanese (ja)
Other versions
JP4322559B2 (en
Inventor
Hiroshi Nakamura
中村 寛
Akira Inubushi
犬伏 昭
Tsukasa Nakahara
中原 司
Toshikatsu Mizuno
水野 敏勝
Ryuichi Yanagida
柳田 隆一
Haruyasu Minowa
箕輪 晴康
Toshifumi Mizushima
水島 敏文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SC MACHINERY KK
Shimizu Construction Co Ltd
IHI Transport Machinery Co Ltd
Shimizu Corp
Original Assignee
SC MACHINERY KK
Shimizu Construction Co Ltd
Ishikawajima Transport Machinery Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SC MACHINERY KK, Shimizu Construction Co Ltd, Ishikawajima Transport Machinery Co Ltd, Shimizu Corp filed Critical SC MACHINERY KK
Priority to JP2003156993A priority Critical patent/JP4322559B2/en
Publication of JP2004059321A publication Critical patent/JP2004059321A/en
Application granted granted Critical
Publication of JP4322559B2 publication Critical patent/JP4322559B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To adopt a floor climbing type climbing crane when constructing a building made of RC. <P>SOLUTION: This climbing crane has a mast 5 supported by a building frame via a mast receiving beam 6, a crane body 3 liftable to the mast and supportable to the lower floor than the uppermost floor via a body receiving beam 9 and a climbing mechanism 10 arranged in the crane body and alternately lifting the mast and the crane body. The mast receiving beam and the body receiving beam have a freely collapsible outrigger, and can vary the length. When climbing, the mast is lifted to the crane body in a state of supporting the crane body to the lower floor (the N-1 floor) than the uppermost floor (the N floor) of the constructed building frame, and the crane body is lifted to the mast after supporting a lower end part of the mast to the building frame in the lower floor (the N-2 floor) than a support position of the crane body. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、特に鉄筋コンクリート造の高層建物を施工する際に採用して好適なクライミングクレーンおよびそのクライミング方法に関する。
【0002】
【従来の技術】
周知のように、高層建物の施工に際して採用されるクライミングクレーンには、図5に示すようないわゆるマストクライミング式のものと、図6に示すようないわゆるフロアクライミング式のものがある。
【0003】
図5に示すマストクライミング式のものは、施工するべき建物1の外部にマスト2を立設して、クレーン本体3をマスト2に対して上昇可能とし、施工進捗に伴いマスト2を上方に延長してはクレーン本体3をクライミングさせていく形式のものであるが、これは旋回中心が建物1の外部であることから、旋回半径の大きい大型クレーンが必要となる、クライミングクレーン設置のために地上ヤードを必要とする、建物1の全高に及ぶ長大なマスト2とそれを支持するための水平ステー4が必要である、敷地が狭隘な場合には旋回時に敷地境界線の外側に出てしまう懸念がある、といった問題があり、有効に採用できない場合も多い。
【0004】
一方、図6に示すフロアクライミング式のものは、建物の全高に及ぶような長大なマスト2に代えて所定長のマスト5を施工済みの躯体の頂部に立設し、その全体を施工進捗に伴って順次上方に盛り替えていく形式のものである。これによれば、マスト5を建物1の内側に設置することで図5に示したようなマストクライミング式のものに較べて旋回半径が小さい小型のもので済み、クレーン設置のための地上ヤードも不要となり、マスト5の長さ(高さ)は建物1の高さに拘わらず必要最小限で済むし水平ステーも不要であり、旋回時に敷地境界線外に出てしまう懸念もなく、マストクライミング式のものに較べてより有効であるといわれている。
【0005】
そして、この種のフロアクライミング式のクライミングクレーンには、クレーン本体3にジャッキ等のクライミング機構が設置されていて、そのクライミング機構を操作してマスト5とクレーン本体3とを交互に上昇させることによりそれ自身でクライミングが可能なものとしておくことが一般的である。図7はそのようなクライミングクレーンにおけるクライミング工程を示すもので、(a)に示すようにマスト5の下端部をマスト受け梁6を介して施工済みの躯体(図示例ではN−5階の位置)に支持した状態で所定階(N階)までの躯体の施工を行った後、クレーン本体3を一時的に支持するための本体受け梁7を最上階(N階)に設置し、クライミング機構を操作して(b)に示すようにクレーン本体3をマスト5に対して降下させて本体受け梁7上に仮支持する。そして、その状態でマスト受け梁6を内側に縮退あるいは折り畳み、クライミング機構を操作して本体受け梁7から反力をとって(c)に示すようにマスト5をクレーン本体3に対して上昇させ、(d)に示すようにマスト5の下端部をマスト受け梁6を介して所定階(図示例ではN−2階)の躯体に固定した後に、クライミング機構によりクレーン本体3をマスト5に対して上昇させ、本体受け梁7を撤去するようにしている。
【0006】
ところで、上記のような従来のフロアクライミング式のクライミングクレーンは、鉄骨造(S造)の建物の施工に際しては好適に採用可能であるが、鉄筋コンクリート造(RC造)の建物の施工に際しては有効に採用できないものである。
【0007】
すなわち、従来のフロアクライミング式のクライミングクレーンは、クライミングに際してクレーン本体3を本体受け梁7を介して最上階の躯体に対して仮支持するものであることから、クライミングの段階では最上階の躯体強度がクライミングクレーンをクライミングするに充分な強度を有していることが前提となる。したがって、RC造の建物に適用する場合には、最上階の躯体コンクリートを打設してからその強度が充分に発現するまでの養生期間を経た後でないとクライミングを実施できないことになるが、そのようにクライミング工程がコンクリートの養生期間により拘束されることでは効率的な施工を望めず、現実的でない。
【0008】
なお、特許文献1にはRC造の建物にも適用可能とされるクライミングクレーンが提案されているが、これはマストとクレーン本体とを連結してしまい、昇降機構をクレーン本体から切り離して独立に昇降可能とするという極めて特殊な構造のものであるので、汎用性に乏しいものである。
【0009】
【特許文献1】
特開2000−327265号公報
【0010】
【発明が解決しようとする課題】
以上のことから、従来においてはこの種のフロアクライミング式のクライミングクレーンはコンクリートの養生期間を必要としないS造の建物の施工に適用されるのみで、RC造の建物の施工に際しては有効に適用できるものではなく、それを可能とする有効適切な手段の開発が必要とされていた。
【0011】
【課題を解決するための手段】
上記事情に鑑み、請求項1の発明は、高層建物を施工するに際して施工済みの躯体に設置され、施工進捗に伴って順次上方へ盛り替えられていくクライミングクレーンであって、下端部がマスト受け梁を介して施工済みの躯体に支持されて立設されるマストと、マストに対して相対的に昇降可能とされかつ本体受け梁を介して施工済みの躯体の最上階よりも下層の階に対して支持可能なクレーン本体と、クレーン本体に設置され、クレーン本体を本体受け梁を介して躯体に対して支持した状態でマストをクレーン本体に対して上昇させ、かつマストをマスト受け梁を介して躯体に支持した状態でクレーン本体をマストに対して上昇させるためのクライミング機構とを具備してなることを特徴とする。
【0012】
請求項2の発明は、請求項1の発明のクライミングクレーンにおいて、マスト受け梁はマストとともに昇降可能とされ、本体受け梁はクレーン本体とともに昇降可能とされ、それらマスト受け梁および本体受け梁は、いずれも水平面内において回動可能とされた折り畳み自在のアウトリガーを有し、それらアウトリガーを展開させた状態で施工済みの梁により支持可能とされ、かつアウトリガーを内側に折り畳んだ状態で梁との干渉を回避して昇降可能とされていることを特徴とする。
【0013】
請求項3の発明は、請求項1または2の発明のクライミングクレーンにおいて、マスト受け梁および本体受け梁の双方もしくは少なくとも一方は、要所に適宜長さの拡張部材が介装されることでその長さが可変とされていることを特徴とする。
【0014】
請求項4の発明は、高層建物を施工するに際して、マストに対してクレーン本体が相対的に昇降可能なクライミングクレーンを用い、そのクライミングクレーンを施工済みの躯体に設置して施工進捗に伴い順次上方へ盛り替えていくためのクライミングクレーンのクライミング方法であって、クライミングに際しては、クレーン本体を施工済みの躯体の最上階よりも下層の階に対して支持した状態でマストをクレーン本体に対して上昇させ、マストの下端部をクレーン本体を支持している階よりも下層の階において躯体に対して支持した後、クレーン本体をマストに対して上昇させることを特徴とする。
【0015】
【発明の実施の形態】
図1は本発明の実施形態であるクライミングクレーンの概略構成を示すものである。本実施形態のクライミングクレーンの基本構成は上述した従来のフロアクライミング式のクライミングクレーンと共通しており、従来のものと同様に、下端部がマスト受け梁6を介して施工済みの躯体に支持されて立設される所定長のマスト5と、そのマスト5に対して相対的に昇降可能なクレーン本体3とを主体として構成されているものであるが、従来のクライミングクレーンではクライミングに際して本体受け梁7を最上階に設置してそれにクレーン本体3を仮支持するものであったのに対し、本実施形態のクライミングクレーンにおいては、クレーン本体3の下方に連結部材8を備えた本体受け梁9を設置しておき、クライミングに際してはその本体受け梁9を介してクレーン本体3を最上階よりも下層の階に対して仮支持するものとしている。本例における本体受け梁9はマスト受け梁6と同様に伸縮可能あるいは折り畳み可能とされていて、これを躯体に対して固定する際には外側に伸張あるいは展開し、クライミングに際しては内側に縮退あるいは折り畳むようにされている。また、本体受け梁9の上部に備えられている連結部材8は、マスト5の外側において相対的に昇降可能に装着されたトラス柱状あるいはフレーム状のもので、その高さ(本体受け梁9とクレーン本体3との間の長さ)はこの建物1の2階層分程度とされている。
【0016】
そして、本実施形態のクライミングクレーンには、これ自体がクライミングするためのクライミング機構10がクレーン本体3に搭載されている。クライミング機構10は、マスト5を把持する把持機構11と、その把持機構11と上記の連結部材8との間に介装されたジャッキ12とからなり、従来のものと同様にマスト5とクレーン本体3のいずれか一方を躯体に対して固定した状態でこのクライミング機構を操作することにより、図2に示すようにそれらを交互に上昇させることでクライミングが可能なものである。
【0017】
すなわち、図2(a)に示すように、マスト5の下端部をマスト受け梁6を介して施工済みの躯体(図示例のようにたとえばN−5階の位置)に対して支持した状態で、所定階(N階)までの躯体の施工を行った後、クライミング機構10を操作して(b)に示すようにクレーン本体3を降下させ、縮退させておいた本体受け梁9を最上階よりも下層の階(たとえば図示しているようにN−1階)の位置に配置し、そこで本体受け梁9を伸張させてクレーン本体3を仮支持する。続いて、(c)に示すようにマスト受け梁6を縮退し、本体受け梁9から反力をとってクライミング機構10によりマスト5を引き上げて上昇させ、(d)に示すようにマスト受け梁6を伸張させてマスト5を所定階(たとえばN−2階)に対して固定した後、本体受け梁9を縮退し、マスト5から反力をとってクライミング機構10によりクレーン本体3を押し上げて上昇させる。
【0018】
上記のように、本実施形態のクライミングクレーンは従来のフロアクライミング式のクライミングクレーンとほぼ同様の操作でクライミングを行うことが可能なものであるが、クレーン本体3の下方に連結部材8を備えた本体受け梁9を設けておき、その本体受け梁9を介してクレーン本体3を最上階よりも下層の階に対して仮支持した状態でクライミングを行うことが可能であることから、RC造の建物の施工に適用した場合においては、コンクリート強度が既に充分に発現した階に対してクレーン本体3を仮支持することが可能であり、したがって最上階の躯体強度が充分に発現していない早期の段階においてクライミングを行うことが可能であり、それ故に、従来においては採用が困難であったRC造の建物の施工に際してもS造の場合の同様にフロアクライミング式のクライミングクレーンを支障なく採用することが可能となる。
【0019】
図3はマスト受け梁6の一例を示す。これは、いずれも鉄骨材からなる主梁6aと横梁6bとX梁6cとを主体とするフレーム状のもので、その中心部(X梁6cの交差部)にマスト5の下端部が連結されるようになっている。このマスト受け梁6は、主梁6aの端部に、水平面内において回動可能とされて折り畳み自在なアウトリガー6dがそれぞれ設けられていて、(b)に実線で示すようにそれらアウトリガー6dを展開して施工済みの梁20に係合させることでこのマスト受け梁6の全体およびそこから立設されているマスト5がそれら梁20によって安定に支持され、かつ、マスト5を昇降させる際には破線で示すようにアウトリガー6dを内側に折り畳むことで梁20との干渉を支障なく回避し得るものとされている。
【0020】
なお、アウトリガー6dを支持する梁20は必要であれば適宜補強すれば良いが、いずれにしてもアウトリガー6dを可及的に柱21に近い位置で支持することが好ましく、そのためには、横梁6bの端部にフランジによるジョイント部を設けておき、(c)に示すようにアウトリガー6dを支持する梁20のスパン長によってはジョイント部に適当な長さの拡張部材6eを介装することで横梁6bの全長を調節可能としておくことが好ましく、それにより梁スパンの如何に係わらず柱際に安定に支持させることが可能となるし、梁スパンの異なる他の現場にも転用することができる。勿論、そのような拡張部材6eによる長さ調整は主梁6aに対して行っても良い。
【0021】
図4は本体受け梁9の一例を示す。これは、主梁9aと横梁9bとを主体とするフレーム状のもので、この中心部をマスト5が相対的に昇降可能に挿通し、かつこの本体受け梁9の上部には連結部材8としての門型フレーム9cを介してクレーン本体3aが搭載されたものである。この本体受け梁9においても、上記のマスト受け梁6の場合と同様に、主梁9aの端部には水平面内において回動可能とされて折り畳み自在なアウトリガー9dが設けられていて、それらアウトリガー9dを展開して施工済みの梁20に係合させることで、この本体受け梁9およびそれに搭載されているクレーン本体3の全体を施工済みの梁20により安定に支持可能であり、かつクレーン本体3とともに本体受け梁9を昇降させる際にはアウトリガー9dを折り畳むことで梁20との干渉を回避し得るものとされている。
【0022】
上記のようなマスト受け梁6や本体受け梁9を採用することにより、アウトリガー6d,9dを簡単な操作で展開し折り畳むことでクライミングクレーン全体を安定に支持できかつ容易にクライミングすることができることはもとより、それらマスト受け梁6や本体受け梁9は単に折り畳み自在なアウトリガー6d、9dを備えたものであるのでその構成は充分に簡単であり、したがって安価に製作できるものであるし、各部の寸法を可変としておくことで様々なスパンの建物にも適用可能であり、他の建物においても広く転用することができる。
【0023】
なお、上記実施形態ではクライミングに際してクレーン本体3を本体受け梁9により最上階(N階)の直下階(N−1階)に対して支持するものとしたが、場合によっては連結部材8の高さを調節することでさらにその下層の階(たとえばN−2階)に対してクレーン本体3を支持することも可能である。また、本発明はRC造の建物の施工に際して適用することが現実的かつ最適であるが、必要であればSRC造やS造の建物の場合に採用することも妨げるものではない。
【0024】
勿論、本発明は図示例の実施形態に限定されることなく、マスト受け梁6や本体受け梁9、アウトリガー6dやアウトリガー9d、クライミング機構10その他の具体的な構成は適宜の設計的変更が可能であることはいうまでもない。たとえば、上記実施形態ではアウトリガー6d、9dとして折り畳み式のものを例示したが、アウトリガーとしては外側に伸張しかつ内側に縮退する伸縮式のものをはじめとして様々な構成のものを採用可能である。また、上記実施形態ではマスト受け梁6の要所に拡張部材6eを介装することでその長さを可変としたが、マスト受け梁6を可変長とするための構成は適宜であるし、マスト受け梁6のみならず、あるいはそれに代えて、本体受け梁9を同様の構成あるいは他の構成で可変長とすることでも勿論良い。
【0025】
【発明の効果】
請求項1の発明のクライミングクレーンによれば、クレーン本体を最上階よりも下層の階に対して支持した状態でクライミングを行うことが可能であるので、RC造の建物に適用しても早期のクライミングが可能であり、したがって従来においては採用が困難であったRC造の建物への適用が可能となる。
【0026】
請求項2の発明のクライミングクレーンによれば、折り畳み自在なアウトリガーを有するマスト受け梁および本体受け梁を採用したことにより、それらマスト受け梁および本体受け梁により安定に支持できかつ簡単な操作で容易にクライミングすることができるし、構成の簡略化を充分に図ることができる。
【0027】
請求項3の発明のクライミングクレーンによれば、マスト受け梁と本体受け梁の双方もしくはいずれかに拡張部材を介装することでその長さを可変としたので、梁スパンに応じて適正な長さとすることで柱際に安定に支持させることが可能であるし、梁スパンが異なる他の現場に転用することが可能である。
【0028】
請求項4の発明のクライミング方法によれば、上記のクライミングクレーンの採用により、RC造の建物の施工に際してもフロアクライミング式のクライミングクレーンを支障なく採用することが可能である。
【図面の簡単な説明】
【図1】本発明の実施形態であるクライミングクレーンの概略構成図である。
【図2】同、クライミング方法を示す図である。
【図3】同、マスト受け梁の一例を示す図である。
【図4】同、本体受け梁の一例を示す図である。
【図5】従来のマストクライミング式のクライミングクレーンの概要図である。
【図6】従来のフロアクライミング式のクライミングクレーンの概要図である。
【図7】同、クライミング工程を示す図である。
【符号の説明】
1 建物
3 クレーン本体
5 マスト
6 マスト受け梁
6d アウトリガー
6e 拡張部材
8 連結部材
9 本体受け梁
9d アウトリガー
10 クライミング機構
11 把持機構
12 ジャッキ
20 梁(躯体)
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a climbing crane and a climbing method which are particularly suitable for construction of a high-rise building made of reinforced concrete.
[0002]
[Prior art]
As is well known, climbing cranes employed in the construction of a high-rise building include a so-called mast climbing type as shown in FIG. 5 and a so-called floor climbing type as shown in FIG.
[0003]
In the mast climbing type shown in FIG. 5, the mast 2 is erected outside the building 1 to be constructed, the crane body 3 can be raised with respect to the mast 2, and the mast 2 is extended upward as the construction progresses. Then, the crane body 3 is climbed. However, since the turning center is outside the building 1, a large crane with a large turning radius is required. Requires a yard, requires a long mast 2 spanning the entire height of the building 1 and a horizontal stay 4 to support it. If the site is narrow, it may come out of the site boundary when turning. In many cases, it cannot be adopted effectively.
[0004]
On the other hand, in the floor climbing type shown in FIG. 6, instead of a long mast 2 extending over the entire height of the building, a mast 5 of a predetermined length is erected on the top of the already constructed skeleton, and the whole is used for the construction progress. This is a type that is sequentially rearranged upward. According to this, by installing the mast 5 inside the building 1, a small turning radius is smaller than that of the mast climbing type as shown in FIG. 5, and the ground yard for installing the crane is also required. Mast climbing is no longer necessary, and the length (height) of the mast 5 is minimal, regardless of the height of the building 1, and no horizontal stay is required. It is said to be more effective than the formula.
[0005]
In this type of floor climbing type climbing crane, a climbing mechanism such as a jack is installed on the crane main body 3, and the mast 5 and the crane main body 3 are raised alternately by operating the climbing mechanism. It is common practice to be able to climb on its own. FIG. 7 shows a climbing process in such a climbing crane. As shown in FIG. 7A, the lower end of the mast 5 is constructed via a mast receiving beam 6 (in the illustrated example, the position of the N-5 floor). ), The skeleton is constructed up to a predetermined floor (N floor), and then a main body receiving beam 7 for temporarily supporting the crane body 3 is installed on the top floor (N floor), and a climbing mechanism is provided. Is operated to lower the crane main body 3 with respect to the mast 5 as shown in FIG. Then, in this state, the mast receiving beam 6 is contracted or folded inward, and the climbing mechanism is operated to take a reaction force from the main body receiving beam 7 to raise the mast 5 with respect to the crane main body 3 as shown in (c). (D), after the lower end of the mast 5 is fixed to the frame of the predetermined floor (the N-2 floor in the illustrated example) via the mast receiving beam 6, the crane body 3 is moved to the mast 5 by the climbing mechanism. The main body receiving beam 7 is removed.
[0006]
By the way, the conventional floor climbing type climbing crane as described above can be suitably used when constructing a steel-frame (S) building, but is effectively used when constructing a reinforced concrete (RC) building. It cannot be adopted.
[0007]
That is, since the conventional floor climbing type climbing crane temporarily supports the crane body 3 via the main body receiving beam 7 to the skeleton on the top floor during climbing, the strength of the skeleton on the top floor is increased at the climbing stage. Has sufficient strength to climb a climbing crane. Therefore, when applied to an RC building, climbing can only be performed after a curing period from when the concrete on the top floor is cast and its strength is fully developed. As described above, if the climbing process is restricted by the curing period of the concrete, efficient construction cannot be expected and it is not practical.
[0008]
In addition, Patent Literature 1 proposes a climbing crane that can be applied to a RC building, but this connects a mast and a crane main body, and separates an elevating mechanism from the crane main body and independently. Since it has a very special structure that can be moved up and down, it has poor versatility.
[0009]
[Patent Document 1]
JP 2000-327265 A
[Problems to be solved by the invention]
From the above, conventionally, this kind of floor climbing type climbing crane is only applied to the construction of the S-shaped building which does not require the concrete curing period, and is effectively applied to the construction of the RC building. It was not possible, and there was a need to develop effective and appropriate means to make it possible.
[0011]
[Means for Solving the Problems]
In view of the above circumstances, the invention according to claim 1 is a climbing crane that is installed on a constructed skeleton when constructing a high-rise building, and is sequentially rearranged upward as the construction progresses. A mast that is supported and erected on the completed skeleton through the beam, and can be moved up and down relatively to the mast and on the lower floor than the top floor of the completed skeleton through the main body receiving beam The mast is lifted with respect to the crane body while the crane body is installed on the crane body and supported on the crane body via the main body receiving beam, and the mast is moved through the mast receiving beam. And a climbing mechanism for raising the crane body with respect to the mast while being supported by the skeleton.
[0012]
According to a second aspect of the present invention, in the climbing crane of the first aspect, the mast receiving beam can be raised and lowered together with the mast, and the main body receiving beam can be raised and lowered together with the crane main body. All have foldable outriggers that are rotatable in the horizontal plane, and can be supported by the installed beams with the outriggers deployed, and interference with the beams when the outriggers are folded inward And is capable of ascending and descending.
[0013]
According to a third aspect of the present invention, in the climbing crane according to the first or second aspect of the invention, at least one of the mast receiving beam and the main body receiving beam is provided with an expansion member having an appropriate length at a key position. The length is variable.
[0014]
The invention of claim 4 uses a climbing crane whose crane body can be moved up and down relatively to the mast when constructing a high-rise building, and installs the climbing crane on the constructed skeleton and sequentially moves upward with the construction progress. This is a climbing crane climbing method for ascending the mast.In climbing, the mast is raised with respect to the crane body while supporting the crane body on the floor lower than the top floor of the constructed skeleton The crane body is raised with respect to the mast after the lower end of the mast is supported by the frame on a floor lower than the floor supporting the crane body.
[0015]
BEST MODE FOR CARRYING OUT THE INVENTION
FIG. 1 shows a schematic configuration of a climbing crane according to an embodiment of the present invention. The basic configuration of the climbing crane of the present embodiment is common to the above-described conventional floor climbing type climbing crane, and the lower end is supported by the constructed skeleton through the mast receiving beam 6 as in the conventional case. A mast 5 having a predetermined length and a crane body 3 which can be moved up and down relatively with respect to the mast 5 are mainly used. 7 is installed on the top floor and the crane main body 3 is temporarily supported thereon. In the climbing crane of the present embodiment, the main body receiving beam 9 having the connecting member 8 below the crane main body 3 is provided. The crane body 3 is temporarily installed on a floor lower than the top floor via the main body receiving beam 9 during climbing. It is. The main body receiving beam 9 in this example is extendable or foldable similarly to the mast receiving beam 6, and expands or expands outward when fixing it to the frame, and contracts or expands inward when climbing. It is designed to fold. Further, the connecting member 8 provided on the upper part of the main body receiving beam 9 is a truss column-shaped or frame-shaped one mounted on the outside of the mast 5 so as to be able to move up and down relatively. The length between the crane main body 3) and the crane main body 3) is about two levels of the building 1.
[0016]
In the climbing crane of the present embodiment, a climbing mechanism 10 for climbing itself is mounted on the crane body 3. The climbing mechanism 10 includes a gripping mechanism 11 for gripping the mast 5 and a jack 12 interposed between the gripping mechanism 11 and the connecting member 8. By operating this climbing mechanism in a state where one of the three is fixed to the frame, climbing is possible by alternately raising them as shown in FIG.
[0017]
In other words, as shown in FIG. 2A, the lower end of the mast 5 is supported via a mast receiving beam 6 with respect to the completed frame (for example, the position of the N-5th floor as shown in the drawing). After constructing the skeleton up to the predetermined floor (N floor), the climbing mechanism 10 is operated to lower the crane main body 3 as shown in FIG. The crane main body 3 is temporarily supported by extending the main body receiving beam 9 at a lower floor (for example, the N-1 floor as shown). Subsequently, the mast receiving beam 6 is retracted as shown in (c), the mast 5 is lifted and raised by the climbing mechanism 10 by taking a reaction force from the main body receiving beam 9, and as shown in (d), After the mast 5 is fixed to a predetermined floor (for example, the N-2 floor) by extending 6, the main body receiving beam 9 is retracted, and the crane main body 3 is pushed up by the climbing mechanism 10 by taking a reaction force from the mast 5. To raise.
[0018]
As described above, the climbing crane of the present embodiment can perform climbing by substantially the same operation as the conventional floor climbing type climbing crane, but includes the connecting member 8 below the crane main body 3. Since the main body receiving beam 9 is provided, and the crane main body 3 can be temporarily supported on a floor lower than the top floor via the main body receiving beam 9, the climbing can be performed. When applied to the construction of a building, it is possible to temporarily support the crane main body 3 on the floor where the concrete strength has already sufficiently developed, and therefore, in the early stage where the frame strength of the top floor has not sufficiently developed. Climbing can be performed at the stage, and therefore, even in the construction of RC buildings, which was difficult to adopt in the past, Similarly, it is possible to adopt a floor climbing type of climbing crane without any trouble of.
[0019]
FIG. 3 shows an example of the mast receiving beam 6. This is a frame having a main beam 6a, a cross beam 6b, and an X beam 6c, each of which is mainly made of a steel material, and a lower end of the mast 5 is connected to a center portion (intersection of the X beam 6c). It has become so. The mast receiving beam 6 is provided with an outrigger 6d which is rotatable in a horizontal plane and is foldable at an end of the main beam 6a. The outrigger 6d is deployed as shown by a solid line in FIG. The entire mast receiving beam 6 and the mast 5 erected therefrom are stably supported by the mast receiving beam 6 and the mast 5 is lifted and lowered by engaging with the constructed beam 20. As shown by the broken line, by folding the outrigger 6d inward, interference with the beam 20 can be avoided without any trouble.
[0020]
The beam 20 supporting the outrigger 6d may be appropriately reinforced if necessary. In any case, it is preferable to support the outrigger 6d at a position as close to the column 21 as possible. Is provided at the end of the beam, and as shown in (c), depending on the span length of the beam 20 supporting the outrigger 6d, an expansion member 6e of an appropriate length is interposed at the joint portion so that the cross beam can be interposed. It is preferable that the entire length of the beam 6b is adjustable, so that it can be stably supported on the pillar irrespective of the beam span, and can be diverted to other sites having different beam spans. Of course, such length adjustment by the expansion member 6e may be performed on the main beam 6a.
[0021]
FIG. 4 shows an example of the main body receiving beam 9. This is a frame having a main beam 9a and a horizontal beam 9b as a main body. A mast 5 is inserted through the center of the frame so as to be able to move up and down relatively. The crane main body 3a is mounted via the portal frame 9c. In this main body receiving beam 9, similarly to the case of the above-mentioned mast receiving beam 6, an end portion of the main beam 9a is provided with an outrigger 9d which is rotatable in a horizontal plane and is foldable. By deploying the 9d and engaging with the constructed beam 20, the entire body receiving beam 9 and the entire crane body 3 mounted thereon can be stably supported by the constructed beam 20, and the crane body When raising and lowering the main body receiving beam 9 together with 3, the outrigger 9d can be folded to avoid interference with the beam 20.
[0022]
By adopting the mast receiving beam 6 and the main body receiving beam 9 as described above, it is possible to stably support the entire climbing crane and easily climb by expanding and folding the outriggers 6d and 9d by a simple operation. Needless to say, the mast receiving beam 6 and the main body receiving beam 9 are simply provided with the outriggers 6d and 9d which can be freely folded, so that the configuration is sufficiently simple and therefore can be manufactured at a low cost. Can be applied to buildings of various spans, and can be widely used in other buildings.
[0023]
In the above-described embodiment, the crane main body 3 is supported by the main body receiving beam 9 on the floor immediately below the uppermost floor (N floor) (N-1 floor) during climbing. By adjusting the height, it is also possible to support the crane main body 3 on the lower floor (for example, the N-2 floor). Further, the present invention is practically and optimally applied to the construction of an RC building, but does not hinder the adoption of an SRC building or an S building if necessary.
[0024]
Of course, the present invention is not limited to the illustrated embodiment, and the mast receiving beam 6, the main body receiving beam 9, the outrigger 6d, the outrigger 9d, the climbing mechanism 10, and other specific configurations can be appropriately designed and changed. Needless to say, For example, in the above-described embodiment, the outriggers 6d and 9d are of a foldable type, but various types of outriggers, such as an extendable type that expands outward and contracts inward, can be employed. Further, in the above embodiment, the length of the mast receiving beam 6 is variable by interposing the expansion member 6e at a key point, but the configuration for making the mast receiving beam 6 variable is appropriate. Of course, not only the mast receiving beam 6 but also the main body receiving beam 9 may have a variable length with the same configuration or another configuration.
[0025]
【The invention's effect】
According to the climbing crane according to the first aspect of the present invention, it is possible to perform climbing while supporting the crane main body on a floor lower than the top floor. Climbing is possible, and therefore, it is possible to apply the present invention to an RC building, which was difficult to adopt in the past.
[0026]
According to the climbing crane of the second aspect of the present invention, since the mast receiving beam and the main body receiving beam having the foldable outrigger are employed, the mast receiving beam and the main body receiving beam can be stably supported by the mast receiving beam and the main body receiving beam, and can be easily operated by a simple operation. And the configuration can be sufficiently simplified.
[0027]
According to the climbing crane according to the third aspect of the present invention, the length of the mast receiving beam and / or the main body receiving beam is made variable by interposing the expansion member on either or any of the mast receiving beam and the main body receiving beam. By doing so, it is possible to stably support the column, and it is possible to divert it to another site where the beam span is different.
[0028]
According to the climbing method of the fourth aspect of the present invention, by employing the above-described climbing crane, it is possible to use a floor climbing type climbing crane without hindrance even when constructing an RC building.
[Brief description of the drawings]
FIG. 1 is a schematic configuration diagram of a climbing crane according to an embodiment of the present invention.
FIG. 2 is a diagram showing a climbing method.
FIG. 3 is a diagram showing an example of a mast receiving beam.
FIG. 4 is a diagram showing an example of a main body receiving beam.
FIG. 5 is a schematic view of a conventional mast climbing type climbing crane.
FIG. 6 is a schematic view of a conventional floor climbing type climbing crane.
FIG. 7 is a diagram showing a climbing step.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Building 3 Crane main body 5 Mast 6 Mast receiving beam 6d Outrigger 6e Expansion member 8 Connecting member 9 Main body receiving beam 9d Outrigger 10 Climbing mechanism 11 Gripping mechanism 12 Jack 20 Beam (body)

Claims (4)

高層建物を施工するに際して施工済みの躯体に設置され、施工進捗に伴って順次上方へ盛り替えられていくクライミングクレーンであって、下端部がマスト受け梁を介して施工済みの躯体に支持されて立設されるマストと、
マストに対して相対的に昇降可能とされかつ本体受け梁を介して施工済みの躯体の最上階よりも下層の階に対して支持可能なクレーン本体と、
クレーン本体に設置され、クレーン本体を本体受け梁を介して躯体に対して支持した状態でマストをクレーン本体に対して上昇させ、かつマストをマスト受け梁を介して躯体に支持した状態でクレーン本体をマストに対して上昇させるためのクライミング機構とを具備してなることを特徴とするクライミングクレーン。
A climbing crane that is installed on a constructed skeleton when constructing a high-rise building and is gradually re-arranged upward as the construction progresses. A mast to be erected,
A crane main body that can be raised and lowered relatively to the mast and that can be supported via a main body receiving beam on a floor lower than the top floor of the constructed skeleton,
The mast is installed on the crane main body, and the mast is raised with respect to the crane main body with the crane main body supported via the main body receiving beam, and the crane main body is supported with the mast supported on the main body via the mast receiving beam. A climbing mechanism for raising the cranes with respect to the mast.
請求項1記載のクライミングクレーンにおいて、マスト受け梁はマストとともに昇降可能とされ、本体受け梁はクレーン本体とともに昇降可能とされ、それらマスト受け梁および本体受け梁は、いずれも水平面内において回動可能とされた折り畳み自在のアウトリガーを有し、それらアウトリガーを展開させた状態で施工済みの梁により支持可能とされ、かつアウトリガーを内側に折り畳んだ状態で梁との干渉を回避して昇降可能とされていることを特徴とするクライミングクレーン。2. The climbing crane according to claim 1, wherein the mast receiving beam is movable up and down together with the mast, and the main body receiving beam is movable up and down together with the crane main body, and both the mast receiving beam and the main body receiving beam are rotatable in a horizontal plane. Foldable outriggers that can be supported by the installed beams with the outriggers expanded, and can be raised and lowered by avoiding interference with the beams when the outriggers are folded inward A climbing crane characterized by: 請求項1または2記載のクライミングクレーンにおいて、マスト受け梁および本体受け梁の双方もしくは少なくとも一方は、要所に適宜長さの拡張部材が介装されることでその長さが可変とされていることを特徴とするクライミングクレーン。The climbing crane according to claim 1 or 2, wherein at least one of the mast receiving beam and the main body receiving beam is variable in length by appropriately interposing an expanding member of an appropriate length at a key point. A climbing crane characterized by that: 高層建物を施工するに際して、マストに対してクレーン本体が相対的に昇降可能なクライミングクレーンを用い、そのクライミングクレーンを施工済みの躯体に設置して施工進捗に伴い順次上方へ盛り替えていくためのクライミングクレーンのクライミング方法であって、
クライミングに際しては、クレーン本体を施工済みの躯体の最上階よりも下層の階に対して支持した状態でマストをクレーン本体に対して上昇させ、マストの下端部をクレーン本体を支持している階よりも下層の階において躯体に対して支持した後、クレーン本体をマストに対して上昇させることを特徴とするクライミングクレーンのクライミング方法。
When constructing a high-rise building, use a climbing crane that allows the crane body to move up and down relatively to the mast. A climbing crane climbing method,
When climbing, raise the mast with respect to the crane body while supporting the crane body on the floor below the top floor of the constructed skeleton, and lower the mast from the floor supporting the crane body. Climbing the crane body with respect to the mast after supporting the cranes on the lower floor, and climbing the crane.
JP2003156993A 2002-06-03 2003-06-02 Climbing crane Expired - Lifetime JP4322559B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003156993A JP4322559B2 (en) 2002-06-03 2003-06-02 Climbing crane

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2002161663 2002-06-03
JP2003156993A JP4322559B2 (en) 2002-06-03 2003-06-02 Climbing crane

Publications (2)

Publication Number Publication Date
JP2004059321A true JP2004059321A (en) 2004-02-26
JP4322559B2 JP4322559B2 (en) 2009-09-02

Family

ID=31949255

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003156993A Expired - Lifetime JP4322559B2 (en) 2002-06-03 2003-06-02 Climbing crane

Country Status (1)

Country Link
JP (1) JP4322559B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007050968A (en) * 2005-08-18 2007-03-01 Kajima Corp Earthquake resisting structure for crane base using sliding member
JP2010254477A (en) * 2010-08-23 2010-11-11 Sumitomo Mitsui Construction Co Ltd Method and tool for supporting climbing crane
CN116873784A (en) * 2023-09-07 2023-10-13 上海建工一建集团有限公司 Integral formwork system and inner climbing tower crane collaborative lifting equipment and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007050968A (en) * 2005-08-18 2007-03-01 Kajima Corp Earthquake resisting structure for crane base using sliding member
JP2010254477A (en) * 2010-08-23 2010-11-11 Sumitomo Mitsui Construction Co Ltd Method and tool for supporting climbing crane
CN116873784A (en) * 2023-09-07 2023-10-13 上海建工一建集团有限公司 Integral formwork system and inner climbing tower crane collaborative lifting equipment and method
CN116873784B (en) * 2023-09-07 2023-11-07 上海建工一建集团有限公司 Integral formwork system and inner climbing tower crane collaborative lifting equipment and method

Also Published As

Publication number Publication date
JP4322559B2 (en) 2009-09-02

Similar Documents

Publication Publication Date Title
JP2023164952A (en) Heavy object movement device and heavy object movement method using the heavy object movement device
JP2010265727A (en) Method for demolishing building using floor climbing type tower crane
JP2009091123A (en) Crane for steel tower
JP5914203B2 (en) Disassembly method, disassembly assistance device
JP2004059321A (en) Climbing crane and its climbing method
JP2002356297A (en) Steel tower constructing crane and steel tower construction method using crane
JPH0571225A (en) Temporarily set roof of complete weather type
WO2011150488A1 (en) Mobile stage
JPH10280543A (en) Construction method of dome-like roof
JP4504747B2 (en) Building construction method using tower crane
JP2618171B2 (en) Telescopic strut
JPH0932120A (en) Method of construction of structure
JP6037826B2 (en) Climbing method and revolving structure fixing gantry
JP2575571B2 (en) Automatic beam reinforcement device under load of temporary machine
JP2009007129A (en) Climbing crane
JP4352219B2 (en) Crane equipment
JP3328790B2 (en) High-rise building assembly method
JPH09137506A (en) Construction method of building
JP2000192551A (en) Construction method for large span frame
JP3553370B2 (en) Work stage device for steel tower construction and steel tower construction method
JP6953161B2 (en) Climbing crane masts, climbing cranes and building construction methods
JP4571760B2 (en) Building construction method
JP3785742B2 (en) Steel tower construction method for steel tower supported chimney
JPH05179707A (en) Manufacture of truss and construction of dome with truss
JP2002114485A (en) Tower crane and floor climbing system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060320

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081106

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081111

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090113

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090507

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090603

R150 Certificate of patent or registration of utility model

Ref document number: 4322559

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120612

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120612

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120612

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120612

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130612

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130612

Year of fee payment: 4

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130612

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term