JPH0932120A - Method of construction of structure - Google Patents

Method of construction of structure

Info

Publication number
JPH0932120A
JPH0932120A JP17991395A JP17991395A JPH0932120A JP H0932120 A JPH0932120 A JP H0932120A JP 17991395 A JP17991395 A JP 17991395A JP 17991395 A JP17991395 A JP 17991395A JP H0932120 A JPH0932120 A JP H0932120A
Authority
JP
Japan
Prior art keywords
lift
steel
block
roof structure
lifted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP17991395A
Other languages
Japanese (ja)
Inventor
Toshiyuki Kawazoe
俊之 川添
Mitsuo Miura
光男 三浦
Takashi Sato
孝 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tomoe Corp
Original Assignee
Tomoe Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tomoe Corp filed Critical Tomoe Corp
Priority to JP17991395A priority Critical patent/JPH0932120A/en
Publication of JPH0932120A publication Critical patent/JPH0932120A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To shorten the term of works, and to reduce cost by removing a temporary support column and a supporter while simplifying and miniaturizing a lift-up device when a structure such as a large space structure. a building, etc., is built by a method of lift-up construction. SOLUTION: Steel-framed columns bearing roof structures A are built under a lowest state while lift-up devices 1 capable of being lifted by themselves are assembled into the steel-framed column lower structures B0 . The roof structures A are assembled and constructed to the upper sections of the masts 2 of the lift-up devices 1, and the roof structures A are elevated by the lift-up devices 1. Steel-framed column blocks (b) are inserted and extended on the steel-framed column lower structures B0 under the lifted roof structures, and lift-up corresponding to one block by the lift-up devices 1 and extension at the upper places of the steel-framed column blocks (b) are repeated successively, thus gradually building the structures while elevating the roof structures A.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、スポーツ施設や
イベント施設などに適用される大空間構造物、あるいは
ビルなどの構造物をリフトアップ工法で構築する構築工
法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for constructing a large space structure applied to sports facilities, event facilities or the like, or a structure such as a building by a lift-up method.

【0002】[0002]

【従来の技術】この種の構造物を構築するには、屋根構
造物を地上近くで組立て構築した後、上昇させる工法が
採用されている。図6に示すのは、従来の大空間構造物
を構築する例であり、図6(a)においては、構築すべ
き構造物の外側に仮設の支持柱50を設置し、この支持
柱50の上部突出部にジャッキ51を配設し、ジャッキ
51のステップバー52の下端を屋根構造物Aに連結
し、ステップバー52を尺取り式にジャッキアップする
ことにより屋根構造物Aを所定高さまでリフトアップし
ている。リフトアップ後に支持柱50の内側に本設の鉄
骨柱Bを構築して屋根構造物Aを支持する。
2. Description of the Related Art In order to construct this type of structure, a construction method is employed in which a roof structure is assembled and constructed near the ground and then raised. FIG. 6 shows an example of constructing a conventional large space structure. In FIG. 6 (a), a temporary support column 50 is installed outside the structure to be constructed, and The jack 51 is arranged on the upper protruding portion, the lower end of the step bar 52 of the jack 51 is connected to the roof structure A, and the step bar 52 is jacked up to lift the roof structure A to a predetermined height. Is up. After the lift-up, a steel frame pillar B is built inside the support pillar 50 to support the roof structure A.

【0003】図6(b)においては、鉄骨柱Bの構築位
置の内側にリフトアップ装置60を設置し、このリフト
アップ装置60の構柱部材61の上で屋根構造物Aを組
立て構築した後、リフトアップ装置60により屋根構造
物Aをプッシュアップしている。プッシュアップに際し
ては、ステップロッド63をジャッキ62でジャッキア
ップし、次いでタワー61の下部に構柱部材ブロックを
継ぎ足し、これを繰り返すことにより、屋根構造物Aを
所定高さまでプッシュアップしている。プッシュアップ
後にリフトアップ装置60の外側に本設の鉄骨柱Bを構
築して屋根構造物Aを支持する。
In FIG. 6 (b), after the lift-up device 60 is installed inside the building position of the steel frame pillar B, the roof structure A is assembled and built on the column member 61 of the lift-up device 60. The roof structure A is pushed up by the lift-up device 60. At the time of push-up, the step rod 63 is jacked up by the jack 62, and then the pillar member block is added to the lower part of the tower 61, and this is repeated, whereby the roof structure A is pushed up to a predetermined height. After the push-up, a steel frame pillar B is built outside the lift-up device 60 to support the roof structure A.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、前述の
従来工法の場合、仮設の支持柱50あるいはリフトアッ
プ装置60を本設の鉄骨柱Bとは別に設置し、また構築
後にはこれらを撤去しなければならず、構築作業に時間
がかかり、またコストもアップする問題がある。
However, in the case of the above-mentioned conventional method, the temporary support pillar 50 or the lift-up device 60 must be installed separately from the main steel pillar B, and these must be removed after construction. However, there is a problem that the construction work takes time and the cost increases.

【0005】さらに、ジャッキ51のステップバー52
あるいは構柱部材61の長さが長くなり、この点でもコ
ストがかかる。
Further, the step bar 52 of the jack 51
Alternatively, the column member 61 becomes long, which is also costly.

【0006】この発明は、前述のような問題点を解消す
べくなされたもので、その目的は、大空間構造物あるい
はビルなどの構造物をリフトアップ工法により構築する
に際し、従来の仮設の支持部材や支持装置を無くすこと
ができると共に、リフトアップ装置を簡易で小型の装置
とすることができ、工期の短縮およびコストダウンを図
れる構造物の構築工法を提供することにある。
The present invention has been made to solve the above-mentioned problems, and an object thereof is to support conventional temporary construction when constructing a large space structure or a structure such as a building by a lift-up method. An object of the present invention is to provide a method for constructing a structure that can eliminate members and supporting devices, can use a lift-up device as a simple and small device, and can shorten the construction period and reduce the cost.

【0007】[0007]

【課題を解決するための手段】本発明は、屋根構造物を
支持する支持構造体(大空間構造物の鉄骨柱やビルの下
部構造など)を最も低い状態に構築すると共に、この下
部支持構造体内に自昇可能なリフトアップ装置を組み込
み、このリフトアップ装置のマスト上部に屋根構造物を
組立て構築し、前記リフトアップ装置により前記屋根構
造体を上昇させ、上昇した屋根構造体の下で前記下部支
持構造体の上に支持構造体ブロック(鉄骨柱ブロックあ
るいはビル構造体ブロックなど)を継ぎ足し、リフトア
ップ装置による1ブロック分のリフトアップ,支持構造
体ブロックの上部位置での継足しを順次繰り返すことに
より、屋根構造物を上昇させつつ構造物を構築していく
ことを特徴とする。
SUMMARY OF THE INVENTION According to the present invention, a support structure for supporting a roof structure (such as a steel column of a large space structure or a substructure of a building) is constructed in the lowest state and the lower support structure is constructed. A self-elevable lift-up device is incorporated in the body, a roof structure is assembled and constructed on the mast of the lift-up device, the roof structure is lifted by the lift-up device, and the roof structure is lifted under the lifted roof structure. A support structure block (steel column block or building structure block, etc.) is added on top of the lower support structure, lift-up for one block by a lift-up device, and addition at the upper position of the support structure block are sequentially repeated. By doing so, the structure is constructed while raising the roof structure.

【0008】従来のような仮設の支持柱や支持装置など
を構築あるいは設置することなく、本設の鉄骨柱等の支
持構造体を利用して屋根構造物のリフトアップを行なう
ことができ、また簡易で小型のリフトアップ装置により
屋根構造物のリフトアップと鉄骨柱等の支持構造体の構
築を行うことができる。
[0008] The roof structure can be lifted up by using a supporting structure such as a steel column, which is permanently installed, without constructing or installing a temporary supporting column or a supporting device as in the prior art. With a simple and small lift-up device, it is possible to lift-up a roof structure and construct a support structure such as a steel column.

【0009】[0009]

【発明の実施の形態】以下、この発明を図示する実施例
に基づいて説明する。図1〜図4は、競技場などの大空
間構造物に適用した例、図5はビルに適用した例であ
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the illustrated embodiments. 1 to 4 are examples applied to a large space structure such as a stadium, and FIG. 5 is an example applied to a building.

【0010】図2,図3に示すように、大空間構造物
は、円形などの屋根構造物Aと、これを外周部分で支持
する複数の鉄骨柱Bと、下部躯体Cなどからなり、本発
明では、図1に示すように、鉄骨柱Bの必要最低限の下
部構造B0 を組立て構築すると共に、この鉄骨柱下部構
造B0 内にリフトアップ装置1を組み込み、このリフト
アップ装置1のマスト2の上部に屋根構造物Aを組立て
構築し、このリフトアップ装置1により屋根構造体Aを
上昇させ、上昇した屋根構造体Aの下で下部構造B0
上に鉄骨柱ブロックbを挿入して継ぎ足し、リフトアッ
プ装置1の1ブロック分の自昇,鉄骨柱ブロックbの上
部位置での挿入継足しを順次繰り返す。
As shown in FIGS. 2 and 3, the large space structure is composed of a roof structure A having a circular shape, a plurality of steel columns B for supporting the roof structure A at the outer peripheral portion thereof, a lower frame C, and the like. In the invention, as shown in FIG. 1, a minimum required substructure B 0 of the steel column B is assembled and constructed, and the lift-up device 1 is incorporated in the steel-column lower structure B 0 , and the lift-up device 1 The roof structure A is assembled and constructed on the upper part of the mast 2, the roof structure A is raised by the lift-up device 1, and the steel column block b is inserted under the raised roof structure A on the lower structure B 0. Then, the self-elevation for one block of the lift-up device 1 and the insertion and addition at the upper position of the steel column block b are sequentially repeated.

【0011】鉄骨柱ブロックbは、リフトアップ装置1
のリフトアップストロークに対応した高さとし、また図
4に示すように、左右に2つ割りの構造として組み付け
後に接合端部どうしを溶接やボルトにより接合可能とし
ている。リフトアップ装置1は、図1に示すように、マ
スト2と、可動固定ビーム3と、上部固定ビーム4と、
下部固定ビーム5と、リフトアップジャッキ6と、吊上
げ材(ステップバー)7からなる。
The steel column block b is a lift-up device 1
4 has a height corresponding to the lift-up stroke, and as shown in FIG. 4, the joining end portions can be joined together by welding or bolts after the assembling is made into two left and right structures. As shown in FIG. 1, the lift-up device 1 includes a mast 2, a movable fixed beam 3, an upper fixed beam 4,
It is composed of a lower fixed beam 5, a lift-up jack 6, and a hoisting material (step bar) 7.

【0012】上部固定ビーム4および下部固定ビーム5
は、マスト2の上部,下部にそれぞれ固定され、可動固
定ビーム3は、上部固定ビーム4と下部固定ビーム5と
の間でマスト2に対して昇降可能に設けられる。図4に
示すように、可動固定ビーム3は、マスト2を取り囲む
形状でマスト2の側面を転動する案内ローラ3cを内側
に有する基部リング3bと、この基部リング3bから水
平に突出する4つの梁部3aからなる。上部固定ビーム
4および下部固定ビーム5は、4つの梁部4a,5aを
直接マスト2に固定して構成されている。
Upper fixed beam 4 and lower fixed beam 5
Are fixed to the upper and lower parts of the mast 2, respectively, and the movable fixed beam 3 is provided between the upper fixed beam 4 and the lower fixed beam 5 so as to be movable up and down with respect to the mast 2. As shown in FIG. 4, the movable fixed beam 3 includes a base ring 3b having a guide roller 3c that rolls on the side surface of the mast 2 and surrounds the mast 2, and four base rings 3b that horizontally project from the base ring 3b. The beam portion 3a. The upper fixed beam 4 and the lower fixed beam 5 are configured by directly fixing the four beam portions 4a, 5a to the mast 2.

【0013】リフトアップジャッキ6は、可動固定ビー
ム3の4つの梁部3aの上面に設置し、吊上げ材7は、
リフトアップジャッキ6に対応させて上部固定ビーム4
と下部固定ビーム5間に配設し、リフトアップジャッキ
6の伸長により吊上げ材7を上昇させることで、上下部
固定ビーム4・5およびマスト2を可動固定ビーム3に
対してジャッキアップし、吊上げ材7に対してリフトア
ップジャッキ6を収縮させることで、マスト2に対して
可動固定ビーム3をジャッキアップする。
The lift-up jack 6 is installed on the upper surfaces of the four beam portions 3a of the movable fixed beam 3, and the lifting material 7 is
Upper fixed beam 4 corresponding to lift-up jack 6
Between the lower fixed beam 5 and the lower fixed beam 5, and by lifting the lifting material 7 by extending the lift-up jack 6, the upper and lower fixed beams 4 and 5 and the mast 2 are jacked up to the movable fixed beam 3 and lifted. By contracting the lift-up jack 6 with respect to the material 7, the movable fixed beam 3 is jacked up with respect to the mast 2.

【0014】リフトアップジャッキ6はセンターホール
ジャッキなどとし、吊上げ材7をチャック機構により把
持可能とする。あるいは、吊上げ材7には多数のピン孔
を穿設しておき、リフトアップジャッキ6の可動部材に
設けたピンを前記ピン孔に挿脱する方式とする。また、
鉄骨柱ブロックbの内面には、図4に示すように、梁部
3a,4aあるいは5aの先端を挟持可能な案内ブラケ
ット10を突設し、この案内ブラケット10に上下方向
に一定のピッチ(少なくとも1ジャッキアップストロー
ク分)で係合孔11を穿設しておく。一方、梁部3a,
4aあるいは5aの先端部には、案内ブラケット10に
向かって突出可能な支持ピン12を設け、この支持ピン
12を係合孔11に手動あるいは自動で挿脱可能とす
る。
The lift-up jack 6 is a center hole jack or the like, and the lifting material 7 can be held by a chuck mechanism. Alternatively, the lifting member 7 may be provided with a large number of pin holes, and the pins provided on the movable member of the lift-up jack 6 may be inserted into and removed from the pin holes. Also,
As shown in FIG. 4, a guide bracket 10 is provided on the inner surface of the steel column block b so that the tip of the beam portion 3a, 4a or 5a can be held between the guide bracket 10 and the guide bracket 10. The engagement hole 11 is formed by one jack-up stroke). On the other hand, the beam portion 3a,
A support pin 12 that can project toward the guide bracket 10 is provided at the tip of 4a or 5a, and this support pin 12 can be inserted into or removed from the engagement hole 11 manually or automatically.

【0015】なお、各ビーム3・4・5を鉄骨柱ブロッ
クbへ固定する構造としては、前述の案内ブラケット1
0の係合孔11と支持ピン12に限らず、図4(d)に
示すように、鉄骨柱ブロックbの内面に突起20を上下
方向に一定のピッチで突設し、この突起20の上に枕木
部材21を介して梁部3a,4aあるいは5aの先端を
載置するようにしてもよい。
As a structure for fixing each of the beams 3, 4 and 5 to the steel column block b, the guide bracket 1 described above is used.
As shown in FIG. 4D, not only the engagement holes 11 and the support pins 12 of 0, but also the projections 20 are provided on the inner surface of the steel column block b in the vertical direction at a constant pitch. Alternatively, the tips of the beam portions 3a, 4a or 5a may be placed via the sleeper member 21.

【0016】このようなリフトアップ装置1において、
例えば上下固定ビーム4・5を上昇させる場合には、可
動固定ビーム3を支持ピン12を介して鉄骨柱ブロック
bに固定した状態で、リフトアップジャッキ6により吊
上げ材7を上昇させ、1ジャッキアップストローク分上
昇した上下固定ビーム4・5を支持ピン12を介して鉄
骨柱ブロックbに固定し、次いで案内ブラケット10に
支持された可動固定ビーム3の支持ピン12の係合を外
してリフトアップジャッキ6を収縮させる。以上の工程
を順次繰り返すことにより、上下固定ビーム4・5を尺
取り式に上昇させる。このジャッキアップを複数回繰り
返すことにより、上下固定ビーム4・5が1鉄骨柱ブロ
ック分だけリフトアップすることになる。
In such a lift-up device 1,
For example, when the vertically fixed beams 4 and 5 are lifted, the lifting member 7 is lifted by the lift-up jack 6 while the movable fixed beam 3 is fixed to the steel column block b via the support pin 12, and one jack-up is performed. The upper and lower fixed beams 4 and 5 raised by the stroke are fixed to the steel column block b via the support pin 12, and then the support pin 12 of the movable fixed beam 3 supported by the guide bracket 10 is disengaged to lift up the jack. Shrink 6 By repeating the above steps in sequence, the upper and lower fixed beams 4 and 5 are lifted in a lengthwise manner. By repeating this jacking up a plurality of times, the upper and lower fixed beams 4 and 5 are lifted up by one steel column block.

【0017】また、可動固定ビーム3を上昇させる場合
にも、同様の複数回のジャッキアップを繰り返すことに
より、1鉄骨柱ブロック分だけリフトアップする。な
お、可動固定ビーム3および上下固定ビーム4・5のリ
フトアップは前述したジャッキと吊上げ材に限らず、ウ
インチとワイヤロープによる方式などでもよい。
Also, when the movable fixed beam 3 is raised, by repeating the same jacking up a plurality of times, one steel column block is lifted up. The lift-up of the movable fixed beam 3 and the upper and lower fixed beams 4 and 5 is not limited to the jack and the lifting material described above, but may be a method using a winch and a wire rope.

【0018】なお、上下固定ビーム4,5間には吊上げ
材7が配置固定され、吊上げ材7にはリフトアップジャ
ッキ6を介し可動固定ビーム3が配置されているが、吊
上げ材7を補強するものとして上下固定ビーム4,5間
に補強部材が設けられる場合もある。
A hoisting member 7 is arranged and fixed between the upper and lower fixed beams 4 and 5, and a movable fixed beam 3 is arranged on the hoisting member 7 via a lift-up jack 6, but the hoisting member 7 is reinforced. In some cases, a reinforcing member may be provided between the upper and lower fixed beams 4 and 5.

【0019】以上のような構成において、次のような手
順で大空間構造物の構築が行われる(図1参照)。
With the above structure, a large space structure is constructed by the following procedure (see FIG. 1).

【0020】(1) 鉄骨柱ブロックb0 (この実施例の場
合、3つ)を基礎面上に積み重ねて鉄骨柱下部構造B0
を構築すると同時に、この鉄骨柱下部構造B0 内にリフ
トアップ装置1を設置する。上部固定ビーム4は最上部
の鉄骨柱ブロックb0 の上部に固定し、下部固定ビーム
5は最下部の鉄骨柱ブロックb0 の下部に固定し、可動
固定ビーム3は中間の鉄骨柱ブロックb0 の上部に固定
し、この状態でマスト2の最上部の上に屋根構造物Aを
組立て構築する。
(1) Steel column blocks b 0 (three in this embodiment) are stacked on the foundation surface to form a steel column lower structure B 0.
At the same time as the construction, the lift-up device 1 is installed in the steel column lower structure B 0 . The upper fixed beam 4 is fixed to the upper part of the uppermost steel pillar block b 0 , the lower fixed beam 5 is fixed to the lower part of the lowermost steel pillar block b 0 , and the movable fixed beam 3 is fixed to the middle steel pillar block b 0. The roof structure A is assembled and constructed on the uppermost part of the mast 2 in this state.

【0021】(2) この状態から上下固定ビーム4・5の
固定を外し、前述したリフトアップジャッキ6による複
数回のジャッキアップで、上下固定ビーム4・5,マス
ト2および屋根構造物Aを1鉄骨柱ブロック分だけ上昇
させる。下部固定ビーム5を最下部の鉄骨柱ブロックb
0 の上部に固定する。
(2) From this state, the upper and lower fixed beams 4 and 5 are unfixed, and the upper and lower fixed beams 4.5 and the mast 2 and the roof structure A are removed by jacking the lift-up jack 6 a plurality of times. Raise only the steel column block. The lower fixed beam 5 is attached to the lowermost steel column block b.
Fix at the top of 0 .

【0022】(3) マスト2あるいは上部固定ビーム4に
設けた天井走行クレーンなどを用いて、鉄骨柱ブロック
1 を吊り上げ、鉄骨柱下部構造B0 の上に挿入し、鉄
骨柱ブロックb1 と鉄骨柱下部構造B0 とを溶接または
ボルトで接合し、上部固定ビーム4を新しく取付けられ
た鉄骨柱ブロックb1 の上部に固定する。
(3) Using an overhead traveling crane or the like provided on the mast 2 or the upper fixed beam 4, the steel column block b 1 is lifted up and inserted onto the steel column lower structure B 0 , and the steel column block b 1 The steel column lower structure B 0 is welded or bolted to fix the upper fixing beam 4 to the upper portion of the newly installed steel column block b 1 .

【0023】(4) 可動固定ビーム3の固定を外し、リフ
トアップジャッキ6による複数回のジャッキアップで、
可動固定ビーム3のみを1鉄骨柱ブロック分だけ上昇さ
せる。
(4) The movable fixed beam 3 is unfixed, and the lift-up jack 6 is used to jack up a plurality of times.
Only the movable fixed beam 3 is raised by one steel column block.

【0024】可動固定ビーム3を最上部の鉄骨柱ブロッ
クb0 の上部に固定する。
The movable fixed beam 3 is fixed to the upper part of the uppermost steel column block b 0 .

【0025】(5) 以下、(2) (3) の工程を繰り返すこと
により、自昇するリフトアップ装置1により鉄骨柱ブロ
ックbが順次鉄骨柱上部に継ぎ足され、鉄骨柱Bが構築
されると共に、屋根構造物Aが所定の設計高さまで上昇
する。屋根構造物Aを鉄骨柱Bに連結し、リフトアップ
装置1を撤去することにより、大空間構造物が完成す
る。
(5) By repeating the steps (2) and (3) below, the steel pillar blocks b are successively added to the upper parts of the steel pillars by the lift-up device 1 that self-rises, and the steel pillars B are constructed. , The roof structure A rises to a predetermined design height. A large space structure is completed by connecting the roof structure A to the steel column B and removing the lift-up device 1.

【0026】次に、図5に示すビルの場合にも、リフト
アップ装置1を使用して同様に構築することができる。
この場合も、下部構造体B0'を組立て構築すると共に、
この下部構造体B0'の外周部分における角部および中間
部にリフトアップ装置1を組み込み、このリフトアップ
装置1のマスト2の上部に屋根構造物A’を組立て構築
し、このリフトアップ装置1により屋根構造体A' を上
昇させ、上昇した屋根構造体A’の下で下部構造体B0'
の上にブロックb’を継ぎ足し、リフトアップ装置1に
よる1ブロック分の自昇,ブロックb’の上部位置での
継足しを順次繰り返してビルを構築する。
Next, also in the case of the building shown in FIG. 5, the lift-up device 1 can be used to construct the same.
In this case also, the lower structure B 0 'is assembled and constructed, and
The lift-up device 1 is incorporated in the corners and the middle part of the outer peripheral portion of the lower structure B 0 ′, and the roof structure A ′ is assembled and constructed on the upper part of the mast 2 of the lift-up device 1. The roof structure A'is raised by the lower structure B 0 'under the raised roof structure A'.
The block b'is added to the top of the building, the self-elevation of one block by the lift-up device 1 and the addition at the upper position of the block b'are repeated sequentially to construct a building.

【0027】なお、ビル躯体は、鉄骨とプレキャストコ
ンクリート,またはRC構造もしくはSRC構造であ
り、1ブロック分の鉄骨あるいは鉄筋を継ぎ足しなが
ら、1ブロック分のPC板を取付け、あるいは1ブロッ
ク分のコンクリート打設を行うことになる。
The building frame is a steel frame and precast concrete, or an RC structure or an SRC structure. One block of PC board is attached while one block of steel frame or rebar is added, or one block of concrete is poured. Will be set up.

【0028】[0028]

【発明の効果】前述の通り、この発明は、本設の鉄骨柱
等の支持構造体を利用して屋根構造体をリフトアップ
し、本設の鉄骨柱等の支持構造体内を自昇するリフトア
ップ装置により支持構造体ブロックを上部位置で継ぎ足
すようにしたため、次のような効果を奏する。
As described above, according to the present invention, the roof structure is lifted up by using the supporting structure such as the main steel column, and the lift is self-elevated in the supporting structure such as the main steel column. Since the supporting structure block is replenished at the upper position by the up device, the following effects are obtained.

【0029】(1) 本設の鉄骨柱等の支持構造体を利用し
て屋根構造物をリフトアップすることができ、従来のよ
うな仮設の支持柱や支持装置をを無くすことができると
共に、屋根構造物のリフトアップと同時に構造物を構築
することができ、工期の短縮とコストダウンを図ること
ができる。
(1) A roof structure can be lifted up by using a supporting structure such as a steel frame column that is permanently installed, and it is possible to eliminate a temporary supporting column and a supporting device as in the prior art. The structure can be constructed at the same time as the roof structure is lifted up, and the construction period can be shortened and the cost can be reduced.

【0030】(2) リフトアップ装置を簡易で小型の装置
とすることができ、施工設備のコストダウンを図ること
ができる。
(2) The lift-up device can be a simple and small device, and the cost of construction equipment can be reduced.

【0031】(3) 構築された屋根構造物の下でのリフト
アップ作業であるので、雨天でも作業が行われ、工期短
縮が図れる。
(3) Since the lift-up work is performed under the constructed roof structure, the work can be performed even in rainy weather and the construction period can be shortened.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明に係る構造物の構築工法を工程順に示
す断面図である。
FIG. 1 is a sectional view showing a method of constructing a structure according to the present invention in the order of steps.

【図2】この発明に係る大空間構造物の一例を示す平面
図である。
FIG. 2 is a plan view showing an example of a large space structure according to the present invention.

【図3】図2の大空間構造物の構築工法の概略を順に示
す断面図である。
3A to 3C are cross-sectional views sequentially showing the outline of the construction method for the large space structure in FIG.

【図4】この発明に係るリフトアップ装置の詳細であ
り、(a)は可動固定ビーム部分の横断面図、(b)は
上部または下部の固定ビーム部分を示す横断面図、
(c)は可動固定ビーム部分の縦断面図、(d)はビー
ム梁部と鉄骨柱ブロックとの固定方式の他の例を示す横
断面図である。
FIG. 4 is a detail of the lift-up device according to the present invention, in which (a) is a cross-sectional view of a movable fixed beam portion, (b) is a cross-sectional view showing an upper or lower fixed beam portion,
(C) is a vertical cross-sectional view of a movable fixed beam portion, and (d) is a horizontal cross-sectional view showing another example of the method of fixing the beam beam portion and the steel column block.

【図5】この発明に係る構造物の構築工法をビルに適用
した例を示す斜視図である。
FIG. 5 is a perspective view showing an example in which the structure construction method according to the present invention is applied to a building.

【図6】従来の構築工法を示す断面図であり、(a)は
ジャッキとステップバーによるリフトアップ工法、
(b)はリフトアップ装置によるプッシュアップ工法で
ある。
FIG. 6 is a cross-sectional view showing a conventional construction method, in which (a) is a lift-up method using a jack and a step bar,
(B) is a push-up construction method using a lift-up device.

【符号の説明】[Explanation of symbols]

A…屋根構造物、B…鉄骨柱、B0 …鉄骨柱下部構造、
b…鉄骨柱ブロック、1…リフトアップ装置、2…マス
ト、3…可動固定ビーム、4…上部固定ビーム、5…下
部固定ビーム、6…リフトアップジャッキ、7…吊上げ
材、10…案内ブラケット、11…係合孔、12…支持
ピン。
A ... Roof structure, B ... Steel column, B0 ... Steel column lower structure,
b ... Steel column block, 1 ... Lift up device, 2 ... Mast, 3 ... Movable fixed beam, 4 ... Upper fixed beam, 5 ... Lower fixed beam, 6 ... Lift up jack, 7 ... Lifting material, 10 ... Guide bracket, 11 ... Engagement hole, 12 ... Support pin.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 屋根構造物を支持する支持構造体を最も
低い状態に構築すると共に、この下部支持構造体内に自
昇可能なリフトアップ装置を組み込み、このリフトアッ
プ装置のマスト上部に屋根構造物を組立て構築し、前記
リフトアップ装置により前記屋根構造体を上昇させ、上
昇した屋根構造体の下で前記下部支持構造体の上に支持
構造体ブロックを継ぎ足し、リフトアップ装置による1
ブロック分のリフトアップ,支持構造体ブロックの上部
位置での継足しを順次繰り返すことにより、屋根構造物
を上昇させつつ構造物を構築していくことを特徴とする
構造物の構築工法。
1. A support structure for supporting a roof structure is constructed in the lowest state, a self-elevating lift-up device is incorporated in the lower support structure, and the roof structure is provided on a mast of the lift-up device. By assembling and constructing the roof structure, the roof structure is lifted by the lift-up device, and a support structure block is added on the lower support structure under the lifted roof structure.
A structure construction method characterized by constructing a structure while raising the roof structure by sequentially repeating the lifting up of blocks and the addition of blocks at the upper position of the support structure block.
JP17991395A 1995-07-17 1995-07-17 Method of construction of structure Pending JPH0932120A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17991395A JPH0932120A (en) 1995-07-17 1995-07-17 Method of construction of structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17991395A JPH0932120A (en) 1995-07-17 1995-07-17 Method of construction of structure

Publications (1)

Publication Number Publication Date
JPH0932120A true JPH0932120A (en) 1997-02-04

Family

ID=16074112

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17991395A Pending JPH0932120A (en) 1995-07-17 1995-07-17 Method of construction of structure

Country Status (1)

Country Link
JP (1) JPH0932120A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012184588A (en) * 2011-03-06 2012-09-27 Kajima Corp Lifting and lowering method and system of multistoried building
CN104060843A (en) * 2014-07-08 2014-09-24 七冶建设有限责任公司 Inversion construction method for ultra-large roof system
CN105507599A (en) * 2015-12-04 2016-04-20 中冶建工集团有限公司 Construction method using planar herringbone smallest assembled rigid unit structures to weld net shell structure
CN109440942A (en) * 2018-12-12 2019-03-08 中国三冶集团有限公司 A kind of factory building roof rack mounting structure and construction technology
CN110565903A (en) * 2019-09-12 2019-12-13 中建八局第二建设有限公司 construction method of large air pipe in steel structure net rack
KR102394812B1 (en) * 2021-02-09 2022-05-09 최필주 Method for constructing precast flat slab

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012184588A (en) * 2011-03-06 2012-09-27 Kajima Corp Lifting and lowering method and system of multistoried building
CN104060843A (en) * 2014-07-08 2014-09-24 七冶建设有限责任公司 Inversion construction method for ultra-large roof system
CN105507599A (en) * 2015-12-04 2016-04-20 中冶建工集团有限公司 Construction method using planar herringbone smallest assembled rigid unit structures to weld net shell structure
CN109440942A (en) * 2018-12-12 2019-03-08 中国三冶集团有限公司 A kind of factory building roof rack mounting structure and construction technology
CN109440942B (en) * 2018-12-12 2023-11-14 中国三冶集团有限公司 Installation structure and construction process of factory building roof grid
CN110565903A (en) * 2019-09-12 2019-12-13 中建八局第二建设有限公司 construction method of large air pipe in steel structure net rack
KR102394812B1 (en) * 2021-02-09 2022-05-09 최필주 Method for constructing precast flat slab

Similar Documents

Publication Publication Date Title
JP2009073599A (en) Supporting structure of tower crane and climbing method
CA3132733A1 (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
JPH0932120A (en) Method of construction of structure
JP3732586B2 (en) Method and apparatus for constructing steel structure
JP6736226B2 (en) Structure and construction method of the structure constructed on the tower-shaped building
JP2018096163A (en) Method of constructing building
JPH10280543A (en) Construction method of dome-like roof
JPH04161566A (en) Constructing apparatus for large space building
JP3981469B2 (en) Construction method of concrete structure
JP2618171B2 (en) Telescopic strut
JP3425352B2 (en) Self-elevating formwork device
JP2000192551A (en) Construction method for large span frame
CN212001918U (en) Upright post mounting structure
JPH09137506A (en) Construction method of building
JP3660657B2 (en) Construction method of viaduct
JPH06101348A (en) Method for constructing tower
JP3368483B2 (en) Bridge pier construction method
JP3553370B2 (en) Work stage device for steel tower construction and steel tower construction method
JPH0431412Y2 (en)
JP2590671B2 (en) Construction method of steel frame using overhead crane frame
CN111155715A (en) Upright post mounting structure
JP3139854B2 (en) Collapse prevention frame
JP2696486B2 (en) Building construction method
JP3715378B2 (en) Automatic roof raising device and method of building a building by raising the roof
JP3416759B2 (en) Underground structure frame building equipment