JP2003281196A - Device connection management system - Google Patents

Device connection management system

Info

Publication number
JP2003281196A
JP2003281196A JP2002085333A JP2002085333A JP2003281196A JP 2003281196 A JP2003281196 A JP 2003281196A JP 2002085333 A JP2002085333 A JP 2002085333A JP 2002085333 A JP2002085333 A JP 2002085333A JP 2003281196 A JP2003281196 A JP 2003281196A
Authority
JP
Japan
Prior art keywords
connection
information
line
cable
identification code
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002085333A
Other languages
Japanese (ja)
Other versions
JP4170000B2 (en
JP2003281196A5 (en
Inventor
Akira Sugiyama
陽 杉山
Masaki Fujimura
昌樹 藤村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2002085333A priority Critical patent/JP4170000B2/en
Publication of JP2003281196A publication Critical patent/JP2003281196A/en
Publication of JP2003281196A5 publication Critical patent/JP2003281196A5/ja
Application granted granted Critical
Publication of JP4170000B2 publication Critical patent/JP4170000B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a device connection management system for managing the connection status of lines in making isolation of a system and connection test for the system in wiring work or the like. <P>SOLUTION: This device connection management system is composed of a plurality of computers network-connected to perform connection management for a line between devices of various facilities and a database for storing data. The system includes a wiring work planning means for collecting laying, disconnection, connection and removal information on the lines according to the current data and a change of modified data of an elementary wiring diagram showing the operation and connection of the devices, l, and dividing the information including the information on laying, disconnection, connection and removal of the lines into items by each line and listed to create a construction work drawing and store the same in a database. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、工場や発電所等
各種プラント、施設において各種制御盤間や機器間を接
続するケーブルや配管の接続管理を行う機器接続管理シ
ステムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a device connection management system for managing connection of cables and pipes connecting various control panels and devices in various plants and facilities such as factories and power plants.

【0002】[0002]

【従来の技術】各種プラントにおいては多数の制御盤、
機器等を設置してあることから、これらの間に接続され
るケーブルや配管等(以下ライン)の数は極めて多く、こ
れらのラインの接続管理は大変煩雑な作業である。
2. Description of the Related Art In various plants, a large number of control panels,
Since the devices and the like are installed, the number of cables and pipes (hereinafter referred to as lines) connected between them is extremely large, and connection management of these lines is a very complicated work.

【0003】そこで従来、例えば特開平9−20443
5号公報に開示されているように、ゲーブルに貼り付け
るバーコードシールを発行しその情報をデータベースに
蓄積しておき、ゲーブルに貼り付けられたバーコードシ
ールを読み取り、これに基づきデータベースを検索する
ことによりケーブルの識別や配線情報の管理に使用する
装置があった。
Therefore, conventionally, for example, Japanese Unexamined Patent Publication No. 9-20443.
As disclosed in Japanese Patent Publication No. 5, a gable-attached barcode sticker is issued, the information is accumulated in a database, the barcode sticker attached to the gable is read, and the database is searched based on this. Therefore, there was a device used for cable identification and wiring information management.

【0004】またさらに、特開平11−31178号公
報には同様にして配線データをデータベースに格納し、
配線作業指示、作業の確認、進捗状況把握に利用してい
るものがあった。
Further, in Japanese Patent Laid-Open No. 11-31178, wiring data is similarly stored in a database,
Some were used for wiring work instructions, confirmation of work, and grasp of progress.

【0005】[0005]

【発明が解決しようとする課題】しかしながら従来のこ
の種のケーブル管理システムでは、ケーブルすなわちラ
インに直接係わる事項の管理のみしか行われておらず、
より拡張された機器接続管理が求められている。
However, in the conventional cable management system of this kind, only management of matters directly related to the cable, that is, the line is performed,
More advanced device connection management is required.

【0006】この発明は上記の課題を解消するためにな
されたもので、配線工事等の際の該系統の隔離(電気系
統であれば電源隔離)、あるいは系統の接続試験(電気系
統であれば回路試験)等を行う際のラインの接続状況の
管理等も合わせて行う機器接続管理システムを提供する
ことを目的とする。
The present invention has been made in order to solve the above-mentioned problems, and it is the isolation of the system at the time of wiring work (the power source is isolated if it is an electrical system) or the connection test of the system (if it is an electrical system. It is an object of the present invention to provide a device connection management system that also manages the connection status of lines when performing (circuit testing), etc.

【0007】[0007]

【課題を解決するための手段】上記の目的に鑑み、この
発明は、各種施設の機器間のラインの接続管理を行うネ
ットワーク接続された複数のコンピュータとデータを蓄
積するデータベースからなる機器接続管理システムであ
って、機器の動作、つながりを示す展開接続図の現在の
データと改装データの変化を基にラインの布設・解線・
結線・撤去情報を収集して、各ライン毎に上記ラインの
布設・解線・結線・撤去の情報を含む情報を複数の項目
に分けてリスト化された工事図面を作成してデータベー
スに格納する配線工事計画手段を備えたことを特徴とす
る機器接続管理システムにある。
In view of the above-mentioned object, the present invention provides a device connection management system comprising a plurality of network-connected computers for managing the connection of lines between devices of various facilities and a database for accumulating data. However, based on the changes in the current data and the refurbishment data of the expansion connection diagram showing the operation and connection of the equipment, the laying / disconnection of the line /
Collect wiring / removal information, create information on each line including information on installation / disconnection / connection / removal of the above line into multiple items, create a construction drawing listed, and store it in the database. The equipment connection management system is characterized by having a wiring work planning means.

【0008】また、機能試験のためにラインで接続され
た機器の一部を切り離す隔離の確認を行うために、上記
展開接続図の図面上で指定された隔離部分の機器を抽出
し、これらの抽出された機器に対して識別コード付電源
隔離札を発行する識別コード付電源隔離札発行手段をさ
らに備えたことを特徴とする。
Further, in order to confirm the isolation for disconnecting a part of the equipment connected by the line for the function test, the equipment of the isolated portion specified on the drawing of the above expansion connection diagram is extracted and these It is characterized by further comprising a power supply separation tag with an identification code for issuing a power supply separation tag with an identification code to the extracted device.

【0009】また、ラインおよびこれが接続する機器に
接続相手を照合するために貼り付けられ、これらの読み
取り入力が照合されるライン毎の接続識別コードを上記
リスト化された工事図面に含み、上記展開接続図から収
集されたラインの布設・解線・結線・撤去情報と共に使
用して作業の可否を決める配線管理手段をさらに備えた
ことを特徴とする。
Further, a connection identification code for each line, which is attached to a line and a device to which it is connected to verify the connection partner, and whose read input is verified, is included in the construction drawings listed above, and is expanded as described above. It is characterized by further comprising a wiring management means for deciding whether or not the work can be performed by using the information on the laying / disconnection / connection / removal of the line collected from the connection diagram.

【0010】また、上記リスト化された工事図面が機能
試験のための試験実施予定日程の情報を含むことを特徴
とする。
Further, the construction drawings listed above include information on a scheduled test implementation schedule for a functional test.

【0011】[0011]

【発明の実施の形態】なお以下では説明を分かり易くす
るために、工場における電気系統のケーブルの機器間の
接続管理を例に挙げて説明する。 実施の形態1.図1はこの発明の一実施の形態による機
器接続管理システムの構成を示す図である。図において
10はプラント建設・管理会社で、設計部門、工事部
門、試験部門のそれぞれのパーソナルコンピュータ等の
コンピュータ(PC)11〜13、および後述するライン
管理を行うためのデータが蓄積格納されるデータベース
(D/B)14がLAN等により接続されている。20は
電力会社、21はこの電力会社20の電力会社PCであ
る。30a,30bは工場や発電所等のプラントであ
り、プラント30a内にはプラントの建設や改装(更新)
工事に使用される現場PC30a(複数台でもよい)が示
されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS In order to make the description easy to understand, connection management between devices of electric system cables in a factory will be described below as an example. Embodiment 1. FIG. 1 is a diagram showing the configuration of a device connection management system according to an embodiment of the present invention. In the figure, reference numeral 10 denotes a plant construction / management company, which is a database in which computers (PCs) 11 to 13 such as personal computers of the design department, the construction department, and the test department, and data for performing line management described later are accumulated and stored.
(D / B) 14 is connected by a LAN or the like. Reference numeral 20 is a power company, and 21 is a power company PC of the power company 20. 30a and 30b are plants such as factories and power plants, and the plant 30a is constructed and refurbished (updated).
A site PC 30a (a plurality of PCs may be used) used for construction is shown.

【0012】そしてプラント建設・管理会社10、電力
会社20、プラント30a、30bの各PCは通信ネッ
トワーク40を介して通信可能である。また、現場PC
としてセルフォン、携帯電話、PHS、モバイルコンピ
ュータ等を含む携帯情報端末51を使用してもよく、そ
の場合には携帯情報端末用ネットワーク50を介して通
信が行われる。
The PCs of the plant construction / management company 10, the electric power company 20, and the plants 30a and 30b can communicate with each other via the communication network 40. Also, on-site PC
As the mobile information terminal 51 including a cell phone, a mobile phone, a PHS, a mobile computer, etc., may be used, and in that case, communication is performed via the mobile information terminal network 50.

【0013】以下、新設プラントの建設時の機器接続管
理システムの動作を図2に示すフローチャートに従って
説明する(枠のない部分はシステム以下の作業を示す)。
新設プラント設計、あるいは新設盤(制御盤等の各種
盤)、新設機器の設置工事の発注があると、設計部門で
は設計部門PC11により、例えば図3の(a)に示す展
開接続図(盤、機器の動作やつながりを示した図面)およ
び図3の(b)に示す結線図(盤、機器のケーブル接続位
置および各ケーブルの情報を示した図面)の作成が行わ
れ、これがD/B14に格納される(1001)。
The operation of the equipment connection management system at the time of construction of a new plant will be described below with reference to the flow chart shown in FIG. 2 (a portion without a frame indicates work below the system).
When there is an order for designing a new plant, installing a new board (various boards such as a control board), or installing new equipment, the design department PC 11 in the design department, for example, the development connection diagram (board, board shown in FIG. 3A). A drawing showing the operation and connection of the equipment) and a wiring diagram (drawing showing the board, the cable connection position of the equipment and the information of each cable) shown in Fig. 3 (b) are created, and this is shown in D / B14. It is stored (1001).

【0014】例えばケーブル番号AAAのケーブルは図
3の(a)に示すように端子台X21、X22間に接続さ
れ、図3の(b)に示すようにケーブル番号AAAのケー
ブルは2芯で、一端の線AAA1が端子台X21の3番
の端子、線AAA2が端子台X21の4番の端子、他端
の線AAA1が端子台X22の10番の端子、線AAA
2が端子台X22の9番の端子にそれぞれ接続されるこ
とを示し、かつ各ケーブルの種類、サイズ、芯数等のケ
ーブル情報が含まれている。
For example, the cable with the cable number AAA is connected between the terminal blocks X21 and X22 as shown in FIG. 3A, and the cable with the cable number AAA is two cores as shown in FIG. 3B. The line AAA1 at one end is the third terminal of the terminal block X21, the line AAA2 is the fourth terminal of the terminal block X21, the line AAA1 at the other end is the tenth terminal of the terminal block X22, and the line AAA.
2 indicates that each is connected to the 9th terminal of the terminal block X22, and includes cable information such as the type, size, and number of cores of each cable.

【0015】工事部門では工事部門PC12により、D
/B14に格納された展開接続図および結線図を読み出
し(1003)、これらのデータに基づき、ケーブル番号
を元に、各ケーブルの接続先等の情報をリスト化した工
事図面を作成して格納する(1005)。展開接続図およ
び結線図には所定の領域に所定の種類の情報が記載され
ているため、例えば展開接続図からケーブルを特定して
このケーブルに関する各情報を展開接続図および結線図
から読み出してリスト化する。以降、展開接続図、結線
図および工事図面の情報はリンクされる。
In the construction department, the construction department PC 12
Read out the developed connection diagram and connection diagram stored in / B14 (1003), and based on these data, create and store a construction drawing that lists information such as the connection destination of each cable based on the cable number. (1005). Since the expansion connection diagram and connection diagram contain information of a predetermined type in a predetermined area, for example, a cable is specified from the expansion connection diagram, and each information related to this cable is read from the expansion connection diagram and connection diagram and listed. Turn into. After that, information on the development connection diagram, connection diagram, and construction drawing will be linked.

【0016】工事図面は例えば図4に示すようにケーブ
ル情報、接続先、接続識別コード、状態情報、作業情報
等の項目からなる。ケーブル情報には、「ケーブル種
類」「ケーブルサイズおよび芯数」「電力・制御・計装
等の回路区分」等が含まれ、接続先には、「既設接続部
の機器名称および機器番号」「新規接続先の機器名称お
よび機器番号」「新規接続先情報」「既設接続部の端子
台番号」「新規接続先の端子台番号」「ケーブルの発線
地および着線地」等が含まれ、接続識別コードには「ケ
ーブルの各線毎の接続を示すコード」等が含まれ、状態
情報には「接続・解線・撤去状態」「電源隔離日程」等
が含まれ、作業情報には「新規布設・解線・結線・撤去
の区分」「作業日程」等が含まれる。なお、これらには
後述する改装時の場合も考慮したものも含まれている。
The construction drawing is composed of items such as cable information, connection destination, connection identification code, status information, work information, etc. as shown in FIG. The cable information includes "cable type", "cable size and number of cores", "circuit classification such as electric power / control / instrumentation", etc., and the connection destination is "device name and device number of existing connection part"" Includes the device name and device number of the new connection destination, "new connection destination information", "terminal block number of existing connection part", "terminal block number of new connection destination", "source and destination of cable", etc. The connection identification code includes "a code indicating each connection of each cable", etc., the status information includes "connection / disconnection / removal status""power supply isolation schedule", and the work information includes "new Includes the categories of installation / disconnection / connection / removal ”and“ work schedule ”. Note that these include items that have been taken into consideration when remodeling as described below.

【0017】次に、工事図面の情報より新設盤、機器、
ケーブルに貼り付ける接続識別コードのシールあるいは
タグ等を作成して発行し、これらは図4のリストに接続
識別コードとして蓄積される(1007)。なお接続識別
コードはケーブルとこれと接続する各種盤や機器の端子
台の端子や内部の内線を特定するものであればいかなる
形式のものでもよい。
Next, from the information of the construction drawings, the new installation board, equipment,
A sticker or tag of the connection identification code to be attached to the cable is created and issued, and these are stored as the connection identification code in the list of FIG. 4 (1007). The connection identification code may be of any type as long as it identifies the cable and the terminals of the terminal block of various boards and devices connected to the cable and the internal extension.

【0018】なお、以下では説明を煩雑にしないために
基本的に各種盤、機器を含めて機器とし、また端子台の
概念を省略し、内線や他のケーブルを含めた意味で端子
とし、ケーブルと端子の接続として説明する。
In the following, in order not to make the description complicated, the various boards and devices are basically included in the equipment, and the concept of the terminal block is omitted, and the terminals include extension lines and other cables. Will be described as the connection of the terminals.

【0019】次に設計部門では新設機器を製作し、これ
に接続識別コードのシールを貼り付けるが、この際、P
Cに接続されたコードリーダ等(特に図示せず)で作業員
の操作により読み取られた接続識別コードに従って該機
器の情報を表示させ、機器を確認した上で接続識別コー
ドシールを貼り付けるようにしてもよい(1009)。こ
の場合、図4に示す上記ケーブル番号に基づくリスト
(工事図面)に対応する、機器番号に基づくリスト(工事
図面)を同様にして作成してD/B14に格納してお
く。
Next, in the design department, a new device is manufactured, and a seal of the connection identification code is attached to this, and at this time, P
The information of the device is displayed according to the connection identification code read by the operator's operation with a code reader or the like (not particularly shown) connected to C, and the connection identification code sticker is attached after confirming the device. Yes (1009). In this case, the list based on the above cable numbers shown in FIG.
A list (construction drawing) corresponding to (construction drawing) based on the device number is similarly created and stored in the D / B 14.

【0020】次に新設機器およびケーブルがプラント等
の現場に搬入され建設作業が行われる。現場では新設さ
れるケーブルに接続識別コードのシールを貼り付ける
が、この際、現場PC31あるいは携帯情報端末51に
接続されたコードリーダ等(特に図示せず)で作業員の操
作により読み取られた接続識別コードに従って上記D/
B14の情報を検索して該ケーブルの情報を表示させ、
ケーブルを確認した上で接続識別コードシールを貼り付
けるようにしてもよい(1011)。
Next, the new equipment and cables are carried into a site such as a plant for construction work. At the site, the seal of the connection identification code is attached to the newly installed cable, but at this time, the connection read by the operator's operation with a code reader (not shown) connected to the site PC 31 or the portable information terminal 51. D / according to the identification code
Search the information of B14 and display the information of the cable,
The connection identification code sticker may be attached after checking the cable (1011).

【0021】次に、実際にケーブルと機器を接続する
際、作業員の操作により読み取られた接続するケーブル
と機器の接続識別コードを入力し(1013)、D/B1
4に格納された図4に示すケーブル番号を元にしたリス
ト(工事図面)に基づき、接続識別コードの照合を行い
(1015)、一致すればケーブルの接続を行い、そうで
なければ再度、読み取られた接続識別コードの入力を行
う。そして一致がみられない場合いは、例えば設計部門
あるいは工事部門に差し戻す。またこの際、布設・解線
・結線・撤去を示す作業情報を合わせて照合に使用して
もよい。
Next, when the cable and the device are actually connected, the connection identification code of the cable to be connected and the device read by the operation of the operator is input (1013), and the D / B1 is entered.
Check the connection identification code based on the list (construction drawing) based on the cable numbers shown in Fig. 4 stored in 4.
(1015) If they match, the cable is connected, and if not, the read connection identification code is input again. If no match is found, send it back to, for example, the design department or the construction department. At this time, work information indicating installation, disconnection, connection, and removal may be combined and used for collation.

【0022】接続が完了されたケーブルと機器は再度、
接続識別コードが作業員の操作により読み取られこれを
入力し(1017)、図4のリストの情報(接続識別コー
ド、接続先、状態情報、作業情報)が記入、変更、更新
され、接続実績として蓄積される(1019)。
Once the cable and equipment have been connected,
The connection identification code is read by the operator's operation and input (1017), and the information (connection identification code, connection destination, status information, work information) in the list of FIG. 4 is entered, changed or updated, and the connection record is obtained. It is accumulated (1019).

【0023】次にAに進み、試験部門は現場で接続試験
を行うが、その前に現場PC31あるいは携帯情報端末
51を使用して接続実績確認を行う。試験員から試験項
目が入力されると、該試験における接続確認箇所を図4
のリスト(工事図面)の情報で確認して接続完了判断をし
結果を表示する(1021)。この際、例えば図5に示す
ような各試験項目に対するケーブル番号や接続識別コー
ドで示された接続・隔離確認箇所の関係を示す試験用接
続・隔離確認テーブルを予めD/B14に格納してお
き、ケーブル番号や接続識別コードで検索された図4の
リストの状態情報等から接続完了判断をし結果を表示す
る。
Next, proceeding to A, the test department conducts a connection test on site, but before that, the connection performance is confirmed using the site PC 31 or the portable information terminal 51. When the test items are entered by the test staff, the connection confirmation points in the test are shown in FIG.
After confirming the information in the list (construction drawing), it is judged that the connection is completed and the result is displayed (1021). At this time, for example, a test connection / separation confirmation table showing a relationship between connection / separation confirmation points indicated by cable numbers or connection identification codes for each test item as shown in FIG. 5 is stored in the D / B 14 in advance. , The connection completion judgment is made from the status information in the list of FIG.

【0024】そして表示された結果から、該試験回路の
接続が完了していれば試験員は現場試験を実施し、完了
されていなければ例えば試験員が工事部門に接続確認を
依頼する。
From the displayed result, if the connection of the test circuit is completed, the tester performs a field test, and if not completed, the tester requests the construction department to confirm the connection.

【0025】次に、改装工事の解線までの機器接続管理
システムの動作を図6に示すフローチャートに従って説
明する(枠のない部分はシステム以下の作業を示す)。改
装工事の発注があると、設計部門では設計部門PC11
により、例えば図3の(a)に示す展開接続図および図3
の(b)に示す結線図の更新が行われ、これがD/B14
に格納される(1023)。
Next, the operation of the device connection management system up to the breaking of the renovation work will be described with reference to the flowchart shown in FIG. 6 (the parts without a frame indicate the work below the system). When there is an order for renovation work, the design department PC11
By using, for example, the expansion connection diagram shown in FIG.
The wiring diagram shown in (b) is updated and this is D / B14.
(1023).

【0026】工事部門では工事部門PC12により、D
/B14に格納された展開接続図および結線図を読み出
し(1025)、これらのデータに基づき、図4のリスト
化した工事図面を作成あるいは更新して格納する(10
27)。そして後述する実際の改装工事に使用するもの
として、改装される部分だけのリストを別途作成するよ
うにしてもよい。展開接続図の現在のデータと改装デー
タの変化、差異を基に新規布設・解線・結線・撤去ケー
ブルを自動収集してリスト化することが可能である。こ
れは作業情報となる。上記新設の場合は全てが新規敷設
となる。
In the construction department, the construction department PC 12
The expansion connection diagram and the connection diagram stored in / B14 are read (1025), and based on these data, the construction drawings listed in FIG. 4 are created or updated and stored (1025).
27). Then, a list of only parts to be refurbished may be separately created for use in the actual refurbishment work described later. It is possible to automatically collect and list new laying / disconnection / connection / removal cables based on changes and differences between the current data of the development connection diagram and the refurbishment data. This is work information. In the case of the above new construction, all will be new construction.

【0027】次に、工事図面の情報より改装機器、ケー
ブルに貼り付ける接続識別コードのシールあるいはタグ
等を作成して発行し、これらは図4のリストに接続識別
コードとして蓄積される(1029)。
Next, a refurbished device, a seal or a tag of a connection identification code to be attached to the cable is created and issued from the information of the construction drawing, and these are stored in the list of FIG. 4 as the connection identification code (1029). .

【0028】次に設計部門では改装機器を製作し、これ
に接続識別コードのシールを貼り付けるが、この際、コ
ードリーダで作業員の操作により読み取られた接続識別
コードに従って該機器の情報を表示させ、機器を確認し
た上で接続識別コードシールを貼り付けるようにしても
よい(1031)。この場合、機器番号に基づく図4のよ
うなリスト(工事図面)を同様にして作成してD/B14
に格納しておく。
Next, in the design department, a refurbished device is manufactured, and a sticker of the connection identification code is attached to the refurbished device. At this time, the information of the device is displayed according to the connection identification code read by the operator by the code reader. Then, after confirming the device, the connection identification code sticker may be attached (1031). In this case, a list (construction drawing) based on the device number as shown in FIG.
Stored in.

【0029】次に改装工事を行う際に、プラント建設会
社は電力会社にプラントの改装部分の電源隔離を依頼す
る。そこで電力会社20は電力会社PC21においてD
/B14の展開接続図、結線図、改装用工事図面を参考
に、例えば展開接続図上で隔離部分を指定すると(10
33)、これに対応する部分のスイッチ等の機器が抽出
され、指定に基づき抽出された機器(スイッチ等を含む)
に識別コード付電源隔離札が作成され発行される(10
35)。そして隔離の際には、電力会社職員等の電源隔
離の係員が電源隔離を行う操作スイッチを操作し識別コ
ード付電源隔離札を取り付ける。
Next, when performing the renovation work, the plant construction company requests the electric power company to isolate the power source of the refurbished part of the plant. Therefore, the electric power company 20 uses D on the electric power company PC 21.
/ B14 Referring to the expansion connection diagram, connection diagram, and renovation construction drawing, for example, specify the isolated part on the expansion connection diagram (10
33), devices corresponding to this, such as switches, are extracted and extracted based on the designation (including switches)
A power supply isolation tag with an identification code is created and issued in (10
35). At the time of isolation, a power source isolation staff member such as an electric power company operator operates an operation switch for power isolation, and attaches a power source isolation tag with an identification code.

【0030】スイッチ操作後、PCに接続されたコード
リーダ等(現場PC31あるいは携帯情報端末51に接
続されたコードリーダあるいはこれに相当するもの)で
電力会社職員の操作により読み取られた隔離済スイッチ
の隔離札の識別コードを入力し、隔離実績として例えば
図4の対応する部分の状態情報として蓄積される(10
37)。なお、隔離部分を指定するステップ1033
で、電源隔離日程を入力するようにし、隔離実績蓄積の
際に電源隔離日程が合わせて蓄積されるようにしてもよ
い。
After the switch operation, the isolated switch read by the operator of the power company by a code reader or the like connected to the PC (code reader connected to the field PC 31 or the portable information terminal 51 or equivalent) is operated. The identification code of the quarantine tag is input, and the quarantine record is stored as the status information of the corresponding part of FIG. 4 (10
37). It should be noted that step 1033 of designating the isolated part
Then, the power source isolation schedule may be input, and the power source isolation schedule may be accumulated together when the isolation record is accumulated.

【0031】電源隔離が終了すると、プラントの現場で
工事部門の作業員によりケーブルの解線が行われる。ま
ず現場PC31あるいは携帯情報端末51に接続された
コードリーダ等(特に図示せず)で作業員の操作により読
み取られた解線するケーブルの接続識別コードが入力さ
れ(1039)、回路毎およびケーブル毎の隔離完了判定
およびその判定結果の表示が行われる。そして隔離完了
と判定されれば作業員によりケーブルの解線が行われ、
電源隔離が完了していなければ電力会社に電源隔離の確
認および再隔離を依頼する。(1041)。隔離完了判定
は例えば図7に示したような各回路(複数のケーブル)、
各ケーブルに対するケーブル番号や接続識別コードで示
された接続・隔離確認箇所の関係を示す隔離用接続・隔
離確認テーブルを予めD/B14に格納しておき、ケー
ブル番号や接続識別コードで検索された図4のリストの
状態情報等から隔離完了判定をし結果を表示する。
When the power source isolation is completed, the cable is disconnected by the worker in the construction department at the plant site. First, the connection identification code of the cable to be unloaded, which is read by the operator's operation with a code reader (not particularly shown) connected to the on-site PC 31 or the portable information terminal 51, is input (1039), and each circuit and each cable The isolation completion determination and the result of the determination are displayed. And if it is judged that the isolation is completed, the worker will disconnect the cable,
If the power source isolation has not been completed, ask the power company to confirm the power source isolation and re-isolate it. (1041). The isolation completion determination is performed by each circuit (plural cables) as shown in FIG. 7,
A connection / separation confirmation table for isolation indicating the relationship between the connection / separation confirmation points indicated by the cable number or connection identification code for each cable is stored in the D / B 14 in advance, and the cable number or connection identification code is searched. The quarantine completion judgment is made from the status information of the list of FIG. 4 and the result is displayed.

【0032】解線が完了されたケーブルと機器は再度、
接続識別コードが作業員の操作により読み取られこれを
入力し(1043)、図4のリストの情報(接続識別コー
ド、接続先、状態情報、作業情報)が記入、変更、更新
され、解線実績として蓄積される(1045)。
For the cables and devices whose disconnection has been completed,
The connection identification code is read by the operator's operation and input (1043), and the information (connection identification code, connection destination, status information, work information) in the list of FIG. Is stored as (1045).

【0033】次に、改装工事の解線以降の機器接続管理
システムの動作を図8に示すフローチャートに従って説
明する(枠のない部分はシステム以下の作業を示す)。改
装工事に係わる機器およびケーブルがプラント等の現場
に搬入され改装作業が行われる。現場では改装されるケ
ーブルに接続識別コードのシールを貼り付けるが、この
際、現場PC31あるいは携帯情報端末51に接続され
たコードリーダ等(特に図示せず)で作業員の操作により
読み取られた接続識別コードに従って上記D/B14の
情報を検索して該ケーブルの情報を表示させ、ケーブル
を確認した上で接続識別コードシールを貼り付けるよう
にしてもよい(1047)。
Next, the operation of the device connection management system after disconnection of the renovation work will be described with reference to the flow chart shown in FIG. 8 (the parts without a frame indicate the work below the system). The equipment and cables involved in the renovation work are brought into the site such as a plant and the renovation work is performed. At the site, the sticker of the connection identification code is attached to the cable to be refurbished, but at this time, the connection read by the operator's operation with a code reader (not shown) connected to the site PC 31 or the portable information terminal 51. The information of the D / B 14 may be searched according to the identification code to display the information of the cable, and the connection identification code sticker may be attached after confirming the cable (1047).

【0034】次に、実際にケーブルと機器を接続する
際、作業員の操作により読み取られた接続するケーブル
と機器の接続識別コードを入力し(1049)、D/B1
4に格納された図4に示すケーブル番号を元にしたリス
ト(工事図面)に基づき、接続識別コードの照合を行い
(1051)、一致すればケーブルの接続を行い、そうで
なければ再度、読み取られた接続識別コードの入力を行
う。そして一致がみられない場合いは、例えば設計部門
あるいは工事部門に差し戻す。またこの際、布設・解線
・結線・撤去を示す作業情報を合わせて照合に使用して
もよい。
Next, when the cable and the device are actually connected, the connection identification code of the cable to be connected and the device read by the operation of the operator is input (1049), and D / B1
Check the connection identification code based on the list (construction drawing) based on the cable numbers shown in Fig. 4 stored in 4.
(1051) If they match, the cable is connected, and if not, the read connection identification code is input again. If no match is found, send it back to, for example, the design department or the construction department. At this time, work information indicating installation, disconnection, connection, and removal may be combined and used for collation.

【0035】接続が完了したケーブルと機器は再度、接
続識別コードが作業員の操作により読み取られこれを入
力し(1053)、図4のリストの情報(接続識別コー
ド、接続先、状態情報、作業情報)が記入、変更、更新
され、接続実績として蓄積される(1055)。
The connection identification code of the connected cable and device is read again by the operation of the operator and is input (1053), and the information (connection identification code, connection destination, status information, work) of the list of FIG. 4 is input. (Information) is entered, changed, updated, and accumulated as a connection record (1055).

【0036】次に試験部門は現場で接続試験を行うが、
その前に現場PC31あるいは携帯情報端末51を使用
して接続実績確認を行う。試験員から試験項目が入力さ
れると、該試験における接続確認箇所を図4のリスト
(工事図面)の情報で確認して接続完了判断をし結果を表
示する(1057)。この際、例えば図5に示すような各
試験項目に対するケーブル番号や接続識別コードで示さ
れた接続確認箇所の関係を示す試験用接続確認テーブル
を予めD/B14に格納しておき、ケーブル番号や接続
識別コードで検索された図4のリストの状態情報等から
接続完了判断をし結果を表示する。
Next, the test department conducts a connection test on site,
Before that, the connection record is confirmed using the on-site PC 31 or the portable information terminal 51. When the test items are entered by the tester, the connection confirmation points in the test are listed in Fig. 4.
After confirming the information of (construction drawing), it is judged that the connection is completed and the result is displayed (1057). At this time, for example, a test connection confirmation table showing the relationship between the cable numbers and connection confirmation points indicated by the connection identification code for each test item as shown in FIG. It is judged that the connection is completed based on the status information in the list of FIG. 4 searched by the connection identification code and the result is displayed.

【0037】そして表示された結果から、該試験回路の
接続が完了していれば試験員は現場試験を実施し、完了
されていなければ例えば試験員が工事部門に接続確認を
依頼する。
From the displayed result, if the connection of the test circuit is completed, the tester conducts a field test, and if not, for example, the tester requests the construction department to confirm the connection.

【0038】試験が終了すると電力会社に回路の復旧を
依頼し、電力会社は隔離回路スイッチの復旧を行い、ス
イッチ操作後、PCに接続されたコードリーダ等(現場
PC31あるいは携帯情報端末51に接続されたコード
リーダあるいはこれに相当するもの)で係員の操作によ
り読み取られた復旧済スイッチの隔離札の識別コードを
入力し、復旧実績として例えば図4の対応する部分の状
態情報として蓄積される(1059)。そして復旧された
スイッチの隔離札が取り外される。
Upon completion of the test, the electric power company is requested to restore the circuit, the electric power company restores the isolated circuit switch, and after the switch operation, a code reader or the like connected to the PC (connected to the field PC 31 or the portable information terminal 51). The identification code of the isolated tag of the restored switch read by the operator's operation is input with a code reader (or a code reader equivalent thereto), and is stored as the restoration record, for example, as the status information of the corresponding portion in FIG. 4 ( 1059). Then, the isolated tag of the restored switch is removed.

【0039】なお、作業情報の一部としてあるいは図4
のリストに別途項目を追加して、試験実施予定日程およ
び試験対象のエリアの情報を試験員が入力して蓄積する
ことにより、ネットワークを介して試験日程を迅速にに
把握することが可能となる。
As a part of the work information or in FIG.
It is possible to quickly grasp the test schedule via the network by adding a separate item to the list of the above and allowing the test staff to input and store information on the planned test schedule and the area under test. .

【0040】なお、上記実施の形態では工場における電
気系統のケーブルの機器間の接続管理を例に挙げて説明
したが本願はこれに限定されるものではなく、各種施設
の機器間の配線、配管等のラインの接続管理すべてに適
用可能である。
In the above embodiment, the connection management between the devices of the electric system cables in the factory has been described as an example, but the present application is not limited to this, and wiring and piping between the devices of various facilities are possible. It is applicable to all connection management of lines such as.

【0041】[0041]

【発明の効果】以上本願発明では特に、従来、配線工事
計画は展開接続図等の図面を基に新規に布設するケーブ
ル、解線するケーブル、撤去するケーブル等を手入力に
よりリスト化し、工事図面として使用していたが、この
発明における配線工事計画手段では、展開接続図のデー
タを基に新規布設・解線・結線・撤去ケーブルを自動収
集してリスト化することが可能である。そのデータは現
地にデータ伝送されて工事に使用されるため工事用図面
作成時間および発送時間が短縮される。展開接続図より
自動収集される項目の例として「ケーブル番号」「電力
・制御・計装等の回路区分」「ケーブル線番」「新規布
設・解線・結線・撤去の区分」「既設接続部の機器名称
および機器番号」「新規接続先の機器名称および機器番
号」「新規接続先情報」等があげられる。結線図より自
動収集される項目の例として「ケーブル種別」「ケーブ
ルサイズおよび芯数」「既設接続部の端子台番号」「新
規接続先の端子台番号」「ケーブルの発線地および着線
地」等があげられる。
As described above, particularly in the present invention, conventionally, the wiring work plan is based on the drawings such as the expansion connection diagram, and the newly installed cable, the cable to be disconnected, the cable to be removed, and the like are manually entered into a list, and the construction drawing is drawn. However, the wiring construction planning means in the present invention can automatically collect and list new laying / disconnection / connection / removal cables based on the data of the developed connection diagram. Since the data is transmitted to the site and used for construction, construction drawing time and shipping time are shortened. Examples of items that are automatically collected from the expanded connection diagram are "Cable number", "Circuit classification such as power / control / instrumentation", "Cable wire number", "New installation / disconnection / connection / disconnection classification", and "Existing connection part". Device name and device number "," device name and device number of new connection destination "," new connection destination information ", and the like. "Cable type""Cable size and number of cores""Terminal block number of existing connection part""Terminal block number of new connection destination""Cable origination and landing site" , Etc.

【0042】また従来、現地の電源隔離作業は電力会社
等が回路毎に隔離札を作成して隔離を実施して、その関
連回路が隔離されたことを確認した上で、電源隔離の係
員が展開接続図等の図面を用いて隔離回路に関連するケ
ーブルを抽出して、ケーブルの解線や撤去等の作業を実
施していた。隔離後の操作スイッチには隔離管理札が掛
けられて操作禁止の表示がなされる。電源隔離の確認方
法は隔離管理札を確認するか、電力会社から工事実施者
へ隔離されたことを通知文書や図面色分類を行ったもの
で連絡する等の様々な方法があり、隔離確認に対しては
方法が統一されていなかったため電源隔離の係員が誤っ
て隔離されていない回路のケーブルを解線する恐れがあ
った。この発明における電源隔離手段では、隔離確認を
確実に行うため、展開接続図等の図面上で電源隔離部分
を指定すると、これに対応する部分のスイッチ等の機器
が抽出され、指定に基づき抽出された機器(スイッチ等
を含む)に識別コード付電源隔離札を発行する(識別コー
ド付電源隔離札発行手段)。隔離の際は隔離を行いたい
操作スイッチに札を掛けて識別コードを読取、操作スイ
ッチを操作する。識別コードを読取ることによって、隔
離を実施したという実績がデータに蓄積されて工事作業
員がその実績データを確認することにより迅速に隔離確
認を行うことが可能である。識別コードには文字を直接
認識させる読取装置やバーコード等を使用する。
Conventionally, in the local power source isolation work, an electric power company or the like creates an isolation tag for each circuit to perform isolation, and after confirming that the related circuits have been isolated, a power source isolation staff member The cables related to the isolation circuit were extracted using drawings such as the expansion connection diagram, and the work such as disconnecting and removing the cables was performed. After the isolation, the operation switch is hung with an isolation management tag and the operation is prohibited. There are various methods for confirming power supply isolation, such as confirming the isolation control tag, or notifying the construction operator from the power company of the fact that they have been isolated by notifying them with a notification document or drawing color classification. On the other hand, the method was not unified, so there was a risk that the power supply isolation staff would accidentally disconnect the cable of the circuit that was not isolated. In the power source isolation means of the present invention, in order to confirm the isolation surely, when the power source isolation portion is designated on the drawing such as the development connection diagram, the device such as the switch of the portion corresponding to this is extracted and extracted based on the designation. The power supply isolation tag with identification code is issued to the device (including switch etc.) (power supply isolation tag with identification code issuing means). At the time of isolation, put a tag on the operation switch you want to isolate, read the identification code, and operate the operation switch. By reading the identification code, the actual result of the quarantine is accumulated in the data, and the construction worker can confirm the actual result data to quickly confirm the quarantine. As the identification code, a reading device or a bar code that directly recognizes the character is used.

【0043】また従来、現場のケーブル解線・撤去・接
続作業は工事の進捗に応じて解線・撤去・接続作業を展
開接続図等の図面で抽出して作成したリストに作業予定
日と作業実績を記入して工程管理を行っていた。また、
ケーブルの解線・撤去・接続作業については、展開接続
図を基に作成したリストを基に対象ケーブルの作業区分
を判断し、作業を行っていたためヒューマンエラーによ
る解線・撤去・接続ミスの恐れがあった。この発明にお
ける配線管理手段では、これらの問題を解決するために
ケーブルおよびケーブル芯線に接続識別コードを貼り付
けて、更に接続する機器の端子台等にも外線ケーブルと
照合する接続識別コードを貼り付けて、予め展開接続図
データから反映された布設・解線・結線・撤去の作業指
示をケーブル番号毎に接続識別コードを読取り照合させ
て、ケーブル側と機器側と合致していれば、作業可の表
示をさせて、作業を行う。これにより作業のミスを防止
すると同時に作業の実績として蓄積することが可能であ
る。また現地電源隔離手段とは連動しており、未隔離の
場合は作業解線または撤去の作業ができないことを確認
できる。
Conventionally, in the field cable disconnection / removal / connection work, according to the progress of the construction, the wire disconnection / removal / connection work is extracted in the drawing such as the expanded connection diagram and the like, and the scheduled work date and work are created in the created list. I entered the results and managed the process. Also,
Regarding cable disconnection / removal / connection work, there is a risk of disconnection / removal / misconnection due to human error because the work category of the target cable was determined based on the list created based on the expanded connection diagram. was there. In the wiring management means according to the present invention, in order to solve these problems, the connection identification code is attached to the cable and the cable core wire, and the connection identification code to be collated with the external line cable is attached to the terminal block of the device to be connected. Then, by checking the connection identification code for each cable number, the work instructions for installation, disconnection, connection, and removal reflected in advance from the connection diagram data are checked, and if the cable side and the device side match, the work is possible. Is displayed and work is performed. This makes it possible to prevent work mistakes and at the same time accumulate work results. It is also linked to the on-site power source isolation means, and it is possible to confirm that work cannot be disconnected or removed if it is not isolated.

【0044】また従来、試験日程は現地試験担当者より
紙面による日程の連絡通知が行われていた。しかし試験
日程は日々変動するため日程変更された場合の把握が遅
れることがあった。この発明における試験引継管理手段
では、試験員が現地試験に必要な回路およびケーブルに
対して試験実施予定日程を入力することによりネットワ
ークを介して試験日程を迅速に把握することが可能とな
った。また、配線管理手段とも連動しておリ、現地工事
担当者が解線・撤去・接続作業を行った進捗を試験担当
者が迅速に把握することが可能となる。
Conventionally, regarding the test schedule, a local person in charge of the test has notified the schedule of the report on paper. However, because the test schedule fluctuates day by day, it may be delayed in understanding the schedule. With the test takeover management means according to the present invention, the tester can quickly grasp the test schedule via the network by inputting the scheduled test execution schedule for the circuits and cables required for the field test. Also, in cooperation with the wiring management means, it becomes possible for the test personnel to quickly grasp the progress of the disconnection / removal / connection work performed by the local construction personnel.

【図面の簡単な説明】[Brief description of drawings]

【図1】 この発明の一実施の形態による機器接続管理
システムの構成を示す図である。
FIG. 1 is a diagram showing a configuration of a device connection management system according to an embodiment of the present invention.

【図2】 この発明の一実施の形態による機器接続管理
システムの新設工事における動作を示すフローチャート
である。
FIG. 2 is a flowchart showing an operation in new construction of the device connection management system according to the embodiment of the present invention.

【図3】 この発明に係わる展開接続図および結線図の
一例を示す図である。
FIG. 3 is a diagram showing an example of a developed connection diagram and a connection diagram according to the present invention.

【図4】 この発明に係わる工事図面の一例を示す図で
ある。
FIG. 4 is a diagram showing an example of a construction drawing according to the present invention.

【図5】 この発明に係わる試験用接続・隔離確認テー
ブルの一例を示す図である。
FIG. 5 is a diagram showing an example of a test connection / isolation confirmation table according to the present invention.

【図6】 この発明の一実施の形態による機器接続管理
システムの改装工事の解線までの動作を示すフローチャ
ートである。
FIG. 6 is a flowchart showing an operation up to the breaking of renovation work of the device connection management system according to the embodiment of the present invention.

【図7】 この発明に係わる隔離用接続・隔離確認テー
ブルの一例を示す図である。
FIG. 7 is a diagram showing an example of a quarantine connection / quarantine confirmation table according to the present invention.

【図8】 この発明の一実施の形態による機器接続管理
システムの改装工事の解線以降の動作を示すフローチャ
ートである。
FIG. 8 is a flowchart showing an operation after disconnection of renovation work of the device connection management system according to the embodiment of the present invention.

【符号の説明】[Explanation of symbols]

10 プラント建設・管理会社、11 設計部門PC、
12 工事部門PC、13 試験部門PC、14 D/
B(データベース)、20 電力会社、21 電力会社P
C、30a,30b プラント、31 現場PC、40
通信ネットワーク、50 携帯情報端末用ネットワー
ク、51 携帯情報端末。
10 plant construction and management companies, 11 design department PCs,
12 Construction Department PC, 13 Testing Department PC, 14 D /
B (database), 20 electric power companies, 21 electric power companies P
C, 30a, 30b plant, 31 field PC, 40
Communication network, 50 mobile information terminal network, 51 mobile information terminal.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 各種施設の機器間のラインの接続管理を
行うネットワーク接続された複数のコンピュータとデー
タを蓄積するデータベースからなる機器接続管理システ
ムであって、 機器の動作、つながりを示す展開接続図の現在のデータ
と改装データの変化を基にラインの布設・解線・結線・
撤去情報を収集して、各ライン毎に上記ラインの布設・
解線・結線・撤去の情報を含む情報を複数の項目に分け
てリスト化された工事図面を作成してデータベースに格
納する配線工事計画手段を備えたことを特徴とする機器
接続管理システム。
1. A device connection management system comprising a plurality of network-connected computers for managing the connection of lines between devices of various facilities and a database for accumulating data, and an expanded connection diagram showing the operation and connection of the devices. Line laying / disconnection / connection based on current data and changes in renovation data
Collect the removal information and install the above line for each line.
A device connection management system comprising a wiring work planning means for creating a work drawing in which information including disconnection / connection / removal information is divided into a plurality of items, and stored in a database.
【請求項2】 機能試験のためにラインで接続された機
器の一部を切り離す隔離の確認を行うために、上記展開
接続図の図面上で指定された隔離部分の機器を抽出し、
これらの抽出された機器に対して識別コード付電源隔離
札を発行する識別コード付電源隔離札発行手段をさらに
備えたことを特徴とする請求項1に記載の機器接続管理
システム。
2. In order to confirm the isolation for disconnecting a part of the equipment connected by the line for the function test, the equipment of the isolated portion specified on the drawing of the above expansion connection diagram is extracted,
The device connection management system according to claim 1, further comprising: an identification code-attached power supply isolation tag issuing means for issuing an identification code-attached power supply isolation tag to these extracted devices.
【請求項3】 ラインおよびこれが接続する機器に接続
相手を照合するために貼り付けられ、これらの読み取り
入力が照合されるライン毎の接続識別コードを上記リス
ト化された工事図面に含み、上記展開接続図から収集さ
れたラインの布設・解線・結線・撤去情報と共に使用し
て作業の可否を決める配線管理手段をさらに備えたこと
を特徴とする請求項1または2に記載の機器接続管理シ
ステム。
3. The above-mentioned construction drawings including a connection identification code for each line, which is attached to a line and a device to which the line is connected to verify the connection partner, and whose read inputs are verified, are included in the construction drawings listed above, The equipment connection management system according to claim 1 or 2, further comprising wiring management means for determining whether or not the work can be performed by using the information on the laying / disconnection / connection / removal of the line collected from the connection diagram. .
【請求項4】 上記リスト化された工事図面が機能試験
のための試験実施予定日程の情報を含むことを特徴とす
る請求項1ないし3のいずれか1項に記載の機器接続管
理システム。
4. The equipment connection management system according to claim 1, wherein the listed construction drawings include information on a scheduled test implementation schedule for a functional test.
JP2002085333A 2002-03-26 2002-03-26 Device connection management system Expired - Fee Related JP4170000B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002085333A JP4170000B2 (en) 2002-03-26 2002-03-26 Device connection management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002085333A JP4170000B2 (en) 2002-03-26 2002-03-26 Device connection management system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2008161217A Division JP2008299859A (en) 2008-06-20 2008-06-20 Equipment connection management system

Publications (3)

Publication Number Publication Date
JP2003281196A true JP2003281196A (en) 2003-10-03
JP2003281196A5 JP2003281196A5 (en) 2005-09-15
JP4170000B2 JP4170000B2 (en) 2008-10-22

Family

ID=29232335

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002085333A Expired - Fee Related JP4170000B2 (en) 2002-03-26 2002-03-26 Device connection management system

Country Status (1)

Country Link
JP (1) JP4170000B2 (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006086690A (en) * 2004-09-15 2006-03-30 Nippon Telegr & Teleph Corp <Ntt> Medium stock totalling system and method thereof, and program thereof and recording medium
JP2007020360A (en) * 2005-07-11 2007-01-25 Mitsubishi Electric Building Techno Service Co Ltd Cable connection display unit and cable connection display method
JP2007066238A (en) * 2005-09-02 2007-03-15 Mitsubishi Electric Building Techno Service Co Ltd Cable connection reader, control panel and cable connection display method
JP2007072791A (en) * 2005-09-07 2007-03-22 Sanmei Electric Co Ltd Wiring work support system
JP2007200279A (en) * 2005-12-28 2007-08-09 Ttk:Kk Design support system for cable wiring
JP2007215398A (en) * 2006-01-16 2007-08-23 Hitachi Ltd Cable connection guide method and device used therefor
JP2008090479A (en) * 2006-09-29 2008-04-17 Toshiba Corp Production inspection support device, production inspection support method, and its program
JP2008171186A (en) * 2007-01-11 2008-07-24 Hitachi Plant Technologies Ltd Cable installation support and management system
JP2008301354A (en) * 2007-06-01 2008-12-11 Nippon Telegraph & Telephone East Corp Stock management apparatus, method, and stock management program, and computer readable recording medium with stock management program recorded thereon
US7850479B2 (en) 2006-01-16 2010-12-14 Hitachi, Ltd. Cable connection guiding method using a terminal indicating device
JP2011070478A (en) * 2009-09-28 2011-04-07 Hitachi Ltd Power panel designing support device, power panel designing support method and program
JP2013012008A (en) * 2011-06-29 2013-01-17 Toshiba Mitsubishi-Electric Industrial System Corp Drawing management system
CN103488837A (en) * 2013-09-26 2014-01-01 国家电网公司 Automatic power network wire frame map layout method based on factory geographic information
CN103488844A (en) * 2013-09-26 2014-01-01 国家电网公司 Power grid net rack graph automatic wiring method based on power station geographic information
JP2014174765A (en) * 2013-03-08 2014-09-22 Toshiba Corp Information management server and plant test method

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4562125B2 (en) * 2004-09-15 2010-10-13 日本電信電話株式会社 Medium inventory totalizing apparatus and method, and program
JP2006086690A (en) * 2004-09-15 2006-03-30 Nippon Telegr & Teleph Corp <Ntt> Medium stock totalling system and method thereof, and program thereof and recording medium
JP2007020360A (en) * 2005-07-11 2007-01-25 Mitsubishi Electric Building Techno Service Co Ltd Cable connection display unit and cable connection display method
JP4566846B2 (en) * 2005-07-11 2010-10-20 三菱電機ビルテクノサービス株式会社 Cable connection display device and cable connection display method
JP2007066238A (en) * 2005-09-02 2007-03-15 Mitsubishi Electric Building Techno Service Co Ltd Cable connection reader, control panel and cable connection display method
JP4644074B2 (en) * 2005-09-02 2011-03-02 三菱電機ビルテクノサービス株式会社 Cable connection reader, distribution board, and cable connection display method
JP2007072791A (en) * 2005-09-07 2007-03-22 Sanmei Electric Co Ltd Wiring work support system
JP4575258B2 (en) * 2005-09-07 2010-11-04 三明電機株式会社 Wiring work support system
JP2007200279A (en) * 2005-12-28 2007-08-09 Ttk:Kk Design support system for cable wiring
JP2007215398A (en) * 2006-01-16 2007-08-23 Hitachi Ltd Cable connection guide method and device used therefor
JP4613912B2 (en) * 2006-01-16 2011-01-19 株式会社日立製作所 Cable connection guide method and apparatus used therefor
US7850479B2 (en) 2006-01-16 2010-12-14 Hitachi, Ltd. Cable connection guiding method using a terminal indicating device
JP2008090479A (en) * 2006-09-29 2008-04-17 Toshiba Corp Production inspection support device, production inspection support method, and its program
US8010999B2 (en) 2007-01-11 2011-08-30 Hitachi Plant Technologies, Ltd. Cable installation support and management system
JP2008171186A (en) * 2007-01-11 2008-07-24 Hitachi Plant Technologies Ltd Cable installation support and management system
JP2008301354A (en) * 2007-06-01 2008-12-11 Nippon Telegraph & Telephone East Corp Stock management apparatus, method, and stock management program, and computer readable recording medium with stock management program recorded thereon
JP2011070478A (en) * 2009-09-28 2011-04-07 Hitachi Ltd Power panel designing support device, power panel designing support method and program
JP2013012008A (en) * 2011-06-29 2013-01-17 Toshiba Mitsubishi-Electric Industrial System Corp Drawing management system
JP2014174765A (en) * 2013-03-08 2014-09-22 Toshiba Corp Information management server and plant test method
CN103488837A (en) * 2013-09-26 2014-01-01 国家电网公司 Automatic power network wire frame map layout method based on factory geographic information
CN103488844A (en) * 2013-09-26 2014-01-01 国家电网公司 Power grid net rack graph automatic wiring method based on power station geographic information
CN103488844B (en) * 2013-09-26 2016-05-25 国家电网公司 A kind of Net Frame of Electric Network figure automatic wiring method based on plant stand geography information
CN103488837B (en) * 2013-09-26 2016-08-31 国家电网公司 A kind of Net Frame of Electric Network figure autoplacement method based on plant stand geography information

Also Published As

Publication number Publication date
JP4170000B2 (en) 2008-10-22

Similar Documents

Publication Publication Date Title
JP2003281196A (en) Device connection management system
US7454432B2 (en) Section identification and distribution system monitoring system, method and program product
US8520531B2 (en) Isolation list creation program, method, and device
JP2016189088A (en) Facility management support system
JP2008191725A (en) Plant facility management/maintenance support system
JP2008299859A (en) Equipment connection management system
JP2003281196A5 (en)
JP4859577B2 (en) Building equipment work report creation system
JP4057580B2 (en) Plant misoperation prevention system
JP2007065062A (en) Optical fiber network management method, optical fiber network management equipment, and program and recording medium thereof
JP2008102696A (en) Method and apparatus for managing electrical installation device
EP4254289A1 (en) Data management system, management method, and management program
JP2004252851A (en) Processing method and device for operating passive component management, work support terminal, program for operating passive component management, and storage medium using it
JP4707689B2 (en) Valve check support system
JP5111025B2 (en) System planning support system
JP2004219644A (en) System, method, and program for management for coated optical fiber of optical cable
JP2004229456A (en) Delivery system for distribution system map data
JP4101713B2 (en) Cable connection diagram creation device, cable connection diagram creation method, and program
JP4597076B2 (en) Power system blackout work plan setting method and system
Sykes et al. Creating a sustainable protective relay asset strategy
JP2003022308A (en) System for managing equipment
Tremblay et al. Protective relay upgrade utilizing real-time simulator technology
JP5008303B2 (en) Information providing system, information providing apparatus, and information providing method
JP3727814B2 (en) Passive component management system and method, and recording medium recording management program
JP2020091530A (en) Facility management system

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050324

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050324

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080422

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080620

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080805

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080806

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110815

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110815

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120815

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120815

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130815

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees