JP2002356285A - Main rope replacing method and main rope replacing device for elevator - Google Patents

Main rope replacing method and main rope replacing device for elevator

Info

Publication number
JP2002356285A
JP2002356285A JP2001162662A JP2001162662A JP2002356285A JP 2002356285 A JP2002356285 A JP 2002356285A JP 2001162662 A JP2001162662 A JP 2001162662A JP 2001162662 A JP2001162662 A JP 2001162662A JP 2002356285 A JP2002356285 A JP 2002356285A
Authority
JP
Japan
Prior art keywords
main rope
main
counter pulley
rope
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001162662A
Other languages
Japanese (ja)
Inventor
Mizuki Gomi
瑞樹 五味
Atsushi Kozono
淳 小薗
Noriyuki Sahoda
典之 佐保田
Koji Yamashita
浩二 山下
Yoichi Yoshida
洋一 吉田
Futoshi Sekiya
太志 関谷
Eiichiro Tsuzukibashi
英一郎 続橋
Satoshi Tanakadate
聡 田中舘
Yoshihiro Takeuchi
愛浩 竹内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2001162662A priority Critical patent/JP2002356285A/en
Publication of JP2002356285A publication Critical patent/JP2002356285A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a main rope replacing method and main replacing device, capable of safely and quickly replacing new and old main ropes without any fear that the main rope is dislocated from a counter pulley or slipped from a groove. SOLUTION: This main rope replacing device 32 is provided with a main rope crossing preventing means 32a, a main rope groove slip-off preventing means 32c, a main rope latch means 32b and the like. The device is fitted to the counter pulley 9 to perform main rope replacing work. Thus, the main ropes 7, 21 to be replaced and its connecting part 23 can be surely wound round a designated groove of the counter pulley 9, so there is no fear that the new main rope 21 is dislocated from the counter pulley 9 or slipped from the groove during replacing work. Accordingly, it is not necessary to assemble a work scaffold in the vicinity of the counter pulley 9 and confirm and correct the winding state of the new main rope 21.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、エレベータの主ロ
ープ交換方法と主ロープ交換装置とに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator main rope changing method and a main rope changing device.

【0002】[0002]

【従来の技術】乗かごプーリおよびカウンタプーリを備
えたエレベータにおける従来の主ロープ交換作業は、特
開平3−61276号公報に記載されているような手順
で行われる。かかる従来技術について、図13の縦断面
図を参照しつつ説明する。
2. Description of the Related Art A conventional main rope replacement operation in an elevator having a car pulley and a counter pulley is performed according to a procedure described in Japanese Patent Application Laid-Open No. 3-61276. Such a conventional technique will be described with reference to a longitudinal sectional view of FIG.

【0003】従来の主ロープ交換作業は、まず、乗かご
2を乗かご吊り上げ手段13により最上階近傍に吊り下
げると共に、カウンタウェート3を下部に配置した支持
体12により支える。この状態で、既設の主ロープ7の
カウンタウェート側固定端11の近傍において、機械室
4の床に主ロープ交換補助装置14を吊り下げ、主ロー
プ7のうちカウンタプーリ9に巻回されている部分の上
方に位置する部分を、この主ロープ交換補助装置14で
弾性挟持する。つまり、機械室4のプーリ6の下方にお
いて主ロープ7が自重で落下しないように、主ロープ交
換補助装置14にテンションを負荷させる。その後、カ
ウンタウェート側固定端11の近傍Aで主ロープ7を切
断し、この切断端に、乗り場に配置したドラム20の新
主ロープ21の一端を接続すると共に、主ロープ7の乗
かご側固定端10の近傍Cで止め金具から主ロープ7を
切り離し、この切り離した端を、乗り場に配置した回収
ドラム24に巻き付ける。
In the conventional main rope replacement work, first, the car 2 is suspended near the top floor by the car lifting means 13 and the counterweight 3 is supported by the support 12 arranged at the lower part. In this state, the main rope replacement auxiliary device 14 is hung on the floor of the machine room 4 near the fixed end 11 on the counter weight side of the existing main rope 7, and is wound around the counter pulley 9 of the main rope 7. The part located above the part is elastically clamped by the main rope replacement assisting device 14. That is, tension is applied to the main rope replacement assist device 14 so that the main rope 7 does not fall under its own weight below the pulley 6 in the machine room 4. Thereafter, the main rope 7 is cut in the vicinity A of the counterweight side fixed end 11, and one end of the new main rope 21 of the drum 20 arranged at the landing is connected to the cut end, and the main rope 7 is fixed to the car side. At the vicinity C of the end 10, the main rope 7 is cut off from the clasp, and the cut end is wound around the collecting drum 24 arranged at the landing.

【0004】この状態で、機械室4に設置されている巻
上機を駆動させてシーブ5を低速で回転させながら、既
設の主ロープ7を回収ドラム24に巻き取っていくと共
に、新主ロープ21をドラム20から送り出していく。
そして、既設の主ロープ7と新主ロープ21との接続部
Bが回収ドラム24側に現れたら巻上機を駆動停止し
て、主ロープ7と新主ロープ21との接続を解除する。
最後に、新主ロープ21の接続解除した側の端部を、乗
かご側固定端10の止め金具に接続固定すると共に、こ
の新主ロープ21をカウンタウェート側固定端11の近
傍の所定位置で切断し、その切断端をカウンタウェート
側固定端11の止め金具に接続固定して、主ロープ交換
作業を完了していた。
In this state, while the hoisting machine installed in the machine room 4 is driven to rotate the sheave 5 at a low speed, the existing main rope 7 is wound around the collection drum 24 and the new main rope 7 is wound. 21 is sent out from the drum 20.
Then, when the connecting portion B between the existing main rope 7 and the new main rope 21 appears on the collection drum 24 side, the drive of the hoist is stopped and the connection between the main rope 7 and the new main rope 21 is released.
Lastly, the disconnected end of the new main rope 21 is connected and fixed to the fastener of the car-side fixed end 10, and the new main rope 21 is fixed at a predetermined position near the counterweight-side fixed end 11. After cutting, the cut end was connected and fixed to the stopper of the counterweight side fixed end 11 to complete the main rope replacement work.

【0005】なお、機械室のないエレベータの場合、巻
上機のシーブを低速回転させるのではなく、乗かご上に
新たに設置したロープ引き出し装置を回転させながら主
ロープ交換作業を行うという手法が知られているが、ロ
ープ引き出し装置を利用するという点を除いて、作業手
順は上述した従来例とほぼ同等である。
[0005] In the case of an elevator without a machine room, there is a method in which a main rope replacement operation is performed while rotating a rope pulling device newly installed on a car, instead of rotating a sheave of a hoist at low speed. It is known, but the working procedure is almost the same as the above-mentioned conventional example except that a rope pulling device is used.

【0006】また、上述した主ロープ交換作業では、既
設の主ロープ7と新主ロープ21とを接続した後、カウ
ンタプーリ9を経由させながら両主ロープ7,21を交
換していくので、カウンタプーリ9のロープ用の溝から
主ロープ7や新主ロープ21が脱落しないように配慮し
ておく必要がある。そして、主ロープ交換作業時の使用
を意図したものではないが、カウンタプーリの溝から主
ロープが外れないようにするための装置として、従来、
特開平7−97165号公報に記載されているように、
主ロープをカウンタプーリの溝に確実に嵌入させるため
の案内具や、特開平11−263555号公報に記載さ
れているように、カウンタプーリの主ロープ巻き掛け面
を覆うように配置されて該巻き掛け面との間隔が調整可
能なU字形の外れ止め部材が提案されている。
In the above-described main rope replacement work, after connecting the existing main rope 7 and the new main rope 21, the two main ropes 7 and 21 are replaced while passing through the counter pulley 9. Care must be taken so that the main rope 7 and the new main rope 21 do not fall off from the rope groove of the pulley 9. And although it is not intended for use at the time of main rope replacement work, as a device for preventing the main rope from coming off from the groove of the counter pulley,
As described in JP-A-7-97165,
A guide for securely fitting the main rope into the groove of the counter pulley, and a winding device which is arranged so as to cover the main rope winding surface of the counter pulley as described in JP-A-11-263555. There has been proposed a U-shaped stopper member whose distance from the hanging surface is adjustable.

【0007】[0007]

【発明が解決しようとする課題】既設の主ロープと新主
ロープとを接続したうえで交換していくという主ロープ
交換作業において、新旧の主ロープを接続する手法とし
ては、中空管状に紐を編み込んでなる中空管状部材内に
既設の主ロープと新主ロープとを通し、引っ張り力を加
えて中空管状部材の内径を小さくすることにより緊縛力
を得るというロープグリップ方式や、新旧の主ロープの
接続端部をほぐしてストランド同士を圧着させる方式な
どが採用されるが、いずれにせよ、新旧の主ロープの接
続部の径は主ロープ自体の径よりも大きくなる。そのた
め、従来公知の主ロープ外れ止め装置を使用して主ロー
プ交換作業を行おうとすると、上記案内具の場合、新旧
の主ロープの接続部が通過不能となってしまう。また、
上記U字形の外れ止め部材の場合は、新旧の主ロープの
接続部の径に合わせてカウンタプーリとの間隔を広げる
と新主ロープが位置ずれを生じやすくなるため、交換作
業後のテンション付与時に新主ロープが他のロープ溝に
入り込んで主ロープ同士の交差を引き起こす恐れがあ
る。したがって、この種の主ロープ交換作業において
は、従来、カウンタプーリに巻回されている主ロープの
交差除去や外れ確認、直し作業等が必要となって、その
ための作業足場をカウンタプーリ近傍の高所に組み立て
ねばならず、これが作業効率や安全性を損なう要因とな
っていた。
In a main rope replacement operation in which an existing main rope and a new main rope are connected and then exchanged, as a method of connecting the old and new main ropes, a hollow tubular cord is used. The existing main rope and the new main rope are passed through the braided hollow tubular member, and a tension force is applied to reduce the inner diameter of the hollow tubular member to obtain a binding force. A method of loosening the connection ends and crimping the strands together is adopted, but in any case, the diameter of the connection portion of the old and new main ropes is larger than the diameter of the main rope itself. Therefore, when the main rope replacement operation is performed using a conventionally known main rope detachment prevention device, in the case of the above-described guide, the connection portion of the old and new main ropes cannot pass. Also,
In the case of the U-shaped retaining member, when the distance between the counter pulley and the new main rope is increased according to the diameter of the connection part of the old and new main ropes, the new main rope is likely to be displaced. There is a risk that the new main rope may enter another rope groove and cause intersection of the main ropes. Therefore, in this type of main rope replacement work, conventionally, it is necessary to remove the intersection of the main rope wound around the counter pulley, check for disengagement, correct the work, etc. It had to be assembled in a place, which was a factor that impaired work efficiency and safety.

【0008】本発明は、このような従来技術の実情に鑑
みてなされたもので、その第1の目的は、主ロープがカ
ウンタプーリから外れたり溝ずれを起こす恐れがなくて
安全かつ迅速に新旧の主ロープの交換作業が行える、エ
レベータの主ロープ交換方法を提供することにある。ま
た、本発明の第2の目的は、主ロープがカウンタプーリ
から外れたり溝ずれを起こす恐れがなくて安全かつ迅速
に新旧の主ロープの交換作業が行える、エレベータの主
ロープ交換装置を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of such a situation of the prior art, and a first object of the present invention is to safely and quickly convert a new rope into an old one without the risk of the main rope coming off the counter pulley or causing groove slippage. It is an object of the present invention to provide an elevator main rope replacement method capable of performing the main rope replacement work described above. A second object of the present invention is to provide an elevator main rope changing device capable of safely and quickly exchanging new and old main ropes without the risk of the main rope coming off the counter pulley or causing a groove shift. It is in.

【0009】[0009]

【課題を解決するための手段】本発明は上記第1の目的
を達成するために、巻上機のシーブに巻回されると共に
その両端が昇降路の頂部に支持固定される複数本の主ロ
ープと、この主ロープの一端と上記シーブとの間で該主
ロープに乗かごプーリを係合させて支持される乗かご
と、上記主ロープの他端と上記シーブとの間で該主ロー
プにカウンタプーリを係合させて支持されるカウンタウ
ェートとを備えたエレベータで、既設の主ロープと新主
ロープとを接続して上記カウンタプーリを経由させなが
ら両主ロープを交換していく主ロープ交換方法におい
て、上記主ロープのうち上記カウンタプーリに巻かれて
いる部分の近傍を該カウンタプーリの溝方向へと導く長
尺穴と、この長尺穴を仕切って隣接する上記主ロープ同
士の交差を防止する仕切り体とを有し、この仕切り体の
仕切り幅を変位可能とした主ロープ交差防止手段と、上
記主ロープのうち上記カウンタプーリに巻かれている部
分を複数箇所で該カウンタプーリの溝に沿って案内する
複数の巻回部仕切り体を有し、この巻回部仕切り体の仕
切り幅を変位可能とした主ロープ溝ずれ防止手段とを用
いて、既設の主ロープを回収しながら新主ロープに交換
していくようにした。
SUMMARY OF THE INVENTION In order to achieve the first object, the present invention provides a plurality of main units which are wound around a sheave of a hoisting machine and both ends of which are supported and fixed to the top of a hoistway. A rope, a car supported by engaging a car pulley with the main rope between one end of the main rope and the sheave, and a main rope between the other end of the main rope and the sheave An elevator equipped with a counter weight supported by engaging a counter pulley with a main rope that connects an existing main rope and a new main rope and exchanges both main ropes through the counter pulley. In the replacement method, an elongated hole that guides a portion of the main rope wound around the counter pulley in a groove direction of the counter pulley, and an intersection of the main ropes that partition the elongated hole and are adjacent to each other. Work to prevent Main rope crossing prevention means having a partition body which is capable of displacing a partition width of the partition body, and a portion of the main rope wound around the counter pulley at a plurality of locations along a groove of the counter pulley. A new main rope is collected while using the main rope groove deviation prevention means having a plurality of winding part partition bodies for guiding the main rope in a manner that the partition width of the winding part partition body can be displaced. Was replaced.

【0010】このように仕切り幅が変位可能な主ロープ
交差防止手段および主ロープ溝ずれ防止手段を用いるこ
とによって、新旧の主ロープとその接続部をカウンタプ
ーリの所定の溝に確実に巻回させることができるので、
交換作業中に主ロープがカウンタプーリから外れたり溝
ずれを起こす恐れがなくなる。それゆえ、カウンタプー
リ部において主ロープの交差や外れを確認したり直した
りする煩雑な作業が省略でき、それに伴いカウンタプー
リ近傍の高所に作業足場を組み立てる必要もなくなっ
て、作業効率が向上し、安全性も高まる。
[0010] By using the main rope crossing prevention means and the main rope groove deviation prevention means capable of displacing the partition width in this manner, the old and new main ropes and the connecting portion thereof are securely wound around predetermined grooves of the counter pulley. So you can
During replacement work, there is no danger of the main rope coming off the counter pulley or causing groove slippage. Therefore, it is possible to omit the troublesome work of checking or correcting the intersection or disengagement of the main ropes at the counter pulley, and it is not necessary to assemble a work scaffold at a high place near the counter pulley, thereby improving work efficiency. , Safety is also increased.

【0011】また、本発明は上記第2の目的を達成する
ために、巻上機のシーブに巻回されると共にその両端が
昇降路の頂部に支持固定される複数本の主ロープと、こ
の主ロープの一端と上記シーブとの間で該主ロープに乗
かごプーリを係合させて支持される乗かごと、上記主ロ
ープの他端と上記シーブとの間で該主ロープにカウンタ
プーリを係合させて支持されるカウンタウェートとを備
えたエレベータで、既設の主ロープと新主ロープとを接
続して上記カウンタプーリを経由させながら両主ロープ
を交換していく作業時に用いられる主ロープ交換装置に
おいて、上記主ロープのうち上記カウンタプーリに巻か
れている部分の近傍を該カウンタプーリの溝方向へと導
く長尺穴と、この長尺穴を仕切って隣接する上記主ロー
プ同士の交差を防止する仕切り体とを有し、この仕切り
体の仕切り幅を変位可能とした主ロープ交差防止手段
や、上記主ロープのうち上記カウンタプーリに巻かれて
いる部分を複数箇所で該カウンタプーリの溝に沿って案
内する複数の巻回部仕切り体を有し、この巻回部仕切り
体の仕切り幅を変位可能とした主ロープ溝ずれ防止手段
や、上記主ロープ接続部が通過可能な間隔を保って上記
カウンタプーリの溝に対向して設けられた主ロープ外れ
止め手段を備える構成とした。
In order to achieve the second object, the present invention provides a plurality of main ropes wound around a sheave of a hoist and both ends of which are supported and fixed to the top of a hoistway. A car supported by engaging a car pulley with the main rope between one end of the main rope and the sheave, and a counter pulley on the main rope between the other end of the main rope and the sheave. An elevator equipped with a counter weight that is engaged and supported, and a main rope used when connecting an existing main rope and a new main rope and exchanging both main ropes while passing through the counter pulley. In the exchange device, an elongated hole that guides the vicinity of a portion of the main rope wound around the counter pulley in a groove direction of the counter pulley, and an intersection between the main ropes that partition the elongated hole and are adjacent to each other. Prevent And a main rope crossing prevention means which makes the partition width of the partition body displaceable, and a portion of the main rope wound around the counter pulley at a plurality of locations in a groove of the counter pulley. A plurality of winding part partitioning bodies for guiding along the main rope groove displacing preventing means capable of displacing a partition width of the winding part partitioning body, and maintaining an interval through which the main rope connecting part can pass. The main rope is provided with a retaining means provided opposite to the groove of the counter pulley.

【0012】このように主ロープ交差防止手段や主ロー
プ溝ずれ防止手段、主ロープ外れ止め手段等を備えて構
成される主ロープ交換装置は、新旧の主ロープとその接
続部をカウンタプーリの所定の溝に確実に巻回させるこ
とができるので、交換作業中に主ロープがカウンタプー
リから外れたり溝ずれを起こす恐れがなくなる。それゆ
え、カウンタプーリ部において主ロープの交差や外れを
確認したり直したりする煩雑な作業が省略でき、それに
伴いカウンタプーリ近傍の高所に作業足場を組み立てる
必要もなくなって、作業効率が向上し、安全性も高ま
る。
[0012] The main rope exchanging device comprising the main rope crossing prevention means, the main rope groove slippage prevention means, the main rope detachment prevention means, etc., as described above, uses the old and new main ropes and their connecting parts to the predetermined length of the counter pulley. The main rope can be securely wound around the groove, so that there is no risk of the main rope coming off the counter pulley or causing the groove to shift during the replacement operation. Therefore, it is possible to omit the troublesome work of checking or correcting the intersection or disengagement of the main ropes at the counter pulley, and it is not necessary to assemble a work scaffold at a high place near the counter pulley, thereby improving work efficiency. , Safety is also increased.

【0013】[0013]

【発明の実施の形態】以下、本発明の実施の形態を図面
によって説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0014】図2は、本発明の一実施形態に係るエレベ
ータの主ロープ交換作業開始時の状態を示す縦断面図で
ある。このエレベータでは、機械室4に設置されている
巻上機のシーブ5に主ロープ7が巻回されていて、主ロ
ープ7の一端側は乗かごプーリ8に巻回されてから機械
室4の床に固定され、主ロープ7の他端側はプーリ6お
よびカウンタプーリ9に巻回されてから機械室4の床に
固定されている。
FIG. 2 is a longitudinal sectional view showing a state of the elevator according to one embodiment of the present invention at the time of starting a main rope replacement operation. In this elevator, a main rope 7 is wound around a sheave 5 of a hoisting machine installed in a machine room 4. One end of the main rope 7 is wound around a car pulley 8 and then The other end side of the main rope 7 is fixed to the floor of the machine room 4 after being wound around the pulley 6 and the counter pulley 9.

【0015】主ロープ交換作業を行う場合、まず第一工
程として、カウンタウェート3とほぼ同じ高さ位置とな
るように乗かご2を停止させて、この乗かご2上を作業
足場としてカウンタプーリ9に主ロープ交換装置32を
取り付ける。
When the main rope replacement work is performed, first, as a first step, the car 2 is stopped so as to be at the same height position as the counterweight 3 and the counter pulley 9 is used as a work platform on the car 2. The main rope changing device 32 is attached to the main body.

【0016】この主ロープ交換装置32は、図8〜図1
2にその詳細を示すように、カウンタプーリ9に巻かれ
ている主ロープ7の両端部のすぐ上方に設置される主ロ
ープ交差防止手段32aと、カウンタプーリ9に巻かれ
ている主ロープ7の両端部を包囲するように設置される
主ロープ外れ止め手段32bと、カウンタプーリ9に巻
かれている主ロープ7の複数箇所を位置規制する主ロー
プ溝ずれ防止手段32cとによって概略構成されてい
る。
The main rope changing device 32 is shown in FIGS.
As shown in detail in FIG. 2, a main rope crossing prevention means 32a installed just above both ends of the main rope 7 wound on the counter pulley 9 and a main rope 7 wound on the counter pulley 9 It is roughly constituted by main rope detachment preventing means 32b installed so as to surround both ends, and main rope groove deviation preventing means 32c for regulating the positions of a plurality of positions of the main rope 7 wound on the counter pulley 9. .

【0017】上記主ロープ交差防止手段32aは、図8
の平面図に示すように、主ロープ7を挿通してカウンタ
プーリ9の溝方向へと導く長尺穴44と、主ロープ外れ
止め手段32bと連結するための孔45と、長尺穴44
を仕切って隣接する主ロープ7同士の交差を防止する仕
切り体35とを有する。長尺穴44の形状は、既設の主
ロープ7と新主ロープ21との接続部にロープグリップ
23(図1参照)を使用する関係上、ロープ径の変化に
対応できる幅寸法および長さ寸法に設定した両面皿もみ
形状としている。つまり、新旧の主ロープ7,21の接
続部でロープ径は大きくなり、φ12の主ロープであれ
ば最大直径は20mm、φ10の主ロープであれば最大
直径は17mmとなる。したがって、長尺穴44の幅寸
法の最小値W1は、ロープグリップ23が引っ掛かりな
く通過できるように、φ12の主ロープであれば幅22
mm、φ10の主ロープであれば幅18mmに設定して
おく。また、長尺穴44の長さ寸法の最小値L1は、φ
12の主ロープが9本の場合は長さ198mm、φ10
の主ロープが5本の場合は長さ110mmに設定してお
く。なお、長尺穴44の幅寸法の最大値W2および長さ
寸法の最大値L2は、φ12の主ロープであれば幅32
mmで長さ208mm、φ10の主ロープであれば幅2
6mmで長さ118mmとしている。この主ロープ交差
防止手段32aを設置することによって、既設の主ロー
プ7や新主ロープ21やその接続部が、カウンタプーリ
9に巻かれる直前に位置規制されて、確実にカウンタプ
ーリ9の溝へ案内されることになる。
The main rope crossing prevention means 32a is shown in FIG.
As shown in the plan view, a long hole 44 through which the main rope 7 is inserted and guided in the groove direction of the counter pulley 9, a hole 45 for connecting with the main rope detachment preventing means 32b, and a long hole 44
And a partitioning body 35 for partitioning the main ropes 7 to prevent the intersection between the adjacent main ropes 7. The shape of the elongated hole 44 has a width dimension and a length dimension that can cope with a change in the rope diameter due to the use of the rope grip 23 (see FIG. 1) at the connection between the existing main rope 7 and the new main rope 21. The double-sided dish is set to be fir-shaped. In other words, the rope diameter increases at the connection between the new and old main ropes 7 and 21, the maximum diameter is 20 mm for a φ12 main rope, and 17 mm for a φ10 main rope. Therefore, the minimum value W1 of the width dimension of the long hole 44 is the width 22 of the main rope of φ12 so that the rope grip 23 can pass through without being caught.
If the main rope is 10 mm or 10 mm, the width is set to 18 mm. The minimum value L1 of the length of the long hole 44 is φ
When 12 main ropes are 9, the length is 198mm, φ10
If there are five main ropes, the length is set to 110 mm. In addition, the maximum value W2 of the width dimension of the long hole 44 and the maximum value L2 of the length dimension are the width 32 for the main rope of φ12.
mm, length 208mm, φ2 main rope width 2
The length is 6 mm and the length is 118 mm. By installing the main rope crossing prevention means 32a, the position of the existing main rope 7, the new main rope 21 and the connecting portion thereof is regulated immediately before being wound on the counter pulley 9, and the main rope 7 and the connecting rope are securely inserted into the groove of the counter pulley 9. You will be guided.

【0018】上記主ロープ外れ止め手段32bは、カウ
ンタプーリ9の溝および側面に板材を対向配置させて、
既設の主ロープ7や新主ロープ21やその接続部がカウ
ンタプーリ9から脱落しないようにするためのものであ
る。この主ロープ外れ止め手段32bのうちカウンタプ
ーリ9の溝に対向させる板材は、カウンタプーリ9との
間にロープグリップ23が引っ掛かりなく通過可能な間
隔を確保して該溝に対向配置させる。また、主ロープ外
れ止め手段32bのうちカウンタプーリ9の側面に対向
させる板材は、図9の側面図において矢印で示すよう
に、カウンタプーリ9を挟み込んでスライド可能に嵌合
する左右一対の板材からなる。これは、主ロープの本数
によってカウンタプーリ9の幅寸法が変化することを考
慮したもので、この主ロープ外れ止め手段32bは左右
一対の板材の間隔を適宜調整することにより、プーリ幅
が変化しても支障なく設置することができる。
The main rope coming-off prevention means 32b is provided with a plate material opposed to the groove and the side surface of the counter pulley 9,
The purpose is to prevent the existing main rope 7, new main rope 21, and the connection portion from falling off the counter pulley 9. The plate material of the main rope detachment preventing means 32b opposed to the groove of the counter pulley 9 is arranged facing the groove with a gap allowing the rope grip 23 to pass through without being caught between the plate pulley 9 and the counter pulley 9. As shown by arrows in the side view of FIG. 9, the plate material of the main rope coming-off preventing means 32b that faces the side surface of the counter pulley 9 is a pair of left and right plate materials that slidably fit with the counter pulley 9 interposed therebetween. Become. This takes into account that the width dimension of the counter pulley 9 changes depending on the number of main ropes, and the main rope detachment preventing means 32b changes the pulley width by appropriately adjusting the interval between the pair of left and right plate members. It can be installed without any trouble.

【0019】上記主ロープ溝ずれ防止手段32cは、図
10の正面図にように、カウンタプーリ9のすべての溝
と溝の間に配置される仕切り板36を有する。隣接する
仕切り板36同士の間隔は主ロープ7の径よりも広いの
で、カウンタプーリ9の溝を通過中の主ロープ7を仕切
り板36によって仕切ることができ、また、ロープグリ
ップ23の通過時には摺動抵抗によって仕切り板36が
通過方向に移動し、通過後に再び元の仕切り位置に戻る
ようになっている。ただし、仕切り板36が主ロープ7
の通過方向に対して上下に移動自在な構成であってもよ
い。
The main rope groove deviation preventing means 32c has a partition plate 36 disposed between all the grooves of the counter pulley 9, as shown in the front view of FIG. Since the interval between the adjacent partition plates 36 is wider than the diameter of the main rope 7, the main rope 7 passing through the groove of the counter pulley 9 can be partitioned by the partition plate 36. The partition plate 36 moves in the passing direction due to the dynamic resistance, and returns to the original partition position again after passing. However, the partition plate 36 is the main rope 7
May be configured to be movable up and down with respect to the passing direction.

【0020】このように主ロープ交差防止手段32aと
主ロープ外れ止め手段32bと主ロープ溝ずれ防止手段
32cとを備えた主ロープ交換装置32をカウンタプー
リ9に取り付けることにより、主ロープ交換作業時に、
既設の主ロープ7や新主ロープ21やその接続部がカウ
ンタプーリ9から外れたり溝ずれを起こしたりする心配
がなくなる。
By attaching the main rope exchanging device 32 having the main rope crossing prevention means 32a, the main rope slippage prevention means 32b, and the main rope groove slippage prevention means 32c to the counter pulley 9, the main rope exchange work can be performed. ,
There is no need to worry about the existing main rope 7, the new main rope 21 or the connection portion coming off the counter pulley 9 or causing a groove shift.

【0021】そして、主ロープ交換装置32を設置した
後、第二工程として、乗かご2を低速で上昇運転して昇
降路1の最上階乗場34近傍に停止させると共に、カウ
ンタウェート3を昇降路1の底部近傍で緩衝器33より
も上方に位置するように支持体12上に載置して仮保持
する。
After the main rope changing device 32 is installed, as a second step, the car 2 is moved up at a low speed to stop it near the top floor landing 34 of the hoistway 1 and the counterweight 3 is moved up and down. 1 and is temporarily held on the support 12 so as to be located above the shock absorber 33 near the bottom of the first support 1.

【0022】その後、第三工程として、主ロープ7のカ
ウンタウェート3側が自重で落下することを防ぐため
に、カウンタプーリ9に巻回されて上方へ延びている主
ロープ3の上端部を、乗かご2上から、ロープ保持具2
8,29を用いて図示せぬ建屋梁などの昇降路内強度部
材に固定して仮保持する。また、昇降路1の頂部近傍の
強度部材に乗かご吊り手段13を取り付けて、この乗か
ご吊り手段13で乗かご2を吊り上げることにより、主
ロープ7のテンションを除去して弛ませる。しかる後、
主ロープ7のうち乗かごプーリ8とシーブ5との間に位
置する部分を、ロープ保持具30で仮保持する。これに
より、機械室4のシーブ5とプーリ6との間において主
ロープ7に弛みが生じるので、複数本の主ロープ7を複
数回に分けて交換する場合、その時点で交換しない主ロ
ープ7とシーブ5と間および該主ロープ7とプーリ6間
にそれぞれ養生材15,19を挟み込んでおく。
Then, as a third step, in order to prevent the counterweight 3 side of the main rope 7 from dropping by its own weight, the upper end of the main rope 3 wound around the counter pulley 9 and extending upward is placed in the car cage. 2 From above, rope holder 2
It is fixed and temporarily held to a strength member in a hoistway such as a building beam (not shown) using 8, 29. Further, the car hanging means 13 is attached to a strength member near the top of the hoistway 1, and the car 2 is lifted by the car hanging means 13 so that the tension of the main rope 7 is removed and slackened. After a while
A portion of the main rope 7 located between the car pulley 8 and the sheave 5 is temporarily held by a rope holder 30. As a result, the main rope 7 is slackened between the sheave 5 and the pulley 6 in the machine room 4, so that when the plurality of main ropes 7 are replaced in a plurality of times, the main ropes 7 are not replaced at that time. Curing materials 15 and 19 are sandwiched between the sheave 5 and between the main rope 7 and the pulley 6, respectively.

【0023】次なる第四工程では、主ロープ7の乗かご
側端10およびカウンタウェート側端11を機械室4の
床から取り外す。この取り外し作業を図3〜図6を用い
て説明すると、まず、複数本の主ロープ7のうちの数
本、例えば6本のうちの3本について、図6に示すよう
に、ボルト部材43に螺合しているテンション調整部材
用ナット41を機械室4側から緩めることにより、主ロ
ープ7の両端10,11の引き上げ代を確保する。そし
て、ボルト部材43を介して両端10,11を引き上げ
た状態で、ばね40の下に引上げ支持材42を配置す
る。これによりばね40の下に隙間が形成されるので、
この隙間を利用して主ロープ引上げ手段38を送り出
し、図3に示すように、乗かご2の上部まで主ロープ引
上げ手段38を垂らす。次に、主ロープ引上げ手段38
の送り出し側を、主ロープ7を囲むように設けたリング
状の主ロープ端部保持手段38aに連結した後、主ロー
プ引上げ手段38を機械室4側から引き上げて、図6に
示すように主ロープ止め金具39の下部に係止させる。
この一連のロープ端部支持作業を主ロープ7の両端1
0,11で行うことにより、図4に示すような状態とな
る。
In the next fourth step, the car side end 10 and the counterweight side end 11 of the main rope 7 are removed from the floor of the machine room 4. This detaching operation will be described with reference to FIGS. 3 to 6. First, several of the plurality of main ropes 7, for example, three of the six main ropes 7 are attached to the bolt member 43 as shown in FIG. 6. By loosening the threaded tension adjusting member nut 41 from the machine room 4 side, a margin for raising both ends 10 and 11 of the main rope 7 is secured. Then, with the both ends 10 and 11 pulled up via the bolt member 43, the pull-up support member 42 is arranged below the spring 40. As a result, a gap is formed below the spring 40,
The main rope pulling means 38 is sent out using this gap, and the main rope pulling means 38 is suspended to the upper part of the car 2 as shown in FIG. Next, the main rope pulling means 38
Is connected to a ring-shaped main rope end holding means 38a provided so as to surround the main rope 7, and then the main rope pulling means 38 is pulled up from the machine room 4 side, and as shown in FIG. The lower part of the rope stopper 39 is locked.
This series of rope end support work is performed on both ends of the main rope 7.
Performing at 0 and 11 results in the state as shown in FIG.

【0024】こうして主ロープ引上げ手段38で主ロー
プ7の両端10,11を支持したまま、図6に示すテン
ション調整部材用ナット41とばね40を取り外した
後、図5に示すように、主ロープ7の両端10,11を
機械室4の床から乗かご2上まで降ろす。また、この作
業後、乗かごプーリ8から機械室4の床までの距離と、
カウンタウェート3側のロープ保持具28から機械室4
の床までの距離とを、それぞれ測定しておく。
With the main rope pulling means 38 supporting the two ends 10, 11 of the main rope 7, the tension adjusting member nut 41 and the spring 40 shown in FIG. 6 are removed, and then, as shown in FIG. The both ends 10 and 11 of 7 are lowered from the floor of the machine room 4 onto the car 2. After this work, the distance from the car pulley 8 to the floor of the machine room 4
From the rope holder 28 on the counterweight 3 side to the machine room 4
And the distance to the floor are measured.

【0025】次に、第五工程として、乗かごプーリ8と
乗かご側端10との間で主ロープ7を切断すると共に、
ロープ保持具28とカウンタウェート側端11との間で
主ロープ7を切断する。
Next, as a fifth step, while cutting the main rope 7 between the car pulley 8 and the car side end 10,
The main rope 7 is cut between the rope holder 28 and the counterweight side end 11.

【0026】続く第六工程では、図1に示すように乗か
ごプーリ8の上部にテンション負荷装置27を設置す
る。このテンション負荷装置27には図7に示すよう
に、主ロープ7の乗かご2側の切断端と新主ロープ21
の一端とがそれぞれ数回半巻き付けられる。そして、テ
ンション負荷装置27に巻き付けられた主ロープ7の乗
かご2側の切断端は回収ドラム24へと引き出し、ま
た、テンション負荷装置27に巻き付けられた新主ロー
プ21の一端は、ロープグリップ23を用いて、ガイド
プーリ26に巻回させた主ロープ7のカウンタウェート
3側の切断端と接続する。
In the subsequent sixth step, a tension load device 27 is installed above the car pulley 8 as shown in FIG. As shown in FIG. 7, the tension load device 27 has a cut end of the main rope 7 on the car 2 side and the new main rope 21.
And one end of each are wound several times half. The cut end on the car 2 side of the main rope 7 wound around the tension load device 27 is pulled out to the collection drum 24, and one end of the new main rope 21 wound around the tension load device 27 is connected to the rope grip 23. Is connected to the cut end of the main rope 7 wound around the guide pulley 26 on the counterweight 3 side.

【0027】その後、第七工程として、交換する主ロー
プ7をロープ保持具28〜30から開放するが、その
際、テンション負荷装置27から引き出される新主ロー
プ21と、テンション負荷装置27に巻き取られる主ロ
ープ7との間に、テンションがかかるように、テンショ
ン負荷装置27に負荷をかける。この時点では図1に示
すように、交換されない主ロープ7のテンションは機械
室4のシーブ5付近で除去されており、交換する主ロー
プ7と新主ロープ21には昇降路1内において全体にテ
ンションがかけられた状態となっている。
Thereafter, as a seventh step, the main rope 7 to be replaced is released from the rope holders 28 to 30. At this time, the new main rope 21 pulled out from the tension load device 27 and wound around the tension load device 27. A load is applied to the tension load device 27 so that tension is applied to the main rope 7. At this time, as shown in FIG. 1, the tension of the main rope 7 that is not replaced has been removed near the sheave 5 of the machine room 4, and the main rope 7 to be replaced and the new main rope 21 have been totally removed in the hoistway 1. The tension has been applied.

【0028】このようにして準備作業が完了した時点
で、乗かご2上で低速下降運転の操作を行って機械室4
の巻上機を駆動させ、最上階乗場34に設置した回収ド
ラム24に既設の主ロープ7を巻き取っていくと共に、
同じく最上階乗場34に設置した新主ロープ用ドラム2
0から新主ロープ21を繰り出していくことにより、主
ロープ7,21が昇降路1内で交換されていく。そし
て、主ロープ7と新主ロープ21との接続部であるロー
プグリップ23がテンション負荷装置27から一定量引
き出された段階で運転を停止し、主ロープ7と新主ロー
プ21との接続を解除する。この状態で、新主ロープ2
1は、カウンタプーリ9や機械室4のプーリ6およびシ
ーブ5に巻回されて乗かご2上のテンション負荷装置2
7へ導かれており、主ロープ交換装置32の規制や案内
を受けるためカウンタプーリ9の溝に確実に巻き掛けら
れている。
When the preparatory work has been completed in this way, the operation of low-speed descent operation on the car 2 is performed to
Is driven to wind up the existing main rope 7 around the collection drum 24 installed at the top floor landing 34,
Drum 2 for new main rope also installed at the top floor landing 34
By extending the new main rope 21 from zero, the main ropes 7 and 21 are exchanged in the hoistway 1. Then, when the rope grip 23, which is the connection between the main rope 7 and the new main rope 21, is pulled out from the tension load device 27 by a certain amount, the operation is stopped, and the connection between the main rope 7 and the new main rope 21 is released. I do. In this state, the new main rope 2
1 is a tension load device 2 wound around a counter pulley 9 and a pulley 6 and a sheave 5 of a machine room 4 on a car 2.
7, and is securely wound around the groove of the counter pulley 9 in order to receive the regulation and guidance of the main rope changing device 32.

【0029】次いで、第八工程として、交換後の新主ロ
ープ21を再びロープ保持具28〜30で仮保持してテ
ンション負荷装置27から抜き取り、予め測定しておい
た乗かごプーリ8から機械室床までの距離とロープ保持
具28から機械室床までの距離とに合わせて、この新主
ロープ21の両端を切断する。そして、主ロープ7の乗
かご側端10やカウンタウェート側端11を外す際の手
順と逆の手順で作業を進めて、新主ロープ21の両端1
0,11を機械室4の床に固定する。
Next, as an eighth step, the new main rope 21 after the replacement is temporarily held again by the rope holders 28 to 30 and pulled out from the tension load device 27, and the machine room is removed from the car pulley 8 which has been measured in advance. Both ends of the new main rope 21 are cut in accordance with the distance to the floor and the distance from the rope holder 28 to the machine room floor. Then, work is performed in a procedure reverse to the procedure for removing the car side end 10 and the counterweight side end 11 of the main rope 7, and the two ends 1 of the new main rope 21 are removed.
0 and 11 are fixed to the floor of the machine room 4.

【0030】なお、上述した第三工程から第八工程まで
の作業を必要回数だけ順次繰り返して、すべての主ロー
プ7を交換してもよいが、乗かご2上や昇降路1内の状
況に応じて、第四工程および第五工程での作業をすべて
の主ロープ7に対して行った後、第六工程から第八工程
までの作業を必要回数だけ順次繰り返すようにしてもよ
い。
The above-described operations from the third step to the eighth step may be sequentially repeated as many times as necessary to replace all the main ropes 7. However, depending on the situation on the car 2 and the hoistway 1, Accordingly, after performing the operations in the fourth step and the fifth step for all the main ropes 7, the operations from the sixth step to the eighth step may be sequentially repeated as many times as necessary.

【0031】このように本実施形態例によれば、長尺穴
44や仕切り体35を有する主ロープ交差防止手段32
aと、主ロープ外れ止め手段32bと、仕切り板36を
有する主ロープ溝ずれ防止手段32cとを備え、ロープ
グリップ23の通過にも支障をきたさずに主ロープ7や
新主ロープ21をカウンタプーリ9の溝に対して位置決
めできる主ロープ交換装置32を採用しているので、主
ロープ7と新主ロープ21とを接続してカウンタプーリ
9を経由させながら両主ロープ7,21を交換していく
主ロープ交換作業において、従来懸念されていたカウン
タプーリ部での主ロープ同士の交差や主ロープの溝ず
れ、外れ等が発生しなくなる。したがって、かかる主ロ
ープの交差等を確認して直すという作業は不要となっ
て、カウンタプーリ9の近傍に作業足場を組み立てる必
要もなくなる。その結果、主ロープ交換作業の作業効率
が向上し、作業の安全性も高まる。
As described above, according to the present embodiment, the main rope intersection preventing means 32 having the elongated hole 44 and the partition 35 is provided.
a, a main rope slippage preventing means 32b, and a main rope groove slippage preventing means 32c having a partition plate 36. The main rope 7 and the new main rope 21 are separated by a counter pulley without hindering passage of the rope grip 23. Since the main rope exchanging device 32 which can be positioned with respect to the groove 9 is adopted, the main rope 7 and the new main rope 21 are connected, and the two main ropes 7 and 21 are exchanged while passing through the counter pulley 9. In many main rope replacement operations, the crossing of the main ropes at the counter pulley portion, the gap of the main ropes, the detachment of the main ropes, and the like, which have conventionally been concerned, do not occur. Therefore, there is no need to check and correct the intersection of the main ropes, and it is not necessary to assemble a work scaffold near the counter pulley 9. As a result, work efficiency of the main rope replacement work is improved, and work safety is also improved.

【0032】なお、上述した実施形態例では機械室4内
に巻上機が設置されているエレベータについて説明した
が、昇降路の上部等に巻上機を設置して機械室が省略さ
れているエレベータの場合にも、主ロープ交換装置32
を採用することで主ロープ交換作業の効率や安全性が向
上することは言うまでもない。
In the embodiment described above, the elevator in which the hoisting machine is installed in the machine room 4 has been described. However, the hoisting machine is installed in the upper part of the hoistway, and the machine room is omitted. In the case of an elevator, the main rope changing device 32
It is needless to say that the efficiency and safety of the main rope replacement work are improved by adopting the above.

【0033】[0033]

【発明の効果】以上説明したように本発明によるエレベ
ータの主ロープ交換方法は、仕切り幅が変位可能な主ロ
ープ交差防止手段および主ロープ溝ずれ防止手段を用い
ることによって、新旧の主ロープとその接続部をカウン
タプーリの所定の溝に確実に巻回させることができるの
で、交換作業中に主ロープがカウンタプーリから外れた
り溝ずれを起こす恐れがなくなる。それゆえ、カウンタ
プーリ部において主ロープの交差や外れを確認したり直
したりする煩雑な作業が省略でき、それに伴いカウンタ
プーリ近傍の高所に作業足場を組み立てる必要もなくな
って、安全かつ迅速に新旧の主ロープの交換作業が行え
るようになり、作業に要する費用も低減できる。
As described above, the method for exchanging the main rope of the elevator according to the present invention uses the main rope crossing prevention means and the main rope groove deviation prevention means capable of displacing the partition width, thereby enabling the old and new main ropes and their main ropes to be replaced. Since the connecting portion can be reliably wound around the predetermined groove of the counter pulley, there is no possibility that the main rope may come off the counter pulley or cause a groove shift during the replacement operation. Therefore, it is possible to omit the troublesome work of checking or repairing the crossing or disengagement of the main ropes at the counter pulley portion. The main rope replacement work can be performed, and the cost required for the work can be reduced.

【0034】また、本発明によるエレベータの主ロープ
交換装置は、主ロープ交差防止手段や主ロープ溝ずれ防
止手段、主ロープ外れ止め手段等を備えて構成され、新
旧の主ロープとその接続部をカウンタプーリの所定の溝
に確実に巻回させることができるので、交換作業中に主
ロープがカウンタプーリから外れたり溝ずれを起こす恐
れがなくなる。それゆえ、カウンタプーリ部において主
ロープの交差や外れを確認したり直したりする煩雑な作
業が省略でき、それに伴いカウンタプーリ近傍の高所に
作業足場を組み立てる必要もなくなって、安全かつ迅速
に新旧の主ロープの交換作業が行えるようになり、作業
に要する費用も低減できる。
The elevator main rope exchanging device according to the present invention is provided with a main rope crossing preventing means, a main rope groove deviation preventing means, a main rope detachment preventing means, and the like. Since the main rope can be reliably wound around the predetermined groove of the counter pulley, there is no risk of the main rope coming off the counter pulley or causing a groove shift during the replacement operation. Therefore, it is possible to omit the troublesome work of checking or repairing the crossing or detachment of the main rope in the counter pulley portion, and it is not necessary to assemble a work scaffold at a high place near the counter pulley, and the new and old work can be performed safely and quickly. The main rope replacement work can be performed, and the cost required for the work can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係るエレベータの主ロー
プ交換作業中の状態を示す縦断面図である。
FIG. 1 is a longitudinal sectional view showing a state during a main rope replacement operation of an elevator according to an embodiment of the present invention.

【図2】該エレベータの主ロープ交換作業開始時の状態
を示す縦断面図である。
FIG. 2 is a longitudinal sectional view showing a state where the main rope replacement work of the elevator is started.

【図3】該エレベータの主ロープ端取り外し作業の初期
状態を示す縦断面図である。
FIG. 3 is a longitudinal sectional view showing an initial state of a main rope end removing operation of the elevator.

【図4】該エレベータの主ロープ端取り外し作業の中期
状態を示す縦断面図である。
FIG. 4 is a longitudinal sectional view showing a middle stage state of a main rope end removing operation of the elevator.

【図5】該エレベータの主ロープ端取り外し作業の終期
状態を示す縦断面図である。
FIG. 5 is a longitudinal sectional view showing a final state of a main rope end removing operation of the elevator.

【図6】図4の要部拡大図である。FIG. 6 is an enlarged view of a main part of FIG. 4;

【図7】図1に示すテンション負荷装置の詳細図であ
る。
FIG. 7 is a detailed view of the tension load device shown in FIG.

【図8】図1に示す主ロープ交換装置を構成している主
ロープ交差防止手段の平面図である。
FIG. 8 is a plan view of a main rope crossing prevention unit included in the main rope exchange device shown in FIG. 1;

【図9】該主ロープ交換装置を構成している主ロープ外
れ止め手段の側面図である。
FIG. 9 is a side view of a main rope detaching prevention means constituting the main rope exchange device.

【図10】該主ロープ交換装置を構成している主ロープ
溝ずれ防止手段の正面図である。
FIG. 10 is a front view of a main rope groove deviation preventing means constituting the main rope exchanging device.

【図11】該主ロープ交換装置の全体正面図である。FIG. 11 is an overall front view of the main rope changing device.

【図12】該主ロープ交換装置の全体側面図である。FIG. 12 is an overall side view of the main rope changing device.

【図13】従来例に係るエレベータの主ロープ交換作業
中の状態を示す縦断面図である。
FIG. 13 is a longitudinal sectional view showing a state during a main rope replacement operation of an elevator according to a conventional example.

【符号の説明】[Explanation of symbols]

1 昇降路 2 乗かご 3 カウンターウェート 4 機械室 5 シーブ 7 主ロープ 8 乗かごプーリ 9 カウンタプーリ 20,24 ドラム 21 新主ロープ 23 ロープグリップ 32 主ロープ交換装置 32a 主ロープ交差防止手段 32b 主ロープ外れ止め手段 32c 主ロープ溝ずれ防止手段 35 仕切り体 36 仕切り板(巻回部仕切り体) 44 長尺穴 Reference Signs List 1 hoistway 2 elevator car 3 counter weight 4 machine room 5 sheave 7 main rope 8 elevator car pulley 9 counter pulley 20, 24 drum 21 new main rope 23 rope grip 32 main rope exchange device 32a main rope crossing prevention means 32b main rope detachment Stopping means 32c Main rope groove slippage prevention means 35 Partition body 36 Partition plate (winding part partition body) 44 Elongated hole

───────────────────────────────────────────────────── フロントページの続き (72)発明者 佐保田 典之 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 山下 浩二 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 吉田 洋一 東京都足立区中川4丁目16番29号 日立エ レベータテクノサービス株式会社内 (72)発明者 関谷 太志 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 続橋 英一郎 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 田中舘 聡 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 竹内 愛浩 茨城県日立市東多賀町一丁目1番1号 日 立多賀テクノロジー株式会社内 Fターム(参考) 3F305 BB02 BC21 DA11 DA21  ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Noriyuki Sabota 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo, Japan Inside the Hitachi Building System Co., Ltd. (72) Koji Yamashita 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo, Ltd. (72) Inventor Yoichi Yoshida 4-16-29 Nakagawa, Adachi-ku, Tokyo Within Hitachi Elevator Techno Service Co., Ltd. (72) Inventor Futoshi Sekiya 1-6-6 Kanda Nishikicho, Chiyoda-ku, Tokyo Stock Company (72) Inventor Eiichiro Suzuhashi 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo, Japan Incorporated Hitachi Building Systems (72) Inventor Satoshi Tanakadate 1-6-6, Kandanishikicho, Chiyoda-ku, Tokyo, Ltd. Hitachi Building Systems Co., Ltd. No. 1 No. 1 Date start-Taga Technology Co., Ltd. in the F-term (reference) 3F305 BB02 BC21 DA11 DA21

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 巻上機のシーブに巻回されると共にその
両端が昇降路の頂部に支持固定される複数本の主ロープ
と、この主ロープの一端と上記シーブとの間で該主ロー
プに乗かごプーリを係合させて支持される乗かごと、上
記主ロープの他端と上記シーブとの間で該主ロープにカ
ウンタプーリを係合させて支持されるカウンタウェート
とを備えたエレベータで、既設の主ロープと新主ロープ
とを接続して上記カウンタプーリを経由させながら両主
ロープを交換していく主ロープ交換方法において、 上記主ロープのうち上記カウンタプーリに巻かれている
部分の近傍を該カウンタプーリの溝方向へと導く長尺穴
と、この長尺穴を仕切って隣接する上記主ロープ同士の
交差を防止する仕切り体とを有し、この仕切り体の仕切
り幅を変位可能とした主ロープ交差防止手段と、 上記主ロープのうち上記カウンタプーリに巻かれている
部分を複数箇所で該カウンタプーリの溝に沿って案内す
る複数の巻回部仕切り体を有し、この巻回部仕切り体の
仕切り幅を変位可能とした主ロープ溝ずれ防止手段とを
用いて、 既設の主ロープを回収しながら新主ロープに交換してい
くことを特徴とするエレベータの主ロープ交換方法。
1. A plurality of main ropes wound around a sheave of a hoisting machine and both ends of which are supported and fixed to the top of a hoistway, and a main rope connected between one end of the main rope and the sheave. An elevator provided with a car supported by engaging a car pulley and a counterweight supported by engaging a counter pulley with the main rope between the other end of the main rope and the sheave. In the main rope exchange method of connecting an existing main rope and a new main rope and exchanging both main ropes through the counter pulley, a portion of the main rope wound on the counter pulley And a partition that partitions the elongated hole to prevent the adjacent main ropes from intersecting with each other, and displaces the partition width of the partition. Made possible A rope crossing prevention means, and a plurality of winding part partition bodies for guiding a part of the main rope wound around the counter pulley along a groove of the counter pulley at a plurality of locations. A main rope replacement method for an elevator, characterized in that an existing main rope is recovered and replaced with a new main rope by using a main rope groove displacement preventing means capable of displacing a partition width of a body.
【請求項2】 請求項1の記載において、上記カウンタ
プーリの溝に対向して設けられて上記主ロープの該溝か
らの脱落を防止する主ロープ外れ止め手段を用いたこと
を特徴とするエレベータの主ロープ交換方法。
2. The elevator according to claim 1, further comprising main rope detachment preventing means provided opposite to the counter pulley groove to prevent the main rope from dropping out of the groove. Main rope replacement method.
【請求項3】 巻上機のシーブに巻回されると共にその
両端が昇降路の頂部に支持固定される複数本の主ロープ
と、この主ロープの一端と上記シーブとの間で該主ロー
プに乗かごプーリを係合させて支持される乗かごと、上
記主ロープの他端と上記シーブとの間で該主ロープにカ
ウンタプーリを係合させて支持されるカウンタウェート
とを備えたエレベータで、既設の主ロープと新主ロープ
とを接続して上記カウンタプーリを経由させながら両主
ロープを交換していく作業時に用いられる主ロープ交換
装置において、 上記主ロープのうち上記カウンタプーリに巻かれている
部分の近傍を該カウンタプーリの溝方向へと導く長尺穴
と、この長尺穴を仕切って隣接する上記主ロープ同士の
交差を防止する仕切り体とを有する主ロープ交差防止手
段を備え、上記仕切り体の仕切り幅を変位可能としたこ
とを特徴とするエレベータの主ロープ交換装置。
3. A plurality of main ropes wound around a sheave of a hoisting machine and both ends of which are supported and fixed to the top of a hoistway, and a main rope connected between one end of the main rope and the sheave. An elevator provided with a car supported by engaging a car pulley and a counterweight supported by engaging a counter pulley with the main rope between the other end of the main rope and the sheave. In a main rope exchanging device used for connecting an existing main rope and a new main rope and exchanging both main ropes while passing through the counter pulley, the main rope is wound around the counter pulley among the main ropes. Main rope crossing preventing means having an elongated hole for guiding the vicinity of the portion in the groove direction of the counter pulley, and a partition member for partitioning the elongated hole and preventing the adjacent main ropes from intersecting with each other. Comprising, a main rope replacement device for an elevator, characterized in that the displaceable partition width of the partitioning member.
【請求項4】 巻上機のシーブに巻回されると共にその
両端が昇降路の頂部に支持固定される複数本の主ロープ
と、この主ロープの一端と上記シーブとの間で該主ロー
プに乗かごプーリを係合させて支持される乗かごと、上
記主ロープの他端と上記シーブとの間で該主ロープにカ
ウンタプーリを係合させて支持されるカウンタウェート
とを備えたエレベータで、既設の主ロープと新主ロープ
とを接続して上記カウンタプーリを経由させながら両主
ロープを交換していく作業時に用いられる主ロープ交換
装置において、 上記主ロープのうち上記カウンタプーリに巻かれている
部分を複数箇所で該カウンタプーリの溝に沿って案内す
る複数の巻回部仕切り体を有する主ロープ溝ずれ防止手
段を備え、上記巻回部仕切り体の仕切り幅を変位可能と
したことを特徴とするエレベータの主ロープ交換装置。
4. A plurality of main ropes wound around a sheave of a hoisting machine and both ends of which are supported and fixed to the top of a hoistway, and a main rope connected between one end of the main rope and the sheave. An elevator provided with a car supported by engaging a car pulley and a counterweight supported by engaging a counter pulley with the main rope between the other end of the main rope and the sheave. In a main rope exchanging device used for connecting an existing main rope and a new main rope and exchanging both main ropes while passing through the counter pulley, the main rope is wound around the counter pulley among the main ropes. A main rope groove deviation preventing means having a plurality of winding part partition bodies for guiding the cut portion along a groove of the counter pulley at a plurality of places, and the partition width of the winding part partition body can be displaced. The main rope replacement device for an elevator, characterized in that.
【請求項5】 請求項4の記載において、上記主ロープ
のうち上記カウンタプーリに巻かれている部分の近傍を
該カウンタプーリの溝方向へと導く長尺穴と、この長尺
穴を仕切って隣接する上記主ロープ同士の交差を防止す
る仕切り体とを有する主ロープ交差防止手段を備え、上
記仕切り体の仕切り幅を変位可能としたことを特徴とす
るエレベータの主ロープ交換装置。
5. An elongated hole for guiding a portion of the main rope, which is wound around the counter pulley, in a direction of a groove of the counter pulley, wherein the elongated hole is partitioned. A main rope changing device for an elevator, comprising: a main rope crossing preventing means having a partition body for preventing the adjacent main ropes from crossing each other, wherein a partition width of the partition body is displaceable.
【請求項6】 請求項3〜5のいずれかの記載におい
て、上記カウンタプーリの溝に対向して設けられて上記
主ロープの該溝からの脱落を防止する主ロープ外れ止め
手段を備えたことを特徴とするエレベータの主ロープ交
換装置。
6. The main rope detaching means according to claim 3, wherein said main rope is provided so as to face said groove of said counter pulley, and prevents said main rope from falling out of said groove. A main rope changing device for an elevator.
JP2001162662A 2001-05-30 2001-05-30 Main rope replacing method and main rope replacing device for elevator Pending JP2002356285A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001162662A JP2002356285A (en) 2001-05-30 2001-05-30 Main rope replacing method and main rope replacing device for elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001162662A JP2002356285A (en) 2001-05-30 2001-05-30 Main rope replacing method and main rope replacing device for elevator

Publications (1)

Publication Number Publication Date
JP2002356285A true JP2002356285A (en) 2002-12-10

Family

ID=19005755

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001162662A Pending JP2002356285A (en) 2001-05-30 2001-05-30 Main rope replacing method and main rope replacing device for elevator

Country Status (1)

Country Link
JP (1) JP2002356285A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005298084A (en) * 2004-04-07 2005-10-27 Toshiba Elevator Co Ltd Rope hooking device of elevator
JP2009155026A (en) * 2007-12-26 2009-07-16 Hitachi Ltd Compensation rope slip-off prevention device of elevator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005298084A (en) * 2004-04-07 2005-10-27 Toshiba Elevator Co Ltd Rope hooking device of elevator
JP4619031B2 (en) * 2004-04-07 2011-01-26 東芝エレベータ株式会社 Elevator rope hanging device
JP2009155026A (en) * 2007-12-26 2009-07-16 Hitachi Ltd Compensation rope slip-off prevention device of elevator

Similar Documents

Publication Publication Date Title
AU2007247066B2 (en) A method for replacing the hoisting roping of an elevator and a traction appliance arrangement used in the replacement
JP2007099515A (en) Method for mounting support means of lift cage to lift cage and lift shaft
JP2002356285A (en) Main rope replacing method and main rope replacing device for elevator
JP2510732B2 (en) Main loop replacement auxiliary device
JP4491110B2 (en) Elevator rope hanging method
JP2001287877A (en) Main rope replacement method and device for elevator
CN109292601B (en) Method for replacing steel wire rope of elevator
JP2603730B2 (en) How to change the elevator main rope
JPH0818774B2 (en) How to change the elevator main rope
JP2002205886A (en) Main rope replacing method for elevator
JP2002265164A (en) Main rope replacing method and main rope replacing device for two-to-one roping elevator
JP2003238046A (en) Main rope replacing method for elevator
JPH07133085A (en) Replacement of main rope of elevator
JP2003206083A (en) Main rope changing method and device for elevator
JP2014105035A (en) Method for replacing main rope of elevator
JP2912989B2 (en) Main rope hanging method of elevator
JP3035099B2 (en) Elevator main cable replacement method
JP3020325B2 (en) Elevator main cable replacement method
JP2654409B2 (en) Elevator main cable replacement method
WO2021106134A1 (en) Rope feeding assistance jig for elevator rope replacement work
JP2002205885A (en) Main rope end section adjusting method for two-to-one roping elevator
JP2849281B2 (en) Elevator main cable replacement method
JPH10218529A (en) Replacement method of elevator main rope
JP2002003125A (en) Method for replacing main rope of elevator
JPH054784A (en) Elevator main cable replacing method