JP2510732B2 - Main loop replacement auxiliary device - Google Patents

Main loop replacement auxiliary device

Info

Publication number
JP2510732B2
JP2510732B2 JP19672089A JP19672089A JP2510732B2 JP 2510732 B2 JP2510732 B2 JP 2510732B2 JP 19672089 A JP19672089 A JP 19672089A JP 19672089 A JP19672089 A JP 19672089A JP 2510732 B2 JP2510732 B2 JP 2510732B2
Authority
JP
Japan
Prior art keywords
main rope
rope
belt
new
wound around
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP19672089A
Other languages
Japanese (ja)
Other versions
JPH0361276A (en
Inventor
正宏 村瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Elevator Engineering and Service Co Ltd
Original Assignee
Hitachi Elevator Engineering and Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Elevator Engineering and Service Co Ltd filed Critical Hitachi Elevator Engineering and Service Co Ltd
Priority to JP19672089A priority Critical patent/JP2510732B2/en
Publication of JPH0361276A publication Critical patent/JPH0361276A/en
Application granted granted Critical
Publication of JP2510732B2 publication Critical patent/JP2510732B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

【発明の詳細な説明】 <産業上の利用分野> 本発明は主ロープ交換補助装置に係り、特にエレベー
タの主ロープの交換作業に使用される主ロープ交換補助
装置に関する。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a main rope replacement auxiliary device, and more particularly to a main rope replacement auxiliary device used for replacing a main rope of an elevator.

<従来の技術> エレベータにおいては、安全運転状態を確保するため
に、かごとつり合うおもりを吊り下げている主ロープ
を、定期的に新主ロープに交換することが必要である。
<Prior Art> In an elevator, in order to ensure a safe driving state, it is necessary to regularly replace a main rope suspending a car and a counterweight with a new main rope.

このエレベータの主ロープの交換作業は、特開昭52−
71043号公報に開示されているように、最上階に電動ウ
インチを設置し、ロープドラムを最下階に必要個数設置
して行う。この場合、ロープドラムから掛け廻しに必要
な長さの新主ロープを巻戻して切断し、新主ロープを最
下階に位置しているつり合おもり用のプーリに掛け廻
し、新主ロープのつり合いおもり側の一端を、最上階に
設置した電動ウインチの巻上用ロープに緊結し、電動ウ
インチを駆動させて新主ロープを引き上げ、新主ロープ
のつり合いおもり側の一端を、つり合いおもり側のロー
プ止めに固定する。
This elevator main rope replacement work is described in JP-A-52-
As disclosed in Japanese Patent No. 71043, an electric winch is installed on the top floor and a required number of rope drums are installed on the bottom floor. In this case, rewind the new main rope of the required length from the rope drum and cut it, hang the new main rope around the counterweight pulley located on the bottom floor, One end of the counterweight side is tightly connected to the hoisting rope of the electric winch installed on the top floor, the electric winch is driven to pull up the new main rope, and one end of the counterweight side of the new main rope is connected to the counterweight side. Secure with a rope stop.

次いで、新主ロープのかご側の他端を、電動ウインチ
の巻上用ロープに緊結し、電動ウインチを駆動させて新
主ロープを引き上げ、機械室に据付けられている巻上機
プーリ、そらせ用プーリ及び最上階に位置するかごプー
リに掛け廻し、新主ロープのかご側の他端をかご側のロ
ープ止めに仮固定する。
Next, the other end on the car side of the new main rope is tightly connected to the hoisting rope of the electric winch, the electric winch is driven to pull up the new main rope, and the hoisting machine pulley installed in the machine room Hang it around the pulley and the car pulley located on the top floor, and temporarily fix the other car end of the new main rope to the car rope stop.

以下同様にして、全ロープドラムの新ロープを1本ず
つ掛け廻し、全新ロープのかご側の他端をソケツテイン
グして、かご側のロープ止めに固定して主ロープの交換
作業が終了する。
In the same manner, the new ropes of all the rope drums are hung around one by one, the other end of the car side of the new rope is socketed, fixed to the rope stopper on the car side, and the replacement work of the main rope is completed.

<発明が解決しようとする課題> 前述した従来の新主ロープの交換作業では、電動ウイ
ンチを最上階に設置する必要があり、電動ウインチの最
上階までの運搬、組立設置及び電源確保などの煩雑な準
備作業が必要である。
<Problems to be Solved by the Invention> In the above-mentioned conventional operation of replacing the new main rope, it is necessary to install the electric winch on the uppermost floor, and it is complicated to carry the electric winch to the uppermost floor, assemble and install the power source, etc. Preparation work is necessary.

また、新主ロープと電動ウインチの巻上用ロープとの
緊結など、昇降路内で行わねばならぬ作業も多く、作業
能率と作業の安全性に問題があつた。
In addition, there were many work that had to be done in the hoistway, such as tightening the new main rope and the rope for hoisting the electric winch, and there was a problem in work efficiency and work safety.

本発明は、前述したエレベータの主ロープ交換作業の
現状に鑑みてなされたものであり、その目的は電動ウイ
ンチを使用せずに、エレベータの主ロープ交換作業を安
全且つ能率的に行うことが出来る主ロープ交換補助装置
を提供することにある。
The present invention has been made in view of the current state of the above-described elevator main rope replacement work, and the object thereof is to perform the elevator main rope replacement work safely and efficiently without using an electric winch. It is to provide a main rope replacement auxiliary device.

<課題を解決するための手段> 前記目的を達成するために、複数の主ロープが機械室
に設けられた巻上機のシーププーリに掛け廻され、前記
主ロープは両端が前記機械室の床にそれぞれ支持された
状態で、昇降路内に吊り下げられ、前記主ロープにかご
昇降体とつり合いおもり昇降体とが、互いに相反する方
向に移動自在にプーリを介して吊り下げられたエレベー
タに対して、前記主ロープの一端を切断し、この切断端
に階床から繰り出し自在に配された新主ロープの一端を
接続し、前記巻上機を駆動することにより、前記主ロー
プを前記新主ロープに交換する際に使用される主ロープ
交換補助装置である本発明は、前記昇降路壁に支持され
るフレームと、このフレームに回転自在に取り付けら
れ、前記主ロープの延長方向と交叉する方向に配列され
る3組のローラ列と、これらのローラ列にそれぞれ巻装
されたベルトとを有し、中央のローラ列に巻装されたベ
ルトと一方のベルト間に、下方に向かつて移動する前記
主ロープ又は前記新主ロープが挟持され、前記中央のロ
ーラ列に巻装されたベルトと他方側のベルト間に、上方
に向かつて移動する前記主ロープ又は前記新主ロープが
挟持されるように構成されている。
<Means for Solving the Problems> In order to achieve the above object, a plurality of main ropes are wound around a sheep pulley of a hoisting machine provided in the machine room, and both ends of the main rope are attached to the floor of the machine room. With respect to an elevator that is suspended in a hoistway while being respectively supported, a car elevating body and a weight elevating body that are balanced with the main rope by a pulley movably in opposite directions. , By cutting one end of the main rope, connecting one end of a new main rope that is arranged so as to be able to be paid out from the floor to the cut end, and driving the hoisting machine to move the main rope to the new main rope. The present invention, which is a main rope replacement assisting device used when replacing the main rope with a frame supported by the hoistway wall, is rotatably attached to the frame, and extends in a direction intersecting the extension direction of the main rope. The roller train has three sets of rollers arranged and belts respectively wound around these roller trains, and is moved downward between the belt wound around the central roller train and one of the belts. The main rope or the new main rope is clamped, and the main rope or the new main rope moving upward is clamped between the belt wound around the central roller row and the belt on the other side. It is configured.

<作用> 本発明を使用してエレベータの主ロープ交換を行うに
は、フレームを昇降路壁に支持し、おもり昇降体のプー
リに掛け廻された主ロープの一端側を、フレームに主ロ
ープの延長方向と交叉する方向に回転自在に配列される
3組のローラ列の中央のローラ列に巻装されたベルト
と、一方側のベルト間に配設する。また、おもり昇降体
のプーリに掛け廻された主ロープの他端側を、前記中央
のローラ列に巻装されたベルトと、他方側のベルト間に
配設する。
<Operation> In order to replace the main rope of the elevator using the present invention, the frame is supported on the hoistway wall, and one end of the main rope hung around the pulley of the weight lifting body is attached to the frame. It is arranged between a belt wound around a central roller row of three pairs of roller rows rotatably arranged in a direction intersecting with the extension direction and a belt on one side. Further, the other end side of the main rope wound around the pulley of the weight lifting body is arranged between the belt wound around the central roller row and the belt on the other side.

この状態で、主ロープの一端を切断し、この切断端に
階床から繰り出し自在に配された新主ロープの一端を接
続し、機械室に設けられている巻上機を駆動する。
In this state, one end of the main rope is cut, and one end of a new main rope that is freely drawn from the floor is connected to this cut end to drive the hoisting machine provided in the machine room.

この駆動によつて主ロープが、新主ロープに交換され
た状態で昇降路内に配設され、この交換の過程で3組の
ローラ列に巻装されたベルトで挟持された主ロープ又は
新主ロープは、自重で落下することがなく、安全且つ能
率的に主ロープの交換が行われる。
By this drive, the main rope is installed in the hoistway in a state where it is replaced with a new main rope, and in the process of this replacement, the main rope or the new rope sandwiched between the belts wound around the three roller rows is used. The main rope does not fall under its own weight, and the main rope can be replaced safely and efficiently.

<実施例> 以下、本発明の実施例を第1図乃至第3図を参照して
説明する。
<Example> Hereinafter, an example of the present invention will be described with reference to FIGS.

ここで、第1図は実施例を使用したエレベータの主ロ
ープ交換作業の説明図、第2図は実施の正面図、第3図
は第2図のA−A断面図である。
Here, FIG. 1 is an explanatory view of the main rope replacement work of the elevator using the embodiment, FIG. 2 is a front view of the implementation, and FIG. 3 is a sectional view taken along the line AA of FIG.

第2図及び第3図に示すように、主ロープ交換補助装
置14は、フレーム26にそれぞれ4個のローラ15a〜15cを
組とする3組のローラ列が、回転自在に取り付けられ、
各組のローラ列に対してそれぞれベルト18、16、17が巻
装されている。
As shown in FIGS. 2 and 3, in the main rope replacement auxiliary device 14, three pairs of roller rows each including four rollers 15a to 15c in a frame 26 are rotatably attached.
Belts 18, 16 and 17 are respectively wound around the roller rows of each set.

ベルト18とベルト16及びベルト16とベルト17とは、そ
れぞれ周面を近接対向して配設されていて、作業時に昇
降路壁にフレーム26が支持されて取り付けられた状態で
は、ベルト18とベルト16間及びベルト16とベルト17に、
エレベータの主ロープ7が、それぞれ弾性挟持されるよ
うなつている。また、ベルト17、18は中央のベルト16側
に移動可能な構造となつていて、この移動によつて主ロ
ープ交換補助装置14の主ロープ7の挟持力の調整が可能
になつている。
The belt 18 and the belt 16 and the belt 16 and the belt 17 are arranged so that their peripheral surfaces are closely opposed to each other, and when the frame 26 is supported and attached to the hoistway wall at the time of work, the belt 18 and the belt 18 are attached. Between 16 and belt 16 and belt 17,
The main ropes 7 of the elevator are elastically clamped. Further, the belts 17 and 18 are structured to be movable toward the central belt 16 side, and by this movement, the clamping force of the main rope 7 of the main rope replacement auxiliary device 14 can be adjusted.

実施例を使用して、エレベータの主ロープを交換する
際の交換作業について説明する。
Using examples, the replacement work when replacing the main rope of the elevator will be described.

(1)第1図において機械室4内に設置されている図示
せぬ巻上機を駆動させて、かご昇降体2が最上階床の近
傍に、つり合いおもり昇降体3が昇降路1のピツトに配
置した支持体12上に位置するように移動させ、この状態
で巻上機の駆動を停止させる。
(1) A hoist (not shown) installed in the machine room 4 in FIG. 1 is driven so that the car elevator 2 is located near the uppermost floor and the counterweight elevator 3 is installed in the hoistway 1. It is moved so as to be positioned on the support 12 arranged in the above position, and the drive of the hoisting machine is stopped in this state.

次いで、チエンブロツク13によつてかご昇降体2を、
かご側ロープ止め金具10の近傍の機械室4の床に吊り下
げる。
Then, the car elevator 2 is lifted by the chain block 13.
It is hung on the floor of the machine room 4 near the car-side rope stopper 10.

また、おもり側ロープ止め金具11の近傍の機械室4の
床に、実施例に係る主ロープ交換補助装置14をフレーム
26部分で吊り下げる。このようにして吊り下げられたフ
レーム26の上方の機械室4の床には、ガイドプーリ22が
取り付けられる。
In addition, on the floor of the machine room 4 near the rope stopper 11 on the weight side, the main rope replacement auxiliary device 14 according to the embodiment is framed.
Suspend at 26 parts. A guide pulley 22 is attached to the floor of the machine room 4 above the frame 26 thus suspended.

(2)つり合いおもり昇降体3のプーリ9に掛け廻され
ている主ロープ7のおもり側ロープ止め金具11に固定さ
れている一端側を、主ロープ交換補助装置14のベルト1
6、17間に導入し、この端部側の主ロープと対向し機械
室4のそらせプーリ6側に導かれる他端側を、主ロープ
交換補助装置14のベルト16、18間に導入する。
(2) Counterweight The one end of the main rope 7 hung around the pulley 9 of the lifting / lowering body 3 and fixed to the rope stopper 11 on the weight side is connected to the belt 1 of the main rope replacement assist device 14.
The other end side, which is introduced between 6 and 17, and which is opposed to the main rope on the end side and is guided to the deflecting pulley 6 side of the machine chamber 4, is introduced between the belts 16 and 18 of the main rope replacement auxiliary device 14.

そして、ベルト17、18をそれぞれベルト16側に移動さ
せ、主ロープ7が自重で落下しないように、ベルト16〜
18で圧接力を調整して弾性挟持させる。
Then, the belts 17 and 18 are moved to the belt 16 side so that the main rope 7 does not drop by its own weight.
Adjust the pressure contact force with 18 and elastically clamp.

(3)最上階床に新主ロープ21が巻装されているロープ
ドラム20を配設し、最上階床より1階下の階床に主ロー
プ7を巻き取る巻き取りドラム24を配設する。
(3) The rope drum 20 around which the new main rope 21 is wound is arranged on the top floor, and the winding drum 24 for winding the main rope 7 is arranged on the floor one floor below the top floor.

そして、ロープドラム20から新主ロープ21を巻き戻し
て、その先端部分をガイドプーリ22に掛け廻す。
Then, the new main rope 21 is unwound from the rope drum 20, and the tip portion thereof is hung around the guide pulley 22.

(4)おもり側ロープ止め金具11の近傍のA部で、主ロ
ープ7を切断し、その切断端とガイドプーリ22に掛け廻
されている新主ロープ21の端部とを圧着スリーブで相互
に接続してB部を形成する。
(4) The main rope 7 is cut at the portion A in the vicinity of the rope stopper 11 on the weight side, and the cut end and the end of the new main rope 21 wound around the guide pulley 22 are mutually connected by a crimp sleeve. Connect to form part B.

また、かご側ロープ止め金具10の近傍のC部で、主ロ
ープ7を切断し、この切断端をガイドプーリ23を介して
導出し、巻き取りドラム24に巻き取り可能に巻装する。
Further, the main rope 7 is cut at a portion C near the car-side rope stopper 10 and the cut end is led out through the guide pulley 23 and wound around the winding drum 24 so as to be wound up.

(5)機械室4の図示せぬ巻上機を低速で駆動し、そら
せプーリ6、シーブプーリ5、かご昇降体2のプーリ8
及びガイドプーリ23を介して、保守員によつて操作され
る巻き取りドラム24に主ロープ7が巻き取られる。
(5) The unillustrated hoisting machine in the machine room 4 is driven at a low speed, and the deflecting pulley 6, the sheave pulley 5, and the pulley 8 of the car elevating / lowering body 2 are driven.
The main rope 7 is wound around the winding drum 24, which is operated by the maintenance personnel, via the guide pulley 23.

この巻き取り作業の過程で、前述のB部がガイドプー
リ23に案内されて現れたら、巻上機を停止し、B部の接
続を解除して主ロープ7と新主ロープ21とを分離し、新
主ロープ21の端部をかご側ロープ止め金具10に接続固定
する。
In the course of this winding operation, when the above-mentioned part B is guided by the guide pulley 23 and appears, the hoisting machine is stopped, the connection of part B is released, and the main rope 7 and the new main rope 21 are separated. , Connect and fix the end of the new main rope 21 to the rope stopper 10 on the car side.

そして、おもり側ロープ止め金具11近傍において、新
主ロープ21を所定長に切断し、その切断端部をおもり側
ロープ止め金具11に接続固定する。
Then, in the vicinity of the weight side rope stopper 11, the new main rope 21 is cut into a predetermined length, and the cut end is connected and fixed to the weight side rope stopper 11.

(6)ガイドプーリ22、23及び主ロープ交換補助装置14
を取り外し、かご昇降体2を吊り上げていたチエンブロ
ツク13を取り外す。
(6) Guide pulleys 22 and 23 and main rope replacement auxiliary device 14
And remove the chain block 13 from which the car lifting body 2 is lifted.

そして、つり合いおもり昇降体3を保持していた支持
体12を取り除いて、かご昇降体2とつり合いおもり昇降
体3を昇降路1内で正常運転可能な状態に配設させる。
Then, the supporting body 12 holding the counterweight lifting / lowering body 3 is removed, and the car lifting / lowering body 2 and the counterweight lifting / lowering body 3 are arranged in the hoistway 1 in a state where normal operation is possible.

このように、主ロープ7の交換作業中主ロープ7又は
新主ロープ21は、ベルト16、17に弾性挟持されながら下
方に移動し、ベルト16、18に弾性挟持されながら上方に
移動する。この際、ベルト16〜18は主ロープ7又は新主
ロープ21を弾性挟持しているため、主ロープが自重で落
下することはない。
In this way, during the replacement work of the main rope 7, the main rope 7 or the new main rope 21 moves downward while being elastically sandwiched between the belts 16 and 17, and moves upward while being elastically sandwiched between the belts 16 and 18. At this time, since the belts 16 to 18 elastically sandwich the main rope 7 or the new main rope 21, the main rope does not drop by its own weight.

従つて、主ロープ落下防止のブレーキを設ける必要は
なく、主ロープ7の回収と新主ロープ21の巻き付けに必
要な動力は小さくなり、巻上機を低速で駆動させ、保守
員が巻き取りドラム24を操作するだけの簡単な作業で、
短時間に主ロープの交換が行われる。また、昇降路1内
で行う作業が大幅に削減され、主ロープ交換作業中に主
ロープは、主ロープ交換補助装置14に弾性挟持されてバ
ランス状態にあるため、保守員は安全に主ロープの交換
作業を行うことが出来る。
Therefore, it is not necessary to provide a brake for preventing the main rope from falling, and the power required for collecting the main rope 7 and winding the new main rope 21 becomes small, the hoist is driven at a low speed, and the maintenance staff takes up the winding drum. It is a simple work that only operates 24,
The main rope will be replaced in a short time. Further, the work performed in the hoistway 1 is significantly reduced, and during maintenance work of the main rope, the main rope is elastically clamped by the main rope replacement auxiliary device 14 and is in a balanced state. Exchange work can be performed.

第1図においては、かご昇降体2を昇降路1の最上階
近傍に、つり合いおもり昇降体3を昇降路1のピツト近
傍に位置させて、主ロープ交換作業を行う場合を説明し
たが、昇降路1の最上階近傍につり合いおもり昇降体3
を位置させ、昇降路1のピツト近傍にかご昇降体2を位
置させて、主ロープの交換を行うことも出来る。この場
合には、主ロープ交換補助装置14は、かご昇降体2のプ
ーリ8に掛け廻される主ロープを挟持するように、かご
側ロープ止め金具10側において、機械室4の床に吊り下
げられる。
In FIG. 1, the case where the car lifting / lowering body 2 is positioned near the top floor of the hoistway 1 and the counterweight lifting / lowering body 3 is positioned near the pits of the hoistway 1 to perform the main rope replacement work is described. Counterweight 3 near the top floor of Road 1
It is also possible to replace the main rope by positioning the car lifting body 2 near the pit of the hoistway 1. In this case, the main rope exchange assisting device 14 is hung on the floor of the machine room 4 on the side of the car-side rope stopper 10 so as to sandwich the main rope that is hung around the pulley 8 of the car lifter 2. .

<発明の効果> 以上詳細に説明したように、本発明に係る主ロープ交
換補助装置を使用すると、昇降路内での主ロープの自重
による落下が防止され、電動ウインチや落下防止ブレー
キを用いずに、簡単な設備構成で保守員の作業負担も少
なく安全且つ能率的にエレベータの主ロープの交換が行
われる。
<Effects of the Invention> As described in detail above, when the main rope replacement auxiliary device according to the present invention is used, the main rope is prevented from falling due to its own weight in the hoistway, and an electric winch or a fall prevention brake is not used. Moreover, the main ropes of the elevator can be replaced safely and efficiently with a simple equipment configuration and with less work load on maintenance personnel.

【図面の簡単な説明】[Brief description of drawings]

第1図は、本発明の実施例を使用したエレベータの主ロ
ープ交換作業の説明図、第2図は、本発明の実施例の正
面図、第3図は、第2図のA−A断面図である。 1……昇降路、2……かご昇降体、3……つり合いおも
り昇降体、4……機械室、5……シーブプーリ、6……
そらせプーリ、7……主ロープ、8、9……プーリ、10
……かご側ロープ止め金具、11……おもり側ロープ止め
金具、12……支持体、13……チエンブロツク、14……主
ロープ交換補助装置、15a、15b、15c……ローラ、16、1
7、18……ベルト、20……ロープドラム、21……新主ロ
ープ、24……巻き取りドラム、26……フレーム。
FIG. 1 is an explanatory view of an elevator main rope replacement work using an embodiment of the present invention, FIG. 2 is a front view of an embodiment of the present invention, and FIG. 3 is a sectional view taken along the line AA of FIG. It is a figure. 1 ... Hoistway, 2 ... Car lift, 3 ... Counterweight lift, 4 ... Machine room, 5 ... Sheave pulley, 6 ...
Deflection pulley, 7 ... Main rope, 8,9 ... Pulley, 10
…… Cage side rope stopper, 11 …… Weight side rope stopper, 12 …… Supporting body, 13 …… Chiene block, 14 …… Main rope replacement auxiliary device, 15a, 15b, 15c …… Roller, 16, 1
7, 18 …… Belt, 20 …… Rope drum, 21 …… New main rope, 24 …… Winding drum, 26 …… Frame.

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】複数の主ロープが、機械室に設けられた巻
上機のシーブプーリに掛け廻され、前記主ロープは両端
が前記機械室の床にそれぞれ支持された状態で、昇降路
内に吊り下げられ、前記主ロープにかご昇降体とつり合
いおもり昇降体とが、互いに相反する方向に移動自在に
プーリを介して吊り下げられたエレベータに対して、前
記主ロープの一端を切断し、この切断端に階床から繰り
出し自在に配された新主ロープの一端を接続し、前記巻
上機を駆動することにより、前記主ロープを前記新主ロ
ープに交換する際に使用される主ロープ交換補助装置で
あり、前記昇降路壁に支持されるフレームと、このフレ
ームに回転自在に取り付けられ、前記主ロープの延長方
向と交叉する方向に配列される3組のローラ列と、これ
らのローラ列にそれぞれ巻装されたベルトとを有し、中
央のローラ列に巻装されたベルトと一方側のベルト間
に、下方に向かつて移動する前記主ロープ又は前記新主
ロープが挟持され、前記中央のローラ列に巻装されたベ
ルトと他方側のベルト間に、上方に向かつて移動する前
記主ロープ又は前記新主ロープが挟持されるように構成
されてなる主ロープ交換補助装置。
1. A plurality of main ropes are wound around a sheave pulley of a hoisting machine provided in a machine room, and both ends of the main rope are supported in a floor of the machine room in a hoistway. Suspended, a car lifting body and a weight lifting body that are balanced with the main rope by the main rope are movably suspended in mutually opposite directions with respect to an elevator hung via a pulley, and one end of the main rope is cut, The main rope exchange used when exchanging the main rope with the new main rope by connecting one end of the new main rope that is freely extended from the floor to the cut end and driving the hoisting machine. An auxiliary device, a frame supported on the hoistway wall, three sets of roller rows rotatably attached to the frame and arranged in a direction intersecting with the extension direction of the main rope, and these roller rows Niso Each of them has a belt wound around it, and the main rope or the new main rope moving downward is sandwiched between the belt wound around the central roller row and the belt on one side, The main rope replacement auxiliary device configured such that the main rope moving upward and the new main rope are sandwiched between the belt wound around the roller row and the belt on the other side.
JP19672089A 1989-07-31 1989-07-31 Main loop replacement auxiliary device Expired - Lifetime JP2510732B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19672089A JP2510732B2 (en) 1989-07-31 1989-07-31 Main loop replacement auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19672089A JP2510732B2 (en) 1989-07-31 1989-07-31 Main loop replacement auxiliary device

Publications (2)

Publication Number Publication Date
JPH0361276A JPH0361276A (en) 1991-03-18
JP2510732B2 true JP2510732B2 (en) 1996-06-26

Family

ID=16362476

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19672089A Expired - Lifetime JP2510732B2 (en) 1989-07-31 1989-07-31 Main loop replacement auxiliary device

Country Status (1)

Country Link
JP (1) JP2510732B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003062116A1 (en) * 2002-01-18 2003-07-31 Nitta Corporation Elevator drive belt

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000187983A (en) 1998-12-22 2000-07-04 Nec Corp Memory device
FI119320B (en) * 2006-04-18 2008-10-15 Kone Corp Line feed device for mounting, replacing and / or retracting the carrier line in an elevator
JP4935465B2 (en) * 2007-04-02 2012-05-23 三菱電機ビルテクノサービス株式会社 Hydraulic rope main rope replacement method and main rope replacement pulley jig used therefor
FI122066B (en) * 2009-12-31 2011-08-15 Kone Corp A method of making a lift
US8448323B2 (en) * 2010-10-15 2013-05-28 Kone Corporation Method for modernizing an elevator
CN111566038B (en) * 2018-01-12 2021-07-02 三菱电机株式会社 Elevator and method for modifying same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003062116A1 (en) * 2002-01-18 2003-07-31 Nitta Corporation Elevator drive belt
US6983826B2 (en) 2002-01-18 2006-01-10 Nitta Corporation Elevator drive belt
KR100852850B1 (en) 2002-01-18 2008-08-18 니타 가부시키가이샤 Elevator drive belt

Also Published As

Publication number Publication date
JPH0361276A (en) 1991-03-18

Similar Documents

Publication Publication Date Title
US3519101A (en) Construction elevator system
JP2510732B2 (en) Main loop replacement auxiliary device
JP6969686B2 (en) How to extend the lift of a construction elevator
JP3807775B2 (en) How to lift the construction elevator
JP4491110B2 (en) Elevator rope hanging method
JP2001114484A (en) Construction method for suspending elevator main rope
JPH0791012B2 (en) Driving method of elevator main rope
JPH0818774B2 (en) How to change the elevator main rope
JP5595292B2 (en) Replacing the main rope of the machine room-less elevator
JPH01181689A (en) Lift rope replacing method
CN109952262B (en) Method for inspecting emergency stop device of elevator
JP2000344440A (en) Method of operation for hanging main rope of 2:1 roping elevator and main rope guide device therefor
JPH082850A (en) Work method in elevator shaft
JP2603730B2 (en) How to change the elevator main rope
JP2005280956A (en) Rescue device for confined passenger in elevator
JP2542086B2 (en) How to replace the main rope of the elevator
JPH0818773B2 (en) How to change the elevator main rope
JP3020325B2 (en) Elevator main cable replacement method
JPH0780656B2 (en) Elevator main rope replacement method
JPH054784A (en) Elevator main cable replacing method
JP2654409B2 (en) Elevator main cable replacement method
JPH0734067Y2 (en) Rope removal device
JP2003206083A (en) Main rope changing method and device for elevator
JP2004091208A (en) Method and device for replacing main rope of elevator
JP2008037624A (en) Method of replacing main rope for machine room-less elevator of 2:1 roping system