JP2002003125A - Method for replacing main rope of elevator - Google Patents

Method for replacing main rope of elevator

Info

Publication number
JP2002003125A
JP2002003125A JP2000181896A JP2000181896A JP2002003125A JP 2002003125 A JP2002003125 A JP 2002003125A JP 2000181896 A JP2000181896 A JP 2000181896A JP 2000181896 A JP2000181896 A JP 2000181896A JP 2002003125 A JP2002003125 A JP 2002003125A
Authority
JP
Japan
Prior art keywords
rope
main rope
elevator
main
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000181896A
Other languages
Japanese (ja)
Inventor
Noriyuki Sahoda
典之 佐保田
Kiyoshi Naganuma
清 長沼
Kazutake Yokoyama
一威 横山
Isato Uragami
勇人 浦上
Masahiro Murase
正宏 村瀬
Daisuke Fukunaga
大助 福永
Kazuyoshi Iizaka
和好 飯坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2000181896A priority Critical patent/JP2002003125A/en
Publication of JP2002003125A publication Critical patent/JP2002003125A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method for replacing a main rope of an elevator capable of replacing the main rope in a short time. SOLUTION: A counterweight 5 is fixed to a bottom 1a of a hoistway by a holding base 12, and a car 4 is hoisted by cranes 13a and 13b mounted on a pulley beam 8. Then, one end of a newly installed main rope 6 is connected to one end of an existing main rope 21 via a rope connecting means 17, and the existing main rope 21 is replaced by the newly installed main rope 6 by pulling out the other end of the existing main rope by a rope pull-in device 15 provided on an upper part of the car 4.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はエレベータの主ロー
プ交換方法及び装置に係わり、特に、昇降路上方に独立
した機械室を設けないエレベータの主ロープ交換方法に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for exchanging a main rope of an elevator, and more particularly, to a method of exchanging a main rope of an elevator without providing an independent machine room above a hoistway.

【0002】[0002]

【従来の技術】近年、エレベータにおいては、巻上機や
制御盤などを昇降路内に設置する方式のものが製品化さ
れており、屋上に機械室を形成する必要がないという利
点があるため、その市場は増えてきている。しかし、主
ロープは、従来の1:1ローピング方式のエレベータに
対して約4倍以上の長さが必要であり、この主ロープを
掛けるプーリの数が多いことから損傷を考慮した主ロー
プの交換周期が短くなっている。この種のエレベータに
おいて、かご枠の下部にかご下プーリを有したものが特
開平7−10437号公報および特開平11−1303
65号公報に記載されており、この場合の既設ロープの
交換は、特開平9−194160号公報に記載の跳ね出
し式の作業足場等を設置して行なっている。これを図7
に示したエレベータ昇降路の断面図を用いて説明する。
2. Description of the Related Art In recent years, elevators in which a hoisting machine and a control panel are installed in a hoistway have been commercialized, and there is an advantage that there is no need to form a machine room on a roof. , The market is growing. However, the length of the main rope is required to be about four times or more longer than that of the conventional 1: 1 roping type elevator, and since the number of pulleys on which the main rope is hung is large, replacement of the main rope in consideration of damage is required. The cycle is short. In this type of elevator, an elevator having a lower cage pulley at a lower portion of a car frame is disclosed in JP-A-7-10437 and JP-A-11-13033.
The replacement of the existing rope in this case is performed by installing a spring-type work scaffold or the like described in JP-A-9-194160. This is shown in FIG.
This will be described with reference to the sectional view of the elevator hoistway shown in FIG.

【0003】先ず、乗かご4およびつり合いおもり5を
それぞれ所定の位置に固定した後、既設のロープを撤去
し、その後、新設するロープ6の一方の端固定部6aを
プーリビーム8に連結し、作業者が跳ね出し式の作業足
場30に乗ってかご下プーリ4aにロープ6を掛けて立
ちあげ、プーリビーム8に取り付けた転向プーリ8aに
掛ける。その後、垂下したロープ6を昇降路1の下部に
配置したトラクションマシン7のプーリ7aに掛けた
後、再び立ちあげてプーリビーム8に取り付けた転向プ
ーリ8bおよびつり合いおもり5のおもり上プーリ5a
に掛けて他方の端固定部6bをプーリビーム8に連結す
る。このようにかご下プーリ4aおよびおもり上プーリ
5aにロープ6を掛けるために、跳ね出し式の作業足場
30を設置して作業を行なっている。
[0003] First, after the car 4 and the counterweight 5 are respectively fixed at predetermined positions, the existing rope is removed, and then one end fixing portion 6a of the new rope 6 is connected to the pulley beam 8 to perform work. A person stands on the bobbin pulley 4a with the rope 6 standing up on the spring-out work platform 30, and hangs on the turning pulley 8a attached to the pulley beam 8. Thereafter, the hanging rope 6 is hung on a pulley 7a of a traction machine 7 arranged at the lower part of the hoistway 1, and then rises again to turn the turning pulley 8b attached to the pulley beam 8 and the upper pulley 5a of the counterweight 5a.
To connect the other end fixing portion 6 b to the pulley beam 8. In this way, in order to hang the rope 6 on the lower car pulley 4a and the upper weight pulley 5a, the operation is performed by installing the spring-type work platform 30.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、従来の
エレベータの主ロープ交換方法は、既設ロープを全て撤
去した後、乗かご4の下部に設置したかご下プーリ4a
にロープ6を掛けるために、昇降路上部に跳ね出し式の
作業足場30を組み立て、この作業足場30に作業者が
乗って行なっていたため、ロープの交換に多大な作業時
間を必要としていた。
However, the conventional method for replacing the main rope of an elevator is to remove the existing ropes and then install the lower pulley 4a in the lower part of the car 4.
In order to hang the rope 6 on the hoistway, a spring-type work scaffold 30 was assembled on the upper part of the hoistway, and a worker took a ride on the work scaffold 30, so that a large amount of work time was required to replace the rope.

【0005】本発明の目的とするところは、短時間に主
ロープの交換を行なえるようにしたエレベータの主ロー
プ交換方法を提供することにある。
It is an object of the present invention to provide an elevator main rope replacement method capable of replacing a main rope in a short time.

【0006】[0006]

【課題を解決するための手段】本発明は上記目的を達成
するために、複数本の主ロープの両端を昇降路の頂部に
固定し、その中間部をつり合いおもりに設けたつり合い
おもり上プーリと、ピットに配置したトラクションマシ
ンのシーブと、上記昇降路の頂部付近に設置した二つの
転向プーリと、乗かごに設置したプーリとに巻きかけ、
既設主ロープを新設主ロープに交換するエレベータの主
ロープ交換方法において、上記乗かごおよび上記つり合
いおもりを所定の位置に支持した後、上記既設主ロープ
の一方の端部に上記新設主ロープの一端をロープ接続手
段で接続し、上記既設主ロープの他端から回収しながら
上記新設主ロープを交換するようにしたことを特徴とす
る。
According to the present invention, in order to achieve the above object, a plurality of main ropes are fixed at both ends to the top of a hoistway, and an intermediate portion thereof is provided with a counterweight upper pulley provided on a counterweight. , A sheave of a traction machine arranged in the pit, two turning pulleys installed near the top of the hoistway, and a pulley installed in the car,
In an elevator main rope replacement method for replacing an existing main rope with a new main rope, after supporting the car and the counterweight at a predetermined position, one end of the new main rope is attached to one end of the existing main rope. Are connected by a rope connecting means, and the new main rope is replaced while collecting from the other end of the existing main rope.

【0007】本発明のエレベータの主ロープ交換方法
は、乗かごおよびつり合いおもりを所定の位置に指示し
た後、既設主ロープの一端に新設主ロープを接続し、既
設主ロープの他端から回収しながら新設主ロープと入れ
替えるようにしたため、昇降路に足場の設置や撤去が不
要となり、短時間にエレベータの主ロープ交換を行なう
ことができる。また、電動機のシーブが回転可能な状態
であるのでロープの引っ張り力を小さくすることがで
き、短時間で主ロープの交換作業を行なうことができ
る。
In the elevator main rope replacement method according to the present invention, after a car and a counterweight are designated at predetermined positions, a new main rope is connected to one end of the existing main rope and collected from the other end of the existing main rope. However, since it is replaced with the new main rope, it is not necessary to install or remove a scaffold on the hoistway, and the main rope of the elevator can be replaced in a short time. Further, since the sheave of the electric motor is rotatable, the pulling force of the rope can be reduced, and the main rope can be replaced in a short time.

【0008】[0008]

【発明の実施の形態】以下、本発明の実施の形態を図面
によって説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0009】図5および図6は、本発明の一実施の形態
によるエレベータのロープ掛け方法を採用するエレベー
タ昇降路の断面正面図および断面側面図である。
FIGS. 5 and 6 are a sectional front view and a sectional side view of an elevator shaft adopting an elevator rope hanging method according to an embodiment of the present invention.

【0010】昇降路1のビル側には複数階床のエレベー
タ出入口が形成されており、この出入口から見て左右の
昇降路壁には一対の乗かご用ガイドレール2と、この乗
かご用ガイドレール2の奥側に位置する一対のつり合い
おもり用ガイドレール16がそれぞれ固定され、乗かご
4は乗かご用ガイドレール2に、また、つり合いおもり
5はつり合いおもり用ガイドレール16にそれぞれ案内
されて昇降可能である。昇降路1の上部1bの側壁には
プーリビーム8が詳細を省略した固定手段によって固定
されており、このプーリビーム8に転向プーリ8a,8
bが支持されている。また乗かご4の下部にはかご下プ
ーリ4a,4bが設けられ、つり合いおもり5の上部に
はつり合いおもり上プーリ5aが設けられている。主ロ
ープ21の一端は端固定部21aによりプーリビーム8
に固定され、また主ロープ21の他端は端固定部21b
によりプーリビーム8に固定され、その中間部は転向プ
ーリ8a,8b、かご下プーリ4a,4bおよびつり合
いおもり上プーリ5aに図示のように掛けられている。
An elevator entrance having a plurality of floors is formed on the building side of the hoistway 1, and a pair of car guide rails 2 and a guide for the car are provided on left and right hoistway walls as viewed from the entrance. A pair of counterweight guide rails 16 located on the inner side of the rail 2 are respectively fixed, and the car 4 is guided by the car guide rail 2 and the counterweight 5 is guided by the counterweight guide rail 16. It can be moved up and down. A pulley beam 8 is fixed to the side wall of the upper part 1b of the hoistway 1 by fixing means whose details are omitted.
b is supported. A lower car pulley 4a, 4b is provided at the lower part of the car 4 and a counterweight upper pulley 5a is provided at the upper part of the counterweight 5. One end of the main rope 21 is connected to the pulley beam 8 by the end fixing portion 21a.
And the other end of the main rope 21 is fixed to an end fixing portion 21b.
The pulley beam 8 is fixed to the pulley beam 8, and the intermediate portion thereof is hung on the turning pulleys 8a and 8b, the car lower pulleys 4a and 4b, and the counterweight upper pulley 5a as shown in the drawing.

【0011】昇降路の底部1aには支持ベース11上に
トラクションマシン7が設置されており、一般的なエレ
ベータにおいてトラクションマシン7などの配置のため
に昇降路1の上部に形成されている機械室は省略されて
いる。乗かご4およびつり合いおもり5の下部には、そ
れぞれ緩衝装置29,30が配置されている。
A traction machine 7 is installed on a support base 11 at the bottom 1a of the hoistway. A machine room formed above the hoistway 1 for disposing the traction machine 7 and the like in a general elevator. Has been omitted. Under the car 4 and the counterweight 5, shock absorbers 29 and 30 are arranged, respectively.

【0012】次に、図3に示したフローチャートを用い
ながらエレベータの主ロープ交換方法を説明する。
Next, an elevator main rope replacement method will be described with reference to the flowchart shown in FIG.

【0013】先ず、ステップS1で乗かごおよびつり合
いおもりを保持固定する工程を行なう。これは図1およ
び図2に示したように、つり合いおもり5の下部を保持
台12によって昇降路の底部1aに固定し、また、プー
リビーム8に吊り部8c,8dを固定し、この吊り部8
c,8dにチェーンブロックなどの揚重装置13a,1
3bを介して乗かご4を吊り上げると同時に、最初に交
換する一本目以外の既設主ロープ21のテンションを予
め算出した新設主ロープ6の初期伸びの長さ分だけ緩め
る。
First, in step S1, a step of holding and fixing the car and the counterweight is performed. As shown in FIGS. 1 and 2, as shown in FIGS. 1 and 2, the lower portion of the counterweight 5 is fixed to the bottom 1 a of the hoistway by the holding stand 12, and the hanging portions 8 c and 8 d are fixed to the pulley beam 8.
Lifting devices 13a, 1 such as chain blocks for c and 8d
At the same time as lifting the car 4 via 3b, the tension of the existing main rope 21 other than the first main rope to be replaced first is loosened by the length of the initial extension of the new main rope 6 calculated in advance.

【0014】次に、ステップS2でトラクションマシン
7のブレーキを開放するが、機械的に図示しないブレー
キ開放治具を用いるか、または電気的な回路によりブレ
ーキを開放する。
Next, in step S2, the brake of the traction machine 7 is released. The brake is released mechanically by using a brake release jig (not shown) or by an electric circuit.

【0015】次いで、ステップS3のロープ引込み装置
15を設置する。ロープ引込み装置15は、図1および
図2に示すように乗かご4のかご上の強度部材に固定す
るが、ここで使用するロープ引込み装置15としては動
力によりドラムを回転させてロープを巻き取るものより
も、エンドレスにロープを送り出す方式のものが望まし
い。次のステップS4では、既設主ロープ21を把握す
る。これは、既設主ロープ21の一本をつり合いおもり
用レール16や乗かご4などに図示しない固定体を用い
て固定する。
Next, the rope retracting device 15 in step S3 is installed. The rope retracting device 15 is fixed to a strength member on the car of the car 4 as shown in FIGS. 1 and 2, and the rope retracting device 15 used here rotates the drum by power to wind up the rope. It is more desirable to use a system that sends out a rope endlessly than a rope. In the next step S4, the existing main rope 21 is grasped. For this, one of the existing main ropes 21 is fixed to the counterweight rail 16 or the car 4 using a fixed body (not shown).

【0016】その後、ステップS5ではステップS4で
固定した既設主ロープ21の固定位置よりも上方でその
既設主ロープ21を切断し、図1および図2に示すよう
にエレベータホール24に新設主ロープ6を巻回したド
ラム28を設置する。またプーリビーム8にガイド手段
14a,14bを配置するが、特にガイド手段14bは
つり合いおもり上プーリ5aの上部に位置するように取
り付ける。その後、ドラム28からガイド手段14a,
14bを介して一本の新設主ロープ6の一端を昇降路1
内に引き込み、この新設主ロープ6と一本の既設主ロー
プ21とをロープ接続手段17で接続する。このロープ
接続手段17は、両ロープの端部同士を突き合わせた部
分を包むように設置され、互いのロープが引っ張られる
ことで、円筒形の網状に形成されたロープ接続手段17
の円筒形が縮まって各プーリを通過可能に接続するよう
になっている。また、両主ロープのそれぞれの端部をほ
ぐし、各々のストランド同士を圧着部材等を用いて接続
しても良い。
Then, in step S5, the existing main rope 21 is cut above the fixing position of the existing main rope 21 fixed in step S4, and the new main rope 6 is inserted into the elevator hall 24 as shown in FIGS. Is installed. Also, guide means 14a and 14b are arranged on the pulley beam 8, and especially the guide means 14b is attached so as to be located above the counterweight upper pulley 5a. Thereafter, the guide means 14a,
14b, one end of one new main rope 6 is connected to the hoistway 1
The new main rope 6 and one existing main rope 21 are connected by the rope connecting means 17. The rope connecting means 17 is installed so as to wrap a portion where the ends of both ropes abut each other, and the ropes are pulled by each other to form a rope connecting means 17 formed in a cylindrical net shape.
Is shrunk and connected so that each pulley can pass through. Alternatively, the ends of the two main ropes may be loosened, and the respective strands may be connected to each other using a crimping member or the like.

【0017】次にステップS6で、一本の既設主ロープ
21を引き出しながら新設主ロープ6を掛ける。このと
き、乗かご4のかご上にロープ引込み装置15を固定
し、乗かご4側の既設主ロープ21の端部を端固定部2
1aの近傍で切断し、その既設主ロープ21の同側端部
をガイド手段14cを介してロープ引込み装置15に装
着する。その後、ロープ引込み装置15を動作させて既
設主ロープ21が収納容器20内に収納して行くが、ロ
ープ引込み装置15を作動させるとロープ接続手段17
で接続した新設主ロープ6はガイド手段14b,14a
を通過し、つり合いおもり上プーリ5a……転向プーリ
8b……シーブ7a……転向プーリ8a……かご下プー
リ4a,4bを順次通過して掛けられていく。
Next, in step S6, the new main rope 6 is hung while pulling out one existing main rope 21. At this time, the rope retraction device 15 is fixed on the car of the car 4 and the end of the existing main rope 21 on the side of the car 4 is fixed to the end fixing section 2.
The main rope 21 is cut in the vicinity of 1a, and the same side end of the existing main rope 21 is attached to the rope pull-in device 15 via the guide means 14c. After that, the existing main ropes 21 are stored in the storage container 20 by operating the rope retracting device 15.
The new main ropes 6 connected by means of the guide means 14b, 14a
, A counterweight upper pulley 5a, a turning pulley 8b, a sheave 7a, a turning pulley 8a, and a car pulley 4a, 4b.

【0018】ステップS7では、新設主ロープ6の端部
をそれぞれ端固定部21a,21bに図示しない接続部
材で接続する。上述した一連の作業を、主ロープの本数
の全てについて行なう。
In step S7, the ends of the newly installed main rope 6 are connected to the end fixing portions 21a and 21b by connecting members (not shown). The above-described series of operations is performed for all the main ropes.

【0019】続くステップS8では、揚重装置13a,
13bを緩めて乗かご4を新設主ロープ6で吊り下げ、
新設主ロープ6の端固定部21a,21bで全てのロー
プのテンション調整を行ない、これによってロープ交換
作業を完了する。
In the following step S8, the lifting devices 13a,
13b is loosened and the car 4 is suspended by the new main rope 6,
The tension of all the ropes is adjusted by the end fixing portions 21a and 21b of the newly installed main rope 6, thereby completing the rope replacement work.

【0020】上述したステップS1で、乗かご4および
つり合いおもり5を保持固定するとき、緩めた既設主ロ
ープ21の一本がつり合いおもり上プーリ5aの溝から
外れてしまい、再度、既設主ロープ21aにテンション
を掛けたときに、もとの溝に収まらずにつり合いおもり
上プーリ5aの軸部に掛かってしまうことが考えられ
る。
When the car 4 and the counterweight 5 are held and fixed in step S1 described above, one of the loosened main ropes 21 comes off the groove of the counterweight upper pulley 5a, and the existing main rope 21a is again turned on. It is conceivable that when tension is applied to the shaft of the counterweight upper pulley 5a without fitting into the original groove.

【0021】そのような場合、一部断面した平面図であ
る図4に示すように外れ止め装置22を設置する。この
外れ止め装置22は、既設主ロープ21c,21d,2
1eが掛けられている両側に一対配置されており、既設
主ロープ21c,21d,21eがつり合いおもり上プ
ーリ5aの溝から離れようとするのを防止するように近
接して配置した案内部22cと、既設主ロープ21c,
21d,21eがつり合いおもり5の枠体5bの方向へ
移動して軸部5cに掛かるのを防止するつば部22d,
22eと、これらの案内部22cおよびつば部22d,
22eの一つを規制して外れ止め装置22をつり合いお
もり5の枠体5bに固定する固定手段22a,22bと
から構成している。
In such a case, a stopper device 22 is installed as shown in FIG. The detachment preventing device 22 is provided with the existing main ropes 21c, 21d, 2
A pair of guide portions 22c are disposed on both sides where 1e is hung, and are arranged close to each other so as to prevent the existing main ropes 21c, 21d and 21e from moving away from the groove of the counterweight upper pulley 5a. , The existing main rope 21c,
Collar 22d, which prevents 21d, 21e from moving in the direction of frame 5b of counterweight 5 and hanging on shaft 5c.
22e, these guide portions 22c and collar portions 22d,
Fixing means 22a and 22b for fixing one of the stoppers 22e to the frame 5b of the counterweight 5 by regulating one of the stoppers 22e.

【0022】上述したように緩めた既設主ロープ21
d,21eがつり合いおもり上プーリ5aの溝5eから
外れてしまい、再度、既設主ロープ21d,21eにテ
ンションをかけたときに、もとの溝5eに収まらずにつ
り合いおもり上プーリ5aの軸部5cに掛かってしまう
ことが考えられるが、ロープ外れ止め装置22を事前に
設置しておくなら、緩めた主ロープに再度テンションを
かけたときに主ロープが溝5eから外れてしまうことは
ない。このロープ外れ止め装置22の付設は、つり合い
おもり上プーリ5aやその他のプーリ、またはシーブ7
aの主ロープが外れそうなものにおいて行なうことがで
きる。
The existing main rope 21 which has been loosened as described above
d and 21e are disengaged from the groove 5e of the counterweight upper pulley 5a, and when tension is applied to the existing main ropes 21d and 21e again, the shaft portion of the counterweight upper pulley 5a does not fit in the original groove 5e. Although it is conceivable that the rope 5c may be hung, if the rope detachment preventing device 22 is installed in advance, the main rope will not come off from the groove 5e when the loosened main rope is re-tensioned. The attachment of the rope stopper device 22 includes the counterweight upper pulley 5a and other pulleys or sheaves 7a.
This can be done on those where the main rope of a is likely to come off.

【0023】このようなエレベータの主ロープ交換方法
によれば、既設主ロープ21の撤去前に、既設主ロープ
21の一方の端部に新設主ロープ6の一方の端部を連結
し、既設主ロープ21の他端側をロープ引込み装置15
に導入して巻き取り回収できるようにしているため、従
来のように昇降路に足場を設置する必要がなく、また、
電動機のシーブが回転可能な状態であるのでロープの引
っ張り力を小さくすることができるため、短時間で主ロ
ープの交換作業を行なうことができる。
According to such an elevator main rope replacement method, one end of the new main rope 6 is connected to one end of the existing main rope 21 before the existing main rope 21 is removed. Connect the other end of the rope 21 to the rope retraction device 15
It is not necessary to install a scaffold in the hoistway as before,
Since the sheave of the electric motor is rotatable, the pulling force of the rope can be reduced, so that the main rope can be replaced in a short time.

【0024】また、上述した実施の形態では、既設主ロ
ープ21を1本ずつ交換しているが、エレベータホール
24に交換する各新設主ロープ6を巻き付けるドラム2
8と、回収する既設主ロープ21をそれぞれ収納する収
納容器21を設置するスぺースが十分にある場合、三本
の既設主ロープ21c,21d,21eと三本の新設主
ロープ6を同時に交換することもできる。
In the above-described embodiment, the existing main ropes 21 are replaced one by one, but the drum 2 around which each new main rope 6 to be replaced with the elevator hall 24 is wound.
8 and three existing main ropes 21c, 21d, 21e and three new main ropes 6 are simultaneously replaced when there is sufficient space for installing the storage container 21 for storing the existing main ropes 21 to be collected. You can also.

【0025】尚、上述した実施の形態ではかご上にロー
プ引込み装置15を設置し、このロープ引込み装置15
によって既設主ロープ21を回収するようにしたが、こ
のロープ引込み装置15を設けないで、トラクションマ
シン7の電動機を運転しながら既設主ロープ21の端固
定部21a側の端を引き出すようにしても同様である。
In the embodiment described above, the rope retracting device 15 is installed on the car, and the rope retracting device 15
Although the existing main rope 21 is collected by the above, the end of the existing main rope 21 on the end fixing portion 21a side may be pulled out while operating the electric motor of the traction machine 7 without providing the rope retracting device 15. The same is true.

【0026】[0026]

【発明の効果】以上説明したように本発明によるエレベ
ータの主ロープ交換方法は、つり合いおもりおよび乗か
ごを所定の位置に保持した後、既設主ロープの一端に新
設主ロープの一端を接続し、既設主ロープを引き出しな
がら新設主ロープと入れ替えるようにしたため、昇降路
に跳ね出し式足場を設置する必要がなくなるので短時間
にエレベータの主ロープ交換を行なうことができる。ま
た、電動機のシーブが回転可能な状態であるのでロープ
の引っ張り力を小さくすることができるため、短時間で
主ロープの交換作業を行なうことができる。
As described above, according to the elevator main rope replacement method of the present invention, after the counterweight and the car are held at predetermined positions, one end of the new main rope is connected to one end of the existing main rope. Since the existing main ropes are pulled out and replaced with the new main ropes, there is no need to install a spring-type scaffold on the hoistway, so that the main ropes of the elevator can be replaced in a short time. In addition, since the sheave of the electric motor is rotatable, the pulling force of the rope can be reduced, so that the main rope can be replaced in a short time.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態によるエレベータの主ロ
ープ交換方法を採用した作業途中状態を示すエレベータ
昇降路の断面正面図である。
FIG. 1 is a cross-sectional front view of an elevator hoistway showing a state in the middle of work using an elevator main rope replacement method according to an embodiment of the present invention.

【図2】図1に示したエレベータ昇降路の断面側面図で
ある。
FIG. 2 is a sectional side view of the elevator shaft shown in FIG.

【図3】図1に示したエレベータにおける主ロープ交換
方法を示すフローチャートである。
FIG. 3 is a flowchart showing a main rope replacement method in the elevator shown in FIG.

【図4】図1に示したエレベータの要部を示す一部断面
平面図である。
FIG. 4 is a partial sectional plan view showing a main part of the elevator shown in FIG. 1;

【図5】図1に示したエレベータの作業前状態を示すエ
レベータ昇降路の断面正面図である。
FIG. 5 is a sectional front view of the elevator shaft showing a state before the operation of the elevator shown in FIG. 1;

【図6】図5に示したエレベータ昇降路の断面側面図で
ある。
6 is a sectional side view of the elevator shaft shown in FIG.

【図7】従来のエレベータの主ロープ交換方法を採用し
た作業途中状態を示すエレベータ昇降路の断面側面図で
ある。
FIG. 7 is a sectional side view of an elevator hoistway showing a state in the middle of work using a conventional method of replacing a main rope of an elevator.

【符号の説明】[Explanation of symbols]

1 昇降路 4 乗かご 4b かご下プーリ 5 つり合いおもり 6 新設主ロープ 7 トラクションマシン 8 プーリビーム 8a,8b 転向プーリ 12 保持台 13a,13b 揚重装置 15 ロープ引込み装置 17 ロープ接続手段 21 既設主ロープ 22 ロープ外れ止め装置 DESCRIPTION OF SYMBOLS 1 Hoistway 4 Car 4b Car lower pulley 5 Counterweight 6 New main rope 7 Traction machine 8 Pulley beam 8a, 8b Turning pulley 12 Holder 13a, 13b Lifting device 15 Rope pull-in device 17 Rope connecting means 21 Existing main rope 22 Rope Captive device

───────────────────────────────────────────────────── フロントページの続き (72)発明者 横山 一威 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 浦上 勇人 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 村瀬 正宏 東京都足立区中川4丁目16番29号 日立エ レベータテクノサービス株式会社内 (72)発明者 福永 大助 東京都足立区中川4丁目16番29号 日立エ レベータテクノサービス株式会社内 (72)発明者 飯坂 和好 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 Fターム(参考) 3F305 BA03 BB02 BB19 DA11 DA15 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Kazutake Yokoyama 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo, Japan Inside the Hitachi Building System Co., Ltd. (72) Inventor Hayato Urakami 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo, Japan (72) Inventor Masahiro Murase 4-16-29 Nakagawa, Adachi-ku, Tokyo Inside Hitachi Elevator Techno Service Co., Ltd. (72) Daisuke Fukunaga 4-16-29 Nakagawa, Adachi-ku, Tokyo Hitachi Elevator Techno Service Co., Ltd. (72) Inventor Kazuyoshi Iizaka 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo F-term in Hitachi Building Systems Co., Ltd. 3F305 BA03 BB02 BB19 DA11 DA15

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 複数本の主ロープの両端を昇降路の頂部
に固定し、その中間部をつり合いおもりに設けたつり合
いおもり上プーリと、ピットに配置したトラクションマ
シンのシーブと、上記昇降路の頂部付近に設置した二つ
の転向プーリと、乗かごに設置したプーリとに巻きか
け、既設主ロープを新設主ロープに交換するエレベータ
の主ロープ交換方法において、上記乗かごおよび上記つ
り合いおもりを所定の位置に支持した後、上記既設主ロ
ープの一方の端部に上記新設主ロープの一端をロープ接
続手段で接続し、上記既設主ロープの他端から回収しな
がら上記新設主ロープを交換するようにしたことを特徴
とするエレベータの主ロープ交換方法。
1. A balance weight upper pulley having both ends of a plurality of main ropes fixed to a top portion of a hoistway, a middle portion thereof being provided on a balance weight, a sheave of a traction machine arranged in a pit, and a shaft of the hoistway. In the main rope replacement method of an elevator in which the two main pulleys installed near the top and the pulleys installed in the car are wound around and the existing main ropes are replaced with new main ropes, the above-mentioned car and the counterweight are provided in a predetermined manner. After being supported at the position, one end of the new main rope is connected to one end of the existing main rope by a rope connecting means, and the new main rope is replaced while being recovered from the other end of the existing main rope. A main rope replacement method for an elevator, characterized in that:
【請求項2】 請求項1記載のものにおいて、上記乗か
ごを上記昇降路の上部近傍に支持したことを特徴とする
エレベータの主ロープ交換方法。
2. The method according to claim 1, wherein the car is supported near an upper portion of the hoistway.
【請求項3】 請求項1記載のものにおいて、複数本の
上記既設主ロープのうち、1回目の交換対象以外のもの
のロープテンションを緩め、上記トラクションマシンの
シーブを回転可能な状態にして行なうようにしたことを
特徴とするエレベータの主ロープ交換方法。
3. The traction machine according to claim 1, wherein the rope tension of a plurality of the existing main ropes other than the first replacement target rope is loosened so that the sheave of the traction machine is rotatable. A main rope replacement method for an elevator, characterized in that:
【請求項4】 請求項1記載のものにおいて、上記既設
主ロープの他端近傍にロープ引き込み装置を設け、この
ロープ引き込み装置によって上記既設主ロープの他端を
回収するようにしたことを特徴とするエレベータの主ロ
ープ交換方法。
4. The apparatus according to claim 1, wherein a rope retraction device is provided near the other end of the existing main rope, and the other end of the existing main rope is collected by the rope retraction device. How to change the main rope of the elevator.
【請求項5】 請求項1記載のものにおいて、上記トラ
クションマシンを駆動してそのシーブを回転しながら、
上記既設主ロープの他端を回収するようにしたことを特
徴とするエレベータの主ロープ交換方法。
5. The apparatus according to claim 1, wherein the traction machine is driven to rotate a sheave thereof.
An elevator main rope replacement method, wherein the other end of the existing main rope is collected.
【請求項6】 請求項1記載のものにおいて、上記シー
ブおよび上記各プーリの所定のものに、上記主ロープが
外れないようにするロープ外れ止め装置を設けた後、上
記既設主ロープの回収を行なうようにしたことを特徴と
するエレベータの主ロープ交換方法。
6. The device according to claim 1, wherein a predetermined device of the sheave and each of the pulleys is provided with a rope stopper device for preventing the main rope from coming off, and then the existing main rope is recovered. A method of replacing a main rope of an elevator, wherein the method is performed.
JP2000181896A 2000-06-16 2000-06-16 Method for replacing main rope of elevator Pending JP2002003125A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000181896A JP2002003125A (en) 2000-06-16 2000-06-16 Method for replacing main rope of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000181896A JP2002003125A (en) 2000-06-16 2000-06-16 Method for replacing main rope of elevator

Publications (1)

Publication Number Publication Date
JP2002003125A true JP2002003125A (en) 2002-01-09

Family

ID=18682754

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000181896A Pending JP2002003125A (en) 2000-06-16 2000-06-16 Method for replacing main rope of elevator

Country Status (1)

Country Link
JP (1) JP2002003125A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009534275A (en) * 2006-04-18 2009-09-24 コネ コーポレイション Rope recovery method and apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009534275A (en) * 2006-04-18 2009-09-24 コネ コーポレイション Rope recovery method and apparatus

Similar Documents

Publication Publication Date Title
JP2007099515A (en) Method for mounting support means of lift cage to lift cage and lift shaft
JP2008222382A (en) Method for moving lifting device for installation
JP4491110B2 (en) Elevator rope hanging method
JP4089986B2 (en) Hydraulic rope main rope replacement method
JP2008308248A (en) Elevator rope reeving method
JP3807775B2 (en) How to lift the construction elevator
JP2003128359A (en) Roping method for elevator
JP3841616B2 (en) Elevator main rope replacement method and apparatus
JP3844944B2 (en) Demolition method of construction elevator
JP2001114484A (en) Construction method for suspending elevator main rope
JP2002003125A (en) Method for replacing main rope of elevator
JP2839970B2 (en) Elevator main cable replacement method
JPH082850A (en) Work method in elevator shaft
JPH0818774B2 (en) How to change the elevator main rope
JP2000344440A (en) Method of operation for hanging main rope of 2:1 roping elevator and main rope guide device therefor
JP2003238046A (en) Main rope replacing method for elevator
JP5058181B2 (en) How to hang an elevator rope
JP2007186274A (en) Method for installing elevator hoistway top part equipment
JPH10203751A (en) Main rope replacing method of 2:1 roping elevator and device thereof
JP2003206083A (en) Main rope changing method and device for elevator
JP2654409B2 (en) Elevator main cable replacement method
JPH08133634A (en) Jumping method for jump-up elevator
JPH09235082A (en) Elevator modification method
JPH10218529A (en) Replacement method of elevator main rope
JPH0262389A (en) Rope changing method for elevator

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060117

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060530