JP2002098728A - Electric leak detection device - Google Patents

Electric leak detection device

Info

Publication number
JP2002098728A
JP2002098728A JP2001209917A JP2001209917A JP2002098728A JP 2002098728 A JP2002098728 A JP 2002098728A JP 2001209917 A JP2001209917 A JP 2001209917A JP 2001209917 A JP2001209917 A JP 2001209917A JP 2002098728 A JP2002098728 A JP 2002098728A
Authority
JP
Japan
Prior art keywords
leakage detection
leakage
voltage
sine wave
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001209917A
Other languages
Japanese (ja)
Other versions
JP4875257B2 (en
Inventor
Ken Osawa
憲 大澤
Masahiro Takada
雅弘 高田
Teruyoshi Ekoshi
輝善 江越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Panasonic Holdings Corp
Original Assignee
Toyota Motor Corp
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp, Matsushita Electric Industrial Co Ltd filed Critical Toyota Motor Corp
Priority to JP2001209917A priority Critical patent/JP4875257B2/en
Publication of JP2002098728A publication Critical patent/JP2002098728A/en
Application granted granted Critical
Publication of JP4875257B2 publication Critical patent/JP4875257B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Emergency Protection Circuit Devices (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

PROBLEM TO BE SOLVED: To detect accurately existence of an electric leak between a high- voltage circuit and a low-voltage circuit. SOLUTION: Even if a short-time noise is superimposed on a sine-wave output from the high-voltage circuit 10 through a coupling capacitor 32, a soft filter means 351 removes only voltage data for leak detection corresponding to a minute time part in which a noise component is detected from the voltage data for leak detection, and a leak detection means 352 compares the maximum voltage value Vmax in the remaining voltage data for leak detection after soft filter processing with a threshold VT for leak detection, to thereby detect the existence of the leak between the high-voltage circuit 10 and the low-voltage circuit 20. Therefore, false detection of the leak caused by the noise can be prevented. Otherwise, the existence of the leak can be detected by integrating the voltage data for leak detection with a prescribed period T to operate an effective value of a sine-wave rectification output, and comparing the effective value with a reference effective value.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、例えば電気自動車
などに用いられ、高電圧回路と低電圧回路との間の漏電
の有無を検出する漏電検出装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an electric leakage detecting device used in, for example, an electric vehicle and detecting the presence or absence of electric leakage between a high voltage circuit and a low voltage circuit.

【0002】[0002]

【従来の技術】従来より、環境問題、エネルギー問題を
解決する低公害車として、HEV、PEVなどの電気自
動車が注目を集めている。この電気自動車は、二次電池
を搭載し、この電池に蓄えられた電力により電動機(モ
ータ)を駆動することにより走行するようになってい
る。このような電気自動車には、電動機を駆動するため
の高電圧回路と、音響機器などの電子機器を駆動するた
めの低電圧回路とを有している。この高電圧回路には、
電動機駆動用のインバータが搭載されている。
2. Description of the Related Art Conventionally, electric vehicles such as HEV and PEV have attracted attention as low-emission vehicles for solving environmental problems and energy problems. This electric vehicle is equipped with a secondary battery, and runs by driving an electric motor (motor) with electric power stored in the battery. Such an electric vehicle has a high-voltage circuit for driving an electric motor and a low-voltage circuit for driving electronic devices such as audio devices. In this high voltage circuit,
An inverter for driving a motor is mounted.

【0003】一方、この種の漏電検出装置は正弦波発生
回路を有し、正弦波発生回路がコンデンサを介して高電
圧回路に接続されている。高電圧回路と低電圧回路との
間の漏電発生時には、正弦波発生回路からの正弦波出力
がコンデンサを介して高電圧回路から低電圧回路側へと
流れるため、その分、正弦波発生手段からの正弦波出力
レベルが低下する。この低下した正弦波出力レベルが漏
電検出用の閾値に比べて低いことを検出することによ
り、高電圧回路と低電圧回路間で漏電があったことを検
出するようになっている。
On the other hand, this type of leakage detecting device has a sine wave generating circuit, and the sine wave generating circuit is connected to a high voltage circuit via a capacitor. When a short circuit occurs between the high-voltage circuit and the low-voltage circuit, the sine-wave output from the sine-wave generation circuit flows from the high-voltage circuit to the low-voltage circuit via the capacitor. Of the sine wave output level is decreased. By detecting that the lowered sine wave output level is lower than the leakage detection threshold value, it is possible to detect that there is a leakage between the high voltage circuit and the low voltage circuit.

【0004】[0004]

【発明が解決しようとする課題】しかし、上記従来の漏
電検出装置では、電動機やその駆動用インバータを有す
る高電圧回路側からコンデンサを介して正弦波出力に短
時間ノイズ(ヒゲ状ノイズ)が重畳した状態で漏電検出
を行なっていたため、漏電が発生して上記正弦波出力レ
ベルが低下している状態であっても、ノイズをひろって
漏電のない正常状態であると誤検出してしまうという問
題を有していた。
However, in the above-described conventional earth leakage detecting device, short-time noise (whisker-like noise) is superimposed on a sine wave output via a capacitor from a high voltage circuit having an electric motor and an inverter for driving the electric motor. In the state where the leakage was detected in the state where the leakage occurred, even if the leakage was generated and the above-mentioned sine wave output level was lowered, the noise was spread and it was erroneously detected as a normal state without leakage. Had.

【0005】本発明は、上記従来の問題を解決するもの
で、高電圧回路と低電圧回路間における漏電の有無を正
確に検出することができる漏電検出装置を提供すること
を目的とする。
An object of the present invention is to solve the above-mentioned conventional problems, and an object of the present invention is to provide a leakage detecting device capable of accurately detecting the presence or absence of a leakage between a high voltage circuit and a low voltage circuit.

【0006】[0006]

【課題を解決するための手段】本発明の漏電検出装置
は、所定周期の正弦波を発生する正弦波発生手段と、こ
の正弦波発生手段の出力端と高電圧回路を容量結合する
結合手段と、正弦波発生手段の出力端に接続された整流
手段と、この整流手段の整流出力に対応した漏電検出用
電圧データを収得し、この漏電検出用電圧データの最大
値と漏電検出用の閾値を比較することにより、高電圧回
路と低電圧回路間の漏電の有無を検出する漏電検出手段
とを有した漏電検出装置において、漏電検出手段の前段
に、整流出力の微小時間部分に重畳されたノイズ成分を
検出すると共に、ノイズ成分が検出された整流出力の微
小時間部分を除いて得た漏電検出用電圧データを前記漏
電検出手段に出力するソフトフィルタ手段が設けられた
ものである。即ち、漏電検出手段の前段に、整流出力の
微小時間部分の入力電圧変化量を、予め求められたノイ
ズ成分のない微小時間部分の入力電圧変化量と比較する
ことによりノイズ成分の有無を検出すると共に、ノイズ
成分が検出された整流出力の微小時間部分を除いて得た
漏電検出用電圧データを漏電検出手段に出力するソフト
フィルタ手段が設けられている。
According to the present invention, there is provided an earth leakage detecting device comprising: a sine wave generating means for generating a sine wave having a predetermined period; and a coupling means for capacitively coupling an output terminal of the sine wave generating means and a high voltage circuit. Rectifying means connected to the output terminal of the sine wave generating means, and acquiring leakage current detection voltage data corresponding to the rectified output of the rectifying means, and calculating the maximum value of the leakage detection voltage data and the leakage detection threshold value. By comparing, in the leakage detection device having the leakage detection means for detecting the presence or absence of leakage between the high-voltage circuit and the low-voltage circuit, the noise superimposed on the minute time portion of the rectified output before the leakage detection means Soft filter means is provided for detecting the component and outputting the leak detection voltage data obtained by excluding the minute time portion of the rectified output from which the noise component is detected to the leak detection means. That is, the presence or absence of a noise component is detected by comparing the input voltage change amount in the minute time portion of the rectified output with a previously obtained input voltage change amount in the minute time portion having no noise component before the leakage detection means. In addition, there is provided a soft filter means for outputting leak detection voltage data obtained by removing a short time portion of the rectified output from which the noise component is detected to the leak detection means.

【0007】この構成により、高電圧回路側から結合手
段を介して正弦波出力に短時間ノイズが重畳しても、ノ
イズ成分が検出された整流出力の微小時間部分を漏電検
出用電圧データから取り除いた後に、高電圧回路と低電
圧回路間における漏電検出を行なうので、ノイズに起因
した漏電の有無の誤検出が防止される。
With this configuration, even if noise is superimposed on the sine wave output from the high voltage circuit via the coupling means for a short time, the minute time portion of the rectified output in which the noise component is detected is removed from the leakage detection voltage data. After that, leakage detection between the high voltage circuit and the low voltage circuit is performed, so that erroneous detection of leakage due to noise is prevented.

【0008】また、好ましくは、本発明の漏電検出装置
において、正弦波発生手段の出力端と低電圧回路側との
間に、抵抗手段および漏電検出動作確認用のスイッチ手
段の直列回路を設けている。
Preferably, in the electric leakage detecting apparatus of the present invention, a series circuit of a resistance means and a switch means for confirming an electric leakage detection operation is provided between the output terminal of the sine wave generating means and the low voltage circuit side. I have.

【0009】この構成により、漏電検出動作確認用のス
イッチ手段を有した漏電検出装置にソフトフィルタ手段
を有した本発明を容易に適用させることが可能である。
With this configuration, it is possible to easily apply the present invention having the soft filter means to the leak detection apparatus having the switch means for checking the leak detection operation.

【0010】次に、本発明の漏電検出装置は、所定周期
の正弦波を発生する正弦波発生手段と、この正弦波発生
手段の出力端と高電圧回路を容量結合する結合手段と、
正弦波発生手段の出力端に接続された整流手段と、この
整流手段の整流出力から得た値と漏電検出用の基準値を
比較することにより、高電圧回路と低電圧回路間の漏電
の有無を検出する漏電検出手段とを有した漏電検出装置
において、漏電検出手段の前段に、整流出力の微小時間
部分毎の漏電検出用電圧データを取得し、この漏電検出
用電圧データを所定期間にわたって積分して実効値を得
る実効値演算手段が設けられ、漏電検出手段は、実効値
演算手段で得た実効値と、予め求められた漏電検出用の
基準実効値とを比較して漏電検出を行うものである。
Next, the leakage detecting device of the present invention comprises a sine wave generating means for generating a sine wave of a predetermined period, a coupling means for capacitively coupling an output terminal of the sine wave generating means and a high voltage circuit,
By comparing a rectifier connected to the output terminal of the sine wave generator with a value obtained from the rectified output of the rectifier and a reference value for detecting leakage, whether there is a leakage between the high voltage circuit and the low voltage circuit. In the leakage detection device having the leakage detection means for detecting the leakage, the leakage detection voltage data for each minute time portion of the rectified output is obtained before the leakage detection means, and the leakage detection voltage data is integrated over a predetermined period. An effective value calculating means for obtaining an effective value is provided, and the electric leakage detecting means performs electric leakage detection by comparing the effective value obtained by the effective value calculating means with a reference effective value for electric leakage detection obtained in advance. Things.

【0011】この構成により、整流出力の微小時間部分
毎の漏電検出用電圧データを所定期間にわたって積分し
て所定期間の正弦波出力の実効値を得、これと漏電検出
用の基準実効値とを比較することにより、高電圧回路と
低電圧回路間の漏電の有無を検出するので、ヒゲ状のノ
イズ成分があっても、それは正弦波出力の積分面積値に
占める割合が小さく、漏電検出用の大小比較に影響を与
えないことから、ノイズ成分による漏電の誤検出を防止
することが可能となる。
With this configuration, the leakage detection voltage data for each minute time portion of the rectified output is integrated over a predetermined period to obtain an effective value of the sine wave output for a predetermined period. By comparing, the presence or absence of leakage between the high-voltage circuit and the low-voltage circuit is detected, so even if there is a beard-like noise component, its proportion in the integrated area value of the sine wave output is small, Since the magnitude comparison is not affected, it is possible to prevent erroneous detection of leakage due to noise components.

【0012】また、好ましくは、本発明の漏電検出装置
において、積分する所定期間は正弦波の任意の1/2周
期である。
Preferably, in the earth leakage detecting device of the present invention, the predetermined period for integration is an arbitrary half cycle of a sine wave.

【0013】この構成により、整流出力のどの時点から
でも演算待機させることなく、最短に所定期間の正弦波
出力の実効値の計算が可能なので、漏電判定が高速化可
能となる。
With this configuration, the effective value of the sine wave output for a predetermined period can be calculated in the shortest time without having to wait for the operation from any point of the rectified output, so that the leak determination can be performed at high speed.

【0014】[0014]

【発明の実施の形態】以下、本発明の漏電検出装置を電
気自動車に適用させた場合の実施の形態1,2について
図面を参照しながら説明する。 (実施形態1)図1は本発明の実施形態1における電気
自動車の構成を示すブロック図であり、図2は図1の正
弦波発生手段および整流手段からの出力波形図である。
図1および図2において、電気自動車1は、電動機(モ
ータ)などの高電圧負荷11を駆動制御する高電圧回路
10と、各種電子機器などの低電圧負荷21を駆動する
低電圧回路20と、高電圧回路10と低電圧回路20と
の間の漏電の有無を検出する漏電検出装置30とを有し
ている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments 1 and 2 in which an electric leakage detection device of the present invention is applied to an electric vehicle will be described below with reference to the drawings. (Embodiment 1) FIG. 1 is a block diagram showing a configuration of an electric vehicle according to Embodiment 1 of the present invention, and FIG. 2 is an output waveform diagram from a sine wave generating means and a rectifying means of FIG.
1 and 2, an electric vehicle 1 includes a high-voltage circuit 10 that drives and controls a high-voltage load 11 such as an electric motor (motor), a low-voltage circuit 20 that drives a low-voltage load 21 such as various electronic devices, and the like. It has a leakage detection device 30 that detects the presence or absence of leakage between the high-voltage circuit 10 and the low-voltage circuit 20.

【0015】高電圧回路10は、高電圧電源12と、高
電圧電源12からの電力を高電圧負荷11側に導通可能
とするスイッチ手段13と、高電圧負荷11を駆動制御
するインバータ14とを有している。
The high-voltage circuit 10 includes a high-voltage power supply 12, switch means 13 for conducting power from the high-voltage power supply 12 to the high-voltage load 11, and an inverter 14 for driving and controlling the high-voltage load 11. Have.

【0016】高電圧電源12は、直列に接続された複数
の二次電池121で構成されており、電気自動車1を走
らせる駆動源としての電動機(モータ)を回転駆動させ
るのに必要な高電圧(例えば288V)を出力可能とし
ている。
The high-voltage power supply 12 is composed of a plurality of secondary batteries 121 connected in series. The high-voltage power supply 12 has a high voltage necessary to rotationally drive a motor as a driving source for driving the electric vehicle 1. (For example, 288 V) can be output.

【0017】スイッチ手段13は、リレーなどで構成さ
れており、電動機(モータ)などの高電圧負荷11を駆
動させるのに必要な所定以上の電流容量を有している。
The switch means 13 is composed of a relay or the like, and has a predetermined current capacity or more necessary for driving the high-voltage load 11 such as an electric motor (motor).

【0018】インバータ14は電動機(モータ)を回転
駆動させるべく、高電圧電源12からの直流電圧を交流
電圧に変換するものである。
The inverter 14 converts a DC voltage from the high voltage power supply 12 into an AC voltage so as to rotate the electric motor (motor).

【0019】低電圧回路20は、低電圧電源22と、低
電圧電源22と低電圧負荷21との間の接続制御を可能
とする電源スイッチ23とを有している。
The low-voltage circuit 20 has a low-voltage power supply 22 and a power switch 23 that enables connection control between the low-voltage power supply 22 and the low-voltage load 21.

【0020】低電圧電源22は、直列に接続された複数
の二次電池221で構成されており、イルミネーション
表示手段222や、電子機器としての音響機器223
(例えばラジオやステレオ)などの低電圧負荷21を駆
動させるのに必要な低電圧(例えば12V)を出力可能
としている。
The low-voltage power supply 22 is composed of a plurality of secondary batteries 221 connected in series, and includes illumination display means 222 and audio equipment 223 as electronic equipment.
A low voltage (for example, 12 V) necessary to drive a low-voltage load 21 such as a radio or a stereo can be output.

【0021】電源スイッチ23はイグニションキースイ
ッチであり、車全体の電気系統をオンオフ制御するもの
である。電源スイッチ23はスイッチ手段13に連動し
ており、電源スイッチ23のオン操作でスイッチ手段1
3もオン動作し、電源スイッチ23のオフ操作でスイッ
チ手段13もオフ動作するようになっている。
The power switch 23 is an ignition key switch for turning on and off the electric system of the entire vehicle. The power switch 23 is linked to the switch means 13, and the switch means 1 is turned on when the power switch 23 is turned on.
3 is also turned on, and when the power switch 23 is turned off, the switch means 13 is also turned off.

【0022】漏電検出装置30は、正弦波発生手段31
(以下SG31という)と、SG31の出力端と高電圧
回路10を容量結合する結合手段としての結合コンデン
サ32と、SG31からの正弦波交流出力を整流する整
流手段33と、整流手段33からの整流出力を所定周期
のパルス信号に変換するADコンバータ34と、ADコ
ンバータ34からのパルス信号の電圧値を用いて漏電の
有無を検出制御する制御手段35と、漏電検出動作確認
用のスイッチ手段36とを有している。
The leakage detecting device 30 includes a sine wave generating means 31
(Hereinafter referred to as SG31), a coupling capacitor 32 as a coupling means for capacitively coupling the output terminal of the SG31 and the high-voltage circuit 10, a rectifying means 33 for rectifying a sine wave AC output from the SG31, and a rectification from the rectifying means 33. An AD converter 34 for converting an output into a pulse signal of a predetermined cycle, control means 35 for detecting and controlling the presence or absence of a leakage using the voltage value of the pulse signal from the AD converter 34, and switch means 36 for confirming a leakage detection operation. have.

【0023】SG31は、周期Tが1secの正弦波か
らなる所定周波数の交流出力を発生させるものである。
The SG 31 generates an AC output of a predetermined frequency consisting of a sine wave having a period T of 1 sec.

【0024】結合コンデンサ32は、SG31の出力端
と高電圧電源12の負極側との間に設けられ、漏電検出
装置30と高電圧回路10とを電気的に容量結合するも
のである。
The coupling capacitor 32 is provided between the output terminal of the SG 31 and the negative terminal of the high voltage power supply 12 and electrically capacitively couples the leakage detecting device 30 and the high voltage circuit 10.

【0025】整流手段33は整流用ダイオードとオペア
ンプで構成され、本実施形態1では半波整流を行うもの
とする。高電圧回路10から結合コンデンサ32を介し
てノイズ成分がSG31からの正弦波出力(周期1se
c)に重畳され、これを整流手段33が半波整流する
と、図3に示すようなノイズ成分Yが乗った整流出力波
形Xが得られるようになっている。
The rectifying means 33 comprises a rectifying diode and an operational amplifier. In the first embodiment, it is assumed that half-wave rectification is performed. The noise component from the high voltage circuit 10 via the coupling capacitor 32 causes the sine wave output from the SG 31 (period 1 sec).
When the rectification means 33 performs half-wave rectification on this, the rectification output waveform X on which the noise component Y is superimposed as shown in FIG. 3 is obtained.

【0026】ADコンバータ34は、整流手段33から
の整流出力を、所定時間幅(例えば4msec)毎の波
高値に対応した電圧レベルのパルス信号に変換するもの
である。本実施形態1では、SG31からの正弦波出力
の周期を1secとしているため、半波整流出力波形X
の出力時間は0.5secであることから、半波整流出
力波形Xを分割する微小時間部分dtを4msecとす
ると、半波整流出力波形Xは125分割されることにな
る。ADコンバータ34は、半波整流出力波形Xを12
5分割したパルス波形に順次変換して、制御手段35に
出力するようになっている。
The AD converter 34 converts the rectified output from the rectifier 33 into a pulse signal of a voltage level corresponding to the peak value for each predetermined time width (for example, 4 msec). In the first embodiment, since the period of the sine wave output from the SG 31 is 1 sec, the half-wave rectified output waveform X
Since the output time of the half-wave rectified output waveform X is 0.5 sec, if the minute time portion dt for dividing the half-wave rectified output waveform X is set to 4 msec, the half-wave rectified output waveform X is divided into 125. The AD converter 34 converts the half-wave rectified output waveform X to 12
The pulse waveform is sequentially converted into five divided pulse waveforms and output to the control means 35.

【0027】制御手段35は、ソフトフィルタ手段35
1と漏電検出手段352とを有している。また、制御手
段35のハード構成としては、CPU(中央演算処理装
置)とメモリとI/Oポートとを有するマイクロコンピ
ュータで構成されている。このCPUは、メモリ内に記
憶されたソフトフィルタ処理用のプログラムと漏電検出
処理用のプログラムに基づいて、I/Oポートから収得
した各種漏電検出用データを用いてソフトフィルタ処理
と漏電検出処理を実施し、その結果である漏電検出の有
無を示す制御信号をI/Oポートから、外部のスイッチ
手段13に出力して高電圧回路10の電源をオフ制御可
能とすると共に、イルミネーション表示手段222の漏
電表示部に出力してその表示ランプを点灯制御可能とす
るようになっている。
The control means 35 includes a soft filter means 35
1 and a leakage detecting means 352. The hardware configuration of the control means 35 is constituted by a microcomputer having a CPU (Central Processing Unit), a memory, and an I / O port. The CPU performs soft filter processing and leakage detection processing using various types of leakage detection data obtained from the I / O ports based on the soft filtering processing program and the leakage detection processing program stored in the memory. The I / O port outputs a control signal indicating the presence / absence of leakage detection to the external switch means 13 so that the power supply of the high-voltage circuit 10 can be turned off. The output is output to the leakage display unit so that the display lamp can be controlled to be turned on.

【0028】ここで、ソフトフィルタ処理について以下
に説明する。ソフトフィルタ処理とは、ノイズ成分が乗
った整流出力波形の微小時間部分(4msec)を漏電
検出用データとして採用しないように除くフィルタ処理
を、マイクロコンピュータのソフトウエアによって実施
するものである。ノイズ成分がある整流出力波形の微小
時間部分(4msec)を漏電検出用データから除く処
理について、図4を用いて詳細に説明するが、ここで
は、その説明を簡略化するために、半波整流出力波形X
を10分割した場合について説明する。
Here, the soft filter processing will be described below. The soft filter processing is performed by software of a microcomputer to perform a filter processing for removing a minute time portion (4 msec) of a rectified output waveform on which a noise component is superimposed so as not to be used as leakage detection data. The process of removing the short time portion (4 msec) of the rectified output waveform having a noise component from the leakage detection data will be described in detail with reference to FIG. 4. Here, in order to simplify the description, half-wave rectification is performed. Output waveform X
Is divided into ten parts.

【0029】図4に示すように、漏電検出データ件数n
=10で、漏電検出データの番号を示す変数I=1〜1
0とする。また、ADコンバータからソフトフィルタ手
段351に入力されるAD収得値が一定値以下の正弦波
であるから、微小時間部分(4msec)の入力電圧変
化量dV110の各最大変化量MaxdVは計算で求め
ることができる。このため、各最大変化量MaxdVを
それぞれ予め求めるものとする。ソフトフィルタ手段3
51は、サンプリングする微小時間部分(4msec)
の入力電圧変化量dV110を順次計算して監視してお
り、例えばデータ番号I=1の計測電圧値V1を前回の
計測電圧値(dV1に相当)とし、データ番号I=2の
計測電圧値V2を今回の計測電圧値(dV1+dV2に相
当)とすれば、(今回の計測電圧値V2−前回の計測電
圧値V1)の絶対値(dV2)が正弦波の最大変化量(M
axdV)以下という条件式を満たさないときは、その
計測電圧値V2を漏電検出用データとして採用せず、ま
た、その条件式を満たすときは、その計測電圧値V2
漏電検出用データとして採用するようになっている。こ
の場合は、ノイズYが波形上に乗っていて高い電圧値に
なっているので、上記条件式を満足せず、その計測電圧
値V2は漏電検出用データとして採用しないことにな
る。上記と同様に、ソフトフィルタ手段351は、デー
タ番号I=3〜10についても、各計測電圧値V310
を漏電検出用データとして採用するか否かを判定するよ
うになっている。なお、データ番号I=1の場合には、
例えばデータ番号I=1の計測電圧値V1を今回の計測
電圧値(dV1に相当)とし、データ番号I=0の計測
電圧値V0を前回の計測電圧値(V0=0に相当)とすれ
ば、今回の計測電圧値V1−前回の計測電圧値0の絶対
値(dV1に相当)が正弦波の最大変化量(Maxd
V)以下という条件式を満たすかどうかを検証する。こ
の場合は、ノイズYが波形上に乗っていないので、上記
条件式を満足し、その計測電圧値V1は漏電検出用デー
タとして採用することになる。
As shown in FIG. 4, the number of leakage detection data n
= 10, a variable I = 1 to 1 indicating the number of leakage detection data
Set to 0. Also, since the AD acquisition value input from the AD converter to the soft filter means 351 is a sine wave having a fixed value or less, the maximum change amount MaxdV of the input voltage change amount dV 1 to 10 in the minute time portion (4 msec) is calculated. Can be obtained by Therefore, it is assumed that each maximum change amount MaxdV is obtained in advance. Soft filter means 3
51 is a minute time portion for sampling (4 msec)
The sequentially calculated input voltage variation dV 1 ~ 10 monitors, for example, the measured voltage value V 1 of the data number I = 1 previous measurement voltage value (corresponding to dV 1) of data number I = 2 if the measured voltage value V 2 current measurement voltage value (corresponding to dV 1 + dV 2), - the absolute value of (current measurement voltage value V 2 previous measurement voltage value V 1) (dV 2) Maximum change of sine wave (M
axdV) or less, the measured voltage value V 2 is not adopted as the leakage detection data, and when the conditional expression is satisfied, the measured voltage value V 2 is used as the leakage detection data. It has been adopted. In this case, the noise Y is in the high voltage value riding on the waveform, it does not satisfy the above condition, the measured voltage value V 2 would not employ as leakage detection data. Similarly to the above, the soft filter means 351 performs the measurement for each of the measured voltage values V 3 to V 10 for the data numbers I = 3 to 10.
It is determined whether or not is adopted as the leakage detection data. When the data number I = 1,
For example the measured voltage value V 1 of the data number I = 1 and the current measurement voltage value (corresponding to dV 1), corresponding to the data number previous measurement voltage value measured voltage value V 0 which I = 0 (V 0 = 0 ), The absolute value (corresponding to dV 1 ) of the current measured voltage value V 1 -the previous measured voltage value 0 is the maximum change amount of the sine wave (Maxd
V) Verify whether the following conditional expression is satisfied. In this case, the noise Y is not riding on the waveform, satisfy the above condition, the measured voltage value V 1 was made to adopt a leakage detection data.

【0030】次に、漏電検出手段352は、ノイズ成分
が重畳された正弦波出力の微小時間部分の各計測電圧値
(採用されていない電圧波高値V2,V3)以外の各計測
電圧値(採用された電圧波高値V1,V410)中から最
大計測電圧値V5を求める。各計測電圧値(採用された
電圧波高値V1,V410)から最大計測電圧値を求める
方法は、例えば、まず、データ番号I=1の計測電圧値
1を仮の最大計測電圧値とし、データ番号I=4の計
測電圧値V4が計測電圧値V1よりも大きい場合には計測
電圧値V4を仮の最大計測電圧値とし、計測電圧値V4
計測電圧値V1以下の場合には計測電圧値V1をそのまま
仮の最大計測電圧値とする。ここでは、計測電圧値V4
が計測電圧値V1よりも大きいので、計測電圧値V4を仮
の最大計測電圧値とする。これをデータ番号I=5〜1
0の計測電圧値V510においても同様に繰り返して大
小比較することにより、最終的な最大電圧値として最大
計測電圧値V5を求めることができる。この最大計測電
圧値(最大電圧値)V5と漏電検出用の閾値VTを比較
することにより、高電圧回路10と低電圧回路20間の
漏電の有無を検出するようになっている。最大計測電圧
値(最大電圧値)V 5が漏電検出用の閾値VT以下の場
合には漏電検出出力(制御信号)を出力し、図4で破線
に示す最大電圧値が漏電検出用の閾値VTよりも大きい
場合には漏電検出出力を出力しないようになっている。
なお、漏電発生時には、SG31からの正弦波出力が結
合コンデンサ32を介して高電圧回路10から低電圧回
路20側へと流れるため、その分、整流手段33の整流
出力の電圧レベルが図4で破線に示す電圧レベルから実
線に示す電圧レベルまで低下している。
Next, the leakage detecting means 352 detects the noise component.
Each measured voltage value in the minute time portion of the sine wave output with
(Voltage peak value V not adoptedTwo, VThreeEach measurement other than)
Voltage value (adopted voltage peak value V1, VFour~Ten) From the middle
Large measurement voltage value VFiveAsk for. Each measured voltage value (adopted
Voltage peak value V1, VFour~Ten) To find the maximum measured voltage value
The method is, for example, first, a measurement voltage value of data number I = 1
V1Is the temporary maximum measured voltage value, and the total of the data number I = 4
Measured voltage value VFourIs the measured voltage value V1Measurement if greater than
Voltage value VFourIs the temporary maximum measured voltage value, and the measured voltage value VFourBut
Measured voltage value V1In the following cases, the measured voltage value V1As it is
The temporary maximum measured voltage value is used. Here, the measured voltage value VFour
Is the measured voltage value V1The measured voltage value VFourTemporarily
Is the maximum measured voltage value. This is called data number I = 5-1.
Measured voltage value V of 0Five~TenIn the same way
By making small comparisons, the final maximum voltage value
Measured voltage value VFiveCan be requested. This maximum measuring power
Pressure value (maximum voltage value) VFiveAnd VT for leakage detection
By doing, between the high voltage circuit 10 and the low voltage circuit 20
It is designed to detect the presence or absence of a short circuit. Maximum measurement voltage
Value (maximum voltage value) V FiveIs less than the threshold value VT for leakage detection
In this case, a leakage detection output (control signal) is output.
Is larger than the threshold value VT for leakage detection
In such a case, no leakage detection output is output.
Note that when an electric leakage occurs, the sine wave output from SG31 is connected.
Low voltage circuit from the high voltage circuit 10 through the
Since the current flows toward the road 20, the rectification of the rectification means 33 is performed accordingly.
The output voltage level changes from the voltage level indicated by the broken line in FIG.
It has dropped to the voltage level indicated by the line.

【0031】この漏電検出出力は、制御手段35のI/
Oポートからスイッチ手段13およびイルミネーション
表示手段222に制御信号を出力し、この制御信号(漏
電検出出力)により、スイッチ手段13をオフすると共
に、イルミネーション表示手段222に例えば各種メン
テナンスマークなどの漏電検出表示を行なうようになっ
ている。
The output of the leakage detection is determined by the I /
A control signal is output from the O port to the switch means 13 and the illumination display means 222, and the control signal (leakage detection output) turns off the switch means 13 and causes the illumination display means 222 to display a leakage detection display such as various maintenance marks. Is to be performed.

【0032】漏電検出動作確認用のスイッチ手段36
は、SG31の出力端と低電圧回路20の低電圧回路G
ND側との間に制限抵抗Rを介して接続可能に設けられ
ており、スイッチ手段36のオンにより、上記漏電発生
時と同様の漏電状態を強制的に発生させることができる
ようになっている。この場合、SG31からの正弦波出
力の電圧レベルは低下するが、抵抗手段Rによって略一
定値に制限されることになる。
Switch means 36 for confirming leakage detection operation
Is the output terminal of the SG 31 and the low voltage circuit G of the low voltage circuit 20.
It is provided so as to be connectable to the ND side via a limiting resistor R, and when the switch means 36 is turned on, it is possible to forcibly generate a leakage state similar to the above-described leakage state. . In this case, the voltage level of the sine wave output from the SG 31 decreases, but is limited to a substantially constant value by the resistance means R.

【0033】上記構成により、以下、その動作を説明す
る。図5は、図1の漏電検出装置30の概略動作を示す
フローチャートである。
The operation of the above configuration will be described below. FIG. 5 is a flowchart showing a schematic operation of the electric leakage detection device 30 of FIG.

【0034】図5に示すように、まず、ステップS10
でイグニションキースイッチにより電源スイッチ23を
オンすることにより、車全体の電気系統に電源供給す
る。次に、ステップS20で制御手段35がイニシャル
チェック処理を実行する。
As shown in FIG. 5, first, in step S10
The power switch 23 is turned on by an ignition key switch to supply power to the electric system of the entire vehicle. Next, in step S20, the control unit 35 executes an initial check process.

【0035】イニシャルチェック処理は、通常のソフト
フィルタ処理および漏電検出処理を所定時間例えば10
sec間程度行なって、高圧回路10と低圧回路20と
の間で漏電しているのかどうかを検出する。これを行な
わないと、漏電している場合には、漏電検出動作を確認
する次の強制漏電検出処理(ステップS30)を行なう
必要が無いからである。
In the initial check process, a normal soft filter process and a leakage detection process are performed for a predetermined time, for example, 10 minutes.
This is performed for about a second to detect whether or not a leak has occurred between the high-voltage circuit 10 and the low-voltage circuit 20. If this is not performed, it is not necessary to perform the next forced earth leakage detection process (step S30) for confirming the earth leakage detection operation when the earth leakage occurs.

【0036】さらに、ステップS30で制御手段35が
強制漏電検出処理を実行する。強制漏電検出処理は、漏
電検出動作確認用のスイッチ手段36をオンしてSG3
1からの正弦波出力を強制的に低電圧回路GND側に流
すことで、強制的に漏電状態を起こし、SG31、整流
手段33、ADコンバータ34および制御手段35が正
常に漏電検出動作をするものかどうかを検証する。この
漏電検出の確認は、操作者が、イルミネーション表示手
段222における漏電表示部の点灯の有無や、高電圧回
路用のスイッチ手段13のオフ動作によって確認するこ
とができる。
Further, in step S30, the control means 35 executes a forced leakage detection process. The forced earth leakage detection process is performed by turning on the switch means 36 for confirming the earth leakage detection operation, and
By forcibly flowing the sine wave output from 1 to the low voltage circuit GND side, a leakage state is forcibly caused, and the SG 31, the rectifier 33, the AD converter 34, and the controller 35 perform the leakage detection operation normally. Verify whether or not. This leakage detection can be confirmed by the operator based on whether the leakage display section of the illumination display means 222 is lit, or by turning off the switch means 13 for the high voltage circuit.

【0037】さらに、ステップS40で制御手段35が
通常漏電検出処理を実行する。通常漏電検出処理は、強
制漏電検出用のスイッチ手段36をオフにしてSG31
からの正弦波出力を結合コンデンサ32を介して高電圧
回路10側に流しつつ、高電圧回路10と低電圧回路2
0間で漏電が発生した場合には、SG31の出力端の電
圧低下を制御手段35にて検出することによって漏電状
態の有無を検出するものである。この漏電検出の確認
は、強制漏電検出処理(ステップS30)の場合と同様
である。
Further, in step S40, the control means 35 executes a normal leakage detection process. The normal earth leakage detection process is performed by turning off the switch means 36 for forced earth leakage detection.
Of the high voltage circuit 10 and the low voltage circuit 2 while the sine wave output from
When a leakage occurs between 0, the control means 35 detects a voltage drop at the output terminal of the SG 31 to detect the presence or absence of a leakage state. The confirmation of the leakage detection is the same as in the forced leakage detection process (step S30).

【0038】図6は、図1の漏電検出装置30の詳細動
作を示すフローチャートであり、図5のイニシャルチェ
ック処理、強制漏電検出処理および通常漏電検出処理を
詳細に示すものである。
FIG. 6 is a flowchart showing the detailed operation of the electric leakage detection device 30 of FIG. 1, and shows the initial check processing, forced electric leakage detection processing, and normal electric leakage detection processing of FIG. 5 in detail.

【0039】図6に示すように、ステップS1で制御手
段35がSG31に対してPWM出力制御を行い、SG
31から所定周期の正弦波が出力される。SG31から
の正弦波出力は、整流手段33で半波整流され、その半
波整流出力は、ADコンバータ34で4msecの所定
微小時間幅毎の波高値(電圧値)に対応した電圧レベル
のパルス信号に変換される。
As shown in FIG. 6, in step S1, the control means 35 performs PWM output control on the SG 31, and
31 outputs a sine wave of a predetermined period. The sine wave output from the SG 31 is half-wave rectified by the rectifying means 33, and the half-wave rectified output is a pulse signal having a voltage level corresponding to a peak value (voltage value) at a predetermined minute time width of 4 msec by the AD converter 34. Is converted to

【0040】さらに、ステップS2のA/D値収得処理
で、制御手段35のソフトフィルタ手段351はADコ
ンバータ34からのパルス信号を順次収得する。即ち、
ソフトフィルタ手段351は、図4に示すように、半波
整流出力波形Xを多数の微小時間部分dt(本実施形態
では4msec)で例えば125に分割された微小時間
部分dt毎の波高値を順次サンプリングする。
Further, in the A / D value acquisition processing in step S2, the soft filter means 351 of the control means 35 sequentially acquires the pulse signals from the AD converter 34. That is,
As shown in FIG. 4, the soft filter means 351 sequentially converts the peak value of each half-time portion dt obtained by dividing the half-wave rectified output waveform X into a large number of minute-time portions dt (4 msec in this embodiment), for example, 125. Sample.

【0041】さらに、ステップS3の最大電圧値収得処
理では、重畳されたノイズ成分が検出された正弦波出力
の微小時間部分を漏電検出用電圧データから取り除くソ
フトフィルタ処理を実行する。このソフトフィルタ処理
後の漏電検出用電圧データから最大電圧値を収得する。
なお、ソフトフィルタ処理については、図7にて詳細に
後述する。
Further, in the maximum voltage value acquisition process in step S3, a soft filter process for removing a minute time portion of the sine wave output in which the superimposed noise component is detected from the leak detection voltage data is executed. The maximum voltage value is obtained from the leak detection voltage data after the soft filter processing.
The soft filter processing will be described later in detail with reference to FIG.

【0042】さらに、ステップS4では、処理がスター
トしてから1sec間が経過したかどうかを制御手段3
5が判定する。制御手段35が1sec間経過したと判
定しない場合には、ステップS5でデータ番号Iを「I
=I+1」とした後にステップS1〜ステップS4を繰
り返す。ステップS4で1sec間経過したと判定した
場合(本実施形態では例えばデータ番号I=1〜125
が終了するのは0.5sec)には、次のステップS6
の判定電圧値収得処理に移行する。
Further, in step S4, it is determined whether or not one second has elapsed since the start of the processing.
5 determines. If the control means 35 does not determine that 1 second has elapsed, the data number I is changed to "I" in step S5.
= I + 1 ”, and then repeat steps S1 to S4. If it is determined in step S4 that 1 second has elapsed (in the present embodiment, for example, data number I = 1 to 125
Is completed for 0.5 sec), the next step S6
The processing shifts to the determination voltage value acquisition processing.

【0043】ステップS6で、漏電検出手段352は、
判定電圧値収得処理として、周期1secの間の最大電
圧値Vmaxを判定電圧VVとして収得する。
In step S6, the electric leakage detection means 352
As the determination voltage value Shutoku processing, Shutoku the maximum voltage value Vmax during the period 1sec as determination voltage V V.

【0044】さらに、ステップS7で、漏電検出手段3
52は、漏電判定処理を実行する。漏電検出手段352
は、漏電判定処理として、判定電圧VVと漏電判定用の
閾値とを比較して、判定電圧VVが所定閾値以下の場合
には漏電状態であると判断し、また、判定電圧VVが所
定閾値VTよりも大きい場合には漏電状態ではないと判
断する。漏電検出手段352が漏電状態であると判断し
た場合には、制御手段35から漏電用のイルミネーショ
ン表示信号がイルミネーション表示手段222に出力さ
れると共に、スイッチ手段13をオフする電源オフ信号
が出力される。
Further, in step S7, the leakage detecting means 3
52 performs an earth leakage determination process. Electric leakage detecting means 352
As leakage determination process, by comparing the threshold for the leakage determination and the determination voltage V V, it determines that the determined voltage V V is leakage state when more than a predetermined threshold value, also determined voltage V V is If it is larger than the predetermined threshold value VT, it is determined that there is no leakage state. When the electric leakage detecting means 352 determines that the electric leakage is in the electric leakage state, the illumination display signal for electric leakage is outputted from the control means 35 to the illumination display means 222 and a power-off signal for turning off the switch means 13 is outputted. .

【0045】以降、正弦波の周期毎に上記と同様の処理
が繰り返される。
Thereafter, the same processing as described above is repeated for each cycle of the sine wave.

【0046】ここで、図7を用いてソフトフィルタ手段
351によるソフトフィルタ処理について詳細に説明す
る。図7に示すように、ステップS41でソフトフィル
タ手段351はデータ番号がI番目の電圧値の最大変化
量MaxdV(AD値入力が一定電圧値以下の正弦波で
あるので、電圧変化量dVの最大値は計算できる)を計
算して収得する。さらに、ステップS42でソフトフィ
ルタ手段351はデータ番号がI番目の計測電圧値の変
化量dVを収得する。さらに、ステップS43でソフト
フィルタ手段351は、計算で得られたデータ番号がI
番目の最大変化量MaxdVと計測電圧値の変化量dV
とを用いて、その変化量dVが最大変化量MaxdV以
下かどうかを判定(上記条件式を満足するかどうかを判
定)する。ステップS43でソフトフィルタ手段351
により、計測電圧値の変化量dV(前回の計測電圧値−
今回の計測電圧値の絶対値)が計算値の最大変化量Ma
xdVよりも大きいと判定された場合には、変化量dV
に対応した正弦波出力(整流出力)の微小時間部分(d
V収得値)にノイズがあると判断して、ステップS44
でそのdV収得値をキャンセルして漏電判定用データと
しては採用しないようにする。
Here, the soft filter processing by the soft filter means 351 will be described in detail with reference to FIG. As shown in FIG. 7, in step S41, the soft filter unit 351 determines that the data number has the maximum change amount MaxdV of the I-th voltage value (since the AD value input is a sine wave having a constant voltage value or less, the maximum voltage change amount dV The value can be calculated). Further, in step S42, the soft filter means 351 acquires the change amount dV of the measured voltage value whose data number is the I-th. Further, in step S43, the soft filter means 351 determines that the data number obtained by the calculation is I
-Th maximum change amount MaxdV and measured voltage value change amount dV
It is determined whether or not the change amount dV is equal to or less than the maximum change amount MaxdV (whether or not the above conditional expression is satisfied). In step S43, the soft filter means 351
The change amount dV of the measured voltage value (previous measured voltage value−
The absolute value of the current measured voltage value) is the maximum change amount Ma of the calculated value.
xdV, the change amount dV
Time portion (d) of the sine wave output (rectified output) corresponding to
It is determined that there is noise in the (V acquisition value), and step S44 is performed.
Then, the dV acquisition value is canceled so as not to be adopted as the leakage determination data.

【0047】さらに、ステップS45において、ソフト
フィルタ手段351により、計測電圧値の変化量dV
(前回の計測電圧値−今回の計測電圧値の絶対値)が計
算値の最大変化量MaxdV以下であると判定された場
合には、変化量dVに対応した正弦波出力(整流出力)
の微小時間部分(dV収得値)にノイズがないと判断し
て、そのdV収得値を漏電判定用データとして採用す
る。今回のdV収得値から求めた波高電圧値と、前回の
dV収得値から求めた波高電圧値とを比較して大きい方
を最大電圧値として収得し、これを所定微小時間(4m
sec)毎に正弦波周期(1sec)だけ繰り返して、
最終的な最大電圧値を収得する。即ち、Vmax(前回
までの収得値)がVI(今回の収得値)よりも小さいな
らば、Vmax=VIをセットする。
Further, in step S45, the change amount dV of the measured voltage value is
When it is determined that (previous measured voltage value−absolute value of the present measured voltage value) is equal to or less than the maximum change amount MaxdV of the calculated value, a sine wave output (rectified output) corresponding to the change amount dV is obtained.
It is determined that there is no noise in the minute time portion (dV acquisition value), and the dV acquisition value is adopted as leakage determination data. The peak voltage value obtained from the current dV acquisition value is compared with the peak voltage value obtained from the previous dV acquisition value, and the larger one is acquired as the maximum voltage value, and this is acquired for a predetermined short time (4 m
sec) every sine wave cycle (1 sec)
Obtain the final maximum voltage value. In other words, Vmax (Shutoku value up to the previous) is if the V I (this Shutoku value) is smaller than, to set the Vmax = V I.

【0048】以上により本実施形態1によれば、高電圧
回路10から結合コンデンサ32を介して正弦波出力に
短時間ノイズが重畳しても、ソフトフィルタ手段351
は、ノイズ成分を検出した整流出力の微小時間部分に対
応した漏電検出用電圧データだけを漏電検出用電圧デー
タから取り除き、漏電検出手段352は、ソフトフィル
タ処理後に残った漏電検出用電圧データの最大電圧値V
maxと漏電検出用の閾値VTとを比較することによっ
て、高電圧回路10と低電圧回路間20の漏電の有無を
検出するようにしたため、ノイズに起因した漏電の誤検
出を防止することができる。したがって、従来のよう
に、漏電が発生して正弦波出力レベルが低下している状
態であっても、ノイズをひろって漏電のない正常状態で
あると誤検出してしまうような事態はなくなる。
As described above, according to the first embodiment, even if noise is superimposed on the sine wave output from the high voltage circuit 10 via the coupling capacitor 32 for a short time, the soft filter means 351
Removes only the leakage detection voltage data corresponding to the minute time portion of the rectified output from which the noise component is detected from the leakage detection voltage data, and the leakage detection means 352 determines the maximum of the leakage detection voltage data remaining after the soft filter processing. Voltage value V
By comparing max with the leakage detection threshold VT, the presence or absence of leakage between the high-voltage circuit 10 and the low-voltage circuit 20 is detected, so that erroneous detection of leakage due to noise can be prevented. . Therefore, unlike the conventional case, even if the sine wave output level is reduced due to the occurrence of the leakage, the situation where the noise is spread and the erroneous detection of the normal state without the leakage is eliminated.

【0049】また、漏電検出動作確認用のスイッチ手段
36を有した漏電検出装置30に、ソフトフィルタ処理
を容易に適用させることができる。
Further, the soft filter processing can be easily applied to the leakage detecting device 30 having the switch means 36 for confirming the leakage detecting operation.

【0050】なお、本実施形態1では、整流手段33が
交流正弦波を半波整流するようにしたが、これに限ら
ず、交流正弦波を全波整流するようにしてもよい。ま
た、本実施形態1では、漏電検出期間を交流正弦波の1
周期(1sec)としたが、漏電検出期間を交流正弦波
の1周期(1sec)以外の他の周期、例えば半周期
(0.5sec)としてもよい。
In the first embodiment, the rectifier 33 rectifies the AC sine wave by half-wave. However, the present invention is not limited to this, and the AC sine wave may be rectified by full-wave. In the first embodiment, the leakage detection period is set to 1 AC sine wave.
Although the cycle (1 sec) is set, the leakage detection period may be set to another cycle other than one cycle (1 sec) of the AC sine wave, for example, a half cycle (0.5 sec).

【0051】また、本実施形態1では、漏電検出動作確
認用のスイッチ手段36を設けたが、これに限らず、漏
電検出動作確認用のスイッチ手段36を設けない場合で
あっても、本発明のソフトフィルタ処理を適用できるこ
とは明らかである。
In the first embodiment, the switch means 36 for confirming the leakage detection operation is provided. However, the present invention is not limited to this. It is clear that the soft filter processing can be applied.

【0052】さらに、本実施形態1では、ステップS3
のAD値収得処理において、4msec毎に4回データ
を収得し、その平均値を収得してそれを用いるようにす
ることもできる。
Further, in the first embodiment, step S3
In the AD value acquisition process, data may be acquired four times every 4 msec, and the average value thereof may be acquired and used.

【0053】さらに、本実施形態1では、(今回の計測
電圧値−前回の計測電圧値)の絶対値dVが、正弦波の
最大変化量(最大電圧変化量MaxdV)以下という条
件式を満たさないときは、その今回の計測電圧値を漏電
検出用電圧データ(候補電圧)として採用せず、また、
その条件式を満たすときは、今回の計測電圧値を漏電検
出用候補電圧として採用するようにしたが、これに加え
てまたは、これとは別に、次回の計測電圧値の判定は、
(前回の計測電圧値−次回の計測電圧値)の絶対値dV
が正弦波の最大変化量(最大電圧変化量MaxdV)×
2以下という条件式を満たさないときは、その次回の計
測電圧値を漏電検出用候補電圧として採用せず、また、
その条件式を満たすときは、次回の計測電圧値を漏電検
出用候補電圧として採用するようにしてもよい。 (実施形態2)上記実施形態1では、ノイズ成分を検出
した整流出力の微小時間部分に対応した漏電検出用電圧
データだけを漏電検出用電圧データから取り除き、残っ
た漏電検出用電圧データの最大電圧値Vmaxと漏電検
出用の閾値VTとを比較することにより、高電圧回路1
0と低電圧回路20の間の漏電を検出するようにした
が、本実施形態2では、ノイズ成分に関わり無く、その
整流波形の実効値に基づいて漏電検出を行う場合であ
る。
Further, in the first embodiment, the conditional expression that the absolute value dV of (current measured voltage value-previous measured voltage value) is equal to or less than the maximum change amount of the sine wave (maximum voltage change amount MaxdV) is not satisfied. At this time, the current measured voltage value is not adopted as the leakage detection voltage data (candidate voltage).
When the conditional expression is satisfied, the current measured voltage value is adopted as a candidate voltage for leakage detection, but in addition to or separately from this, the next determination of the measured voltage value is as follows.
Absolute value dV of (previous measured voltage value-next measured voltage value)
Is the maximum change amount of the sine wave (maximum voltage change amount MaxdV) ×
If the conditional expression of 2 or less is not satisfied, the next measured voltage value is not adopted as a candidate voltage for leakage detection, and
When the conditional expression is satisfied, the next measured voltage value may be adopted as the leakage detection candidate voltage. (Embodiment 2) In Embodiment 1, only the leakage detection voltage data corresponding to the minute time portion of the rectified output in which the noise component is detected is removed from the leakage detection voltage data, and the maximum voltage of the remaining leakage detection voltage data is removed. By comparing the value Vmax with the threshold value VT for leakage detection, the high-voltage circuit 1
Although the leakage between 0 and the low voltage circuit 20 is detected, the second embodiment is a case where the leakage is detected based on the effective value of the rectified waveform regardless of the noise component.

【0054】図8は、本発明の実施形態2における電気
自動車の構成を示すブロック図である。なお、図1と同
様の作用効果を奏する部材には同一の符号を付けてその
説明を省略する。
FIG. 8 is a block diagram showing a configuration of an electric vehicle according to Embodiment 2 of the present invention. Note that members having the same functions and effects as those in FIG. 1 are denoted by the same reference numerals, and description thereof will be omitted.

【0055】図8において、漏電検出装置30Aは、S
G31と、結合コンデンサ32と、整流手段33と、A
Dコンバータ34と、漏電検出制御用の制御手段35A
と、漏電検出動作確認用のスイッチ手段36とを有して
いる。なお、ADコンバータ34は整流出力の微小時間
部分毎の漏電検出用電圧データを得る漏電検出用電圧デ
ータ収得手段で構成される。
In FIG. 8, the leakage detecting device 30A
G31, coupling capacitor 32, rectifier 33, A
D converter 34 and control means 35A for leakage detection control
And switch means 36 for confirming the leakage detection operation. The AD converter 34 is constituted by a leak detection voltage data acquisition means for obtaining leak detection voltage data for each minute time portion of the rectified output.

【0056】制御手段35Aは、実効値演算手段353
と漏電検出手段354とを有している。また、制御手段
35Aのハード構成としては、CPU(中央演算処理装
置)とメモリとI/Oポートとを有するマイクロコンピ
ュータで構成されている。このCPUは、メモリ内に記
憶された整流出力の実効値演算処理用のプログラムと漏
電検出処理用のプログラムに基づいて、I/Oポートか
ら収得した各種漏電検出用データを用いて実効値演算処
理と漏電検出処理を実施し、その結果である漏電検出の
有無を示す制御信号をI/Oポートから、外部のスイッ
チ手段13に出力して高電圧回路10の電源をオフ制御
可能とすると共に、イルミネーション表示手段222の
漏電表示部に出力してその表示ランプを点灯制御可能と
するようになっている。
The control means 35A includes an effective value calculating means 353
And a leakage detecting means 354. The hardware configuration of the control means 35A is constituted by a microcomputer having a CPU (Central Processing Unit), a memory, and an I / O port. The CPU performs an effective value calculation process using various types of leakage detection data obtained from the I / O port based on a program for the effective value calculation process of the rectified output and a program for the leakage detection process stored in the memory. Then, a control signal indicating the presence or absence of leakage detection is output from the I / O port to the external switch means 13 so that the power supply of the high-voltage circuit 10 can be turned off. The output is output to the leakage display section of the illumination display means 222 so that the display lamp can be controlled to be turned on.

【0057】実効値演算手段353は、ADコンバータ
34にてサンプリングされた、所定期間(図9(b)に
示す例えばT1)で所定時間幅(微小時間部分;例えば
4msec)毎の波高値に対応した電圧レベルのパルス
信号(漏電検出用電圧データであって図9(b)に示す
AD1〜ADn;nは自然数)をマイクロコンピュータ
内のメモリに保存しておき、以下の式(数1)にて微小
時間部分毎の漏電検出用電圧データを所定期間T(ここ
では1/2周期T1)にわたって積分して電圧波形の実
効値を演算するものである。
The effective value calculating means 353 corresponds to the peak value sampled by the AD converter 34 for a predetermined period (for example, T1 shown in FIG. 9B) and for every predetermined time width (a minute time portion; for example, 4 msec). The pulse signal of the obtained voltage level (the leak detection voltage data, AD1 to ADn shown in FIG. 9B; n is a natural number) is stored in the memory of the microcomputer, and the following equation (Equation 1) is obtained. Then, the effective value of the voltage waveform is calculated by integrating the leakage detection voltage data for each minute time portion over a predetermined period T (1/2 cycle T1 in this case).

【0058】[0058]

【数1】 漏電検出手段354は、ノイズ成分が重畳された正弦波
整流出力の所定期間T1の全微小時間部分毎の漏電検出
用電圧データ(図9(b)のAD1〜ADn)の演算実
効値と、漏電検出用に予め用意した1/2周期T1にお
ける正弦波整流出力の基準実効値とを比較することによ
り、高電圧回路10と低電圧回路20間の漏電の有無を
検出するようになっている。例えば演算実効値が基準実
効値未満の場合には漏電検出出力(制御信号)を出力
し、また、演算実効値が基準実効値以上の場合には漏電
検出出力を出力しないようになっている。なお、漏電発
生時には、SG31からの正弦波出力が結合コンデンサ
32を介して高電圧回路10から低電圧回路20側へと
流れるため、その分、整流手段33からの正弦波整流出
力の電圧レベルが低下する。
(Equation 1) The leakage detecting means 354 calculates the effective value of the leakage detection voltage data (AD1 to ADn in FIG. 9B) for each short time portion of the predetermined period T1 of the sine wave rectified output on which the noise component is superimposed, and the leakage. By comparing the sine wave rectified output in the 周期 cycle T1 prepared for detection with the reference effective value of the sine wave rectified output, the presence or absence of leakage between the high voltage circuit 10 and the low voltage circuit 20 is detected. For example, when the calculated effective value is less than the reference effective value, a leak detection output (control signal) is output, and when the calculated effective value is equal to or more than the reference effective value, no leakage detection output is output. Note that, when a leakage occurs, the sine wave output from the SG 31 flows from the high voltage circuit 10 to the low voltage circuit 20 via the coupling capacitor 32, and accordingly, the voltage level of the sine wave rectified output from the rectifier 33 is reduced. descend.

【0059】したがって、従来は、図9(a)に示すよ
うにA/Dコンバータにて正弦波整流出力をサンプリン
グし、T期間のサンプリング電圧データの最大電圧値V
L1を求め、この最大電圧値VL1と漏電判定用の基準
最大電圧値VLとを比較することにより漏電の有無を判
定するものであり、このとき、漏電が発生して正弦波整
流出力の最大電圧レベル(図10の本当のVL)が低下
している状態であっても、ノイズ成分(電圧データAD
3)をひろって漏電のない正常な最大電圧レベル(図1
0のVL)であると誤検出してしまうような事態(課
題)が生じていたが、本実施形態2によればこれを解消
することができる。
Therefore, conventionally, as shown in FIG. 9A, the sine wave rectified output is sampled by the A / D converter, and the maximum voltage value V of the sampling voltage data in the T period is obtained.
L1 is determined, and the presence / absence of a leakage is determined by comparing the maximum voltage value VL1 with a reference maximum voltage value VL for determining a leakage. At this time, a leakage occurs and the maximum voltage of the sine wave rectified output is determined. Even when the level (real VL in FIG. 10) is reduced, the noise component (voltage data AD)
Normal maximum voltage level without leakage by expanding 3) (Fig. 1
Although a situation (problem) that erroneously detects VL as 0 (VL) has occurred, according to the second embodiment, this can be solved.

【0060】即ち、本実施形態2によれば、高電圧回路
10から結合コンデンサ32を介して正弦波出力に、図
10に示すような短時間ノイズが重畳しても、実効値演
算手段353は、正弦波整流出力の全微小時間部分の漏
電検出用電圧データ(AD1〜ADn)を所定期間Tで
積分して正弦波整流出力の実効値を演算し、その演算実
効値と、予め用意した所定期間Tの基準実効値とを比較
し、その大小関係によって漏電の有無を検出する。この
ため、正弦波出力にノイズが重畳されて、図10に示す
ように微小時間部分の電圧データAD3が、本当の電圧
レベルよりも大幅に高くなっていても、全微小時間部分
の電圧データ(AD1〜ADn)を積分して実効値(面
積値)に変換することで、そのノイズ成分を含む電圧デ
ータ(AD3)が目立たなくなり、特に、単発のヒゲ状
ノイズに強く(耐ノイズ性アップ)、ノイズに起因した
漏電の誤検出を防止することができる。微小時間部分が
微小であるほど全面積値(実効値)に占めるノイズ成分
の割合が少なく、ノイズ成分の漏電判定における影響が
少ない。
That is, according to the second embodiment, even if the short-time noise as shown in FIG. 10 is superimposed on the sine wave output from the high-voltage circuit 10 via the coupling capacitor 32, the effective value calculating means 353 The effective value of the sine wave rectified output is calculated by integrating the leakage detection voltage data (AD1 to ADn) of the sine wave rectified output for a very short time in a predetermined period T, and the calculated effective value and a predetermined predetermined value are calculated. A comparison is made with the reference effective value of the period T, and the presence or absence of a leakage is detected based on the magnitude relation. Therefore, even if noise is superimposed on the sine wave output and the voltage data AD3 in the minute time portion is significantly higher than the true voltage level as shown in FIG. AD1 to ADn) and converting them into an effective value (area value), the voltage data (AD3) including the noise component becomes inconspicuous. In particular, the voltage data (AD3) is strong against single-whisker-like noise (increased noise resistance). Erroneous detection of leakage due to noise can be prevented. The smaller the minute time portion, the smaller the proportion of the noise component in the entire area value (effective value), and the less the noise component has in the leakage determination.

【0061】なお、本実施形態2では、正弦波整流出力
の電圧零ポイントから零ポイントまでの1/2周期(図
9(b)のT1)毎に整流電圧波形の実効値を演算し、
これを用いて漏電検出を行ったが、例えば電圧零ポイン
トからずれた図9(b)の1/2周期T2毎に電圧波形
の実効値を演算し、これを用いて漏電検出を行うように
してもよい。1/2周期T1での漏電検出の場合に、電
圧零ポイントからずれた場合には次の電圧零ポイントま
で待機した後に、正弦波整流出力の電圧零ポイントから
零ポイントまでの1/2周期T1にて実効値を演算する
必要があったが、1/2周期T2毎の漏電検出では、正
弦波整流出力のどの時点からでも演算待機させることな
く、最短ADn収得毎に実効値の計算が可能なので漏電
判定が高速化可能となる。したがって、従来は、マイク
ロコンピュータが正弦波整流出力の1周期における最大
電圧値VL1が基準最大電圧値VLよりも小さい場合に
漏電であると判定していたが、漏電判定に1周期かかっ
ており、これに比べれば、本実施形態2では、正弦波出
力の電圧零ポイントから零ポイントまでの1/2周期に
て漏電判定が可能となり、漏電判定の高速化可能とな
る。さらに、どの時点からでも待機期間無く1/2周期
にて漏電判定ができれば漏電判定の高速化可能となる。
なお、漏電判定は、A/Dコンバータサンプリング毎に
も可能である。
In the second embodiment, the effective value of the rectified voltage waveform is calculated for each half cycle (T1 in FIG. 9B) from the zero point of the sine wave rectified output to the zero point.
The leakage detection was performed using this. For example, the effective value of the voltage waveform was calculated for each half cycle T2 in FIG. 9B deviated from the voltage zero point, and the leakage detection was performed using this. You may. In the case of the leak detection in the half cycle T1, if the voltage deviates from the zero voltage point, after waiting for the next zero voltage point, the half cycle T1 from the zero voltage point of the sine wave rectified output to the zero point is performed. It was necessary to calculate the effective value, but in the leakage detection every half cycle T2, the effective value can be calculated every acquisition of the shortest ADn without waiting for the calculation from any point of the sine wave rectified output Therefore, it is possible to speed up the earth leakage determination. Therefore, conventionally, it had determined that the microcomputer is leakage when the maximum voltage value VL 1 in one cycle of the sine wave rectified output is smaller than the reference maximum voltage value VL, which takes 1 cycle to leakage determination In comparison with this, in the second embodiment, the leakage determination can be performed in a half cycle from the zero point of the voltage of the sine wave output to the zero point, and the leakage determination can be speeded up. Furthermore, if the leakage determination can be performed in a half cycle without any waiting period from any point in time, the speed of the leakage determination can be increased.
In addition, the earth leakage determination is also possible for each A / D converter sampling.

【0062】また、本実施形態2では、実効値演算手段
353と漏電検出手段354とを有する漏電検出制御用
の制御手段35Aをマイクロコンピュータで構成した
が、これに限らず、図8の制御手段35AにSG31お
よびADコンバータ34をも含めてマイクロコンピュー
タ(制御手段)で構成することもできる。この場合に
は、例えば図11のように構成することができる。な
お、ADコンバータ34からなる漏電検出用電圧データ
収得手段を実効値演算手段353に含めてもよい。
In the second embodiment, the control means 35A for leakage detection control having the effective value calculating means 353 and the leakage detection means 354 is constituted by a microcomputer. However, the present invention is not limited to this. The microcomputer 35A may include a microcomputer (control means) including the SG 31 and the AD converter 34. In this case, for example, it can be configured as shown in FIG. Note that the effective value calculating means 353 may include a means for obtaining voltage data for detecting electric leakage, which includes the AD converter 34.

【0063】[0063]

【発明の効果】以上により、請求項1によれば、高電圧
回路側から結合手段を介して正弦波出力に短時間ノイズ
が重畳しても、ノイズ成分が検出された整流出力の微小
時間部分を漏電検出用電圧データから取り除いた後に、
高電圧回路と低電圧回路間における漏電検出を行なうた
め、ノイズに起因した漏電の誤検出を防止して正確な漏
電検出を行うことができる。
As described above, according to the first aspect, even if noise is superimposed on the sine wave output for a short time from the high voltage circuit via the coupling means, a minute time portion of the rectified output in which the noise component is detected. Is removed from the leakage detection voltage data,
Since leakage detection between the high-voltage circuit and the low-voltage circuit is performed, erroneous detection of leakage due to noise can be prevented, and accurate leakage detection can be performed.

【0064】また、請求項2によれば、漏電検出動作確
認用のスイッチ手段を有した漏電検出装置に、ソフトフ
ィルタ手段を有した本発明を容易に適用させることがで
きる。
Further, according to the second aspect, the present invention having the soft filter means can be easily applied to the electric leakage detection device having the switch means for confirming the electric leakage detection operation.

【0065】さらに、請求項3によれば、整流出力の微
小時間部分毎の漏電検出用電圧データを所定期間にわた
って積分して所定期間の正弦波出力の実効値を得、これ
と漏電検出用の基準実効値とを比較することにより、高
電圧回路と低電圧回路間の漏電の有無を検出するため、
ヒゲ状のノイズ成分があっても、それは正弦波出力の積
分面積値に占める割合を小さくでき、漏電検出用の大小
比較に影響を与えることがなく、ノイズ成分による漏電
の誤検出を防止することができる。
Further, according to the third aspect, the leakage detection voltage data for each minute time portion of the rectified output is integrated over a predetermined period to obtain an effective value of a sine wave output for a predetermined period. In order to detect the presence or absence of leakage between the high voltage circuit and the low voltage circuit by comparing with the reference effective value,
Even if there is a mustache-like noise component, it can reduce the ratio of the sine wave output to the integral area value, and does not affect the magnitude comparison for leakage detection, thereby preventing erroneous detection of leakage due to noise components. Can be.

【0066】さらに、請求項4によれば、整流出力のど
の時点からでも演算待機させることなく最短に、所定期
間の正弦波出力の実効値の計算が可能なので、漏電判定
を高速に行うことができる。
Further, according to the fourth aspect, the effective value of the sine wave output for a predetermined period can be calculated at the shortest time without waiting for the calculation from any point of the rectified output, so that the leakage determination can be performed at high speed. it can.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施形態1における電気自動車の構成
を示すブロック図である。
FIG. 1 is a block diagram illustrating a configuration of an electric vehicle according to a first embodiment of the present invention.

【図2】図1の正弦波発生手段および整流手段からの出
力波形図である。
FIG. 2 is an output waveform diagram from a sine wave generation unit and a rectification unit of FIG. 1;

【図3】図1の整流手段の出力端における半波整流出力
の波形図である。
FIG. 3 is a waveform diagram of a half-wave rectified output at an output terminal of the rectifier of FIG. 1;

【図4】図1の制御手段が行なうソフトフィルタ処理の
説明図である。
FIG. 4 is an explanatory diagram of a soft filter process performed by a control unit of FIG. 1;

【図5】図1の漏電検出装置の概略動作を示すフローチ
ャートである。
FIG. 5 is a flowchart showing a schematic operation of the electric leakage detection device of FIG. 1;

【図6】図1の漏電検出装置の詳細動作を示すフローチ
ャートである。
FIG. 6 is a flowchart showing a detailed operation of the leakage detecting device of FIG. 1;

【図7】図6の最大電圧値収得時におけるソフトフィル
タ処理を示すフローチャートである。
FIG. 7 is a flowchart showing a soft filter process at the time of obtaining a maximum voltage value in FIG. 6;

【図8】本発明の実施形態2における電気自動車の構成
を示すブロック図である。
FIG. 8 is a block diagram illustrating a configuration of an electric vehicle according to a second embodiment of the present invention.

【図9】(a)は従来の漏電判定を説明するための正弦
波整流出力の波形図、(b)は本実施形態2の漏電判定
を説明するための正弦波整流出力の波形図である。
FIG. 9A is a waveform diagram of a sine wave rectified output for explaining a conventional leakage determination, and FIG. 9B is a waveform diagram of a sine wave rectified output for describing a leakage determination according to the second embodiment. .

【図10】本実施形態2の漏電判定を説明するためのノ
イズ成分がのった正弦波整流出力の波形図である。
FIG. 10 is a waveform diagram of a sine-wave rectified output on which a noise component is added for explaining the leakage determination according to the second embodiment.

【図11】本発明の漏電検出装置の他の構成例を示すブ
ロック図である。
FIG. 11 is a block diagram showing another configuration example of the leakage detection device of the present invention.

【符号の説明】[Explanation of symbols]

10 高電圧回路 20 低電圧回路 30,30A 漏電検出装置 31 正弦波発生手段(SG) 32 結合コンデンサ 33 整流手段 34 ADコンバータ 35,35A 制御手段 351 ソフトフィルタ手段 352,354 漏電検出手段 353 実効値演算手段 36 スイッチ手段 DESCRIPTION OF SYMBOLS 10 High voltage circuit 20 Low voltage circuit 30, 30A Leakage detection device 31 Sine wave generation means (SG) 32 Coupling capacitor 33 Rectification means 34 AD converter 35, 35A Control means 351 Soft filter means 352, 354 Leakage detection means 353 Effective value calculation Means 36 Switch means

───────────────────────────────────────────────────── フロントページの続き (72)発明者 高田 雅弘 静岡県湖西市境宿555番地 パナソニック イーブイエナジー株式会社内 (72)発明者 江越 輝善 静岡県湖西市境宿555番地 パナソニック イーブイエナジー株式会社内 Fターム(参考) 2G014 AA16 AB24 AC18 5G004 AA04 AB02 BA01 CA02 DB01 DB03 DB04 DC01 DC14 GA01 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Masahiro Takada 555 Sakaijuku, Kosai-shi, Shizuoka Prefecture Inside Panasonic Eve Energy Co., Ltd. F term (reference) 2G014 AA16 AB24 AC18 5G004 AA04 AB02 BA01 CA02 DB01 DB03 DB04 DC01 DC14 GA01

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 所定周期の正弦波を発生する正弦波発生
手段と、該正弦波発生手段の出力端と高電圧回路を容量
結合する結合手段と、前記正弦波発生手段の出力端に接
続された整流手段と、該整流手段の整流出力に対応した
漏電検出用電圧データを収得し、該漏電検出用電圧デー
タの最大値と漏電検出用の閾値を比較することにより、
前記高電圧回路と低電圧回路間の漏電の有無を検出する
漏電検出手段とを有した漏電検出装置において、 前記漏電検出手段の前段に、前記整流出力の微小時間部
分の入力電圧変化量を、予め求められたノイズ成分のな
い微小時間部分の入力電圧変化量と比較することにより
ノイズ成分の有無を検出すると共に、前記ノイズ成分が
検出された整流出力の微小時間部分を除いて得た漏電検
出用電圧データを前記漏電検出手段に出力するソフトフ
ィルタ手段が設けられた漏電検出装置。
1. A sine wave generating means for generating a sine wave of a predetermined period, coupling means for capacitively coupling an output terminal of the sine wave generating means and a high voltage circuit, and an output terminal of the sine wave generating means. Rectifying means, by obtaining leakage detection voltage data corresponding to the rectified output of the rectification means, by comparing the maximum value of the leakage detection voltage data and the leakage detection threshold,
In the leakage detection device having a leakage detection unit that detects the presence or absence of leakage between the high-voltage circuit and the low-voltage circuit, the input voltage change amount of the rectified output in a very short time portion is provided before the leakage detection unit. The presence / absence of a noise component is detected by comparing with a previously obtained input voltage change amount of a minute time portion having no noise component, and the leakage detection obtained by removing the minute time portion of the rectified output where the noise component is detected is obtained. An electric leakage detection device provided with soft filter means for outputting voltage data for use to the electric leakage detection means;
【請求項2】 前記正弦波発生手段の出力端と前記低電
圧回路側との間に、抵抗手段および漏電検出動作確認用
のスイッチ手段の直列回路を設けた請求項1に記載の漏
電検出装置。
2. An electric leakage detecting apparatus according to claim 1, further comprising a series circuit of a resistance means and a switch means for confirming an operation of detecting an electric leakage between the output terminal of said sine wave generating means and said low voltage circuit side. .
【請求項3】 所定周期の正弦波を発生する正弦波発生
手段と、該正弦波発生手段の出力端と高電圧回路を容量
結合する結合手段と、前記正弦波発生手段の出力端に接
続された整流手段と、該整流手段の整流出力から得た値
と漏電検出用の基準値を比較することにより、前記高電
圧回路と低電圧回路間の漏電の有無を検出する漏電検出
手段とを有した漏電検出装置において、 前記漏電検出手段の前段に、前記整流出力の微小時間部
分毎の漏電検出用電圧データを取得し、該漏電検出用電
圧データを所定期間にわたって積分して実効値を得る実
効値演算手段が設けられ、 前記漏電検出手段は、前記実効値演算手段で得た実効値
と、予め求められた漏電検出用の基準実効値とを比較し
て漏電検出を行う漏電検出装置。
3. A sine wave generating means for generating a sine wave of a predetermined period, coupling means for capacitively coupling an output terminal of the sine wave generating means and a high voltage circuit, and an output terminal of the sine wave generating means. And a leakage detection means for detecting the presence or absence of leakage between the high voltage circuit and the low voltage circuit by comparing a value obtained from the rectified output of the rectification means with a reference value for leakage detection. In the leakage detection device, the leakage detection voltage data for each short time portion of the rectified output is obtained before the leakage detection means, and the leakage detection voltage data is integrated over a predetermined period to obtain an effective value. A leakage detecting device for performing leakage detection by comparing the effective value obtained by the effective value computing unit with a previously obtained reference effective value for leakage detection.
【請求項4】 前記積分する所定期間は前記正弦波の任
意の1/2周期である請求項3記載の漏電検出装置。
4. The leakage detection device according to claim 3, wherein the predetermined period for integration is an arbitrary half cycle of the sine wave.
JP2001209917A 2000-07-17 2001-07-10 Earth leakage detector Expired - Fee Related JP4875257B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001209917A JP4875257B2 (en) 2000-07-17 2001-07-10 Earth leakage detector

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2000216685 2000-07-17
JP2000216685 2000-07-17
JP2000-216685 2000-07-17
JP2001209917A JP4875257B2 (en) 2000-07-17 2001-07-10 Earth leakage detector

Publications (2)

Publication Number Publication Date
JP2002098728A true JP2002098728A (en) 2002-04-05
JP4875257B2 JP4875257B2 (en) 2012-02-15

Family

ID=26596194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001209917A Expired - Fee Related JP4875257B2 (en) 2000-07-17 2001-07-10 Earth leakage detector

Country Status (1)

Country Link
JP (1) JP4875257B2 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003060532A1 (en) * 2001-12-27 2003-07-24 Panasonic Ev Energy Co., Ltd. Leak detection apparatus and motor car
JP2008032660A (en) * 2006-07-31 2008-02-14 Chugoku Electric Power Co Inc:The Device and method for measuring leakage current
JP2009300400A (en) * 2008-06-17 2009-12-24 Nippon Soken Inc Insulation resistance detector and insulation resistance detecting method
JP2010096739A (en) * 2008-10-15 2010-04-30 Test Research Inc Inspection device and its inspection method
KR101228530B1 (en) 2011-06-13 2013-01-31 박양석 Leakage alarm system by detecting leakage current removed harmonic wave and method thereof
JP2014059158A (en) * 2012-09-14 2014-04-03 Toyota Motor Corp Insulation resistance reduction-detecting device, and vehicle having the same
JP2015130345A (en) * 2014-01-07 2015-07-16 エルエス産電株式会社Lsis Co.,Ltd. Earth leakage circuit breaker
JP2016217785A (en) * 2015-05-15 2016-12-22 株式会社デンソー Electric leakage detection device
WO2017073031A1 (en) * 2015-10-30 2017-05-04 パナソニックIpマネジメント株式会社 Electric leak detection device and electric leak detection method
WO2018211577A1 (en) * 2017-05-16 2018-11-22 三菱電機株式会社 Digital relay
US20220357408A1 (en) * 2019-06-28 2022-11-10 Sanyo Electric Co., Ltd. Leakage detection device and power system for vehicle

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5162633A (en) * 1974-10-28 1976-05-31 Takeda Riken Ind Co Ltd ZATSUONJOKYOKAIRO
JPS54151490A (en) * 1978-05-19 1979-11-28 Komatsu Mfg Co Ltd Device for detecting abnormality of fluctuation in rotation
JPS61169766A (en) * 1985-01-23 1986-07-31 Fuji Electric Co Ltd Digital measuring system
JPH0545386A (en) * 1991-08-15 1993-02-23 Anritsu Corp Measuring device of peak to peak value of waveform signal
JPH0756740A (en) * 1993-08-20 1995-03-03 Mitsubishi Electric Corp Monitoring/diagnostic inference device
JPH07140071A (en) * 1993-11-15 1995-06-02 Sony Corp Method for measuring dispersibility of microparticle in liquid
JPH0785093B2 (en) * 1985-10-30 1995-09-13 オムロン株式会社 AC effective value-DC conversion circuit
JPH0870503A (en) * 1994-08-30 1996-03-12 Nippondenso Co Ltd Ground fault detector circuit for electric car
JPH1048266A (en) * 1996-07-31 1998-02-20 Fujitsu Ten Ltd Peak hold circuit
JPH10221395A (en) * 1997-02-07 1998-08-21 Denso Corp System for detecting ground fault of electric vehicle
JPH11195987A (en) * 1997-12-26 1999-07-21 Canon Inc Check method for glitch noise, device and recording medium
JPH11218554A (en) * 1997-10-30 1999-08-10 Matsushita Electric Ind Co Ltd Leak detector of electric vehicle
JP2000013902A (en) * 1998-06-26 2000-01-14 Nissan Motor Co Ltd Device for detecting ac side leak of electric vehicle
JP2000010735A (en) * 1998-06-22 2000-01-14 Yokogawa M & C Kk Signal converter

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5162633A (en) * 1974-10-28 1976-05-31 Takeda Riken Ind Co Ltd ZATSUONJOKYOKAIRO
JPS54151490A (en) * 1978-05-19 1979-11-28 Komatsu Mfg Co Ltd Device for detecting abnormality of fluctuation in rotation
JPS61169766A (en) * 1985-01-23 1986-07-31 Fuji Electric Co Ltd Digital measuring system
JPH0785093B2 (en) * 1985-10-30 1995-09-13 オムロン株式会社 AC effective value-DC conversion circuit
JPH0545386A (en) * 1991-08-15 1993-02-23 Anritsu Corp Measuring device of peak to peak value of waveform signal
JPH0756740A (en) * 1993-08-20 1995-03-03 Mitsubishi Electric Corp Monitoring/diagnostic inference device
JPH07140071A (en) * 1993-11-15 1995-06-02 Sony Corp Method for measuring dispersibility of microparticle in liquid
JPH0870503A (en) * 1994-08-30 1996-03-12 Nippondenso Co Ltd Ground fault detector circuit for electric car
JPH1048266A (en) * 1996-07-31 1998-02-20 Fujitsu Ten Ltd Peak hold circuit
JPH10221395A (en) * 1997-02-07 1998-08-21 Denso Corp System for detecting ground fault of electric vehicle
JPH11218554A (en) * 1997-10-30 1999-08-10 Matsushita Electric Ind Co Ltd Leak detector of electric vehicle
JPH11195987A (en) * 1997-12-26 1999-07-21 Canon Inc Check method for glitch noise, device and recording medium
JP2000010735A (en) * 1998-06-22 2000-01-14 Yokogawa M & C Kk Signal converter
JP2000013902A (en) * 1998-06-26 2000-01-14 Nissan Motor Co Ltd Device for detecting ac side leak of electric vehicle

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003060532A1 (en) * 2001-12-27 2003-07-24 Panasonic Ev Energy Co., Ltd. Leak detection apparatus and motor car
US6919726B2 (en) 2001-12-27 2005-07-19 Panasonic Ev Energy Co., Ltd. Leakage detection apparatus and motor car
JP2008032660A (en) * 2006-07-31 2008-02-14 Chugoku Electric Power Co Inc:The Device and method for measuring leakage current
JP2009300400A (en) * 2008-06-17 2009-12-24 Nippon Soken Inc Insulation resistance detector and insulation resistance detecting method
JP2010096739A (en) * 2008-10-15 2010-04-30 Test Research Inc Inspection device and its inspection method
US8179143B2 (en) 2008-10-15 2012-05-15 Test Research, Inc. Apparatus for testing printed circuit and method therefor
KR101228530B1 (en) 2011-06-13 2013-01-31 박양석 Leakage alarm system by detecting leakage current removed harmonic wave and method thereof
JP2014059158A (en) * 2012-09-14 2014-04-03 Toyota Motor Corp Insulation resistance reduction-detecting device, and vehicle having the same
JP2015130345A (en) * 2014-01-07 2015-07-16 エルエス産電株式会社Lsis Co.,Ltd. Earth leakage circuit breaker
US9678130B2 (en) 2014-01-07 2017-06-13 Lsis Co., Ltd. Earth leakage circuit breaker
JP2016217785A (en) * 2015-05-15 2016-12-22 株式会社デンソー Electric leakage detection device
WO2017073031A1 (en) * 2015-10-30 2017-05-04 パナソニックIpマネジメント株式会社 Electric leak detection device and electric leak detection method
WO2018211577A1 (en) * 2017-05-16 2018-11-22 三菱電機株式会社 Digital relay
US11152775B2 (en) 2017-05-16 2021-10-19 Mitsubishi Electric Corporation Digital relay
US20220357408A1 (en) * 2019-06-28 2022-11-10 Sanyo Electric Co., Ltd. Leakage detection device and power system for vehicle

Also Published As

Publication number Publication date
JP4875257B2 (en) 2012-02-15

Similar Documents

Publication Publication Date Title
EP2439827B1 (en) System for detection of a ground fault in a high resistance ground network
JP5012803B2 (en) Insulation resistance detection system, insulation resistance detection device, and insulation resistance detection method
CN101382577B (en) Single-phase earth fault positioning device for electrical power distribution network
CN103779949B (en) Apparatus and method for detecting the phase sequence in vehicle
JP2002098728A (en) Electric leak detection device
KR20030069802A (en) Alternator testing method and system using ripple detection
WO2007026514A1 (en) Insulating resistance detection apparatus
CN112034394B (en) Rectifier open-circuit fault diagnosis method based on current half-wave difference and electronic equipment
CN103728578B (en) Demagnetization detection method, move back magnetic sensor circuit and application the circuit constant-flow driver
CN106019056A (en) Method for detecting three-phase rectifier power tube open circuit fault in real time
JPH11218554A (en) Leak detector of electric vehicle
JP5072727B2 (en) Insulation resistance detection device and insulation resistance detection method
US20080062732A1 (en) Method of compensating output voltage distortion of half-bridge inverter and device based on the method
JP3956895B2 (en) Earth leakage detector
JP2004286523A (en) Earth leakage determining device, earth leakage determination program, and insulation resistance measuring unit
CN115328087A (en) Primary side information detection circuit, method and chip of secondary side PD controller
JP2004212376A (en) Leakage detecting device
JP2016166770A (en) Electric leak detection device
WO2017073031A1 (en) Electric leak detection device and electric leak detection method
JP4195458B2 (en) Inverter circuit diagnostic device
US6930454B2 (en) Method for operating at least one low-pressure discharge lamp and operating device for at least one low-pressure discharge lamp
JP2004361309A (en) Motor drive unit
JP2006280140A (en) Inverter simulator and motor simulator
CN105075084A (en) Electric power conversion device
US20110037393A1 (en) Method and circuit arrangement for operating at least one discharge lamp

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080507

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100712

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100714

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100910

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110218

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110418

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111028

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111125

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141202

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees