JP2002070486A - Muck conveying method in tunnel construction - Google Patents

Muck conveying method in tunnel construction

Info

Publication number
JP2002070486A
JP2002070486A JP2000261509A JP2000261509A JP2002070486A JP 2002070486 A JP2002070486 A JP 2002070486A JP 2000261509 A JP2000261509 A JP 2000261509A JP 2000261509 A JP2000261509 A JP 2000261509A JP 2002070486 A JP2002070486 A JP 2002070486A
Authority
JP
Japan
Prior art keywords
slip
container
waste
crusher
temporary storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000261509A
Other languages
Japanese (ja)
Other versions
JP4493187B2 (en
Inventor
Hikozo Imaoka
彦三 今岡
Kazuhiko Matsuguchi
一彦 松口
Hiroshi Fukui
弘 福井
Tadayuki Kobayakawa
忠行 小早川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sato Kogyo Co Ltd
Original Assignee
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sato Kogyo Co Ltd filed Critical Sato Kogyo Co Ltd
Priority to JP2000261509A priority Critical patent/JP4493187B2/en
Publication of JP2002070486A publication Critical patent/JP2002070486A/en
Application granted granted Critical
Publication of JP4493187B2 publication Critical patent/JP4493187B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a muck conveying method capable of minimizing the influence on an excavation cycle and efficiently disposing of a cutting face muck by the reduced number of muck conveying vehicles. SOLUTION: A temporary store place 30 for a muck vessel is provided to a position of a backward side separated from a cutting face S, a section from a muck loading place on this side of the cutting face S to the temporary vessel store place 30 is made as a first muck removing section 20 to carry out a muck conveyance by a vessel conveying vehicle 3, at the same time, a muck crusher 11 is placed to a position on an entrance side separated from the temporary muck vessel store place 30, a section from the temporary muck vessel store place 30 to the muck crusher 11 is made as a second muck removing section 40 to carry out a muck conveyance by a vessel conveying vehicle 8, and after the muck is crushed by the muck crusher 11, the muck is conveyed to the outside of a tunnel by means of a continuous belt conveyer equipment 50.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、切羽掘削サイクル
への影響を最小限に止め、少ないズリ運搬車両により効
率的にズリを処理できるようにしたベルトコンベア方式
併用のズリ搬出方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for carrying out a slip using a belt conveyor system in which the influence on a face excavation cycle is minimized and the slip can be efficiently processed by a small amount of slip transport vehicles.

【0002】[0002]

【従来の技術】従来より、切羽において掘削したズリの
搬出は、切羽近傍においてホイールローダなどのズリ積
込み機械により大型ダンプトラックに積載し、坑内を走
行することにより坑外までの搬出を行っている。
2. Description of the Related Art Conventionally, in order to carry out excavation at a face, the excavation is carried out by loading a large dump truck near the face by a loader such as a wheel loader and traveling inside the mine to carry it out of the mine. .

【0003】しかし、上記ダンプトラックによるズリ搬
出の場合には、掘削が進むにつれて走行距離が長くな
り、ダンプトラックを漸次増大しなければならなくなる
とともに、走行台数の増加により、他の通行車両、たと
えば支保工運搬車両、トンネル施工機械などの通行が大
幅に制限されるようになる。また、坑内の安全確保や排
気ガスや粉塵等により坑内環境が悪化するなどの問題が
あった。
[0003] However, in the case of slip-out by the above-mentioned dump truck, the traveling distance becomes longer as the excavation proceeds, and the number of the dump trucks must be gradually increased. The traffic of shoring transport vehicles and tunnel construction machinery will be greatly restricted. In addition, there is a problem that the underground environment is deteriorated due to ensuring the safety of the underground and exhaust gas and dust.

【0004】そこで近年は、連続式ベルトコンベアによ
るズリ搬出方法が採用されるようになってきた。連続式
ベルトコンベアによるズリ搬出方法としては、たとえば
特許第2899880号公報、特開平11-62485号公報などに記
載されるものを挙げることができる。前者の特許第2899
880号公報に記載される方法(従来例1)は、切羽の手
前に移動式クラッシャーを配備し、該移動式クラッシャ
ーにより均等に破砕したズリを連続式ベルトコンベアに
より坑外まで搬出するものであり、後者の特開平11-624
85号公報に記載されるズリ搬出方法(従来例2)は、ト
ンネルの切羽から発生したズリを運搬容器に積み込み、
運搬車両を用いて切羽後方に設置したズリ破砕機まで運
搬し、運搬容器内のズリをズリ破砕機に投入し、破砕さ
れたズリを連続式ベルトコンベアにより坑外まで搬出す
るものである。
[0004] In recent years, a method of carrying out a slip using a continuous belt conveyor has been adopted. Examples of the method of carrying out the shears using a continuous belt conveyor include those described in Japanese Patent No. 2899880, Japanese Patent Application Laid-Open No. 11-62485, and the like. The former patent No. 2899
In the method described in Japanese Patent Publication No. 880 (conventional example 1), a movable crusher is provided in front of a face, and the scraps uniformly crushed by the movable crusher are carried out to the outside of the mine by a continuous belt conveyor. And the latter JP-A-11-624
In the method for carrying out the waste described in Japanese Patent Publication No. 85 (conventional example 2), the waste generated from the face of the tunnel is loaded into a transport container,
A transport vehicle is used to transport the waste to a waste crusher installed behind the face, throw the waste in the transport container into the waste crusher, and transport the crushed waste to the outside of the mine by a continuous belt conveyor.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、従来例
1に係る連続式ベルトコンベアによるズリ搬出方法の場
合には、切羽の手前領域を占有してのズリ搬出作業とな
るため、掘削サイクル毎に発生したズリを連続式ベルト
コンベアにすべて投入するまでは次のサイクル工程に入
ることができず、時間的ロスが大きいなどの問題があ
る。また、所望の時間内でズリの処理を行いたい場合に
は、ズリ処理能力を高めるため高能力のクラッシャーが
必要になるとともに、高い搬送能力のベルトコンベアが
必要となる。すなわち、従来例1のズリ搬出方法は、掘
削サイクルに及ぼす影響が甚大となり、掘削サイクルの
短縮化を図る場合にはズリ処理機械および搬送設備の能
力負担が過度に大きくなる。
However, in the case of the method of carrying out the shearing by the continuous belt conveyor according to the conventional example 1, since the work is carried out while occupying the area in front of the face, it occurs every time the excavation cycle occurs. Until all of the waste is put into the continuous belt conveyor, the next cycle process cannot be started, resulting in a problem such as a large time loss. In addition, when it is desired to perform the shear processing within a desired time, a high-performance crusher is required to increase the shear processing capacity, and a belt conveyor having a high conveying capacity is required. That is, the shearing-out method of Conventional Example 1 has an enormous effect on the excavation cycle, and when shortening the excavation cycle, the load on the capacity of the shearing machine and the transport equipment becomes excessively large.

【0006】また、クラッシャーの位置が切羽から離れ
ると、ズリをクラッシャーに投入するホイールローダな
どのズリ積込み機械の移動距離が長くなりズリの積込み
作業が非効率となるため、頻繁に連続式ベルトコンベア
の延伸作業を行い、常に切羽手前にクラッシャーを定位
させなければならないなどの問題があった。
Further, if the position of the crusher moves away from the face, the moving distance of a slip loading machine such as a wheel loader for feeding the slip into the crusher becomes long and the loading operation of the slip becomes inefficient. And the crusher must always be located in front of the face.

【0007】さらには、常に切羽手前にクラッシャーお
よび連続式ベルトコンベアの先端となるテール台車を位
置させるものであり、地山が悪化した場合の工法変更、
たとえばミニベンチ工法からショートベンチ工法へ変更
したい場合でも、前記テール台車の高さ寸法が大きく上
半断面内に位置させることが出来ないため、工法変更が
実質的に困難であるなどの問題もある。
In addition, a crusher and a tail truck serving as a tip of a continuous belt conveyor are always located in front of the face, and a construction method change when the ground is deteriorated,
For example, even when it is desired to change from the mini bench method to the short bench method, the height of the tail carriage is so large that it cannot be located in the upper half section, so that there is a problem that the construction method is substantially difficult to change.

【0008】これに対して、従来例2に係るズリ搬出方
法の場合には、破砕機(クラッシャー)を切羽の後方に
設置し、切羽と破砕機との間を往復する複数のズリ運搬
車両によりズリを運搬するようにしている。その結果、
工法変更が容易に行えるようになるとともに、ズリ運搬
車両により効率的にズリ運搬が出来れば、切羽手前に山
積みされたズリの処理は効率化されるようになるが、破
砕機でのズリ破砕効率やベルトコンベアの搬送能力が低
い場合には、破砕機へズリ投入待ちのためのズリ運搬車
両が並ぶこととなり、ズリ運搬車両の効率的利用が図れ
ないなどの問題があった。また、切羽から破砕機までの
距離が長くなると、ズリ運搬車両による走行距離が長く
なり、ズリ出し作業が非効率となるため、掘進に合わせ
てズリ運搬車両を多くするか、頻繁にズリ破砕機および
連続式ベルトコンベアを切羽側に前進させなければなら
ないなどの問題がある。
On the other hand, in the case of the shear discharging method according to the conventional example 2, a crusher (crusher) is installed behind the face, and a plurality of shear transport vehicles reciprocate between the face and the crusher. We carry scraps. as a result,
If the method of construction can be easily changed, and if the sludge transport vehicle can efficiently transport the sludge, the processing of the piles piled up in front of the face will become more efficient, but the efficiency of the shredding by the crusher If the conveyor capacity of the belt conveyor is low, there is a problem that the waste transport vehicles are lined up to wait for the waste to be thrown into the crusher, so that the waste transport vehicles cannot be used efficiently. In addition, if the distance from the face to the crusher becomes longer, the traveling distance by the shear transport vehicle becomes longer, and the slipping work becomes inefficient.Therefore, increase the number of the shear transport vehicles according to the excavation or frequently use the shear crusher. In addition, there is a problem that the continuous belt conveyor must be advanced to the face side.

【0009】他方、トンネル施工においては、切羽の掘
削以外に切羽の後方側において、下半ベンチ掘削があっ
たり、インバート掘削が必要とされる。これらの掘削に
よって生じたズリの処理については、前記切羽手前また
は切羽後方に設置したクラッシャーまで運搬するか、別
途ダンプトラックにより坑外まで運搬するなどの方法が
採られていた。
On the other hand, in tunnel construction, besides excavation of a face, there is a lower half bench excavation behind the face, or an invert excavation is required. Regarding the processing of the scraps generated by these excavations, a method has been adopted in which the chips are transported to a crusher installed in front of or behind the face or separately to the outside of the pit by a dump truck.

【0010】そこで本発明の主たる課題は、掘削サイク
ルへの影響を最小限とでき、かつ少ないズリ運搬車両に
より効率的に切羽ズリを処理できるようにするととも
に、クラッシャー能力およびベルトコンベア搬送能力を
小規模化(平均化)できるようにすること、および好適
には下半ベンチ掘削および/またはインバート掘削によ
って生じたズリを効率的に切羽ズリと同時搬出できるよ
うにしたトンネル施工におけるズリ搬出方法を提供する
ことにある。
Therefore, a main object of the present invention is to minimize the influence on the excavation cycle and to efficiently process face scraps with a small number of shear transport vehicles, and to reduce the crusher capacity and the belt conveyor conveyance capacity. Provided is a method of allowing a scale (averaging), and preferably a method of carrying out a slip in a tunnel construction in which a waste generated by lower bench excavation and / or invert excavation can be efficiently carried out simultaneously with a face shear. Is to do.

【0011】[0011]

【課題を解決するための手段】前記課題を解決するため
の第1発明は、切羽から後方側に離れた位置にズリ容器
の仮置き場を設けるとともに、このズリ容器仮置き場か
ら坑口側に離れた位置にズリ破砕機を置き、ズリが充填
されたズリ容器を前記切羽からズリ容器仮置き場まで運
搬し仮置きする第1ズリ運搬工程と、前記ズリ容器仮置
き場に仮置きされたズリ容器をズリ破砕機まで運搬する
第2ズリ運搬工程とによりズリをズリ破砕機まで運搬し
た後、ここから連続式ベルトコンベアによって坑外まで
搬送することを特徴とするものである。
According to a first aspect of the present invention, there is provided a temporary storage space for a slip container at a position away from a face to a rear side, and a temporary storage space for the slip container at a wellhead side. A first slip transporting step of placing a shear crusher at a position, transporting the slip container filled with the slip from the face to the temporary storage site for the slip container, and temporarily shifting the slip container temporarily stored in the temporary slip container storage site. After transporting the debris to the debris crusher by the second debris transporting step of transporting the debris to the crusher, the debris is transported from here to the outside of the pit by a continuous belt conveyor.

【0012】本発明においては、ズリ運搬路の途中に緩
衝部となるズリ容器の仮置き場を設けるようにし、切羽
から前記ズリ容器仮置き場までの運搬工程と、ズリ容器
仮置き場からズリ破砕機までの運搬工程の2工程によっ
てズリの運搬を行った後、連続式ベルトコンベアに乗せ
て坑外まで運搬するようにしている。
[0012] In the present invention, a temporary storage site for the waste container serving as a buffer is provided in the middle of the waste transport path, and a transportation step from the face to the temporary storage site for the waste container, and a step from the temporary storage site for the waste container to the waste crusher. After transporting the debris by the two transport processes, the transport is carried on a continuous belt conveyor to the outside of the mine.

【0013】したがって、ズリ運搬路の途中に緩衝部と
なるズリ容器の仮置き場を設けたため、従来例2のよう
にズリ投入待ちなどの時間ロスが発生することがなく、
切羽で発生したズリを効率的に処理できるようになる。
その結果、掘削サイクルへの影響が最小限となるととも
に、ズリ容器仮置き場までの小運搬で良いためズリ容器
運搬車も少ない台数で済むようになるとともに、クラッ
シャー能力およびベルトコンベア搬送能力を小規模化
(平均化)できるようになる。
[0013] Therefore, since a temporary storage area for the slip container serving as a buffer is provided in the middle of the slip transport path, there is no time loss such as waiting for slip insertion as in the conventional example 2.
The shear generated at the face can be efficiently processed.
As a result, the impact on the excavation cycle will be minimized, and small-scale transport to the temporary storage site for the waste container will be sufficient, so that only a small number of waste container transport vehicles will be required, and the crusher capacity and belt conveyor transport capacity will be small. (Averaging).

【0014】また、ズリ破砕機および連続式ベルトコン
ベアの延伸作業も、ごく頻繁に行う必要はなく、ある程
度の時間間隔をおいて行うようにしてもズリ処理が非効
率化することが無くなる。
Also, the work of stretching the shear crusher and the continuous belt conveyor does not need to be performed very frequently, and even if it is performed at a certain time interval, the efficiency of the shear processing is not reduced.

【0015】一方、より具体的態様に係る第2発明は、
切羽から後方側に離れた位置にズリ容器仮置き場を設け
るとともに、切羽手前のズリ積込み場所から前記ズリ容
器仮置き場までの区間をズリ出し第1区間として設定
し、かつ前記ズリ容器仮置き場から坑口側に離れた位置
にズリ破砕機およびこのズリ破砕機位置から坑外に至る
連続式ベルトコンベア設備を設けるとともに、前記ズリ
容器仮置き場から前記ズリ破砕機までの区間をズリ出し
第2区間として設定し、前記ズリ出し第1区間におい
て;1または複数のズリ容器運搬車を配備し、前記ズリ
積込み場所にてズリが入れられたズリ容器を前記ズリ容
器仮置き場まで運搬し仮置きするとともに、ズリ容器仮
置き場に置いてある空のズリ容器をズリ積込み場所まで
運搬するズリ運搬作業を行い、前記ズリ出し第2区間に
おいて;1または複数のズリ容器運搬車を配備し、前記
ズリ容器仮置き場に置いてあるズリが入れられたズリ容
器を前記破砕機まで運搬しズリを破砕機に投入した後、
空のズリ容器を元のズリ容器仮置き場まで運搬するズリ
運搬作業を行い、その後、前記ズリ破砕機まで運ばれた
ズリを前記ズリ破砕機により破砕した後、前記連続式ベ
ルトコンベア設備により坑外まで搬送することを特徴と
するものである。
On the other hand, a second invention according to a more specific embodiment is as follows.
A slip container temporary storage place is provided at a position away from the face to the rear side, and a section from the slip loading place in front of the face to the slip container temporary storage place is set as a slip-out first section, and a wellhead is provided from the slip container temporary storage place. In addition to providing a shear crusher and a continuous belt conveyor facility extending from the position of the shear crusher to the outside of the mine at a position away from the side, a section from the temporary storage site of the shear container to the shear crusher is set as a second section for slipping. And in the first section for taking out the slip, one or a plurality of slip container transport vehicles are provided, and the slip container in which the slip is loaded at the slip loading location is transported to the temporary storage place for the slip container and temporarily stored. Performing a slip transport operation of transporting an empty slip container placed in a temporary container storage area to a slip loading location; Deploy shear container truck, after the shear container temporary field shear container shear is placed that is placed in were placed in a crusher haul and shear to the crusher,
After performing the shearing transport operation of transporting the empty shearing container to the original shearing container temporary storage site, and then crushing the shears carried to the shearing crusher by the shearing crusher, by the continuous belt conveyor facility, It is characterized by being transported to

【0016】本第2発明では、切羽〜ズリ容器仮置き場
までのズリ出し第1区間に1または複数台のズリ容器運
搬車を配備するとともに、ズリ容器仮置き場〜ズリ破砕
機までのズリ出し第2区間に1または複数台のズリ容器
運搬車を配備し、各区間に配備されたズリ容器運搬車に
よってそれぞれ区間毎にズリ容器の運搬を分担するよう
にしたものである。ズリ出し第1区間およびズリ出し第
2区間におけるズリ容器運搬を各区間に配備したズリ容
器運搬車によって行うようにすることで、前記ズリ容器
仮置き場に置かれたズリ容器については、掘削サイクル
とは全く無関係に、すなわちズリ出し第2区間における
ズリ容器運搬は、切羽の掘削に併行して行うこともでき
るし、ズリ出し第1区間におけるズリ容器運搬に併行し
て行うこともできるようになるとともに、少ない台数の
ズリ容器運搬車により他の作業との調整を取りながら行
えば良くなるため、クラッシャー能力およびベルトコン
ベア搬送能力を小規模化(平均化)できるようになる。
In the second aspect of the present invention, one or a plurality of waste container transport vehicles are provided in the first section from the face to the temporary storage site of the shear container, and the slip from the temporary storage site of the waste container to the waste crusher is provided. One or a plurality of waste container transport vehicles are provided in two sections, and transport of the waste container is shared for each section by each of the waste container transport vehicles provided in each section. By carrying out the transport of the waste container in the first section and the second section of the slip-out operation by the waste container transport vehicle arranged in each section, for the slip container placed in the temporary storage area for the slip container, the excavation cycle and Is completely unrelated, that is, the transport of the shear container in the second section of the shearing can be performed in parallel with the excavation of the face, or can be performed in parallel with the transport of the shear container in the first section of the shearing. At the same time, it is sufficient to perform adjustment with other operations by using a small number of waste container carriers, so that the crusher capacity and the belt conveyor transfer capacity can be reduced (averaged).

【0017】他方、本ズリ搬出方法においては、前記ズ
リ容器仮置き場をインバート掘削部より切羽側に位置さ
せるとともに、前記ズリ破砕機をインバート掘削部より
坑口側に位置させるようにすれば、前記インバート掘削
部にて発生したズリをズリ破砕機まで運搬し、切羽ズリ
と共に搬送することが可能となる。
On the other hand, in the present method for carrying out the slip, the temporary storage place for the waste container is located on the face side of the invert excavation part, and the waste shredder is located on the wellhead side of the invert excavation part. Debris generated in the excavation part can be transported to the debris crusher and transported together with the face debris.

【0018】ところで、前記ズリ容器は、1サイクル毎
の掘削で発生するズリを処理するのに必要な台数よりも
多くの台数を使用するのが望ましい。具体的には、1サ
イクル掘削毎のズリを処理するのに必要な台数の10〜
40%増し、好ましくは20〜30%増しの台数を投入
するのが望ましい。
By the way, it is desirable to use a larger number of the above-mentioned slip containers than the number required for processing the slip generated by excavation in each cycle. Specifically, the number of units required to process shears per cycle
It is desirable to increase the number by 40%, preferably by 20 to 30%.

【0019】[0019]

【発明の実施の形態】以下、本発明の実施の形態につい
て図面を参照しながら詳述する。図1は本発明に係るズ
リ搬出方法を採用したトンネル施工縦断面図であり、図
2はその平面図である。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a vertical sectional view of a tunnel construction employing a slip-out method according to the present invention, and FIG. 2 is a plan view thereof.

【0020】本トンネル施工では、切羽Sにて掘削され
たズリの搬出に当たり、切羽後方側にズリ容器(以下、
ベッセルという。)の仮置き場30を設けるとともに、
このベッセル仮置き場30を間に挟んで、切羽S側にズ
リ出し第1区間20を設定するとともに、坑口側にズリ
出し第2区間40を設定し、これらズリ出し区間20〜
40の後端部位置から連続ベルトコンベア14によって
坑外への搬送を行うようにするものである。
In the construction of the tunnel, when the debris excavated by the face S is carried out, a debris container (hereinafter, referred to as a “rear container”) is provided on the rear side of the face.
It is called Vessel. ) And a temporary storage space 30
With the vessel temporary storage place 30 interposed therebetween, the first slippage section 20 is set on the face S side, and the second slippage section 40 is set on the wellhead side.
The transfer from the rear end portion 40 to the outside of the pit is performed by the continuous belt conveyor 14.

【0021】以下、さらに具体的に詳述すると、先ず、
本形態例では、切羽Sにブームヘッダーまたはパワーカ
ッターなどと呼ばれる自由断面掘削機1が位置し、上半
ベンチ長を極端に短くして上半断面と下半断面とを一括
的に併行掘削するミニベンチ工法(フリーベンチ工法ま
たはマイクロベンチ工法とも呼ばれる。)により掘削が
行われている。
Hereinafter, more specifically, first,
In the present embodiment, a free-section excavator 1 called a boom header or a power cutter is located on the face S, and the upper half bench length is extremely shortened so that the upper half section and the lower half section are collectively excavated in parallel. Excavation is performed by the mini bench method (also called the free bench method or the micro bench method).

【0022】切羽Sの後方側位置には、2ブーム式ドリ
ルジャンボ6が待機しており、トンネル壁面より地山中
にロックボルト打設を行う際には、切羽S位置まで前進
し削孔を行うとともに、ロックボルトの挿入・打設を行
う。
A 2-boom type drill jumbo 6 stands by at a position on the rear side of the face S, and when rock bolts are to be driven from the tunnel wall surface into the ground, the drill advances to the face S position and drills holes. At the same time, insert and drive lock bolts.

【0023】なお、本例では前記自由断面掘削機1によ
る機械掘削を主とした掘削方式を採用しているが、切羽
の掘削は発破掘削や、トンネルボーリングマシンによる
全断面機械掘削工法であってもよい。また、符号4はト
ランス台車であり、符号5は大型集塵機台車、符号7は
吹付け機である。
In this embodiment, an excavation method mainly using mechanical excavation by the free-section excavator 1 is employed. However, excavation of a face is a blast excavation or a full-section mechanical excavation method using a tunnel boring machine. Is also good. Reference numeral 4 is a transformer truck, reference numeral 5 is a large dust collector truck, and reference numeral 7 is a spraying machine.

【0024】掘削されたズリの搬出に当たっては、前記
自由断面掘削機1後方側のズリ積込み場所10に、ホイ
ールローダなどのズリ積込み機2を位置させ、前記自由
断面掘削機1のズリ出しコンベア1aから排出されるズ
リを順次、空のベッセル9(以下、空の場合は空ベッセ
ル9と表現する。)に積み込むようにする。
When carrying out the excavated debris, a debris loading machine 2 such as a wheel loader is positioned at a debris loading location 10 on the rear side of the free-section excavator 1, and the debris conveyor 1 a of the free-section excavator 1 is provided. sequentially shear discharged from an empty vessel 9 (hereinafter, in the case of air expressed as empty vessel 9 E.) so that load on.

【0025】ズリが充満されたベッセル9(以下、ズリ
充填の場合は充ベッセル9と表現する。)は、ベッセ
ル運搬車3、3によりベッセル仮置き場30まで運搬さ
れ、仮置きされた後、近傍に置かれている空ベッセル9
を車体前部のフォークによって持上げ、切羽Sのズリ
積込み場所10まで運搬する作業を繰り返す。このズリ
出し第1区間20におけるズリ運搬は、掘削サイクル工
程の内、自由断面掘削機1による掘削の度に行われる。
The vessel 9 in which shear is filled (hereinafter, in the case of shear filling expressed as charging vessel 9 F.) Is carried by a vessel truck 3,3 to Bessel temporary field 30, after being temporarily placed, Empty vessel 9 placed nearby
E is lifted by the fork at the front of the vehicle body, and the operation of transporting the face E to the slip loading location 10 is repeated. The shear conveyance in the first section 20 is performed every time excavation is performed by the free-section excavator 1 in the excavation cycle process.

【0026】なお、図1に示される例では、ズリ出し第
1区間20においてズリ運搬を行うベッセル運搬車3の
台数は2台としたが、1台であってもよいし、2台以上
の台数を配備するようにしてもよい。特に、発破工法な
どのように一気に切羽Sが切り崩されるような掘削工法
を採用している場合には、2台以上のベッセル運搬車
3、3を配備して、すみやかに切羽手前に積み上がった
ズリを処理するのが望ましい。
In the example shown in FIG. 1, the number of the vessel transporting vehicles 3 for carrying the shearing in the first section 20 is two, but may be one or two or more. The number may be deployed. In particular, when an excavation method such that the face S is cut at a stroke, such as a blasting method, is adopted, two or more vessel carriers 3, 3 are deployed, and the vehicle is quickly stacked in front of the face. It is desirable to process the waste.

【0027】一方、インバート桟橋42が設置されたイ
ンバート掘削部41の後方側に、ズリ破砕機11が設置
され、前記ベッセル仮置き場30から前記ズリ破砕機1
1までの区間をズリ出し第2区間40として、ベッセル
運搬車8がベッセル仮置き場30に置かれた充ベッセル
を前記ズリ破砕機11まで運搬し、ズリをズリ破砕
機11に投入したならば、空ベッセル9をベッセル仮
置き場30まで持ち帰り仮置きする。このズリ出し第2
区間40におけるズリ運搬は、切羽の掘削工程とは全く
無関係に行うことが可能である。すなわち、前記ズリ出
し第1区間20のズリ運搬は切羽掘削の工程に合わせた
運搬が必要となるが、一旦ベッセル仮置き場30に仮置
きされたズリは、切羽掘削とは全く無関係に作業を進め
ることができる。また、運搬の作業効率がトンネル掘削
効率に与える影響がないため、クラッシャー能力および
連続ベルトコンベア14の運搬能力についても小規模化
(平均化)できるようになる。かかるズリ出し第2区間
40に配備されるベッセル運搬車8の台数は、複数台と
することも可能であるが、掘削サイクルとは無関係にズ
リ出し作業が行えるメリットを生かす意味では、1台に
よりベッセル9の運搬を行うようにするのが望ましい。
On the other hand, on the rear side of the invert excavation section 41 where the invert pier 42 is installed, the shear crusher 11 is installed.
The section up to 1 as muck second section 40, if the vessel truck 8 transports the charge vessel 9 F placed in a vessel temporary field 30 to the shear crushing machine 11, was charged with shear to shear crushing machine 11 if, to take home temporarily placed an empty vessel 9 E until the vessel temporary storage field 30. This slip out 2
The shear transport in the section 40 can be performed completely independently of the face excavation process. That is, the transport of the shears in the first section 20 needs to be transported in accordance with the face excavation process. However, once the temporary storage in the vessel temporary storage area 30, the work proceeds completely independently of the face excavation. be able to. In addition, since the transport work efficiency does not affect the tunnel excavation efficiency, the crusher capacity and the transport capacity of the continuous belt conveyor 14 can be reduced in size (averaged). Although the number of the vessel transporting vehicles 8 provided in the second section 40 for displacing can be set to a plurality of units, in order to take advantage of the fact that the displacing operation can be performed irrespective of the excavation cycle, one unit is used. It is desirable to carry the vessel 9.

【0028】前記ベッセル仮置き場30は、インバート
掘削部41よりも切羽S側に位置させるとともに、前記
ズリ破砕機11はインバート掘削部41より坑口側に位
置させるようにするのが望ましい。仮に、インバート掘
削部41の後方側にベッセル仮置き場30を位置させる
と、ベッセル仮置き場30が切羽Sから遠すぎるように
なりズリ出し第1区間20でのズリ出し作業が効率化し
ないとともに、ズリ出し第1区間20におけるズリ運搬
が、インバート掘削時の車両通行規制の影響を受けるよ
うになるため好ましくないものとなる。また、ズリ破砕
機11をインバート掘削部41の後方側に位置させるこ
とにより、インバート掘削によって生じたズリをズリ破
砕機11に投入して、切羽ズリと同時に連続式ベルトコ
ンベア14によって搬送処理できるようになる。
It is desirable that the vessel temporary storage place 30 is located closer to the face S than the invert excavation section 41, and that the shear crusher 11 is located closer to the wellhead than the invert excavation section 41. If the vessel temporary storage area 30 is located behind the invert excavation section 41, the vessel temporary storage area 30 will be too far from the face S, and the slip removal operation in the first section 20 will not be efficient, and the slip will not be efficient. The slip transport in the first outgoing section 20 becomes unfavorable because it is affected by the vehicle traffic regulation at the time of invert excavation. In addition, by positioning the shear crusher 11 on the rear side of the invert excavation part 41, the shear generated by the invert excavation can be fed into the shear crusher 11 and conveyed by the continuous belt conveyor 14 simultaneously with the face shear. become.

【0029】また前記ベッセル仮置き場30では、相対
的に切羽側位置に空ベッセル仮置き場31とし、相対的
に坑口側位置に充ベッセル仮置き場32を設定するのが
望ましい。すなわち、ズリ出し第1区間20において運
ばれた充ベッセル9を充ベッセル仮置き場32の先頭
側に仮置きし、空ベッセル9を持ち帰る時は、空ベッ
セル仮置き場31の後尾側に仮置きされている空ベッセ
ル9を持ち帰るようにする。また、ズリ出し第2区間
40では、ベッセル運搬車8は充ベッセル仮置き場32
の後尾側に仮置きされている充ベッセル9をズリ破砕
機11まで運搬し、空となった空ベッセル9を空ベッ
セル仮置き場31の先頭側に仮置きするようにすれば、
切羽掘削の進行に合わせて自然にベッセル仮置き場30
を前進させることができるようになる。
In the vessel temporary storage area 30, it is desirable to set an empty vessel temporary storage area 31 at a relatively face side position and a filled vessel temporary storage area 32 at a relatively wellhead side position. That is, temporary charge vessel 9 F carried in muck first section 20 at the top side of the charging vessel temporary field 32, when bring the empty vessel 9 E are temporarily placed to the end side of the air-Bessel temporary field 31 It is to make bring back an empty vessel 9 E are. Also, in the second section 40 where the slippage occurs, the vessel transport vehicle 8 is moved to the full vessel temporary storage area 32.
If the charge vessel 9 F that is temporarily placed to the end side of the transported to the shear crushing machine 11, so as to temporarily placed an empty vessel 9 E became empty at the beginning side of the empty vessel temporary field 31,
Vessel temporary storage area 30 naturally as the face excavation progresses
Can be advanced.

【0030】前記ベッセル9の投入台数は、1サイクル
毎の掘削で発生するズリ量を運搬するのに必要な台数よ
りも多くの台数を投入するのが望ましい。図示例では、
具体的には1サイクル掘削毎に発生するズリを処理する
のに必要な台数の25%増の台数を投入するようにして
いる。必要最小台数を超えたズリ容器台数分は、確実に
ズリ容器運搬の緩衝的役目を担うようになり、各種作業
の調整を容易化するとともに、ズリ出し第1区間20と
ズリ出し第2区間40との間の作業干渉を無くすように
なる。すなわち、前記ズリ出し第2区間40におけるズ
リ容器の運搬が他工種、たとえばインバート掘削、ベル
トコンベア延伸作業、インバートコンクリート施工など
のために運搬できない時間帯が長く続いたとしても、所
要台数を超えるズリ容器台数が投入されていることによ
り、切羽掘削およびズリ出し第1区間20におけるズリ
運搬は前記影響を受けることなく円滑に作業を進めるこ
とができるようになる。
The number of the vessels 9 to be loaded is desirably greater than the number required to transport the amount of shear generated during the excavation in each cycle. In the example shown,
Specifically, the number of units required for processing the shears generated for each cycle excavation is increased by 25%. The number of slip containers exceeding the required minimum number reliably serves as a buffer for transporting the slip containers, thereby facilitating the adjustment of various operations, and at the same time, the first section 20 and the second section 40. Work interference between the two. That is, even if the time period during which the transport of the shearing container in the second slipping-out second section 40 cannot be transported due to other types of work, for example, invert excavation, belt conveyor stretching work, invert concrete construction, etc., continues for a long time, the number of slips that exceeds the required number of Since the number of containers has been inserted, the excavation of the face and the conveyance of the shear in the first section 20 can proceed smoothly without being affected by the above.

【0031】他方、前記ズリ破砕機11を先頭とする連
続式ベルトコンベア設備50は、切羽S側から順に、ズ
リ破砕機11、中継ベルトコンベア12、テール台車1
3、連続ベルトコンベア14、傾斜ベルトコンベア15
から構成され、前記ズリ破砕機11に投入されたズリを
均一の粒径に破砕した後、中継ベルトコンベア12を介
して連続ベルトコンベア14および傾斜ベルトコンベア
15によって坑外まで搬送するようになっている。
On the other hand, the continuous belt conveyor equipment 50 having the above-mentioned shear crusher 11 as the head comprises a shear crusher 11, a relay belt conveyor 12, a tail carriage 1 in order from the face S side.
3, continuous belt conveyor 14, inclined belt conveyor 15
After crushing the shears supplied to the shear crusher 11 into a uniform particle size, the crushed crushers are transported to the outside of the mine by the continuous belt conveyor 14 and the inclined belt conveyor 15 via the relay belt conveyor 12. I have.

【0032】詳細には図3に示されるように、前記ズリ
破砕機11としては、ズリ投入高さ位置を低くできるイ
ンパクトロール式クラッシャーが用いられており、前記
ベッセル運搬車8によって運ばれたズリがズリ投入部に
投入されると、ズリはズリ破砕機11によって破砕され
ながら搬送され、中継ベルトコンベア12の一方側端部
に落下した後、中継ベルトコンベア12によって搬送さ
れ、他方側端部より連続ベルトコンベア14上に落下
し、ここから坑外まで連続的に搬送される。なお、前記
中継ベルトコンベア12は、同図に鎖線で示されるよう
に、坑口側の他方端部を中心として鉛直軸周りに所定角
度範囲で回動可能となっており、前記ズリ破砕機11の
位置決めが容易に行えるようになっている。
As shown in detail in FIG. 3, an impact roll type crusher capable of lowering the height of the slip input is used as the shear crusher 11, and the shear carried by the vessel carrier 8 is used. Is thrown into the slip feeding section, the slip is transported while being crushed by the slip crushing machine 11, dropped to one end of the relay belt conveyor 12, and then transported by the relay belt conveyor 12, from which the other end. It falls on the continuous belt conveyor 14 and is continuously conveyed from here to the outside of the pit. The relay belt conveyor 12 is rotatable within a predetermined angle range around a vertical axis around the other end on the wellhead side as shown by a chain line in FIG. Positioning can be easily performed.

【0033】前記連続ベルトコンベア14は、図5に示
されるように、トンネル方向に所定間隔で脚部21、2
1を備えるコンベア台枠22と、このコンベア台枠22
の長手方向に適宜の間隔で設けられたリターン側ベルト
の支持ローラ23、23…と、複数のキャリアローラ2
5…、26の組合せからなりキャリア側ベルトを支持す
るキャリア側ベルトの支持ローラユニット24とからな
る定置式ベルトコンベアであり、テール台車13の内部
に設置されたテールユニット16内にベルトを反転させ
るリターンプーリを有するとともに、坑口部に一方側リ
ターンプーリを備え、かつ坑口部に設置されたメインド
ライブ17によって無端ループ駆動されるようになって
いる。リターン側ベルトの途中には、ベルトを多数のプ
ーリに往復状態で懸架させることによりベルト長を蓄え
たベルトストレージユニット18を備えており、前記テ
ール台車13の前進に伴ってベルトを繰り出すことで延
伸可能となっている。なお、連続ベルトコンベア14の
反力は、前記テール台車13の自重によって支持される
ようになっている。
As shown in FIG. 5, the continuous belt conveyor 14 has legs 21, 2 at predetermined intervals in the tunnel direction.
Conveyor frame 22 including
, Provided on the return side belt at appropriate intervals in the longitudinal direction, and a plurality of carrier rollers 2
The stationary belt conveyor is a fixed-type belt conveyor composed of a combination of 5..., 26 and a support roller unit 24 for the carrier-side belt that supports the carrier-side belt, and inverts the belt into a tail unit 16 installed inside the tail carriage 13. It has a return pulley, has a one-side return pulley at the wellhead, and is driven endlessly by a main drive 17 installed at the wellhead. In the middle of the return side belt, there is provided a belt storage unit 18 that stores the belt length by suspending the belt in a reciprocating manner on a number of pulleys, and stretches the belt by extending the belt as the tail carriage 13 advances. It is possible. The reaction force of the continuous belt conveyor 14 is supported by the weight of the tail carriage 13.

【0034】前記定置式の連続ベルトコンベア14はト
ンネル内のコンベア配設全区間に亘って設置されてい
る。前記連続ベルトコンベア設備50区間には、シート
張台車21およびスライドセントル22が設けられる
が、前記連続ベルトコンベア14を連続して通すため
に、シート張台車21およびスライドセントル22は、
トンネル中心線Lから一方側に偏心させた位置として前
記連続ベルトコンベア14の設置空間を確保するように
している(図4参照)。なお、前記シート張台車21お
よびスライドセントル22は、連続ベルトコンベア設備
50区間以外の場所、すなわちズリ破砕機11よりも切
羽S側に位置させるようにしてもよい。
The stationary continuous belt conveyor 14 is installed over the entire section of the tunnel where the conveyors are provided. In the section of the continuous belt conveyor equipment 50, a sheet tension cart 21 and a slide center 22 are provided. In order to continuously pass the continuous belt conveyor 14, the sheet tension cart 21 and the slide center 22 are
An installation space for the continuous belt conveyor 14 is secured at a position eccentric to one side from the tunnel center line L (see FIG. 4). In addition, the sheet upholstery 21 and the slide center 22 may be located in places other than the continuous belt conveyor equipment 50 section, that is, on the face S side of the shear crusher 11.

【0035】[0035]

【発明の効果】以上詳説のとおり本発明によれば、掘削
サイクルへの影響を最小限とでき、かつ少ないズリ運搬
車両により効率的に切羽ズリを処理できるようになると
ともに、クラッシャー能力およびベルトコンベア搬送能
力を小規模化(平均化)できるようになる。
As described above in detail, according to the present invention, the influence on the excavation cycle can be minimized, and the face shear can be efficiently processed by a small amount of the shear transport vehicle. The transport capacity can be reduced (averaged).

【0036】また同時に、下半ベンチ掘削および/また
はインバート掘削によって生じたズリを効率的に切羽ズ
リと同時搬出できるようになり、ズリ処理の効率化も図
れるようになる。
At the same time, it is possible to efficiently carry out the scrap generated by the lower half bench excavation and / or the invert excavation simultaneously with the face shear, thereby improving the efficiency of the shear processing.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るズリ搬出方法を採用したトンネル
施工縦断面図である。
FIG. 1 is a longitudinal sectional view of a tunnel construction employing a slip-out method according to the present invention.

【図2】その平面図である。FIG. 2 is a plan view thereof.

【図3】ズリ破砕機11、中継ベルトコンベア12およ
びテール台車13部を示す、(A)は側面図、(B)は平面図
である。
3A and 3B are a side view and a plan view, respectively, showing a shear crusher 11, a relay belt conveyor 12, and a tail carriage 13;

【図4】スライドセントル22部の概略正面図である。FIG. 4 is a schematic front view of a slide center 22 part.

【図5】連続ベルトコンベア14を示す、(A)は側面
図、(B)は断面図である。
5 (A) is a side view and FIG. 5 (B) is a sectional view showing the continuous belt conveyor 14. FIG.

【符号の説明】[Explanation of symbols]

1…自由断面掘削機、2…ズリ積込み機、3…ベッセル
運搬車、6…2ブーム式ドリルジャンボ、8…ベッセル
運搬車、9…ベッセル、9…空ベッセル、9 …充ベ
ッセル、10…ズリ積込み場所、11…ズリ破砕機、1
2…中継ベルトコンベア、13…テール台車、14…連
続ベルトコンベア、15…傾斜ベルトコンベア、20…
ズリ出し第1区間、21…シート張台車、22…スライ
ドセントル、30…ベッセル仮置き場、31…空ベッセ
ル仮置き場、32…充ベッセル仮置き場、40…ズリ出
し第2区間、41…インバート掘削部、50…連続式ベ
ルトコンベア区間
 1: free section excavator, 2: shear loading machine, 3: vessel
Truck, 6… 2 boom type drill jumbo, 8… Vessel
Truck, 9 ... Vessel, 9E… Empty vessel, 9 F… Full
Ssell, 10 ... Spot loading place, 11 ... Swarf crusher, 1
2 ... Relay belt conveyor, 13 ... Tail carriage, 14 ... Ream
Continuation belt conveyor, 15 ... inclined belt conveyor, 20 ...
Slip-out first section, 21 ... Sheet trolley, 22 ... Sly
Decentre, 30 ... Vessel temporary storage, 31 ... empty Besse
Le temporary storage, 32 ... full vessel temporary storage, 40 ...
Second section, 41 ... Inverted excavation section, 50 ... Continuous type
Belt conveyor section

───────────────────────────────────────────────────── フロントページの続き (72)発明者 福井 弘 東京都中央区日本橋本町4丁目12番20号 佐藤工業株式会社内 (72)発明者 小早川 忠行 宮城県仙台市青葉区本町1−10−3 佐藤 工業株式会社東北支店内 Fターム(参考) 2D054 DA02 DA17 DA19 DA37  ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Hiroshi Fukui 4-12-20 Nihonbashi Honcho, Chuo-ku, Tokyo Inside Sato Industry Co., Ltd. (72) Inventor Tadayuki Kobayakawa 1-10-3 Honmachi, Aoba-ku, Sendai, Miyagi Prefecture Sato Kogyo Co., Ltd. Tohoku Branch F-term (reference) 2D054 DA02 DA17 DA19 DA37

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】切羽から後方側に離れた位置にズリ容器の
仮置き場を設けるとともに、このズリ容器仮置き場から
坑口側に離れた位置にズリ破砕機を置き、ズリが充填さ
れたズリ容器を前記切羽からズリ容器仮置き場まで運搬
し仮置きする第1ズリ運搬工程と、前記ズリ容器仮置き
場に仮置きされたズリ容器をズリ破砕機まで運搬する第
2ズリ運搬工程とによりズリをズリ破砕機まで運搬した
後、ここから連続式ベルトコンベアによって坑外まで搬
送することを特徴とするトンネル施工におけるズリ搬出
方法。
A temporary storage space for a waste container is provided at a position distant from the face to the rear side, and a shear crusher is disposed at a position away from the temporary storage site at a wellhead to remove the waste container filled with the waste. Slip crushing by a first slip transporting step of transporting and temporarily placing the shears from the face to the slip container temporary storage place, and a second shear transporting step of transporting the slip containers temporarily placed in the slip container temporary storage to the shear crusher. A method of transporting slips in tunnel construction, comprising transporting the paper to the outside of the mine by a continuous belt conveyor after transporting the paper to the machine.
【請求項2】切羽から後方側に離れた位置にズリ容器仮
置き場を設けるとともに、切羽手前のズリ積込み場所か
ら前記ズリ容器仮置き場までの区間をズリ出し第1区間
として設定し、かつ前記ズリ容器仮置き場から坑口側に
離れた位置にズリ破砕機およびこのズリ破砕機位置から
坑外に至る連続式ベルトコンベア設備を設けるととも
に、前記ズリ容器仮置き場から前記ズリ破砕機までの区
間をズリ出し第2区間として設定し、 前記ズリ出し第1区間において;1または複数のズリ容
器運搬車を配備し、前記ズリ積込み場所にてズリが入れ
られたズリ容器を前記ズリ容器仮置き場まで運搬し仮置
きするとともに、ズリ容器仮置き場に置いてある空のズ
リ容器をズリ積込み場所まで運搬するズリ運搬作業を行
い、 前記ズリ出し第2区間において;1または複数のズリ容
器運搬車を配備し、前記ズリ容器仮置き場に置いてある
ズリが入れられたズリ容器を前記破砕機まで運搬しズリ
を破砕機に投入した後、空のズリ容器を元のズリ容器仮
置き場まで運搬するズリ運搬作業を行い、 その後、前記ズリ破砕機まで運ばれたズリを前記ズリ破
砕機により破砕した後、前記連続式ベルトコンベア設備
により坑外まで搬送することを特徴とするトンネル施工
におけるズリ搬出方法。
2. A slip container temporary storage place is provided at a position away from the face to the rear side, and a section from a slip loading place in front of the face to the slip container temporary storage place is set as a first slip-out section and the slip is set. A shear crusher and a continuous belt conveyor facility extending from the position of the waste crusher to the outside of the mine are provided at a position distant from the container temporary storage site to the wellhead side, and a section from the temporary container storage site to the shear crusher is removed. Set as a second section, and in the first section for taking out the slip; deploying one or a plurality of waste container transport vehicles, transporting the slip container filled with the slip at the place for loading the slip to the temporary storage place for the slip container, and temporarily Along with placing, performing a slip transport operation to transport an empty slip container placed in the slip container temporary storage area to the slip loading location, One or more waste container transport vehicles are provided, and the waste container in which the waste is placed in the temporary storage place for the waste container is transported to the crusher, and the waste is placed in the crusher. Carrying the waste transporting work to transport the waste container to the temporary storage place, and then crushing the waste carried to the waste crusher by the waste crusher, and then transporting it to the outside of the pit by the continuous belt conveyor equipment Slip-out method in tunnel construction.
【請求項3】前記ズリ容器仮置き場をインバート掘削部
より切羽側に位置させるとともに、前記ズリ破砕機をイ
ンバート掘削部より坑口側に位置させ、前記インバート
掘削部にて発生したズリをズリ破砕機まで運搬し、切羽
ズリと共に搬送するようにした請求項1、2いずれかに
記載のトンネル施工におけるズリ搬出方法。
3. The shearing container temporary storage place is located on the face side of the invert excavation part, and the shearing crusher is located on the wellhead side of the invert excavation part. 3. The method of carrying out a slip in tunnel construction according to claim 1, wherein the method is carried to a transporting machine along with the cutting edge.
【請求項4】前記ズリ容器は、1サイクル毎の掘削で発
生するズリを処理するのに必要な台数よりも多くの台数
を使用する請求項1〜3いずれかに記載のトンネル施工
におけるズリ搬出方法。
4. The method according to claim 1, wherein a larger number of said containers are used than the number required for processing the waste generated during excavation in each cycle. Method.
JP2000261509A 2000-08-30 2000-08-30 Slipping method in tunnel construction Expired - Lifetime JP4493187B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000261509A JP4493187B2 (en) 2000-08-30 2000-08-30 Slipping method in tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000261509A JP4493187B2 (en) 2000-08-30 2000-08-30 Slipping method in tunnel construction

Publications (2)

Publication Number Publication Date
JP2002070486A true JP2002070486A (en) 2002-03-08
JP4493187B2 JP4493187B2 (en) 2010-06-30

Family

ID=18749338

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000261509A Expired - Lifetime JP4493187B2 (en) 2000-08-30 2000-08-30 Slipping method in tunnel construction

Country Status (1)

Country Link
JP (1) JP4493187B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015030982A (en) * 2013-07-31 2015-02-16 株式会社奥村組 Tunnel construction method
JP7310039B1 (en) * 2023-04-06 2023-07-18 大栄工機株式会社 Muck Carry-out System and Muck Carry-out Method in Tunnel Construction

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6653493B2 (en) * 2015-05-28 2020-02-26 清水建設株式会社 Rapid tunnel construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60188600A (en) * 1984-03-09 1985-09-26 飛島建設株式会社 Feed-out method of blasting mined substance
JPH0571294A (en) * 1991-12-10 1993-03-23 Tobishima Corp Method of carrying blasting output such as muck, etc.
JPH06212887A (en) * 1992-06-30 1994-08-02 Ube Ind Ltd Waste transferring method in tunnel
JPH06280479A (en) * 1992-06-30 1994-10-04 Ube Ind Ltd Carrying method for waste in tunnel
JPH06288196A (en) * 1993-04-02 1994-10-11 Maeda Corp Pier for tunnel work, invert execution method, and tunnel construction method
JPH1162485A (en) * 1997-08-27 1999-03-05 Toyo Umpanki Co Ltd Earth/sand in tonnel delivery-out method and device therefor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60188600A (en) * 1984-03-09 1985-09-26 飛島建設株式会社 Feed-out method of blasting mined substance
JPH0571294A (en) * 1991-12-10 1993-03-23 Tobishima Corp Method of carrying blasting output such as muck, etc.
JPH06212887A (en) * 1992-06-30 1994-08-02 Ube Ind Ltd Waste transferring method in tunnel
JPH06280479A (en) * 1992-06-30 1994-10-04 Ube Ind Ltd Carrying method for waste in tunnel
JPH06288196A (en) * 1993-04-02 1994-10-11 Maeda Corp Pier for tunnel work, invert execution method, and tunnel construction method
JPH1162485A (en) * 1997-08-27 1999-03-05 Toyo Umpanki Co Ltd Earth/sand in tonnel delivery-out method and device therefor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015030982A (en) * 2013-07-31 2015-02-16 株式会社奥村組 Tunnel construction method
JP7310039B1 (en) * 2023-04-06 2023-07-18 大栄工機株式会社 Muck Carry-out System and Muck Carry-out Method in Tunnel Construction

Also Published As

Publication number Publication date
JP4493187B2 (en) 2010-06-30

Similar Documents

Publication Publication Date Title
CN103097658B (en) Continuous extraction mining system
CN110454219B (en) Full-gangue underground automatic filling device and method
US20110175429A1 (en) Mining system
JP2002070486A (en) Muck conveying method in tunnel construction
JPH09273393A (en) Belt conveyor device
JP6707609B2 (en) Equipment for carrying out crushed stones and sand in tunnel construction
CN210906501U (en) Movable type breaking and transporting integrated machine
JP3838843B2 (en) Conveying method by stretching belt conveyor and stretching belt conveyor equipment
CN107100626A (en) Monomer movement type complete equipment semi-continuousmining technology system
US20110227396A1 (en) Mining system
JP2967535B2 (en) Backup deck
CN114560223B (en) Non-stop slag discharging soil bucket and use method thereof
JP7310039B1 (en) Muck Carry-out System and Muck Carry-out Method in Tunnel Construction
JP3911648B2 (en) Sliding conveying method and belt conveyor
JP2022049974A (en) Muck conveying system and muck conveying method in tunnel construction
JP2001140588A (en) Conveying method for muck in tunnel
JP4548904B2 (en) Method for projecting tunnel and hopper used in the method
CN211777453U (en) Be used for earth pressure balance shield to construct big stone quick transfer device
JP7488779B2 (en) Muck removal system
CN210622850U (en) Mine transportation system
JP2022094192A (en) Tunnel debris conveying system and tunnel debris conveying method
JP2024089095A (en) Tailpiece dolly and method for transporting debris
OA20820A (en) Operating process for an open-pit mining site.
CN110878706A (en) Coal mine rapid tunneling gangue transportation system
AU2022206713A1 (en) Operating process for an open-pit mining site

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070612

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090206

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090218

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090414

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20091020

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100402

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100406

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130416

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130416

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140416

Year of fee payment: 4