Artesian countermeasure method in ground excavation work

Info

Publication number
JP2000144742A
JP2000144742A JP10315963A JP31596398A JP2000144742A JP 2000144742 A JP2000144742 A JP 2000144742A JP 10315963 A JP10315963 A JP 10315963A JP 31596398 A JP31596398 A JP 31596398A JP 2000144742 A JP2000144742 A JP 2000144742A
Authority
JP
Japan
Prior art keywords
guide pipe
ground
excavation work
supporting
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10315963A
Other languages
Japanese (ja)
Inventor
Naoyuki Kita
直之 喜多
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP10315963A priority Critical patent/JP2000144742A/en
Publication of JP2000144742A publication Critical patent/JP2000144742A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To make it possible to surely ensure integrity between tension member and bottom slab. SOLUTION: When a set of tension members 20 providing bearing bodies 22 to them is completed, grout is poured into a bored hole to harden, and anchorage sections 20b are anchored to the ground. When the anchorage on the lower end sides of the tension members 20 is completed, guide pipes 14 are pulled out upward to project the bearing bodies 22 to the outside from the lower ends of the guide pipes 14, and bearing plates 22b are widened. When the bearing plates 22b of the bearing bodies 22 are widened so as to direct a horizontal direction, underwater concrete is cast in an earth retaining wall 10 to form the bottom slab 24.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、地盤掘削工事に
おける被圧対策工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for countermeasures against pressure in ground excavation work.

【0002】[0002]

【従来の技術】シールド掘進機の発進ないしは到達立坑
などを始めとして、地盤中に円形,多角形などの閉合さ
れた断面形状の土止め壁を構築し、内部の地盤を掘削す
る地盤掘削工事がある。
2. Description of the Related Art Ground excavation work for constructing a closed wall such as a circular or polygonal cross section in the ground, such as starting or reaching a shaft of a shield excavator, and excavating the internal ground. is there.

【0003】このような地盤掘削工事においては、地盤
を掘削すると被圧を受ける場合があって、盤膨れやボイ
リングなどの不都合が発生する。このような場合の被圧
対策工法として、従来、地下水位を低下させて、被圧自
体を小さくする地下水位低下工法、地盤改良を施し、改
良体の重量で上向きの圧力に対抗させる地盤改良工法、
底版の浮き上りを引張材で抑制する引張材による抑止工
法が知られている。
[0003] In such ground excavation work, when the ground is excavated, the ground may be subjected to pressure, which causes inconveniences such as board swelling and boiling. Conventionally, as a countermeasure against pressure in such a case, a groundwater level lowering method that lowers the groundwater level to reduce the pressure itself, and a ground improvement method that performs ground improvement and counters upward pressure with the weight of the improved body ,
A restraining method using a tensile material that suppresses the lifting of the bottom plate with a tensile material is known.

【0004】しかし、地下水位低下工法は、地盤条件や
構造物の規模にもよるが、一般的にコストが低いという
有利性があるものの、周辺地盤に変化を生じさせるなど
環境面で問題がある。
[0004] However, although the method of lowering the groundwater level depends on the ground conditions and the size of the structure, it is generally advantageous in that the cost is low, but there is an environmental problem such as causing a change in the surrounding ground. .

【0005】また、地盤改良工法は、コスト高になるこ
とが多く、改良体の信頼性にも不安が残る。一方、引張
材による抑止工法は、環境や信頼性の問題が少なく、コ
ストも比較的安いという有利性があるものの、以下に説
明する技術的な課題があった。
[0005] In addition, the ground improvement method is often expensive, and the reliability of the improved body remains uneasy. On the other hand, the deterrent method using a tensile material has the advantages of less environmental and reliability problems and relatively low cost, but has the following technical problems.

【0006】[0006]

【発明が解決しようとする課題】すなわち、引張材によ
る抑止工法は、例えば、その一例が特開平4−2723
88号公報に開示されているのように、根切り掘削面以
深に下端が定着された引張材の上端側周面と、水中打設
するコンクリトーにより形成される底版とを一体化させ
て、底版の浮き上りを防止する。
That is, for example, Japanese Patent Laid-Open No. 4-2723 discloses an example of a restraining method using a tensile material.
As disclosed in Japanese Patent Publication No. 88, the upper end side peripheral surface of the tensile material having the lower end fixed deeper than the root excavation surface and the bottom plate formed by the concrete poured into the water are integrated, Prevents the bottom plate from rising.

【0007】ところが、この場合、底版と引張材との間
の一体性は、水中に打設されるコンクリートの付着力に
依存しているので、確実性に乏しく、底版に浮き上り力
が作用した際に、この作用力に対して、引張材を効果的
に抵抗させることが難しいという問題があった。
However, in this case, since the integrity between the bottom plate and the tensile member depends on the adhesive force of concrete poured into water, the reliability is poor, and a floating force acts on the bottom plate. In this case, there is a problem that it is difficult to effectively resist the tensile member to the acting force.

【0008】本発明は、このような従来の問題点に鑑み
てなされたものであって、その目的とするところは、引
張材と底版との間の一体性を確実に確保することができ
る地盤掘削工事における被圧対策工法を提供することに
ある。
The present invention has been made in view of such conventional problems, and an object of the present invention is to provide a ground which can surely secure the integrity between a tension member and a bottom plate. An object of the present invention is to provide a method for countermeasures against pressure in excavation work.

【0009】[0009]

【課題を解決するための手段】上記目的を達成するため
に、本発明は、地盤中に構築した土止め壁の内部を掘削
し、根切り掘削面以深に下端が定着された引張材を設置
した後に、前記土止め壁内に底版を形成して内部を排水
する地盤掘削工事において、前記引張材の上端側に一体
に設けられ、前記底版内に位置する支圧体を配置するよ
うにした。このように構成した地盤掘削工事における被
圧対策工法によれば、引張材の上端側に支圧体が一体に
設けられているので、底版と引張材との一体性が確実に
確保され、底版に浮き上り力が作用した際に、この作用
力に対して、引張材を効果的に抵抗させることができ
る。前記支圧体は、前記底版の厚み方向の中心よりも上
方に配置することが望ましく、この構成を採用すると、
底版の厚みを有効に活用して、より一層効果的に引張材
を作用力に対して抵抗させることができる。前記支圧体
は、前記引張材を設置する際に、前記土止め壁内の上下
方向に設置されるガイドパイプ内に収縮状態で収納され
ていて、前記ガイドパイプを上方移動させることによ
り、前記ガイドパイプから突出して、水平方向に延びる
ように拡開させることができる。この構成によれば、ガ
イドパイプの設置と上方移動とにより、簡単に支圧体を
底版の厚み方向の所定位置に設置することができる。前
記支圧体は、前記ガイドパイプ内に挿通される引張材の
上部側に固設された定着具と、この定着具の外周に拡縮
自在に枢着された複数の支圧プレートと、前記各支圧プ
レートを拡開方向に付勢するバネとで構成することがで
きる。
In order to achieve the above object, the present invention excavates the inside of a retaining wall constructed in the ground, and installs a tensile member having a lower end fixed below the root excavation surface. After that, in the ground excavation work for forming the bottom plate in the retaining wall and draining the inside, a supporting body that is integrally provided on the upper end side of the tensile member and is located in the bottom plate is arranged. . According to the pressure-prevention countermeasure method in the ground excavation work configured as described above, since the supporting member is integrally provided on the upper end side of the tensile member, the integrity of the bottom plate and the tensile member is reliably ensured, and the bottom plate is secured. When a lifting force acts on the tension member, the tensile member can effectively resist the acting force. It is desirable that the supporting member is disposed above the center of the bottom plate in the thickness direction.
By effectively utilizing the thickness of the bottom plate, it is possible to more effectively resist the tensile member against the acting force. The supporting member is stored in a contracted state in a guide pipe installed vertically in the retaining wall when installing the tension member, and the guide pipe is moved upward by moving the guide pipe upward. It can be expanded so as to protrude from the guide pipe and extend in the horizontal direction. According to this configuration, the supporting member can be easily installed at a predetermined position in the thickness direction of the bottom slab by installing and moving the guide pipe upward. The support member includes a fixing device fixedly provided on an upper side of a tension member inserted into the guide pipe, a plurality of support plates pivotally attached to the outer periphery of the fixing device so as to be able to expand and contract, and And a spring for urging the bearing plate in the expanding direction.

【0010】[0010]

【発明の実施の形態】以下、本発明の好適な実施の形態
について、添付図面を参照にして詳細に説明する。図1
から図6は、本発明にかかる地盤掘削工事における被圧
対策工法の一実施例を示している。
Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG.
Fig. 6 to Fig. 6 show an embodiment of a countermeasure against pressure in ground excavation work according to the present invention.

【0011】同図に示した被圧対策工法では、まず、図
1に示すように、水平断面が閉合された筒状の土止め壁
10が地盤中に構築される。この土止め壁10は、例え
ば、地中連続壁工法やSMW工法,TRD工法などによ
り地下水位(WL)以深まで形成される。
In the countermeasure against pressure method shown in FIG. 1, first, as shown in FIG. 1, a cylindrical retaining wall 10 having a closed horizontal section is constructed in the ground. The retaining wall 10 is formed to a depth below the groundwater level (WL) by, for example, an underground continuous wall method, an SMW method, a TRD method, or the like.

【0012】土止め壁10が所定深度まで構築される
と、土止め壁10の内部の水中掘削および排土が行わ
れ、この掘削が所定深度の根切り掘削面12に到達する
と、内部の水中掘削を停止する。
When the retaining wall 10 is constructed to a predetermined depth, underwater excavation and earth removal inside the retaining wall 10 are performed, and when the excavation reaches the root excavation surface 12 at the predetermined depth, the internal submerged water is excavated. Stop drilling.

【0013】次に、図2に示すように、下端が根切り掘
削面12に到達する両端が開口した中空円筒状のガイド
パイプ14を設置する。このとき、各ガイドパイプ14
の上端側は、地上に設置した係止部材16により、ほぼ
鉛直になるように支持する。
Next, as shown in FIG. 2, a hollow cylindrical guide pipe 14 whose both ends are open and whose lower end reaches the root excavation surface 12 is installed. At this time, each guide pipe 14
Is supported substantially vertically by a locking member 16 installed on the ground.

【0014】そして、ガイドパイプ14内に図示省略の
ボーリングロッドを挿入して、根切り掘削面12以深の
地盤18を削孔する。この削孔が所定深度まで行われる
と、ガイドパイプ14内を挿通させてその下端が削孔の
先端に到達する引張材20を、各ガイドパイプ14内に
挿入する。
Then, a boring rod (not shown) is inserted into the guide pipe 14 to bore the ground 18 deeper than the root excavation surface 12. When the drilling is performed to a predetermined depth, the tensile material 20 whose lower end reaches the tip of the drilling hole is inserted into each guide pipe 14 by passing through the guide pipe 14.

【0015】本実施例の引張材20は、例えば、PC鋼
棒,PC鋼線,H型鋼などで構成されたアンカー本体2
0aと、このアンカー本体20aの下端に一体に設けら
れ、拡径された定着部20bとを備えており、アンカー
本体20aは、ガイドパイプ14内を挿通して上端に突
出する長さを有している。
The tensile member 20 of this embodiment is, for example, an anchor body 2 made of a PC steel rod, a PC steel wire, an H-shaped steel, or the like.
0a and an anchoring portion 20b that is provided integrally with the lower end of the anchor main body 20a and has an enlarged diameter. The anchor main body 20a has a length that penetrates the guide pipe 14 and protrudes to the upper end. ing.

【0016】また、この引張材20には、図5,6にそ
の詳細を示す支圧体22が取付けられている。同図に示
した支圧体22は、定着具22aと、支圧プレート22
bと、コイルバネ22cとを備えている。
A supporting member 22 whose details are shown in FIGS. 5 and 6 is attached to the tension member 20. The support member 22 shown in FIG.
b and a coil spring 22c.

【0017】定着具22aは、軸方向にアンカー本体2
0aの挿通孔22dが貫通形成され、下端側の挿通孔2
2dの開口端の外周に略十字状に配置された4枚の支圧
プレート22bが拡縮自在(揺動自在)に枢着されてい
る。なお、支圧ブレート22bの数は、4に限ることは
なく、これ以上ないしは以下であってもよい。
The fixing device 22a is disposed in the anchor body 2 in the axial direction.
0a is formed through the through hole 22d.
Four supporting plates 22b arranged in a substantially cross shape on the outer periphery of the opening end of the 2d are pivotally attached to be able to expand and contract (swing freely). The number of supporting plates 22b is not limited to four, but may be more or less.

【0018】コイルバネ22cは、拡縮自在に枢着され
た各支圧プレート22bを拡開方向に付勢し、フリーな
状態では、各支圧プレート22bは、図5,6に実線で
示すように、ほぼ水平方向を指向するように延設され
る。
The coil spring 22c urges each of the supporting plates 22b, which are pivotally attached so as to be able to expand and contract, in the expanding direction. In a free state, each supporting plate 22b moves as shown by a solid line in FIGS. , Extending substantially horizontally.

【0019】このように構成された支圧体22は、その
定着具22aが、図3に示すように、底版24の厚み方
向の中心から上方になる位置に固設される。
As shown in FIG. 3, the supporting member 22 having the above-mentioned structure is fixed to a position above the center of the bottom plate 24 in the thickness direction of the bottom plate 24, as shown in FIG.

【0020】そして、引張材20をガイドパイプ14内
に挿通する際には、図5に仮想線で示すように、各支圧
プレート22bをバネ22cの付勢力に抗して収縮させ
た状態で挿入する。
When the tension member 20 is inserted into the guide pipe 14, as shown by phantom lines in FIG. 5, each supporting plate 22b is contracted against the urging force of the spring 22c. insert.

【0021】支圧体22を装着した引張材20のセット
が終了すると、削孔内にグラウトを注入して硬化させる
ことにより、定着部20bを地盤18に固定定着させ
る。
When the setting of the tension member 20 with the supporting member 22 is completed, grout is injected into the drilled hole and hardened to fix and fix the fixing portion 20b to the ground 18.

【0022】この定着が終了すると、引張材20には、
原則的には、緊張力を与えないが、施工条件,引張材2
0の材質,構造物の規模などを考慮して、緊張力を与え
る場合もある。
When the fixing is completed, the tensile member 20
In principle, no tension is applied, however,
Tension may be applied in consideration of the zero material, the scale of the structure, and the like.

【0023】引張材20の下端側の定着が終了すると、
図3に示すように、ガイドパイプ14を上方に所定距離
だけ引上げる。この引き上げ距離は、底版24を形成す
る厚みに相当するものであって、ガイドパイプ14を引
上げると、支圧体22がガイドパイプ14の下端から外
方に突出する。
When the fixing of the lower end side of the tensile member 20 is completed,
As shown in FIG. 3, the guide pipe 14 is pulled upward by a predetermined distance. This lifting distance corresponds to the thickness forming the bottom plate 24. When the guide pipe 14 is pulled up, the supporting body 22 projects outward from the lower end of the guide pipe 14.

【0024】支圧体22がこのようにして突出すると、
各支圧プレート22bがバネ22cにより拡開方向に付
勢されているので、突出すると直ちに各支圧プレート2
2bは、開いてほぼ水平方向に延設する。
When the support 22 protrudes in this manner,
Each supporting plate 22b is urged in the expanding direction by a spring 22c, so that each supporting plate 22b
2b is opened and extends substantially horizontally.

【0025】支圧体22の支圧プレート22bが水平方
向を指向するように拡開すると、土止め壁10内に水中
コンクリートを打設して、底版24を形成する。水中コ
ンクリートが硬化すると、内部の水を排水した後に、ガ
イドパイプ14を撤去し、底版24の上方に延びている
引張材20を切断撤去すると、図4に示すように、工事
が完了する。
When the support plate 22b of the support body 22 is expanded so as to be directed in the horizontal direction, underwater concrete is poured into the retaining wall 10 to form the bottom slab 24. When the underwater concrete hardens, draining the internal water, removing the guide pipe 14 and cutting and removing the tension member 20 extending above the bottom slab 24 completes the construction as shown in FIG.

【0026】さて、以上のように構成した被圧対策工法
によれば、引張材20の上端側に水平方向に延びる支圧
体22が一体に設けられているので、底版24と引張材
20との一体性が確実に確保され、底版24に浮き上り
力が作用した際に、この作用力に対して、引張材20を
効果的に抵抗させることができる。
According to the pressure-resisting countermeasure method constructed as described above, the supporting member 22 extending in the horizontal direction is integrally provided on the upper end side of the tensile member 20, so that the bottom plate 24 and the tensile member 20 are connected to each other. When the floating force acts on the bottom plate 24, the tensile member 20 can effectively resist the acting force.

【0027】また、本実施例の場合には、支圧体22
は、底版24の厚み方向の中心よりも上方、より具体的
には、底版24の上端近傍に配置しているので、底版2
4の厚みを有効に活用して、より一層効果的に引張材2
0を作用力に対して抵抗させることができる。
In the case of the present embodiment, the supporting member 22
Are arranged above the center of the bottom plate 24 in the thickness direction, more specifically, near the upper end of the bottom plate 24,
4 is effectively utilized, and the tensile member 2 is more effectively used.
0 can be made to resist the acting force.

【0028】さらに、本実施例の場合には、支圧体22
は、引張材20を設置する際に、土止め壁10内の上下
方向に設置されるガイドパイプ14内に収縮状態で収納
されていて、ガイドパイプ14を上方移動させることに
より、ガイドパイプ14から突出して、水平方向に延び
るように拡開させる。
Further, in the case of the present embodiment, the supporting member 22
When the tension member 20 is installed, it is housed in a contracted state in a guide pipe 14 installed vertically in the retaining wall 10, and is moved from the guide pipe 14 by moving the guide pipe 14 upward. It protrudes and expands so as to extend in the horizontal direction.

【0029】このため、ガイドパイプ14の設置と上方
移動とにより、簡単に支圧体22を底版24の厚み方向
の所定の位置に設置することができる。
Therefore, the supporting member 22 can be easily installed at a predetermined position in the thickness direction of the bottom plate 24 by installing and moving the guide pipe 14 upward.

【0030】図7は、この発明にかかる被圧対策工法で
用いることができる支圧体22’の他の例を示してい
る。同図に示した支圧体22’は、上記実施例のガイド
パイプ14を、引張材20の定着部20bを地盤18に
定着した後に、上方に移動させることだけでなく、完全
に撤去する場合に採用される構造であり、位置決め治具
22dと、支圧効果用治具22eと、クサビ治具22f
とを備えている。
FIG. 7 shows another example of the supporting member 22 'which can be used in the pressure-receiving countermeasure method according to the present invention. The bearing member 22 ′ shown in FIG. 6 is used not only to move the guide pipe 14 of the above-described embodiment upward but also to completely remove the guide pipe 14 after fixing the fixing portion 20 b of the tensile member 20 to the ground 18. The positioning jig 22d, the bearing effect jig 22e, and the wedge jig 22f
And

【0031】位置決め治具22dは、ガイドパイプ14
よりも小径のリング体であって、予め引張材20のアン
カー本体20aの所定個所に固着される。
The positioning jig 22d is connected to the guide pipe 14
The ring body has a smaller diameter than that of the ring member, and is fixed to a predetermined portion of the anchor body 20a of the tension member 20 in advance.

【0032】支圧効果用治具22eは、アンカー本体2
0aが上下方向に挿通される筒部220eと、この筒部
220eの下端に突設され、水平方向に延びる円盤状の
フランジ部221eと、筒部220eの上端側開口端に
設けられたテーパ孔222eとを備えている。
The supporting effect jig 22e is connected to the anchor body 2
0a is inserted vertically, a disk-shaped flange portion 221e protruding from the lower end of the cylindrical portion 220e and extending in the horizontal direction, and a tapered hole provided at the upper end opening end of the cylindrical portion 220e. 222e.

【0033】この支圧効果用治具22eは、ガイドパイ
プ14を撤去した状態で、アンカー本体20aの上端側
から挿入され、下端が位置決め治具22dに当接する位
置にセットされる。
The bearing effect jig 22e is inserted from the upper end side of the anchor body 20a with the guide pipe 14 removed, and is set at a position where the lower end abuts on the positioning jig 22d.

【0034】クサビ治具22fは、中心軸上にアンカー
本体20aの挿通孔が貫通形成され、支圧効果用治具2
2eの上部側に装着されて、テーパ孔222e内に嵌着
されることで、位置決め治具22dとの間に支圧効果用
治具22eを挟み込んで固定する。
In the wedge jig 22f, an insertion hole of the anchor body 20a is formed through the center axis, and the bearing effect jig 2f is formed.
The jig 22e for supporting effect is sandwiched and fixed between the positioning jig 22d and the positioning jig 22d by being mounted on the upper side of 2e and fitted in the tapered hole 222e.

【0035】この場合、支圧効果用治具22eの固定位
置は、上記実施例と同様に、底版24の厚み方向の中心
から上方に設定される。このように構成した支圧体2
2’を用いる場合には、その設置が上記実施例よりも若
干面倒になるが、支圧効果用治具22eを備えているの
で、底版24に浮き上り力が作用した際に、この作用力
に対して、引張材20を効果的に抵抗させることができ
る。
In this case, the fixing position of the bearing effect jig 22e is set upward from the center of the bottom plate 24 in the thickness direction, similarly to the above embodiment. Supporting body 2 configured in this manner
When 2 'is used, its installation is slightly more troublesome than in the above embodiment, but since it has the supporting effect jig 22e, when the floating force acts on the bottom plate 24, this acting force is used. , The tensile member 20 can be effectively resisted.

【0036】[0036]

【発明の効果】以上、実施例で詳細に説明したように、
本発明にかかる地盤掘削工事における被圧対策工法によ
れば、引張材と底版との一体性は、支圧体を介在させる
ことにより確実に確保され、しかも、底版の浮き上りに
対して、引張材を効果的に対抗させることができる。
As described above in detail in the embodiments,
According to the method for countermeasures against pressure in the ground excavation work according to the present invention, the integrity of the tension member and the bottom slab is reliably ensured by the interposition of the supporting member, and further, the lifting of the bottom slab is prevented by tension. The material can be effectively countered.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明にかかる地盤掘削工事における被圧対策
工法の最初の工程を示す施工状態の断面説明図である。
FIG. 1 is a cross-sectional explanatory view of a construction state showing an initial step of a method for countermeasures against pressure in a ground excavation work according to the present invention.

【図2】図1の工程に引き続いて行われる工程の断面説
明図である。
FIG. 2 is an explanatory cross-sectional view of a step performed subsequent to the step of FIG. 1;

【図3】図2の工程に引き続いて行われる工程の断面説
明図である。
FIG. 3 is an explanatory cross-sectional view of a step performed subsequent to the step of FIG. 2;

【図4】図3の工程に引き続いて行われる工程の断面説
明図である。
FIG. 4 is an explanatory cross-sectional view of a step performed subsequent to the step of FIG. 3;

【図5】図1に示した被圧対策工法に用いる支圧体の断
面図である。
FIG. 5 is a cross-sectional view of a supporting body used in the pressure-reducing countermeasure method shown in FIG.

【図6】図5の下面図である。FIG. 6 is a bottom view of FIG.

【図7】図1に示した被圧対策工法に用いる支圧体の他
の例を示す断面図である。
FIG. 7 is a cross-sectional view showing another example of a supporting member used in the pressure-reducing method shown in FIG.

【符号の簡単な説明】[Brief description of reference numerals]

10 土止め壁 12 根切り掘削面 14 ガイドパイプ 16 係止部材 18 地盤 20 引張材 20a アンカー本体 20b 定着部 22 支圧体 22a 定着具 22b 支圧プレート 22c バネ DESCRIPTION OF SYMBOLS 10 Retaining wall 12 Root excavation surface 14 Guide pipe 16 Locking member 18 Ground 20 Tensile material 20a Anchor main body 20b Fixing part 22 Supporting body 22a Fixing tool 22b Bearing support plate 22c Spring

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 地盤中に構築した土止め壁の内部を掘削
し、根切り掘削面以深に下端が定着された引張材を設置
した後に、 前記土止め壁内に底版を形成して内部を排水する地盤掘
削工事において、 前記引張材の上端側に一体に設けられ、前記底版内に位
置する支圧体を配置することを特徴とする地盤掘削工事
における被圧対策工法。
Claims: 1. An inside of a retaining wall constructed in the ground is excavated, and a tension member having a lower end fixed to a depth below a root excavation surface is installed. In a ground excavation work for draining, a pressure-bearing countermeasure method in a ground excavation work, comprising arranging a supporting body integrally provided on an upper end side of the tensile member and located in the bottom slab.
【請求項2】 前記支圧体は、前記底版の厚み方向の中
心よりも上方に配置することを特徴とする地盤掘削工事
における被圧対策工法。
2. The method of countermeasures against pressure in ground excavation work, wherein the bearing member is disposed above a center of the bottom plate in a thickness direction.
【請求項3】 前記支圧体は、前記引張材を設置する際
に、前記土止め壁内の上下方向に設置されるガイドパイ
プ内に収縮状態で収納されていて、前記ガイドパイプを
上方移動させることにより、前記ガイドパイプから突出
して、水平方向に延びるように拡開することを特徴とす
る請求項1または2記載の地盤掘削工事における被圧対
策工法。
3. The support member is stored in a contracted state in a guide pipe installed vertically in the retaining wall when the tension member is installed, and the support member moves the guide pipe upward. 3. The method according to claim 1, wherein the projecting portion extends from the guide pipe so as to extend in a horizontal direction.
【請求項4】 前記支圧体は、前記ガイドパイプ内に挿
通される引張材の上部側に固設された定着具と、 この定着具の外周に拡縮自在に枢着された複数の支圧プ
レートと、 前記各支圧プレートを拡開方向に付勢するバネとからな
ることを特徴とする請求項3記載の地盤掘削工事におけ
る被圧対策工法。
4. A fixing device fixed to an upper side of a tension member inserted into the guide pipe, and a plurality of supporting members pivotally attached to the outer periphery of the fixing device so as to be able to expand and contract. The method according to claim 3, comprising a plate and a spring for urging each of the supporting plates in the expanding direction.
JP10315963A 1998-11-06 1998-11-06 Artesian countermeasure method in ground excavation work Pending JP2000144742A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10315963A JP2000144742A (en) 1998-11-06 1998-11-06 Artesian countermeasure method in ground excavation work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10315963A JP2000144742A (en) 1998-11-06 1998-11-06 Artesian countermeasure method in ground excavation work

Publications (1)

Publication Number Publication Date
JP2000144742A true JP2000144742A (en) 2000-05-26

Family

ID=18071704

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10315963A Pending JP2000144742A (en) 1998-11-06 1998-11-06 Artesian countermeasure method in ground excavation work

Country Status (1)

Country Link
JP (1) JP2000144742A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009084919A (en) * 2007-10-01 2009-04-23 Kajima Corp Ground excavating method
JP2010242421A (en) * 2009-04-08 2010-10-28 Kajima Corp Construction method for excavating ground
CN104196034A (en) * 2014-09-18 2014-12-10 中建交通建设集团有限公司 Foundation pit construction method employing steel sheet piles as support cofferdam
CN105239578A (en) * 2015-08-28 2016-01-13 中交第二航务工程局有限公司 Water-rich sand layer deep foundation pit underwater construction method
CN105862722A (en) * 2016-04-07 2016-08-17 中建交通建设集团有限公司 Three-dimensional treatment method of subway deep foundation pit in karst intense development region
JP2019199692A (en) * 2018-05-14 2019-11-21 鹿島建設株式会社 Ground improvement structure and excavating method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009084919A (en) * 2007-10-01 2009-04-23 Kajima Corp Ground excavating method
JP2010242421A (en) * 2009-04-08 2010-10-28 Kajima Corp Construction method for excavating ground
CN104196034A (en) * 2014-09-18 2014-12-10 中建交通建设集团有限公司 Foundation pit construction method employing steel sheet piles as support cofferdam
CN105239578A (en) * 2015-08-28 2016-01-13 中交第二航务工程局有限公司 Water-rich sand layer deep foundation pit underwater construction method
CN105862722A (en) * 2016-04-07 2016-08-17 中建交通建设集团有限公司 Three-dimensional treatment method of subway deep foundation pit in karst intense development region
JP2019199692A (en) * 2018-05-14 2019-11-21 鹿島建設株式会社 Ground improvement structure and excavating method
JP7017980B2 (en) 2018-05-14 2022-02-09 鹿島建設株式会社 Ground improvement structure and excavation method

Similar Documents

Publication Publication Date Title
JP4663541B2 (en) Seismic reinforcement method for existing concrete pier
JP2000144742A (en) Artesian countermeasure method in ground excavation work
JP2002070048A (en) Construction method for steel core of column in inverted construction system, and plier and steel pipe pile used for the method
JP2003232033A (en) Foundation pile structure
KR101491746B1 (en) pile foundation and the installation method
JP2001295291A (en) Joining method of column and pile
JP4624867B2 (en) Seismic isolation repair method for existing buildings
JP3453664B2 (en) Shaft construction method
JP2009287172A (en) Method for constructing base-isolated building by inverted construction method
JP4440799B2 (en) Ground excavation method
KR20030028518A (en) apparatus and method for retaining wall using ground anchor
JP2007146538A (en) Method of treating pile head of on-site-formed pile
JP3757754B2 (en) Construction method for underwater foundation structures
JP4474965B2 (en) Leg fixing method for building
JP4314681B2 (en) Reverse strut construction method
JPH06287943A (en) Foot protection method for tip of foundation pile and cylindrical foundation pile
JP2855156B2 (en) How to build underground structures
JP3843045B2 (en) Rock construction method for jacket structure
JPH0559215B2 (en)
JPH1113067A (en) Burying construction method for supplementary stud in reverse concreting construction method
KR102557752B1 (en) Pre-drilling and positioning method for installation of jacket foundation
JP3014267B2 (en) Steel pipe sheet pile wall construction method and steel pipe sheet pile
JP2009041285A (en) Fixing device for car port roof bearing pole
JP2935632B2 (en) Steel pipe sheet pile wall construction method
JP2567990B2 (en) Reverse construction method for underground construction