EP2939901B1 - Train control system and train control method - Google Patents
Train control system and train control method Download PDFInfo
- Publication number
- EP2939901B1 EP2939901B1 EP13867115.1A EP13867115A EP2939901B1 EP 2939901 B1 EP2939901 B1 EP 2939901B1 EP 13867115 A EP13867115 A EP 13867115A EP 2939901 B1 EP2939901 B1 EP 2939901B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- train
- radio communication
- ground
- route
- stop limit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 238000000034 method Methods 0.000 title claims description 19
- 238000004891 communication Methods 0.000 claims description 215
- 238000011144 upstream manufacturing Methods 0.000 claims description 12
- 238000006243 chemical reaction Methods 0.000 claims description 6
- 238000010586 diagram Methods 0.000 description 35
- 238000012937 correction Methods 0.000 description 7
- 238000001514 detection method Methods 0.000 description 7
- 230000007257 malfunction Effects 0.000 description 5
- 230000005856 abnormality Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 230000000007 visual effect Effects 0.000 description 4
- 230000010365 information processing Effects 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
- B61L25/02—Indicating or recording positions or identities of vehicles or trains
- B61L25/025—Absolute localisation, e.g. providing geodetic coordinates
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L15/00—Indicators provided on the vehicle or train for signalling purposes
- B61L15/0018—Communication with or on the vehicle or train
- B61L15/0027—Radio-based, e.g. using GSM-R
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/08—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only
- B61L23/14—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only automatically operated
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/08—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only
- B61L23/14—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only automatically operated
- B61L23/18—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only automatically operated specially adapted for changing lengths of track sections in dependence upon speed and traffic density
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/20—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L3/00—Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal
- B61L3/02—Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control
Definitions
- the present invention relates to a train control system and a train control method.
- a train control system which notifies a train position detected by a train itself to a ground-side control device using wireless.
- it is possible to set a train stop limit position with a higher resolution than a security function using a track circuit of a current situation, and it is possible to reduce a train operation interval by the movement block.
- the track circuit needs a lot of complicated interconnections, less ground facilities are required and reduction in facility costs is also expected.
- Patent Document 1 Japanese Patent Publication No. 4301888 .
- JP 2006 256 454 A discloses a train control system comprising ground radio communication means, interlocking means and ground control means, wherein the ground control means calculate a first stop limit position such that the train does not enter a calculated radio communication disruption section.
- a ground-side device cannot judge whether the train resides in front of a point, resides above the point, or has passed the point. Therefore, while the train resides in the radio communication disabled section, the point cannot be converted, and it is impossible to perform an operation such as overtaking by a high-class train.
- an interlocking control device also called an interlocking device
- the interlocking control device judges this situation as an "improper dropping", and might make all signal information stop indication, and thus, the train operation might be stopped.
- a problem to be solved by the present invention is to provide, in a train control system that notifies a train on-rail position from a train to a ground using wireless, a train control system and a train control method that enables the train to be operated, even when a radio communication disabled section occurs.
- a train control system of an embodiment is a train control system including ground radio communication means that transmits and receives information with on-board radio communication means of a train, ground communication means that is installed at a predetermined stop position at which the train stops, and transmits and receives information with the on-board communication means of the train, interlocking control means that performs a conversion of a point and a locking of a route, and ground control means that calculates a stop limit position to be given to each train, based on a train position and an opening state of a train route, and controls the interlocking control means so as to perform operation control of each train in a predetermined section, wherein the ground control means calculates a first stop limit position such that the train does not enter a calculated radio communication disruption section including all or part of a section in which the radio communication is disrupted between the ground radio communication means and the on-board radio communication means, calculates, with respect to a train that is made to travel through the calculated radio communication disruption section, a second stop limit position so that the train reaches up to
- Fig. 1 is a diagram that illustrates an entire configuration (outline) of a train control system described as an embodiment.
- an operation management device 1 a system management device 2, a ground control device 3, an interlocking control device 4, a ground radio communication device 5 and an antenna 6 thereof, an ATO (automatic train control) ground coil 7, a position correction ground coil 8, an inter-base network 9, and a wayside network 10 are installed on a ground side.
- ATO automatic train control
- the operation management device 1 performs a route setting request, or the like to the ground control device 3, based on a train operation diagram or an operation situation of a train 11.
- the system management device 2 performs operation situation monitoring, setting change, or the like of the entire system.
- the ground control device 3 receives train position information from each train 11 through the ground radio communication device 5 and the wayside network 10, grasps an on-rail situation of each train 11 from the received position information, transmits the information through the wayside network 10 to the operation management device 1 and the system management device 2, and further transmits the information to the interlocking control device 4.
- the interlocking control device 4 outputs a necessary command to a point device (point) 20, based on the information of the train on-rail situation from the ground control device 3 and the route setting request from the operation management device 1, performs a conversion or a lock of the point device 20, and transmits signal information (progress indication/stop indication) to the ground control device 3, based on a route opening situation.
- the ground control device 3 obtains an obstacle position (herein, an end position of the preceding train 11) as a leading end position of a progression-possible range of the (succeeding) train 11, from the signal information received from the interlocking control device 4 and the on-rail situation of the train 11, and sets a position upstream from that position by a security control margin distance, as a stop limit position, and transmits the information of the stop limit position to an on-board control device 12 through the ground radio communication device 5 and an on-board radio communication device 15.
- the information of the stop limit position like this is transmitted to the on-board control device 12 through an on-board coil 17 and the ATO ground coil 7.
- the ATO ground coil 7 performs communication with an ATO device 13 for the purpose of home door control or the like, and is necessarily installed at a stop position of the station. Since the train 11 stops above the ATO ground coil 7 or stops in the vicinity thereof, in the present embodiment, the ATO ground coil 7 is also used for communication between the ground control device 3 and the train 11 side.
- the position correction ground coil 8 is a ground coil that gives position information such that, using the given position information, a speed/position detection device 14 can correct the position information of its own train calculated by this device.
- the inter-base network 9 is a communication path that is established over an entire line section to be controlled by the corresponding train control system, communicably connects the operation management device 1 and the system management device 2, and a plurality of ground control devices 3, and also communicably connects the plurality of ground control devices 3 to one another.
- the wayside network 10 is a communication path that is established over a control range of the ground control device 3, communicably connects the ground control device 3 and a plurality of ground radio communication devices 5, and also communicably connects the plurality of ground radio communication devices 5 within the control range of the ground control device 3, to one another.
- the on-board control device 12, the ATO device (automatic train operation device) 13, the speed/position detection device 14, the on-board radio communication device 15 and an antenna 16 thereof, and the on-board coil 17 are installed on the train 11.
- the on-board control device 12 issues a brake command to a braking device (not illustrated) of the train 11, so that the train does not overrun the stop limit position received from the ground control device 3, and also the train speed does not exceed a speed limit.
- the ATO device 13 performs control, such as power running/braking of the train 11, on the vehicle.
- the train 11 travels on a rail 21, while wheels 19 are driven/braked by a driving/braking device (not illustrated), based on a power running/brake command of the ATO device 13, and stops above the ATO ground coil 7 installed at a predetermined stop position of the station with a predetermined accuracy.
- the speed/position detection device 14 counts the number of pulses of a TG (tachogenerator) 18, and detects a speed based on a wheel diameter and the number of teeth of the TG 18.
- the means that acquires the speed signal is not limited to the TG 18, and may use another means such as a pulse generator (PG).
- the speed/position detection device 14 calculates a moving distance by integrating the number of pulses of the TG 18 or the detected speed, and in addition, calculates the position of the own train, and further corrects the position information of the own train, based on the position information received from the position correction ground coil 8 through the on-board coil 17.
- the correction of the position information may be performed, such that the position information of the own train is corrected, based on ground coil installation position information read from a database (not illustrated), based on ground coil identification information received from the position correction ground coil 8 through the on-board coil 17.
- the position of the own train may be acquired using position information detected by the GPS device.
- the information acquired using the TG 18 or the GPS device may be mainly used as the position information of the own train, and the position information acquired from the other side may be used as auxiliary information for correction or the like.
- the speed/position detection device 14 transmits the position information of the own train which has been detected as described above, to the ground control device 3 through the on-board radio communication device 15 and the ground radio communication device 5. In addition, when the train 11 stops at a station, the speed/position detection device 14 also transmits the position information of the own train to the ground control device 3 through the on-board coil 17 and the ATO ground coil 7.
- the functions such as the information processing and the control in the operation management device 1, the system management device 2, the ground control device 3, the interlocking control device 4, and the on-board control device 12 can be realized using an information processing unit.
- the train control system of the present embodiment configured as described above has, as one feature, a point that the train control system not only performs the same radio communication as a conventional train control system that uses the radio communication by the ground radio communication device 5 and the on-board radio communication device 15, but also when the train 11 stops at the station, the train control system performs the communication between the ground control device 3 and the on-board control device 12 also through the on-board coil 17 and the ATO ground coil 7, transmits the information of the stop limit position from the ground side to the on-board control device 12, and transmits the position information of the train 11 from the on-board side to the ground control device 3.
- the train operation is interrupted on the both sides of the same section.
- a specific example of a case where the radio communication is disrupted will be described with reference to Fig. 3-1, Fig. 3-2 .
- the trains 11 will be described as a train A, a train B, ... , so as to distinguish the trains 11 from one another.
- the train B resides on the branch part, and in 302 in the same drawing, the train A having left the station stops in front of the branch part.
- the ground control device 3 cannot judge whether the train B having arrived at the station, or the train A having left the station stops in front of the branch part, or stops on the branch part, or is passing through the branch part. Therefore, it is impossible to convert the point device 20, until the radio communication is recovered, and it is confirmed that the train A or the train B is not on rail in the branch part.
- the interlocking control device 4 might detect "improper dropping", and the operation of each train 11 might be stopped.
- the trains A, B which have stuck in the radio communication disrupted section are guided and evacuated by the human system, and then, as indicated by 304 of Fig. 3-2 , when a train C is made to enter this section by a visual operation, the ground control device 3 cannot confirm that the train C is not on rail in the branch part, until the train C moves out of the section in which the radio communication is disrupted and the communication is recovered. Therefore, the point device 20 cannot be converted, and it is impossible to perform an operation to pass a train D through a main track, while the train C stops in a subsidiary main track.
- the interlocking control device 4 might detect "improper dropping", and the operation of each train 11 might be stopped.
- a plurality of routes are respectively defined in down and up directions in the interlocking control device 4.
- routes 0 to 3 are respectively defined for down and up directions.
- routes 0 to 5 are respectively defined for down and up directions.
- signal information of the virtual traffic signal is given from the interlocking control device 4 to the ground control device 3.
- the interlocking control device 4 in a case where the down train 11 intends to stop at the station through the route 0, when any route is unlocked, any virtual traffic signal is made to show stop indication.
- the interlocking control device 4 after confirming that the route 0 and the competing route 1 are unlocked and another train 11 is not present on the route 0, converts the point device 20 necessary for setting the route 0, sets the route 0, locks the route 0, and makes the virtual traffic signal of the entrance of the route 0 to show progress indication.
- the train 11 can enter the route 0 in which the progress indication is outputted.
- the interlocking control device 4 unlocks the route 0, because the train 11 has arrived at the last track circuit of the route. By this means, it becomes possible to set the route 1 for the next train 11.
- virtual traffic signals 33 illustrated in the drawing do not specifically exemplify the stop indication/progress indication, but are illustrated as symbols alone.
- the cases of the other routes illustrated in Fig. 4-1 and the routes illustrated in Fig. 4-2 to Fig. 4-4 are the same as the case of setting the route 0 illustrated in Fig. 4-1 as described above.
- the interlocking control device 4 After confirming that the route X and the competing route are unlocked, and another train 11 is not present on the route X, converts the point device 20 necessary for setting the route X, sets the route X, locks the route X, and makes the virtual traffic signal of the entrance of the route X show progress indication.
- the train 11 can enters the route X in which the progress indication is output, and when the train 11 arrives at the last track circuit of the route X, the interlocking control device 4 unlocks the route X. By this means, it becomes possible to set the route X and the competing route for the next train 11.
- Fig. 5 is a flow chart describing a basic processing of the train control system of the present embodiment
- Fig. 6 is a diagram describing a radio propagation range and a calculated radio communication disruption section in the present embodiment.
- Fig. 7-1 to Fig. 7-15 are diagrams describing specific operations of the train control system of the present embodiment.
- a situation is assumed that the train A having left the station from the subsidiary main track, the train B arriving at the station from the main track, and the train C subsequent to the train B are on rail.
- a stop limit position 30 immediately before each train 11 in the traveling direction indicates a stop limit position of each train 11.
- the virtual traffic signal 31 shows the stop indication and the virtual traffic signal 32 shows the progress indication.
- the basic processing of the train control system of the present embodiment (including the operation by the human system, such as the evacuation of the train 11) is shown in the flow chart shown in Fig. 5 . That is, to begin with, setting of the calculated radio communication disruption section is performed (A01), next, a processing of grasping whether the train 11 having stuck in the calculated radio communication disruption section is on the rail is performed (A02), next, evacuation of the train 11 having stuck in the calculated radio communication disruption section is performed (A03), and then, a train operation control is performed in the calculated radio communication disruption section (A04).
- setting of the calculated radio communication disruption section is performed (A01)
- A02 a processing of grasping whether the train 11 having stuck in the calculated radio communication disruption section is on the rail
- evacuation of the train 11 having stuck in the calculated radio communication disruption section is performed (A03)
- a train operation control is performed in the calculated radio communication disruption section (A04).
- the ground control device 3 sets the calculated radio communication disruption section, based on a radio propagation range (range in which a propagation strength above a certain level is ensured) of the ground radio communication device 5 from which abnormality has been detected, which is read from a database (not illustrated), based on identification information of the ground radio communication device 5 from which abnormality is detected.
- the radio propagation range of each ground radio communication device 5, which is present in the database is set as a minimum range of a changing radio propagation range that is covered by each ground radio communication device 5 (that is, a range in which a propagation strength above a certain level is ensured). Therefore, the calculated radio communication disruption section to be set in the above, is set wider than the range in which the radio communication has actually been disrupted, in consideration of uncertainty ( Fig. 6 : in the same drawing, the malfunction of the central ground radio communication device 5 is assumed). However, the calculated radio communication disruption section illustrated in Fig. 6 is an example, and can be set wider than the illustrated one.
- the method of detecting the malfunction of the radio communication device can use a method disclosed in, for example, Japanese Patent Application Publication No. 2007-124148 .
- the database can be configured by storing the identification information of the ground radio communication device 5 and the radio propagation range thereof in association with each other.
- the ground control device 3 regards a range from a lastly received train end position to a position of an upstream side (side into which the train 11 enters), out of the stop limit position of each of the trains A and B and the end position of the calculated radio communication disruption section (in the drawing, the right end position of the calculated radio communication disruption section), as an on-rail range of each of the trains A, B ( Fig. 7-2 : 702), and notifies the on-rail ranges to the interlocking control device 4.
- the ground control device 3 holds the lastly received train end positions, in order to determine the on-rail ranges of the trains A and B as described above.
- a stop limit position is given to the train C of the upstream side of the calculated radio communication disruption section, such that the train C does not enter the calculated radio communication disruption section.
- the stop limit position given to the train C will be retracted more in front (upstream side) than the stop limit position determined by the position of the preceding train 11 ( Fig. 7-2 : 703).
- the train C may not be able to stop before reaching a new stop limit position, depending on a distance to the start of the calculated radio communication disruption section (in the drawing, the left end of the calculated radio communication disruption section).
- the train A in which the route up to outside the calculated radio communication disruption section is ensured is advanced by visual operation guided by the human system ( Fig. 7-3 : 704).
- the communication with the ground control device 3 is recovered, and since the train A reports the position of the own train, the ground control device 3 can update the train position information, and the train A can be returned to the normal operation ( Fig. 7-4 : 705).
- the interlocking control device 4 is notified from the ground control device 3 that the train A has arrived at the end of the route, and unlocks the locked departure route ( Fig. 7-4 : 706).
- the on-rail information notified from the ground control device 3 since the on-rail range of the train A does not transit by skipping the middle of the route, the operation cannot be stopped by detecting abnormality (improper dropping) in the interlocking control device 4.
- the train B that is more upstream than the station stop position is guided by the human system and moved to the stop position by visual operation, because the route to the station stop position is taken ( Fig. 7-5 : 707). Since the train B stopped at a predetermined stop position reports the position of the own train to the ground control device 3 through the on-board coil 17 and the ATO ground coil 7, the ground control device 3 can update the train position information ( Fig. 7-6 : 708). After that, the interlocking control device 4 is notified from the ground control device 3 that the train B has arrived at the end of the route, and unlocks the locked route ( Fig. 7-6 : 709).
- both of the trains A, B which have stuck in the section at the time of occurrence of the calculated radio communication disruption section as described above are in a state that the trains A, B have advanced outside the calculated radio communication disruption section, or are in a state that the positions thereof can be grasped through the ATO ground coil 7, the trains are in a state in which the on-rail situation in the calculated radio communication disruption section can be grasped.
- the interlocking control device 4 sets the route ( Fig. 7-7 : 710) for the train B to depart from the station, based on the route setting request from the operation management device 1, locks the route, and makes the route signal information progress indication ( Fig. 7-7 : 32).
- the ground control device 3 While the stop limit position of the train B calculated from the signal information from the interlocking control device 4 and the on-rail situation of each train 11 is more upstream than a position at which the end of the train can exit from the calculated radio communication disruption section, the ground control device 3 notifies the stop limit position in which a departure route entrance is made as an obstacle position, in place of the calculated stop limit position, to the on-board control device 12 of the train B, through the ATO ground coil 7 and the on-board coil 17. During this time, the train B remains stopped.
- the ground control device 3 transmits the stop limit position, the end position of the calculated radio communication disruption section, and an instruction to shift to a mode in which emergency stop is not performed even when the radio communication is disrupted (emergency brake is not applied), to the on-board control device 12 of the train B, through the ATO ground coil 7 and the on-board coil 17 ( Fig. 7-7 : 711). After that, the train B departs by an automatic operation.
- the train 11 emergently stops by applying the emergency brake, but, in the present embodiment, when the operation mode is shifted to the "mode in which emergency stop is not performed even when the radio communication is disrupted", the automatic operation is possible because the train 11 continuously operates without stop even when the radio communication is disrupted.
- the ground control device 3 regards a range from a lastly received train end position (end position when the train stops at the station) to a position of the upstream side, out of the stop limit position of the train B and the end position of the calculated radio communication disruption section, as the on-rail range of the train B ( Fig. 7-8 : 712).
- the ground control device 3 can update the train position information, and the train B can release the mode in which emergency stop is not performed even when the radio communication is disrupted, and can return to the normal operation ( Fig. 7-9 : 713).
- the interlocking control device 4 is notified from the ground control device 3 that the train B has arrived at the end of the route, and unlocks the locked departure route ( Fig. 7-9 : 714). Regarding the on-rail information notified from the ground control device 3, since the on-rail range of the train B does not transit by skipping the middle of the route, the operation cannot be stopped by detecting abnormality (improper dropping) in the interlocking control device 4.
- the interlocking control device 4 issues a conversion command of the point device 20, based on the route setting request from the operation management device 1, sets the route ( Fig. 7-10 : 715) for the train C to arrive at the station, locks the route, and makes the route signal information progress indication ( Fig. 7-10 : 32).
- the ground control device 3 While the stop limit position of the train C calculated from the signal information from the interlocking control device 4 and the on-rail situation of the train B is more upstream than a position that can reach up to a predetermined station stop position (ATO ground coil 7), the ground control device 3 notifies the stop limit position in which the start of the calculated radio communication disruption section is made as an obstacle position, in place of the calculated stop limit position, to the train C by radio communication. By this means, the train C does not enter the calculated radio communication disruption section.
- the ground control device 3 transmits the stop limit position that is the position at which the communication can be performed with the ground coil 7 when the train is stopped, the end position of the calculated radio communication disruption section, and an instruction to shift to the mode in which the emergency stop is not performed even when the radio communication is disrupted, to the train C by radio communication.
- the ground control device 3 transmits the stop limit position, the end position of the calculated radio communication disruption section, and an instruction to shift to the mode in which the emergency stop is not performed even when the radio communication is disrupted, to the train C by radio communication ( Fig. 7-10 : 716).
- the train C enters the calculated radio communication disruption section by automatic operation, and travels the set route ( Fig. 7-10 : 715).
- the ground control device 3 regards a range from a lastly received train end position to the position of the more upstream side, out of the stop limit position of the train C and the end position of the calculated radio communication disruption section, as the on-rail range of the train C ( Fig. 7-11 : 717).
- the ground control device 3 can update the train position information ( Fig. 7-12 : 718).
- the interlocking control device 4 is notified from the ground control device 3 that the train C has arrived at the end of the route, and unlocks the locked route ( Fig. 7-12 : 719).
- an operation that enables the train C to overtake the train B can be performed, by setting and locking the route passing through the station, and by giving the stop limit position so that the train can advance the calculated radio communication disruption section in 716 of Fig. 7-10 .
- Fig. 8-1 to Fig. 8-6 are diagrams describing the operation of the case where the calculated radio communication disruption section occurs in the middle of the route setting change in the train control system of the embodiment.
- the manner of description in Fig. 8-1 to Fig. 8-6 conforms to that is Fig. 7-1 to Fig. 7-15 described above.
- the operation management device 1 requests the interlocking control device 4 to unlock the main track departure route, and to lock the subsidiary track departure route.
- the interlocking control device 4 makes the signal information with respect to the main track departure route stop indication ( Fig. 8-2 : 801), and based on this, the ground control device 3 calculates the stop limit position in which the main track departure route entrance is made the obstacle position. At this time, the stop limit position of the train E is retracted ( Fig. 8-2 : 802).
- the ground control device 3 notifies the calculated stop limit position to the on-board control device 12 of the train E.
- the on-board control device 12 of the train E responds to the ground control device 3 that the train E can stop before reaching the new stop limit position ( Fig. 8-3 : 803). And having received the response, the ground control device 3 notifies that the route of the stop indication can be unlocked, to the interlocking control device 4.
- the interlocking control device 4 waits for the time necessary for the train E to stop, unlocks the main track departure route ( Fig. 8-3 : 804), sets the subsidiary main track departure route ( Fig. 8-3 : 805) for the train D, and locks the route.
- the ground control device 3 notifies to the interlocking control device 4 such that: (1) “unlocking impossible” with respect to the route of the progress indication, (2) “unlocking possible” with respect to the route of the stop indication, in a case where the notification that the train can stop up to the route entrance is obtained from the on-board control device 12, and (3) “unlocking impossible” in the other cases.
- the ground control device 3 Having not obtained the information indicating "the train can stop up to the main track departure route entrance" from the on-board control device 12 of the train E, the ground control device 3 notifies the interlocking control device 4 of "unlocking impossible” with respect to the main track departure route ( Fig. 8-5 : 807).
- the ground control device 3 sets the calculated radio communication disruption section, as described above, and performs control while regarding the range illustrated in Fig. 8-5 : 808, as the on-rail range of the train E.
- the interlocking control device 4 can unlock the set route before the train enters the set route, only when the information of "unlocking possible” is obtained.
- the information of "unlocking impossible” is notified from the ground control device 3, since the main track departure route remains locked, the safety is ensured.
- the on-board control device 12 can receive a new stop limit position from the ground control device 3 through the ATO ground coil 7, and can return the information indicating that the train can stop before reaching the stop limit position", and thereby the ground control device 3 notifies "unlocking possible" to the interlocking control device 4. Having received this notification, the interlocking control device 4 can safely unlock the main track departure route ( Fig. 8-6 : 810).
- the train control system of the above-described embodiments in the train control system which notifies the train on-rail position from the train to the ground side control device using wireless, even when the radio communication disabled section occurs in all or part of the interlocking control section, the operations such as overtaking and waiting in this section can be realized at low costs, while safety is ensured.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Description
- The present invention relates to a train control system and a train control method. BACKGROUND ART
- Recently, a train control system has been developed which notifies a train position detected by a train itself to a ground-side control device using wireless. In the system, it is possible to set a train stop limit position with a higher resolution than a security function using a track circuit of a current situation, and it is possible to reduce a train operation interval by the movement block.
In addition, while the track circuit needs a lot of complicated interconnections, less ground facilities are required and reduction in facility costs is also expected. - However, in a case where a ground-side radio base station malfunctions, and a radio communication disabled section occurs, a position of a vehicle that resides in that section cannot be grasped at the ground side, and a stop limit position cannot be notified to the train. Hence, the operation of the train is interrupted on both sides of this section.
- Patent Document 1: Japanese Patent Publication No.
4301888 JP 2006 256 454 A - Generally, in a case where radio communication cannot be performed in a section including a branch part (hereinafter, described as an "interlocking control section"), a ground-side device cannot judge whether the train resides in front of a point, resides above the point, or has passed the point. Therefore, while the train resides in the radio communication disabled section, the point cannot be converted, and it is impossible to perform an operation such as overtaking by a high-class train. In addition, when a train that has stuck in the radio communication disrupted section is guided and evacuated to the outside of the section by a human system, since an interlocking control device (also called an interlocking device) cannot acquire information indicating that the train has sequentially moved on a track circuit, the interlocking control device judges this situation as an "improper dropping", and might make all signal information stop indication, and thus, the train operation might be stopped.
- A problem to be solved by the present invention is to provide, in a train control system that notifies a train on-rail position from a train to a ground using wireless, a train control system and a train control method that enables the train to be operated, even when a radio communication disabled section occurs.
- The problem is solved by the present invention which is defined by the features of the train control system according to
claim 1 and the features of the train control method according toclaim 7. - A train control system of an embodiment is a train control system including ground radio communication means that transmits and receives information with on-board radio communication means of a train, ground communication means that is installed at a predetermined stop position at which the train stops, and transmits and receives information with the on-board communication means of the train, interlocking control means that performs a conversion of a point and a locking of a route, and ground control means that calculates a stop limit position to be given to each train, based on a train position and an opening state of a train route, and controls the interlocking control means so as to perform operation control of each train in a predetermined section, wherein the ground control means calculates a first stop limit position such that the train does not enter a calculated radio communication disruption section including all or part of a section in which the radio communication is disrupted between the ground radio communication means and the on-board radio communication means, calculates, with respect to a train that is made to travel through the calculated radio communication disruption section, a second stop limit position so that the train reaches up to a position of the ground communication means, or a third stop limit position that is ahead of the calculated radio communication disruption section, and in a state in which all or part of the train resides in the calculated radio communication disruption section, with respect to the train of which the radio communication is disrupted, estimates a current train position, based on an end position of the calculated radio communication disruption section in a train traveling direction, the second or third stop limit position, and a lastly received train position, and performs operation control of each train.
-
- [
Fig. 1] Fig. 1 is a diagram illustrating an entire configuration (outline) of a train control system described as an embodiment. - [
Fig. 2] Fig. 2 is a diagram describing a problem when radio communication is disrupted in a conventional train control system. - [
Fig. 3-1] Fig. 3-1 is a diagram describing a specific example when radio communication is disrupted. - [
Fig. 3-2] Fig. 3-2 is a diagram describing a specific example when the radio communication is disrupted. - [
Fig. 4-1] Fig. 4-1 is a diagram describing a virtual traffic signal in the embodiment. - [
Fig. 4-2] Fig. 4-2 is a diagram describing a virtual traffic signal in the embodiment. - [
Fig. 4-3] Fig. 4-3 is a diagram describing a virtual traffic signal in the embodiment. - [
Fig. 4-4] Fig. 4-4 is a diagram describing a virtual traffic signal in the embodiment. - [
Fig. 5] Fig. 5 is a flow chart describing a basic operation of the train control system of the embodiment. - [
Fig. 6] Fig. 6 is a diagram describing a radio propagation range and a calculated radio communication disruption section in the embodiment. - [
Fig. 7-1] Fig. 7-1 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-2] Fig. 7-2 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-3] Fig. 7-3 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-4] Fig. 7-4 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-5] Fig. 7-5 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-6] Fig. 7-6 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-7] Fig. 7-7 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-8] Fig. 7-8 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-9] Fig. 7-9 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-10] Fig. 7-10 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-11] Fig. 7-11 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-12] Fig. 7-12 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-13] Fig. 7-13 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-14] Fig. 7-14 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 7-15] Fig. 7-15 is a diagram for describing a specific operation of the train control system of the embodiment. - [
Fig. 8-1] Fig. 8-1 is a diagram describing an operation when defining a calculated radio communication disruption section in the middle of the route setting change in the train control system of the embodiment. - [
Fig. 8-2] Fig. 8-2 is a diagram describing an operation when defining the calculated radio communication disruption section in the middle of the route setting change in the train control system of the embodiment. - [
Fig. 8-3] Fig. 8-3 is a diagram describing an operation when defining the calculated radio communication disruption section in the middle of the route setting change in the train control system of the embodiment. - [
Fig. 8-4] Fig. 8-4 is a diagram describing an operation when defining the calculated radio communication disruption section in the middle of the route setting change in the train control system of the embodiment. - [
Fig. 8-5] Fig. 8-5 is a diagram describing an operation when defining the calculated radio communication disruption section in the middle of the route setting change in the train control system of the embodiment. - [
Fig. 8-6] Fig. 8-6 is a diagram describing an operation when defining the calculated radio communication disruption section in the middle of the route setting change in the train control system of the embodiment. -
Fig. 1 is a diagram that illustrates an entire configuration (outline) of a train control system described as an embodiment. - In the same drawing, an
operation management device 1, asystem management device 2, aground control device 3, aninterlocking control device 4, a groundradio communication device 5 and anantenna 6 thereof, an ATO (automatic train control)ground coil 7, a positioncorrection ground coil 8, aninter-base network 9, and awayside network 10 are installed on a ground side. - The
operation management device 1 performs a route setting request, or the like to theground control device 3, based on a train operation diagram or an operation situation of atrain 11. - The
system management device 2 performs operation situation monitoring, setting change, or the like of the entire system. - The
ground control device 3 receives train position information from eachtrain 11 through the groundradio communication device 5 and thewayside network 10, grasps an on-rail situation of eachtrain 11 from the received position information, transmits the information through thewayside network 10 to theoperation management device 1 and thesystem management device 2, and further transmits the information to theinterlocking control device 4. - The
interlocking control device 4 outputs a necessary command to a point device (point) 20, based on the information of the train on-rail situation from theground control device 3 and the route setting request from theoperation management device 1, performs a conversion or a lock of thepoint device 20, and transmits signal information (progress indication/stop indication) to theground control device 3, based on a route opening situation. - In the present embodiment, the
ground control device 3 obtains an obstacle position (herein, an end position of the preceding train 11) as a leading end position of a progression-possible range of the (succeeding)train 11, from the signal information received from theinterlocking control device 4 and the on-rail situation of thetrain 11, and sets a position upstream from that position by a security control margin distance, as a stop limit position, and transmits the information of the stop limit position to an on-board control device 12 through the groundradio communication device 5 and an on-boardradio communication device 15. In addition, when thetrain 11 stops at a station, the information of the stop limit position like this is transmitted to the on-board control device 12 through an on-board coil 17 and the ATOground coil 7. - The ATO
ground coil 7 performs communication with anATO device 13 for the purpose of home door control or the like, and is necessarily installed at a stop position of the station. Since thetrain 11 stops above the ATOground coil 7 or stops in the vicinity thereof, in the present embodiment, the ATOground coil 7 is also used for communication between theground control device 3 and thetrain 11 side. - In addition, the position
correction ground coil 8 is a ground coil that gives position information such that, using the given position information, a speed/position detection device 14 can correct the position information of its own train calculated by this device. - The
inter-base network 9 is a communication path that is established over an entire line section to be controlled by the corresponding train control system, communicably connects theoperation management device 1 and thesystem management device 2, and a plurality ofground control devices 3, and also communicably connects the plurality ofground control devices 3 to one another. On the other hand, thewayside network 10 is a communication path that is established over a control range of theground control device 3, communicably connects theground control device 3 and a plurality of groundradio communication devices 5, and also communicably connects the plurality of groundradio communication devices 5 within the control range of theground control device 3, to one another. - Then, in
Fig. 1 , the on-board control device 12, the ATO device (automatic train operation device) 13, the speed/position detection device 14, the on-boardradio communication device 15 and anantenna 16 thereof, and the on-board coil 17 are installed on thetrain 11. - The on-
board control device 12 issues a brake command to a braking device (not illustrated) of thetrain 11, so that the train does not overrun the stop limit position received from theground control device 3, and also the train speed does not exceed a speed limit. - The
ATO device 13 performs control, such as power running/braking of thetrain 11, on the vehicle. Thetrain 11 travels on arail 21, whilewheels 19 are driven/braked by a driving/braking device (not illustrated), based on a power running/brake command of theATO device 13, and stops above theATO ground coil 7 installed at a predetermined stop position of the station with a predetermined accuracy. - The speed/
position detection device 14 counts the number of pulses of a TG (tachogenerator) 18, and detects a speed based on a wheel diameter and the number of teeth of theTG 18. In addition, the means that acquires the speed signal is not limited to theTG 18, and may use another means such as a pulse generator (PG). Furthermore, the speed/position detection device 14 calculates a moving distance by integrating the number of pulses of theTG 18 or the detected speed, and in addition, calculates the position of the own train, and further corrects the position information of the own train, based on the position information received from the positioncorrection ground coil 8 through the on-board coil 17. The correction of the position information may be performed, such that the position information of the own train is corrected, based on ground coil installation position information read from a database (not illustrated), based on ground coil identification information received from the positioncorrection ground coil 8 through the on-board coil 17. In addition, in a case where a GPS (Global Positioning System) device is mounted on thetrain 11, the position of the own train may be acquired using position information detected by the GPS device. Furthermore, the information acquired using theTG 18 or the GPS device may be mainly used as the position information of the own train, and the position information acquired from the other side may be used as auxiliary information for correction or the like. - The speed/
position detection device 14 transmits the position information of the own train which has been detected as described above, to theground control device 3 through the on-boardradio communication device 15 and the groundradio communication device 5. In addition, when thetrain 11 stops at a station, the speed/position detection device 14 also transmits the position information of the own train to theground control device 3 through the on-board coil 17 and theATO ground coil 7. - The functions such as the information processing and the control in the
operation management device 1, thesystem management device 2, theground control device 3, the interlockingcontrol device 4, and the on-board control device 12 can be realized using an information processing unit. - The train control system of the present embodiment configured as described above has, as one feature, a point that the train control system not only performs the same radio communication as a conventional train control system that uses the radio communication by the ground
radio communication device 5 and the on-boardradio communication device 15, but also when thetrain 11 stops at the station, the train control system performs the communication between theground control device 3 and the on-board control device 12 also through the on-board coil 17 and theATO ground coil 7, transmits the information of the stop limit position from the ground side to the on-board control device 12, and transmits the position information of thetrain 11 from the on-board side to theground control device 3. - By the way, when the ground
radio communication device 5 cannot perform communication due to malfunction or the like, a radio communication disrupted section occurs. In a state in which the radio communication is disrupted, the train position cannot be notified from the on-board side to the ground side, and the stop limit position cannot be notified from the ground side to the on-board side. Therefore, in order to ensure safety, it is determined that thetrain 11 of which the radio communication is disrupted emergently stops. In a conventional train control system, the train of which the radio communication is disrupted is evacuated by a manual visual operation, and then, a shuttle operation is performed on both sides of the radio communication disrupted section, until the malfunctioned groundradio communication device 5 is recovered, and the radio communication is enabled again, as illustrated inFig. 2 . Thus, the train operation is interrupted on the both sides of the same section. In addition, even in the case of passing thetrain 11 by treating the calculated radio communication disruption section as the fixed block, it is impossible to confirm whether thetrain 11 is not on rail in the branch part inside the section, while thetrain 11 resides in the calculated radio communication disruption section. Therefore, it is impossible to perform the conversion of thepoint device 20, and it is impossible to perform an operation such as overtaking or waiting by asubsequent train 11. Here, a specific example of a case where the radio communication is disrupted will be described with reference toFig. 3-1, Fig. 3-2 . Incidentally, here, thetrains 11 will be described as a train A, a train B, ... , so as to distinguish thetrains 11 from one another. - In 301 of
Fig. 3-1 , the train B resides on the branch part, and in 302 in the same drawing, the train A having left the station stops in front of the branch part. However, theground control device 3 cannot judge whether the train B having arrived at the station, or the train A having left the station stops in front of the branch part, or stops on the branch part, or is passing through the branch part. Therefore, it is impossible to convert thepoint device 20, until the radio communication is recovered, and it is confirmed that the train A or the train B is not on rail in the branch part. In addition, when the train A is guided and evacuated by the human system as indicated by 303 in the same drawing, it is impossible to acquire the information indicating that the train A has sequentially progressed on the track circuit. Therefore, the interlockingcontrol device 4 might detect "improper dropping", and the operation of eachtrain 11 might be stopped. - In addition, the trains A, B which have stuck in the radio communication disrupted section are guided and evacuated by the human system, and then, as indicated by 304 of
Fig. 3-2 , when a train C is made to enter this section by a visual operation, theground control device 3 cannot confirm that the train C is not on rail in the branch part, until the train C moves out of the section in which the radio communication is disrupted and the communication is recovered. Therefore, thepoint device 20 cannot be converted, and it is impossible to perform an operation to pass a train D through a main track, while the train C stops in a subsidiary main track. In addition, when the train C is guided and advanced by the human system as indicated by 305 of the same drawing, since the information indicating that the train C has sequentially progressed on the track circuit cannot be obtained, the interlockingcontrol device 4 might detect "improper dropping", and the operation of eachtrain 11 might be stopped. - When the radio communication is disrupted in the interlocking control section in this manner, a conventional control method cannot perform operations such as overtaking or waiting.
- Here, "virtual traffic signals" indicated by a symbol of a traffic signal in
Fig. 3-1 and Fig. 3-2 (the same as those illustrated inFig. 7-1 toFig. 7-15 , andFig. 8-1 toFig. 8-6 ) will be described with reference toFig. 4-1 toFig. 4-4 . - A plurality of routes are respectively defined in down and up directions in the interlocking
control device 4. In examples ofFig. 4-1 ,Fig. 4-2 in which there is no shuttle operation,routes 0 to 3 are respectively defined for down and up directions. In examples ofFig. 4-3, Fig. 4-4 in which there is the shuttle operation,routes 0 to 5 are respectively defined for down and up directions. - As information indicating the permission or denial of entrance into each route defined as above, signal information of the virtual traffic signal is given from the interlocking
control device 4 to theground control device 3. For example, inFig. 4-1 , in a case where thedown train 11 intends to stop at the station through theroute 0, when any route is unlocked, any virtual traffic signal is made to show stop indication. When the operation management system requests setting of theroute 0 to the interlockingcontrol device 4, the interlockingcontrol device 4, after confirming that theroute 0 and the competingroute 1 are unlocked and anothertrain 11 is not present on theroute 0, converts thepoint device 20 necessary for setting theroute 0, sets theroute 0, locks theroute 0, and makes the virtual traffic signal of the entrance of theroute 0 to show progress indication. Thetrain 11 can enter theroute 0 in which the progress indication is outputted. When thetrain 11 arrives at a home on theroute 0, the interlockingcontrol device 4 unlocks theroute 0, because thetrain 11 has arrived at the last track circuit of the route. By this means, it becomes possible to set theroute 1 for thenext train 11. In addition,virtual traffic signals 33 illustrated in the drawing do not specifically exemplify the stop indication/progress indication, but are illustrated as symbols alone. - In addition, the cases of the other routes illustrated in
Fig. 4-1 and the routes illustrated inFig. 4-2 to Fig. 4-4 are the same as the case of setting theroute 0 illustrated inFig. 4-1 as described above. When the operation management system requests setting of any route (here, this route is described as a route X) to the interlockingcontrol device 4, the interlockingcontrol device 4, after confirming that the route X and the competing route are unlocked, and anothertrain 11 is not present on the route X, converts thepoint device 20 necessary for setting the route X, sets the route X, locks the route X, and makes the virtual traffic signal of the entrance of the route X show progress indication. Thetrain 11 can enters the route X in which the progress indication is output, and when thetrain 11 arrives at the last track circuit of the route X, the interlockingcontrol device 4 unlocks the route X. By this means, it becomes possible to set the route X and the competing route for thenext train 11. - Next, a specific train control operation of the train control system of the present embodiment will be described with reference to
Fig. 5, Fig. 6 ,Fig. 7-1 toFig. 7-15 .Fig. 5 is a flow chart describing a basic processing of the train control system of the present embodiment, andFig. 6 is a diagram describing a radio propagation range and a calculated radio communication disruption section in the present embodiment. In addition,Fig. 7-1 toFig. 7-15 are diagrams describing specific operations of the train control system of the present embodiment. In addition, here, a situation is assumed that the train A having left the station from the subsidiary main track, the train B arriving at the station from the main track, and the train C subsequent to the train B are on rail. In addition, in each drawing, astop limit position 30 immediately before eachtrain 11 in the traveling direction indicates a stop limit position of eachtrain 11. Furthermore, thevirtual traffic signal 31 shows the stop indication and thevirtual traffic signal 32 shows the progress indication. - The basic processing of the train control system of the present embodiment (including the operation by the human system, such as the evacuation of the train 11) is shown in the flow chart shown in
Fig. 5 . That is, to begin with, setting of the calculated radio communication disruption section is performed (A01), next, a processing of grasping whether thetrain 11 having stuck in the calculated radio communication disruption section is on the rail is performed (A02), next, evacuation of thetrain 11 having stuck in the calculated radio communication disruption section is performed (A03), and then, a train operation control is performed in the calculated radio communication disruption section (A04). In the following, details of the above processings will be described. - To begin with, when a radio communication disrupted section occurs due to malfunction or the like of the ground
radio communication device 5, the train A and the train B that are on rail in this section detect the radio communication disruption, and emergently stop (Fig. 7-1 : 701). For example, theground control device 3 sets the calculated radio communication disruption section, based on a radio propagation range (range in which a propagation strength above a certain level is ensured) of the groundradio communication device 5 from which abnormality has been detected, which is read from a database (not illustrated), based on identification information of the groundradio communication device 5 from which abnormality is detected. - In the present embodiment, the radio propagation range of each ground
radio communication device 5, which is present in the database, is set as a minimum range of a changing radio propagation range that is covered by each ground radio communication device 5 (that is, a range in which a propagation strength above a certain level is ensured). Therefore, the calculated radio communication disruption section to be set in the above, is set wider than the range in which the radio communication has actually been disrupted, in consideration of uncertainty (Fig. 6 : in the same drawing, the malfunction of the central groundradio communication device 5 is assumed). However, the calculated radio communication disruption section illustrated inFig. 6 is an example, and can be set wider than the illustrated one. Also, the method of detecting the malfunction of the radio communication device can use a method disclosed in, for example, Japanese Patent Application Publication No.2007-124148 radio communication device 5 and the radio propagation range thereof in association with each other. - Next, with respect to the trains A, B of which communication is disrupted in the calculated radio communication disruption section, the
ground control device 3 regards a range from a lastly received train end position to a position of an upstream side (side into which thetrain 11 enters), out of the stop limit position of each of the trains A and B and the end position of the calculated radio communication disruption section (in the drawing, the right end position of the calculated radio communication disruption section), as an on-rail range of each of the trains A, B (Fig. 7-2 : 702), and notifies the on-rail ranges to the interlockingcontrol device 4. Theground control device 3 holds the lastly received train end positions, in order to determine the on-rail ranges of the trains A and B as described above. - On the other hand, a stop limit position is given to the train C of the upstream side of the calculated radio communication disruption section, such that the train C does not enter the calculated radio communication disruption section. At that time, it is likely that the stop limit position given to the train C will be retracted more in front (upstream side) than the stop limit position determined by the position of the preceding train 11 (
Fig. 7-2 : 703). In that case, the train C may not be able to stop before reaching a new stop limit position, depending on a distance to the start of the calculated radio communication disruption section (in the drawing, the left end of the calculated radio communication disruption section). In this way, although it is likely that the train C will overrun the new stop limit position, even when the stop limit position before retraction is more downstream than the branch part, and the train C overruns up to the branch part, for example, since the interlockingcontrol device 4 locks the route up to the stop limit position before retraction, the safety is ensured. - Next, out of the trains A, B which have stuck in the calculated radio communication disruption section, the train A in which the route up to outside the calculated radio communication disruption section is ensured is advanced by visual operation guided by the human system (
Fig. 7-3 : 704). In the train A advanced from the calculated radio communication disruption section, the communication with theground control device 3 is recovered, and since the train A reports the position of the own train, theground control device 3 can update the train position information, and the train A can be returned to the normal operation (Fig. 7-4 : 705). - After that, the interlocking
control device 4 is notified from theground control device 3 that the train A has arrived at the end of the route, and unlocks the locked departure route (Fig. 7-4 : 706). Regarding the on-rail information notified from theground control device 3, since the on-rail range of the train A does not transit by skipping the middle of the route, the operation cannot be stopped by detecting abnormality (improper dropping) in the interlockingcontrol device 4. - Next, out of the trains A, B which have stuck in the calculated radio communication disruption section, the train B that is more upstream than the station stop position is guided by the human system and moved to the stop position by visual operation, because the route to the station stop position is taken (
Fig. 7-5 : 707). Since the train B stopped at a predetermined stop position reports the position of the own train to theground control device 3 through the on-board coil 17 and theATO ground coil 7, theground control device 3 can update the train position information (Fig. 7-6 : 708). After that, the interlockingcontrol device 4 is notified from theground control device 3 that the train B has arrived at the end of the route, and unlocks the locked route (Fig. 7-6 : 709). - Since both of the trains A, B which have stuck in the section at the time of occurrence of the calculated radio communication disruption section as described above are in a state that the trains A, B have advanced outside the calculated radio communication disruption section, or are in a state that the positions thereof can be grasped through the
ATO ground coil 7, the trains are in a state in which the on-rail situation in the calculated radio communication disruption section can be grasped. - Next, regarding the train operation in the calculated radio communication disruption section, two cases will be described: a case where the train B is first departed, and a case where the train B and the train C perform waiting.
- In this case, since it is confirmed that any
train 11 is not on rail in the route departing from the station or the competing route, the interlockingcontrol device 4 sets the route (Fig. 7-7 : 710) for the train B to depart from the station, based on the route setting request from theoperation management device 1, locks the route, and makes the route signal information progress indication (Fig. 7-7 : 32). - While the stop limit position of the train B calculated from the signal information from the interlocking
control device 4 and the on-rail situation of eachtrain 11 is more upstream than a position at which the end of the train can exit from the calculated radio communication disruption section, theground control device 3 notifies the stop limit position in which a departure route entrance is made as an obstacle position, in place of the calculated stop limit position, to the on-board control device 12 of the train B, through theATO ground coil 7 and the on-board coil 17. During this time, the train B remains stopped. - When the stop limit position of the train B calculated from the signal information from the interlocking
control device 4 and the on-rail situation of eachtrain 11 is more downstream than the position at which the end of the train can exit from the calculated radio communication disruption section, theground control device 3 transmits the stop limit position, the end position of the calculated radio communication disruption section, and an instruction to shift to a mode in which emergency stop is not performed even when the radio communication is disrupted (emergency brake is not applied), to the on-board control device 12 of the train B, through theATO ground coil 7 and the on-board coil 17 (Fig. 7-7 : 711). After that, the train B departs by an automatic operation. Generally, in the section in which the radio communication is disrupted, thetrain 11 emergently stops by applying the emergency brake, but, in the present embodiment, when the operation mode is shifted to the "mode in which emergency stop is not performed even when the radio communication is disrupted", the automatic operation is possible because thetrain 11 continuously operates without stop even when the radio communication is disrupted. - When the train B starts moving, and the
ATO ground coil 7 and the on-board coil 17 are disconnected, since the communication between theground control device 3 and the on-board control device 12 is disrupted, theground control device 3 regards a range from a lastly received train end position (end position when the train stops at the station) to a position of the upstream side, out of the stop limit position of the train B and the end position of the calculated radio communication disruption section, as the on-rail range of the train B (Fig. 7-8 : 712). After that, in the train B which has advanced from the calculated radio communication disruption section, the communication with theground control device 3 is recovered, and since the train B reports the position of the own train, theground control device 3 can update the train position information, and the train B can release the mode in which emergency stop is not performed even when the radio communication is disrupted, and can return to the normal operation (Fig. 7-9 : 713). - The interlocking
control device 4 is notified from theground control device 3 that the train B has arrived at the end of the route, and unlocks the locked departure route (Fig. 7-9 : 714). Regarding the on-rail information notified from theground control device 3, since the on-rail range of the train B does not transit by skipping the middle of the route, the operation cannot be stopped by detecting abnormality (improper dropping) in the interlockingcontrol device 4. - In this case, since it is confirmed that the
train 11 is not on rail in the route entering the station or the competing route, the interlockingcontrol device 4 issues a conversion command of thepoint device 20, based on the route setting request from theoperation management device 1, sets the route (Fig. 7-10 : 715) for the train C to arrive at the station, locks the route, and makes the route signal information progress indication (Fig. 7-10 : 32). - While the stop limit position of the train C calculated from the signal information from the interlocking
control device 4 and the on-rail situation of the train B is more upstream than a position that can reach up to a predetermined station stop position (ATO ground coil 7), theground control device 3 notifies the stop limit position in which the start of the calculated radio communication disruption section is made as an obstacle position, in place of the calculated stop limit position, to the train C by radio communication. By this means, the train C does not enter the calculated radio communication disruption section. - After that, (1) in a case where the stop limit position of the train C calculated from the signal information from the interlocking
control device 4 and the on-rail situation of the train B becomes more downstream than a position that can reach up to a predetermined station stop position (ATO ground coil 7), and the stop limit position is more upstream than the position at which the train end of the train C can exit from the radio disrupted section, theground control device 3 transmits the stop limit position that is the position at which the communication can be performed with theground coil 7 when the train is stopped, the end position of the calculated radio communication disruption section, and an instruction to shift to the mode in which the emergency stop is not performed even when the radio communication is disrupted, to the train C by radio communication. In addition, (2) in a case where the stop limit position of the train C calculated from the signal information from the interlockingcontrol device 4 and the on-rail situation of the train B becomes more downstream than the position that can reach up to the predetermined station stop position (ATO ground coil 7), and the stop limit position is the position at which the train end of the train C can exit from the radio disruption section, theground control device 3 transmits the stop limit position, the end position of the calculated radio communication disruption section, and an instruction to shift to the mode in which the emergency stop is not performed even when the radio communication is disrupted, to the train C by radio communication (Fig. 7-10 : 716). In response to this, the train C enters the calculated radio communication disruption section by automatic operation, and travels the set route (Fig. 7-10 : 715). - When the train C enters the calculated radio communication disruption section, and the radio communication between the
ground control device 3 and the on-board control device 12 is disrupted, theground control device 3 regards a range from a lastly received train end position to the position of the more upstream side, out of the stop limit position of the train C and the end position of the calculated radio communication disruption section, as the on-rail range of the train C (Fig. 7-11 : 717). - Since the train C having arrived at the station and stopped at a predetermined stop position reports the position of the own train through the on-
board coil 17 and theATO ground coil 7, theground control device 3 can update the train position information (Fig. 7-12 : 718). The interlockingcontrol device 4 is notified from theground control device 3 that the train C has arrived at the end of the route, and unlocks the locked route (Fig. 7-12 : 719). - In this case, the procedure of causing the train C (or the train B) to depart from the station is the same as the case 4-1. where the train B is made to first depart, and the description thereof will be omitted here. The drawings corresponding to above-described
Fig. 7-7 toFig. 7-9 in this case are illustrated inFig. 7-13 toFig. 7-15 . Portions ofsymbols 720 to 724 illustrated in these drawings respectively correspond to portions ofsymbols 710 to 714 of above-describedFig. 7-7 toFig. 7-9 . - In addition, instead of the operation in which the train B and the train C wait, an operation that enables the train C to overtake the train B can be performed, by setting and locking the route passing through the station, and by giving the stop limit position so that the train can advance the calculated radio communication disruption section in 716 of
Fig. 7-10 . - Next, as another embodiment, an operation of the case where a calculated radio communication disruption section occurs in the middle of the route setting change in the train control system of the present embodiment will be described with reference to
Fig. 8-1 toFig. 8-6 .Fig. 8-1 toFig. 8-6 are diagrams describing the operation of the case where the calculated radio communication disruption section occurs in the middle of the route setting change in the train control system of the embodiment. In addition, the manner of description inFig. 8-1 toFig. 8-6 conforms to that isFig. 7-1 toFig. 7-15 described above. - In a state in which the station arrival route to the main track and the departure route from the main track are locked for the train E illustrated in
Fig. 8-1 (at this time, the virtual traffic signal on the main track route is avirtual traffic signal 32 showing progress indication: others arevirtual traffic signals 31 showing stop indication), when the train D which stops on the subsidiary main track is made to first depart, because the arrival of the train E is delayed, theoperation management device 1 requests the interlockingcontrol device 4 to unlock the main track departure route, and to lock the subsidiary track departure route. The interlockingcontrol device 4 makes the signal information with respect to the main track departure route stop indication (Fig. 8-2 : 801), and based on this, theground control device 3 calculates the stop limit position in which the main track departure route entrance is made the obstacle position. At this time, the stop limit position of the train E is retracted (Fig. 8-2 : 802). - In this case, when there is no obstacle in the radio communication, the
ground control device 3 notifies the calculated stop limit position to the on-board control device 12 of the train E. - Having received the notification, the on-
board control device 12 of the train E responds to theground control device 3 that the train E can stop before reaching the new stop limit position (Fig. 8-3 : 803). And having received the response, theground control device 3 notifies that the route of the stop indication can be unlocked, to the interlockingcontrol device 4. - Having received the notification, the interlocking
control device 4 waits for the time necessary for the train E to stop, unlocks the main track departure route (Fig. 8-3 : 804), sets the subsidiary main track departure route (Fig. 8-3 : 805) for the train D, and locks the route. - On the other hand, in a case where the radio communication disrupted section occurs before the on-
board control device 12 of the train E receives the stop limit position (Fig. 8-4 ), the train E emergently stops due to the radio communication disruption (Fig. 8-4 : 806). However, until then, since the train E travels with the recognition that the entry into the main track departure route is permitted, it is likely that the train E enters up to the inside of the main track departure route and then stops. When theground control device 3 unlocks the main track departure route after the elapse of a predetermined time, after reporting that the retracted stop limit position has been transmitted to the train E to the interlockingcontrol device 4, as in a conventional interlocking control, it is likely that the train E will enter the branch part in which thepoint device 20 is not fixed, and be derailed. - In the present embodiment, the on-
board control device 12 always notifies theground control device 3 of the notified stop limit position and whether the train E can stop before reaching the stop limit position. Since the radio communication is disrupted before the train E receives the retracted stop limit position, the information which theground control device 3 has received lastly from the on-board control device 12 of the train E is information that the train E can stop before reaching the stop limit position before retraction (= stop limit position capable of passing through the station). - With respect to the signal information, the
ground control device 3 notifies to the interlockingcontrol device 4 such that: (1) "unlocking impossible" with respect to the route of the progress indication, (2) "unlocking possible" with respect to the route of the stop indication, in a case where the notification that the train can stop up to the route entrance is obtained from the on-board control device 12, and (3) "unlocking impossible" in the other cases. Having not obtained the information indicating "the train can stop up to the main track departure route entrance" from the on-board control device 12 of the train E, theground control device 3 notifies the interlockingcontrol device 4 of "unlocking impossible" with respect to the main track departure route (Fig. 8-5 : 807). In addition, theground control device 3 sets the calculated radio communication disruption section, as described above, and performs control while regarding the range illustrated inFig. 8-5 : 808, as the on-rail range of the train E. - The interlocking
control device 4 can unlock the set route before the train enters the set route, only when the information of "unlocking possible" is obtained. Here, since the information of "unlocking impossible" is notified from theground control device 3, since the main track departure route remains locked, the safety is ensured. - When the train E which has stuck in the calculated radio communication disruption section is guided and moved to the station stop position by the human system (
Fig. 8-6 : 809), the on-board control device 12 can receive a new stop limit position from theground control device 3 through theATO ground coil 7, and can return the information indicating that the train can stop before reaching the stop limit position", and thereby theground control device 3 notifies "unlocking possible" to the interlockingcontrol device 4. Having received this notification, the interlockingcontrol device 4 can safely unlock the main track departure route (Fig. 8-6 : 810). - As described above, it is possible to continue the operation of the
train 11, even when the calculated radio communication disruption section occurs in the middle of the route setting change. - As described above, according to the train control system of the above-described embodiments, in the train control system which notifies the train on-rail position from the train to the ground side control device using wireless, even when the radio communication disabled section occurs in all or part of the interlocking control section, the operations such as overtaking and waiting in this section can be realized at low costs, while safety is ensured.
- While certain embodiments and examples of the present invention have been described, these embodiments and examples have been presented by way of example only, and are not intended to limit the scope of the invention, which is defined by the features of the independent claims.
-
- 1
- operation management device
- 2
- system management device
- 3
- ground control device
- 4
- interlocking control device
- 5
- ground radio communication device
- 6, 16
- antenna
- 7
- ATO ground coil
- 8
- position correction ground coil
- 9
- inter-base network
- 10
- wayside network
- 11
- train
- 12
- on-board control device
- 13
- ATO device
- 14
- speed/position detection device
- 15
- on-board radio communication device
- 17
- on-board coil
- 18
- TG
- 19
- wheel
- 20
- point device
- 21
- rail
Claims (16)
- A train control system comprising:ground radio communication means (5) that transmits and receives information with on-board radio communication means of a train;ground communication means (7) that is installed at a predetermined stop position at which the train stops, and transmits and receives information with the on-board communication means of the train;interlocking control means (4) that performs a conversion of a point and a locking of a route; andground control means (3) that calculates a stop limit position to be given to each train, based on a train position and an opening state of a train route, and controls the interlocking control means (4) so as to perform operation control of each train in a predetermined section;wherein the ground control means (3):calculates a first stop limit position such that the train does not enter a calculated radio communication disruption section including all or part of a section in which the radio communication is disrupted between the ground radio communication means (5) and the on-board radio communication means;calculates, with respect to a train (B) that is made to travel through the calculated radio communication disruption section, a second stop limit position so that the train reaches up to a position of the ground communication means (7); andin a state in which all or part of the train resides in the calculated radio communication disruption section, with respect to the train of which the radio communication is disrupted, estimates a current train position, based on an end position of the calculated radio communication disruption section in a train traveling direction, the second stop limit position, and a lastly received train position, and performs operation control of each train.
- The train control system according to Claim 1, wherein the ground control means (3) further:calculates, with respect to a train (A) that is made to travel through the calculated radio communication disruption section, a third stop limit position that is ahead of the calculated radio communication disruption section; andin a state in which all or part of the train resides in the calculated radio communication disruption section, with respect to the train of which the radio communication is disrupted, estimates a current train position, based on an end position of the calculated radio communication disruption section in a train traveling direction, the third stop limit position, and a lastly received train position.
- The train control system according to Claim 2, wherein: while the train stops at the predetermined stop position, the ground communication means (7) receives position information from the on-board communication means of the train, and transmits the third stop limit position to the on-board communication means of the train.
- The train control system according to Claim 2, wherein, before the train enters the calculated radio communication disruption section or while the train stops at the predetermined stop position, in a case where the stop limit position of the train becomes the third stop limit position, the ground control means (3) transmits information including the third stop limit position, and an instruction to shift to a mode in which the train does not emergently stop even when the radio communication is disrupted, to the on-board communication means of the train through the ground communication means (7).
- The train control system according to Claim 4, wherein: before the train enters the calculated radio communication disruption section, in a case where the stop limit position of the train is ahead of a position where the train can reach up to the predetermined stop limit, and is within the calculated radio communication disruption section, the ground control means (3) transmits information including the second stop limit position designating the predetermined stop position, and the instruction to shift to the mode in which the train does not emergently stop even when the radio communication is disrupted, to the on-board radio communication means of the train through the ground radio communication means (5).
- The train control system according to Claim 1, wherein: the ground communication means (7) is communication means provided for controlling a home door.
- In a train control method which has a ground radio communication unit that communicates with an on-board communication unit provided in a train, and a ground communication means (7) that is installed at a predetermined stop position at which the train stops, and is communicable with the train, calculates a stop limit position to be given to the train, based on information through the ground radio communication unit, and performs operation control of the train in a predetermined section, wherein the train control method comprises:when the radio communication between the on-board radio communication unit and the ground radio communication unit is disrupted, setting a calculated radio communication disruption section including a section in which the radio communication is disrupted;with respect to a train (B) traveling through the calculated radio communication disruption section, estimating an on-rail state of the train, based on a first stop limit position so that the train reaches up to a position of the ground communication means (3), and a lastly received train position; andperforming operation control of the train, based on the estimated on-rail state of the train.
- The train control method according to Claim 7, further comprising:with respect to a train (A) traveling through the calculated radio communication disruption section, estimating an on-rail state of the train, based on a second stop limit position that is ahead of the calculated radio communication disruption section, and a lastly received train position; andperforming operation control of the train, based on the estimated on-rail state of the train.
- The train control method according to Claim 7 or 8, further comprising:calculating a third stop limit position such that the train does not enter the calculated radio communication disruption section;wherein operation control of the train is performed to a train that is located upstream of the calculated radio communication disruption section, based on the third stop limit position, such that the train does not enter the calculated radio communication disruption section.
- The train control method according to Claim 8, wherein:when the train resides in the calculated radio communication disruption section, and the second stop limit position is set to the train, operation control of the train is performed such that the train in which a route is ensured is evacuated up to the outside of the calculated radio communication disruption section.
- The train control method according to Claim 7 or 8, wherein:when the train that is within the calculated radio communication disruption section, and is located more upstream than a position of the ground communication means (7) has moved to the position of the ground communication means (7), the ground communication means (7) communicates with the train, to grasp the position of the train, and operation control is performed based on the position.
- The train control method according to Claim 11, wherein:when the train stops at the position of the ground communication means (7), and the second stop limit position is set to the train, information including the second stop limit position and an instruction to shift to a mode in which the train does not emergently stop even when the radio communication is disrupted is transmitted to the on-board communication means of the train through the ground communication means (7).
- The train control method according to Claim 7 or 8, wherein:the operation control of the train performs interlocking control between an upstream-side point to branch a route of the train into a first route and a second route, and a downstream-side point to make the first route and the second route join the route.
- The train control method according to Claim 13, wherein:when the train traveling through the calculated radio communication disruption section stops at a position of a first ground coil on the first route, the route is converted to the second route by the upstream-side point device; andwith respect to a subsequent train traveling through the calculated radio communication disruption section, an on-rail state of the subsequent train is estimated, based on a fourth stop limit position so as to make the train reach up to a position of a second ground coil on the second route, and a lastly received train position.
- The train control method according to Claim 14, wherein:when the subsequent train becomes on rail within the calculated radio communication disruption section, and on the downstream side of the ground communication means (7);an on-rail state of the subsequent train is estimated, based on the stop limit position, an end position of the calculated radio communication disruption section in a traveling direction, and a lastly received position of the subsequent train; andconversion control is performed to the route, by operating the downstream-side point, such that the train can advance from the second route.
- The train control method according to Claim 8, wherein:before the train enters the calculated radio communication disruption section, and in a case where the stop limit position of the train is ahead of the position of the ground communication means (7) and is within the calculated radio communication disruption section, information including the second stop limit position designating the ground communication means (7), and an instruction to shift to a mode in which the train does not emergently stop even when the radio communication is disrupted is transmitted to the on-board radio communication means of the subsequent train through the ground radio communication means.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012287515A JP5885654B2 (en) | 2012-12-28 | 2012-12-28 | Train control system |
PCT/JP2013/005317 WO2014103102A1 (en) | 2012-12-28 | 2013-09-09 | Train control system and train control method |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2939901A1 EP2939901A1 (en) | 2015-11-04 |
EP2939901A4 EP2939901A4 (en) | 2016-09-21 |
EP2939901B1 true EP2939901B1 (en) | 2018-03-21 |
Family
ID=51020245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13867115.1A Not-in-force EP2939901B1 (en) | 2012-12-28 | 2013-09-09 | Train control system and train control method |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP2939901B1 (en) |
JP (1) | JP5885654B2 (en) |
CN (1) | CN104583052B (en) |
IN (1) | IN2015DN01601A (en) |
WO (1) | WO2014103102A1 (en) |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6310868B2 (en) * | 2015-02-12 | 2018-04-11 | 株式会社日立製作所 | Course control system, course control method, and ground device |
JP6541563B2 (en) * | 2015-12-10 | 2019-07-10 | 株式会社日立製作所 | Railway security system and interlocking device |
WO2017195313A1 (en) * | 2016-05-12 | 2017-11-16 | 株式会社京三製作所 | Train control system |
WO2017195317A1 (en) * | 2016-05-12 | 2017-11-16 | 株式会社京三製作所 | Ground device |
JP6657391B2 (en) * | 2016-05-12 | 2020-03-04 | 株式会社京三製作所 | Ground equipment |
KR101834854B1 (en) * | 2016-07-28 | 2018-03-07 | 한국철도기술연구원 | train-centric electronic interlocking system for connected train based autonomous train control system and the method thereof |
JP6532609B2 (en) * | 2016-08-04 | 2019-06-19 | 三菱電機株式会社 | Wireless train control system and wireless train control method |
JP6799432B2 (en) * | 2016-10-13 | 2020-12-16 | 東日本旅客鉄道株式会社 | Railroad vehicle mileage record grasping system |
JP6925144B2 (en) * | 2017-03-22 | 2021-08-25 | 株式会社日立製作所 | Wireless train control system and its ground side control device |
CN107128336A (en) * | 2017-04-25 | 2017-09-05 | 王昌兴 | Rail cars group, which is thrown, stops carrying additionally system and method |
CN109285345A (en) * | 2018-09-06 | 2019-01-29 | 杭州飞遁科技有限公司 | A kind of traffic circulation network failure allocation processing method |
JP7349384B2 (en) * | 2020-02-13 | 2023-09-22 | 東日本旅客鉄道株式会社 | central device |
CN111746596A (en) * | 2020-06-11 | 2020-10-09 | 中铁第四勘察设计院集团有限公司 | Train parking control method and device |
CN111746597A (en) * | 2020-06-11 | 2020-10-09 | 中铁第四勘察设计院集团有限公司 | Train parking control system and method |
CN112061180B (en) * | 2020-08-28 | 2022-07-19 | 交控科技股份有限公司 | Turnout side-impact protection method and system |
CN114228788B (en) * | 2021-12-13 | 2023-09-08 | 卡斯柯信号有限公司 | Rail side auxiliary positioning method, device, equipment and medium for out-of-position train |
CN115140125B (en) * | 2022-08-19 | 2023-08-18 | 中国人民解放军国防科技大学 | Train positioning method based on LDV, UWB, MEMS combination |
WO2024048075A1 (en) * | 2022-08-31 | 2024-03-07 | 株式会社日立製作所 | Train control system |
CN115923887B (en) * | 2023-03-10 | 2023-05-05 | 北京全路通信信号研究设计院集团有限公司 | Train route handling method and device, electronic equipment and storage medium |
CN116395004B (en) * | 2023-06-08 | 2023-08-15 | 北京全路通信信号研究设计院集团有限公司 | Train operation control method and system |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11245818A (en) * | 1998-03-06 | 1999-09-14 | Toshiba Corp | Train communication apparatus and method |
JP4070490B2 (en) * | 2002-03-27 | 2008-04-02 | 株式会社京三製作所 | Train control system and train control method |
JP4301888B2 (en) * | 2003-08-27 | 2009-07-22 | 日本信号株式会社 | Train control device |
JP4714490B2 (en) * | 2005-03-18 | 2011-06-29 | 北海道旅客鉄道株式会社 | In-vehicle device and operation management device |
JP2006298069A (en) * | 2005-04-18 | 2006-11-02 | Toshiba Corp | Radio train control system |
JP4641245B2 (en) | 2005-10-26 | 2011-03-02 | 三菱電機株式会社 | Ad hoc network system, wireless ad hoc terminal and failure detection method thereof |
JP4471996B2 (en) * | 2007-09-18 | 2010-06-02 | 株式会社日立製作所 | Train control system |
JP5268737B2 (en) * | 2009-03-27 | 2013-08-21 | 株式会社日立製作所 | Radio train control system, radio train control on-board system and radio train control ground system |
JP5355495B2 (en) * | 2010-01-13 | 2013-11-27 | 株式会社日立製作所 | Signal security system |
-
2012
- 2012-12-28 JP JP2012287515A patent/JP5885654B2/en not_active Expired - Fee Related
-
2013
- 2013-09-09 EP EP13867115.1A patent/EP2939901B1/en not_active Not-in-force
- 2013-09-09 CN CN201380045098.6A patent/CN104583052B/en not_active Expired - Fee Related
- 2013-09-09 WO PCT/JP2013/005317 patent/WO2014103102A1/en active Application Filing
- 2013-09-09 IN IN1601DEN2015 patent/IN2015DN01601A/en unknown
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
CN104583052B (en) | 2016-11-09 |
EP2939901A1 (en) | 2015-11-04 |
IN2015DN01601A (en) | 2015-07-03 |
EP2939901A4 (en) | 2016-09-21 |
JP2014129029A (en) | 2014-07-10 |
WO2014103102A1 (en) | 2014-07-03 |
CN104583052A (en) | 2015-04-29 |
JP5885654B2 (en) | 2016-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2939901B1 (en) | Train control system and train control method | |
US9669853B2 (en) | Train control system | |
US9884635B2 (en) | Signaling system and door control method | |
US9663125B2 (en) | Train control system | |
US9522688B2 (en) | On-board device, signaling system, and control method of moving vehicle | |
US20160046306A1 (en) | On-board device, signaling system and control method of moving vehicle | |
US10293842B2 (en) | On-board device, signaling system, and control method of moving vehicle | |
CN107709136B (en) | Method and device for determining driving authorization for a rail vehicle | |
US9849897B2 (en) | Signaling system and control method of moving vehicle | |
WO2014064826A1 (en) | Presence-on-track detection device, and presence-on-track detection method | |
EP2937259B1 (en) | Train control device, and train control method | |
US20150051761A1 (en) | Locator loop control system and method of using the same | |
JP2019004587A (en) | Automatic Train Operation System | |
JP5826543B2 (en) | Train control device | |
JP5300366B2 (en) | Automatic train control device | |
JP2010136561A (en) | Method and device for controlling train operation | |
JP5470315B2 (en) | Signal control system | |
KR20160071645A (en) | Train coupling-decoupling system | |
JP2015033177A (en) | Railway vehicle and railway vehicle control system | |
JPWO2018207480A1 (en) | Automatic train security equipment and on-board equipment | |
JP2002331936A (en) | Passing-each-other timing correction method in passing- each-other part on car running track, passing-each-other timing correction system and car traffic system | |
JP2008049754A (en) | Train information transmission device | |
JP5452544B2 (en) | Signal control system | |
KR101618414B1 (en) | System and Method for Setting Protection Range of Train | |
CN117382701A (en) | Backward jump mark-matching parking method, device, equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20150319 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
A4 | Supplementary search report drawn up and despatched |
Effective date: 20160823 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61L 27/00 20060101ALI20160817BHEP Ipc: B61L 3/12 20060101ALI20160817BHEP Ipc: B61L 25/02 20060101ALI20160817BHEP Ipc: B61L 15/00 20060101ALI20160817BHEP Ipc: B61L 3/02 20060101ALI20160817BHEP Ipc: B61L 23/14 20060101AFI20160817BHEP Ipc: B61L 23/18 20060101ALI20160817BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61L 15/00 20060101ALI20170427BHEP Ipc: B61L 23/18 20060101ALI20170427BHEP Ipc: B61L 3/12 20060101ALI20170427BHEP Ipc: B61L 25/02 20060101ALI20170427BHEP Ipc: B61L 3/02 20060101ALI20170427BHEP Ipc: B61L 23/14 20060101AFI20170427BHEP Ipc: B61L 27/00 20060101ALI20170427BHEP |
|
INTG | Intention to grant announced |
Effective date: 20170522 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTC | Intention to grant announced (deleted) | ||
INTG | Intention to grant announced |
Effective date: 20171030 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 980761 Country of ref document: AT Kind code of ref document: T Effective date: 20180415 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013034896 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20180321 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180621 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 6 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 980761 Country of ref document: AT Kind code of ref document: T Effective date: 20180321 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180621 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180622 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20180828 Year of fee payment: 6 Ref country code: IT Payment date: 20180919 Year of fee payment: 6 Ref country code: FR Payment date: 20180813 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180723 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013034896 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
26N | No opposition filed |
Effective date: 20190102 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20180909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180930 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180930 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180930 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180930 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180321 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602013034896 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130909 Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180321 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200401 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180721 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190930 |