EP2931992B1 - Support and construction for facade panels in a curtain wall and curtain wall - Google Patents
Support and construction for facade panels in a curtain wall and curtain wall Download PDFInfo
- Publication number
- EP2931992B1 EP2931992B1 EP13789472.1A EP13789472A EP2931992B1 EP 2931992 B1 EP2931992 B1 EP 2931992B1 EP 13789472 A EP13789472 A EP 13789472A EP 2931992 B1 EP2931992 B1 EP 2931992B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- curtain wall
- support
- rail
- wing
- reinforcing rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims description 26
- 230000003014 reinforcing effect Effects 0.000 claims description 22
- 239000004411 aluminium Substances 0.000 claims description 8
- 229910052782 aluminium Inorganic materials 0.000 claims description 8
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 8
- 238000005452 bending Methods 0.000 claims description 4
- 239000011521 glass Substances 0.000 claims description 4
- 230000000295 complement effect Effects 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 239000012212 insulator Substances 0.000 description 6
- 239000000463 material Substances 0.000 description 2
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000009970 fire resistant effect Effects 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003319 supportive effect Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Definitions
- the present invention relates to a curtain wall.
- curtain walls that primarily consist of glass facade panels that are placed in a construction consisting of vertical elements, called posts, and horizontal elements, called rails.
- the posts and rails are connected together by cruciform supports that are fastened to a post, and of which two wings are fastened to rails, and if need be rest on a nose of the rails, for example in a supporting structure made of aluminium profiles. It goes without saying that such supports can also be constructed with one wing for use with posts that only have rails on one side.
- the facade panels for example glass panels that can be relatively heavy, then rest on the supports, which transmit the weight of the facade panels to the posts via the rails.
- Such supports are known from DE 19854203 , DE29912697 and EP 1460191 for example.
- the supports together with the rails to which they are connected, can bend under the weight of the supported facade panels. This can lead to a rail touching the underlying facade panel, which can be damaged as a result.
- a solution for this is to use deeper rails, i.e. rails that extend over a greater horizontal distance, which is aesthetically unattractive and of course is more expensive on account of an increased use of materials.
- Deeper rails also only have a limited effect on the rigidity of the rail, because while the dimensions of the rails are indeed larger in the horizontal direction, but they are generally hollow profiles such that the rigidity in the vertical direction only increases to a limited extent, while bending takes place in the vertical direction.
- Wings of the traditional supports cannot be made more rigid by giving them a greater height, because the height is limited by the vertical distance between two facade panels, which must be kept small.
- the purpose of the present invention is to provide a solution to the aforementioned and other disadvantages, by providing a curtain wall as defined in claim 1.
- the wings of the supports may possibly bend slightly under the weight of the facade panels, without this bending being passed on to the rails.
- the wing is essentially T shaped here, viewed in the vertical cross-section, whereby the reinforcing rib is formed by the head of the T.
- reinforcing rib extends both upwards and downwards.
- this reinforcing rib after construction of the curtain wall, must be alongside the facade panels, so that a part of the wing can be at a lower height between the facade panels, because the vertical distance between the facade panels must be kept small.
- the components of the construction are designed such that the wing can move with respect to the rail, whereby a movement is possible in the vertical direction over a minimum distance.
- wing and the rails are not designed to be connected together, for example due to a complementary shape or by facilities for coupling means.
- the rail is provided with a detail for a seal on the top and/or bottom edge, whereby the detail or details are at least partially above or below and around the reinforcing rib.
- the construction also comprises a screw profile, whereby the rail and screw profile have a partially complementary shape so that the screw profile can be inserted in the rail.
- the reinforcing rib of the wing is at least partly between the rail and each of the two facade panels located above one another.
- a curtain wall 1 shown in figures 1 and 2 primarily consists of a post 2, made from a hollow aluminium post profile, and two rails 3, made of hollow aluminium rail profiles, that are fastened together. It goes without saying that an entire curtain wall 1 comprises a large number of such posts 2 and rails 3.
- the post 2 and rails 3 are provided with details 5 at two edges in which seals 6 are affixed that can seal off openings between the post 2 and the rails 3 on the one hand, and a facade panel 7, for example a glass panel, on the other hand.
- the rails 3 are provided with a nose 8, which is a double ridge 9 with a narrow groove 10 between them.
- the nose 8 protrudes out of the rails 3 in the direction of the facade panel 7.
- a cruciform support 11 is fastened to the post 2 and rails 3, that primarily consists of a body 12 that is fastened to the post 2 by means of bolts 13 and two wings 14 that are each fastened to a rail 3 by means of bolts 14.
- the support 11 is made of steel, but could also be made of aluminium or another metal.
- a facade panel rests on a wing 14 of a support 11 via a small supporting block 15, and this wing 14 in turn partly rests on the nose 8 of the rails 3, and partly rests on the post 2 via the body 12.
- An insulator 16 is affixed in the nose 8 between two facade panels 7 located above one another, which counteracts air circulation in the space between two facade panels 7 and thereby increases the insulating properties of the curtain wall 1.
- the transition between two facade panels 7 is covered by a clamping profile 17 of two parts screwed into the insulator 16 and the nose 8. This clamping profile 17 clamps facade panels 7 against the rails 3, so that the facade panels are well secured in the construction of rails 3 and posts.
- the maximum vertical distance between two facade panels 7 is defined by the height H of the rails 3 in combination with the overlap, set by standards, between the clamping profile 17 and a facade panel 7 and a small clearance to prevent contact. It is undesirable here to increase the height H of the rails 3 with regard to the undesired visual impact thereof.
- the support 11 is constructed such that only the body 12 contains holes 18 to fasten the support 11 to the post 2.
- the wings 14 are not designed to be connected to the rails 3. The result is that the support 11 is then only fastened to the post 2.
- the wings 14 of the support 11 are provided with a reinforcing rib 19, which extends over the length L of the wing 14 and protrudes both below and above the part 20 of the wing 14 on which the facade panel 7 rests. Due to its height A the reinforcing rib 19 provides effective resistance against vertical bending of the wing 14.
- the wings 14 have a cross-section that has the form of a tilted T, whereby the reinforcing rib 19 forms the head of the T.
- the rails 3 are constructed with a deepened section 21 that is located between the details 5 for seals 6.
- This deepened section 21 provides room for the reinforcing rib 19, so that the reinforcing rib 19 has a height A that is greater than the maximum vertical distance between two facade panels 7, whereby the reinforcing rib 19 is between the rail 3 and the facade panel 7.
- the details 5 for seals 6 fit widely around the reinforcing rib 19, so that this reinforcing rib 19 can move freely between the details 5 for seals 6, at least over a certain distance.
- the construction is provided with an extension piece 22 that is mounted on the support 11.
- this extension piece 22 and the support 11 are provided with holes 23 in which bolts can be affixed.
- the extension piece can, depending on the material from which it is made, also partially act as an insulator.
- the deepened section 21 is constructed as an undercut groove that enables a complementarily shaped aluminium screw profile 24 to be inserted there, in which the screws with which the clamping profile 17 is fastened can grip.
- a traditional plastic insulator can be used.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL13789472T PL2931992T3 (pl) | 2012-12-12 | 2013-10-24 | Wspornik i konstrukcja dla paneli fasadowych w ścianie fasadowej oraz ściana fasadowa |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BE2012/0839A BE1021515B1 (nl) | 2012-12-12 | 2012-12-12 | Steun en constructie voor gevelpanelen in een vliesgevel en vliesgevel |
PCT/BE2013/000057 WO2014089643A1 (en) | 2012-12-12 | 2013-10-24 | Support and construction for facade panels in a curtain wall and curtain wall |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2931992A1 EP2931992A1 (en) | 2015-10-21 |
EP2931992B1 true EP2931992B1 (en) | 2016-12-21 |
Family
ID=47826744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13789472.1A Active EP2931992B1 (en) | 2012-12-12 | 2013-10-24 | Support and construction for facade panels in a curtain wall and curtain wall |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP2931992B1 (nl) |
BE (1) | BE1021515B1 (nl) |
ES (1) | ES2616453T3 (nl) |
PL (1) | PL2931992T3 (nl) |
WO (1) | WO2014089643A1 (nl) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202013105585U1 (de) * | 2013-12-09 | 2015-03-10 | SCHÜCO International KG | Pfosten-Riegel-Konstruktion |
CN107882226A (zh) * | 2017-10-27 | 2018-04-06 | 上海市建筑装饰工程集团有限公司 | 钢结构承载框架的施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4428171A (en) * | 1982-03-12 | 1984-01-31 | Atlantic Richfield Company | Thermal storefront system |
DE19606906C2 (de) * | 1996-02-13 | 1999-04-15 | Mannesmann Ag | Fassadensystem für vertikale, diagonale und horizontale Verkleidungen von Bauten |
DE19854203C2 (de) * | 1998-11-24 | 2002-04-25 | Lanco Lange Fenster Fassaden | Pfosten/Riegel-Fassade für ein Gebäude |
DE29912697U1 (de) | 1999-07-19 | 1999-09-09 | Mannesmann Ag | Verkleidungssystem für Fassaden und Dächer von Bauwerken |
BE1015425A6 (nl) * | 2003-03-21 | 2005-03-01 | Reynaers Aluminium Nv | Verbeterde steun voor gevelpanelen van een vliesgevel. |
-
2012
- 2012-12-12 BE BE2012/0839A patent/BE1021515B1/nl active
-
2013
- 2013-10-24 EP EP13789472.1A patent/EP2931992B1/en active Active
- 2013-10-24 ES ES13789472.1T patent/ES2616453T3/es active Active
- 2013-10-24 PL PL13789472T patent/PL2931992T3/pl unknown
- 2013-10-24 WO PCT/BE2013/000057 patent/WO2014089643A1/en active Application Filing
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
EP2931992A1 (en) | 2015-10-21 |
PL2931992T3 (pl) | 2017-06-30 |
ES2616453T3 (es) | 2017-06-13 |
BE1021515B1 (nl) | 2015-12-04 |
WO2014089643A1 (en) | 2014-06-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR200474071Y1 (ko) | 엘리베이터 도어실과 결합된 엘리베이터 홀 플로어 커버 | |
MX2012002921A (es) | Sistema de paneles. | |
EP3456911B1 (en) | Frames for manufacturing large area doors or windows | |
KR100968216B1 (ko) | 조립식 지붕구조물 | |
EP2931992B1 (en) | Support and construction for facade panels in a curtain wall and curtain wall | |
CN103216069B (zh) | 一种地板或墙板卡件 | |
KR20090111738A (ko) | 조립식 벽판넬 구조 | |
KR101310889B1 (ko) | 건축용 외장패널의 연결구조 | |
CA2779808A1 (en) | Modular wall system | |
CZ2010151A3 (cs) | Hliníkové zábradlí tvorené prefabrikovanými dutými profily | |
CN204001702U (zh) | 一种丁字墙塑料模板 | |
EP3350400B1 (en) | Profile for the fastening and thermal insulation system of windows, doors and facades | |
CN202595959U (zh) | 新型幕墙立柱 | |
CN209483139U (zh) | 一种超长无立柱卧棂百叶窗结构 | |
KR101304781B1 (ko) | 보강 및 각도 조절수단을 갖는 벽선반 받침대 | |
CN203924339U (zh) | 一种新型自由组装温室 | |
CN205713691U (zh) | 石膏条板和铝合金窗框连接构造 | |
CN204456548U (zh) | 封闭式幕墙板的连接机构 | |
CN204299053U (zh) | 新型滑动支架 | |
CN204647826U (zh) | 一种铝型材 | |
KR20170053474A (ko) | 지하 이중벽 설치구조 | |
KR20130126211A (ko) | 건축물의 외장패널 고정장치 | |
KR101074648B1 (ko) | 건축물지주 | |
CN102733561A (zh) | 一种建筑雨棚 | |
CN202769243U (zh) | 加强上固铝型材 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20150505 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
17Q | First examination report despatched |
Effective date: 20160603 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20160802 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: ORITI PATENTS - FRANCO ORITI, CH Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 855643 Country of ref document: AT Kind code of ref document: T Effective date: 20170115 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013015691 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170322 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170321 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 855643 Country of ref document: AT Kind code of ref document: T Effective date: 20161221 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2616453 Country of ref document: ES Kind code of ref document: T3 Effective date: 20170613 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170421 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170421 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170321 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013015691 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 5 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20170922 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171024 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171024 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171024 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20131024 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161221 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: MC Payment date: 20220929 Year of fee payment: 10 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230418 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20230927 Year of fee payment: 11 Ref country code: NL Payment date: 20230912 Year of fee payment: 11 Ref country code: GB Payment date: 20230914 Year of fee payment: 11 Ref country code: CZ Payment date: 20230911 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20230918 Year of fee payment: 11 Ref country code: FR Payment date: 20230912 Year of fee payment: 11 Ref country code: BE Payment date: 20230908 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20230929 Year of fee payment: 11 Ref country code: CH Payment date: 20231102 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20240131 Year of fee payment: 11 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20231031 |