EP2700604A1 - Anti-sway control method and arrangement - Google Patents
Anti-sway control method and arrangement Download PDFInfo
- Publication number
- EP2700604A1 EP2700604A1 EP12181009.7A EP12181009A EP2700604A1 EP 2700604 A1 EP2700604 A1 EP 2700604A1 EP 12181009 A EP12181009 A EP 12181009A EP 2700604 A1 EP2700604 A1 EP 2700604A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- load
- rope
- swaying
- pendulous motion
- reeling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/06—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
- B66C13/063—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads electrical
Definitions
- the present invention relates to a method of controlling a crane and a crane arrangement.
- the problem has been addressed in the prior art.
- the prior art solutions try to solve the problem by measuring and controlling accelerations of a crane boom or a crane trolley in order to dampen the swaying motion of a load.
- One example of the prior art is described in European patent EP0717004 .
- the patent discloses a method for damping a load swing of a crane during a traversing motion of a load-carrying trolley. The method comprises determining substantially continuously the acceleration of the trolley/bridge and an instantaneous swing time constant, swing velocity and deviation from equilibrium of a pendulum formed by the load. When the velocity reference changes, the acceleration providing the desired change in velocity is determined and that acceleration is switched on immediately.
- the acceleration compensating for the swing prevailing at the moment of change of the velocity is determined and that acceleration is switched on either immediately or, if the compensating acceleration exceeds the maximum acceleration permissible to the traversing drive when switched on immediately, when the pendulum formed by the load has reached its extreme position.
- the disclosed method requires complex measurements and calculations of velocities and accelerations of different elements of the system. Another shortcoming is that the method functions only with a small amplitude pendulous motion. Elimination of large amplitude pendulous motion requires higher acceleration rates from the traversing drive than it is capable of providing.
- An object of the present invention to provide a method and an apparatus for implementing the method so as to alleviate the above disadvantages.
- the objects of the invention are achieved by a method and an arrangement which are characterized by what is stated in the independent claims.
- the preferred embodiments of the invention are disclosed in the dependent claims.
- the invention is based on the idea of detecting a pendulous swaying motion of a load and at least two positions of the pendulous motion, for example both extreme positions or one extreme position and an equilibrium position.
- the pendulous motion is dampened by reeling in a rope hanging the load when the load is near an extreme position and reeling off the rope when the load is near the equilibrium position.
- the reeling in and reeling off periods can be calculated from the at least two detected positions.
- An advantage of the method and arrangement of the invention is that the arrangement is very simple and usually it requires very little or no additional hardware to a crane arrangement.
- the detection steps can be realized by measuring an electrical response caused by the swaying load to the reel's drive.
- Another advantage is that the method can be applied to virtually any amplitude of pendulous motion.
- Figure 1 illustrates an example of a crane arrangement with a load in pendulous motion
- Figure 2 illustrates an embodiment of a crane arrangement with a load controlled along a first path
- Figure 3 illustrates an embodiment of a crane arrangement with a load controlled along a second path
- Figure 1 illustrates an example of a crane arrangement.
- the invention may not be restricted to any specific type of lifting device or crane.
- the invention may be used in many different arrangements which comprise some kind of lifting device.
- a crane of Figure 1 is used as an exemplary embodiment due to its simple construction.
- the crane arrangement comprises a crane boom 4, a reel arrangement 3 and a rope 6.
- the crane boom 4 may comprise a trolley and a trolley drive for moving the trolley along the crane boom wherein the reel arrangement may be fixed to the trolley or it can be a part of the trolley.
- the rope 6 may be winded around a reel 2 of the reel arrangement 3 and a load 8 is suspended by the rope 6.
- the rope may be for example a steel cable or some other string that is flexible enough so that it can be winded on the reel 2 and strong enough to lift and hold the loads 8 that are to be lifted with the crane arrangement.
- the reel arrangement 3 comprises a reel drive for rotating the reel and a controller for controlling the reel drive.
- the controller is programmable and has means for measuring electrical parameters of the reel drive.
- the controller may also have communications means e.g. for receiving instructions and transmitting measurement results.
- the reel arrangement may comprise multiple ropes on one or more reels which may be controlled with one or more controllers.
- the pendulous motion 10 has three special positions: an equilibrium position 13 and two extreme positions 12, 14. In the equilibrium position 13 the load 8 has minimum potential energy and maximum kinetic energy. In the extreme positions 12, 14 the load 8 has maximum potential energy and no kinetic energy.
- the pendulous motion of the load 8 is dampened if the load 8 is lifted up at the extreme positions 12, 14 and lowered down at the equilibrium point 13.
- moving a mass almost instantaneously requires very high peak power and very strong ropes or cables which hold the mass. Therefore, in practice, the load 8 has to be lifted up near the extreme points 12, 14 by reeling in the rope 6 that holds the load 8. Similarly the load 8 has to be lowered near the equilibrium point 13.
- FIG. 2 illustrates an example of a practical path 20 for dampening pendulous motion of a load 8. Only a moderate peak power is required to make the load 8 follow the path 20 because the load is lifted and lowered with a relatively low speed.
- the lifting of the load 8 may begin when the load approaching the extreme point 14 has passed the middle point between the equilibrium position 13 and the extreme position 14.
- the load may be lifted continuously until the load reaches again the middle point between the equilibrium position 13 and the extreme position 14, now approaching the equilibrium position 13.
- the load may be lowered down and the lowering may continue when the load 8 passes the equilibrium point 13 until the load reaches the middle point between the equilibrium point 13 and the extreme point 12.
- the load may be lifted again and the lifting may continue when the load reaches the extreme point and starts to approach the equilibrium point 13. Again, the lifting may continue until the load reaches again the middle point between the extreme point 12 and the equilibrium point 13 wherein lowering of the load may begin again.
- Figure 3 illustrates an example of a practical path 30 for dampening pendulous motion of a load 8.
- the path 30 of Figure 3 requires higher peak power than following the path 20 of Figure 2 because the movements of the load 8 are realized in much shorter period of time.
- following the path 30 of Figure 3 dampens the pendulous motion 10 of the load 8 faster than following the path 20 of Figure 2 .
- faster movements will cause more stress to crane structures, so the path 30 of Figure 3 is usable with relatively light loads compared to the lifting capacity of the crane structure.
- the suspended load 8 that is in pendulous motion 10 causes an alternating force to the rope 6 and the alternating force causes an alternating torque to the reel 2 of the reel arrangement 3.
- the torque may be detected and measured electrically with the reel drive and/or the controller of the reel arrangement.
- the alternating torque has to be compensated with certain amount of power at the reel arrangement in order to prevent the reel from rotating.
- the amount of power needed to compensate the alternating torque may be measured to detect changes in the torque.
- the required measurements may be realized with modern electrical drives and controllers without any additional components in the electrical drive. Functions, properties and/or operations of the reel arrangement may already be monitored in existing reel arrangements so the changes caused by the load in the pendulous motion have to be identified and extracted from the monitored data.
- the suspended load in the pendulous motion causes maximum torque to the reel at the equilibrium point and minimum torque at the extreme points.
- half a cycle of the pendulous motion i.e. from one extreme point 12 to the other extreme point 14, is enough to determine values for quantities necessary for dampening the load's motion.
- a quarter of a cycle i.e. from one extreme point 12 to the equilibrium point 13 may be enough for measuring the needed initial values.
- Duration of a cycle may be calculated or estimated when at least two points of pendulous motion are detected.
- next moments of time when the load is at extreme point or equilibrium point may be calculated or estimated when the at least two points of pendulous motion are detected and time stamped.
- the extreme points 12, 14 may be detected also when the pendulous motion is being dampened by alternately ascending and descending the load.
- dampening actions do not have to happen at an exact point of the pendulous motion to be effective. Therefore good estimates of next moments of time when the load is at a critical point will also result to faster dampening than without any actions.
- certain dampening actions may be omitted during certain cycles to improve detection accuracy of the extreme points. For example, the pendulous motion of the load is only monitored and measured during the first cycle. On the second cycle the load is ascended near one of the extreme points 12. On the third cycle the load is descended near the equilibrium point 13. On the fourth cycle the load is again ascended near one of the extreme points 12, then descended again near the equilibrium point 13, and so on.
- the amplitude may be amplified by reversing the movement directions of the dampening actions, i.e. ascending the load near the equilibrium point 13 and descending the load near the extreme points 12, 14.
- the rotating reel and reel drive may be substituted with a linear drive arrangement.
- the linear drive arrangement may have a limited capacity for ascending and descending the load, for example 20 centimeters, 50 centimeters, 1 meter or 2 meters from a centre position of the linear drive. The limited capacity means that in some cases the load can not be descended to ground level or ascended all the way up to touch the linear drive arrangement.
- a crane arrangement comprises a reel and a reel drive for ascending and descending a load to different heights and a linear drive arrangement for ascending and descending the load only for purpose of dampening and amplifying the pendulous motion of the load. Similar methods may be used for dampening the pendulous motion of a load with the linear drive arrangement as described above in connection with the reel arrangements.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control And Safety Of Cranes (AREA)
Abstract
The invention is based on the idea of detecting a pendulous swaying motion of a load (8) and at least two positions (12, 13; 13, 14) of the pendulous motion. The pendulous motion is dampened by reeling in a rope (6) hanging the load when the load is near an extreme position (12, 14) and reeling off the rope when the load is near the equilibrium position (13). The reeling in and reeling off periods can be calculated from the at least two detected positions.
Description
- The present invention relates to a method of controlling a crane and a crane arrangement.
- Moving of a crane trolley or a crane boom which holds a load hanging by a rope causes swaying motion to the load. Usually the swaying of the load must be dampened before the load can be lowered to ground. A problem with the swaying load is that without any counter measures it takes a long time before the load is still after it has been moved and this waiting time decreases productivity of the crane significantly.
- The problem has been addressed in the prior art. The prior art solutions try to solve the problem by measuring and controlling accelerations of a crane boom or a crane trolley in order to dampen the swaying motion of a load. One example of the prior art is described in European patent
EP0717004 . The patent discloses a method for damping a load swing of a crane during a traversing motion of a load-carrying trolley. The method comprises determining substantially continuously the acceleration of the trolley/bridge and an instantaneous swing time constant, swing velocity and deviation from equilibrium of a pendulum formed by the load. When the velocity reference changes, the acceleration providing the desired change in velocity is determined and that acceleration is switched on immediately. The acceleration compensating for the swing prevailing at the moment of change of the velocity is determined and that acceleration is switched on either immediately or, if the compensating acceleration exceeds the maximum acceleration permissible to the traversing drive when switched on immediately, when the pendulum formed by the load has reached its extreme position. - The disclosed method requires complex measurements and calculations of velocities and accelerations of different elements of the system. Another shortcoming is that the method functions only with a small amplitude pendulous motion. Elimination of large amplitude pendulous motion requires higher acceleration rates from the traversing drive than it is capable of providing.
- An object of the present invention to provide a method and an apparatus for implementing the method so as to alleviate the above disadvantages. The objects of the invention are achieved by a method and an arrangement which are characterized by what is stated in the independent claims. The preferred embodiments of the invention are disclosed in the dependent claims.
- The invention is based on the idea of detecting a pendulous swaying motion of a load and at least two positions of the pendulous motion, for example both extreme positions or one extreme position and an equilibrium position. The pendulous motion is dampened by reeling in a rope hanging the load when the load is near an extreme position and reeling off the rope when the load is near the equilibrium position. The reeling in and reeling off periods can be calculated from the at least two detected positions.
- An advantage of the method and arrangement of the invention is that the arrangement is very simple and usually it requires very little or no additional hardware to a crane arrangement. The detection steps can be realized by measuring an electrical response caused by the swaying load to the reel's drive. Another advantage is that the method can be applied to virtually any amplitude of pendulous motion.
- In the following the invention will be described in greater detail by means of preferred embodiments with reference to the attached [accompanying] drawings, in which
-
Figure 1 illustrates an example of a crane arrangement with a load in pendulous motion; -
Figure 2 illustrates an embodiment of a crane arrangement with a load controlled along a first path; -
Figure 3 illustrates an embodiment of a crane arrangement with a load controlled along a second path; -
Figure 1 illustrates an example of a crane arrangement. The invention may not be restricted to any specific type of lifting device or crane. The invention may be used in many different arrangements which comprise some kind of lifting device. A crane ofFigure 1 is used as an exemplary embodiment due to its simple construction. In the embodiment ofFigure 1 the crane arrangement comprises acrane boom 4, areel arrangement 3 and arope 6. Thecrane boom 4 may comprise a trolley and a trolley drive for moving the trolley along the crane boom wherein the reel arrangement may be fixed to the trolley or it can be a part of the trolley. Therope 6 may be winded around areel 2 of thereel arrangement 3 and aload 8 is suspended by therope 6. The rope may be for example a steel cable or some other string that is flexible enough so that it can be winded on thereel 2 and strong enough to lift and hold theloads 8 that are to be lifted with the crane arrangement. In addition to thereel 2 thereel arrangement 3 comprises a reel drive for rotating the reel and a controller for controlling the reel drive. Preferably the controller is programmable and has means for measuring electrical parameters of the reel drive. The controller may also have communications means e.g. for receiving instructions and transmitting measurement results. The reel arrangement may comprise multiple ropes on one or more reels which may be controlled with one or more controllers. - When the crane boom or the trolley and the reel with it is moved to a certain position the load will move and start swinging in
pendulous motion 10 below the position where the reel was moved. Amplitude of the pendulous motion depends on the movement of the reel. High acceleration results in high amplitude to the pendulous motion and low acceleration results in low amplitude of the pendulous motion. Thependulous motion 10 has three special positions: anequilibrium position 13 and twoextreme positions equilibrium position 13 theload 8 has minimum potential energy and maximum kinetic energy. In theextreme positions load 8 has maximum potential energy and no kinetic energy. - The pendulous motion of the
load 8 is dampened if theload 8 is lifted up at theextreme positions equilibrium point 13. However, moving a mass almost instantaneously requires very high peak power and very strong ropes or cables which hold the mass. Therefore, in practice, theload 8 has to be lifted up near theextreme points rope 6 that holds theload 8. Similarly theload 8 has to be lowered near theequilibrium point 13. -
Figure 2 illustrates an example of apractical path 20 for dampening pendulous motion of aload 8. Only a moderate peak power is required to make theload 8 follow thepath 20 because the load is lifted and lowered with a relatively low speed. The lifting of theload 8 may begin when the load approaching theextreme point 14 has passed the middle point between theequilibrium position 13 and theextreme position 14. The load may be lifted continuously until the load reaches again the middle point between theequilibrium position 13 and theextreme position 14, now approaching theequilibrium position 13. At the same point, the load may be lowered down and the lowering may continue when theload 8 passes theequilibrium point 13 until the load reaches the middle point between theequilibrium point 13 and theextreme point 12. At this point, the load may be lifted again and the lifting may continue when the load reaches the extreme point and starts to approach theequilibrium point 13. Again, the lifting may continue until the load reaches again the middle point between theextreme point 12 and theequilibrium point 13 wherein lowering of the load may begin again. -
Figure 3 illustrates an example of apractical path 30 for dampening pendulous motion of aload 8. Thepath 30 ofFigure 3 requires higher peak power than following thepath 20 ofFigure 2 because the movements of theload 8 are realized in much shorter period of time. However, following thepath 30 ofFigure 3 dampens thependulous motion 10 of theload 8 faster than following thepath 20 ofFigure 2 . In addition, faster movements will cause more stress to crane structures, so thepath 30 ofFigure 3 is usable with relatively light loads compared to the lifting capacity of the crane structure. - The suspended
load 8 that is inpendulous motion 10 causes an alternating force to therope 6 and the alternating force causes an alternating torque to thereel 2 of thereel arrangement 3. The torque may be detected and measured electrically with the reel drive and/or the controller of the reel arrangement. The alternating torque has to be compensated with certain amount of power at the reel arrangement in order to prevent the reel from rotating. The amount of power needed to compensate the alternating torque may be measured to detect changes in the torque. The required measurements may be realized with modern electrical drives and controllers without any additional components in the electrical drive. Functions, properties and/or operations of the reel arrangement may already be monitored in existing reel arrangements so the changes caused by the load in the pendulous motion have to be identified and extracted from the monitored data. - The suspended load in the pendulous motion causes maximum torque to the reel at the equilibrium point and minimum torque at the extreme points. In optimal conditions, half a cycle of the pendulous motion, i.e. from one
extreme point 12 to the otherextreme point 14, is enough to determine values for quantities necessary for dampening the load's motion. In some cases even a quarter of a cycle, i.e. from oneextreme point 12 to theequilibrium point 13, may be enough for measuring the needed initial values. Duration of a cycle may be calculated or estimated when at least two points of pendulous motion are detected. Similarly, next moments of time when the load is at extreme point or equilibrium point may be calculated or estimated when the at least two points of pendulous motion are detected and time stamped. Theextreme points - The dampening actions do not have to happen at an exact point of the pendulous motion to be effective. Therefore good estimates of next moments of time when the load is at a critical point will also result to faster dampening than without any actions. In an embodiment, certain dampening actions may be omitted during certain cycles to improve detection accuracy of the extreme points. For example, the pendulous motion of the load is only monitored and measured during the first cycle. On the second cycle the load is ascended near one of the extreme points 12. On the third cycle the load is descended near the
equilibrium point 13. On the fourth cycle the load is again ascended near one of theextreme points 12, then descended again near theequilibrium point 13, and so on. - In some cases, it may be useful to amplify the amplitude of the pendulous motion of the load. The amplitude may be amplified by reversing the movement directions of the dampening actions, i.e. ascending the load near the
equilibrium point 13 and descending the load near theextreme points - In typical reel arrangements it is possible to descend a load until it reaches ground level or all the rope is reeled out. Similarly, the load can be ascended by reeling in the rope until the load blocks movement of the reel. In an embodiment where the only function of a crane arrangement is to dampen or amplify the amplitude of the pendulous motion of the load the rotating reel and reel drive may be substituted with a linear drive arrangement. The linear drive arrangement may have a limited capacity for ascending and descending the load, for example 20 centimeters, 50 centimeters, 1 meter or 2 meters from a centre position of the linear drive. The limited capacity means that in some cases the load can not be descended to ground level or ascended all the way up to touch the linear drive arrangement. In an embodiment, a crane arrangement comprises a reel and a reel drive for ascending and descending a load to different heights and a linear drive arrangement for ascending and descending the load only for purpose of dampening and amplifying the pendulous motion of the load. Similar methods may be used for dampening the pendulous motion of a load with the linear drive arrangement as described above in connection with the reel arrangements.
- It will be obvious to a person skilled in the art that, as the technology advances, the inventive concept can be implemented in various ways. The invention and its embodiments are not limited to the examples described above but may vary within the scope of the claims.
Claims (12)
- A method of controlling a crane for dampening a swaying of a load (8) suspended by a rope (6), characterized in that the method comprises steps of:detecting the swaying of the suspended load (8),detecting at least two positions of a pendulous motion (10) of the swaying suspended load (8),reeling in the rope suspending the load near extreme points (12, 14) of the pendulous motion (10) of the load (8), andreeling off the rope suspending the load near an equilibrium point (13) of the pendulous motion (10) of the load (8).
- A method according to claim 1, characterized in that the detection of the swaying of the suspended load (8) is performed by measuring torque caused by the suspended load (8) to a drive of the crane.
- A method according to claim 1 or 2, characterized in that the detection of the at least two positions of a pendulous motion of the swaying load (8) is performed by measuring torque caused by the swaying load (8) to a drive of the crane.
- A method according to any one of claims 1 to 3, characterized in that the steps of reeling in the rope (6) and reeling off the rope (6) are performed in such a manner that a path (20, 30) of the suspended load (8) has a shape of a figure of eight in a plane defined by the pendulous motion of the suspended load (8).
- A method according to any one of claims 1 to 4, characterized in that the method further comprises a step of calculating an instance of time in the future when the load is at an extreme point (12, 14) of the pendulous motion based on the at least two detected positions of the swaying load (8).
- A method according to any one of claims 1 to 5, characterized in that the method further comprises a step of calculating an instance of time when the load will be at equilibrium point of the pendulous motion based on the at least two detected positions of the swaying load.
- A method according to any one of claims 1 to 6, characterized in that the method further comprises a step of calculating a period of the pendulous motion based on the at least two detected positions of the swaying load (8).
- A method according to any one of claims 1 to 7, characterized in that the method further comprises a step of calculating the time between the detected at least two positions of a pendulous motion of the swaying load (8).
- A method according to any one of claims 1 to 8, characterized in that the step of reeling in the rope (6) takes place only when the load (8) is closer to an extreme point (12, 14) than the equilibrium point (13) of the pendulous motion of the swaying load (8) and the step of reeling off the rope (6) may take place only when the load (8) is closer to the equilibrium point (13) than an extreme point (12, 14) of the pendulous motion of the swaying load (8).
- A method according to claim 2 or 3, characterized in that the torque is measured by measuring electrical response caused by the torque in a reel drive arrangement.
- A method according to any one of claims 1 to 10, characterized in that at least one of the at least two positions to be detected is one of the following: an equilibrium point (13) of the pendulous motion and an extreme point (12, 14) of the pendulous motion.
- A crane arrangement comprising a movable crane boom (2), a reel (4) adapted to receive a rope (6) for ascending and descending a load (8), a drive for rotating said reel in order to reel in and reel off the rope (6), and a controller for controlling said drive, characterized in that said controller has means for detecting at least two positions of a pendulous motion of a load (8) and means for reeling in the rope near extreme points of the pendulous motion and reeling off the rope near an equilibrium point.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP12181009.7A EP2700604A1 (en) | 2012-08-20 | 2012-08-20 | Anti-sway control method and arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP12181009.7A EP2700604A1 (en) | 2012-08-20 | 2012-08-20 | Anti-sway control method and arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
EP2700604A1 true EP2700604A1 (en) | 2014-02-26 |
Family
ID=46724262
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP12181009.7A Withdrawn EP2700604A1 (en) | 2012-08-20 | 2012-08-20 | Anti-sway control method and arrangement |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP2700604A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104310218A (en) * | 2014-09-30 | 2015-01-28 | 苏州汇川技术有限公司 | System and method for anti-sway control of crane |
JP2020121875A (en) * | 2019-01-31 | 2020-08-13 | 住友重機械搬送システム株式会社 | crane |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0717004A2 (en) | 1994-12-13 | 1996-06-19 | ABB Industry Oy, | Method for damping the load swing of a crane |
US5938052A (en) * | 1995-04-26 | 1999-08-17 | Kabushiki Kaisha Yaskawa Denki | Rope steadying control method and apparatus for crane or the like |
US20050224438A1 (en) * | 2002-09-30 | 2005-10-13 | Siemens Aktiengesellschaft | Method and device for maintaining a position of a load suspended from a lifting gear |
-
2012
- 2012-08-20 EP EP12181009.7A patent/EP2700604A1/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0717004A2 (en) | 1994-12-13 | 1996-06-19 | ABB Industry Oy, | Method for damping the load swing of a crane |
US5938052A (en) * | 1995-04-26 | 1999-08-17 | Kabushiki Kaisha Yaskawa Denki | Rope steadying control method and apparatus for crane or the like |
US20050224438A1 (en) * | 2002-09-30 | 2005-10-13 | Siemens Aktiengesellschaft | Method and device for maintaining a position of a load suspended from a lifting gear |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104310218A (en) * | 2014-09-30 | 2015-01-28 | 苏州汇川技术有限公司 | System and method for anti-sway control of crane |
JP2020121875A (en) * | 2019-01-31 | 2020-08-13 | 住友重機械搬送システム株式会社 | crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2537728C2 (en) | Weight registration system for load suspended on lifting crane cable | |
US8627575B2 (en) | Hook pose detecting equipment and crane | |
CN102976200B (en) | Lifting control method, device and system as well as lifting appliance and hoisting machine | |
RU2722326C2 (en) | Crane, as well as a method for controlling overload protection of such a crane | |
WO2016055025A2 (en) | Crane operation range compensation method and apparatus | |
CN103145040B (en) | Crane and lifting hook lifting control method, lifting hook lifting control device and lifting hook lifting control system thereof | |
EP2896589B1 (en) | Method and apparatus | |
RU2676210C1 (en) | Device and method of controlling swinging of load suspended from lifting apparatus | |
RU2709322C2 (en) | Crane, as well as monitoring method of overload protection device of said crane | |
JP6673745B2 (en) | Crane steady rest control method and system | |
CN104609311A (en) | Dual-winding synchronous control system and dual-winding synchronous control method for crane | |
US20200017340A1 (en) | Lifting device and method for starting up the hoisting gear of such a lifting device | |
CN103264952B (en) | Construction method for hoisting converter tower steam pocket in position by using guide rod | |
CN104495622A (en) | Wind load control system, method and apparatus and hoisting equipment | |
CN103663153A (en) | Crane winding control method, device and system and crane | |
EP2700604A1 (en) | Anti-sway control method and arrangement | |
JP5287316B2 (en) | Elevator equipment | |
CN102530729B (en) | Method and system for controlling pendulum of suspender | |
CN106185634B (en) | A kind of derrick crane and its preventing colliding with top control method, device and system | |
CN201971576U (en) | Moment limiting device and tower crane with same | |
JP6280396B2 (en) | Rope trolley crane runout angle measuring device | |
US10870559B2 (en) | Apparatus and method for measuring rotational angle of sinking platform | |
CN103613000B (en) | Self-balance type control method for offshore crane | |
JP7436163B2 (en) | How to calculate the number of ropes on a pulley block | |
JP6280401B2 (en) | Rope trolley crane runout angle measuring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20140827 |