EP2340348A2 - Drilling station - Google Patents

Drilling station

Info

Publication number
EP2340348A2
EP2340348A2 EP09776076A EP09776076A EP2340348A2 EP 2340348 A2 EP2340348 A2 EP 2340348A2 EP 09776076 A EP09776076 A EP 09776076A EP 09776076 A EP09776076 A EP 09776076A EP 2340348 A2 EP2340348 A2 EP 2340348A2
Authority
EP
European Patent Office
Prior art keywords
drilling
drilling rig
mast
rig according
displaceable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP09776076A
Other languages
German (de)
French (fr)
Inventor
Hans-Peter Murr
Georg Streicher
Andreas Beck
Rupert Köckeis
Christian Kerschl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Max Streicher & Co KGaA GmbH
Original Assignee
Max Streicher & Co KGaA GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Max Streicher & Co KGaA GmbH filed Critical Max Streicher & Co KGaA GmbH
Publication of EP2340348A2 publication Critical patent/EP2340348A2/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/003Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables

Definitions

  • the present invention relates to a drilling rig or drilling apparatus, in particular a deep drilling apparatus, which is used in the offshore sector, wherein the use of this deep drilling apparatus is preferably carried out during vertical drilling for the development of deposits.
  • deposit includes in particular the occurrence of a substance in liquid, gaseous or solid form or the presence of energetically usable conditions in geological structures, in particular with respect to crude oil, natural gas and geothermal energy.
  • the drilling mast 1 is mounted on a pivot bearing 2 to be pivotable with respect to the drilling platform 4. This allows a simple and safe installation of the drilling mast 1 implement.
  • a vertically movable feed carriage 6 is fixed, which has a receiving device 8 for boring bars.
  • the drill rods 10 are fed via a pipe handler 12 and attached to the receiving device 8 and then introduced into the wellbore.
  • the drilling platform 4 is arranged on a substructure 14, which has a plurality of segments 16, which are stacked side by side and one above the other.
  • This object is achieved by a drilling rig according to claim 1, a power supply device according to claim 20, by mud pumps according to claim 25 and a device for generating hydraulic energy according to claim 26.
  • a drilling rig is provided for use on a drilling platform with a drilling mast.
  • This drilling rig is characterized in that the drilling mast and / or the power supply and / or the hydraulic energy generating device is composed of individual elements whose respective masses do not exceed a mass limit below 25 tons. This allows a faster assembly and disassembly of the drilling rig according to the invention become.
  • an installation consisting of a drilling mast and substructure can be erected or dismantled in two or three days.
  • linkages are preferably introduced into a borehole, with drilling with single boring bars being preferred.
  • a quick connector system such as, for example, a semi-automated twist lock or a stub closure to implement the necessary function.
  • the drilling platform is preferably an offshore drilling platform, which may for example be supported on the seabed or may be buoyant.
  • the drilling mast may be attached to a substructure or an extra sub-deck may be provided below the drilling mast. In the place below the drilling mast then the blow-out preventer is provided.
  • the drilling rig can have a substructure to which the drilling mast is attached and which together with the drilling mast can be displaced together on the drilling platform at least in one direction.
  • an increased mobility of the drilling mast can be implemented in adaptation to be introduced or existing holes.
  • the drilling mast may be provided with a feed slide on which preferably a rotary drive is provided and which is drivable via a hydraulic and / or electric drive, which is displaceable together with the substructure and the drilling mast. In this way, a compact unit can be implemented, are provided on the functional elements for carrying out the drilling process close to the drilling mast.
  • a hydraulic supply device can be displaced together, via which, for example, a feed slide and / or a drill rod handling device can be fed. This way you can Energy loss can be reduced and the entire rig can be compactly implemented.
  • a receiving device for boring bars and / or other drilling accessories can be displaceable together with the drilling mast. This reduces the chances of introducing the drill pipe into the borehole and saves energy.
  • the hook load on the feed slide is at least 200 American tons, preferably about 400 American tons.
  • American ton refers to the unit of mass abbreviated to tn.sh. "short ton", with a tn.sh.907.1874 kilograms.Thus, a high hook load can be realized with a compact design of the rig and can nevertheless good mobility of the drilling mast can be ensured.
  • the substructure preferably has a footprint of greater than or equal to 6m x 6m and less than or equal to 12m x 12m.
  • a substructure with such a base can be easily moved and also move in a frame in one direction while the frame is displaceable in a direction perpendicular to this first direction of movement. In this way, the drilling rig can be used in wells near which obstacles are arranged.
  • Bohrstangen- handle means which is displaceable together with the drilling mast.
  • the boring bar can be introduced into the well or be removed from this.
  • the drilling rig with respect to the drilling platform has at least one stationary generator and an electrical device for providing the energy.
  • This energy can be used both for electrical equipment and for hydraulic equipment, such as Flushing pumps, be provided.
  • the power generation can be provided separately from the drilling mast, which can also be designed to be displaceable, and thus the energy expenditure for shifting can be reduced and a secure power generation can be implemented in a stationary arrangement.
  • the stationary and / or mobile components of the drilling rig are at least partially, preferably completely, composed of individual elements whose respective mass does not exceed the stated mass limit value.
  • the drilling rig can be set up with existing crane systems on platforms in a short time. For example, it is possible to set up and commission the entire system, for example in seven or ten days. In previous systems with much larger modules, such as a much heavier, massive drill mast, such short construction or dismantling times have not been feasible.
  • the individual elements can preferably be connected to one another without welding in order to also take into account the explosion protection on the drilling platform. Said positive or non-positive connection is to be preferred.
  • the mass limit is preferably 22 tons, more preferably 17 tons or 15 tons, and preferably 11 tons.
  • the drilling mast may be slidable on a frame in a first direction and the frame may be slidable on the drilling platform in a second direction that is substantially perpendicular to the first direction.
  • the drilling mast is displaceable on the frame in the first direction without hydraulic supply device and displaceable in the second direction together with the hydraulic supply device.
  • the hydraulic supply device can alternatively be arranged on opposite sides of the drill mast with respect to the second direction.
  • it is possible to react to concrete conditions of the drilling platform and it is also possible to operate boreholes close to obstacles while at the same time implementing a common method of a hydraulic supply device with the drilling mast.
  • Such a flexible arrangement allows short operating times of the drilling rig on the drilling platforms. In combination with the short setup and dismantling times, short-term assignments can be realized.
  • the substructure may have the height of at least 2, preferably 3 standard containers, whereby standard dimensions can also be implemented in the construction of the substructure.
  • the use of the drilling rig according to the invention in an offshore drilling platform is of particular advantage, since the transport of individual elements to such a drilling platform is determined by weather influences, the transport capacity of ships and the lifting capacity of cranes either on the transport ships or on the drilling platform.
  • Standard dimensions and the weight limit, which according to the invention is preferably applied to a plurality of individual elements, also allows the transport and loading and unloading of transport vessels in adverse weather conditions.
  • the functional elements for driving, supplying and operating a drilling rig and / or the periphery are at least partially redundant.
  • the drilling rig can still be operated even in the event of failure of individual elements and can be prevented from giving up the borehole due to the sticking, for example from the drill string.
  • Such an emergency operation does not have to be performed at full power, but the elements may be adapted such that the operation of a respective functional element allows a basic supply of the wellbore.
  • the control device for monitoring the drilling process can be designed to be redundant, so that monitoring of the drilling process is possible even in the event of failure of an operator or damage to a workplace.
  • a power supply device is preferably provided for a drilling rig, more preferably for an offshore drilling rig, in which an internal combustion engine and the generator are provided in two modules and the respective mass of the internal combustion engine of the generator each have a mass limit of below or equal to 25 tons, preferably does not exceed 11 tons.
  • the separation of internal combustion engine and generator makes it possible, for example, that generator outputs of, for example, at least 500 kVA can be implemented and yet a simple transport of the individual elements to offshore drilling platforms is possible.
  • the modules can be connected to one another in a gastight manner, which takes account of explosion protection.
  • the module connection is airtight.
  • another module in which a heat exchanger and a fuel tank are provided, may be provided at the power supply device, and an even further module may be provided with the input lock and the control panel.
  • these modules can also be integrated into the module of the internal combustion engine and / or the generator.
  • flushing pumps are also provided, preferably for a drilling rig, more preferably for an offshore drilling rig, for pumping the drilling fluid with at least two, preferably four pumps whose mass does not exceed a mass limit below 25 tons, preferably 11 tons.
  • a redundant design of the pump can be implemented, which allows emergency operation of the system even in a partial failure.
  • a simple transportability of the individual elements can be ensured.
  • a device for generating hydraulic energy for a top drive and / or a handling device can be provided, wherein the device forming individual functional elements are redundant. In this way, for example, for a drilling rig, preferably an offshore drilling rig, an emergency operation for the operation of the top drive and the handling device can be implemented in order to ensure the operation of the system during a partial failure of the system.
  • FIG. 1 shows a drilling device according to the prior art
  • FIG. 2 shows an oblique top view from the left of the drilling rig according to the invention
  • FIG. 3 shows a plan view of the drilling rig according to the invention
  • FIG. 4 shows a view from the left onto the drilling rig according to the invention
  • FIG. 5 shows a front view of the drilling rig according to the invention
  • FIG. 6 shows a detail of a view from the left of the drilling rig according to the invention
  • FIG. 7 shows a detail of the plan view of the drilling rig according to the invention
  • FIG. 8 shows a view of the upper mast end with topdrive and guide for the drag chain of the drilling rig according to the invention
  • FIG. 9 shows a detail of the front view of the drilling rig according to the invention.
  • FIG. 10 shows an enlarged view of the detail on the front view of the drilling rig according to the invention
  • FIG. 11A shows a view from the left of the flushing preparation and the hydraulic units
  • FIG. 11B shows a plan view of flushing preparation and the hydraulic units
  • FIG. 11C shows a sectional view along the line AA from FIG. 11A
  • FIG. 11D shows a sectional view along the line BB
  • FIG. 11E show a sectional view on the line CC in FIG. 11A
  • FIG. 12B shows a sectional view through a generator of the drilling rig according to the invention
  • FIG. 12B shows a sectional top view of the generators of the drilling rig according to the invention
  • FIG. 12C shows a sectional view along the line DD of the generators
  • FIG. 12D shows a sectional view along the line EE in FIG. 12B of the generators the drilling rig according to the invention shows and
  • Figure 13 shows a top perspective view of the substructure from the left rear.
  • FIG. 2 An offshore vertical deep drilling rig according to the present invention is shown in Figure 2 in the oblique view from the left.
  • the offshore vertical deep drilling rig 20 is located on a substructure, eg on a drilling platform 22, which, as shown in FIG. 2, may have a raised drilling platform section 26, for example by supports 24.
  • the drilling platform 22 has a longitudinal direction X and a transverse direction Y. Parallel to the arrangement of the holes are preferably 2 guide rails 28a and 28b.
  • the drilling unit 32 and the hydraulic and conditioning unit 34 are slidably formed on the guide rails 28a, 28b in the transverse direction Y.
  • the drilling module 32 is applied via a frame 36 to the guide rails 28a, 28b, on which the drilling module 32 is displaceable in the longitudinal direction X of the drilling platform. In this way, the drilling unit can be positioned over a desired borehole 30 by displacement in both the X and Y directions.
  • the hydraulic and conditioning unit 34 is mounted on the guide rails 28a, 28b via frame elements 37a, 37b.
  • FIG. 5 shows a front view of the drilling unit 32 and the hydraulic and conditioning unit 34 in the position shown in FIG.
  • the drilling unit 32 is then located on the left-hand side, while the hydraulic and conditioning unit 34 is arranged on the right-hand side.
  • the hydraulic pressure accumulator 38 for the blow-out preventer an electronic control device 40, electrical power distribution modules 42a, 42b and generators 44a and 44b are provided.
  • the drilling unit 32 and the hydraulic and conditioning unit 34 are supplied with electric power from the electronic control unit 40 and the electric power distribution modules 42a, 42b.
  • FIG. 3 shows a plan view of the deep drilling rig 20 according to the invention.
  • the relative distance to the electrical power distribution modules 42a, 42b and the electronic control device 40 changes Change of this relative distance are not shown in the present invention guide chains used, so that at different relative position of the units 32 and 34 on the drilling platform 22 a secure power supply from the devices 40, 42a, 42b is ensured.
  • An advantage of the present deep drilling rig is that it is modularly assembled. It takes into account requirements for loads to be moved by platform cranes.
  • the upper limit may be 20t or 17t, 15t, 13t, or preferably 11t for all the individual elements to be transported that make up the rig.
  • the compliance with the maximum limit for the mass of the individual elements or modules makes it possible with conventional platform cranes the individual elements for the drilling rig according to the invention can be loaded and unloaded.
  • mechanical connection devices for mounting on the drilling platform 22 without welding are preferred for connecting the individual elements.
  • the use of conventional transport ships for transporting the individual elements also allows the modules to be transported to the drilling platform even in difficult weather conditions and rough seas.
  • the left side view shown in Fig. 4 the enlarged left side view shown in Fig. 6 will be the front view shown in Fig. 5 and the front view details shown in Figs. 8 to 10 3, and the details of this plan view of FIG. 3 shown in FIG. 7, and with reference to the detailed views of FIG. 11, the structure of the drilling unit 32 and the hydraulic and conditioning unit 34 are explained.
  • the drilling unit 32 can be removed in the overall view Fig. 5 and has on the frame 36 a base 46, on which the Fig. 10 removable working platform 48 is located. Above the working platform 48 extends from this substantially perpendicularly the drilling mast 50. Immediately above the working platform 48 wind protection elements 52a, 52b are provided
  • the substructure 46 has, as it is also the view from the left rear of FIG. 13 can be removed, in the present embodiment, 3 floors, which are connected to each other via spiral staircases.
  • the trip tank 56 is provided above the blow-out preventer 54.
  • the present invention is not limited to the provision of the 3-storey substructure and the provision of spiral staircases for connecting the floors, but any number of floors adapted to the drilling requirements, including, for example, a ladder connection between the floors may be provided.
  • the drilling mast 50 has four individual segments 58a-d, which are mechanically connected to one another. It has been found by the inventors that this subdivision of the drilling mast 50 into segments is advantageous for erecting on offshore platforms. Details of the mounting method of the drilling mast will be explained in more detail below.
  • the feed carriage 60 further comprises a drill motor 62 with receiving device 63 for attaching the drill rods and a rod shaft 65 with attached elevator 64.
  • This rod shaft 65 is used for quick removal of the drill pipe from the well and re-introduction of this to the already drilled depth.
  • the lines for supplying the drill motor 62 and feed carriage 60 are fastened to a guide element 70 which extends beyond the upper segment 58a of the drill mast with feed carriage 60 located above the drill mast 50.
  • the guide element 70 has a segment with a longitudinal extent in the longitudinal direction X. on, whereby several hydraulic lines for the drill motor 62 can be kept side by side with little mutual interference.
  • a boring bar handler 66 and a screwing device 68 are provided on the boring mast 50 adjacent the work platform 48.
  • a wedge not shown, is attached, via which the already introduced into the borehole boring bars can be held during the screwing.
  • it is arranged above the boring bar handling device 66 vertically above the boring bar introduced into the borehole and screwed by means of the screwing device 68.
  • the bolted boring bars are then driven via the drill motor 62 on the feed carriage 60, so that the drill rod attached via the boring bar handling device 66 can be introduced into the borehole.
  • the use of the boring bar handler 66 will be described in greater detail below.
  • the attachment of the drill rods is monitored via a control cabin 72 which is provided adjacent to the work platform 48.
  • the control cabin 72 preferably has two workstations via which the same operating tasks can be implemented.
  • This redundancy points to a second advantage of the invention that preferably at least central devices are redundantly provided in the offshore vertical deep drilling rig 20 according to the invention, so that the operation of the deep drilling rig is maintained in the event of failure of a device via the second device with identical basic function can be. In this way, a high overall technical availability of the rig is achieved, which is particularly advantageous in offshore installations, where once necessary repairs are always associated with a great deal of time and expense.
  • each of these transverse modules 74a-d has a respective frame 75a-d into which a respective purging pump 76a-d with gear is inserted.
  • each of the frames 75a-d is transported individually and each of the scavenging pumps 76a-d.
  • the rinsing pumps with gear are preferably selected so that the respective pumping mass is below the mass restriction, for example, 11t.
  • the inventors' concept of redundantly designing the facilities in the drilling rig can be implemented.
  • Two longitudinal modules 78a, 78b in which the tanks for the drilling mud are located, are applied to the four transverse modules 74a-d in the longitudinal direction X.
  • a sectional view of the tanks is shown in Fig. 11 D with the section B-B in Fig. 11A. Again, the redundant design of the facilities is preferred. Further, the provision of two tanks of different capacity in the longitudinal module 78a and three tanks in the longitudinal module 78b is exemplary only and any tank configuration tuned with the mud pumps 78a-d may be used in the longitudinal modules.
  • the two longitudinal modules 78a, 78b have a distance b from each other and can be connected to each other by a bridge. The distance b is due to safety considerations. On the other hand, a compact hydraulic and conditioning unit 34 should be provided.
  • the longitudinal modules 78a, 78b there are two longitudinal modules 80a, 80b.
  • the screen unit is provided, while in the longitudinal module 80b are the hydraulic units 82, 84 for the drill motor 62, more precisely for rotating and moving the receiving device 63 and feed carriage 60 are.
  • the embodiment of the hydraulic and conditioning unit 34 described above is only one example and there may be any modification with regard to the number and the function of the modules or individual elements of this unit 34. Although it is favorable from an energetic point of view to provide the hydraulics for the feed slide 60 in the uppermost modules. But these can also be provided at any point in the unit 34.
  • the flushing treatment and / or the flushing pumps and / or the flushing tank and / or the hydraulic supply system may be formed stationary on the drilling platform 22.
  • the co-provision and co-movement of the drilling unit 32 and the hydraulic and conditioning unit 34 is a difference from conventional stationary onshore deep drilling rigs where the tank system, mud pumps, and hydraulic units for driving the topdrive are at least partially housed stationary in the drilling platform 22 are.
  • the electric power distribution modules 42a, b, the generators 44a, 44b, and the electronic control unit 40 are constructed according to the mass restriction for individual elements of the rig. This is shown by way of example with reference to a generator 44a in Figs. 12A to 12D, wherein Fig. 12A is a sectional side view of the generator 44a, Fig. 12B is a sectional plan view, Fig. 12C is a sectional view taken on line DD in Fig. 12A and Fig. 12D is a sectional view EE in Fig. 12B.
  • the generators for offshore installation are designed as one-piece modules.
  • the generator module 44a has been divided into four modules 86a-d.
  • the module 86a heat exchangers 88 for the heat transfer of engine, generator, diesel and residual heat and a fuel tank 90 are provided.
  • the module 86b is the drive motor for the generator, which is also sized so that this at least without the frame of the module 86b does not exceed the specified mass limit of, for example, 11t.
  • a drive motor with a power above 1000 kW is preferably preferred.
  • the minimum output of the generators will thus be above 4000 kW.
  • any other power adapted to the required drilling work can be provided with any number of generators.
  • the generators are preferably designed to be redundant, so that in case of accident, the well can be secured with reduced power.
  • the module 86c contains the generator with corresponding heat dissipation, while the module 86d has an input lock 92 and a control field 94.
  • the electrical power distribution modules 42a, b which are also modular with respect to the mass restriction, there are electrical devices to feed the electrical customers of the rig at corresponding terminals, for example, there are the frequency converter for the hydraulic pumps in the hydraulic and Conditioning unit 34 and the circuit breaker.
  • the electronic control unit 40 provides the control signals for the drilling process and carries out the signal conditioning from and to the control cabin 72.
  • the fuel tank system to supply the generators.
  • the fuel, preferably diesel, in the fuel tanks 90 is provided only as a daily reserve.
  • diesel tanks may be provided on the power generation platform 26 between the drilling unit 32 and the electric power distribution module 42b.
  • a drill rod rack 96 Attached to the work platform 48 at the windshield 52a opposite side and adjacent to the windshield 52b and the control cab 72 is a drill rod rack 96, as shown in FIG. On this boring bar rack 96 are the boring bars, which are to be introduced directly to the borehole. Not shown in the drawings is a drill rod bearing bearing a larger number of drill rods than on the drill rod rack, preferably for a plurality of days.
  • drill rod handling device 66 the recording of the horizontal in Fig. 9 on the drill rack rack 96 boring bars 98, the vertical orientation of these and the screwing of these by means of the screwing 68 with the through the wedge system with respect to the drilling platform held drill pipe in the borehole.
  • An inspection and maintenance crane 102 to which a man basket 104 can be attached, is also attached to the work platform 48. In this way, the maintenance personnel can quickly reach the desired locations.
  • an access platform 106 with stairs 108 is provided on the hydraulic and conditioning unit 34, via which unit 34 is accessible.
  • the access platform 106 is connected by stairs 110 to an access to the control cabin 72.
  • the staircase 108 is preferably arranged so that in a process of the units 32 and 34 over the entire length of the guide rails 28a, 28b the staircase 108 can move past the crane 100 for the drill rods. Alternatively, a temporary removal of the crane 100 may take place to move the units 32, 34. If the use of the deep drilling rig according to the invention is desired only in a certain area of the guide rails 28a, 28b, the installation location of staircase 108 and platform 106 can be adapted accordingly.
  • the bridges 87 and the access platform 106 with associated stairs are, on the one hand, designed such that a movement beyond the desired extension in the transverse direction Y is possible without colliding with devices on or on the platform.
  • the arrangement of the stairs ensures that the units 32, 34 are constantly accessible.
  • the present invention can also be implemented modularly in the form of only individual functional elements.
  • a drilling rig for use on a drilling platform with a drilling mast, which is characterized in that the drilling mast and / or the power supply and / or the hydraulic energy generating device are composed of individual elements whose respective masses have a mass limit below or below do not exceed 25 1.
  • a drilling rig for use on a drilling platform with a drilling mast, the drilling rig having a substructure to which the drilling mast is attached and which is displaceable together with the drilling mast on the drilling platform at least in one direction, the drilling mast resting on a frame is slidable in a first direction and the frame is slidable on the drilling platform in a second direction which is substantially perpendicular to the first direction, wherein the drilling mast on the frame in the first direction without a arranged next to the substructure hydraulic and / or processing unit is displaceable and displaceable in the second direction together with the hydraulic and / or conditioning unit.
  • the drilling mast is composed of individual elements whose respective masses do not exceed a mass limit of less than or equal to 25 t. In this way, the drilling mast can also be provided variably at corner regions of the drilling platform and maximum space utilization is possible.
  • a drilling rig for use on a drilling rig with a drilling mast, characterized in that the drilling mast and / or the power supply and / or the hydraulic power generating means are composed of individual elements whose respective masses have a mass limit below or equal to 25 1 do not exceed.
  • the drilling rig according to the first aspect has a substructure on which the drilling mast is mounted and which, together with the drilling mast on the drilling platform, can be displaced together in at least one direction.
  • a hydraulic supply device is displaceable together with the drilling mast.
  • a receiving device for drill rods and / or other drilling accessories can be displaced together with the drill mast in accordance with a fifth aspect.
  • the hook load on the feed slide is at least 200 American tons, preferably about 400 American tons.
  • the substructure has a footprint of greater than or equal to 6mx6m and less than or equal to 12mx12m.
  • a boring bar handle device is provided, which is displaceable together with the boring mast.
  • a drilling rig according to any one of the first to eighth aspects, according to a ninth aspect, has fixed at least one generator and electrical means for providing energy relative to the drilling platform.
  • the stationary and / or mobile components of the drilling rig at least partially, preferably completely, composed of individual elements whose respective mass does not exceed said mass limit.
  • the individual elements can be connected to one another without welding.
  • the mass limit value is 22 t, more preferably 17 t or 15 t, and preferably 11 t.
  • the drilling mast is slidable on a frame in a first direction, and the frame on the drilling platform is slidable in a second direction substantially perpendicular to the first direction.
  • the mast is slidable on the frame in the first direction without hydraulic supply and slidable in the second direction together with the hydraulic supply.
  • the hydraulic feeding device with respect to the second direction may alternatively be arranged on opposite sides of the drilling mast.
  • the substructure has the height of at least two, preferably three, standard containers.
  • the drilling platform is an offshore drilling platform.
  • the control device for monitoring the drilling operation is designed to be redundant. It becomes one according to a twentieth aspect
  • Energy supply device preferably for a drilling rig, provided in which an internal combustion engine and the generator are provided in two modules and the respective mass of the internal combustion engine and the generator does not exceed a mass limit of less than or equal to 251, preferably 11t.
  • the generator power is at least 500 kVA.
  • the modules are connectable to each other in a gas-tight manner.
  • a heat exchanger and a fuel tank are provided.
  • flushing pumps preferably for a drilling rig, for pumping the drilling mud with at least two, preferably four, pumps whose mass does not exceed a mass limit of less than or equal to 251, preferably 11t.
  • a device for generating hydraulic energy for a top drive and / or a handling device provided, wherein the device forming individual functional elements are redundant.
  • Control cab a-d Cross module a-d Frame a-d Flush pump a, b Longitudinal module a, b Longitudinal module

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to a drilling station that is used on a drilling platform, comprises a drilling mast, and is characterized in that the drilling mast and/or the power supply and/or the hydraulic power generating device is/are composed of individual elements, each of which does not weigh more than 25 t. A joining process requiring no welding, preferably by means of quick release connectors, is preferred.

Description

Beschreibung description
Bohranlagedrilling rig
Die vorliegende Erfindung bezieht sich auf eine Bohranlage bzw. Bohrvorrichtung, insbesondere eine Tiefbohrvorrichtung, die im Offshore-Bereich zum Einsatz gelangt, wobei der Einsatz dieser Tiefbohrvorrichtung bevorzugt beim Vertikalbohren zur Erschließung von Lagerstätten erfolgt. Der Begriff „Lagerstätte" beinhaltet dabei insbesondere das Vorkommen eines Stoffes in flüssiger, gasförmiger oder fester Form oder das Vorliegen von energetisch nutzbaren Verhältnissen in geologischen Strukturen, insbesondere in Bezug auf Erdöl, Erdgas und geothermische Energie.The present invention relates to a drilling rig or drilling apparatus, in particular a deep drilling apparatus, which is used in the offshore sector, wherein the use of this deep drilling apparatus is preferably carried out during vertical drilling for the development of deposits. The term "deposit" includes in particular the occurrence of a substance in liquid, gaseous or solid form or the presence of energetically usable conditions in geological structures, in particular with respect to crude oil, natural gas and geothermal energy.
Stand der TechnikState of the art
Das Vertikalbohren gelangt zur Ausbeutung von Öl- und Gasfeldern aber auch bei der Gewinnung geothermischer Energie zum Einsatz. Aus dem Stand der Technik ist eine Vertikalbohranlage vom Typ VDD 370 der Max Streicher GmbH & Co. KG aA bekannt, die in Figur 1 beispielhaft wiedergegeben ist und nachfolgend kurz beschrieben ist.Vertical drilling is used for the exploitation of oil and gas fields but also for the production of geothermal energy. From the prior art, a vertical drilling rig of the type VDD 370 Max Streicher GmbH & Co. KG aA is known, which is exemplified in Figure 1 and described briefly below.
Der Bohrmast 1 ist an einem Schwenklager 2 gelagert, um in Bezug auf die Bohrplattform 4 verschwenkbar zu sein. Dadurch lässt sich eine einfache und sichere Montage des Bohrmastes 1 umsetzen. An den Bohrmast 1 ist ein vertikal beweglicher Vorschubschlitten 6 befestigt, der ein Aufnahmevorrichtung 8 für Bohrstangen aufweist. Die Bohrstangen 10 werden über einen Pipehandler 12 zugeführt und an der Aufnahmevorrichtung 8 befestigt und anschließend in das Bohrloch eingebracht. Die Bohrplattform 4 ist auf einem Unterbau 14 angeordnet, der eine Mehrzahl von Segmenten 16 aufweist, die nebeneinander und übereinander gestapelt sind.The drilling mast 1 is mounted on a pivot bearing 2 to be pivotable with respect to the drilling platform 4. This allows a simple and safe installation of the drilling mast 1 implement. To the drilling mast 1, a vertically movable feed carriage 6 is fixed, which has a receiving device 8 for boring bars. The drill rods 10 are fed via a pipe handler 12 and attached to the receiving device 8 and then introduced into the wellbore. The drilling platform 4 is arranged on a substructure 14, which has a plurality of segments 16, which are stacked side by side and one above the other.
Eine derartige Anlage ist in den PCT-Anmeldungen PCT/EP2005/000452, PCT/EP2005/000453, PCT/EP2005/000454 und PCT/EP2005/000455 beschrieben. Ein Einsatz dieser Bohranlage ist auch im Offshore-Bereich möglich. Dabei wird die Bohranlage entweder im zusammengebauten Zustand an den Bohrplatz gebracht oder während der Schleppzeit zumindest teilweise zusammengebaut.Such a system is described in PCT applications PCT / EP2005 / 000452, PCT / EP2005 / 000453, PCT / EP2005 / 000454 and PCT / EP2005 / 000455. An application of this drilling rig is also possible in the offshore sector. Here is the Drilling rig either brought to the drilling site in the assembled state or at least partially assembled during towing time.
Während die genannte Offshore-Bohranlage dafür vorgesehen ist, an einem Standort neu errichtet zu werden, bestehen bei der heutigen Offshore-Ausbeutung von Öl- und Gasfeldern zunehmend Probleme darin, dass die Bohranlagen existierender Plattformen technisch veraltet und häufig nicht mehr in Betrieb genommen werden können, jedoch die Ausbeutung unter Verwendung bestehender Bohrlöcher gewünscht wird.While the said offshore drilling rig is designed to be rebuilt at one site, today's offshore exploitation of oil and gas fields is becoming increasingly problematic in that the rigs of existing platforms may become out of date and technically out of date However, the exploitation using existing holes is desired.
Der Abbau vorhandener Bohranlagen und die Neuerrichtung von Bohranlagen ist zeit- und kostenintensiv, insbesondere aufgrund der großen, über See mit Spezialschiffen zu verbringenden Bestandteile der Bohranlage und der Vielzahl an auszuführenden Verbindungsvorgängen, insbesondere von Schweißvorgängen.The mining of existing rigs and the construction of new rigs is time consuming and costly, especially due to the large, to be spent on the sea with special ships components of the rig and the variety of to be performed connecting operations, especially welding operations.
Zusammenfassung der ErfindungSummary of the invention
Es ist Aufgabe der Erfindung, eine Bohranlage bzw. einzelnen Funktionselemente von dieser vorzusehen, mit der/mit denen ein schneller Transport und ein schneller Zusammen- und Abbau möglich ist und die den strengen Sicherheitsvorschriften bei Offshore-Bohranlagen, beispielsweise in Bezug auf den Norsok-Standard, Rechnung trägt/tragen.It is an object of the invention to provide a drilling rig or individual functional elements of this with which / with which a quick transport and a quick assembly and disassembly is possible and the strict safety regulations in offshore drilling rigs, for example with respect to the Norsok- Standard, invoice / carry.
Diese Aufgabe wird durch eine Bohranlage nach Anspruch 1 , eine Energieversorgungseinrichtung nach Anspruch 20, durch Spülungspumpen nach Anspruch 25 und eine Vorrichtung zum Erzeugen von hydraulischer Energie nach Anspruch 26 gelöst.This object is achieved by a drilling rig according to claim 1, a power supply device according to claim 20, by mud pumps according to claim 25 and a device for generating hydraulic energy according to claim 26.
Es wird eine Bohranlage zum Einsatz auf einer Bohrplattform mit einem Bohrmast vorgesehen. Diese Bohranlage ist dadurch gekennzeichnet, dass der Bohrmast und/oder die Energieversorgung und/oder die Erzeugungseinrichtung für hydraulische Energie aus Einzelelementen zusammengesetzt ist, deren jeweiligen Massen ein Massengrenzwert von unterhalb von 25 Tonnen nicht überschreiten. Dadurch kann ein schneller Zusammen- und Abbau der erfindungsgemäßen Bohranlage ermöglicht werden. Eine Anlage aus Bohrmast und Unterbau lässt sich dabei beispielsweise in zwei oder drei Tagen auf- bzw. abbauen. Als Einzelelemente werden nachfolgend bevorzugt diejenigen Elemente bezeichnet, die zusätzlich beispielsweise auf eine existierende Bohrplattform aufgebracht werden können und die ohne Schweißen, vorzugsweise form- oder kraftflüssig, stärker bevorzugt durch ein Schnellverbindersystem, wie zum Beispiel ein semi automated twist lock bzw. einen Stubverschluß verbindbar sind, um die notwendige Funktion umzusetzen. Mit der Bohranlage werden bevorzugt Gestänge in ein Bohrloch eingeführt, wobei das Bohren mit Einzelbohrstangen bevorzugt ist. Auch kann mit der erfindungsgemäßen Bohranlage ein. Loch hergestellt und ein Gestänge eingebracht werden oder ein Gestänge in ein bestehendes Loch eingebracht werden. Die Erfindung kann jedoch auf beliebige Bohrverfahren angewendet werden. Die Bohrplattform ist bevorzugt eine Offshore-Bohrplattform, wobei diese beispielsweise auf dem Meeresboden abgestützt sein kann oder schwimmfähig sein kann. Darüber hinaus kann der Bohrmast an einem Unterbau angebracht sein oder es kann ein Extra-Zwischendeck unterhalb des Bohrmastes vorgesehen sein. In dem Platz unterhalb des Bohrmastes ist dann der Blow-out-preventer vorgesehen.A drilling rig is provided for use on a drilling platform with a drilling mast. This drilling rig is characterized in that the drilling mast and / or the power supply and / or the hydraulic energy generating device is composed of individual elements whose respective masses do not exceed a mass limit below 25 tons. This allows a faster assembly and disassembly of the drilling rig according to the invention become. For example, an installation consisting of a drilling mast and substructure can be erected or dismantled in two or three days. As individual elements, preference is given below to those elements which can additionally be applied, for example, to an existing drilling platform and which can be connected without welding, preferably by molding or by force, more preferably by a quick connector system, such as, for example, a semi-automated twist lock or a stub closure to implement the necessary function. With the drilling rig, linkages are preferably introduced into a borehole, with drilling with single boring bars being preferred. Also, with the drilling rig according to the invention a. Hole produced and a linkage are introduced or a linkage are introduced into an existing hole. However, the invention can be applied to any drilling method. The drilling platform is preferably an offshore drilling platform, which may for example be supported on the seabed or may be buoyant. In addition, the drilling mast may be attached to a substructure or an extra sub-deck may be provided below the drilling mast. In the place below the drilling mast then the blow-out preventer is provided.
Die Bohranlage kann einen Unterbau aufweisen, an dem der Bohrmast angebracht ist und der zusammen mit dem Bohrmast auf der Bohrplattform zumindest in eine Richtung gemeinsam verschiebbar ist. Dadurch kann eine erhöhte Mobilität des Bohrmastes in Anpassung an einzubringende oder bestehende Bohrlöcher umgesetzt werden. Darüber hinaus kann der Bohrmast mit einem Vorschubschlitten versehen sein, an dem vorzugsweise ein Rotationsantrieb vorgesehen ist und der über einen hydraulischen und/oder elektrischen Antrieb antreibbar ist, der gemeinsam mit dem Unterbau und dem Bohrmast verschiebbar ist. Auf diese Weise lässt sich eine kompakte Baueinheit umsetzen, an der Funktionselemente zur Vornahme des Bohrvorgangs nahe am Bohrmast vorgesehen sind.The drilling rig can have a substructure to which the drilling mast is attached and which together with the drilling mast can be displaced together on the drilling platform at least in one direction. As a result, an increased mobility of the drilling mast can be implemented in adaptation to be introduced or existing holes. In addition, the drilling mast may be provided with a feed slide on which preferably a rotary drive is provided and which is drivable via a hydraulic and / or electric drive, which is displaceable together with the substructure and the drilling mast. In this way, a compact unit can be implemented, are provided on the functional elements for carrying out the drilling process close to the drilling mast.
Mit dem Bohrmast kann eine hydraulische Versorgungseinrichtung gemeinsam verschiebbar sein, über die beispielsweise ein Vorschubschlitten und/oder eine Bohrstangen-Handhabevorrichtung speisbar ist. Auf diese Weise kann ein Energieverlust verringert werden und kann die gesamte Bohranlage kompakt umgesetzt werden.With the drilling mast, a hydraulic supply device can be displaced together, via which, for example, a feed slide and / or a drill rod handling device can be fed. This way you can Energy loss can be reduced and the entire rig can be compactly implemented.
Mit dem Bohrmast kann ferner eine Aufnahmeeinrichtung für Bohrstangen und/oder sonstigen Bohrzubehör gemeinsam verschiebbar sein. Dadurch verringern sich die Wege zum Einbringen des Bohrgestänges in das Bohrloch und kann Energie gespart werden.Furthermore, a receiving device for boring bars and / or other drilling accessories can be displaceable together with the drilling mast. This reduces the chances of introducing the drill pipe into the borehole and saves energy.
Entsprechend einer vorteilhaften Ausführung beträgt die Hakenlast am Vorschubschlitten zumindest 200 amerikanische Tonnen, vorzugsweise ungefähr 400 amerikanische Tonnen. Unter „amerikanischer Tonne" wird die mit tn.sh. abgekürzte Maßeinheit der Masse "short ton" angesehen, wobei eine tn.sh. 907,1874 Kilogramm entspricht. Somit kann eine hohe Hakenlast bei einer kompakten Gestaltung der Bohranlage realisiert werden und kann dennoch eine gute Beweglichkeit des Bohrmastes sichergestellt werden.According to an advantageous embodiment, the hook load on the feed slide is at least 200 American tons, preferably about 400 American tons. The term "American ton" refers to the unit of mass abbreviated to tn.sh. "short ton", with a tn.sh.907.1874 kilograms.Thus, a high hook load can be realized with a compact design of the rig and can nevertheless good mobility of the drilling mast can be ensured.
Der Unterbau hat bevorzugt eine Grundfläche von größer gleich 6m x 6m und kleiner bzw. gleich 12m x 12m. Ein Unterbau mit einer derartigen Grundfläche lässt sich einfach bewegen und auch in einem Rahmen in einer Richtung bewegen, während der Rahmen in einer Richtung senkrecht zu dieser ersten Bewegungsrichtung verschiebbar ist. Auf diese Weise kann auch die Bohranlage bei Bohrlöchern eingesetzt werden, nahe denen Hindernisse angeordnet sind.The substructure preferably has a footprint of greater than or equal to 6m x 6m and less than or equal to 12m x 12m. A substructure with such a base can be easily moved and also move in a frame in one direction while the frame is displaceable in a direction perpendicular to this first direction of movement. In this way, the drilling rig can be used in wells near which obstacles are arranged.
Darüber hinaus kann bei der vorliegenden Erfindung eine Bohrstangen- Handhabeeinrichtung vorgesehen sein, die mit dem Bohrmast gemeinsam verschiebbar ist. Dadurch kann unabhängig von der Position des Bohrmastes durch die Bohrstangen- Handhabeeinrichtung die Bohrstange in das Bohrloch eingebracht werden bzw. aus diesem entfernt werden.In addition, in the present invention may be provided a Bohrstangen- handle means which is displaceable together with the drilling mast. Thereby, regardless of the position of the drill mast by the Bohrstangen- handle device, the boring bar can be introduced into the well or be removed from this.
Bei der erfindungsgemäßen Bohranlage wird bevorzugt, dass die Bohranlage in Bezug auf die Bohrplattform ortsfest zumindest einen Generator und eine elektrische Einrichtung zum Bereitstellen der Energie aufweist. Diese Energie kann sowohl für elektrische Einrichtungen als auch für hydraulische Einrichtungen, wie zum Beispiel Spülungspumpen, vorgesehen sein. Auf diese Weise kann die Energieerzeugung getrennt vom Bohrmast, der auch verschiebbar ausgeführt sein kann, vorgesehen werden und somit den Energieaufwand zum Verschieben verringert werden und eine sichere Energieerzeugung in einer stationären Anordnung umgesetzt werden.In the drilling rig according to the invention, it is preferred that the drilling rig with respect to the drilling platform has at least one stationary generator and an electrical device for providing the energy. This energy can be used both for electrical equipment and for hydraulic equipment, such as Flushing pumps, be provided. In this way, the power generation can be provided separately from the drilling mast, which can also be designed to be displaceable, and thus the energy expenditure for shifting can be reduced and a secure power generation can be implemented in a stationary arrangement.
Darüber hinaus kann bevorzugt werden, dass die stationären und/oder die mobilen Bestandteile der Bohranlage zumindest teilweise, vorzugsweise vollständig, aus Einzelelementen zusammengesetzt sind, deren jeweilige Masse den genannten Massengrenzwert nicht überschreitet. Somit kann die Bohranlage mit bestehenden Krananlagen auf Plattformen in kurzer Zeit aufgebaut werden. Beispielsweise sind ein Aufbau und eine Inbetriebnahme der gesamten Anlage beispielsweise in sieben oder zehn Tagen möglich. Bei bisherigen Anlagen mit wesentlich größeren Modulen, beispielsweise einem wesentlich schwereren, massiven Bohrmast, sind derartige kurze Aufbau- bzw. Abbauzeiten nicht realisierbar gewesen. Die Einzelelemente können bevorzugt ohne Schweißen miteinander verbunden werden, um auch dem Explosionsschutz auf der Bohrplattform Rechnung zu tragen. Die genannte form- bzw. kraftschlüssige Verbindung ist zu bevorzugen. Der Massengrenzwert beträgt vorzugsweise 22 Tonnen, stärker bevorzugt 17 Tonnen oder 15 Tonnen und beträgt vorzugsweise 11 Tonnen. Diese Werte erlauben den Erfindern die vorstehend genannte kurzen Aufbau- bzw. Abbauzeit für die Bohranlage umzusetzen. Dieser Wert wird auch durch die Hubkraft der daraufbestehenden Bohrplattform vorhandenen Kräne beeinflusst, wobei mit den genannten Werten der Einsatz der erfindungsgemäßen Bohranlage auf eine Vielzahl von Bohrplattformen ermöglicht wird.In addition, it may be preferred that the stationary and / or mobile components of the drilling rig are at least partially, preferably completely, composed of individual elements whose respective mass does not exceed the stated mass limit value. Thus, the drilling rig can be set up with existing crane systems on platforms in a short time. For example, it is possible to set up and commission the entire system, for example in seven or ten days. In previous systems with much larger modules, such as a much heavier, massive drill mast, such short construction or dismantling times have not been feasible. The individual elements can preferably be connected to one another without welding in order to also take into account the explosion protection on the drilling platform. Said positive or non-positive connection is to be preferred. The mass limit is preferably 22 tons, more preferably 17 tons or 15 tons, and preferably 11 tons. These values allow the inventors to implement the abovementioned short construction time for the drilling rig. This value is also influenced by the lifting capacity of the existing drilling platform existing cranes, with said values, the use of the drilling rig according to the invention is made possible on a variety of drilling platforms.
Der Bohrmast kann auf einem Rahmen in eine erste Richtung verschiebbar und der Rahmen kann auf der Bohrplattform in eine zweite Richtung verschiebbar sein, die zur ersten Richtung im Wesentlichen rechwinklig verläuft. Dadurch ist eine Zweiteilung in Bohrmast und Versorgungsanlagen möglich und kann eine schnelle Verschiebbarkeit des Bohrmastes umgesetzt werden.The drilling mast may be slidable on a frame in a first direction and the frame may be slidable on the drilling platform in a second direction that is substantially perpendicular to the first direction. As a result, a bipartition in drilling mast and supply systems is possible and can be implemented a quick displaceability of the drill mast.
Bevorzugt ist der Bohrmast auf den Rahmen in die erste Richtung ohne hydraulische Versorgungseinrichtung verschiebbar und in die zweite Richtung zusammen mit der hydraulischen Versorgungseinrichtung verschiebbar. Dadurch lässt sich der Energieaufwand zum Verschieben in die erste Richtung minimieren und auch ein schnelles Verschieben des Bohrmastes in die erste Richtung umsetzen. Bei der erfindungsgemäßen Bohranlage kann die hydraulische Versorgungseinrichtung in Bezug auf die zweite Richtung alternativ an entgegengesetzten Seiten des Bohrmastes angeordnet werden. Dadurch kann auf konkrete Gegebenheiten der Bohrplattform reagiert werden und können auch Bohrlöcher nahe Hindernissen bedient werden und gleichzeitig ein gemeinsames Verfahren einer hydraulischen Versorgungseinrichtung mit dem Bohrmast umgesetzt werden. Eine derartig flexible Anordnung ermöglicht kurze Einsatzzeiten der Bohranlage auf den Bohrplattformen. In Kombination mit den kurzen Auf- bzw. Abbauzeiten können kurzzeitige Einsätze realisiert werden.Preferably, the drilling mast is displaceable on the frame in the first direction without hydraulic supply device and displaceable in the second direction together with the hydraulic supply device. By doing so leaves minimize the energy required to move in the first direction and also implement a fast moving the drilling mast in the first direction. In the drilling rig according to the invention, the hydraulic supply device can alternatively be arranged on opposite sides of the drill mast with respect to the second direction. As a result, it is possible to react to concrete conditions of the drilling platform and it is also possible to operate boreholes close to obstacles while at the same time implementing a common method of a hydraulic supply device with the drilling mast. Such a flexible arrangement allows short operating times of the drilling rig on the drilling platforms. In combination with the short setup and dismantling times, short-term assignments can be realized.
Der Unterbau kann die Höhe von zumindest 2, vorzugsweise 3 Standardcontainern aufweisen, wodurch Standardmaße auch bei der Errichtung des Unterbaus umsetzbar sind.The substructure may have the height of at least 2, preferably 3 standard containers, whereby standard dimensions can also be implemented in the construction of the substructure.
Der Einsatz der erfindungsgemäßen Bohranlage bei einer Offshore-Bohrplattform ist von besonderen Vorteilen, da der Transport von Einzelelementen zu einer derartigen Bohrplattform durch Witterungseinflüsse, die Transportkapazität von Schiffen und die Tragkraft von Kränen entweder auf den Transportschiffen oder auf der Bohrplattform mitbestimmt wird. Standardmaße und die Gewichtsbeschränkung, die entsprechend der Erfindung bevorzugt auf eine Vielzahl von Einzelelementen angewendet wird, ermöglicht auch den Transport und das Be- bzw. Entladen von Transportschiffen bei ungünstigen Witterungsverhältnissen.The use of the drilling rig according to the invention in an offshore drilling platform is of particular advantage, since the transport of individual elements to such a drilling platform is determined by weather influences, the transport capacity of ships and the lifting capacity of cranes either on the transport ships or on the drilling platform. Standard dimensions and the weight limit, which according to the invention is preferably applied to a plurality of individual elements, also allows the transport and loading and unloading of transport vessels in adverse weather conditions.
Die Funktionselemente zum Ansteuern, zum Versorgen und zum Betreiben eines Bohrgerätes und/oder der Peripherie sind zumindest teilweise redundant ausgebildet. Dadurch kann die Bohranlage auch bei Ausfall von Einzelelementen noch betrieben werden und kann ein Aufgeben des Bohrloches aufgrund des Steckenbleibens, beispielsweise vom Bohrgestänge, verhindert werden. Ein derartiger Notbetrieb muss nicht mit voller Leistung erfolgen, sondern die Elemente können dahingehend angepasst sein, dass der Betrieb eines jeweiligen Funktionselements eine Grundversorgung des Bohrloches zulässt. Die Steuereinrichtung zum Überwachen des Bohrvorgangs kann redundant ausgebildet sein, so dass auch bei Ausfall einer Bedienungsperson oder Beschädigung eines Arbeitsplatzes eine Überwachung des Bohrvorgangs möglich ist.The functional elements for driving, supplying and operating a drilling rig and / or the periphery are at least partially redundant. As a result, the drilling rig can still be operated even in the event of failure of individual elements and can be prevented from giving up the borehole due to the sticking, for example from the drill string. Such an emergency operation does not have to be performed at full power, but the elements may be adapted such that the operation of a respective functional element allows a basic supply of the wellbore. The control device for monitoring the drilling process can be designed to be redundant, so that monitoring of the drilling process is possible even in the event of failure of an operator or damage to a workplace.
Erfindungsgemäß wird eine Energieversorgungseinrichtung vorzugsweise für eine Bohranlage, stärker bevorzugt für eine Offshore-Bohranlage vorgesehen, bei der eine Brennkraftmaschine und der Generator in zwei Modulen vorgesehen sind und die jeweilige Masse der Brennkraftmaschine des Generators jeweils einen Massengrenzwert von unterhalb von bzw. gleich 25 Tonnen, vorzugsweise 11 Tonnen nicht überschreitet. Die Trennung von Brennkraftmaschine und Generator ermöglicht es, dass beispielsweise Generatorleistungen von beispielsweise zumindest 500 kVA umsetzbar sind und dennoch ein einfacher Transport der Einzelelemente zu Offshore- Bohrplattformen möglich ist.According to the invention, a power supply device is preferably provided for a drilling rig, more preferably for an offshore drilling rig, in which an internal combustion engine and the generator are provided in two modules and the respective mass of the internal combustion engine of the generator each have a mass limit of below or equal to 25 tons, preferably does not exceed 11 tons. The separation of internal combustion engine and generator makes it possible, for example, that generator outputs of, for example, at least 500 kVA can be implemented and yet a simple transport of the individual elements to offshore drilling platforms is possible.
Die Module können gasdicht miteinander verbindbar sein, wodurch dem Explosionsschutz Rechnung getragen wird. Vorzugsweise erfolgt die Modulverbindung luftdicht. Optional kann ein weiteres Modul, in dem ein Wärmetauscher und ein Kraftstofftank vorgesehen sind, bei der Energieversorgungseinrichtung vorgesehen sein und ein noch weiteres Modul mit Eingangsschleuse und Steuerungsfeld vorgesehen sein. Alternativ dazu lassen sich diese Module auch in das Modul der Brennkraftmaschine und/oder des Generators integrieren. Eine derartige modulare Unterteilung ermöglicht ein striktes Beachten eines Massengrenzwertes und eine volle Funktionsfähigkeit mit hoher Leistung auf Bohranlagen, bevorzugt Offshore- Bohranlagen.The modules can be connected to one another in a gastight manner, which takes account of explosion protection. Preferably, the module connection is airtight. Optionally, another module, in which a heat exchanger and a fuel tank are provided, may be provided at the power supply device, and an even further module may be provided with the input lock and the control panel. Alternatively, these modules can also be integrated into the module of the internal combustion engine and / or the generator. Such a modular subdivision allows strict attention to mass limit and full high performance performance on drilling rigs, preferably offshore rigs.
Erfindungsgemäß werden ferner Spülungspumpen, vorzugsweise für eine Bohranlage, stärker bevorzugt für eine Offshore-Bohranlage vorgesehen, zum Pumpen der Bohrspülung mit zumindest zwei, vorzugsweise vier Pumpen, deren Masse einen Massengrenzwert von unterhalb von 25 Tonnen, vorzugsweise 11 Tonnen nicht überschreiten, vorgesehen. Dadurch kann eine redundante Ausbildung der Pumpen umgesetzt werden, was einen Notbetrieb der Anlage auch bei einem Teilausfall ermöglicht. Darüber hinaus kann eine einfache Transportierbarkeit der Einzelelemente sichergestellt werden. Erfindungsgemäß kann darüber hinaus eine Vorrichtung zum Erzeugen von hydraulischer Energie für einen Top-Drive und/oder eine Handhabevorrichtung vorgesehen werden, wobei die die Vorrichtung bildenden einzelnen Funktionselemente redundant ausgebildet sind. Auf diese Weise kann beispielsweise für eine Bohranlage, bevorzugt eine Offshore-Bohranlage ein Notbetrieb für den Betrieb des Top-Drive und der Handhabevorrichtung umgesetzt werden, um bei einem Teilausfall der Anlage den Betrieb der Anlage sicherzustellen.According to the invention, flushing pumps are also provided, preferably for a drilling rig, more preferably for an offshore drilling rig, for pumping the drilling fluid with at least two, preferably four pumps whose mass does not exceed a mass limit below 25 tons, preferably 11 tons. As a result, a redundant design of the pump can be implemented, which allows emergency operation of the system even in a partial failure. In addition, a simple transportability of the individual elements can be ensured. According to the invention, moreover, a device for generating hydraulic energy for a top drive and / or a handling device can be provided, wherein the device forming individual functional elements are redundant. In this way, for example, for a drilling rig, preferably an offshore drilling rig, an emergency operation for the operation of the top drive and the handling device can be implemented in order to ensure the operation of the system during a partial failure of the system.
Erfindungsgemäße Weiterbildungen sind Gegenstand der Unteransprüche.Inventive developments are the subject of the dependent claims.
Kurze Beschreibung der ZeichnungenBrief description of the drawings
Nachfolgend wird die Erfindung anhand der beiliegenden Zeichnungen beschrieben, in denenIn the following, the invention will be described with reference to the attached drawings, in which
Figur 1 eine Bohrvorrichtung nach dem Stand der Technik zeigt,FIG. 1 shows a drilling device according to the prior art,
Figur 2 eine schräge Draufsicht von links der erfindungsgemäßen Bohranlage zeigt,FIG. 2 shows an oblique top view from the left of the drilling rig according to the invention,
Figur 3 eine Draufsicht auf die erfindungsgemäße Bohranlage zeigt,FIG. 3 shows a plan view of the drilling rig according to the invention,
Figur 4 eine Ansicht von links auf die erfindungsgemäße Bohranlage zeigt,FIG. 4 shows a view from the left onto the drilling rig according to the invention,
Figur 5 eine Ansicht von vorn auf die erfindungsgemäße Bohranlage zeigt,FIG. 5 shows a front view of the drilling rig according to the invention,
Figur 6 einen Ausschnitt einer Ansicht von links der erfindungsgemäßen Bohranlage zeigt,FIG. 6 shows a detail of a view from the left of the drilling rig according to the invention,
Figur 7 einen Ausschnitt der Draufsicht auf die erfindungsgemäße Bohranlage zeigt, Figur 8 eine Ansicht des oberen Mastendes mit Topdrive und Führung für die Schleppkette der erfindungsgemäßen Bohranlage zeigt,FIG. 7 shows a detail of the plan view of the drilling rig according to the invention, FIG. 8 shows a view of the upper mast end with topdrive and guide for the drag chain of the drilling rig according to the invention,
Figur 9 einen Ausschnitt der Vorderansicht auf die erfindungsgemäße Bohranlage zeigt,FIG. 9 shows a detail of the front view of the drilling rig according to the invention,
Figur 10 eine vergrößerte Ansicht des Ausschnitts auf der Vorderansicht der erfindungsgemäßen Bohranlage zeigt,FIG. 10 shows an enlarged view of the detail on the front view of the drilling rig according to the invention,
Figur 11 A eine Ansicht von links auf die Spülungsaufbereitung und die Hydraulikaggregate zeigt, Figur 11 B eine Draufsicht auf Spülungsaufbereitung und die Hydraulikaggregate zeigt, Figur 11 C eine Schnittansicht an der Linie A-A aus Figur 11A zeigt, Figur 11 D eine Schnittansicht an der Linie B-B aus Figur 11 A und Figur 11 E eine Schnittansicht an der Linie C-C in Figur 11A zeigt,11A shows a view from the left of the flushing preparation and the hydraulic units, FIG. 11B shows a plan view of flushing preparation and the hydraulic units, FIG. 11C shows a sectional view along the line AA from FIG. 11A, FIG. 11D shows a sectional view along the line BB FIG. 11A and FIG. 11E show a sectional view on the line CC in FIG. 11A,
Figur 12A eine Schnittansicht durch einen Generator der erfindungsgemäßen Bohranlage zeigt, Figur 12B eine geschnittene Draufsicht auf die Generatoren der erfindungsgemäßen Bohranlage zeigt, Figur 12C eine Schnittansicht an der Linie D-D der Generatoren zeigt und Figur 12D eine Schnittansicht an der Linie E-E in Figur 12B der Generatoren der erfindungsgemäßen Bohranlage zeigt und12B shows a sectional view through a generator of the drilling rig according to the invention, FIG. 12B shows a sectional top view of the generators of the drilling rig according to the invention, FIG. 12C shows a sectional view along the line DD of the generators, and FIG. 12D shows a sectional view along the line EE in FIG. 12B of the generators the drilling rig according to the invention shows and
Figur 13 eine perspektivische Draufsicht auf den Unterbau von links hinten zeigt.Figure 13 shows a top perspective view of the substructure from the left rear.
Beschreibung der bevorzugten AusführungsformDescription of the preferred embodiment
Eine Offshore-Vertikal-Tiefbohranlage entsprechend der vorliegenden Erfindung ist in Figur 2 in der Schrägansicht von links gezeigt.An offshore vertical deep drilling rig according to the present invention is shown in Figure 2 in the oblique view from the left.
Die Offshore-Vertikal-Tiefbohranlage 20 befindet sich auf einer Unterstruktur, z.B. auf einer Bohrplattform 22, die, wie es in Fig. 2 gezeigt ist, einen beispielsweise durch Stützen 24 erhöhten Bohrplattformabschnitt 26 haben kann. Die Bohrplattform 22 weist eine Längsrichtung X und eine Querrichtung Y auf. Parallel zur Anordnung der Bohrlöcher befinden sich vorzugsweise 2 Führungsschienen 28a und 28b. Auf den Führungsschienen 28a, 28b befinden sich die Bohreinheit 32 und die Hydraulik- und Aufbereitungseinheit 34. Die Einheiten 32 und 34 sind auf den Führungsschienen 28a, 28b in Querrichtung Y verschiebbar ausgebildet.The offshore vertical deep drilling rig 20 is located on a substructure, eg on a drilling platform 22, which, as shown in FIG. 2, may have a raised drilling platform section 26, for example by supports 24. The drilling platform 22 has a longitudinal direction X and a transverse direction Y. Parallel to the arrangement of the holes are preferably 2 guide rails 28a and 28b. On the Guide rails 28a, 28b are the drilling unit 32 and the hydraulic and conditioning unit 34. The units 32 and 34 are slidably formed on the guide rails 28a, 28b in the transverse direction Y.
Das Bohrmodul 32 ist über einen Rahmen 36 auf die Führungsschienen 28a, 28b aufgebracht, auf dem das Bohrmodul 32 in Längsrichtung X der Bohrplattform verschiebbar ist. Auf diese Weise kann die Bohreinheit über einem gewünschten Bohrloch 30 durch Verschiebung sowohl in X- als auch in Y-Richtung positioniert werden. Die Hydraulik- und Aufbereitungseinheit 34 ist über Rahmenelemente 37a, 37b auf die Führungsschienen 28a, 28b aufgebracht.The drilling module 32 is applied via a frame 36 to the guide rails 28a, 28b, on which the drilling module 32 is displaceable in the longitudinal direction X of the drilling platform. In this way, the drilling unit can be positioned over a desired borehole 30 by displacement in both the X and Y directions. The hydraulic and conditioning unit 34 is mounted on the guide rails 28a, 28b via frame elements 37a, 37b.
Um unterschiedlichen Positionen der Bohrlöcher 30 Rechnung zu tragen, können die Positionen von Bohreinheit 32 und Hydraulik- und Aufbereitungseinheit 34 vertauscht werden. In Figur 5 ist eine Vorderansicht der Bohreinheit 32 und der Hydraulik- und Aufbereitungseinheit 34 in der in Figur 2 gezeigten Position dargestellt. Bei vertauschten Einheiten 32 und 34 befindet sich im Gegensatz zu Figur 5 dann die Bohreinheit 32 auf der linken Seite, während die Hydraulik- und Aufbereitungseinheit 34 auf der rechten Seite angeordnet ist.In order to take account of different positions of the boreholes 30, the positions of the drilling unit 32 and the hydraulic and conditioning unit 34 can be reversed. FIG. 5 shows a front view of the drilling unit 32 and the hydraulic and conditioning unit 34 in the position shown in FIG. In the case of exchanged units 32 and 34, in contrast to FIG. 5, the drilling unit 32 is then located on the left-hand side, while the hydraulic and conditioning unit 34 is arranged on the right-hand side.
Zughörig zu der Bohranlage sind der hydraulische Druckspeicher 38 für den Blow- Out-Preventer, eine elektronische Steuereinrichtung 40, elektrische Energieverteilermodule 42a, 42b und Generatoren 44a und 44b vorgesehen. Der Bohreinheit 32 und der Hydraulik- und Aufbereitungseinheit 34 wird die elektrische Energie von der elektronischen Steuereinrichtung 40 und den elektrischen Energieverteilermodule 42a, 42b zugeführt.Toward the drilling rig, the hydraulic pressure accumulator 38 for the blow-out preventer, an electronic control device 40, electrical power distribution modules 42a, 42b and generators 44a and 44b are provided. The drilling unit 32 and the hydraulic and conditioning unit 34 are supplied with electric power from the electronic control unit 40 and the electric power distribution modules 42a, 42b.
Figur 3 ist eine Draufsicht auf die erfindungsgemäße Tiefbohranlage 20 dargestellt. Wie Fig. 3 entnehmbar ist, ändert sich bei einer Bewegung der Bohreinheit 32 und der Hydraulik- und Aufbereitungseinheit 34 auf den Führungsschienen 28, 28b in Y- Richtung der Relativabstand zu den elektrischen Energieverteilermodule 42a, 42b und der elektronischen Steuereinrichtung 40. Zur Berücksichtigung der Änderung dieses Relativabstands werden in der vorliegenden Erfindung nicht dargestellte Führungsketten zum Einsatz gebracht, so dass bei unterschiedlicher Relativposition der Einheiten 32 und 34 auf der Bohrplattform 22 eine sichere Energieversorgung von den Einrichtungen 40, 42a, 42b gewährleistet ist.FIG. 3 shows a plan view of the deep drilling rig 20 according to the invention. As can be seen in FIG. 3, when the drilling unit 32 and the hydraulic and conditioning unit 34 move on the guide rails 28, 28b in the Y direction, the relative distance to the electrical power distribution modules 42a, 42b and the electronic control device 40 changes Change of this relative distance are not shown in the present invention guide chains used, so that at different relative position of the units 32 and 34 on the drilling platform 22 a secure power supply from the devices 40, 42a, 42b is ensured.
Ein Vorteil der vorliegenden Tiefbohranlage besteht darin, dass diese modular zusammengesetzt ist. Dabei werden Anforderungen an durch Plattformkräne zu bewegende Lasten Rechnung getragen. Beispielsweise kann die obere Grenze für alle zu transportierenden Einzelelemente, aus denen die Bohranlage zusammengesetzt ist, 20t oder 17t, 15t, 13t, oder bevorzugt 11t betragen. Das Einhalten der Maximalgrenze für die Masse der Einzelelemente bzw. Module ermöglicht es, dass mit herkömmlichen Plattformkränen die Einzelelemente für die erfindungsgemäße Bohranlage be- und entladen werden können. Darüber hinaus werden zur Verbindung der Einzelelemente mechanische Verbindungseinrichtungen für die Montage auf der Bohrplattform 22 ohne Schweißen bevorzugt.. Der Einsatz herkömmlicher Transportschiffe zum Transport der Einzelelemente ermöglicht ferner, dass die Module auch bei schwierigen Wetterlagen und stärkerem Seegang zur Bohrplattform befördert werden können.An advantage of the present deep drilling rig is that it is modularly assembled. It takes into account requirements for loads to be moved by platform cranes. For example, the upper limit may be 20t or 17t, 15t, 13t, or preferably 11t for all the individual elements to be transported that make up the rig. The compliance with the maximum limit for the mass of the individual elements or modules makes it possible with conventional platform cranes the individual elements for the drilling rig according to the invention can be loaded and unloaded. In addition, mechanical connection devices for mounting on the drilling platform 22 without welding are preferred for connecting the individual elements. The use of conventional transport ships for transporting the individual elements also allows the modules to be transported to the drilling platform even in difficult weather conditions and rough seas.
Nachfolgend werden auch unter Bezugnahme auf die in Fig. 4 gezeigte Seitenansicht von links, die in Fig. 6 gezeigte vergrößerte Darstellung der Seitenansicht von links, die in Fig. 5 gezeigte Vorderansicht und die in den Fig. 8 bis 10 gezeigten Einzelheiten aus der Vorderansicht aus Fig. 5, auf die Draufsicht von Fig. 3 und die in Fig. 7 gezeigten Einzelheiten dieser Draufsicht aus Fig. 3 sowie unter Bezugnahme auf die Detailansichten aus Fig. 11 der Aufbau der Bohreinheit 32 und der Hydraulik- und Aufbereitungseinheit 34 erläutert.Hereinafter, referring also to the left side view shown in Fig. 4, the enlarged left side view shown in Fig. 6 will be the front view shown in Fig. 5 and the front view details shown in Figs. 8 to 10 3, and the details of this plan view of FIG. 3 shown in FIG. 7, and with reference to the detailed views of FIG. 11, the structure of the drilling unit 32 and the hydraulic and conditioning unit 34 are explained.
Die Bohreinheit 32 ist in der Gesamtansicht Fig. 5 entnehmbar und weist auf dem Rahmen 36 einen Unterbau 46 auf, auf dem sich die Fig. 10 entnehmbare Arbeitsbühne 48 befindet. Oberhalb der Arbeitsbühne 48 erstreckt sich von dieser im Wesentlichen senkrecht der Bohrmast 50. Unmittelbar oberhalb der Arbeitsbühne 48 sind Windschutzelemente 52a, 52b vorgesehenThe drilling unit 32 can be removed in the overall view Fig. 5 and has on the frame 36 a base 46, on which the Fig. 10 removable working platform 48 is located. Above the working platform 48 extends from this substantially perpendicularly the drilling mast 50. Immediately above the working platform 48 wind protection elements 52a, 52b are provided
Der Unterbau 46 weist, wie es auch der Ansicht von links hinten aus Fig. 13 entnehmbar ist, im vorliegenden Ausführungsbeispiel 3 Etagen auf, die über Wendeltreppen miteinander verbunden sind. Im Unterbau 46 ist der Blow-out-Preventer 54 angeordnet Der Trip-Tank 56 ist oberhalb des Blow-out-Preventer 54 vorgesehen. Die vorliegende Erfindung ist jedoch nicht auf das Vorsehen des Unterbaus mit 3 Etagen und das Vorsehen von Wendeltreppen zur Verbindung der Etagen beschränkt, sondern es kann eine beliebige, an die Bohranforderungen angepasste Etagenanzahl mit auch beispielsweise einer Leiterverbindung zwischen den Etagen vorgesehen werden.The substructure 46 has, as it is also the view from the left rear of FIG. 13 can be removed, in the present embodiment, 3 floors, which are connected to each other via spiral staircases. In the base 46 is the blow-out preventer The trip tank 56 is provided above the blow-out preventer 54. However, the present invention is not limited to the provision of the 3-storey substructure and the provision of spiral staircases for connecting the floors, but any number of floors adapted to the drilling requirements, including, for example, a ladder connection between the floors may be provided.
Der Bohrmast 50 weist in der in Fig. 5 gezeigten Ausführung vier Einzelsegemente 58a-d auf, die mechanisch miteinander verbunden sind. Durch die Erfinder wurde herausgefunden, dass diese Unterteilung des Bohrmastes 50 in Segmente für ein Errichten auf Offshore-Plattformen von Vorteil ist. Einzelheiten zum Montageverfahren des Bohrmastes werden weiter unten näher ausgeführt.In the embodiment shown in FIG. 5, the drilling mast 50 has four individual segments 58a-d, which are mechanically connected to one another. It has been found by the inventors that this subdivision of the drilling mast 50 into segments is advantageous for erecting on offshore platforms. Details of the mounting method of the drilling mast will be explained in more detail below.
Am Bohrmast 50 sind in seiner Längsrichtung Z Zahnstangen 59 und Laufschienen angebracht, an denen ein in Fig. 8 näher gezeigter Vorschubschlitten 60 in Längsrichtung Z verfahrbar ist, Dabei wird zumindest ein Zahnrad am Vorschubschlitten 60 durch zumindest einen Vorschubmotor angetrieben. Femer sind am Vorschubschlitten Haltebremsen ausgebildet, über die der Vorschubschlitten 60 am Bohrmast 50 ortsfest angeordnet werden kann. Der Vorschubschlitten 60 weist ferner einen Drillmotor 62 mit Aufnahmevorrichtung 63 zum Anbringen der Bohrstangen sowie einen Stabschaft 65 mit angebrachtem Elevator 64 auf. Dieser Stabschaft 65 dient zum schnellen Entfernen des Bohrgestänges aus dem Bohrloch und erneuten Einbringen von diesem bis auf die bereits gebohrte Tiefe. Während des Bohrvorgangs, bei dem das Drehmoment vom Drillmotor 62 über die Aufnahmevorrichtung 63 auf den im Bohrloch befindlichen Bohrkopf aufgebracht wird, wird der Stabschaft 65 mit dem Elevator 64 weggeschwenkt.On the mast 50 Z racks 59 and rails are mounted in its longitudinal direction, to which a shown in Fig. 8 in detail feed carriage 60 in the longitudinal direction Z is moved, at least one gear on the feed carriage 60 is driven by at least one feed motor. Furthermore, holding brakes are formed on the feed carriage, by way of which the feed slide 60 can be arranged in a stationary manner on the drill mast 50. The feed carriage 60 further comprises a drill motor 62 with receiving device 63 for attaching the drill rods and a rod shaft 65 with attached elevator 64. This rod shaft 65 is used for quick removal of the drill pipe from the well and re-introduction of this to the already drilled depth. During the drilling operation, in which the torque from the drill motor 62 is applied via the receiving device 63 to the wellhead located in the borehole, the rod shaft 65 is pivoted away with the elevator 64.
Die Leitungen zur Versorgung des Drillmotors 62 und Vorschubschlittens 60 sind an einem Führungselement 70 befestigt, das sich bei am Bohrmast 50 oben befindlichem Vorschubschlitten 60 über das obere Segment 58a des Bohrmastes hinaus erstreckt. Wie es der in Fig. 4 gezeigten Ansicht von links entnehmbar ist, weist das Führungselement 70 ein Segment mit einer Längserstreckung in Längsrichtung X auf, wodurch mehrere Hydraulikleitungen für den Drillmotor 62 nebeneinander nur mit geringer gegenseitiger Beeinflussung gehalten werden können.The lines for supplying the drill motor 62 and feed carriage 60 are fastened to a guide element 70 which extends beyond the upper segment 58a of the drill mast with feed carriage 60 located above the drill mast 50. As can be seen from the left in the view shown in FIG. 4, the guide element 70 has a segment with a longitudinal extent in the longitudinal direction X. on, whereby several hydraulic lines for the drill motor 62 can be kept side by side with little mutual interference.
Wie es den Fig. 9 und 10 entnehmbar sind, sind am Bohrmast 50 benachbart zur Arbeitsbühne 48 eine Bohrstangenhandhabevorrichtung 66 und eine Verschraubeinrichtung 68 vorgesehen. An der Arbeitsbühne 48 ist ein nicht dargestellter Keil befestigt, über die die bereits in das Bohrloch eingebrachten Bohrstangen während des Verschraubens gehalten werden können. Zum Anbringen einer weiteren Bohrstange wird diese über die Bohrstangen-Handhabevorrichtung 66 senkrecht über der in das Bohrloch eingebrachten Bohrstange angeordnet und vermittels der Verschraubeinrichtung 68 verschraubt. Die verschraubten Bohrstangen werden dann über den Drillmotor 62 am Vorschubschlitten 60 angetrieben, so dass die über die Bohrstangen-Handhabevorrichtung 66 angebrachte Bohrstange in das Bohrloch einbringbar ist. Die Verwendung der Bohrstangen-Handhabevorrichtung 66 wird detaillierter weiter unten dargestellt.As can be seen in FIGS. 9 and 10, a boring bar handler 66 and a screwing device 68 are provided on the boring mast 50 adjacent the work platform 48. At the platform 48, a wedge, not shown, is attached, via which the already introduced into the borehole boring bars can be held during the screwing. For attaching a further boring bar, it is arranged above the boring bar handling device 66 vertically above the boring bar introduced into the borehole and screwed by means of the screwing device 68. The bolted boring bars are then driven via the drill motor 62 on the feed carriage 60, so that the drill rod attached via the boring bar handling device 66 can be introduced into the borehole. The use of the boring bar handler 66 will be described in greater detail below.
Das Anbringen der Bohrstangen wird über eine Steuerkabine 72, die benachbart zur Arbeitsbühne 48 vorgesehen ist, überwacht. Die Steuerkabine 72 weist bevorzugt zwei Arbeitsplätze auf, über die die gleichen Bedienaufgaben umsetzbar sind. Diese Redundanz weist auf einen zweiten Vorteil der Erfindung hin, dass bevorzugt zumindest zentrale Einrichtungen bei der erfindungsgemäßen Offshore-Vertikal-Tiefbohranlage 20 redundant vorgesehen sind, so dass bei dem Ausfall von einer Einrichtung über die zweite Einrichtung mit identischer Grundfunktion der Betrieb der Tiefbohranlage aufrecht erhalten werden kann. Auf diese Weise wird eine hohe technische Gesamtverfügbarkeit der Bohranlage erreicht, was insbesondere bei Offshore-Anlagen von Vorteil ist, wo einmal notwendige Reparaturen immer mit einem großem Zeit- und Kostenaufwand verbunden sind.The attachment of the drill rods is monitored via a control cabin 72 which is provided adjacent to the work platform 48. The control cabin 72 preferably has two workstations via which the same operating tasks can be implemented. This redundancy points to a second advantage of the invention that preferably at least central devices are redundantly provided in the offshore vertical deep drilling rig 20 according to the invention, so that the operation of the deep drilling rig is maintained in the event of failure of a device via the second device with identical basic function can be. In this way, a high overall technical availability of the rig is achieved, which is particularly advantageous in offshore installations, where once necessary repairs are always associated with a great deal of time and expense.
Nun wir die Hydraulik- und Aufbereitungseinheit 34 auch in Bezug zur Bohreinheit 32 näher erläutert.Now we the hydraulic and conditioning unit 34 also explained in relation to the drilling unit 32 in more detail.
Wie es der Vorderansicht in Fig. 9, der Ansicht von links aus Fig. 11A und der geschnittenen Draufsicht in Fig. 11E entnehmbar ist, sind auf den zwei nebeneinander in einem vorbestimmten Abstand a angeordneten, im Wesentlichen rechteckigen Rahmenelementen 37a, 37b, die sich jeweils in der Längsrichtung X der Bohrplattform 22 erstrecken, vier Quermodule 74a-d vorgesehen, die parallel angeordnet sind. Jedes dieser Quermodule 74a-d weist einen jeweiligen Rahmen 75a-d auf, in den eine jeweilige Spülpumpe 76a-d mit Getriebe eingebracht ist.As can be seen from the front view in Fig. 9, the view from the left in Fig. 11A and the sectional plan view in Fig. 11E, the two are side by side arranged at a predetermined distance a, substantially rectangular frame members 37a, 37b, each extending in the longitudinal direction X of the drilling platform 22, four transverse modules 74a-d are provided, which are arranged in parallel. Each of these transverse modules 74a-d has a respective frame 75a-d into which a respective purging pump 76a-d with gear is inserted.
Herkömmlicherweise werden weniger als 4 Spülpumpen bei einer Vertikalbohranlage eingesetzt. Im vorliegenden Fall hat es sich jedoch als vorteilhaft herausgestellt, vier Spülpumpen zu verwenden. Aufgrund der von den Erfindern vorgeschlagenen Massenbeschränkung für die Einzelelemente wird jeder der Rahmen 75a-d einzeln und jede der Spülpumpen 76a-d transportiert. Dabei werden die Spülpumpen mit Getriebe vorzugsweise so ausgewählt, dass die jeweilige Pumpenmasse unterhalb der Massenbeschränkung, beispielsweise 11t liegt. Mit dem Vorsehen von vier Spülpumpen kann darüber hinaus das Konzept der Erfinder, die Einrichtungen bei der Bohranlage redundant auszubilden, umgesetzt werden.Conventionally, less than 4 mud pumps are used in a vertical drilling rig. In the present case, however, it has proven to be advantageous to use four rinsing pumps. Due to the mass limitation for the individual elements proposed by the inventors, each of the frames 75a-d is transported individually and each of the scavenging pumps 76a-d. The rinsing pumps with gear are preferably selected so that the respective pumping mass is below the mass restriction, for example, 11t. Moreover, with the provision of four rinse pumps, the inventors' concept of redundantly designing the facilities in the drilling rig can be implemented.
Auf die vier Quermodule 74a-d sind in Längsrichtung X zwei Längsmodule 78a, 78b aufgebracht, in denen sich die Tanks für die Bohrspülung befinden. Eine Schnittansicht der Tanks ist in Fig. 11 D mit dem Schnitt B-B in Fig. 11 A wiedergegeben. Auch hier wird die redundante Ausbildung der Einrichtungen bevorzugt. Ferner ist das Vorsehen von zwei Tanks mit unterschiedlichem Fassungsvermögen im Längsmodul 78a und von drei Tanks im Längsmodul 78b nur beispielhaft und es kann eine beliebige Tankkonfiguration, die mit den Spülpumpen 78a-d abgestimmt ist in den Längsmodulen zum Einsatz gelangen. Die zwei Längsmodule 78a, 78b haben einen Abstand b zueinander und können durch eine Brücke miteinander verbunden sein. Der Abstand b ist durch sicherheitstechnische Überlegungen bedingt. Andrerseits soll eine kompakte Hydraulik- und Aufbereitungseinheit 34 vorgesehen sein.Two longitudinal modules 78a, 78b, in which the tanks for the drilling mud are located, are applied to the four transverse modules 74a-d in the longitudinal direction X. A sectional view of the tanks is shown in Fig. 11 D with the section B-B in Fig. 11A. Again, the redundant design of the facilities is preferred. Further, the provision of two tanks of different capacity in the longitudinal module 78a and three tanks in the longitudinal module 78b is exemplary only and any tank configuration tuned with the mud pumps 78a-d may be used in the longitudinal modules. The two longitudinal modules 78a, 78b have a distance b from each other and can be connected to each other by a bridge. The distance b is due to safety considerations. On the other hand, a compact hydraulic and conditioning unit 34 should be provided.
Auf den Längsmodulen 78a, 78b befinden sich zwei Längsmodule 80a, 80b. Im Längsmodul 80a befindet sich, wie es der Schnittansicht A-A in Fig. 11C entnehmbar ist, die Siebeinheit, während im Längsmodul 80b die Hydraulikaggregate 82, 84 für den Drillmotor 62, genauer gesagt zum Rotieren und zum Verfahren von Aufnahmevorrichtung 63 und Vorschubschlitten 60, vorgesehen sind. Die vorstehend beschriebene Ausgestaltung der Hydraulik- und Aufbereitungseinheit 34 ist jedoch nur ein Beispiel und es kann eine beliebige Abwandlung hinsichtlich der Anzahl und der Funktion der Module bzw. Einzelelemente dieser Einheit 34 vorliegen. Zwar ist es unter energetischen Gesichtspunkten günstig, die Hydraulik für den Vorschubschlitten 60 in den obersten Modulen vorzusehen. Doch auch diese kann an beliebiger Stelle in der Einheit 34 vorgesehen sein. Darüber hinaus können die Spülungsaufbereitung und/oder die Spülungspumpen und/oder die Spülungstank und/oder die hydraulische Versorgungsanlage stationär auf der Bohrplattform 22 ausgebildet sein.On the longitudinal modules 78a, 78b there are two longitudinal modules 80a, 80b. In the longitudinal module 80a, as can be seen from the sectional view AA in FIG. 11C, the screen unit is provided, while in the longitudinal module 80b are the hydraulic units 82, 84 for the drill motor 62, more precisely for rotating and moving the receiving device 63 and feed carriage 60 are. However, the embodiment of the hydraulic and conditioning unit 34 described above is only one example and there may be any modification with regard to the number and the function of the modules or individual elements of this unit 34. Although it is favorable from an energetic point of view to provide the hydraulics for the feed slide 60 in the uppermost modules. But these can also be provided at any point in the unit 34. In addition, the flushing treatment and / or the flushing pumps and / or the flushing tank and / or the hydraulic supply system may be formed stationary on the drilling platform 22.
In der Ansicht von links in Fig. 6 sind die Brücken 87 wiedergegeben, über die die Quermodule 74a-d und die Längsmodule 78a-d zugänglich sind.In the view from the left in Fig. 6, the bridges 87 are shown, over which the transverse modules 74a-d and the longitudinal modules 78a-d are accessible.
Das gemeinsame Vorsehen und das gemeinsame Bewegen der Bohreinheit 32 und der Hydraulik- und Aufbereitungseinheit 34 stellt einen Unterschied zu herkömmlichen stationären Onshore-Tiefbohranlagen dar, bei denen die Tankanlage, die Spülpumpen und die Hydraulikaggregate zum Antrieb des Topdrives zumindest teilweise stationär in der Bohrplattform 22 untergebracht sind.The co-provision and co-movement of the drilling unit 32 and the hydraulic and conditioning unit 34 is a difference from conventional stationary onshore deep drilling rigs where the tank system, mud pumps, and hydraulic units for driving the topdrive are at least partially housed stationary in the drilling platform 22 are.
Den Hydraulikaggregaten in der Hydraulik- und Aufbereitungseinheit 34 wird die elektrische Energie von den elektrischen Energieverteilermodule 42a, b und den Generatoren 44a, 44b zugeleitet. Auch ist es möglich, dass Steuersignale für die Hydraulikaggregate in der elektronischen Steuereinheit 40 erzeugt werden und der Einheit 34 zugeführt werden.The hydraulic units in the hydraulic and conditioning unit 34, the electrical energy from the electrical power distribution modules 42a, b and the generators 44a, 44b supplied. It is also possible that control signals for the hydraulic units are generated in the electronic control unit 40 and supplied to the unit 34.
Auch die elektrischen Energieverteilermodule 42a, b, die Generatoren 44a, 44b und die elektronische Steuereinheit 40 sind entsprechend der Masseeinschränkung für Einzelelemente der Bohranlage konstruiert. Dieses ist beispielhaft unter Bezugnahme auf einen Generator 44a in den Fig. 12A bis 12D gezeigt, wobei Fig. 12A eine geschnittene Seitenansicht des Generators 44a darstellt, Fig. 12B eine geschnittene Draufsicht, Fig. 12C eine Schnittansicht an der Linie D-D in Fig. 12A und Fig. 12D eine Schnittansicht E-E in Fig. 12B. Herkömmlicherweise sind die Generatoren für Offshore-Anlage als einstückige Module ausgebildet. Bei der vorliegenden Erfindung wurde zum Einhalten der durch die Erfinder als vorteilhaft erkannte Massebeschränkung auf beispielsweise 11t das Generatormodul 44a in vier Module 86a-d unterteilt. Im Modul 86a sind Wärmetauscher 88 für die Wärmeübertragung von Motor-, Generator-, Diesel- und Restwärme und ein Kraftstofftank 90 vorgesehen. Im Modul 86b befindet sich der Antriebsmotor für den Generator, der ebenfalls so bemessen ist, dass dieser zumindest ohne den Rahmen des Moduls 86b die festgelegte Massengrenze von beispielsweise 11t nicht überschreitet. Es wird vorzugsweise ein Antriebsmotor mit einer Leistung oberhalb von 1000 kW bevorzugt.Also, the electric power distribution modules 42a, b, the generators 44a, 44b, and the electronic control unit 40 are constructed according to the mass restriction for individual elements of the rig. This is shown by way of example with reference to a generator 44a in Figs. 12A to 12D, wherein Fig. 12A is a sectional side view of the generator 44a, Fig. 12B is a sectional plan view, Fig. 12C is a sectional view taken on line DD in Fig. 12A and Fig. 12D is a sectional view EE in Fig. 12B. Conventionally, the generators for offshore installation are designed as one-piece modules. In the present invention, in order to comply with the ground restriction found by the inventors to be, for example, 11t, the generator module 44a has been divided into four modules 86a-d. In the module 86a heat exchangers 88 for the heat transfer of engine, generator, diesel and residual heat and a fuel tank 90 are provided. In the module 86b is the drive motor for the generator, which is also sized so that this at least without the frame of the module 86b does not exceed the specified mass limit of, for example, 11t. A drive motor with a power above 1000 kW is preferably preferred.
Da, wie es Fig. 5 entnehmbar ist, vier Generatoren 44a-d zum Einsatz kommen können, wird somit die Mindestleistung der Generatoren über 4000 kW liegen. Es kann jedoch eine beliebige andere, an die notwendigen Bohrarbeiten angepasste Leistung mit einer beliebigen Anzahl von Generatoren vorgesehen werden. Auch die Generatoren sind bevorzugt redundant ausgebildet, so dass bei Havariefällen das Bohrloch mit verringerter Leistung gesichert werden kann.Since, as can be inferred from FIG. 5, four generators 44a-d can be used, the minimum output of the generators will thus be above 4000 kW. However, any other power adapted to the required drilling work can be provided with any number of generators. The generators are preferably designed to be redundant, so that in case of accident, the well can be secured with reduced power.
Im Modul 86c befindet sich der Generator mit entsprechender Wärmeabführung, während das Modul 86d eine Eingangsschleuse 92 und ein Steuerungsfeld 94 aufweist. Durch diese modulartige Ausgestaltung ist eine Zerlegung in Funktionsblöcke bei gleichzeitiger Sicherstellung einer an die Anforderung von Offshore-Plattformen angepassten Leistung des Generators erfolgt.The module 86c contains the generator with corresponding heat dissipation, while the module 86d has an input lock 92 and a control field 94. By this modular design, a decomposition into functional blocks while ensuring a matched to the requirement of offshore platforms power of the generator is done.
In den elektrischen Energieverteilermodule 42a, b, die ebenfalls im Hinblick auf die Massenbeschränkung modular ausgebildet sind, befinden sich elektrische Einrichtungen, um an entsprechenden Anschlüssen die elektrischen Abnehmer der Bohranlage zu speisen, beispielsweise befinden sich dort die Frequenzumrichter für die Hydraulikpumpen in der Hydraulik- und Aufbereitungseinheit 34 und die Leistungsschalter. Durch die elektronische Steuereinheit 40 werden die Steuersignale für den Bohrprozess zur Verfügung gestellt und die Signalaufbereitung von und zur Steuerkabine 72 vorgenommen.In the electrical power distribution modules 42a, b, which are also modular with respect to the mass restriction, there are electrical devices to feed the electrical customers of the rig at corresponding terminals, for example, there are the frequency converter for the hydraulic pumps in the hydraulic and Conditioning unit 34 and the circuit breaker. The electronic control unit 40 provides the control signals for the drilling process and carries out the signal conditioning from and to the control cabin 72.
In Fig. 2 nicht dargestellt ist die Kraftstofftankanlage zu Versorgung der Generatoren. Der Kraftstoff, vorzugsweise Diesel, in den Kraftstofftanks 90 ist lediglich als Tagesreserve vorgesehen. Beispielsweise können Dieseltanks auf der Energieerzeugungsplattform 26 zwischen der Bohreinheit 32 und dem elektrischen Energieverteilermodul 42b vorgesehen sein.Not shown in Fig. 2 is the fuel tank system to supply the generators. The fuel, preferably diesel, in the fuel tanks 90 is provided only as a daily reserve. For example, diesel tanks may be provided on the power generation platform 26 between the drilling unit 32 and the electric power distribution module 42b.
An der Arbeitsbühne 48 ist an der zum Windschutz 52a entgegengesetzten Seite und benachbart zum Windschutz 52b und der Steuerkabine 72 ein Bohrstangen-Rack 96 befestigt, wie es in Fig. 2 gezeigt ist. Auf diesem Bohrstangen-Rack 96 befinden sich die Bohrstangen, die an das Bohrloch unmittelbar einzubringen sind. In den Zeichnungen nicht dargestellt ist ein Bohrstangenlager, auf dem eine größere Anzahl an Bohrstangen als auf dem Bohrstangen-Rack, vorzugsweise für eine Vielzahl an Tagen, gelagert ist.Attached to the work platform 48 at the windshield 52a opposite side and adjacent to the windshield 52b and the control cab 72 is a drill rod rack 96, as shown in FIG. On this boring bar rack 96 are the boring bars, which are to be introduced directly to the borehole. Not shown in the drawings is a drill rod bearing bearing a larger number of drill rods than on the drill rod rack, preferably for a plurality of days.
Der Transport der Bohrstangen zwischen dem nicht dargestellten Bohrstangenlager und dem Bohrstangen-Rack erfolgt über einen Kran 100, der vorzugsweise um 360° verschwenkbar ist und der ein Befüllen des Bohrstangen-Racks bei unterschiedlichen Relativpositionen der Bohreinheit 32 auf den Führungsschienen 28a, 28b gestattet. Durch die unter Bezugnahme auf Fig. 10 bereits erläuterte Bohrstangen-Handhabevorrichtung 66 erfolgt die Aufnahme der in Fig. 9 waagerecht auf dem Bohrstangen-Rack 96 befindlichen Bohrstangen 98, die senkrechte Ausrichtung von diesen und das Verschrauben von diesen vermittels der Verschraubeinrichtung 68 mit dem durch das Keilsystem in Bezug auf die Bohrplattform gehaltenen Bohrgestänge im Bohrloch.The transport of the drill rods between the drill rod bearing and the drill rod rack, not shown, via a crane 100, which is preferably pivotable through 360 ° and allows filling of the drill rod rack at different relative positions of the drilling unit 32 on the guide rails 28a, 28b. By already explained with reference to Fig. 10 drill rod handling device 66, the recording of the horizontal in Fig. 9 on the drill rack rack 96 boring bars 98, the vertical orientation of these and the screwing of these by means of the screwing 68 with the through the wedge system with respect to the drilling platform held drill pipe in the borehole.
An der Arbeitsbühne 48 ist ferner ein Inspektions- und Wartungskran 102 befestigt, an dem ein Mannkorb 104 anbringbar ist. Auf diese Weise kann das Wartungspersonal schnell zu den gewünschten Orten gelangen. Wie es Fig. 2 und 6 ferner entnehmbar ist, ist auf der Hydraulik- und Aufbereitungseinheit 34 eine Zugangspiattform 106 mit Treppe 108 vorgesehen, über die die Einheit 34 zugänglich ist. Die Zugangsplattform 106 ist über eine Treppe 110 mit einem Zugang zur Steuerkabine 72 verbunden. Die Treppe 108 ist bevorzugt so angeordnet, dass sich bei einem Verfahren der Einheiten 32 und 34 über die gesamte Länge der Führungsschienen 28a, 28b die Treppe 108 am Kran 100 für die Bohrstangen vorbeibewegen kann. Alternativ dazu kann auch ein zeitweiliges Entfernen des Krans 100 stattfinden, um die Einheiten 32, 34 zu verfahren. Wenn der Einsatz der erfindungsgemäßen Tiefbohranlage nur in einem bestimmten Bereich der Führungsschienen 28a, 28b gewünscht ist, kann der Installationsort von Treppe 108 und Plattform 106 entsprechend angepasst sein.An inspection and maintenance crane 102, to which a man basket 104 can be attached, is also attached to the work platform 48. In this way, the maintenance personnel can quickly reach the desired locations. As can also be seen in FIGS. 2 and 6, an access platform 106 with stairs 108 is provided on the hydraulic and conditioning unit 34, via which unit 34 is accessible. The access platform 106 is connected by stairs 110 to an access to the control cabin 72. The staircase 108 is preferably arranged so that in a process of the units 32 and 34 over the entire length of the guide rails 28a, 28b the staircase 108 can move past the crane 100 for the drill rods. Alternatively, a temporary removal of the crane 100 may take place to move the units 32, 34. If the use of the deep drilling rig according to the invention is desired only in a certain area of the guide rails 28a, 28b, the installation location of staircase 108 and platform 106 can be adapted accordingly.
Wie es insbesondere Fig. 6 entnehmbar ist, sind die Brücken 87 und die Zugangsplattform 106 mit zugeordneten Treppen einerseits so ausgebildet, dass eine Bewegung über die gewünschte Streckung in Querrichtung Y möglich ist, ohne mit Einrichtungen an oder auf der Plattform zu kollidieren. Andrerseits stellt die Anordnung der Treppen sicher, dass die Einheiten 32, 34 ständig zugänglich sind.As can be seen in particular from FIG. 6, the bridges 87 and the access platform 106 with associated stairs are, on the one hand, designed such that a movement beyond the desired extension in the transverse direction Y is possible without colliding with devices on or on the platform. On the other hand, the arrangement of the stairs ensures that the units 32, 34 are constantly accessible.
Mit der erfindungsgemäßen Bohranlage ist somit ein einfacher Auf- bzw. Abbau möglich, während eine hohe Leistungsfähigkeit bei einem geringen Platzbedarf realisiert werden kann. Da der Massengrenzwert auch bei jedem der einzelnen Funktionselemente realisiert werden kann, kann die vorliegende Erfindung auch modular in Form nur einzelner Funktionselemente realisiert werden.With the drilling rig according to the invention thus a simple assembly and disassembly is possible, while a high performance can be realized with a small footprint. Since the mass limit value can also be realized in each of the individual functional elements, the present invention can also be implemented modularly in the form of only individual functional elements.
Erfindungsgemäß wird somit eine Bohranlage zum Einsatz auf einer Bohrplattform mit einem Bohrmast vorgesehen, die dadurch gekennzeichnet ist, dass der Bohrmast und/oder die Energieversorgung und/oder die Erzeugungseinrichtung für hydraulische Energie aus Einzelelementen zusammengesetzt sind, deren jeweilige Massen einen Massengrenzwert von unterhalb von bzw. gleich 25 1 nicht überschreiten. Dabei wird ein Zusammensetzvorgang ohne Schweißen, vorzugsweise mit Schnellverbindern bevorzugt. Es wird eine Bohranlage zum Einsatz auf einer Bohrplattform mit einem Bohrmast vorgesehen, wobei die Bohranlage einen Unterbau aufweist, an dem der Bohrmast angebracht ist und der zusammen mit dem Bohrmast auf der Bohrplattform zumindest in eine Richtung gemeinsam verschiebbar ist, wobei der Bohrmast auf einem Rahmen in eine erste Richtung verschiebbar ist und der Rahmen auf der Bohrplattform in eine zweite Richtung verschiebbar ist, die zur ersten Richtung im Wesentlichen rechtwinklig verläuft, wobei der Bohrmast auf dem Rahmen in die erste Richtung ohne eine neben dem Unterbau angeordnete Hydraulik- und/oder Aufbereitungseinheit verschiebbar ist und in die zweite Richtung zusammen mit der Hydraulik- und/oder Aufbereitungseinheit verschiebbar ist. wobei der Bohrmast aus Einzelelementen zusammengesetzt ist, deren jeweilige Massen einen Massengrenzwert von unterhalb von bzw. gleich 25 t nicht überschreiten. Auf diese Weise kann der Bohrmast auch an Eckbereichen der Bohrplattform variabel vorgesehen werden und es ist eine maximale Platzausnutzung möglich.According to the invention, a drilling rig is thus provided for use on a drilling platform with a drilling mast, which is characterized in that the drilling mast and / or the power supply and / or the hydraulic energy generating device are composed of individual elements whose respective masses have a mass limit below or below do not exceed 25 1. In this case, an assembly process without welding, preferably with quick connectors preferred. There is provided a drilling rig for use on a drilling platform with a drilling mast, the drilling rig having a substructure to which the drilling mast is attached and which is displaceable together with the drilling mast on the drilling platform at least in one direction, the drilling mast resting on a frame is slidable in a first direction and the frame is slidable on the drilling platform in a second direction which is substantially perpendicular to the first direction, wherein the drilling mast on the frame in the first direction without a arranged next to the substructure hydraulic and / or processing unit is displaceable and displaceable in the second direction together with the hydraulic and / or conditioning unit. wherein the drilling mast is composed of individual elements whose respective masses do not exceed a mass limit of less than or equal to 25 t. In this way, the drilling mast can also be provided variably at corner regions of the drilling platform and maximum space utilization is possible.
Entsprechend einem ersten Aspekt wird eine Bohranlage zum Einsatz auf einer Bohrplattform mit einem Bohrmast vorgesehen, die dadurch gekennzeichnet, dass der Bohrmast und/oder die Energieversorgung und/oder die Erzeugungseinrichtung für hydraulische Energie aus Einzelelementen zusammengesetzt sind, deren jeweilige Massen einen Massengrenzwert von unterhalb von bzw. gleich 25 1 nicht überschreiten.According to a first aspect, a drilling rig is provided for use on a drilling rig with a drilling mast, characterized in that the drilling mast and / or the power supply and / or the hydraulic power generating means are composed of individual elements whose respective masses have a mass limit below or equal to 25 1 do not exceed.
Die Bohranlage nach dem ersten Aspekt weist entsprechend einem zweiten Aspekt einen Unterbau auf, an dem der Bohrmast angebracht ist und der zusammen mit dem Bohrmast auf der Bohrplattform zumindest in eine Richtung gemeinsam verschiebbar ist.According to a second aspect, the drilling rig according to the first aspect has a substructure on which the drilling mast is mounted and which, together with the drilling mast on the drilling platform, can be displaced together in at least one direction.
Bei der Bohranlage nach dem ersten oder zweiten Aspekt ist entsprechend einem dritten Aspekt der Bohrmast mit einem Vorschubschlitten versehen ist, an dem vorzugsweise ein Rotationsantrieb vorgesehen und der über einen hydraulischen und/oder elektrischen Antrieb antreibbar, der gemeinsam mit dem Unterbau und dem Bohrmast verschiebbar ist. Bei der Bohranlage nach einem der ersten bis dritten Aspekte ist entsprechend einem vierten Aspekt mit dem Bohrmast eine hydraulische Versorgungseinrichtung gemeinsam verschiebbar.In the drilling rig according to the first or second aspect, according to a third aspect of the drilling mast is provided with a feed carriage on which preferably provided a rotary drive and driven by a hydraulic and / or electric drive which is displaceable together with the substructure and the drilling mast , In the drilling rig according to one of the first to third aspects, according to a fourth aspect, a hydraulic supply device is displaceable together with the drilling mast.
Bei der Bohranlage nach einem der ersten bis vierten Aspekte ist entsprechend einem fünften Aspekt mit dem Bohrmast eine Aufnahmeeinrichtung für Bohrstangen und/oder sonstiges Bohrzubehör gemeinsam verschiebbar.In the drilling rig according to one of the first to fourth aspects, a receiving device for drill rods and / or other drilling accessories can be displaced together with the drill mast in accordance with a fifth aspect.
Bei der Bohranlage nach einem der ersten bis fünften Aspekte beträgt entsprechend einem sechsten Aspekt die Hakenlast am Vorschubschlitten zumindest 200 Amerikanischen Tonnen, vorzugsweise ungefähr 400 Amerikanischen Tonnen.In the drilling rig according to one of the first to fifth aspects, according to a sixth aspect, the hook load on the feed slide is at least 200 American tons, preferably about 400 American tons.
Bei der Bohranlage nach einem der zweiten bis sechsten Aspekte hat entsprechend einem siebenten Aspekt der Unterbau eine Grundfläche von größer gleich 6mx6m und kleiner bzw. gleich 12mx12m.In the drilling rig according to one of the second to sixth aspects, according to a seventh aspect, the substructure has a footprint of greater than or equal to 6mx6m and less than or equal to 12mx12m.
Bei der Bohranlage nach einem der ersten bis siebenten Aspekte ist entsprechend einem achten Aspekt eine Bohrstangen-Handhabeeinrichtung vorgesehen ist, die mit dem Bohrmast gemeinsam verschiebbar ist.In the drilling rig according to one of the first to seventh aspects, according to an eighth aspect, a boring bar handle device is provided, which is displaceable together with the boring mast.
Eine Bohranlage nach einem der ersten bis achten Aspekte weist entsprechend einem neunten Aspekt ortsfest in Bezug auf die Bohrplattform zumindest einen Generator und eine elektrische Einrichtung zum Bereitstellen von Energie auf.A drilling rig according to any one of the first to eighth aspects, according to a ninth aspect, has fixed at least one generator and electrical means for providing energy relative to the drilling platform.
Bei der Bohranlage nach einem der ersten bis neunten Aspekte sind entsprechend einem zehnten Aspekt die stationären und/oder die mobilen Bestandteile der Bohranlage zumindest teilweise, vorzugsweise vollständig, aus Einzelelementen zusammengesetzt, deren jeweilige Masse den genannten Massengrenzwert nicht überschreitet.In the drilling rig according to one of the first to ninth aspects, according to a tenth aspect, the stationary and / or mobile components of the drilling rig at least partially, preferably completely, composed of individual elements whose respective mass does not exceed said mass limit.
Bei der Bohranlage nach einem der ersten bis zehnten Aspekte sind entsprechend einem elften Aspekt die Einzelelemente ohne Schweißen miteinander verbindbar. Bei der Bohranlage nach einem der ersten bis elften Aspekte beträgt entsprechend einem zwölften Aspekt der Massengrenzwert 22 t, stärker bevorzugt 17 t oder 15 t und vorzugsweise 11 t.In the drilling rig according to one of the first to tenth aspects, according to an eleventh aspect, the individual elements can be connected to one another without welding. In the drilling rig according to any of the first to eleventh aspects, according to a twelfth aspect, the mass limit value is 22 t, more preferably 17 t or 15 t, and preferably 11 t.
Bei der Bohranlage nach einem der ersten bis zwölften Aspekte ist entsprechend einem dreizehnten Aspekt der Bohrmast auf einem Rahmen in eine erste Richtung verschiebbar und ist der Rahmen auf der Bohrplattform in eine zweite Richtung verschiebbar, die zur ersten Richtung im Wesentlichen rechtwinklig verläuft.In the drilling rig of any of the first to twelfth aspects, according to a thirteenth aspect, the drilling mast is slidable on a frame in a first direction, and the frame on the drilling platform is slidable in a second direction substantially perpendicular to the first direction.
Bei der Bohranlage entsprechend dem dreizehnten Aspekte ist entsprechend einem vierzehnten Aspekt der Bohrmast auf dem Rahmen in die erste Richtung ohne hydraulische Versorgungseinrichtung verschiebbar ist und in die zweite Richtung zusammen mit der hydraulischen Versorgungseinrichtung verschiebbar.In the drilling rig according to the thirteenth aspect, according to a fourteenth aspect, the mast is slidable on the frame in the first direction without hydraulic supply and slidable in the second direction together with the hydraulic supply.
Bei der Bohranlage entsprechend dem vierzehnten Aspekte ist entsprechend einem fünfzehnten Aspekt die hydraulische Versorgungseinrichtung in Bezug auf die zweite Richtung alternativ an entgegengesetzten Seiten des Bohrmastes anordenbar.In the drilling rig according to the fourteenth aspect, according to a fifteenth aspect, the hydraulic feeding device with respect to the second direction may alternatively be arranged on opposite sides of the drilling mast.
Bei der Bohranlage nach einem der zweiten bis fünfzehnten Aspekte weist entsprechend einem sechzehnten Aspekt der Unterbau die Höhe von zumindest zwei, vorzugsweise drei, Standardcontainer auf.In the drilling rig according to one of the second to fifteenth aspects, according to a sixteenth aspect, the substructure has the height of at least two, preferably three, standard containers.
Bei der Bohranlage nach einem der ersten bis sechzehnten Aspekte ist entsprechend einem siebzehnten Aspekt die Bohrplattform eine Offshore-Bohrplattform.In the drilling rig according to one of the first to sixteenth aspects, according to a seventeenth aspect, the drilling platform is an offshore drilling platform.
Bei der Bohranlage nach einem der ersten bis siebzehnten Aspekte sind entsprechend einem achtzehnten Funktionselemente zum Ansteuern, Versorgen und Betreiben eines Bohrgerätes und/oder der Peripherie zumindest teilweise redundant ausgebildet.In the drilling rig according to one of the first to seventeenth aspects, according to an eighteenth functional elements for driving, supplying and operating a drilling rig and / or the periphery, at least partially redundant are formed.
Bei der Bohranlage nach einem der ersten bis achtzehnten Aspekte ist entsprechend einem neunzehnten die Steuereinrichtung zur Überwachung des Bohrvorgangs redundant ausgebildet. Es wird entsprechend einem zwanzigsten Aspekt eineIn the drilling rig according to one of the first to eighteenth aspects, according to a nineteenth, the control device for monitoring the drilling operation is designed to be redundant. It becomes one according to a twentieth aspect
Energieversorgungseinrichtung, vorzugsweise für eine Bohranlage, vorgesehen, bei der eine Brennkraftmaschine und der Generator in zwei Modulen vorgesehen sind und die jeweilige Masse der Brennkraftmaschine und des Generators jeweils einen Massengrenzwert von unterhalb von bzw. gleich 251, vorzugsweise 11t, nicht überschreitet.Energy supply device, preferably for a drilling rig, provided in which an internal combustion engine and the generator are provided in two modules and the respective mass of the internal combustion engine and the generator does not exceed a mass limit of less than or equal to 251, preferably 11t.
Bei einer Energieversorgungseinrichtung entsprechend dem zwanzigsten Aspekt beträgt entsprechend einem einundzwanzigsten Aspekt die Generatorleistung zumindest 500 kVA.In a power supply device according to the twentieth aspect, according to a twenty-first aspect, the generator power is at least 500 kVA.
Bei einer Energieversorgungseinrichtung entsprechend dem einundzwanzigsten Aspekt sind entsprechend einem zweiundzwanzigsten Aspekt die Module gasdicht miteinander verbindbar.In a power supply device according to the twenty-first aspect, according to a twenty-second aspect, the modules are connectable to each other in a gas-tight manner.
Bei einer Energieversorgungseinrichtung entsprechend einem der zwanzigsten bis zweiundzwanzigsten Aspekte ist entsprechend einem dreiundzwanzigsten Aspekt ein weiteres Modul vorgesehen, in dem ein Wärmetauscher und ein Kraftstofftank vorgesehen sind.In a power supply device according to any one of the twentieth to twenty-second aspects, according to a twenty-third aspect, there is provided another module in which a heat exchanger and a fuel tank are provided.
Bei einer Energieversorgungseinrichtung entsprechend einem der zwanzigsten bis dreiundzwanzigsten Aspekte ist entsprechend einem vierundzwanzigsten Aspekt ein weiteres Modul mit Eingangsschleuse und Steuerungsfeld vorgesehen.In a power supply device according to one of the twentieth to twenty-third aspects, according to a twenty-fourth aspect, there is provided another module with input lock and control panel.
Es werden Spülungspumpen entsprechend einem fünfundzwanzigsten Aspekt vorgesehen, vorzugsweise für eine Bohranlage, zum Pumpen der Bohrspülung mit zumindest zwei, vorzugsweise vier, Pumpen, deren Masse einen Massengrenzwert von unterhalb von bzw. gleich 251, vorzugsweise 11t, nicht überschreiten.There are provided flushing pumps according to a twenty-fifth aspect, preferably for a drilling rig, for pumping the drilling mud with at least two, preferably four, pumps whose mass does not exceed a mass limit of less than or equal to 251, preferably 11t.
Es wird entsprechend einem sechsundzwanzigsten Aspekt eine Vorrichtung zum Erzeugen hydraulischer Energie für einen Topdrive und/oder eine Handhabevorrichtung vorgesehen, wobei die die Vorrichtung bildenden einzelnen Funktionselemente redundant ausgebildet sind. There is according to a twenty-sixth aspect, a device for generating hydraulic energy for a top drive and / or a handling device provided, wherein the device forming individual functional elements are redundant.
BezugszeichenlisteLIST OF REFERENCE NUMBERS
1 Bohrmast1 drilling mast
2 Schwenklager2 swivel bearings
4 Bohrplattform4 drilling platform
6 Vorschubschlitten6 feed carriages
8 Aufnahmevorrichtung8 recording device
10 Bohrstange10 boring bar
12 Pipehandler12 pipe handlers
14 Unterbau14 substructure
16 Segment16 segment
20 Offshore-Vertikal-Tiefbohranlage20 Offshore vertical deep drilling rig
22 Bohrplattform22 drilling platform
24 Stützen 6 erhöhter Bohrplattformabschnitt 8a,b Führungsschiene24 supports 6 elevated drilling platform section 8a, b guide rail
30 Bohrloch 2 Bohreinheit30 borehole 2 drilling unit
34 Hydraulik- und Aufbereitungseinheit 6 Rahmen 7a,b Rahmenelement 8 Druckspeicher BOP 0 elektronische Steuereinheit 2a,b elektrisches Energieverteilermodul 4 a,b Generator 6 Unterbau 8 Arbeitsbühne 0 Bohrmast 2 a,b Windschutzelement 4 Blow-out-preventer 6 Trip-Tank 8a-e Einzelsegment 9 Zahnstange Vorschubschlitten34 Hydraulic and conditioning unit 6 Frame 7a, b Frame element 8 Pressure accumulator BOP 0 Electronic control unit 2a, b Electric power distribution module 4 a, b Generator 6 Substructure 8 Platform 0 Drilling mast 2 a, b Wind protection element 4 Blow-out preventer 6 Trip tank 8a e Single segment 9 rack feed slide
DrillmotorDrill motor
Aufnahmevorrichtungcradle
ElevatorElevator
Stabschaftrod shaft
Bohrstangen-HandhabevorrichtungDrill rod handler
Verschraubeinrichtungscrewing device
Führungselementguide element
Steuerkabine a-d Quermodul a-d Rahmen a-d Spülpumpe a,b Längsmodul a,b LängsmodulControl cab a-d Cross module a-d Frame a-d Flush pump a, b Longitudinal module a, b Longitudinal module
Hydraulikaggregathydraulic power unit
Hydraulikaggregat a-d ModuleHydraulic unit a-d modules
Brückebridge
Wärmetauscherheat exchangers
KraftstofftankFuel tank
Eingangsschleuseentry lock
Steuerungsfeldcontrol panel
Bohrstangen-RackDrilling rods rack
Bohrstange 0 Kran 2 Inspektions- und Wartungskran4 Mannkorb 6 Zugangsplattform 8 Treppe 0 Treppe 2 Ausnehmung 4 Befestigungseinrichtung 5a,b Vertikalstrebe 116a,b Stützstrebe Boring bar 0 Crane 2 Inspection and maintenance crane4 Man basket 6 Access platform 8 Stair 0 Stairway 2 Recess 4 Fastening device 5a, b Vertical strut 116a, b strut

Claims

Ansprüche claims
1. Bohranlage zum Einsatz auf einer Bohrplattform mit einem Bohrmast, wobei die Bohranlage einen Unterbau aufweist, an dem der Bohrmast angebracht ist und der zusammen mit dem Bohrmast auf der Bohrplattform zumindest in eine Richtung gemeinsam verschiebbar ist, wobei der Bohrmast auf einem Rahmen in eine erste Richtung verschiebbar ist und der Rahmen auf der Bohrplattform in eine zweite Richtung verschiebbar ist, die zur ersten Richtung im Wesentlichen rechtwinklig verläuft. wobei der Bohrmast auf dem Rahmen in die erste Richtung ohne eine neben dem Unterbau angeordnete Hydraulik- und/oder Aufbereitungseinheit verschiebbar ist und in die zweite Richtung zusammen mit der Hydraulik- und/oder Aufbereitungseinheit verschiebbar ist. wobei der Bohrmast aus Einzelelementen zusammengesetzt ist, deren jeweilige Massen einen Massengrenzwert von unterhalb von bzw. gleich 251 nicht überschreiten.1. Drilling rig for use on a drilling platform with a drilling mast, wherein the drilling rig has a base on which the drilling mast is mounted and which is displaceable together with the drilling mast on the drilling platform at least in one direction, wherein the drilling mast on a frame in a first direction is displaceable and the frame is displaceable on the drilling platform in a second direction, which is substantially perpendicular to the first direction. wherein the drilling mast is displaceable on the frame in the first direction without a hydraulic and / or conditioning unit arranged next to the substructure and is displaceable in the second direction together with the hydraulic and / or conditioning unit. wherein the drilling mast is composed of individual elements whose respective masses do not exceed a mass limit of less than or equal to 251.
2. Bohranlage zum Einsatz auf einer Bohrplattform mit einem Bohrmast, dadurch gekennzeichnet, dass der Bohrmast und/oder die Energieversorgung und/oder die Erzeugungseinrichtung für hydraulische Energie aus Einzelelementen zusammengesetzt sind, deren jeweilige Massen einen Massengrenzwert von unterhalb von bzw. gleich 25 1 nicht überschreiten.2. Drilling rig for use on a drilling platform with a drilling mast, characterized in that the drilling mast and / or the hydraulic energy generating means are composed of individual elements whose respective masses do not have a mass limit below or equal to 25 1 exceed.
3. Bohranlage nach Anspruch 1 oder 2, die einen Unterbau aufweist, an dem der Bohrmast angebracht ist und der zusammen mit dem Bohrmast auf der Bohrplattform zumindest in eine Richtung gemeinsam verschiebbar ist.3. Drilling rig according to claim 1 or 2, which has a base on which the drilling mast is mounted and which is displaceable together with the drilling mast on the drilling platform at least in one direction.
4. Bohranlage nach Anspruch 1 , 3 oder 3, wobei der Bohrmast mit einem Vorschubschlitten versehen ist, an dem vorzugsweise ein Rotationsantrieb vorgesehen ist und der über einen hydraulischen und/oder elektrischen Antrieb antreibbar ist, der gemeinsam mit dem Unterbau und dem Bohrmast verschiebbar ist. 4. A drilling rig according to claim 1, 3 or 3, wherein the drilling mast is provided with a feed slide on which preferably a rotary drive is provided and which is drivable via a hydraulic and / or electric drive which is displaceable together with the substructure and the drilling mast ,
5. Bohranlage nach einem der vorhergehenden Ansprüche, wobei mit dem Bohrmast eine hydraulische Versorgungseinrichtung gemeinsam verschiebbar ist5. Drilling rig according to one of the preceding claims, wherein a hydraulic supply device is jointly displaceable with the drilling mast
6. Bohranlage nach einem der vorhergehenden Ansprüche, wobei mit dem Bohrmast eine Aufnahmeeinrichtung für Bohrstangen und/oder sonstiges Bohrzubehör gemeinsam verschiebbar ist.6. Drilling rig according to one of the preceding claims, wherein a receiving device for boring bars and / or other drilling accessories is jointly displaceable with the drilling mast.
7. Bohranlage nach einem der vorhergehenden Ansprüche, wobei die Hakenlast am Vorschubschlitten zumindest 200 Amerikanischen Tonnen, vorzugsweise ungefähr 400 Amerikanischen Tonnen, beträgt.7. Drilling rig according to one of the preceding claims, wherein the hook load on the feed slide is at least 200 American tons, preferably about 400 American tons.
8. Bohranlage nach einem der Ansprüche 3 bis 7, wobei der Unterbau eine Grundfläche von größer gleich 6mx6m und kleiner bzw. gleich 12mx12m hat.8. Drilling rig according to one of claims 3 to 7, wherein the substructure has a base area of greater than or equal to 6mx6m and less than or equal to 12mx12m.
9. Bohranlage nach einem der vorhergehenden Ansprüche, wobei eine Bohrstangen-Handhabeeinrichtung vorgesehen ist, die mit dem Bohrmast gemeinsam verschiebbar ist.9. Drilling rig according to one of the preceding claims, wherein a drill rod-handle device is provided which is displaceable together with the drilling mast.
10. Bohranlage nach einem der vorhergehenden Ansprüche, wobei die Bohranlage ortsfest in Bezug auf die Bohrplattform zumindest einen Generator und eine elektrische Einrichtung zum Bereitstellen von Energie aufweist.10. Drilling rig according to one of the preceding claims, wherein the drilling rig has fixed in relation to the drilling platform at least one generator and an electrical device for providing energy.
11. Bohranlage nach einem der vorhergehenden Ansprüche, wobei die stationären und/oder die mobilen Bestandteile der Bohranlage zumindest teilweise, vorzugsweise vollständig, aus Einzelelementen zusammengesetzt sind, deren jeweilige Masse den genannten Massengrenzwert nicht überschreitet.11. Drilling rig according to one of the preceding claims, wherein the stationary and / or the mobile components of the drilling rig are at least partially, preferably completely, composed of individual elements whose respective mass does not exceed said mass limit.
12. Bohranlage nach einem der vorhergehenden Ansprüche, wobei die Einzelelemente ohne Schweißen miteinander verbindbar sind.12. Drilling rig according to one of the preceding claims, wherein the individual elements are connected to one another without welding.
13. Bohranlage nach einem der vorhergehenden Ansprüche, wobei der Massengrenzwert 22 t, stärker bevorzugt 17 t oder 15 t und vorzugsweise 11 t beträgt. 13. Drilling rig according to one of the preceding claims, wherein the mass limit value is 22 t, more preferably 17 t or 15 t and preferably 11 t.
14. Bohranlage nach einem der vorhergehenden Ansprüche, wobei der Bohrmast auf einem Rahmen in eine erste Richtung verschiebbar ist und der Rahmen auf der Bohrplattform in eine zweite Richtung verschiebbar ist, die zur ersten Richtung im Wesentlichen rechtwinklig verläuft.14. Drilling rig according to one of the preceding claims, wherein the drilling mast is displaceable on a frame in a first direction and the frame is displaceable on the drilling platform in a second direction, which is substantially perpendicular to the first direction.
15. Bohranlage nach Anspruch 14, wobei der Bohrmast auf dem Rahmen in die erste Richtung ohne hydraulische Versorgungseinrichtung verschiebbar ist und in die zweite Richtung zusammen mit der hydraulischen Versorgungseinrichtung verschiebbar ist.15. A drilling rig according to claim 14, wherein the drilling mast is slidable on the frame in the first direction without hydraulic supply device and is displaceable in the second direction together with the hydraulic supply device.
16. Bohranlage nach Anspruch 14, wobei die hydraulische Versorgungseinrichtung in Bezug auf die zweite Richtung alternativ an entgegengesetzten Seiten des Bohrmastes anordenbar ist.16. A drilling rig according to claim 14, wherein the hydraulic supply device with respect to the second direction is alternatively arranged on opposite sides of the drill mast.
17. Bohranlage nach einem der Ansprüche 3 bis 16, wobei der Unterbau die Höhe von zumindest zwei, vorzugsweise drei Standardcontainer aufweist.17. Drilling rig according to one of claims 3 to 16, wherein the substructure has the height of at least two, preferably three standard containers.
18. Bohranlage nach einem der vorhergehenden Ansprüche, wobei die Bohrplattform eine Offshore-Bohrplattform ist.18. Drilling rig according to one of the preceding claims, wherein the drilling platform is an offshore drilling platform.
19. Bohranlage nach einem der vorhergehenden Ansprüche, wobei Funktionselemente zum Ansteuern, Versorgen und Betreiben eines Bohrgerätes und/oder der Peripherie zumindest teilweise redundant ausgebildet sind.19. A drilling rig according to one of the preceding claims, wherein functional elements for driving, supplying and operating a drill and / or the periphery are at least partially redundant.
20. Bohranlage nach einem der vorhergehenden Ansprüche, wobei die Steuereinrichtung zur Überwachung des Bohrvorgangs redundant ausgebildet ist.20. Drilling rig according to one of the preceding claims, wherein the control device is designed to monitor the drilling process redundant.
21. Energieversorgungseinrichtung, vorzugsweise für eine Bohranlage, bei der eine Brennkraftmaschine und der Generator in zwei Modulen vorgesehen sind und die jeweilige Masse der Brennkraftmaschine und des Generators jeweils einen Massengrenzwert von unterhalb von bzw. gleich 25 1, vorzugsweise 11t, nicht überschreitet. 21. Energy supply device, preferably for a drilling rig, in which an internal combustion engine and the generator are provided in two modules and the respective mass of the internal combustion engine and the generator does not exceed a mass limit of below or equal to 25 1, preferably 11t.
22. Energieversorgungseinrichtung nach Anspruch 21 , wobei die Generatorleistung zumindest 500 kVA beträgt22. Energy supply device according to claim 21, wherein the generator power is at least 500 kVA
23. Energieversorgungseinrichtung nach Anspruch 21 oder 22, wobei die Module gasdicht miteinander verbindbar sind23. Energy supply device according to claim 21 or 22, wherein the modules are gas-tight connected to each other
24. Energieversorgungseinrichtung nach einem der Ansprüche 21 bis 23 mit einem weiteren Modul, in dem ein Wärmetauscher und ein Kraftstofftank vorgesehen sind.24. Energy supply device according to one of claims 21 to 23 with a further module in which a heat exchanger and a fuel tank are provided.
25. Energieversorgungseinrichtung nach einem der Ansprüche 21 bis 24 mit einem weiteren Modul mit Eingangsschleuse und Steuerungsfeld.25. Energy supply device according to one of claims 21 to 24 with a further module with input lock and control panel.
26. Spülungspumpen, vorzugsweise für eine Bohranlage, zum Pumpen der Bohrspülung mit zumindest zwei, vorzugsweise vier, Pumpen, deren Masse einen Massengrenzwert von unterhalb von bzw. gleich 251, vorzugsweise 11t, nicht überschreiten.26. Flushing pumps, preferably for a drilling rig, for pumping the drilling fluid with at least two, preferably four, pumps whose mass does not exceed a mass limit of less than or equal to 251, preferably 11t.
27. Vorrichtung zum Erzeugen hydraulischer Energie für einen Topdrive und/oder eine Handhabevorrichtung , wobei die die Vorrichtung bildenden einzelnen Funktionselemente redundant ausgebildet sind. 27. Device for generating hydraulic energy for a top drive and / or a handling device, wherein the device forming the individual functional elements are redundant.
EP09776076A 2008-08-20 2009-08-10 Drilling station Withdrawn EP2340348A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE200810038456 DE102008038456A1 (en) 2008-08-20 2008-08-20 drilling rig
PCT/DE2009/001123 WO2010020214A2 (en) 2008-08-20 2009-08-10 Drilling station

Publications (1)

Publication Number Publication Date
EP2340348A2 true EP2340348A2 (en) 2011-07-06

Family

ID=41566591

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09776076A Withdrawn EP2340348A2 (en) 2008-08-20 2009-08-10 Drilling station

Country Status (7)

Country Link
US (1) US9109399B2 (en)
EP (1) EP2340348A2 (en)
BR (1) BRPI0917281A2 (en)
DE (1) DE102008038456A1 (en)
EA (1) EA023341B1 (en)
MX (1) MX2011001922A (en)
WO (1) WO2010020214A2 (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009043081A1 (en) 2009-09-25 2011-03-31 Max Streicher Gmbh & Co. Kg Aa Storage device for vertical storing of drilling rod in drilling mast of vertical drilling system, has upper retaining device exhibiting retaining slot, which extends with respect to rotation device
US9309728B2 (en) 2012-05-14 2016-04-12 Nabors Drilling International Limited Drilling rig employing tubular handling device
US9410382B2 (en) 2012-05-14 2016-08-09 Nabors Drilling International Limited Drilling rig carriage movable along racks and including pinions driven by electric motors
WO2014182991A1 (en) 2013-05-10 2014-11-13 Devin International, Inc. Drilling rig transfer system and method
EA036726B1 (en) * 2014-07-14 2020-12-11 Дреко Энерджи Сервисез Юлс Mobile drilling rig
US9988807B2 (en) 2016-02-24 2018-06-05 National Oilwell Varco, L.P. Drilling rig with self-elevating drill floor
WO2017155950A1 (en) 2016-03-07 2017-09-14 National Oilwell Varco, L.P. Multi-well bop cellar trailer
US9970211B2 (en) 2016-05-02 2018-05-15 Dreco Energy Services Ulc Guide rails for mobile drilling rig
US10662718B2 (en) * 2016-06-16 2020-05-26 Nabors Drilling Technologies Usa, Inc. Drilling rig stair tower with integrated utility lines and cable tray
US10293854B2 (en) 2016-10-05 2019-05-21 Dreco Energy Services Ulc Movable rig and steering system
US10435861B2 (en) * 2017-06-30 2019-10-08 TorcSill Foundations, LLC Pad site construction and method
US10612315B2 (en) * 2018-02-08 2020-04-07 Saudi Arabian Oil Company Smart skidding system for land operations
CN110067509B (en) * 2018-05-15 2024-03-15 沧州海岳矿山机电设备有限公司 Reverse well drilling machine capable of drilling directional pilot hole and construction process of directional pilot hole
WO2020028969A1 (en) 2018-08-06 2020-02-13 Dreco Energy Services Ulc Drill floor support structures
RU2705132C1 (en) * 2019-01-09 2019-11-05 Государственное бюджетное образовательное учреждение высшего образования "Альметьевский государственный нефтяной институт" Cluster drilling rig
US11603723B2 (en) 2019-08-30 2023-03-14 Nov Canada Ulc Cuttings processing unit

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4899832A (en) * 1985-08-19 1990-02-13 Bierscheid Jr Robert C Modular well drilling apparatus and methods
US5492436A (en) * 1994-04-14 1996-02-20 Pool Company Apparatus and method for moving rig structures
NO310736B1 (en) * 2000-01-03 2001-08-20 Aker Mh As Module-based lightweight drilling rig
FR2822890B1 (en) 2001-03-30 2003-10-31 Cammell Laird Marseille METHOD OF INSTALLING DRILLING APPARATUSES ON OFFSHORE PLATFORMS AND DRILLING APPARATUS RESULTING FROM THE IMPLEMENTATION OF THIS PROCESS
US6745852B2 (en) * 2002-05-08 2004-06-08 Anadarko Petroleum Corporation Platform for drilling oil and gas wells in arctic, inaccessible, or environmentally sensitive locations
US6932553B1 (en) * 2003-03-17 2005-08-23 Itrec, B.V. Multipurpose unit for drilling and well intervention
DE102004004315A1 (en) 2004-01-28 2005-08-11 Max Streicher Gmbh & Co. Kg Aa Apparatus and method for handling objects on a drilling rig
DE202004001242U1 (en) 2004-01-28 2004-04-01 Max Streicher Gmbh & Co. Kg Aa Substructure for a deep drilling platform
DE202004001258U1 (en) * 2004-01-28 2004-04-01 Max Streicher Gmbh & Co. Kg Aa Device for deep drilling in geological structures
DE102004004316A1 (en) 2004-01-28 2005-08-11 Max Streicher Gmbh & Co. Kg Aa Method of producing deep wells in geological structures
WO2008012482A1 (en) * 2006-07-26 2008-01-31 Psl Energy Services Limited Method and apparatus for erecting a mast

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2010020214A3 *

Also Published As

Publication number Publication date
WO2010020214A2 (en) 2010-02-25
EA201100518A1 (en) 2011-10-31
DE102008038456A1 (en) 2010-02-25
BRPI0917281A2 (en) 2015-11-10
WO2010020214A3 (en) 2010-06-10
US20110240371A1 (en) 2011-10-06
MX2011001922A (en) 2011-06-01
US9109399B2 (en) 2015-08-18
WO2010020214A8 (en) 2010-04-22
EA023341B1 (en) 2016-05-31

Similar Documents

Publication Publication Date Title
EP2340348A2 (en) Drilling station
EP2337922B1 (en) Drilling rig and mounting method therefor
EP1105619B1 (en) Drilling device and method for drilling a well
EP2521834B1 (en) Method and apparatus for supplying drill pipes to and removing them from a drilling apparatus
DE3787631T2 (en) Device for storing and handling drill pipes between horizontal and vertical position.
DE2615395C2 (en) Arrangement for the step-by-step successive movement of at least three structural or supporting parts one behind the other
DE102011052399A1 (en) Method and device for separating pipes
WO2005073495A1 (en) Device for the production of deep drilling in geological structures
DE102012016878A1 (en) Boring bar handler, drilling rig for a drilling rig, and method of moving boring bars on a rig
DE102004004315A1 (en) Apparatus and method for handling objects on a drilling rig
WO2005073471A1 (en) Foundation construction for a deep-drilling platform
DE102009043081A1 (en) Storage device for vertical storing of drilling rod in drilling mast of vertical drilling system, has upper retaining device exhibiting retaining slot, which extends with respect to rotation device
DE69119852T2 (en) Marine structure
EP2093373B1 (en) Drilling device, in particular for producing blast holes in the bed of a body of water and method for inserting an explosive charge into the bed of a body of water
WO2021069154A1 (en) Underwater dredging device and method for dredging up bed material under water
DE102014107813A1 (en) Portal scraper with supporting structure based on a truss structure
EP2839105B1 (en) Pipe rack and method for feeding and removing tubular bodies to and from a drilling installation
DE2952525A1 (en) DEVICE FOR CONNECTING UNDERWATER PIPES
WO2010017830A1 (en) Drilling rig for deep well drilling
DE10354083B4 (en) Self-transportable container as a base station for underground installations
EP2390418B1 (en) Method for installing an offshore facility and offshore facility
DE202023100420U1 (en) double excavator system
DE202022101814U1 (en) Device for producing ground bores, which in particular run essentially horizontally
EP4392646A1 (en) Shaft excavator
EP4069942A1 (en) Device for sinking a vertical borehole

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20110318

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: AL BA RS

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20141119

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MAX STREICHER GMBH & CO. KG AA

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20180301