EP2142717A1 - Stahlrahmen und verfahren zu dessen anhebung - Google Patents

Stahlrahmen und verfahren zu dessen anhebung

Info

Publication number
EP2142717A1
EP2142717A1 EP08775456A EP08775456A EP2142717A1 EP 2142717 A1 EP2142717 A1 EP 2142717A1 EP 08775456 A EP08775456 A EP 08775456A EP 08775456 A EP08775456 A EP 08775456A EP 2142717 A1 EP2142717 A1 EP 2142717A1
Authority
EP
European Patent Office
Prior art keywords
pillar
pillars
beams
steel frame
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP08775456A
Other languages
English (en)
French (fr)
Other versions
EP2142717A4 (de
Inventor
Marko Moisio
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rautaruukki Oyj
Original Assignee
Rautaruukki Oyj
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rautaruukki Oyj filed Critical Rautaruukki Oyj
Publication of EP2142717A1 publication Critical patent/EP2142717A1/de
Publication of EP2142717A4 publication Critical patent/EP2142717A4/de
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2421Socket type connectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2451Connections between closed section profiles

Definitions

  • the present invention relates to a steel frame of a building the frame comprising at least horizontal beams and vertical pillars.
  • the invention also relates to a method of erecting a steel frame.
  • the steel frame of buildings is a structure mainly consisting of vertical support pillars and horizontal load-bearing beams. Additionally, trellis structures having various kinds of diagonal braces, triangular structures and the like, are used. The trellis structures are often prefabricated into installation modules in the workshop. The dimensioning and structure of the frame are planned individually for each case.
  • the frame can, for example, be a part of the load-bearing frame structure of the building and act as connector structure with, for example, concrete structures.
  • the frame can also act as a stand-alone load-bearing structure.
  • the advantages of a steel frame are, among others, quick assembly, precisely dimensioned parts due to which they can easily be attached to each other and a good load-bearing capacity in relation to the dimensions and weight of the frame.
  • the flexibility of designing a steel frame is exemplified in thin and low structures and the easiness of connections.
  • a steel frame makes it possible to achieve a good dimensional precision for e.g. parts related to the facade.
  • the steel frames are transported and handled with the same lifting and transport apparatuses as the other component parts, i.e. either fixed cranes or movable vehicle cranes. Both of these lift the load with a hook or other carrying means suspended by wires and the load hangs freely from the ends of the wires. During such lifting the load can freely swing sideways and the pillars or beams must be guided precisely onto their places by hand.
  • installing the parts requires in addition to the crane driver at least one installer for guiding the beam or pillar and for performing the necessary fastening.
  • the most common ways of fastening structures are welding and various bolt connections.
  • the frame is assembled one floor at a time and the crane is used for moving the pillars and beams into their correct places.
  • Screw fastenings can be lightly installed in their places and the welded connections can also be preinstalled for final fastening welding and the bolts are tightened and the final welding is made in their time after the parts are lifted in place.
  • the installation work of the frame requires a lot of labour because the pillars and frames must be guided into their places by hand.
  • the accuracy of a wire-operated crane moving a freely hanging load is not sufficient for positioning parts without manual labour.
  • the bolt holes must be exactly aligned in order to be able to make the connection. Weld seams do require a good installation accuracy as well for forming a correct groove that can be reliably welded.
  • frame installers position the parts of the frame in place and manufacture the connection. Often the pillar or beam must also be supported during manufacturing of the connection or at least in the beginning thereof so that the part is not allowed to move out of alignment.
  • the support is provided with the site lifting apparatuses, the capacity of which must be used for a long time.
  • the site lifting apparatuses the capacity of which must be used for a long time.
  • the aim of the present invention is to provide a novel kind of steel frame, easier to erect than previous frame structure.
  • the invention is based on the idea that a support surface is formed on the end of at least one pillar and a mating surface on the opposite end of a pillar so that the support surface and the mating surface can be located nested one inside the other, thus forming a sleeve structure.
  • At least one of the nested surfaces includes a chamfering for making aligning the ends of the pillars easier.
  • the ends of the pillars are provided with positioning means by means of which the pillars formed as extensions of each other can be positioned in the direction of their longitudinal axis.
  • the pillar is tubular and the chamfering is a cone arranged in the end of the pillar and the first positioning means is a flange, whereby their mating surfaces at the other end of the pillar are the inner hole of the pillar and the edge of the end of the pillar.
  • the pillars comprise positioning and suspension means for at least transverse beams.
  • At least one end of the pillar comprises locking means for gripping another pillar.
  • the locking means are a collar tightened around the end of the pillar.
  • the invention allows a faster and less labour-intensive assembly of the frame than with previous installation methods.
  • the erecting of the frame can to large degree be automatized by using the apparatus described by the applicant in a parallel application for handling the pillars.
  • the apparatus is used for taking the pillars into their places and positioning them by means of a grabber.
  • the grabber can comprise a welding apparatus for attaching the pillar or means for rotating the pillar, whereby a threaded connection can be used in the ends of the pillar. Many other connection methods can also be used for assembling the structure.
  • a grabber apparatus the erecting of the frame and making the connections can be almost totally automatized, if desired.
  • connection method is, for example, shrink fit connection, in which the end of the outer pillar is heated so that it can be arranged around the end of the inner pillar.
  • the heating can easily be carried out by means of, for example, a gas-operated flame ring or an induction heater attached on the grabber.
  • This installation method can even be faster than automatic welding. All in all the invention makes it possible reliably erect the frame without bolt connections, the installation and tightening of which is time- consuming and requires a lot of labour.
  • the pillars can be filled with concrete or fire resistant material.
  • Figure 1 illustrates one pillar connection method according to the invention.
  • FIG. 2 illustrates another connection method according to the invention.
  • Figure 3 illustrates one pillar connection structure method according to the invention.
  • Figure 4 illustrates one pillar connection structure method according to the invention.
  • Figure 5 illustrates one pillar connection structure method according to the invention.
  • Figure 6 illustrates an assembled frame structure
  • Figure 7 is a schematic diagram of assembly of a frame according to the invention by means of a frame erecting apparatus comprising a grabber.
  • the pillars 1 and 2 are straight pillars made of steel tubing. Rectangular hollow beams having a lower flange are used as beams 3.
  • the connection is made via a sleeve 4, 5 formed between pillars 1 and 2.
  • the sleeve comprises a support part going inside the first pillar - lower pillar 1 - that is preferably conical, a transverse flange 5 supported by the upper end of the lower pillar 1 and an installation cone 4 in the shape of a truncated cone to be inserted inside the pillar tube of the second pillar - upper pillar 2.
  • the support part inserted into the lower pillar 1 and the installation cone 4 inserted into the upper pillar 2 preferably have similar form, but as such their form can be freely selected and the forms can differ from each other, as long as the functional requirements presented below are fulfilled.
  • the extension point of beams 3 is arranged at the connection point between pillars 1, 2.
  • the advantage of this arrangement is that the connections of both beams and pillars are made in the same installation point, whereby there is no need to move the machines and tools when making, for example, a weld connection.
  • the upper and lower flanges 6, 7 of the beams to be connected are provided with semi-circular cuts 8 corresponding to the outer diameter of the upper pillar 2.
  • the structure of figure 2 differs from that of figure 1 so that there at least the part of the installation cone 4 on the side of the flange 4 comprises a cylindrical support surface 9.
  • This support surface 9 can be supported by the inner part of the upper pillar 2 or the cuts 8 in the beams 3 in the connection point. If the support surface 9 is dimensioned so as to be supported by the cuts 8 of the beam 3, the upper part of the support surface 9 at the connection point of the cone 4 is provided with an edge 10 on which the upper pillar 2 can be placed. If the beam 3 is supported directly by the support surface 9, the advantage is that the beam 3 is better supported during installation, but on the other hand, the support for the upper pillar 2 is weaker. If the upper pillar 2 is located over the support surface 9 and is supported by flange 5, the assembled structure will be stronger.
  • Figure 3 illustrates a sleeve solution in which the diameters of the pillars must be similar.
  • the lower pillar 1 has a smaller diameter and the diameter of the upper pillar is larger.
  • the connection sleeve is a cup located over the lower pillar comprising a cylindrical body part 11, a sleeve 5 forming a collar connected on one edge thereof, a cone part 12 connected to the opposite end of the body part and a cover 13 closing the sleeve cup.
  • the inner surface of the body part 11 is dimensioned to fit around the outer surface of the lower pillar 1 and its outer surface corresponds to the inner diameter of the upper pillar.
  • the end of the lower pillar 1 is provided with a bevel 14 supported by the lower surface of the cone part 12.
  • the upper end of the lower pillar 1 is supported by the inner surface of the cover 13 of the sleeve cup.
  • the cone part 12 and the cover 13 position the sleeve cup onto the end of the lower pillar 1.
  • Beam 3 or beams are arranged on flange 5 and they are installed around the outer surface of the upper pillar.
  • the above-mentioned structure can be turned around so that the places of the lower pillar 1 and the upper pillar are reversed. Thus, only the beam or beams 3 are located on the other side of the flange 5. Because the lower pillar 1 has a larger load, this structure is more preferred because in it the pillar having the larger diameter and the larger load capacity is located lower.
  • Figure 4 illustrates a simpler embodiment than the previous ones.
  • the pillar structure comprises nested pillar tubes 1, 2 of which the thinner one 2 is provided with a flange 5 by means of, e.g. welding, at a distance from the end of the pillar.
  • the end of the same pillar 1 is provided with a bevel 15.
  • the pillars are installed in this position, the upper pillar 2 is located over the lower pillar 1, supported by the flange 5.
  • the bevel 15 makes it easier to arrange the lower end of the upper pillar 2 onto the end of the lower pillar.
  • the outer and inner diameters of the tubes must closely fit each other, especially when using a shrink fit connection.
  • the beam 3 is installed over the flange 5 so that it is supported by the outer surface of the upper pillar.
  • This connection method can be reversed as well, whereby the beam 3 is located on the other side of the flange 5 and it is supported by the surface of the thinner pillar 1.
  • the alternative of figure 5 is different from this one in that there the beam 3 is located on the flange 5 and against the surface of the thinner pillar 1.
  • the larger pillar 2 is located on the beam 3, the inside of the box structure of the beam 3 being provided with a support flange 16 for transferring the load exerted on the upper surface of the beam to the flange 5.
  • Figure 5 illustrates an assembled structure according to the invention.
  • connection points of the beams 17 are located offset from the connection points of the pillars, whereby a hole is formed in the box structure of the beams at the place of the pillars.
  • the assembly method of all the above-mentioned connection method is relatively similar.
  • the beams and pillars are prepared either at the factory or at the construction site at the latest by making into the beams round holes or curved cuts for the pillars.
  • the holes or cuts are made to suit the diameters of the pillars.
  • For box-section beams it is preferable to have vertical webs intact on the side of the pillars. With I-beams the web can be left intact and the grooves needed for the web can be cut into the ends of the pillars. If sleeves according to figures 1 , 2 or 3 are used, the sleeves are placed to the ends of the pillars, preferably to the ends of the lower pillars, whereby the beams can be placed on their flanges.
  • the parts are manufactured at the machine shop, whereby it is possible to use correct machining tools for manufacturing the parts and the parts are ready for installation at the construction site.
  • the first lower pillars 1 are installed on the foundation. If sleeves 4, 5 or 11-13 are used, they are placed on top of the pillars if that has already not been done.
  • the beams 3 are lifted on flanges 5, subsequent to which the next pillars 2, i.e. upper pillars, can be installed.
  • Welding is an advantageous way of making the connections of the structure. Welding machines are used on construction sites and welding is the most preferred connection method for connecting beams to pillars. The beams and pillars themselves can be fastened to each other by other means as well.
  • One preferred method is shrink fit connection, in which the larger tube, in this case the end of the pillar, is heated, whereby its diameter increases. The heated end of the pillar is taken over the head of the smaller pillar and the pillars are pushed one inside the other. When the heated tube cools, it shrinks tightly over the smaller tube.
  • Various flame or induction heaters are inexpensively available and they are easy to use.
  • a shrink fit connection is immediately load-bearing, so no flange 5 is necessarily needed for positioning the height position of pillars in the case of e.g. figures 4 and 5, but the upper pillar can be pushed accurately on place and then wait a while for it to cool, subsequent to which the installation is complete. It is, however, advantageous to use a flange just for easing positioning, but in case there is no flange, the beams must be suspended during the whole of the fastening process.
  • Shrink-fit connection is also suitable for fastening the sleeves.
  • a shrink-fit connection can require shortening the ends of beams to an accurate length, but not necessarily. Forming a threaded connection between the ends of the beams is also possible, but making such to the ends of the pillars is currently expensive.
  • An interference fit in which parts accurately fitting each other are pressed into contact with each other, can also be used for connections.
  • the inner diameter is slightly larger than the outer diameter, whereby a necessary connection force is provided.
  • the connection can be made by forming a groove in the end of the pillar and by fitting a tightenable collar around the end of the pillar or by providing tightening lugs along the edges of the groove, by means of which the end of the pillar is fastened to a separate sleeve or to the end of another pillar.
  • the possibility of using such a fastening method depends on the beam structure. All seam points can, if necessary, be ensured with weld seams.
  • the frame structure according to the invention is very suitable for erecting with the apparatus described below.
  • an erecting apparatus comprising a rigid boom system and a grabber.
  • This apparatus allows moving the pillars straight to their places and due to the bevels made to the structure no separate guiding is needed in the installation target.
  • the grabber can be provided with flame or induction heater, welding apparatuses or other tools necessary for the installation.
  • the apparatus illustrated in figure 7 comprises a conventional known tractor 17 and a transfer beam system 18 attached thereto.
  • the end of the beam system 18 is provided with a grabber 19 for gripping the pillars 1, 2.
  • the boom system 18 is to transfer the grabber 19 in a three-dimensional environment to a certain point and this function can be carried out by means of many kinds of boom systems.
  • the grabber is to, naturally, first to try and grip the pillar 1, 2 (in the figure) or a beam. On the other hand it is to position the end of the pillar at exactly the correct place by means of rotation movements about the horizontal and vertical plane of the grabber.
  • the grabber also makes sure that the position of the pillar or the beam is correct, hi the example of figure 7 the pillars 1, 2 are positioned vertically and the beams 3 are positioned horizontally.
  • Construction regulations for steel structures include tolerances for, e.g. the largest permissible inclination of the pillars. In order to control this it is preferable to provide the grabber with sensors by means of which the inclination can be controlled and the pillars can be installed vertically.
  • the grabber 19 of the erection apparatus picks the pillar 2 by gripping it near the lower end thereof, i.e. the end located lower when installed in the frame.
  • the pillar is turned to a vertical position by movements of the boom system 18 and the grabber 19 and it is moved to its installation point, in this case to the upper end of the already erected pillar 1.
  • the new pillar 2 is turned into a vertical position and moved to the sleeve 4, 5 of the end of the erected pillar and lowered so as to be supported by the pillar.
  • the upper ends of the pillars are provided with installation sleeves, so the lower end of a new pillar 2, guided by the cone 4, is easily located on top of the erected pillar.
  • the lower end of the cone is provided with a flange 5 onto which the lower end of the new pillar 2 is lowered and on which the beam 3 also rests.
  • the beam 3 is provided with a cut for the ends 1, 2 of the pillars.
  • Any suitable connection can be used for fastening, but if the grabber 19 is provided with an automatic welding apparatus, welding is a very preferable connection method. Thereby the connection will be ready at one go.
  • the frame can be erected by first installing the first line of pillars and then positioning cross-beams on it, subsequent to which another line of pillars and the next beams are installed.
  • the beams can be installed with a site crane as well by manually guiding them, whereby it is possible to simultaneously install new pillars and immediately thereafter beams on the formed installation places.
  • the erecting apparatus and a method of erecting the frame is disclosed in a co-pending application of the applicant.
  • the frame according to the invention can also be erected by means of other kinds of lifting arrangement.
  • the shape of the pillars can be other than round, such as rectangular, square or a polygon. In such a case the other features of the invention must naturally be arranged to fit this shape.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
EP08775456.0A 2007-05-03 2008-04-30 Stahlrahmen und verfahren zu dessen anhebung Withdrawn EP2142717A4 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FI20075312A FI20075312L (fi) 2007-05-03 2007-05-03 Teräsrunko ja menetelmä sen pystyttämiseksi
PCT/FI2008/050237 WO2008135634A1 (en) 2007-05-03 2008-04-30 Steel frame and method for raising the same

Publications (2)

Publication Number Publication Date
EP2142717A1 true EP2142717A1 (de) 2010-01-13
EP2142717A4 EP2142717A4 (de) 2014-09-17

Family

ID=38069480

Family Applications (1)

Application Number Title Priority Date Filing Date
EP08775456.0A Withdrawn EP2142717A4 (de) 2007-05-03 2008-04-30 Stahlrahmen und verfahren zu dessen anhebung

Country Status (4)

Country Link
EP (1) EP2142717A4 (de)
FI (1) FI20075312L (de)
RU (1) RU2459911C2 (de)
WO (1) WO2008135634A1 (de)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6379464B2 (ja) * 2013-09-18 2018-08-29 株式会社大林組 接合構造
AU2016358206A1 (en) * 2015-11-20 2018-07-05 Engineering Innovations Group Pty Limited Thermal fit connection
JP6866021B2 (ja) * 2017-01-18 2021-04-28 株式会社熊谷組 形鋼の接合方法
EP3502368B1 (de) * 2017-12-21 2023-12-06 Tomba Enterprises Pty Ltd Struktureller verbinder

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR921426A (fr) * 1945-11-13 1947-05-07 Charpente métallique
US3378971A (en) * 1962-08-17 1968-04-23 Singer Building structures and joint members therefor
FR2355133A1 (fr) * 1976-06-14 1978-01-13 Gronert Ronald Assemblage d'elements de construction prefabriquee
EP0843053A1 (de) * 1996-11-15 1998-05-20 Dyckerhoff & Widmann Ag Kraftschlüssige Verbindungskonstruktion zwischen Stützen-und Trägerelementen bzw. Trägerelementen untereinander
EP1081300A2 (de) * 1999-09-03 2001-03-07 Leitner Gmbh Bauwerk
GB2376281A (en) * 2001-06-06 2002-12-11 Corus Uk Ltd Connector for joining tubular columns

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1269183A (fr) * 1960-06-28 1961-08-11 Ossature métallique porteuse préfabriquée pour bâtiments
SU642442A1 (ru) * 1976-05-26 1979-01-15 Ордена Октябрьской Революции Всесоюзный Государственный Проектно-Изыскательский И Научно-Исследовательский Институт Энергетических Систем И Электрических Сетей "Энергосетьпроект" Северозападное Отделение Узел соединени трубчатых элементов
JPH0633514A (ja) * 1992-07-17 1994-02-08 Nitsuseki House Kogyo Kk 鉄骨構造体を構成する方法
JPH0913743A (ja) * 1995-07-03 1997-01-14 Nippon Steel Corp 継手および継ぎ式鋼管柱
JP2001342681A (ja) * 2000-06-01 2001-12-14 Kajima Corp 鉄骨架構
JP3568475B2 (ja) * 2000-12-14 2004-09-22 ナカジマ鋼管株式会社 丸形鋼管柱用構造体および丸形鋼管柱用構造体の製造方法
NL1022386C2 (nl) * 2002-01-14 2003-08-19 Volker Stevin Rail & Traffic B Palengrijper.
JP2004116285A (ja) * 2003-10-23 2004-04-15 Jgc Corp 架構構造物

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR921426A (fr) * 1945-11-13 1947-05-07 Charpente métallique
US3378971A (en) * 1962-08-17 1968-04-23 Singer Building structures and joint members therefor
FR2355133A1 (fr) * 1976-06-14 1978-01-13 Gronert Ronald Assemblage d'elements de construction prefabriquee
EP0843053A1 (de) * 1996-11-15 1998-05-20 Dyckerhoff & Widmann Ag Kraftschlüssige Verbindungskonstruktion zwischen Stützen-und Trägerelementen bzw. Trägerelementen untereinander
EP1081300A2 (de) * 1999-09-03 2001-03-07 Leitner Gmbh Bauwerk
GB2376281A (en) * 2001-06-06 2002-12-11 Corus Uk Ltd Connector for joining tubular columns

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of WO2008135634A1 *

Also Published As

Publication number Publication date
RU2009144784A (ru) 2011-06-10
EP2142717A4 (de) 2014-09-17
FI20075312L (fi) 2008-11-04
RU2459911C2 (ru) 2012-08-27
FI20075312A0 (fi) 2007-05-03
WO2008135634A1 (en) 2008-11-13

Similar Documents

Publication Publication Date Title
US4339899A (en) Adjustable connector for coupling tower leg to foundation support anchor
WO2008135634A1 (en) Steel frame and method for raising the same
CN110640685B (zh) 一种用于狭小空间风管螺栓紧固装置及其施工方法
CN112324131B (zh) 一架两用大跨度劲性梁施工结构及其施工工法
CN110725550B (zh) 吊架及厂房钢结构附加层的施工方法
JP5970124B1 (ja) 仮支持柱、及び、電柱建替方法
CN108678181B (zh) 仓顶钢桁架和混凝土组合结构高空施工方法
CN216029086U (zh) 一种垂直管线的安装设备
CN217579784U (zh) 一种悬索桥锚固***钢拉杆的整体组装设备
CN109025287B (zh) 一种斜圆柱大型钢套筒预埋件后锚施工方法
CN109778890A (zh) 一种低层住宅装配式轻钢地基模块、地基及其施工方法
CN215482893U (zh) 一种桩基钢筋笼侧推式控制器
CN211712490U (zh) 管道井管道吊装装置
JP5860187B1 (ja) 吊り足場を拡張する方法および拡張された吊り足場
CN109235271B (zh) 组合桥塔钢壳节段的竖筋定位工装、定位卡座及工作方法
CN113932068B (zh) 环形管廊中弹簧顶置式隔振吊架装配方法
CN117627376B (zh) 一种模块化钢梁和檩条整体安装施工方法
CN113235826B (zh) 一种钢筋丝接安装定位方法
AU2016203317B2 (en) Ground Engaging Construction Support
CN114014158B (zh) 特大型模块化空分冷箱的高空组对调整方法
JP6688612B2 (ja) 杭構造及び杭の組立方法
CN117489130B (zh) 一种环形钢桁架施工工艺
CN215671166U (zh) 一种钢筋丝接安装定位装置
JPH07216877A (ja) 鉄筋建て込み方法及びこれに用いる鉄筋建て込み装置
CN108411764A (zh) 适于强腐蚀环境下的uhpc预制面板栈桥及拼装方法

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20091029

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20140820

RIC1 Information provided on ipc code assigned before grant

Ipc: E04B 1/24 20060101AFI20140813BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20141101