EP1154947B1 - Elevator system - Google Patents

Elevator system Download PDF

Info

Publication number
EP1154947B1
EP1154947B1 EP00906402A EP00906402A EP1154947B1 EP 1154947 B1 EP1154947 B1 EP 1154947B1 EP 00906402 A EP00906402 A EP 00906402A EP 00906402 A EP00906402 A EP 00906402A EP 1154947 B1 EP1154947 B1 EP 1154947B1
Authority
EP
European Patent Office
Prior art keywords
elevator
machine room
rope
arrangement
car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP00906402A
Other languages
German (de)
French (fr)
Other versions
EP1154947A1 (en
Inventor
Anthony Singh
Seppo J. Kiviniemi
Risto Kontturi
Johannes De Jong
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kone Corp
Original Assignee
Kone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kone Corp filed Critical Kone Corp
Publication of EP1154947A1 publication Critical patent/EP1154947A1/en
Application granted granted Critical
Publication of EP1154947B1 publication Critical patent/EP1154947B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/02Installing or exchanging ropes or cables

Definitions

  • the present invention relates to an elevator arrangement as defined in the preamble of claim 1.
  • elevators are needed before the building has been finished. Either the elevators are needed for construction time use or the lower floors are completed before the rest, in which case the elevators serving them must be available for use. As the construction work is advancing, the elevator must be able to serve as many floors as possible.
  • jump elevators For construction time use, so-called jump elevators have been developed, in which the hoisting height of the elevator is increased gradually as the construction work advances.
  • the elevator machine room is moved to an upper level and the length of the elevator rope is increased correspondingly.
  • a general requirement concerning elevators is that the elevator should be usable in its entirety and with all its properties. Therefore, all other components depending on the hoisting height, such as the car cables, compensating ropes, overspeed governors and the electrification and electric cables in the hoistway should also be extended through the whole length of the finished hoistway.
  • FIG. 3 of JP-A-07/97157 shows in detail the releasble anchorage 17 employed in the elevator arrangement according to figure 1; by successively attaching the end of the elevator rope to anchorages spaced upwardly along the elevator shaft, the effective length of rope may be increased whenever the rise of the building increases.
  • a winding drum 21 selectively lockable against rotation, combines the functions of rope store and of detent means and is situated at the bottom of, and outside the elevator shaft.
  • the object of the present invention is to achieve an economic elevator arrangement for construction time use which, with the progress of construction work, can be easily lifted to a higher working level and which is also suited for use as the regular elevator of the building.
  • the invention is characterized by the features presented in the characterization part of claim 1.
  • Other preferred embodiments of the invention are defined in the subclaims.
  • detent means for the elevator ropes are disposed substantially proximate the machine room deck in order to selectively secure the elevator ropes against movements. Further the elevator ropes extend beyond the detent means to a rope supply located outside the hoistway and below the machine room deck.
  • the solution of the invention allows easy provision of the additional rope length needed as the height of the building increases.
  • all components of the elevator are always immediately available for use without complicated adjustments or settings.
  • Those portions of the hoist rope and compensating rope which are not yet in use can be freely disposed in a suitable place, even in a space outside the building.
  • the equipment in the machine room used during construction constitutes the elevator machine room of the finished building as far as applicable.
  • Fig. 1 illustrates the elevator arrangement of the invention.
  • the drive machine 18 consists of an elevator motor, possibly provided with a gear, and a traction sheave driven by it.
  • An elevator rope 4 has been fitted to run over the traction sheave and attached by one end to the car 2 or car frame.
  • the elevator rope runs over a diverting pulley 20 and via a diverting pulley 54 mounted in the upper part of the counterweight 56 back to the machine room deck 22, from where the elevator rope 4 is further passed over a diverting pulley 55 and fixed substantially at the level of the machine room deck 22 by means of a clamp 24 fastened to the hoistway or building structures.
  • the elevator car is implemented using a 1:1 suspension ratio, so the circumferential velocity of the traction sheave corresponds to the velocity of the elevator car.
  • the counterweight is suspended with a ratio of 1:2, so the velocity of the counterweight equals half the circumferential velocity of the traction sheave.
  • a compensating rope 10 Fixed in a known manner to the bottom of the elevator car 2 is a compensating rope 10, which is passed via a diverting pulley 12 in the lower part of the hoistway and via a diverting pulley 58 connected to the lower end of the counterweight 56 to the bottom of the hoistway, where it is fastened to a rope clamp 26.
  • the compensating rope as well as the elevator rope are suspended with a ratio of 1:1 on the side of the elevator car and with a ratio of 1:2 on the side of the counterweight.
  • the elevator works in the normal manner.
  • the rope supply is preferably located in the lower part of the building at or below the level of the first temporary position of the machine room deck.
  • the extra portion 14 of the compensating rope behind clamp 26 is stored on rope reels in rope supply 16.
  • the overspeed governor rope 32 is attached by one end to the elevator car and passed via a diverting pulley 35 in the lower part of the hoistway to the overspeed governor wheel 34.
  • the overspeed governor rope 32 is fastened to a clamp 36 on the top of the car and the free rope portion 38 is stored in an overspeed governor rope supply 40 placed on the top 42 of the car.
  • Deck 48 is connected to deck 22 in such a way that both decks can be raised together as the construction work advances.
  • the supply of electricity to the elevator car and the control of the car equipment are implemented in a manner known in itself by using a car cable 43, which is connected to the elevator car 2 and to the elevator control unit 50.
  • a car cable supply 44 is provided on the machine room deck 22.
  • a hoistway cable supply 46 for hoistway wiring 45 is likewise provided on the machine room deck 22.
  • Fig. 2 presents another example of an embodiment of the invention, in which the compensating system is implemented using chains 60.
  • the compensating chain 60 is extended with the required length of additional chain.
  • the arrangement in Fig. 2 corresponds to the solution illustrated in Fig. 1 and corresponding parts are indicated by the same reference numbers as in Fig. 1.
  • the elevator machine room and its supporting beams are raised somewhat by means of a crane or construction hoist (not shown), whereupon the supporting means of the machine room structure can be released.
  • the machine room is raised to the next machine room level by means of a hoist or by some other applicable hoisting method.
  • the hoist ropes and compensating ropes run freely from the rope reels of the rope supplies.
  • a length of overspeed governor rope is spooled off from the overspeed governor rope reel on the top of the elevator car.
  • lengths of car and hoistway cable corresponding to the lift are released from the car cable and hoistway cable reels on the machine room deck.
  • the supporting means of the machine room deck are activated and the machine room supporting beams are reliably secured to the building.
  • the overspeed governor rope is fixed to the top of the car.
  • the elevator car is hoisted to the highest level by means of a hoist or crane, whereupon the hoist ropes and compensating ropes are secured, tightened to the right tension and locked in place by means of rope clamps.
  • the counterweight is released and the car and hoistway cables are secured and connected to the control panel. After this, the elevator is ready to serve the new floors.
  • the compensating chain is extended before the machine room deck is hoisted to the new working level.
  • the construction time machine room together with the hoisting machine and other machine room equipment can be left permanently in place, so that they form a corresponding part of the machine room.
  • the rope supplies and other equipment used temporarily during construction are now unnecessary and they are naturally removed.

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Description

  • The present invention relates to an elevator arrangement as defined in the preamble of claim 1.
  • During the construction of high-rise buildings, elevators are needed before the building has been finished. Either the elevators are needed for construction time use or the lower floors are completed before the rest, in which case the elevators serving them must be available for use. As the construction work is advancing, the elevator must be able to serve as many floors as possible.
  • For construction time use, so-called jump elevators have been developed, in which the hoisting height of the elevator is increased gradually as the construction work advances. The elevator machine room is moved to an upper level and the length of the elevator rope is increased correspondingly. A general requirement concerning elevators is that the elevator should be usable in its entirety and with all its properties. Therefore, all other components depending on the hoisting height, such as the car cables, compensating ropes, overspeed governors and the electrification and electric cables in the hoistway should also be extended through the whole length of the finished hoistway.
  • From specification US 5,033,586, a solution is known in which the elevator machine room can be raised to and mounted at a desired height. In this solution, a second deck with a rope supply is disposed above the machine room. When the machine room is to be moved, the elevator car is locked in place so that it remains immovable with respect to the machine room and the required additional rope length is taken from the rope supply. In this solution, the rope supply must be lifted along with the machine room, an extra deck must be built and a complex apparatus is needed for paying out the additional rope.
  • Figure 3 of JP-A-07/97157 shows in detail the releasble anchorage 17 employed in the elevator arrangement according to figure 1; by successively attaching the end of the elevator rope to anchorages spaced upwardly along the elevator shaft, the effective length of rope may be increased whenever the rise of the building increases. In the comparable elevator arrangement according to figure 5 a winding drum 21, selectively lockable against rotation, combines the functions of rope store and of detent means and is situated at the bottom of, and outside the elevator shaft.
  • The elevator arrangement according to figure 5 of JP-A-07/97157 is considered to represent the closest available prior art.
  • The object of the present invention is to achieve an economic elevator arrangement for construction time use which, with the progress of construction work, can be easily lifted to a higher working level and which is also suited for use as the regular elevator of the building. To implement this, the invention is characterized by the features presented in the characterization part of claim 1. Other preferred embodiments of the invention are defined in the subclaims.
  • According to the invention as defined in claim 1 detent means for the elevator ropes are disposed substantially proximate the machine room deck in order to selectively secure the elevator ropes against movements. Further the elevator ropes extend beyond the detent means to a rope supply located outside the hoistway and below the machine room deck.
  • The solution of the invention allows easy provision of the additional rope length needed as the height of the building increases. When the machinery is moved to a new working level, all components of the elevator are always immediately available for use without complicated adjustments or settings. Those portions of the hoist rope and compensating rope which are not yet in use can be freely disposed in a suitable place, even in a space outside the building. The equipment in the machine room used during construction constitutes the elevator machine room of the finished building as far as applicable.
  • In the following, the invention will be described in detail by the aid of one of its embodiments with reference to the drawings, wherein
    • Fig. 1 presents an elevator according to the invention, and
    • Fig. 2 presents another elevator according to the invention.
  • Fig. 1 illustrates the elevator arrangement of the invention. Mounted in the upper part of the finished part of a hoistway, which is defined by side walls 28 and 30 and a back wall 29, is a machine room deck 22, which carries the elevator drive machine 18. The drive machine 18 consists of an elevator motor, possibly provided with a gear, and a traction sheave driven by it. An elevator rope 4 has been fitted to run over the traction sheave and attached by one end to the car 2 or car frame. On the other side of the traction sheave, the elevator rope runs over a diverting pulley 20 and via a diverting pulley 54 mounted in the upper part of the counterweight 56 back to the machine room deck 22, from where the elevator rope 4 is further passed over a diverting pulley 55 and fixed substantially at the level of the machine room deck 22 by means of a clamp 24 fastened to the hoistway or building structures. In this example, the elevator car is implemented using a 1:1 suspension ratio, so the circumferential velocity of the traction sheave corresponds to the velocity of the elevator car. On the other hand, the counterweight is suspended with a ratio of 1:2, so the velocity of the counterweight equals half the circumferential velocity of the traction sheave. Fixed in a known manner to the bottom of the elevator car 2 is a compensating rope 10, which is passed via a diverting pulley 12 in the lower part of the hoistway and via a diverting pulley 58 connected to the lower end of the counterweight 56 to the bottom of the hoistway, where it is fastened to a rope clamp 26. Thus, the compensating rope as well as the elevator rope are suspended with a ratio of 1:1 on the side of the elevator car and with a ratio of 1:2 on the side of the counterweight. As for the hoisting machinery and compensating ropes, the elevator works in the normal manner.
  • That part 6 of the elevator rope which is not in use during construction hangs freely below the clamp 24 and the extra rope is spooled on rope reels in a rope supply 8. The rope supply is preferably located in the lower part of the building at or below the level of the first temporary position of the machine room deck. Similarly, the extra portion 14 of the compensating rope behind clamp 26 is stored on rope reels in rope supply 16.
  • The overspeed governor rope 32 is attached by one end to the elevator car and passed via a diverting pulley 35 in the lower part of the hoistway to the overspeed governor wheel 34. The overspeed governor rope 32 is fastened to a clamp 36 on the top of the car and the free rope portion 38 is stored in an overspeed governor rope supply 40 placed on the top 42 of the car.
  • Provided on the machine room deck or on another deck 48 located near it is a space for a control panel 52 and an elevator control unit 50. Deck 48 is connected to deck 22 in such a way that both decks can be raised together as the construction work advances. The supply of electricity to the elevator car and the control of the car equipment are implemented in a manner known in itself by using a car cable 43, which is connected to the elevator car 2 and to the elevator control unit 50. To allow for future hoisting heights, a car cable supply 44 is provided on the machine room deck 22. Correspondingly, a hoistway cable supply 46 for hoistway wiring 45 is likewise provided on the machine room deck 22.
  • Fig. 2 presents another example of an embodiment of the invention, in which the compensating system is implemented using chains 60. In this case, no continuous compensating rope and no rope supply for it are needed, but when the machine room is moved to a higher level, the compensating chain 60 is extended with the required length of additional chain. In other respects, the arrangement in Fig. 2 corresponds to the solution illustrated in Fig. 1 and corresponding parts are indicated by the same reference numbers as in Fig. 1.
  • When the machine room of the elevator is to be raised to the next level, a procedure as described below is observed. The elevator car is driven in service operation mode to the highest position possible. The counterweight is now in its low position, and it is made fast and locked in place. After this, the car is secured in place e.g. by locking it to the guide rails or in some other reliable manner. The rope clamps of the hoist rope and compensating rope are released, whereupon the required additional rope length can be paid out from the rope supplies. The rope clamp holding the overspeed governor rope is loosened so that the rope can slide during the hoisting of the machine room. The wires connected to the elevator control panel are disconnected.
  • The elevator machine room and its supporting beams are raised somewhat by means of a crane or construction hoist (not shown), whereupon the supporting means of the machine room structure can be released. The machine room is raised to the next machine room level by means of a hoist or by some other applicable hoisting method. During the raising, the hoist ropes and compensating ropes run freely from the rope reels of the rope supplies. Similarly, a length of overspeed governor rope is spooled off from the overspeed governor rope reel on the top of the elevator car. Likewise, lengths of car and hoistway cable corresponding to the lift are released from the car cable and hoistway cable reels on the machine room deck.
  • After the machine room deck has been hoisted to the new position, the supporting means of the machine room deck are activated and the machine room supporting beams are reliably secured to the building. The overspeed governor rope is fixed to the top of the car. The elevator car is hoisted to the highest level by means of a hoist or crane, whereupon the hoist ropes and compensating ropes are secured, tightened to the right tension and locked in place by means of rope clamps. The counterweight is released and the car and hoistway cables are secured and connected to the control panel. After this, the elevator is ready to serve the new floors.
  • In the case of elevators in which the compensating system is implemented using chains, the compensating chain is extended before the machine room deck is hoisted to the new working level.
  • There are numerous different alternatives for implementing the securing of the car and counterweight during the hoisting of the machine room. Likewise, the hoisting of the machine room and the elevator car can be implemented using one of several alternative methods. Similarly, there are several methods applicable for locking the rope in practice during construction time use. The payout of rope from the rope supplies can be similarly effected in various ways. The location of the rope supply can be selected in each building according to the possibilities available. The control panels and control unit in the machine room may also be located on the same level with the hoisting machine.
  • Once the building has reached its final height, the construction time machine room together with the hoisting machine and other machine room equipment can be left permanently in place, so that they form a corresponding part of the machine room. The rope supplies and other equipment used temporarily during construction are now unnecessary and they are naturally removed.
  • The above description is not to be regarded as a limitation of the sphere of patent protection, but the embodiments of the invention may be freely varied within the limits defined by the claims.

Claims (11)

  1. An elevator arrangement reconfigurable as building construction proceeds in order to service an increasing number of storeys, said arrangement being installed in an at least partially completed elevator hoistway (28, 29, 30) and comprising an elevator car (2), elevator ropes (4), a counterweight (56) and a machine room deck (22) surmounting the hoistway and having an elevator machine (18) disposed thereupon, whereby the elevator ropes (4) are arranged to run from the elevator car (2) to a traction sheave drivingly connected to the elevator machine (18) and further via a diverting pulley (54) mounted on the counterweight (56) to the machine room deck (22), characterized in that detent means (24) are disposed substantially proximate the machine room deck (22) in order to selectively secure the elevator ropes (4) against movement and that the elevator ropes (4) extend beyond the detent means (24) to a rope supply (8) located outside the hoistway and below the machine room deck (22).
  2. Elevator arrangement as defined in claim 1, characterized in that the elevator rope (4) coming from the counterweight (56) is arranged to run over a diverting pulley (55) disposed on the machine room deck and that the detent means (24) are located substantially proximate said diverting pulley (55).
  3. Elevator arrangement as defined in claim 1, characterized in that the system comprises a compensating rope (10) which is secured to the lower part of the elevator car (2) and arranged to run via a diverting pulley (12) below the car to a diverting pulley (58) on the counterweight (56) and further to a clamp (26) securing the compensating rope (10) in the lower part of the hoistway and from the clamp (26) to a compensating rope supply (16).
  4. Elevator arrangement as defined in claim 1, characterized in that it comprises a rope supply (8, 16, 40, 44, 46) for each of the car cable, the hoistway wiring and the overspeed governor rope.
  5. Elevator arrangement as defined in claim 1, characterized in that the control and operating system (50, 52) of the elevator is disposed substantially in conjunction with the machine room deck (22).
  6. Elevator arrangement as defined in any one of claims 1 - 5, characterized in that the machine room deck (22) can be raised.
  7. Elevator arrangement as defined in claim 6, characterized in that, when the machine room deck (22) is to be raised, the elevator car (2) and the counterweight (56) can be locked in place so that they can not move.
  8. Elevator arrangement as defined in any one of claims 6 - 7, characterized in that the rope supplies (8, 16, 40) can supply a length of rope corresponding to the distance through which the machine room deck (22) is raised.
  9. Elevator arrangement as defined in any one of claims 1 - 8, characterized in that the machine room deck (22) is secured to the building.
  10. Elevator arrangement as defined in any one of claims 1 -9, characterized in that, when the building reaches its final height, the machine room deck (22) forms the machine room or a part of the machine room.
  11. Elevator arrangement as defined in any one of claims 1- 10, characterized in that the elevator components used during construction substantially remain parts of the elevator of the completed building.
EP00906402A 1999-02-24 2000-02-22 Elevator system Expired - Lifetime EP1154947B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
FI990403A FI108431B (en) 1999-02-24 1999-02-24 Hissijõrjestelmõ
FI990403 1999-02-24
PCT/FI2000/000143 WO2000050328A2 (en) 1999-02-24 2000-02-22 Elevator system

Publications (2)

Publication Number Publication Date
EP1154947A1 EP1154947A1 (en) 2001-11-21
EP1154947B1 true EP1154947B1 (en) 2006-04-26

Family

ID=8553939

Family Applications (1)

Application Number Title Priority Date Filing Date
EP00906402A Expired - Lifetime EP1154947B1 (en) 1999-02-24 2000-02-22 Elevator system

Country Status (7)

Country Link
EP (1) EP1154947B1 (en)
CN (1) CN1236992C (en)
AU (1) AU745619B2 (en)
DE (1) DE60027547T2 (en)
FI (1) FI108431B (en)
HK (1) HK1040690B (en)
WO (1) WO2000050328A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11279593B2 (en) 2018-05-17 2022-03-22 Otis Elevator Company Compensation line storing apparatus, jump lift and the usage method thereof

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6364067B1 (en) * 2000-09-20 2002-04-02 Otis Elevator Company Method and apparatus for installing elevator components
US20060225965A1 (en) 2003-04-22 2006-10-12 Siewert Bryan R Elevator system without a moving counterweight
CN100554119C (en) * 2003-06-18 2009-10-28 东芝电梯株式会社 Elevator
SE526546C2 (en) * 2004-03-12 2005-10-04 Alimak Ab Elevator system
SG132591A1 (en) * 2005-11-09 2007-06-28 Inventio Ag Method of constructing a lift installation, and lift installation for that purpose
FI119233B (en) * 2005-11-14 2008-09-15 Kone Corp A method of replacing the elevator rope
FI118644B (en) * 2006-11-17 2008-01-31 Kone Corp Elevator installing method for use during construction of tall building, involves dismounting machine room of elevator provided with room, and converting elevator into elevator without machine room by placing hoisting machine
FI20070694A0 (en) * 2007-09-11 2007-09-11 Kone Corp Elevator arrangement
FI121665B (en) * 2009-06-04 2011-02-28 Kone Corp Method of changing the carrier lines to an elevator and method of manufacturing an elevator
FI20100223A0 (en) * 2010-05-28 2010-05-28 Kone Corp Procedure and lift arrangement
FI125115B (en) 2010-12-31 2015-06-15 Kone Corp Procedure and lift arrangement
FI20116094L (en) * 2011-11-04 2013-05-05 Kone Corp A method for installing a lift hoist
FI20116190L (en) * 2011-11-28 2013-05-29 Kone Corp Lift arrangement and method
US9388020B2 (en) * 2012-03-06 2016-07-12 Kone Corporation Method and an elevator arrangement
EP2636629B1 (en) * 2012-03-06 2015-05-06 KONE Corporation A method and an elevator arrangement
FI125124B (en) 2012-05-23 2015-06-15 Kone Corp Lift arrangement and method
EP3248926A1 (en) * 2016-05-24 2017-11-29 KONE Corporation Elevator arrangement and method
EP3478621B1 (en) * 2016-06-30 2020-11-11 Inventio AG Method for constructing a lift assembly with an adaptable usable lifting height
JP6969686B2 (en) * 2018-08-16 2021-11-24 三菱電機株式会社 How to extend the lift of a construction elevator
CN110844743B (en) 2018-08-21 2022-07-12 奥的斯电梯公司 Skip-floor elevator and skip-floor method
WO2020044444A1 (en) * 2018-08-28 2020-03-05 三菱電機株式会社 Construction elevator with extendable hoisting height
CN110817661A (en) * 2019-10-22 2020-02-21 日立电梯(上海)有限公司 Elevator system used during construction
CN113620147A (en) 2020-05-09 2021-11-09 奥的斯电梯公司 Jump elevator system and jump method used in building construction
CN112693992A (en) * 2020-12-21 2021-04-23 大学士工程管理有限公司 Elevator device and installation method thereof
EP4326659A1 (en) * 2021-04-22 2024-02-28 KONE Corporation A construction elevator arrangement and a method for producing the same
CN118139806A (en) * 2021-11-12 2024-06-04 株式会社日立制作所 Construction elevator and method for extending compensation rope of construction elevator

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1050040B (en) * 1900-01-01
US3519101A (en) * 1968-01-10 1970-07-07 Otis Elevator Co Construction elevator system
US5033586A (en) * 1990-07-11 1991-07-23 Otis Elevator Company Construction elevator assembly
FR2694279A1 (en) * 1992-08-03 1994-02-04 Otis Elevator Co Building construction goods lift - is used following first stage works and includes movable attachment points to permit successive upwards relocation as work progresses
JP2705534B2 (en) * 1993-09-28 1998-01-28 三菱電機株式会社 Elevator equipment for construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11279593B2 (en) 2018-05-17 2022-03-22 Otis Elevator Company Compensation line storing apparatus, jump lift and the usage method thereof

Also Published As

Publication number Publication date
FI990403A0 (en) 1999-02-24
DE60027547D1 (en) 2006-06-01
WO2000050328A3 (en) 2000-12-14
DE60027547T2 (en) 2007-04-05
EP1154947A1 (en) 2001-11-21
FI990403A (en) 2000-08-25
HK1040690B (en) 2006-04-28
AU745619B2 (en) 2002-03-28
HK1040690A1 (en) 2002-06-21
FI108431B (en) 2002-01-31
CN1336900A (en) 2002-02-20
WO2000050328A2 (en) 2000-08-31
AU2808800A (en) 2000-09-14
CN1236992C (en) 2006-01-18

Similar Documents

Publication Publication Date Title
EP1154947B1 (en) Elevator system
EP2016015B1 (en) Method for installing the hoisting roping of an elevator
EP0904247B1 (en) Procedure and apparatus for the installation of an elevator
EP0466667B1 (en) Construction elevator assembly
CA2002158C (en) Elevator erection system using pit storage and roof hoist
EP2197777B1 (en) Elevator arrangement and method
EP0457152B1 (en) Elevator hoistway working platform
JP5095401B2 (en) Elevator installation method and elevator
EP0990615B1 (en) Elevator with governor
JP2007099515A (en) Method for mounting support means of lift cage to lift cage and lift shaft
WO2001064572A1 (en) Jump-lift and method for lifting a machine room
EP4039632A1 (en) Method for expanding a rise of an elevator hoistway
JPWO2004028948A1 (en) Elevator equipment
JPH05262475A (en) Installation method of elevator
JPH08133634A (en) Jumping method for jump-up elevator
AU2007247065B2 (en) Elevator arrangement
JP2023177370A (en) Installation assisting device and installation method for elevator hoisting machine
WO2023160817A1 (en) An elevator construction arrangement and a method
JPH10310340A (en) Lift device for installing elevator
WO2023160819A1 (en) An elevator construction arrangement and a method
JPH09221286A (en) Elevating device for setting elevator
WO2002020389A1 (en) Elevator device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20010628

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

17Q First examination report despatched

Effective date: 20030807

RBV Designated contracting states (corrected)

Designated state(s): DE FR GB

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR GB

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 60027547

Country of ref document: DE

Date of ref document: 20060601

Kind code of ref document: P

ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20070129

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 16

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 17

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 18

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20190219

Year of fee payment: 20

Ref country code: GB

Payment date: 20190218

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20190219

Year of fee payment: 20

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 60027547

Country of ref document: DE

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20200221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20200221