FR2694279A1 - Building construction goods lift - is used following first stage works and includes movable attachment points to permit successive upwards relocation as work progresses - Google Patents

Building construction goods lift - is used following first stage works and includes movable attachment points to permit successive upwards relocation as work progresses Download PDF

Info

Publication number
FR2694279A1
FR2694279A1 FR9209616A FR9209616A FR2694279A1 FR 2694279 A1 FR2694279 A1 FR 2694279A1 FR 9209616 A FR9209616 A FR 9209616A FR 9209616 A FR9209616 A FR 9209616A FR 2694279 A1 FR2694279 A1 FR 2694279A1
Authority
FR
France
Prior art keywords
platform
cabin
sheath
elevator
scalable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
FR9209616A
Other languages
French (fr)
Inventor
Brahim Serge
Trichassont Yves
Nicoletto Daniel
Dupoty Gerard
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Otis Elevator Co
Original Assignee
Otis Elevator Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Otis Elevator Co filed Critical Otis Elevator Co
Priority to FR9209616A priority Critical patent/FR2694279A1/en
Publication of FR2694279A1 publication Critical patent/FR2694279A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/16Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
    • B66B9/187Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure with a liftway specially adapted for temporary connection to a building or other structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Transportation (AREA)
  • Automation & Control Theory (AREA)
  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The goods lift has a mobile platform (3) which is attached to the lift cabin (5). The two are connected in the classic arrangement and the platform carries the drive and control machinery (25,27). It is also attached to at least a portion of the lift housing (2). This forms the upper extremity for the working area for the lift. The cabin is connected to a balancing counterweight (7). The attachment points (15) to the lift housing are movable, enabling them to be fixed in place for operation of the lift or released to enable movement of the platform to a higher level. USE/ADVANTAGE - Reduces use of cranes during construction work.

Description

ASCENSEUR OU MONTE-CHARGES EVOLUTIF, SUIVANT L'AVANCEMENT
DU GROS-OEUVRE DE LA CONSTRUCTION DE BATIMENTS.
SCALABLE ELEVATOR OR LIFT
OF THE STRUCTURE OF BUILDING CONSTRUCTION.

L'invention concerne un ascenseur ou monte-charges évolutif, suivant l'avancement du gros-oeuvre de la construction de bâtiments. The invention relates to a scalable elevator or hoist, depending on the progress of the main structure of the construction of buildings.

Un objet de l'invention est de limiter l'utilisation des grues de chantier, de même que celle des monte-charges de chantier dans la construction de bâtiments notamment pour le second oeuvre. On sait en effet que cette utilisation est relativement onéreuse et, de plus, l'emprise provisoire sur façade des monte-charges de chantier ntest pas négligeable. An object of the invention is to limit the use of construction cranes, as well as that of construction hoists in the construction of buildings, in particular for the finishing work. We know that this use is relatively expensive and, moreover, the temporary footprint on the facade of construction hoists is not negligible.

L'invention vise à remédier à ces inconvénients en proposant un ascenseur évolutif, notamment pour l'application en monte-charges de chantier suivant l'avancement de gros-oeuvre de la construction de bâtiments, caractérisé en ce qu'il comporte une plateforme mobile d'entrainement de la cabine d'ascenseur ou de monte-charges, la dite cabine étant reliée de façon classique à la plate-forme, et en ce que la plate-forme est pourvue de l'ensemble des éléments de machinerie et de commande en liaison avec au moins une portion de la gaine d'ascenseur équipée, à la partie supérieure de laquelle elle est fixée pour le fonctionnement de l'ascenseur sur cette portion. The invention aims to remedy these drawbacks by proposing a scalable elevator, in particular for the application of site hoists according to the progress of structural work in the construction of buildings, characterized in that it comprises a mobile platform for driving the elevator car or freight elevator, said car being conventionally connected to the platform, and in that the platform is provided with all the machinery and control elements in connection with at least a portion of the equipped elevator shaft, at the top of which it is fixed for the operation of the elevator on this portion.

I1 résulte de cette disposition que l'ascenseur évolutif selon l'invention peut être monté et fonctionner sur des portions de hauteur successives de la gaine formée en suivant la construction de gros-oeuvre du bâtiment jusqu'à sa hauteur définitive d'implantation et que, ce faisant, il sert à la desserte de chantier sans necessiter d'autres éléments de transport, tels que des grues ou monte-charges provisoires de chantier. I1 results from this arrangement that the scalable elevator according to the invention can be mounted and operate on successive height portions of the sheath formed by following the construction of the building shell to its final installation height and that , in doing so, it serves the site service without requiring other transport elements, such as cranes or temporary site hoists.

La cabine est avantageusement accouplée à un contrepoids d'équilibrage comme un ascenseur classique, en liaison avec la machinerie d'entraînement de la plateforme. The cabin is advantageously coupled to a balancing counterweight like a conventional elevator, in connection with the platform drive machinery.

La plate-forme comporte des moyens amovibles de fixation à la gaine grâce auxquels elle peut être fixée en position pour le fonctionnement de l'ascenseur sur une portion donnée de la gaine ou libèrée pour son déplacement sur une portion étendue de la gaine. The platform includes removable means for fixing to the sheath by means of which it can be fixed in position for the operation of the elevator on a given portion of the sheath or released for its movement over an extended portion of the sheath.

La plate-forme est montée coulissante sur les railsguide de cabine et est équipée de blocs parachutes avec régulateur agissant sur les guides pour parer à tout mouvement accidentel du déplacement au cours des réhausses successives. Elle est pourvue d'un toit de protection permettant l'équipement de la portion de gaine susjacente en toute sécurité. The platform is slidably mounted on the cabin guide rails and is equipped with parachute blocks with regulator acting on the guides to prevent any accidental movement movement during successive raises. It is provided with a protective roof allowing the equipment of the overlying sheath portion to be safely secured.

De plus, le toit est équipé de crochets permettant la manutention successive de la plate-forme avec la cabine et le contre-poids sur les portions successives de gaine formées et équipées au moyen d'un engin de levage tel qu'une grue. In addition, the roof is equipped with hooks allowing the successive handling of the platform with the cabin and the counterweight on the successive portions of sheath formed and equipped by means of a lifting machine such as a crane.

Un exemple de réalisation de l'invention est décrit ci-après en référence aux dessins annexés sur lesquels
La figure 1 est une vue en perspective schématique d'un ascenseur selon l'invention implanté sur une portion basse équipée d'une gaine de bâtiment en construction, et
La figure 2 montre selon une vue de côté agrandie de cet ascenseur son déplacement en hauteur sur une nouvelle portion de hauteur de la gaine.
An exemplary embodiment of the invention is described below with reference to the accompanying drawings in which
FIG. 1 is a schematic perspective view of an elevator according to the invention located on a lower portion equipped with a sheath of a building under construction, and
Figure 2 shows in an enlarged side view of this elevator its displacement in height over a new height portion of the sheath.

L'ascenseur selon l'invention tel que représenté à la figure 1 est implanté dans une gaine 1 de monte-charges d'un bâtiment en construction (non représenté), dont l'implantation est définitive. Le monte-charges pour faire fonction de chantier est prévu à une capacité de charge d'au moins 2000 kg. Le dispositif est monté représenté dans une portion basse 2 de quelques étages de la gaine (4 à 6) du bâtiment en construction, lequel est naturellement d'une certaine hauteur pour justifier l'implantation évolutive du système selon l'invention. I1 comporte une plate-forme supérieure 3 à laquelle sont reliés la cabine de monte-charges 5 et le contre-poids d'équilibrage 7 au moyen de câbles de traction classiques 9 via la machinerie de traction implantée sur la plate-forme.  The elevator according to the invention as shown in FIG. 1 is installed in a hoist sheath 1 of a building under construction (not shown), the installation of which is final. The freight elevator to operate on site is designed with a load capacity of at least 2000 kg. The device is mounted shown in a lower portion 2 of a few floors of the sheath (4 to 6) of the building under construction, which is naturally of a certain height to justify the progressive installation of the system according to the invention. I1 comprises an upper platform 3 to which are connected the freight elevator cabin 5 and the balancing counterweight 7 by means of conventional traction cables 9 via the traction machinery installed on the platform.

La plate-forme comporte une surface de plancher 11, dite dalle de plancher parce qu'elle sera implantée définitivement ultérieurement avec coulée de béton au sommet de la gaine à l'achèvement de la construction, et un toit de protection 13. Elle est fixée à la partie supérieure de la gaine construite et équipée au moyen de quatre bras télescopiques 15 (figure 2) montés sur la dalle de plancher au niveau de ses coins et sortis pour s ancrer sur les voiles de béton 17 de la gaine par des trous adéquats formés sur cette dernière. Au-dessus du toit, la gaine est en cours d'équipement sur la hauteur d'une nouvelle portion à laquelle la plate-forme et son équipement pourront être réhaussés ultérieurement. Un opérateur est représenté sur un échafaudage montant dans cette nouvelle portion les rails-guides de cabine 19 et de contre-poids 21, les câblages, les portes de baies etc... The platform has a floor surface 11, called a floor slab because it will be permanently installed later with concrete pouring at the top of the sheath at the end of construction, and a protective roof 13. It is fixed to the upper part of the sheath constructed and equipped by means of four telescopic arms 15 (Figure 2) mounted on the floor slab at its corners and extended to anchor on the concrete walls 17 of the sheath by suitable holes trained on the latter. Above the roof, the sheath is being fitted on the height of a new portion to which the platform and its equipment can be raised later. An operator is represented on a scaffolding rising in this new portion the cabin guide rails 19 and counterweight 21, the cables, the bay doors, etc.

La plate-forme est montée coulissante sur les guides de cabine 19 au moyen de quatre coulisseaux 23 disposés par deux sur chacun des guides respectivement au niveau de la traverse de dalle de plancher et en haut au niveau du toit. Elle est en outre équipée de blocs parachutes et d'un régulateur de vitesse accouplé, monté en partie haute de la portion de gaine concernée, qui protègent de tout mouvement accidentel de la manutention de la plate-forme en cours de réhausse. The platform is slidably mounted on the cabin guides 19 by means of four slides 23 arranged in pairs on each of the guides respectively at the level of the cross member of the floor slab and above at the level of the roof. It is also equipped with parachute blocks and a coupled speed regulator, mounted in the upper part of the sheath portion concerned, which protect against any accidental movement of the handling of the platform being raised.

Elle comporte l'ensemble de la machinerie d'entraînement de la cabine, moteur 25 et poulie 27 de traction des câbles de traction 9 ainsi que les éléments de commande (contrôleur, régulateurs de cabine et contrepoids) montés de façon définitive et avec accesibilité pour les opérateurs. L'emplacement de ces éléments doit tenir compte du passage latéral des guides de cabine 19 et de contre-poids 21 et de leur attaches, des hublots d'éclairage en gaine, de la canalisation électrique et de la retombée des câbles de traction et donc des découpes correspondantes nécessaires formées dans la dalle de plancher. D'autres éléments doivent également être portés, tel qu'un dérouleur 31 des câbles de traction équipé de serre-câbles 33 permettant le déroulement des câbles à chaque nouvelle portion de gaine, successivement jusqu'en haut de gaine, à l'achèvement du bâtiment. It includes all of the cabin drive machinery, motor 25 and pulley 27 for traction of the traction cables 9 as well as the control elements (controller, cabin regulators and counterweights) permanently mounted and with accessibility for the operators. The location of these elements must take into account the lateral passage of the cabin guides 19 and counterweights 21 and their attachments, sheathed portholes, the electrical pipe and the fallout of the traction cables and therefore corresponding necessary cutouts formed in the floor slab. Other elements must also be worn, such as an unwinder 31 of the traction cables equipped with cable clamps 33 allowing the unwinding of the cables at each new portion of sheath, successively up to the top of the sheath, upon completion of the building.

Ce matériel est protégé par le toit qui est solidarisé rigidement à la dalle par 4 montants verticaux 35 à ses coins et est équipé de crochets supérieurs 37 pour la manutention de la plate-forme avec la cabine et le contre-poids. This material is protected by the roof which is rigidly secured to the slab by 4 vertical uprights 35 at its corners and is equipped with upper hooks 37 for handling the platform with the cabin and the counterweight.

La cabine et le contre-poids sont classiques. Il faut seulement prévoir un dérouleur de câble pour le régulateur de cabine et un pour le régulateur de contre-poids, ces éléments entrant en fonction à chaque réhausse de la plate-forme (sur une hauteur de 4 à 6 étages) jusqu a la hauteur définitive où ils peuvent être éliminés. The cabin and the counterweight are classic. It is only necessary to provide a cable unwinder for the cabin regulator and one for the counterweight regulator, these elements coming into operation with each raising of the platform (on a height of 4 to 6 floors) up to the height where they can be eliminated.

Le procédé de montage est décrit ci-après. The mounting process is described below.

Le bâtiment étant en cours de construction et une portion 2 de la gaine de monte-charge de hauteur convenable étant formée, on commence par équiper cette portion pour qu'elle puisse recevoir la cabine 5, le contre-poids 7 et la plate-forme d'entrainement 3. La cabine et le contre-poids, convenablement élingués sont introduits à l'aide d'une grue dans la gaine, jusque dans ladite portion de gaine équipée où ils sont glissés sur leurs guides et arrêtés en position. La plateforme prééquipée est ensuite introduite à la grue et disposée sur les guides cabine au-dessus de la cabine. Elle est verrouillée en position relativement à la gaine par ses bras télescopiques. La cabine est alors reliée au moyen des câbles de traction à la machinerie et au contre-poids d'équilibrage. Dès que le montage est complètement effectué sur ladite portion, l'ascenseur peut alors fonctionner sur la hauteur de gaine correspondante et servir à la desserte de chantier, notamment du second oeuvre sur les paliers d'étage correspondants de gros oeuvre. Un plancher de protection 39 pourra être monté au dessus de la plate-forme mobile de la portion de gaine en fonctionnement. Lorsque le gros-oeuvre de bâtiment se sera suffisamment élevé (4 à 6 étages), une nouvelle portion de gaine, adjacente à la précédente, sera équipée (avec les guides, canalisations, seuils et portes). La plate-forme dont les bras télescopiques ont été rentrés pourra alors être soulevée sous contrôle des blocs parachutes, avec la cabine et le contre poids. Elle glissera sur les guides cabine jusqu a un nouveau positionnement, verrouillée par les bras où l'ascenseur pourra fonctionner sur une hauteur étendue aux deux portions de gaine équipées. Les câbles des régulateurs et cordons de liaison sont déroulés simultanément au cours de l'opération. L'opération pourra être répétée sur toute la hauteur de la gaine jusqu'à achèvement du bâtiment où la plate-forme sera fixée définitivement et les dérouleurs de câbles intermédiaires supprimés.  The building being under construction and a portion 2 of the hoist sheath of suitable height being formed, we begin by equipping this portion so that it can receive the cabin 5, the counterweight 7 and the platform 3. The cabin and the counterweight, suitably slinged, are introduced using a crane into the sheath, as far as said portion of fitted sheath where they are slid over their guides and stopped in position. The pre-equipped platform is then introduced to the crane and placed on the cabin guides above the cabin. It is locked in position relative to the sheath by its telescopic arms. The cabin is then connected by means of traction cables to the machinery and the balancing counterweight. As soon as the assembly is completely carried out on said portion, the elevator can then operate on the corresponding shaft height and be used for the service of the site, in particular of the second work on the corresponding stages of the main work. A protective floor 39 can be mounted above the mobile platform of the sheath portion in operation. When the main structure of the building is sufficiently high (4 to 6 floors), a new portion of duct, adjacent to the previous one, will be equipped (with guides, pipes, thresholds and doors). The platform whose telescopic arms have been retracted can then be lifted under the control of the parachute blocks, with the cabin and the counterweight. It will slide on the cabin guides until it is positioned again, locked by the arms where the lift can operate over a height extended to the two sections of shaft equipped. The cables of the regulators and connecting cords are unwound simultaneously during the operation. The operation may be repeated over the entire height of the sheath until completion of the building where the platform will be permanently fixed and the intermediate cable unwinders removed.

Claims (8)

REVENDICATIONS 1- Ascenseur ou monte-charges évolutif, suivant l'avancement du gros-oeuvre de la construction de bâtiments, caractérisé en ce qu'il comporte une plateforme mobile (3) d'entraînement de la cabine (5) d'ascenseur ou de monte-charges, ladite cabine étant reliée de façon classique à la plate-forme, et en ce que la plate-forme (3) est pourvue de l'ensemble des éléments de machinerie (25,27) et de commande en liaison avec au moins une portion (2) de la gaine d'ascenseur équipée, à la partie supérieure de laquelle elle est fixée pour le fonctionnement de l'ascenseur sur cette portion. 1- Scalable elevator or hoist, depending on the progress of the main structure of the construction of buildings, characterized in that it comprises a mobile platform (3) for driving the cabin (5) of elevator or freight elevator, said cabin being conventionally connected to the platform, and in that the platform (3) is provided with all of the machinery (25, 27) and control elements in connection with the minus a portion (2) of the equipped elevator shaft, at the top of which it is fixed for the operation of the elevator on this portion. 2- Ascenseur évolutif selon la revendication 1, caractérisé en ce que la cabine est accouplée à un contrepoids d'équilibrage (7) comme un ascenseur classique, en liaison avec la machinerie d'entraînement (25,27) de la plate-forme. 2- Scalable elevator according to claim 1, characterized in that the cabin is coupled to a balancing counterweight (7) like a conventional elevator, in connection with the drive machinery (25,27) of the platform. 3- Ascenseur évolutif selon l'une des revendications 1,2, caractérisé en ce que la plate-forme comporte des moyens amovibles (15) de fixation à la gaine (1) grâce auxquels elle peut être fixée en position pour le fonctionnement de l'ascenseur sur une portion donnée ou libèrée pour son déplacement sur une portion étendue de la gaine. 3- Scalable elevator according to one of claims 1,2, characterized in that the platform comprises removable means (15) for fixing to the sheath (1) by means of which it can be fixed in position for the operation of the 'lift on a given or freed portion for its movement over an extended portion of the sheath. 4- Ascenseur évolutif selon l'une des revendications précédentes, caractérisé en ce que la plate-forme (3) est montée coulissante sur les rails-guide (19) de cabine et est équipée de blocs parachutes avec régulateur agissant sur les guides pour parer à tout mouvement accidentel du déplacement au cours des réhausses successives. 4- Scalable elevator according to one of the preceding claims, characterized in that the platform (3) is slidably mounted on the guide rails (19) of the cabin and is equipped with parachute blocks with regulator acting on the guides to counter to any accidental movement movement during successive raises. 5- Ascenseur évolutif selon l'une des revendications précédentes, caractérisé en ce que la plate-forme est pourvue d'un toit de protection (13) permettant l'équipement de la portion de gaine susjacente en toute sécurité. 5- Scalable elevator according to one of the preceding claims, characterized in that the platform is provided with a protective roof (13) allowing the equipment of the overlying sheath portion to be safely secured. 6- Ascenseur évolutif selon la revendication 5, caractérisé en ce que le toit est équipé de crochets (37) permettant la manutention successive de la plate forme (3) avec la cabine (5) et le contre-poids (7) sur les portions successives de gaine formées et équipées (2) au moyen d'un engin de levage tel qu'une grue. 6- Scalable elevator according to claim 5, characterized in that the roof is equipped with hooks (37) allowing the successive handling of the platform (3) with the cabin (5) and the counterweight (7) on the portions successive sheaths formed and equipped (2) by means of a lifting device such as a crane. 7- Ascenseur évolutif selon l'une des revendications précécentes, caractérisé en ce que la plate-forme comporte ltensemble de la machinerie d'entraînement de la cabine, moteur (25) et poulie (27) de traction des câbles de traction (9) ainsi que les éléments de commande (contrôleur, régulateurs de cabine et contre-poids) montés de façon définitive et avec accesibilité pour les opérateurs et d'autres éléments, tel qu'un dérouleur (31) des câbles de traction équipé de serre-câbles (33) permettant le déroulement des câbles à chaque nouvelle portion de gaine, successivement jusqu'en haut de gaine, à l'achèvement du bâtiment, l'emplacement de ces éléments tenant compte du passage latéral des guides de cabine (19) et de contre-poids (21) et de leurs attaches, des hublots d'éclairage en gaine, de la canalisation électrique et de la retombée des câbles de traction et donc des découpes correspondantes nécessaires formées dans la dalle de plancher. 7- Scalable elevator according to one of the preceding claims, characterized in that the platform comprises the whole of the driving machinery of the cabin, motor (25) and pulley (27) for traction of the traction cables (9) as well as the control elements (controller, cabin regulators and counterweight) permanently mounted and accessible to operators and other elements, such as a cable unwinder (31) fitted with cable ties (33) allowing the unwinding of the cables to each new sheath portion, successively to the top of the sheath, at the completion of the building, the location of these elements taking account of the lateral passage of the cabin guides (19) and of counterweight (21) and their fasteners, sheathed portholes, the electrical pipe and the fallout of the traction cables and therefore the necessary corresponding cutouts formed in the floor slab. 8- Ascenseur évolutif selon l'une des revendications précédentes, caractérisé en ce que la plate-forme (3) est implantée de façon définitive avec coulée de béton au sommet de la gaine à l'achèvement de la construction.  8- Scalable elevator according to one of the preceding claims, characterized in that the platform (3) is installed permanently with concrete pouring at the top of the sheath at the completion of the construction.
FR9209616A 1992-08-03 1992-08-03 Building construction goods lift - is used following first stage works and includes movable attachment points to permit successive upwards relocation as work progresses Pending FR2694279A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR9209616A FR2694279A1 (en) 1992-08-03 1992-08-03 Building construction goods lift - is used following first stage works and includes movable attachment points to permit successive upwards relocation as work progresses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR9209616A FR2694279A1 (en) 1992-08-03 1992-08-03 Building construction goods lift - is used following first stage works and includes movable attachment points to permit successive upwards relocation as work progresses

Publications (1)

Publication Number Publication Date
FR2694279A1 true FR2694279A1 (en) 1994-02-04

Family

ID=9432567

Family Applications (1)

Application Number Title Priority Date Filing Date
FR9209616A Pending FR2694279A1 (en) 1992-08-03 1992-08-03 Building construction goods lift - is used following first stage works and includes movable attachment points to permit successive upwards relocation as work progresses

Country Status (1)

Country Link
FR (1) FR2694279A1 (en)

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2782072A1 (en) * 1998-08-06 2000-02-11 Otis Elevator Co DEVICE AND METHOD FOR MOVING A MACHINERY ALONG AN ELEVATOR SHAFT DURING THE CONSTRUCTION OF A BUILDING
WO2000050328A2 (en) * 1999-02-24 2000-08-31 Kone Corporation Elevator system
EP1597182A1 (en) * 2003-01-31 2005-11-23 Otis Elevator Company Integrated support for elevator machine, sheaves and terminations
EP1785386A1 (en) * 2005-11-09 2007-05-16 Inventio Ag Method for installing an elevator system and elevator system therefor
US7407041B2 (en) 2005-11-09 2008-08-05 Inventio Ag Method of constructing an elevator installation, and elevator installation for that purpose
US7635049B2 (en) * 2002-12-02 2009-12-22 Kone Corporation Method and apparatus for installing an elevator during the construction of a building
WO2010010226A1 (en) * 2008-07-24 2010-01-28 Kone Corporation Elevator arrangement, method and safety structure
WO2010100319A1 (en) * 2009-03-06 2010-09-10 Kone Corporation Elevator arrangement and method
WO2011048255A1 (en) 2009-10-23 2011-04-28 Kone Corporation Elevator arrangement and method
WO2012072860A1 (en) * 2010-12-01 2012-06-07 Kone Corporation Elevator arrangement and method
CN102762484A (en) * 2009-12-31 2012-10-31 通力股份公司 Method in the manufacture of an elevator
CN103025640A (en) * 2010-05-28 2013-04-03 通力股份公司 Method and elevator arrangement
EP2636629A1 (en) * 2012-03-06 2013-09-11 Kone Corporation A method and an elevator arrangement
CN103303810A (en) * 2012-03-15 2013-09-18 马尼托沃克起重机集团(法国)公司 Motorized height access device for tower cranes
NL2008623C2 (en) * 2012-04-11 2013-10-15 Reco Special Products B V A modular lift apparatus and a method for assembling a modular lift apparatus.
US20130284543A1 (en) * 2010-12-31 2013-10-31 Kone Corporation Method and elevator arrangement
US20150307322A1 (en) * 2014-04-29 2015-10-29 Kone Corporation Travelling cable clamp assembly, an elevator arrangement, and a method
US9388020B2 (en) 2012-03-06 2016-07-12 Kone Corporation Method and an elevator arrangement
WO2017102684A1 (en) * 2015-12-14 2017-06-22 Inventio Ag Method for erecting an elevator system, and elevator system which can be adapted to an increasing building height
LU100817B1 (en) * 2018-05-30 2019-12-02 Thyssenkrupp Elevator Ag Installation of an elevator system with a linear motor
WO2020088979A1 (en) 2018-10-30 2020-05-07 Inventio Ag Method for installing a lift installation
WO2020095431A1 (en) * 2018-11-09 2020-05-14 株式会社日立製作所 Construction elevator device
WO2021038629A1 (en) * 2019-08-23 2021-03-04 株式会社日立製作所 Construction elevator device
US20210245997A1 (en) * 2020-02-12 2021-08-12 Kone Corporation Movable machine room, elevator arrangement and method for constructing elevator
WO2021186493A1 (en) * 2020-03-16 2021-09-23 株式会社日立製作所 Construction elevator device
US11345571B2 (en) * 2016-06-30 2022-05-31 Inventio Ag Rack-and-pinion elevator system having a protective roof
US11377324B2 (en) * 2018-08-21 2022-07-05 Otis Elevator Company Jump elevator and jumping method
US20220219945A1 (en) * 2019-10-31 2022-07-14 Kone Corporation Self-climbing elevator machine room for use during the construction of a building
US11396442B2 (en) 2020-05-09 2022-07-26 Otis Elevator Company Low cost roped jump lift concept
WO2023186420A1 (en) * 2022-03-30 2023-10-05 Inventio Ag Platform for an elevator system for a building which is under construction
US20230339727A1 (en) * 2020-06-26 2023-10-26 Inventio Ag Method for building an elevator system, and elevator system suitable for carrying out the method
US11981537B2 (en) 2019-10-31 2024-05-14 Kone Corporation Self-climbing elevator arrangement for use during the construction of a building

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3519101A (en) * 1968-01-10 1970-07-07 Otis Elevator Co Construction elevator system
US3759349A (en) * 1972-03-13 1973-09-18 Otis Elevator Co Elevator system with temporary hoistway structure and method for use thereof
EP0466667A2 (en) * 1990-07-11 1992-01-15 Otis Elevator Company Construction elevator assembly

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3519101A (en) * 1968-01-10 1970-07-07 Otis Elevator Co Construction elevator system
US3759349A (en) * 1972-03-13 1973-09-18 Otis Elevator Co Elevator system with temporary hoistway structure and method for use thereof
EP0466667A2 (en) * 1990-07-11 1992-01-15 Otis Elevator Company Construction elevator assembly

Cited By (84)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000007923A1 (en) * 1998-08-06 2000-02-17 Otis Elevator Company A device and method for installing elevator equipment
FR2782072A1 (en) * 1998-08-06 2000-02-11 Otis Elevator Co DEVICE AND METHOD FOR MOVING A MACHINERY ALONG AN ELEVATOR SHAFT DURING THE CONSTRUCTION OF A BUILDING
WO2000050328A2 (en) * 1999-02-24 2000-08-31 Kone Corporation Elevator system
WO2000050328A3 (en) * 1999-02-24 2000-12-14 Kone Corp Elevator system
US7635049B2 (en) * 2002-12-02 2009-12-22 Kone Corporation Method and apparatus for installing an elevator during the construction of a building
EP1597182A4 (en) * 2003-01-31 2011-04-06 Otis Elevator Co Integrated support for elevator machine, sheaves and terminations
EP1597182A1 (en) * 2003-01-31 2005-11-23 Otis Elevator Company Integrated support for elevator machine, sheaves and terminations
US8302740B2 (en) 2003-01-31 2012-11-06 Otis Elevator Company Integrated support for elevator machine, sheaves and terminations
US7407041B2 (en) 2005-11-09 2008-08-05 Inventio Ag Method of constructing an elevator installation, and elevator installation for that purpose
CN1962387B (en) * 2005-11-09 2010-05-12 因温特奥股份公司 Method for establishing an elevator equipment and elevator equipment therefor
EP1785386A1 (en) * 2005-11-09 2007-05-16 Inventio Ag Method for installing an elevator system and elevator system therefor
EP2300345A4 (en) * 2008-07-24 2014-07-23 Kone Corp Elevator arrangement, method and safety structure
EP2300345A1 (en) * 2008-07-24 2011-03-30 Kone Corporation Elevator arrangement, method and safety structure
WO2010010226A1 (en) * 2008-07-24 2010-01-28 Kone Corporation Elevator arrangement, method and safety structure
CN102341336A (en) * 2009-03-06 2012-02-01 通力股份公司 Elevator arrangement and method
US20110113720A1 (en) * 2009-03-06 2011-05-19 Kone Corporation Method of installing an elevator
US8881872B2 (en) 2009-03-06 2014-11-11 Kone Corporation Method of installing an elevator
WO2010100319A1 (en) * 2009-03-06 2010-09-10 Kone Corporation Elevator arrangement and method
US8616340B2 (en) 2009-03-06 2013-12-31 Kone Corporation Elevator arrangement and method
CN102341336B (en) * 2009-03-06 2015-05-27 通力股份公司 Elevator arrangement and method
EP2490973A4 (en) * 2009-10-23 2015-12-30 Kone Corp Method in the manufacture of an elevator
CN102666345B (en) * 2009-10-23 2015-08-19 通力股份公司 Lift appliance and method
RU2572933C2 (en) * 2009-10-23 2016-01-20 Коне Корпорейшн Method of elevator production
WO2011048275A1 (en) 2009-10-23 2011-04-28 Kone Corporation Method in the manufacture of an elevator
CN103180237A (en) * 2009-10-23 2013-06-26 通力股份公司 Method in the manufacture of an elevator
AU2010309721B2 (en) * 2009-10-23 2015-11-26 Kone Corporation Elevator arrangement and method
US9193567B2 (en) 2009-10-23 2015-11-24 Kone Corporation Method in the manufacture of an elevator
WO2011048255A1 (en) 2009-10-23 2011-04-28 Kone Corporation Elevator arrangement and method
CN102666346A (en) * 2009-10-23 2012-09-12 通力股份公司 Method in the manufacture of an elevator
CN102666346B (en) * 2009-10-23 2015-04-29 通力股份公司 Method in the manufacture of an elevator
RU2538742C2 (en) * 2009-10-23 2015-01-10 Коне Корпорейшн Elevator structure and method of elevator manufacturing
CN102666345A (en) * 2009-10-23 2012-09-12 通力股份公司 Elevator arrangement and method
US8636115B2 (en) 2009-10-23 2014-01-28 Kone Corporation Hosting machine supporting frame for jump lifts of elevators
CN103180237B (en) * 2009-10-23 2016-08-17 通力股份公司 Lift appliance and method
CN102762484A (en) * 2009-12-31 2012-10-31 通力股份公司 Method in the manufacture of an elevator
US20120291395A1 (en) * 2009-12-31 2012-11-22 Kone Corporation Method in the manufacture of an elevator
CN103025640A (en) * 2010-05-28 2013-04-03 通力股份公司 Method and elevator arrangement
CN103339052A (en) * 2010-12-01 2013-10-02 通力股份公司 Elevator arrangement and method
WO2012072860A1 (en) * 2010-12-01 2012-06-07 Kone Corporation Elevator arrangement and method
AU2011334821B2 (en) * 2010-12-01 2017-03-30 Kone Corporation Elevator arrangement and method
CN103339052B (en) * 2010-12-01 2017-03-29 通力股份公司 Elevator arrangement and method
EP2646361A4 (en) * 2010-12-01 2016-08-03 Kone Corp Elevator arrangement and method
US20130284543A1 (en) * 2010-12-31 2013-10-31 Kone Corporation Method and elevator arrangement
US9604820B2 (en) * 2010-12-31 2017-03-28 Kone Corporation Method and elevator arrangement
US9809424B2 (en) 2012-03-06 2017-11-07 Kone Corporation Method and an elevator arrangement
EP2636629A1 (en) * 2012-03-06 2013-09-11 Kone Corporation A method and an elevator arrangement
US9388020B2 (en) 2012-03-06 2016-07-12 Kone Corporation Method and an elevator arrangement
CN103303810A (en) * 2012-03-15 2013-09-18 马尼托沃克起重机集团(法国)公司 Motorized height access device for tower cranes
CN103303810B (en) * 2012-03-15 2015-06-03 马尼托沃克起重机集团(法国)公司 Motorized height access device for tower cranes
EP2650248A1 (en) * 2012-04-11 2013-10-16 RECO Liftbeheer B.V. A modular lift apparatus and a method for assembling a modular lift apparatus
NL2008623C2 (en) * 2012-04-11 2013-10-15 Reco Special Products B V A modular lift apparatus and a method for assembling a modular lift apparatus.
US20150307322A1 (en) * 2014-04-29 2015-10-29 Kone Corporation Travelling cable clamp assembly, an elevator arrangement, and a method
US9850096B2 (en) * 2014-04-29 2017-12-26 Kone Corporation Travelling cable clamp assembly, an elevator arrangement, and a method
RU2721376C2 (en) * 2015-12-14 2020-05-19 Инвенцио Аг Method for erecting elevator system, and elevator system which can be adapted to increasing building height
CN108367897B (en) * 2015-12-14 2020-04-14 因温特奥股份公司 Method for constructing an elevator installation and elevator installation that can be adapted to an increased building height
CN108367897A (en) * 2015-12-14 2018-08-03 因温特奥股份公司 Method for building lift facility and the lift facility that can be matched with increased depth of building
WO2017102684A1 (en) * 2015-12-14 2017-06-22 Inventio Ag Method for erecting an elevator system, and elevator system which can be adapted to an increasing building height
US10807833B2 (en) 2015-12-14 2020-10-20 Inventio Ag Method for erecting an elevator system, and elevator system which can be adapted to an increasing building height
US11345571B2 (en) * 2016-06-30 2022-05-31 Inventio Ag Rack-and-pinion elevator system having a protective roof
LU100817B1 (en) * 2018-05-30 2019-12-02 Thyssenkrupp Elevator Ag Installation of an elevator system with a linear motor
US11377324B2 (en) * 2018-08-21 2022-07-05 Otis Elevator Company Jump elevator and jumping method
WO2020088979A1 (en) 2018-10-30 2020-05-07 Inventio Ag Method for installing a lift installation
AU2019370583B2 (en) * 2018-10-30 2023-04-13 Inventio Ag Method for installing a lift installation
CN112955398A (en) * 2018-10-30 2021-06-11 因温特奥股份公司 Method for installing an elevator installation
US11845638B2 (en) 2018-10-30 2023-12-19 Inventio Ag Method for installing an elevator system
WO2020095431A1 (en) * 2018-11-09 2020-05-14 株式会社日立製作所 Construction elevator device
JP7064620B2 (en) 2018-11-09 2022-05-10 株式会社日立製作所 Elevator equipment for construction
JPWO2020095431A1 (en) * 2018-11-09 2021-09-24 株式会社日立製作所 Elevator equipment for construction
CN114269673A (en) * 2019-08-23 2022-04-01 株式会社日立制作所 Elevator device for construction
JP7213362B2 (en) 2019-08-23 2023-01-26 株式会社日立製作所 Elevator equipment for construction
WO2021038629A1 (en) * 2019-08-23 2021-03-04 株式会社日立製作所 Construction elevator device
JPWO2021038629A1 (en) * 2019-08-23 2021-03-04
US20220219945A1 (en) * 2019-10-31 2022-07-14 Kone Corporation Self-climbing elevator machine room for use during the construction of a building
US11981537B2 (en) 2019-10-31 2024-05-14 Kone Corporation Self-climbing elevator arrangement for use during the construction of a building
US20210245997A1 (en) * 2020-02-12 2021-08-12 Kone Corporation Movable machine room, elevator arrangement and method for constructing elevator
US11731857B2 (en) * 2020-02-12 2023-08-22 Kone Corporation Movable machine room, elevator arrangement and method for constructing elevator
CN115038660A (en) * 2020-03-16 2022-09-09 株式会社日立制作所 Construction elevator device
JPWO2021186493A1 (en) * 2020-03-16 2021-09-23
JP7268243B2 (en) 2020-03-16 2023-05-02 株式会社日立製作所 Elevator equipment for construction
WO2021186493A1 (en) * 2020-03-16 2021-09-23 株式会社日立製作所 Construction elevator device
US11396442B2 (en) 2020-05-09 2022-07-26 Otis Elevator Company Low cost roped jump lift concept
US20230339727A1 (en) * 2020-06-26 2023-10-26 Inventio Ag Method for building an elevator system, and elevator system suitable for carrying out the method
US12012305B2 (en) * 2020-06-26 2024-06-18 Inventio Ag Method for building an elevator system, and elevator system suitable for carrying out the method
WO2023186420A1 (en) * 2022-03-30 2023-10-05 Inventio Ag Platform for an elevator system for a building which is under construction

Similar Documents

Publication Publication Date Title
FR2694279A1 (en) Building construction goods lift - is used following first stage works and includes movable attachment points to permit successive upwards relocation as work progresses
US7559409B2 (en) Procedure and apparatus for the installation of an elevator
US8485319B2 (en) Method and apparatus for installing an elevator without machine room during construction of a building, and use of a hoisting machine
CA2002158C (en) Elevator erection system using pit storage and roof hoist
US5033586A (en) Construction elevator assembly
CA2544881C (en) Method and device for installation of guide rails in a lift shaft
US4671721A (en) Apparatus and method for positioning an object in a building
WO2010056202A1 (en) Mobile cantilever platforms and methods of installation thereof
AU2019370583B2 (en) Method for installing a lift installation
US4356890A (en) Method for installing an elevator system
WO2001064572A1 (en) Jump-lift and method for lifting a machine room
CN116249668A (en) Elevator apparatus
US6364067B1 (en) Method and apparatus for installing elevator components
JPH07237847A (en) Installation method of elevator
CN116601102A (en) Construction device and method for elevator
JP2878936B2 (en) Elevator installation method
JPH05262475A (en) Installation method of elevator
JPH061562A (en) Guide rail erection method for hydraulic elevator
JPH0733364A (en) Construction elevator with climbing device on inversion pulley
JP2815803B2 (en) Lifting method for elevator governor tensioner
JP3888513B2 (en) Main rope end adjustment method for 2-to-1 roping elevator
WO2023160819A1 (en) An elevator construction arrangement and a method
WO2023160817A1 (en) An elevator construction arrangement and a method
JPH10310340A (en) Lift device for installing elevator
JPH0587000U (en) Lifters for aerial work vehicles