EP1063368A1 EP00112935A EP00112935A EP1063368A1 EP 1063368 A1 EP1063368 A1 EP 1063368A1 EP 00112935 A EP00112935 A EP 00112935A EP 00112935 A EP00112935 A EP 00112935A EP 1063368 A1 EP1063368 A1 EP 1063368A1
Authority
EP
European Patent Office
Prior art keywords
working platform
work platform
carrier
working
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP00112935A
Other languages
German (de)
French (fr)
Other versions
EP1063368B1 (en
Inventor
Alexander Stingl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stingl GmbH
Original Assignee
STINGL MONTAGE und BEFESTIGUNG
Stingl Montage- und Befestigungstechnik GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STINGL MONTAGE und BEFESTIGUNG, Stingl Montage- und Befestigungstechnik GmbH filed Critical STINGL MONTAGE und BEFESTIGUNG
Publication of EP1063368A1 publication Critical patent/EP1063368A1/en
Application granted granted Critical
Publication of EP1063368B1 publication Critical patent/EP1063368B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • E04G1/367Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes specially adapted for elevator shafts

Definitions

  • the invention relates to a work platform for receiving and / or adjusting a work platform.
  • the object of the invention is to provide a working platform for elevator shafts or for other shafts, which are at least formed by two opposite wall parts, which can be produced inexpensively and installed in a very short time between two wall parts.
  • Time can be assembled and only the Device for adjusting the work platform with your associated bracket attached to a wall part must then to the other parts, especially the Working platform to be adjusted into a working position or to pivot until it is on the opposite of the bracket against the wall.
  • the length of the work platform is so determined that when taking a horizontal position is not pivoted further, but automatically sticks in this position. For this purpose, the second abutment of the work platform pressed against the wall.
  • the safety device from a support device or holding device consists of a first and second against the wall Has support part.
  • the one on the work platform Arranged safety device carries on simple Way that the support device or Holding device, for example, fixed or rigidly connected to the work platform, against a wall comes to rest and in this way prevents that the work platform from a horizontal current working position is pivoted further.
  • the support device or holding device ensured that a further pivoting of the Work platform prevented, for example causes a support part arranged rigidly on the work platform, that the work platform doesn't pretend can, especially since the entire contact surface of the holding device or the support device in the working position the work platform roughly parallel to the second wall runs and thereby a perfect backup of the Guaranteed working platform in the horizontal position.
  • the support device or holding device consists of a pulling part, the one end with the work platform and movable at its other end with a bracket connected is.
  • the support device on the work platform also as a pull rod or pull rope can be formed at one end with the work platform and at the other end with yourself in the carrier extending the elevator shaft can be connected can.
  • the carrier takes with it the working platform at an acute angle and serves the work platform at least at one point additionally to intercept or support.
  • one pull rod can also have several pull rods or Traction ropes are provided, which have one end to the outer end of the carrier and with its other end connected to the work platform at one point are.
  • the carrier is in the area of its one end the device for receiving and / or adjusting a Work platform and in the area of its other end the support part is movably connected.
  • the Carrier and also the pulling device movable or articulated, directly or indirectly with the work platform connected.
  • the work platform, the holding device and the carrier form an articulated chain, the individual parts articulated and / or releasably connected are.
  • the device for receiving and / or adjusting the Working platform over cross struts and / or floor slabs are interconnectable.
  • the working platform is separated by two arranged carrier formed, which is approximately the entire clear width or clear shaft depth of an elevator shaft span and against the wall parts support. Additional support for the wearer or the carrier is inclined by the second Carrier possible that with the train parts with the horizontally extending beam is movably connected, but in such a way that the sloping beam in the horizontal position of the work platform an absolutely secure locking of the work platform guaranteed, with both parts preventing the work platform in the work position continues Clockwise rotation adjusted according to the embodiment becomes.
  • the work platform or their carrier and / or the support device or Holding device and / or the carrier variable in length are trained. Due to the variable length Training of the individual carriers or the holding device the entire work platform can be different large elevator shafts can be easily adapted. This gives you a large variability in the work platform, which in no time in any Can be inserted. It is also possible, that the working platform according to the invention everywhere there is used where two opposite fixed wall elements are provided, the abutments for the individual Form support parts of the working platform.
  • the work platform at least in their working position with part of the joint device or with the support device or holding device encloses an angle ⁇ of approximately 90 °.
  • the device for adjustment a work platform as a corner connector or is designed as an angle against a corner edge a wall or a floor of a shaft or one Door opening can be supported.
  • the individual carriers of the work platform can either by fixed struts or only by on the carrier of the work platform loosely removable floor panels can be fixed laterally.
  • the base plates can be fitted with fitting elements be placed on the carrier in order to a lateral shifting of the work platform supports to prevent.
  • the work platform over one or more attachable to the opposite walls Abutment or support element is supported and that the length of the work platform is equal to or greater is as the distance between the opposite Walls.
  • the device 1 for adjusting the work platform 2 has a holder 3, which in the exemplary embodiment 1 as an angle or as an angle bracket can be formed and forms a first device 4, which is designed as a support element.
  • the first device or the angle bracket can to a corner edge of a bottom 18 of a door opening 19 are put on and in this way the entire device for adjusting the work platform take up.
  • the first device 4 follows an articulation 20 on which a first carrier 16 of the working platform 2 via a hinge pin 21 is pivotally connected.
  • the length of the carrier 16 corresponds approximately to the clear width or depth of the elevator shaft, so that the carrier 16 in the working position the work platform is approximately horizontal Takes position and in this position over a second device 9 against the surface of the second wall 8 of the elevator shaft comes to rest.
  • the length of the carrier 16 is such that another Swiveling the carrier 16 and thus also the Working platform 2 from the working position or above this is not possible.
  • the work platform is at every load on the carrier 16 2 the working position shown in Figure 1 or maintains the end position is at the Bracket of the opposite side 6 of the work platform 2 an abutment, for example rigidly arranged, that spans the width of the work platform extends upwards and an abutment for forms the working platform 2.
  • This abutment is in the Embodiment according to Figure 1 as a support device or holding device 11 formed.
  • the support device 11 can be rigid with the carrier 16, for example be connected. This prevents the wearer at a position in which it is parallel to the outer surface the wall 8 runs, further in the clockwise direction is pivoted according to arrow 22.
  • the holding device 11 also designed as a pulling part or pulling rod or pulling rope can be, the lower end according to Figure 1 to the Carrier 16 of the work platform 2 is movable or above a hinge pin 23 is articulated while the upper end of the holding device 11 via a further hinge pin 23 with a support 14 articulated connected is.
  • the carrier 14 forms with the support part or the holding device 11 an acute angle ⁇ , that is, the carrier 14 is longer than the carrier 16, so that it does not go beyond the position shown in FIG. 1 can be pivoted.
  • the holding device or the Train part 11 thus catches the work platform 2 in the area the outer end and also serves as security.
  • the support part or traction part 11 can several traction parts or traction cables can be provided, which with their lower ends in several places on the carrier 16 can be connected flexibly or articulated.
  • the work platform thus forms with the holding device 11 and the carrier 14 and the articulated connection 20th a link chain, the individual parts of the link chain each releasably connected to the adjacent parts are.
  • the carrier 14 and the carrier 16 can be as hollow tube profiles or box tube profiles be formed, part of the tubular profile is larger, so that a second part of the tubular profile slidably recorded and over in the drawing Fasteners not shown are secured can.
  • a pulling device can also be used 25 are connected so that the carrier 14th from its horizontal position shown in Figure 1 placed in a vertical position or in a In the elevator shaft released position pivoted can be.
  • the traction device or traction cable 25 can also, depending on the size of the work platform 2 a mechanical or motor-driven winch become.
  • the two carriers 16 are spaced apart arranged, each carrier 16 part of a single link chain is.
  • the individual carriers 16 can firmly and / or releasably connected to base plates 15 become.
  • Fitting elements or form-locking elements, especially U-profile beams 26, are arranged from above the carrier 16 are placed and in this way a lateral fixation of the carrier 16 in the position ensure according to Figure 2. So that the stability increases the U-profile carrier 26 also releasable with bolts 16 with the carriers 16 get connected.
  • lateral securing elements between the beams 14 and 16 for example a network, be tensioned, that for the operator working on the work platform must work, additional security offers.
  • FIG. 3 shows a further exemplary embodiment, the support device or the traction part 11 replaced by at least one sleeve or shoe 27, 28 is that provided in the wall 7 and / or 8 Drilling hole can be used so that either just one end 6 of the work platform 2 or both ends 5, 6 of the work platform 2 in can support the position according to Figure 3 or the Wear work platform 2. It is also possible that one end 5 of the working platform 2 via the articulated connection 21 fixed and / or pivotable with a shoe 27, similar to that in Figure 1, so that the work platform 2 from the position shown in Figure 1 in the Position according to Figure 3 can be pivoted. At every Wall 7 and 8 can also be two or more at a distance to each other as support elements or abutments Shoes, sleeves or support bolts 27, 28 are provided his.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Movable Scaffolding (AREA)

Abstract

The work platform (2) is set up using a device (1) with a bracket (3) or support section (12), against which the platform can rest. The support section or a support part (4) of the bracket allows one side (5) of the platform to be rested against a counter-bearing or a wall (7). A second support part (9) on this and the opposite side (6) of the platform also allows the platform to be rested against a counter-bearing or a wall (8). A safety device (10) on this opposite side is used to lock the set-up device into position whilst the platform is being used.

Description

Die Erfindung bezieht sich auf eine Arbeitsbühne zum Aufnehmen und/oder Verstellen einer Arbeitsplattform. The invention relates to a work platform for receiving and / or adjusting a work platform.

Es sind bereits allgemein Arbeitsbühnen bekannt, die in Aufzugsschächten von Industrie- oder Wohngebäuden eingesetzt werden und die hierzu auf sehr aufwendige Weise in Aufzugsschächten montiert und befestigt werden müssen.Working platforms which are used in elevator shafts of industrial or residential buildings and which have to be mounted and fastened in elevator shafts in a very complex manner are already known in general .

Demgemäß besteht die Erfindungsaufgabe darin, eine Arbeitsbühne für Schächte von Aufzügen oder für andere Schächte, die zumindest durch zwei gegenüberliegende Wandteile gebildet werden, zu schaffen, die kostengünstig hergestellt und in kürzester Zeit zwischen zwei Wandteilen montiert werden können. Accordingly, the object of the invention is to provide a working platform for elevator shafts or for other shafts, which are at least formed by two opposite wall parts, which can be produced inexpensively and installed in a very short time between two wall parts.

Gelöst wird die Erfindung durch folgende Merkmale:The invention is solved by the following features:

  • 1. Eine Arbeitsbühne weist eine Vorrichtung zum Aufnehmen und/oder Verstellen einer Arbeitsplattform auf,1. A work platform has a device for picking up and / or adjusting a work platform,
  • 2. die Vorrichtung zum Verstellen der Arbeitsplattform ist mit einer Halterung oder einem Abstützteil wirkungsmäßig verbunden, an der die Arbeitsplattform verstellbar angeordnet ist oder das als Auflageteil dient,2. the device for adjusting the work platform is effective with a bracket or a support part connected to which the work platform is adjustable is arranged or that serves as a support part,
  • 3. die Halterung weist eine erste Einrichtung oder das Abstützteil auf, mittels der die Arbeitsplattform im Bereich einer Seite gegen ein Widerlager oder eine Wand abstützbar ist, 3. the holder has a first device or that Support part on, by means of which the working platform in Area of one side against an abutment or wall is supported,
  • 4. die Arbeitsplattform weist auf der einen Seite und einer gegenüberliegenden Seite eine zweite Einrichtung auf, die ebenfalls gegen ein Widerlager oder eine Wand abstützbar ist,4. The work platform has on one side and a second device on an opposite side on, also against an abutment or a wall is supported,
  • 5. die der Halterung gegenüberliegende Seite ist mit einer Sicherungsvorrichtung versehen, die zumindest in der Arbeitsposition der Arbeitsplattform eine Arretierung der Arbeitsplattform bewirkt.5. the side opposite the bracket is with provided with a safety device that at least in the working position of the working platform a lock the working platform.
  • Hierdurch wird erreicht, daß insbesondere in Schächten zur Aufnahme von Aufzügen Arbeitsbühnen in kürzester Zeit montiert werden können und hierzu lediglich die Vorrichtung zum Verstellen der Arbeitsplattform mit ihrer zugehörigen Halterung an ein Wandteil angesetzt werden muß, um dann die übrigen Teile, insbesondere die Arbeitsplattform, in eine Arbeitsposition zu verstellen bzw. zu verschwenken, bis sie an der der Halterung gegenüberliegenden Wand anliegt. Die Länge der Arbeitsplattform ist so bestimmt, daß diese bei Einnahme einer horizontalen Lage nicht weiter verschwenkt wird, sondern sich automatisch in dieser Stellung festsetzt. Hierzu wird das zweite Widerlager der Arbeitsplattform gegen die Wand gepreßt.This ensures that especially in shafts to accommodate elevators in the shortest possible way Time can be assembled and only the Device for adjusting the work platform with your associated bracket attached to a wall part must then to the other parts, especially the Working platform to be adjusted into a working position or to pivot until it is on the opposite of the bracket Against the wall. The length of the work platform is so determined that when taking a horizontal position is not pivoted further, but automatically sticks in this position. For this purpose, the second abutment of the work platform pressed against the wall.

    Ferner ist es vorteilhaft, daß die Sicherungsvorrichtung aus einer Stützvorrichtung oder Halteeinrichtung besteht, die ein erstes und zweites gegen die Wand anlegbares Abstützteil aufweist. Die an der Arbeitsplattform angeordnete Sicherungsvorrichtung trägt auf einfache Weise dazu bei, daß die Stützvorrichtung bzw. die Halteeinrichtung, die beispielsweise fest oder auch starr mit der Arbeitsplattform verbunden ist, gegen eine Wand zur Anlage kommt und auf diese Weise verhindert, daß die Arbeitsplattform aus einer horizontal verlaufenden Arbeitsposition weiter verschwenkt wird. Dies wird durch die Stützvorrichtung bzw. Halteeinrichtung sichergestellt, die ein weiteres Verschwenken der Arbeitsplattform verhindert, da das beispielsweise starr an der Arbeitsplattform angeordnete Stützteil bewirkt, daß die Arbeitsplattform sich nicht verstellen kann, zumal die gesamte Anlagefläche der Halteeinrichtung bzw. der Stützvorrichtung in der Arbeitsstellung der Arbeitsplattform in etwa parallel zur zweiten Wand verläuft und dadurch eine einwandfreie Sicherung der Arbeitsplattform in der horizontalen Lage gewährleistet.It is also advantageous that the safety device from a support device or holding device consists of a first and second against the wall Has support part. The one on the work platform Arranged safety device carries on simple Way that the support device or Holding device, for example, fixed or rigidly connected to the work platform, against a wall comes to rest and in this way prevents that the work platform from a horizontal current working position is pivoted further. This is done by the support device or holding device ensured that a further pivoting of the Work platform prevented, for example causes a support part arranged rigidly on the work platform, that the work platform doesn't pretend can, especially since the entire contact surface of the holding device or the support device in the working position the work platform roughly parallel to the second wall runs and thereby a perfect backup of the Guaranteed working platform in the horizontal position.

    Eine zusätzliche Möglichkeit ist gemäß einer Weiterbildung der erfindungsgemäßen Arbeitsbühne, daß die Stützvorrichtung oder Halteeinrichtung aus einem Zugteil besteht, das mit seinem einen Ende mit der Arbeitsplattform und mit seinem anderen Ende mit einem Träger beweglich verbunden ist. Nach einem anderen Ausführungsbeispiel ist es möglich, daß die Stützvorrichtung an der Arbeitsplattform auch als Zugstange bzw. Zugseil ausgebildet sein kann, die an einem Ende mit der Arbeitsplattform und am anderen Ende mit einem sich in den Aufzugsschacht erstreckenden Träger verbunden sein kann. In der Arbeitsstellung nimmt dabei der Träger mit der Arbeitsplattform einen spitzen Winkel ein und dient dazu, zumindest an einer Stelle die Arbeitsplattform zusätzlich abzufangen bzw. abzustützen. Anstelle der einen Zugstange können auch mehrere Zugstangen bzw. Zugseile vorgesehen sein, die mit einem Ende an das äußere Ende des Trägers und mit ihrem anderen Ende an einer Stelle an die Arbeitsplattform angeschlossen sind. An additional option is according to a training the work platform according to the invention that the support device or holding device consists of a pulling part, the one end with the work platform and movable at its other end with a bracket connected is. According to another embodiment it is possible that the support device on the work platform also as a pull rod or pull rope can be formed at one end with the work platform and at the other end with yourself in the carrier extending the elevator shaft can be connected can. In the working position, the carrier takes with it the working platform at an acute angle and serves the work platform at least at one point additionally to intercept or support. Instead of one pull rod can also have several pull rods or Traction ropes are provided, which have one end to the outer end of the carrier and with its other end connected to the work platform at one point are.

    In weiterer Ausgestaltung der Erfindung ist es vorteilhaft, daß der Träger im Bereich seines einen Endes an die Vorrichtung zum Aufnehmen und/oder Verstellen einer Arbeitsplattform und im Bereich seines anderen Endes an das Abstützteil beweglich angeschlossen ist. Um ein einwandfreies Verstellen der Arbeitsplattform zwischen verschiedenen Positionen zu gewährleisten, sind der Träger und auch die Zugeinrichtung beweglich bzw. gelenkig, mittel- oder unmittelbar mit der Arbeitsplattform verbunden.In a further embodiment of the invention, it is advantageous that the carrier is in the area of its one end the device for receiving and / or adjusting a Work platform and in the area of its other end the support part is movably connected. To a perfect adjustment of the work platform between to ensure different positions are the Carrier and also the pulling device movable or articulated, directly or indirectly with the work platform connected.

    Gemäß einer bevorzugten Ausführungsform der erfindungsgemäßen Lösung ist schließlich vorgesehen, daß die Stützvorrichtung oder Halteeinrichtung mit der Arbeitsplattform und dem Träger eine Gelenkkette bildet, bei der die Arbeitsplattform ein Trag- oder Stützteil, die Halteeinrichtung ein Zugteil und der Träger eine Stützstrebe bildet.According to a preferred embodiment of the invention Finally, it is envisaged that the Support device or holding device with the work platform and forms a link chain for the wearer of the work platform a support or support part, the Holding device a tension member and the carrier a support strut forms.

    Von besonderer Bedeutung ist für die vorliegende Erfindung, daß die Arbeitsplattform, die Halteeinrichtung sowie der Träger eine Gelenkkette bilden, wobei die einzelnen Teile jeweils gelenkig und/oder lösbar verbunden sind.Of particular importance for the present invention is that the work platform, the holding device and the carrier form an articulated chain, the individual parts articulated and / or releasably connected are.

    Im Zusammenhang mit der erfindungsgemäßen Ausbildung und Anordnung ist es von Vorteil, daß die Arbeitsplattform über eine oder mehrere mit Abstand zueinander angeordnete Gelenkketten und/oder Halteeinrichtungen zwischen zwei gegenüberliegenden Wänden in einer gewünschten Position feststellbar ist.In connection with the training according to the invention and arrangement it is advantageous that the work platform over one or more spaced apart Link chains and / or holding devices between two opposite walls in a desired one Position can be determined.

    Vorteilhaft ist es ferner, daß zumindest zwei mit Abstand angeordnete Träger und/oder die Arbeitsplattform der Vorrichtung zum Aufnehmen und/oder Verstellen der Arbeitsplattform über Querstreben und/oder Bodenplatten miteinander verbindbar sind. Im Ausführungsbeispiel wird die Arbeitsplattform durch zwei mit Abstand zueinander angeordnete Träger gebildet, die in etwa die gesamte lichte Weite bzw. lichte Schachttiefe eines Aufzugsschachts überspannen und sich gegen die Wandteile abstützen. Eine zusätzliche Abstützung des Trägers oder der Träger wird durch den zweiten schräg dazu verlaufenden Träger möglich, der über die Zugteile mit dem horizontal verlaufenden Träger beweglich verbunden ist, aber in der Weise, daß der schräg verlaufende Träger in der horizontal verlaufenden Position der Arbeitsplattform eine absolut sichere Arretierung der Arbeitsplattform gewährleistet, wobei beide Teile verhindern, daß die Arbeitsplattform in der Arbeitsposition weiter im Uhrzeigerdrehsinn gemäß Ausführungsbeispiel verstellt wird.It is also advantageous that at least two at a distance arranged carrier and / or the work platform the device for receiving and / or adjusting the Working platform over cross struts and / or floor slabs are interconnectable. In the embodiment the working platform is separated by two arranged carrier formed, which is approximately the entire clear width or clear shaft depth of an elevator shaft span and against the wall parts support. Additional support for the wearer or the carrier is inclined by the second Carrier possible that with the train parts with the horizontally extending beam is movably connected, but in such a way that the sloping beam in the horizontal position of the work platform an absolutely secure locking of the work platform guaranteed, with both parts preventing the work platform in the work position continues Clockwise rotation adjusted according to the embodiment becomes.

    Außerdem ist es vorteilhaft, daß die Arbeitsplattform oder deren Träger und/oder die Stützvorrichtung oder Halteeinrichtung und/oder der Träger längenveränderlich ausgebildet sind. Durch die längenveränderliche Ausbildung der einzelnen Träger oder der Halteeinrichtung kann die gesamte Arbeitsbühne an unterschiedlich große Aufzugsschächte ohne weiteres angepaßt werden. Hierdurch erhält man eine große Variabilität der Arbeitsplattform, die sich in kürzester Zeit in jeden beliebigen Schacht einsetzen läßt. Es ist auch möglich, daß die erfindungsgemäße Arbeitsplattform überall dort eingesetzt wird, wo zwei gegenüberliegende feste Wandelemente vorgesehen sind, die Widerlager für die einzelnen Stützteile der Arbeitsplattform bilden. It is also advantageous that the work platform or their carrier and / or the support device or Holding device and / or the carrier variable in length are trained. Due to the variable length Training of the individual carriers or the holding device the entire work platform can be different large elevator shafts can be easily adapted. This gives you a large variability in the work platform, which in no time in any Can be inserted. It is also possible, that the working platform according to the invention everywhere there is used where two opposite fixed wall elements are provided, the abutments for the individual Form support parts of the working platform.

    Hierzu ist es vorteilhaft, daß die Arbeitsplattform zumindest in ihrer Arbeitsstellung mit einem Teil der Gelenkeinrichtung oder mit der Stützvorrichtung oder Halteeinrichtung einen Winkel α von etwa 90° einschließt.For this it is advantageous that the work platform at least in their working position with part of the joint device or with the support device or holding device encloses an angle α of approximately 90 °.

    Ferner ist es vorteilhaft, daß die Vorrichtung zum Verstellen einer Arbeitsplattform als Eckverbinder oder als Winkel ausgebildet ist, der gegen eine Eckkante einer Wand oder eines Bodens eines Schachtes oder einer Türöffnung abstützbar ist. Die einzelnen Träger der Arbeitsplattform können entweder durch feste Streben oder lediglich durch auf die Träger der Arbeitsplattform lose ablegbare Bodenplatten seitlich fixiert werden. Hierzu können die Bodenplatten mit Paßelementen versehen sein, die auf die Träger aufgesetzt werden, um ein seitliches Verschieben der Träger der Arbeitsplattform zu verhindern.It is also advantageous that the device for adjustment a work platform as a corner connector or is designed as an angle against a corner edge a wall or a floor of a shaft or one Door opening can be supported. The individual carriers of the work platform can either by fixed struts or only by on the carrier of the work platform loosely removable floor panels can be fixed laterally. For this purpose, the base plates can be fitted with fitting elements be placed on the carrier in order to a lateral shifting of the work platform supports to prevent.

    Eine zusätzliche Möglichkeit ist gemäß einer Weiterbildung der erfindungsgemäßen Arbeitsbühne, daß die Bodenplatten über Paßelemente lösbar und/oder fest mit den Trägern verbunden sind.An additional option is according to a training the work platform according to the invention that the floor panels detachable and / or fixed with the fitting elements Carriers are connected.

    Vorteilhaft ist es auch, daß die Arbeitsplattform über ein oder mehrere an den gegenüberliegenden Wänden anbringbares Widerlager oder Tragelement abstützbar ist und daß die Länge der Arbeitsplattform gleich oder größer ist als der Abstand zwischen den gegenüberliegenden Wänden.It is also advantageous that the work platform over one or more attachable to the opposite walls Abutment or support element is supported and that the length of the work platform is equal to or greater is as the distance between the opposite Walls.

    Weitere Vorteile und Einzelheiten der Erfindung sind in den Patentansprüchen und in der Beschreibung erläutert und in den Figuren dargestellt. Es zeigt:

    Figur 1
    eine schematische Darstellung einer Arbeitsbühne für Aufzugsschächte,
    Figur 2
    einen Schnitt entlang der Linie 2-2 gemäß Figur 1,
    Figur 3
    ein weiteres Ausführungsbeispiel einer Arbeitsbühne.
    Further advantages and details of the invention are explained in the patent claims and in the description and shown in the figures. It shows:
    Figure 1
    1 shows a schematic representation of a working platform for elevator shafts,
    Figure 2
    2 shows a section along the line 2-2 according to FIG. 1,
    Figure 3
    another embodiment of a work platform.

    In der Zeichnung ist mit 1 eine Vorrichtung zum Verstellen einer Arbeitsplattform 2 bezeichnet, die zwischen zwei gegenüberliegenden Wänden 7 und 8 auf einfachste Weise in sehr kurzer Zeit montiert werden kann. Die Vorrichtung 1 zum Verstellen der Arbeitsplattform 2 weist eine Halterung 3 auf, die im Ausführungsbeispiel gemäß Figur 1 als Winkel bzw. auch als Winkelträger ausgebildet sein kann und eine erste Einrichtung 4 bildet, die als Stützelement ausgebildet ist. In vorteilhafter Weise kann die erste Einrichtung bzw. der Winkelträger an eine Eckkante eines Bodens 18 einer Türöffnung 19 aufgesetzt werden und auf diese Weise die gesamte Vorrichtung zum Verstellen der Arbeitsplattform aufnehmen. An die erste Einrichtung 4 schließt sich eine Gelenkverbindung 20 an, an der ein erster Träger 16 der Arbeitsplattform 2 über einen Gelenkbolzen 21 schwenkbar angeschlossen ist. Die Länge des Trägers 16 entspricht in etwa der lichten Weite bzw. Tiefe des Aufzugsschachts, so daß der Träger 16 in der Arbeitsstellung der Arbeitsplattform in etwa eine horizontale Lage einnimmt und dabei in dieser Stellung über eine zweite Einrichtung 9 gegen die Oberfläche der zweiten Wand 8 des Aufzugsschachts zur Anlage kommt. Die Länge des Trägers 16 ist so bemessen, daß ein weiteres Verschwenken des Trägers 16 und somit auch der Arbeitsplattform 2 aus der Arbeitsposition bzw. über diese nicht möglich ist.In the drawing, 1 is a device for adjusting a work platform 2 referred to between two opposite walls 7 and 8 in the simplest Way can be assembled in a very short time. The device 1 for adjusting the work platform 2 has a holder 3, which in the exemplary embodiment 1 as an angle or as an angle bracket can be formed and forms a first device 4, which is designed as a support element. In advantageous The first device or the angle bracket can to a corner edge of a bottom 18 of a door opening 19 are put on and in this way the entire device for adjusting the work platform take up. The first device 4 follows an articulation 20 on which a first carrier 16 of the working platform 2 via a hinge pin 21 is pivotally connected. The length of the carrier 16 corresponds approximately to the clear width or depth of the elevator shaft, so that the carrier 16 in the working position the work platform is approximately horizontal Takes position and in this position over a second device 9 against the surface of the second wall 8 of the elevator shaft comes to rest. The length of the carrier 16 is such that another Swiveling the carrier 16 and thus also the Working platform 2 from the working position or above this is not possible.

    Damit jedoch bei jeder Belastung der Träger 16 die Arbeitsplattform 2 die in Figur 1 dargestellte Arbeitsposition oder Endlagestellung beibehält, ist an der Halterung der gegenüberliegenden Seite 6 der Arbeitsplattform 2 ein Widerlager beispielsweise starr angeordnet, das sich über die Breite der Arbeitsplattform nach oben erstreckt und zusätzlich ein Widerlager für die Arbeitsplattform 2 bildet. Dieses Widerlager ist im Ausführungsbeispiel gemäß Figur 1 als Stützvorrichtung bzw. Halteeinrichtung 11 ausgebildet. Die Stützvorrichtung 11 kann beispielsweise mit dem Träger 16 starr verbunden sein. Dadurch wird verhindert, daß der Träger bei einer Position, in der er parallel zur Außenoberfläche der Wand 8 verläuft, weiter im Urzeigerdrehsinn gemäß Pfeil 22 verschwenkt wird. Dies wird in vorteilhafter Weise dadurch verhindert, daß die Stützvorrichtung 11 zwei mit Abstand angeordnete Abstützteile 12 und 13 aufweist, die in der Stellung gemäß Figur 1 gegen die Oberfläche der Wand 8 zur Anlage kommen und damit sicherstellen, daß sich die Arbeitsplattform 2 nicht mehr über die Stellung gemäß Figur 1 in Richtung gemäß Pfeil 22 weiter bewegt.However, this means that the work platform is at every load on the carrier 16 2 the working position shown in Figure 1 or maintains the end position is at the Bracket of the opposite side 6 of the work platform 2 an abutment, for example rigidly arranged, that spans the width of the work platform extends upwards and an abutment for forms the working platform 2. This abutment is in the Embodiment according to Figure 1 as a support device or holding device 11 formed. The support device 11 can be rigid with the carrier 16, for example be connected. This prevents the wearer at a position in which it is parallel to the outer surface the wall 8 runs, further in the clockwise direction is pivoted according to arrow 22. This will be more advantageous Way prevents the support device 11 two spaced support parts 12 and 13, which in the position shown in Figure 1 against the surface of the wall 8 come to rest and thus ensure that the work platform 2 no longer in the direction of the position shown in Figure 1 moved further according to arrow 22.

    Ferner ist es möglich, daß die Haltevorrichtung 11 auch als Zugteil bzw. Zuggestänge oder Zugseil ausgebildet sein kann, wobei das untere Ende gemäß Figur 1 an den Träger 16 der Arbeitsplattform 2 beweglich bzw. über einen Gelenkbolzen 23 gelenkig angeschlossen ist, während das obere Ende der Halteeinrichtung 11 über einen weiteren Gelenkbolzen 23 mit einem Träger 14 gelenkig verbunden ist. Der Träger 14 bildet mit dem Stützteil bzw. der Haltevorrichtung 11 einen spitzen Winkel β, das heißt, der Träger 14 ist länger als der Träger 16, so daß er nicht über die Position gemäß Figur 1 hinaus verschwenkt werden kann. Die Halteeinrichtung bzw. das Zugteil 11 fängt also die Arbeitsplattform 2 im Bereich des äußeren Endes auf und dient zusätzlich als Sicherheit. Anstelle des Stützteils oder Zugteils 11 können mehrere Zugteile bzw. Zugseile vorgesehen sein, die mit ihren unteren Enden an mehreren Stellen am Träger 16 beweglich bzw. gelenkig angeschlossen werden können.It is also possible that the holding device 11 also designed as a pulling part or pulling rod or pulling rope can be, the lower end according to Figure 1 to the Carrier 16 of the work platform 2 is movable or above a hinge pin 23 is articulated while the upper end of the holding device 11 via a further hinge pin 23 with a support 14 articulated connected is. The carrier 14 forms with the support part or the holding device 11 an acute angle β, that is, the carrier 14 is longer than the carrier 16, so that it does not go beyond the position shown in FIG. 1 can be pivoted. The holding device or the Train part 11 thus catches the work platform 2 in the area the outer end and also serves as security. Instead of the support part or traction part 11 can several traction parts or traction cables can be provided, which with their lower ends in several places on the carrier 16 can be connected flexibly or articulated.

    Die Arbeitsplattform bildet also mit der Halteeinrichtung 11 und dem Träger 14 sowie der Gelenkverbindung 20 eine Gelenkkette, wobei die einzelnen Teile der Gelenkkette jeweils lösbar mit den angrenzenden Teilen verbunden sind.The work platform thus forms with the holding device 11 and the carrier 14 and the articulated connection 20th a link chain, the individual parts of the link chain each releasably connected to the adjacent parts are.

    Damit in kürzester Zeit die Arbeitsplattform unterschiedlich großen bzw. breiten Aufzugsschächten ohne weiteres angepaßt werden kann, können die Träger 14, 16 und auch die Halteeinrichtung 11 längenveränderlich ausgebildet sein. Der Träger 14 sowie der Träger 16 können als hohlförmige Rohrprofile oder Kastenrohrprofile ausgebildet sein, wobei ein Teil des Rohrprofils größer ist, so daß ein zweiter Teil des Rohrprofils verschiebbar aufgenommen und über in der Zeichnung nicht dargestellte Befestigungselemente gesichert werden kann. Beispielsweise können in dem Träger 14 zahlreiche mit Abstand zueinander angeordnete Bohrungen 24 vorgesehen werden, die mit Bohrungen des zweiten verschiebbaren Teils des Trägers 14 in Deckung gebracht werden, wobei in diese Bohrungen 24 Bolzen bzw. Schraubenbolzen eingeführt werden können, um die Möglichkeit zu schaffen, die Träger ebenso wie die Träger 16 auf bestimmte Längen einzustellen. An einen der Träger, insbesondere an den Träger 14, kann auch eine Zugeinrichtung 25 angeschlossen werden, so daß der Träger 14 von seiner in Figur 1 dargestellten horizontalen Stellung in eine vertikale Stellung gebracht oder in eine im Aufzugsschacht freigegebene Stellung verschwenkt werden kann. Die Zugeinrichtung bzw. das Zugseil 25 kann, je nach Größe der Arbeitsplattform 2 auch mit einer mechanischen bzw. motorgetriebenen Winde verbunden werden.So the work platform can be different in the shortest possible time large or wide elevator shafts without can be further adapted, the carrier 14, 16th and also the holding device 11 variable in length be trained. The carrier 14 and the carrier 16 can be as hollow tube profiles or box tube profiles be formed, part of the tubular profile is larger, so that a second part of the tubular profile slidably recorded and over in the drawing Fasteners not shown are secured can. For example, numerous can be in the carrier 14 bores 24 spaced apart be provided with the second sliding holes Part of the carrier 14 brought into line be, in these holes 24 bolts or bolts can be introduced to the possibility to create the carrier as well as the carrier 16 set certain lengths. To one of the porters, in particular on the carrier 14, a pulling device can also be used 25 are connected so that the carrier 14th from its horizontal position shown in Figure 1 placed in a vertical position or in a In the elevator shaft released position pivoted can be. The traction device or traction cable 25 can also, depending on the size of the work platform 2 a mechanical or motor-driven winch become.

    Gemäß Figur 2 sind die beiden Träger 16 mit Abstand zueinander angeordnet, wobei jeder Träger 16 Teil einer einzelnen Gelenkkette ist. Die einzelnen Träger 16 können mit Bodenplatten 15 fest und/oder lösbar verbunden werden. Es ist auch möglich, daß an den Bodenplatten Paßelemente bzw. Formschlußelemente, insbesondere U-Profil-Träger 26, angeordnet sind, die von oben her auf die Träger 16 aufgesetzt werden und auf diese Weise eine seitliche Fixierung der Träger 16 in der Stellung gemäß Figur 2 gewährleisten. Damit die Stabilität erhöht wird, können beispielsweise die U-Profil-Träger 26 auch über Schraubenbolzen mit den Trägern 16 lösbar verbunden werden. Je nach Größe der Arbeitsplattform können zwischen den Trägern 14 und 16 seitliche Sicherungselemente, beispielsweise ein Netz, gespannt werden, das für die Bedienungsperson, die auf der Arbeitsplattform arbeiten muß, eine zusätzliche Sicherheit bietet.According to Figure 2, the two carriers 16 are spaced apart arranged, each carrier 16 part of a single link chain is. The individual carriers 16 can firmly and / or releasably connected to base plates 15 become. It is also possible that on the floor panels Fitting elements or form-locking elements, especially U-profile beams 26, are arranged from above the carrier 16 are placed and in this way a lateral fixation of the carrier 16 in the position ensure according to Figure 2. So that the stability increases the U-profile carrier 26 also releasable with bolts 16 with the carriers 16 get connected. Depending on the size of the work platform can lateral securing elements between the beams 14 and 16, for example a network, be tensioned, that for the operator working on the work platform must work, additional security offers.

    In Figur 3 ist ein weiteres Ausführungsbeispiel dargestellt, wobei die Stützvorrichtung oder das Zugteil 11 durch mindestens eine Hülse oder einen Schuh 27, 28 ersetzt wird, der in eine in der Wand 7 und/oder 8 vorgesehene Bohrung sichernd eingesetzt werden kann, so daß sich entweder nur das eine Ende 6 der Arbeitsplattform 2 oder beide Enden 5, 6 der Arbeitsplattform 2 in der Stellung gemäß Figur 3 abstützen können bzw. die Arbeitsplattform 2 tragen. Es ist auch möglich, daß das eine Ende 5 der Arbeitsplattform 2 über die Gelenkverbindung 21 fest und/oder schwenkbar mit einem Schuh 27, ähnlich wie in Figur 1, verbunden ist, so daß die Arbeitsplattform 2 aus der Stellung gemäß Figur 1 in die Stellung gemäß Figur 3 verschwenkt werden kann. An jeder Wand 7 und 8 können auch zwei oder mehrere mit Abstand zueinander als Tragelemente oder Widerlager vorgesehene Schuhe, Hülsen oder Tragbolzen 27, 28 vorgesehen sein. FIG. 3 shows a further exemplary embodiment, the support device or the traction part 11 replaced by at least one sleeve or shoe 27, 28 is that provided in the wall 7 and / or 8 Drilling hole can be used so that either just one end 6 of the work platform 2 or both ends 5, 6 of the work platform 2 in can support the position according to Figure 3 or the Wear work platform 2. It is also possible that one end 5 of the working platform 2 via the articulated connection 21 fixed and / or pivotable with a shoe 27, similar to that in Figure 1, so that the work platform 2 from the position shown in Figure 1 in the Position according to Figure 3 can be pivoted. At every Wall 7 and 8 can also be two or more at a distance to each other as support elements or abutments Shoes, sleeves or support bolts 27, 28 are provided his.

    BezugszeichenlisteLIST OF REFERENCE NUMBERS

    11
    Vorrichtung zum Verstellen einer ArbeitsplattformDevice for moving a work platform
    22
    Arbeitsplattformworking platform
    33
    Halterungbracket
    44
    erste Einrichtung, Winkelträgerfirst device, angle bracket
    55
    Seite bzw. Ende der ArbeitsplattformSide or end of the work platform
    66
    gegenüberliegende Seite bzw. Ende der Arbeitsplattformopposite side or end of the work platform
    77
    Wandwall
    88th
    Wandwall
    99
    zweite Einrichtungsecond facility
    1010
    Sicherungsvorrichtungsafety device
    1111
    Stützvorrichtung oder Halteeinrichtung, Zugteil, ZugseilSupport device or holding device, pulling part, rope
    1212
    Abstützteilsupporting part
    1313
    Abstützteilsupporting part
    1414
    Trägercarrier
    1515
    Querstrebe und/oder BodenplatteCross strut and / or base plate
    1616
    Trägercarrier
    1717
    Paßelement, FormschlußelementFitting element, positive locking element
    1818
    Bodenground
    1919
    Türöffnungdoorway
    2020
    Gelenkverbindungarticulation
    2121
    Gelenkbolzenhinge pins
    2222
    Pfeilarrow
    2323
    Gelenkbolzenhinge pins
    2424
    Bohrungdrilling
    2525
    Zugseil Winkel,U-Profil-TrägerPull rope angle, U-profile beam
    2626
    U-Profil-TrägerU-profile carrier
    2727
    erste Hülse/Schuh-Steckeinrichtung, U-Profil-Trägerfirst sleeve / shoe connector, U-profile carrier
    2828
    zweite Hülse/Schuh-Steckeinrichtung, U-Profil-Träger entspricht einem Widerlager oder Tragelementsecond sleeve / shoe connector, U-profile carrier corresponds to an abutment or support element
    LL
    Weite bzw. Tiefe des Schachtes bzw. Länge der ArbeitsplattformWidth or depth of the shaft or length of the working platform

    Claims (14)

    Arbeitsbühne mit folgenden Merkmalen:Working platform with the following features: 1. sie weist eine Vorrichtung (1) zum Aufnehmen und/oder Verstellen einer Arbeitsplattform (2) auf,1. it has a device (1) for receiving and / or adjusting a work platform (2) on, 2. die Vorrichtung (1) zum Verstellen der Arbeitsplattform (2) ist mit einer Halterung (3) oder einem Abstützteil (12) wirkungsmäßig verbunden, an der die Arbeitsplattform (2) verstellbar angeordnet ist oder das als Auflageteil dient,2. the device (1) for adjusting the work platform (2) is with a bracket (3) or operatively connected to a support part (12), on which the work platform (2) is adjustable is arranged or that serves as a support part, 3. die Halterung (3) weist eine erste Einrichtung (4) oder das Abstützteil (12) auf, mittels der die Arbeitsplattform (2) im Bereich einer Seite (5) gegen ein Widerlager (27, 28) oder eine Wand (7) abstützbar ist,3. the holder (3) has a first device (4) or the support part (12) by means of of the working platform (2) in the area of a Side (5) against an abutment (27, 28) or one Wall (7) can be supported, 4. die Arbeitsplattform (2) weist auf der einen Seite (5) und einer gegenüberliegenden Seite (6) eine zweite Einrichtung (9) auf, die ebenfalls gegen ein Widerlager (27, 28) oder eine Wand (8) abstützbar ist, 4. The work platform (2) points to one Side (5) and an opposite side (6) a second device (9), which also against an abutment (27, 28) or a wall (8) is supported, 5. die der Halterung (5) gegenüberliegende Seite (6) ist mit einer Sicherungsvorrichtung (10) versehen, die zumindest in der Arbeitsposition der Arbeitsplattform (2) eine Arretierung der Arbeitsplattform bewirkt.5. the bracket (5) opposite Side (6) is with a safety device (10) provided at least in the working position the work platform (2) a lock the working platform. Arbeitsbühne nach Anspruch 1, dadurch gekennzeichnet, daß die Sicherungsvorrichtung (10) aus einer Stützvorrichtung oder Halteeinrichtung (11) besteht, die ein erstes und zweites gegen die Wand (8) anlegbares Abstützteil (12, 13) aufweist.Working platform according to Claim 1, characterized in that the securing device (10) consists of a supporting device or holding device (11) which has a first and a second supporting part (12, 13) which can be placed against the wall (8). Arbeitsbühne nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Stützvorrichtung oder Halteeinrichtung (11) aus einem Zugteil besteht, das mit seinem einen Ende mit der Arbeitsplattform (2) und mit seinem anderen Ende mit einem Träger (14) beweglich verbunden ist.Working platform according to claim 1 or 2, characterized in that the supporting device or holding device (11) consists of a pulling part which is movably connected at one end to the working platform (2) and at the other end to a support (14). Arbeitsbühne nach Anspruch 1, dadurch gekennzeichnet, daß der Träger (14) im Bereich seines einen Endes an die Vorrichtung (1) zum Aufnehmen und/oder Verstellen einer Arbeitsplattform (2) und im Bereich seines anderen Endes an das Abstützteil (13) beweglich angeschlossen ist. Working platform according to claim 1, characterized in that the carrier (14) is movably connected in the region of its one end to the device (1) for receiving and / or adjusting a working platform (2) and in the region of its other end to the supporting part (13) is. Arbeitsbühne nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Stützvorrichtung oder Halteeinrichtung (11) mit der Arbeitsplattform (2) und dem Träger (14) eine Gelenkkette bildet, bei der die Arbeitsplattform (2) ein Trag- oder Stützteil, die Halteeinrichtung (11) ein Zugteil und der Träger (14) eine Stützstrebe bildet.Working platform according to one of the preceding claims, characterized in that the supporting device or holding device (11) forms a joint chain with the working platform (2) and the carrier (14), in which the working platform (2) is a supporting or supporting part, the holding device ( 11) a tension member and the carrier (14) forms a support strut. Arbeitsbühne nach Anspruch 1, dadurch gekennzeichnet, daß die Arbeitsplattform (2), die Halteeinrichtung (11) sowie der Träger (14) eine Gelenkkette bildet, wobei die einzelnen Teile jeweils gelenkig und/oder lösbar verbunden sind.Working platform according to claim 1, characterized in that the working platform (2), the holding device (11) and the carrier (14) form a link chain, the individual parts being articulated and / or detachably connected. Arbeitsbühne nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Arbeitsplattform (2) über eine oder mehrere mit Abstand zueinander angeordnete Gelenkketten und/oder Halteeinrichtungen zwischen zwei gegenüberliegenden Wänden (7, 8) in einer Position feststellbar ist.Working platform according to one of the preceding claims, characterized in that the working platform (2) can be fixed in one position via one or more spaced-apart articulated chains and / or holding devices between two opposite walls (7, 8). Arbeitsbühne nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß zumindest zwei mit Abstand angeordnete Träger (16) und/oder die Arbeitsplattform (2) der Vorrichtung (1) zum Aufnehmen und/oder Verstellen der Arbeitsplattform (2) über Querstreben und/oder Bodenplatten (15) miteinander verbindbar sind. Working platform according to one of the preceding claims, characterized in that at least two spaced-apart supports (16) and / or the working platform (2) of the device (1) for receiving and / or adjusting the working platform (2) via cross struts and / or base plates (15) are interconnectable. Arbeitsbühne nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Arbeitsplattform (2) oder deren Träger (16) und/oder die Stützvorrichtung oder Halteeinrichtung (11) und/oder der Träger (14) längenveränderlich ausgebildet sind.Working platform according to one of the preceding claims, characterized in that the working platform (2) or its support (16) and / or the supporting device or holding device (11) and / or the support (14) are variable in length. Arbeitsbühne nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Arbeitsplattform (1) zumindest in ihrer Arbeitsstellung mit einem Teil der Gelenkeinrichtung oder mit der Stützvorrichtung oder Halteeinrichtung (11) einen Winkel α von etwa 90° einschließt.Working platform according to one of the preceding claims, characterized in that the working platform (1) forms an angle α of approximately 90 ° at least in its working position with part of the articulated device or with the supporting device or holding device (11). Arbeitsbühne nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Vorrichtung (1) zum Verstellen einer Arbeitsplattform (2) als Eckverbinder oder als Winkel ausgebildet ist, der gegen eine Eckkante einer Wand (7, 8) oder eines Bodens (18) eines Schachtes oder einer Türöffnung (19) abstützbar ist.Working platform according to one of the preceding claims, characterized in that the device (1) for adjusting a working platform (2) is designed as a corner connector or as an angle against a corner edge of a wall (7, 8) or a floor (18) of a shaft or a door opening (19) can be supported. Arbeitsbühne nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Bodenplatten (15) über Paßelemente (17, 26) lösbar und/oder fest mit den Trägern (16) verbunden sind. Working platform according to one of the preceding claims, characterized in that the base plates (15) are detachably and / or firmly connected to the supports (16) via fitting elements (17, 26). Arbeitsbühne nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Arbeitsplattform (2) über ein oder mehrere an den gegenüberliegenden Wänden (7, 8) anbringbares Widerlager oder Tragelement (27, 28) abstützbar ist.Working platform according to one of the preceding claims, characterized in that the working platform (2) can be supported via one or more abutments or supporting elements (27, 28) which can be attached to the opposite walls (7, 8). Arbeitsbühne nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Länge (L) der Arbeitsplattform (2) gleich oder größer ist als der Abstand zwischen den gegenüberliegenden Wänden (7, 8).Working platform according to one of the preceding claims, characterized in that the length (L) of the working platform (2) is equal to or greater than the distance between the opposite walls (7, 8).
    EP00112935A 1999-06-23 2000-06-20 Work platform Expired - Lifetime EP1063368B1 (en)

    Applications Claiming Priority (2)

    Application Number Priority Date Filing Date Title
    DE19928574A DE19928574C2 (en) 1999-06-23 1999-06-23 Working platform
    DE19928574 1999-06-23

    Publications (2)

    Publication Number Publication Date
    EP1063368A1 true EP1063368A1 (en) 2000-12-27
    EP1063368B1 EP1063368B1 (en) 2005-05-11

    Family

    ID=7912148

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP00112935A Expired - Lifetime EP1063368B1 (en) 1999-06-23 2000-06-20 Work platform

    Country Status (3)

    Country Link
    EP (1) EP1063368B1 (en)
    DE (2) DE19928574C2 (en)
    ES (1) ES2239966T3 (en)

    Cited By (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    GB2417944A (en) * 2004-09-08 2006-03-15 Aire Valley Metal Products Ltd Pivoting work platform for lift shaft

    Families Citing this family (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    WO2004007869A1 (en) 2002-07-12 2004-01-22 Stingl Gmbh Working gantry
    US8646224B2 (en) * 2008-09-17 2014-02-11 Wurtec Elevator Products & Services Construction apparatus
    US8646576B2 (en) 2009-07-30 2014-02-11 Wurtec Elevator Products & Services Foldable hoistway work deck
    US10024488B2 (en) 2014-10-06 2018-07-17 Wurtec, Incorporated Three-beam construction apparatus

    Citations (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    JPH08282941A (en) * 1995-04-19 1996-10-29 Hitachi Building Syst Eng & Service Co Ltd Scaffold device for installing elevator
    JPH08301549A (en) * 1995-04-28 1996-11-19 Hitachi Building Syst Eng & Service Co Ltd Scaffolding device for elevator installation and assembling method thereof

    Family Cites Families (3)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US2710418A (en) * 1952-06-04 1955-06-14 Ayers B Putnam Power scaffolds
    DE3839677A1 (en) * 1988-11-24 1990-05-31 Robota Gmbh DEVICE FOR BREAKING CHIMNEYS
    FR2641018A1 (en) * 1988-12-22 1990-06-29 Otis Elevator Co Building-site scaffolding to be climbed in particular in elevator hoppers

    Patent Citations (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    JPH08282941A (en) * 1995-04-19 1996-10-29 Hitachi Building Syst Eng & Service Co Ltd Scaffold device for installing elevator
    JPH08301549A (en) * 1995-04-28 1996-11-19 Hitachi Building Syst Eng & Service Co Ltd Scaffolding device for elevator installation and assembling method thereof

    Non-Patent Citations (2)

    * Cited by examiner, † Cited by third party
    Title
    PATENT ABSTRACTS OF JAPAN vol. 1997, no. 02 28 February 1997 (1997-02-28) *
    PATENT ABSTRACTS OF JAPAN vol. 1997, no. 03 31 March 1997 (1997-03-31) *

    Cited By (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    GB2417944A (en) * 2004-09-08 2006-03-15 Aire Valley Metal Products Ltd Pivoting work platform for lift shaft
    GB2417944B (en) * 2004-09-08 2008-01-30 Aire Valley Metal Products Ltd Lift shaft work platform

    Also Published As

    Publication number Publication date
    EP1063368B1 (en) 2005-05-11
    ES2239966T3 (en) 2005-10-16
    DE19928574C2 (en) 2001-11-15
    DE19928574A1 (en) 2001-01-04
    DE50010263D1 (en) 2005-06-16

    Similar Documents

    Publication Publication Date Title
    DE3236855C2 (en)
    EP1527242B1 (en) Working gantry
    DE1926293B2 (en) STOP DEVICE FOR VERTICAL STORAGE OF DRILL PIPE AND HANDLE RODS
    EP0034819B1 (en) Movable scaffold
    EP0016317A1 (en) Heigth adjustable trailer hitch
    EP0611726B1 (en) Lift for the installation and the removal of vehicle parts
    DE2747069A1 (en) LIFTING DEVICE WITH OPTIONAL USE OF A HOPPER OR TWO HOPPER
    DE2906155C3 (en) Support with two beams and a sliding guide
    EP1063368A1 (en) Work platform
    DE19527318C2 (en) Lifting device for a dam beam
    EP1396462A2 (en) Load lifting device, in particular for wooden panels
    DE2713485C3 (en) Overhead line trolley
    DE10203017B4 (en) General purpose lid lifter for sewer and manhole covers
    DE102021113863A1 (en) Manhole safety device
    DE102004043481A1 (en) Support device for a pulling device for laying pipelines
    DE820958C (en) Gripper heart, which is carried by the ladder of a freight elevator
    DE19502355C1 (en) Ground=mounted support to grip vertically projecting component
    EP3879034B1 (en) Carriage assembly for construction machine and method for same
    AT512201B1 (en) Device for attaching a catwalk to a fiber web machine, catwalk for a fiber web machine and method for handling a catwalk in connection with a fiber web machine
    EP3128116A1 (en) Ladder base for ladders, scaffolds, working platforms and the like
    EP0187976A2 (en) Locking device for telescopic elements of a lift
    DE1926610C3 (en) Transportable device for straightening tubular workpieces
    DE3248498A1 (en) Device for the retention of sectional closures
    DE2718712C2 (en) Feeding device for sheep breeding
    DE1531119C (en) Safety device for working platforms that can be raised and lowered on hoist ropes

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): DE ES FR GB

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    17P Request for examination filed

    Effective date: 20010530

    AKX Designation fees paid

    Free format text: DE ES FR GB

    17Q First examination report despatched

    Effective date: 20040608

    GRAP Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOSNIGR1

    RAP1 Party data changed (applicant data changed or rights of an application transferred)

    Owner name: STINGL GMBH

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): DE ES FR GB

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    Free format text: NOT ENGLISH

    REF Corresponds to:

    Ref document number: 50010263

    Country of ref document: DE

    Date of ref document: 20050616

    Kind code of ref document: P

    GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

    Effective date: 20050726

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FG2A

    Ref document number: 2239966

    Country of ref document: ES

    Kind code of ref document: T3

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    ET Fr: translation filed
    26N No opposition filed

    Effective date: 20060214

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: PLFP

    Year of fee payment: 16

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: PLFP

    Year of fee payment: 17

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: PLFP

    Year of fee payment: 18

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: PLFP

    Year of fee payment: 19

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20180625

    Year of fee payment: 19

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: FR

    Payment date: 20180620

    Year of fee payment: 19

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: ES

    Payment date: 20180720

    Year of fee payment: 19

    Ref country code: GB

    Payment date: 20180620

    Year of fee payment: 19

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: R119

    Ref document number: 50010263

    Country of ref document: DE

    GBPC Gb: european patent ceased through non-payment of renewal fee

    Effective date: 20190620

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20190620

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20200101

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20190630

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FD2A

    Effective date: 20201028

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20190621