EP0885333B1 - Face walling in sanitary installations - Google Patents

Face walling in sanitary installations Download PDF

Info

Publication number
EP0885333B1
EP0885333B1 EP97906140A EP97906140A EP0885333B1 EP 0885333 B1 EP0885333 B1 EP 0885333B1 EP 97906140 A EP97906140 A EP 97906140A EP 97906140 A EP97906140 A EP 97906140A EP 0885333 B1 EP0885333 B1 EP 0885333B1
Authority
EP
European Patent Office
Prior art keywords
casing
wall
base plate
holding
clamping brackets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP97906140A
Other languages
German (de)
French (fr)
Other versions
EP0885333A1 (en
Inventor
Fritz Rieger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Knauf Marmorit GmbH
Original Assignee
Marmorit GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Marmorit GmbH filed Critical Marmorit GmbH
Publication of EP0885333A1 publication Critical patent/EP0885333A1/en
Application granted granted Critical
Publication of EP0885333B1 publication Critical patent/EP0885333B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B1/2604Connections specially adapted therefor
    • E04B1/2608Connectors made from folded sheet metal
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/01Domestic plumbing installations for fresh water or waste water; Sinks for combinations of baths, showers, sinks, wash-basins, closets, urinals, or the like

Definitions

  • the invention relates to, in particular mechanical, masonry in the sanitary area and a formwork for, especially mechanical, brickwork in the sanitary area.
  • a prefabricated sanitary wall is also known from DE 804 045 C1. However, there is no provision for brickwork with formwork walls.
  • the invention has for its object the fixation of the formwork walls, especially for mechanical facing to simplify, on the condition that the fixed wall elements are still for adjustment let it move.
  • a formwork constructed according to the method according to the features of claim 5 is simple and to create without much time, whereby the wall elements in a simple manner in the holding elements two-dimensional shift, which is the advantage has that the front edges of the wall elements in be positioned on a common vertical plane can. This means that the machine is working precisely Facing possible.
  • a holding element is used on which the wall element under vertical alignment to the wall to be bricked Wall is held clamped.
  • This is what the at least serve two clamping tabs, between which the formwork panel element is jammed, but it is still possible to move the shuttering element in the holding element, to adjust them.
  • the two clamping tabs are from the base plate from substantially rectangular, the in turn is attached to the building wall.
  • the two clamping tabs are advantageously the least a pair of clamping lugs inclined towards each other, the distance between the two clamping tabs in the area of Base plate equal or slightly larger than the thickness of the scarf wall element and the distance between the clamping tabs reduced to their free ends.
  • the clamping effect is caused by mechanical tension, by deforming the clamping tabs during insertion of the wall element is created.
  • the two clamping tabs have different lengths, i.e. starting from the base plate stretch far.
  • the wall element or the formwork board then becomes the longer of the two Clamping tabs moved away from the other clamping tab, so that the space is large enough for the formwork element or shuttering board is insertable.
  • the holding element is a one-piece stamped part and a double-T base plate having two parallel sections and one that connects them and is perpendicular to them extending connecting portion is provided, the two clamping tabs on both sides of the edges of the connecting section protrude from the base plate.
  • Such a holding element can be easily made from a sheet shape by first holding the holding element out of the sheet metal part is punched out to then separate them from each other Clamping tabs extending away by bending by approximately 90 ° into one another essentially parallel and to the rest of the stamped part (i.e. the base plate) bring right-angled alignment.
  • the holding element preferably consists of galvanized Metal.
  • Fig. 1 shows in perspective a holding element 10 made of galvanized Metal which is a base plate 12 and from this protruding, slightly tapered Has clamping tabs 14.
  • the clamping tabs 14 point different length, so that the base plate 12th facing away free end 16 of a clamping tab over the free end 16 of the other clamping tab protrudes.
  • the Base plate 12 essentially has a plan view a double T shape, the two clamping tabs 14 from the middle connecting portion 18 of the base plate 12 protrude, the two parallel T-sections 20 of the Base plate 12 connects together.
  • various holes 22 are introduced, by means of which the screw or nail the retaining element 10 to the wall leaves.
  • the clamping tabs 14 also have holes, which, if desired, used to fix the formwork walls can be. In itself, however, is the pressure force the two clamping tabs 14 due to their mechanical deformation as a result of moving away with the introduced (see Arrow 24) formwork board 26 on both sides of the same apply, sufficient for fixation.
  • Formwork boards 26 can now be adjusted so that their front edges 34, if necessary, in a common vertical plane can be brought. This applies for example for the two shown on the right in FIG. 3 Formwork boards 26, the front edges 34 in a common vertical plane should run so that after completion of the masonry the situation according to Fig. 4 can result. After adjusting the formwork boards 26 can these on the clamping tabs 14 by screws secured against unwanted movements, but what is not necessarily required.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Bidet-Like Cleaning Device And Other Flush Toilet Accessories (AREA)
  • Absorbent Articles And Supports Therefor (AREA)
  • Prostheses (AREA)
  • Finishing Walls (AREA)

Abstract

A support for a boarded panel component (26), especially for machine-fitted face walling in sanitary installations, has a retaining element (10), which has a base plate (12) for securing said retaining element (10) to a building wall (32) and at least one pair of clamping lugs (14) projecting from the base plate (12), for securing a boarded panel component (26). Such supports make it possible to fit boarded panel components (26) proud on a wall so that the insulating space open at the front and defined by said boarded panel components (26) may be filled with mortar.

Description

Die Erfindung betrifft die, insbesondere maschinelle, Vormauerung im Sanitärbereich und eine Verschalung für eine, insbesondere maschinelle, Vormauerung im Sanitärbereich.The invention relates to, in particular mechanical, masonry in the sanitary area and a formwork for, especially mechanical, brickwork in the sanitary area.

Aus Kostengründen und aus Gründen der gestiegenen Anforderungen an die Schalldämmung im Wohnungsbau wird mehr und mehr dazu übergegangen, Sanitärleitungen und -anschlüsse nicht in dem Mauerwerk zu verlegen sondern davor zu installieren. Um die Sanitärrohre und -anschlüsse herum wird dann eine Verschalung zumeist aus Gipskartonplatten vorgesehen, die von der Wand, vor der die Sanitäranschlüsse und -leitungen angeordnet sind, abstehen. Nach Anbringung der Schalwände wird der dann vorderseitig offene Verschalungsraum, der einerseits durch die Schalwände und andererseits durch Seitenwände und Bodenwände des Gebäudes begrenzt ist, mit Mörtel ausgefüllt, der maschinell aufgetragen wird. Die Anbringung der Schalwände, bei denen es sich um Schalbretter mit einer Breite zwischen 15 bis 30 cm Breite handelt, ist dabei relativ zeitaufwendig und kompliziert; zumeist werden die Schalwände mittels manuell aufgetragener Mörtelhäufchen fixiert. Insbesondere unter dem Gesichtspunkt, daß die Schalwände justiert werden müssen, damit ihre der Gebäudewand abgewandten Kanten in einer gemeinsamen vertikalen Ebene verlaufen, bereitet die Befestigung mittels Mörtel Probleme. Zusätzliche Probleme treten dadurch auf, daß die Wand, an der die Schalwände fixiert werden müssen, Unebenheiten aufweisen kann.For cost reasons and for reasons of increased requirements there is more to sound insulation in residential construction and more passed on to plumbing and plumbing not to be laid in the masonry but in front of it to install. Around the sanitary pipes and connections then a formwork is mostly made of plasterboard provided by the wall in front of the plumbing connections and lines are arranged, protrude. After installation the formwork walls becomes the formwork room that is then open on the front, the one hand through the formwork walls and on the other hand through the side walls and floor walls of the building is limited, filled with mortar, which is applied by machine becomes. The attachment of the formwork walls, where it formwork boards with a width between 15 to 30 cm width is relatively time consuming and complicated; mostly the formwork walls are made manually applied pile of mortar fixed. Especially under the point of view that the formwork walls have to be adjusted, so that their edges facing away from the building wall in a common vertical plane, prepares the Fixing with mortar problems. Additional problems occur because the wall on which the formwork walls must be fixed, may have bumps.

Eine vorgefestigte Sanitärwandt ist auch aus DE 804 045 C1 bekannt. Eine Vormauerung mit Schalwänden ist dort jedoch nicht vorgesehen.A prefabricated sanitary wall is also known from DE 804 045 C1. However, there is no provision for brickwork with formwork walls.

Der Erfindung liegt die Aufgabe zugrunde, die Fixierung der Schalwände für die insbesondere maschinelle Vormauerung zu vereinfachen, und zwar unter der Bedingung, daß die fixierte Schalwandelemente sich zwecks Justage noch verschieben lassen. The invention has for its object the fixation of the formwork walls, especially for mechanical facing to simplify, on the condition that the fixed wall elements are still for adjustment let it move.

Zur Lösung dieser Aufgabe wird ein Verfahren zur, insbesondere maschinellen, Vormauerung im Sanitärbereich vor einer Wand in einem Raum vorgeschlagen, bei dem

  • an der Wand mehrere Halteelemente befestigt werden, von denen jedes eine Grundplatte zur Befestigung des Halteelements an einer Wand und mindestens ein Paar von von der Grundplatte abstehenden Klemmlaschen zum klemmenden Halten eines Schalwandelements aufweist,
  • zwischen die Klemmlaschen der Halteelemente Schalwandelemente eingesetzt werden und
  • der durch die Schalwandelemente und/oder Seitensowie Bodenwände des Raumes definierte vorderseitig offene Verschalungsraum durch Mörtelmaterial ausgefüllt wird.
To solve this problem, a method is proposed for, in particular mechanical, brickwork in the sanitary area in front of a wall in a room in which
  • several holding elements are fastened to the wall, each of which has a base plate for fastening the holding element to a wall and at least one pair of clamping tabs projecting from the base plate for holding a formwork wall element in a clamped manner,
  • between the clamping tabs of the holding elements formwork wall elements are used and
  • the shuttering space open on the front defined by the shuttering wall elements and / or sides and floor walls of the room is filled with mortar material.

Eine gemäß dem Verfahren aufgebaute Verschalung gemäß den Merkmalen des Anspruchs 5 ist einfach und ohne großen Zeitaufwand zu erstellen, wobei sich die Schalwandelemente auf einfache Weise in den Halteelementen zweidimensional verschieben lassen, was den Vorteil hat, daß die Vorderkanten der Schalwandelemente in einer gemeinsamen vertikalen Ebene positioniert werden können. Damit ist ein exaktes Arbeiten bei der maschinellen Vormauerung möglich.A formwork constructed according to the method according to the features of claim 5 is simple and to create without much time, whereby the wall elements in a simple manner in the holding elements two-dimensional shift, which is the advantage has that the front edges of the wall elements in be positioned on a common vertical plane can. This means that the machine is working precisely Facing possible.

Bei dem Verfahren und der Verschalung nach der Erfindung wird ein Halteelement verwendet, an dem das Schalwandelement unter senkrechter Ausrichtung zur vorzumauernden Wand klemmend gehalten ist. Hierzu dienen die mindestens zwei Klemmlaschen, zwischen denen das Schalwandelement klemmend gehalten ist, wobei es immer noch möglich ist, das Schalwandelement in dem Halteelement zu verschieben, um sie auszujustieren. Die beiden Klemmlaschen stehen von der Grundplatte im wesentlichen rechtwinklig ab, die ihrerseits an der Gebäudewand befestigt wird. In the method and formwork according to the invention a holding element is used on which the wall element under vertical alignment to the wall to be bricked Wall is held clamped. This is what the at least serve two clamping tabs, between which the formwork panel element is jammed, but it is still possible to move the shuttering element in the holding element, to adjust them. The two clamping tabs are from the base plate from substantially rectangular, the in turn is attached to the building wall.

Vorteilhafterweise sind die beiden Klemmlaschen des mindestens einen Klemmlaschenpaares gegeneinander geneigt, wobei der Abstand der beiden Klemmlaschen im Bereich der Grundplatte gleich bzw. geringfügig größer als die Stärke des Schalwandelements ist und sich der Abstand der Klemmlaschen zu deren freien Enden hin verringert. Die Klemmwirkung wird also durch mechanische Spannung hervorgerufen, die durch Verformen der Klemmlaschen beim Einführen des Schalwandelements entsteht.The two clamping tabs are advantageously the least a pair of clamping lugs inclined towards each other, the distance between the two clamping tabs in the area of Base plate equal or slightly larger than the thickness of the scarf wall element and the distance between the clamping tabs reduced to their free ends. The clamping effect is caused by mechanical tension, by deforming the clamping tabs during insertion of the wall element is created.

Zwecks Vereinfachung des Einführens eines Schalwandelements zwischen die Klemmlaschen ist es von Vorteil, wenn die beiden Klemmlaschen unterschiedliche Längen aufweisen, d.h. sich ausgehend von der Grundplatte unterschiedlich weit erstrecken. Mittels des Schalwandelements bzw. des Schalbretts wird dann die längere der beiden Klemmlaschen von der anderen Klemmlasche abgerückt, so daß der Zwischenraum groß genug ist, damit das Schalwandelement bzw. Schalbrett einführbar ist. Alternativ oder zusätzlich können die Klemmlaschen an ihren der Grundplatte abgewandten Enden zur Bildung eines Einlaufbereichs (geringfügig) auseinanderlaufen.To simplify the insertion of a formwork element between the clamping tabs it is an advantage if the two clamping tabs have different lengths, i.e. starting from the base plate stretch far. By means of the wall element or the formwork board then becomes the longer of the two Clamping tabs moved away from the other clamping tab, so that the space is large enough for the formwork element or shuttering board is insertable. Alternatively or In addition, the clamping tabs on the base plate opposite ends to form an inlet area (slightly) diverge.

Fertigungstechnisch von Vorteil ist es, wenn das Halteelement ein einteiliges Stanzteil ist und eine Doppel-T-Grundplatte aufweist, die mit zwei parallelen Abschnitten und einem diese verbindenden und rechtwinklig zu diesen verlaufenden Verbindungsabschnitt versehen ist, wobei die beiden Klemmlaschen beidseitig der Ränder des Verbindungsabschnitts von der Grundplatte abstehen. Ein solches Halteelement läßt sich auf einfache Weise aus einem Blech formen, indem zunächst das Halteelement aus dem Blechteil ausgestanzt wird, um anschließend die sich noch voneinander weg gerichtet erstreckenden Klemmlaschen durch Abwinkelung um etwa 90° in eine im wesentlichen zueinander parallel und zum Rest des Stanzteils (d.h. der Grundplatte) rechtwinklige Ausrichtung zu bringen.It is advantageous from a manufacturing point of view if the holding element is a one-piece stamped part and a double-T base plate having two parallel sections and one that connects them and is perpendicular to them extending connecting portion is provided, the two clamping tabs on both sides of the edges of the connecting section protrude from the base plate. Such a holding element can be easily made from a sheet shape by first holding the holding element out of the sheet metal part is punched out to then separate them from each other Clamping tabs extending away by bending by approximately 90 ° into one another essentially parallel and to the rest of the stamped part (i.e. the base plate) bring right-angled alignment.

Vorzugsweise besteht das Halteelement aus verzinktem Metall.The holding element preferably consists of galvanized Metal.

Nachfolgend wird anhand der Figuren ein Ausführungsbeispiel der Erfindung näher erläutert. Im einzelnen zeigen:

Fig. 1
eine perspektivische Ansicht eines Halteelements für ein Schalbrett, wobei die Einführbarkeit des Schalbretts in das Halteelement angedeutet ist,
Fig. 2
ein Beispiel einer Vorwandmontage im Sanitärbereich, wobei auf der Wand mehrere Halteelemente zum Halten vertikal und horizontal verlaufender Schalwände angebracht sind,
Fig. 3
die Darstellung gemäß Fig. 2 mit von den Halteelementen gehaltenen Schalbrettern und
Fig. 4
die Situation der Vormauerung bei (zum Teil) mit Mörtel ausgefülltem Verschalungsraum.
An exemplary embodiment of the invention is explained in more detail below with reference to the figures. In detail show:
Fig. 1
2 shows a perspective view of a holding element for a formwork board, wherein the insertability of the formwork board into the holding element is indicated,
Fig. 2
an example of a pre-wall installation in the sanitary area, wherein several holding elements for holding vertically and horizontally running formwork walls are attached to the wall,
Fig. 3
2 with formwork boards held by the holding elements and
Fig. 4
the situation of the facing with (partly) mortar-filled formwork space.

Fig. 1 zeigt perspektivisch ein Halteelement 10 aus verzinktem Metall, das eine Grundplatte 12 und von dieser abstehende, leicht konisch aufeinander zu laufende Klemmlaschen 14 aufweist. Die Klemmlaschen 14 weisen unterschiedliche Länge auf, so daß das der Grundplatte 12 abgewandte freie Ende 16 der einen Klemmlasche über das freie Ende 16 der anderen Klemmlasche übersteht. Die Grundplatte 12 weist in der Draufsicht im wesentlichen eine Doppel-T-Form auf, wobei die beiden Klemmlaschen 14 von dem mittleren Verbindungsabschnitt 18 der Grundplatte 12 abstehen, der die beiden parallelen T-Abschnitte 20 der Grundplatte 12 miteinander verbindet. In der Grundplatte 12 sind diverse Löcher 22 eingebracht, mittels derer sich das Halteelement 10 an der Wand festschrauben bzw. festnageln läßt. Auch die Klemmlaschen 14 weisen Löcher auf, die, falls gewünscht, zur Fixierung der Schalwände verwendet werden können. An sich jedoch ist die Andrückkraft, die beide Klemmlaschen 14 aufgrund ihrer mechanischen Verformung infolge eines Wegbewegens bei eingeführtem (s. Pfeil 24) Schalbrett 26 beidseitig desselben auf dieses aufbringen, für die Fixierung ausreichend.Fig. 1 shows in perspective a holding element 10 made of galvanized Metal which is a base plate 12 and from this protruding, slightly tapered Has clamping tabs 14. The clamping tabs 14 point different length, so that the base plate 12th facing away free end 16 of a clamping tab over the free end 16 of the other clamping tab protrudes. The Base plate 12 essentially has a plan view a double T shape, the two clamping tabs 14 from the middle connecting portion 18 of the base plate 12 protrude, the two parallel T-sections 20 of the Base plate 12 connects together. In the base plate 12 various holes 22 are introduced, by means of which the screw or nail the retaining element 10 to the wall leaves. The clamping tabs 14 also have holes, which, if desired, used to fix the formwork walls can be. In itself, however, is the pressure force the two clamping tabs 14 due to their mechanical deformation as a result of moving away with the introduced (see Arrow 24) formwork board 26 on both sides of the same apply, sufficient for fixation.

Anhand der Fign. 2 und 3 wird die Vorgehensweise bei der maschinellen Vormauerung im Sanitärbereich erläutert, wobei zur Erstellung der Verschalung die in Fig. 1 gezeigten Halteelemente eingesetzt werden.Using the figures 2 and 3 the procedure for mechanical brickwork in the sanitary area explained where to create the formwork shown in Fig. 1 Holding elements are used.

Nachdem der Installateur die Sanitärleitungen 28 sowie Sanitäranschlüsse 30 auf einer Wand 32 verlegt hat, werden auf dieser Wand 32 der Verschalung entsprechend mehrere Halteelemente 10 befestigt. Gemäß Fig. 3 werden dann in die Halteelemente 10 die Schalbretter 26 eingeführt, wobei mit den Schalbrettern 26 durch Anlage gegen die weiter überstehende der beiden Klemmlaschen 14 eines Halteelements 10 der Abstand des Klemmlaschenpaares bis über die Breite des Schalbretts 26 hinaus vergrößert wird, um dann das Schalbrett 26 gemäß dem Pfeil 24 der Fig. 1 in die Halteelemente 10 einschieben zu können. Infolge der Elastizität der Klemmlaschen 14 kommt es zu einer Andrückkraft und damit einer Klemmwirkung auf die Schalbretter 26. Die in den Halteelementen 10 klemmend gehaltenen Schalbretter 26 lassen sich nun noch ausjustieren, so daß ihre Vorderkanten 34, soweit erforderlich, in eine gemeinsame vertikale Ebene gebracht werden können. Dies gilt beispielsweise für die beiden in Fig. 3 rechts dargestellten Schalbretter 26, deren Vorderkanten 34 in einer gemeinsamen vertikalen Ebene verlaufen sollten, damit sich nach Fertigstellung der Vormauerung die Situation gemäß Fig. 4 ergeben kann. Nach dem Justieren der Schalbretter 26 können diese an den Klemmlaschen 14 durch Schrauben gegen ungewollte Bewegungen gesichert werden, was aber nicht notwendigerweise erforderlich ist.After the installer the plumbing 28 and Plumbing connections 30 has been laid on a wall 32 several on this wall 32 of the formwork Holding elements 10 attached. 3 are then in the holding elements 10 introduced the formwork boards 26, wherein with the formwork boards 26 by plant against the next protruding of the two clamping tabs 14 of a holding element 10 the distance between the pair of clamping lugs up to the width of the formwork board 26 is increased to then the formwork board 26 according to arrow 24 of FIG. 1 in to be able to insert the holding elements 10. As a result of Elasticity of the clamping tabs 14 results in a pressing force and thus a clamping effect on the formwork boards 26. The clamped in the holding elements 10 Formwork boards 26 can now be adjusted so that their front edges 34, if necessary, in a common vertical plane can be brought. this applies for example for the two shown on the right in FIG. 3 Formwork boards 26, the front edges 34 in a common vertical plane should run so that after completion of the masonry the situation according to Fig. 4 can result. After adjusting the formwork boards 26 can these on the clamping tabs 14 by screws secured against unwanted movements, but what is not necessarily required.

Nach dem Anbringen der Schalbretter 26 und deren Justage wird mit dem Ausfüllen der Verschalungsräume 35 begonnen, was durch, insbesondere maschinelles, Einbringen von Vormauerungsmörtel 36 erfolgt. Nach dem Glattziehen stellt sich die Situation gemäß Fig. 4 ein. Wie man anhand von Fig. 4 erkennt, handelt es sich bei der aus den Schalbrettern 26 aufgebauten Verschalung um eine sogenannte verlorene Verschalung, bei der die Schalbretter 26 nach Aushärtung des Mörtelmaterials 36 nicht abgenommen werden, d.h. insoweit "verloren" sind.After attaching the formwork boards 26 and adjusting them the filling of the formwork spaces 35 is started, what by, in particular mechanical, introduction of masonry mortar 36 takes place. After smoothing poses the situation according to FIG. 4. How to use Fig. 4 recognizes, it is from the formwork boards 26 built-up formwork around a so-called lost Formwork, in which the formwork boards 26 after curing of the mortar material 36 are not removed, i.e. insofar as "lost".

Claims (12)

  1. A method for, in particular mechanically, face walling in the sanitary field in front of a wall in the room, wherein
    a plurality of holding elements (10) are fastened to the wall (32), each of which has a base plate (12) for mounting the holding element (10) to a wall (32) and at least one pair of clamping brackets (14) projecting from the base plate (12) for clampingly holding a casing wall element (26),
    casing wall elements (26) are set between the clamping brackets (14) of the holding elements (10), and
    the casing space (35) open to the front and defined by the casing wall elements (26) and/or side walls and the floor of the room is filled with mortar material (36).
  2. The method of claim 1, characterized in that the mortar material (36) is introduced mechanically into the casing space (35).
  3. The method of claim 1 or 2, characterized in that gypsum plaster boards or wood plates are used as casing wall elements (26).
  4. The method of one of claims 1 to 3, characterized in that the casing wall elements (26) are left in place after the mortar material (36) has hardened.
  5. A casing for, in particular mechanically, face walling in the sanitary field in front of a building wall, comprising
    at least one holding element (10) with a base plate (12) for mounting the holding element (10) to a building wall (32) and at least one pair of clamping brackets (14) projecting from the base plate (12) for clampingly holding a casing wall element (26), and
    at least one casing wall element (26) held by the at least one holding element (10), the casing wall element projecting from the building wall (32) and being clamped between the clamping brackets (14).
  6. The casing of claim 5, characterized in that the two clamping brackets (14) project from the base plate (12) inclined towards each other.
  7. The casing of claim 5 or 6, characterized in that the two clamping brackets (14) are of different length.
  8. The casing of one of claims 5 to 7, characterized in that the clamping brackets (14) diverge from each other at their ends (16) facing away from the base plate (12).
  9. The casing of one of claims 5 to 8, characterized in that the holding element (10) is a unitary punched part, the base plate (12) having, in top plan view, a double T-shape with two parallel sections (20) and a connecting section joining them and extending at right angles to them, the two clamping brackets (14) projecting from the bas plate (12) on both sides of the connecting section (18).
  10. The casing of one of claims 5 to 9, characterized in that the holding element (10) is made of metal, particularly galvanized metal.
  11. The casing of one of claims 5 to 10, characterized in that the base plate (12) has holes (22) for fastening the holding element (10) to a building wall (32) by means of screws and/or nails.
  12. The casing of one of claims 5 to 11, characterized in that the at least one casing wall element (26) is a gypsum plaster board or a wood plate.
EP97906140A 1996-03-04 1997-02-28 Face walling in sanitary installations Expired - Lifetime EP0885333B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE19608005A DE19608005A1 (en) 1996-03-04 1996-03-04 Mechanical brickwork in the sanitary area
DE19608005 1996-03-04
PCT/EP1997/000986 WO1997033050A1 (en) 1996-03-04 1997-02-28 Face walling in sanitary installations

Publications (2)

Publication Number Publication Date
EP0885333A1 EP0885333A1 (en) 1998-12-23
EP0885333B1 true EP0885333B1 (en) 2001-05-09

Family

ID=7786989

Family Applications (1)

Application Number Title Priority Date Filing Date
EP97906140A Expired - Lifetime EP0885333B1 (en) 1996-03-04 1997-02-28 Face walling in sanitary installations

Country Status (4)

Country Link
EP (1) EP0885333B1 (en)
AT (1) ATE201078T1 (en)
DE (2) DE19608005A1 (en)
WO (1) WO1997033050A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IES20000243A2 (en) * 2000-03-31 2001-10-03 Martin Patrick Shannon A mounting bracket for mounting a frame in a wall opening

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE804045C (en) * 1948-09-21 1951-04-16 Emil Steinbach Zentralheizunge Factory-made frame wall with an installation attached to it
DE1880453U (en) * 1963-07-01 1963-10-10 Hans Fiedler BRACKET FOR FORMING BOARDS.
DE1504171A1 (en) * 1965-01-11 1969-08-14 Guenter Dziuk Method and device for producing plumbing walls from plastic foam
US4498801A (en) * 1981-01-09 1985-02-12 Simpson Strong-Tie Company, Inc. Ridge rafter connector
US4893961A (en) * 1989-06-05 1990-01-16 Trus Joist Corporation Joist hanger
EP0646678B1 (en) * 1993-09-30 1999-02-10 Emil Grumbach Prefabricated sanitary contruction element

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
SCHNEIDER: "Bautabellen", 1986, WERNER VERLAG, 7.AUFLAGE, DÜSSELDORF *

Also Published As

Publication number Publication date
DE19608005A1 (en) 1997-09-18
DE59703507D1 (en) 2001-06-13
WO1997033050A1 (en) 1997-09-12
EP0885333A1 (en) 1998-12-23
ATE201078T1 (en) 2001-05-15

Similar Documents

Publication Publication Date Title
EP0531869B1 (en) Mounting clamp
EP0235843A1 (en) Fastening device for walls cast in permanent moulds
DE7315050U (en) FASTENING HOOKS FOR ANCHORING LIGHTWEIGHT PANELS IN CONCRETE COMPONENTS
DE202004004965U1 (en) Shuttering element, uses connector parts between shuttering boards to hold concrete reinforcement structure at distance from these boards
DE10147831B4 (en) stud wall
DE3405682A1 (en) LOST FORMWORK
EP0885333B1 (en) Face walling in sanitary installations
CH678882A5 (en) Facade-tile invisible mounting - comprises hat-section rails with holes engaged by holding clamps
DE4418746A1 (en) Arrangement for connecting two profile battens with metal fitting, e.g. for exhibition stands
DE19823139A1 (en) Sound-absorbing inside or outside wall cladding for buildings
DE2823216C2 (en)
AT14823U2 (en) Device for releasably securing at least one parapet or a scaffolding console
EP3202997B1 (en) Device for reversibly securing at least one railing or a scaffold bracket
DE202020100059U1 (en) Formwork element
DE3785971T2 (en) Wall connector.
DE2852827C3 (en) Device for fastening permanent shuttering panels on a building wall at the level of the front sides of building ceilings
DE10205542B4 (en) Use of a U-shaped bracket as a fastening means and a two-part fastening means, method and system for fastening structural parts to or in building structures, roof element, roof and method for producing a fastening element
DE10129626A1 (en) Coupler profile between walls or wall and ceiling is in two equal or unequal length parts with center wall and fitted to metal bearer profile in part bonded to cork felt or plastics absorption layer
DE29809317U1 (en) Soundproofing interior or exterior wall cladding
AT403493B (en) Connecting device
AT397400B (en) Connecting element for the layers of a multi-layer masonry structure
DE2910369A1 (en) Concrete wall construction form board - has provision for compensating panels in segment mounted rods and grooves
DE19738600A1 (en) False wall used for installing e.g. sanitation facilities or thermal insulation
DE1708768B1 (en) CONCRETE FACADE ELEMENT
DE19932528C1 (en) Coupling clip for support or trim profiles for wall cladding material has central section bridging gap between profile ends and 2 opposing end tongues spaced apart by less than width of central section

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19980820

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT CH DE FR GB LI

17Q First examination report despatched

Effective date: 19981229

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MARMORIT GMBH

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT CH DE FR GB LI

REF Corresponds to:

Ref document number: 201078

Country of ref document: AT

Date of ref document: 20010515

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 59703507

Country of ref document: DE

Date of ref document: 20010613

ET Fr: translation filed
REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: SCHMAUDER & PARTNER AG PATENTANWALTSBUERO

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20010730

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20070221

Year of fee payment: 11

Ref country code: AT

Payment date: 20070221

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20070222

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20070430

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20070216

Year of fee payment: 11

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20080228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080229

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080228

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20081031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080902

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080228