EP0715022B1 - Method of manufacture or installation of exactly positioned rail supporting points and machine-system for executing the method - Google Patents
Method of manufacture or installation of exactly positioned rail supporting points and machine-system for executing the method Download PDFInfo
- Publication number
- EP0715022B1 EP0715022B1 EP95104687A EP95104687A EP0715022B1 EP 0715022 B1 EP0715022 B1 EP 0715022B1 EP 95104687 A EP95104687 A EP 95104687A EP 95104687 A EP95104687 A EP 95104687A EP 0715022 B1 EP0715022 B1 EP 0715022B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- fixing frame
- fixing
- concrete
- rail support
- feeder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
- E01B1/004—Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/005—Making of concrete parts of the track in situ
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/06—Transporting, laying, removing or renewing sleepers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/09—Ballastless systems
Definitions
- the invention relates to a method for precise position Manufacture or installation of rail bases for the Recording of railroad tracks on pre-concrete Concrete roadways with the help of rail base elements in the In the course of the production of railway lines, in particular of High-speed railroad tracks, which concrete lanes Cavities for the inclusion of in-road longitudinally spaced rail support points to be arranged exhibit.
- the cavities can be in Continuous longitudinal direction, as it were as grooves, be arranged. But you can also as an individual Cavities should be arranged at a distance.
- the invention furthermore relates to a machine system for carrying out a such procedure.
- the invention as a whole belongs to the technology of ballastless track superstructure.
- the concrete road is in generally on a hydraulically bound base layer concreted. It is preferred, but not restrictive constructed as it is in the unpublished DE 44 42 497 A1 is described.
- Rail base denotes the components which the rails of the tracks with the concrete carriageway connect. In general, the rails are made using Rail fastening devices at the rail bases attached. They are in classic track construction Rail bases on the sleepers.
- the invention is based on a ballastless track system, as it e.g. in the already mentioned DE 44 42 497 A1 is described.
- This superstructure system includes one Base course, a continuously manufactured concrete pavement and Reception facilities for the individual railroad tracks, the railroad tracks with rail fasteners are attached in the receiving devices.
- the Concrete roadway of this superstructure system can be used as a single layer Concrete roadway to be built.
- the reception facilities for the railroad tracks serve Rail bases that are concreted into the concrete carriageway and with reinforcement components in the form of reinforcement loops or reinforcement cages are anchored in the concrete carriageway.
- the top of the rail support points Cavities in which the rail fasteners and rail feet of the individual fastened therein Rail tracks are arranged.
- the rail fasteners and thus the rail feet are in the form of Rail fastening screws in the manner of sleeper screws, which are screwed into the rail bases, kept in the cavities.
- the base course is according to the Rules of architecture to include the static and dynamic loads set up. This also applies to the rail bases.
- the one described above Superstructure system has many advantages in terms of manufacturing technology Terms.
- the concrete track with the cavities can be used Road pavers, as usual and proven in road construction are easy to manufacture.
- it is different Known track system to which on DE 39 01 347 A1 is referred to, is complex in terms of production technology.
- the concrete road is in Cut across the longitudinal direction like a concrete trough corresponding edge elements manufactured.
- Track yokes coming out two railroad tracks and sleepers exist in the Concrete trough and placed in the planned location raised.
- This is followed by another work step the Gleisjoch completely using a concreting machine concreted.
- a monolithic composite of the Gleisjoches the concrete carriageway slab cannot be manufactured in this way.
- the Gleisjoch has to be raised considerably for the pouring, in order to allow a perfect under-molding of the sleepers There is an adjustment device for this required, which is capable of inherent rigidity to overcome the track yoke and tolerances balance.
- the invention is based on the technical problem a structure of the ballastless track superstructure, which with a concrete carriageway and with integrated rail bases works, the rail support points simply, precisely and to manufacture and set up safely.
- the invention is also based on the technical problem Machine system to specify which for such a process is particularly suitable.
- the invention is based on the knowledge that the Manufacture or installation of rail bases for the Recording of railroad tracks on pre-concreted concrete carriageways the realization of a manufacturing cycle according to features 1.1), 1.4) and 1.5) with regard to The speed of construction brings great advantages, with regard to on the important positioning accuracy of the rail bases and thus the one laid on the track Rail tracks are no disadvantages must, if otherwise in accordance with characteristics 1.2.) and 1.3) is followed.
- the advantage is that the Manufacturing the rail bases or setting up the Rail bases are also carried out automatically can, as will be explained.
- the described Process steps can be done with the help of modern control and Drive technology for machines and machine parts performed and by a machinist or by one Computer can be controlled programmably. So far implement different embodiments. It understands themselves that the control of modern metrological Measures, e.g. laser beam measurement technology.
- the positioning station on the one hand and the Recording station on the other hand can be moved synchronously.
- the two stations be independent stations or also united as it were into one vehicle or be coupled together.
- the positioning station on the one hand and the Recording station, on the other hand moved independently of one another and with the help of a transfer device and a Takeover facility coupled.
- rail base elements can be used to be worked as formwork for concreting Rail bases are formed. Will the Concrete rail bases, so the invention speaks of the production of rail bases. But it can also be worked with rail base elements that in turn designed as prefabricated rail bases are and are concreted. The invention speaks in this respect from the establishment of the rail bases.
- the invention teaches to solve the technical problems furthermore a special machine system, which for Implementation of the procedure is set up.
- This Machine system is the subject of claims 7 to 10.
- Adjustment machine 1 forms a along the concrete road movable positioning station. He has a facility for the transport of fixation frames or Fixing frame groups in the direction of production and one Adjustment device for the adjustment of the fixing frame or Fixing frame groups. These are temporarily on the Concrete slab 3 attached.
- the feeder portal 2 forms a reception station. The following are also for the Positioning station or the receiving station the reference numerals 1 or 2 used.
- the receiving station 2 consists of the movable feeder portal 2 and is with lifting and conveying devices 4 for the Fixing frame 5 or the fixing frame groups equipped.
- the Feeder portal 2 picks up after manufacture or setup the rail bases 6, in the production direction behind the Adjustment machines 1, the fixing frame 5 or fixing frame groups and leads them back into the manufacturing cycle on. It can be seen in FIG. 1 that the automatic adjustment device 1 on the feeder portal side and the feeder portal 2 on the adjustment machine side with transfer devices 7 or Transfer devices 8 for the fixing frame 5 or for the Fixierrahmen weakness is provided.
- the lifting and conveying device 4 of the feeder portal 2 consists of a hoist to which the fixing frame 5 or fixing frame groups can be connected and which in Fixing direction and can be moved back. You can see in the 1 shows a control center 13. At this control center 13 are both the automatic adjustment device 1 and the feeder portal 2 connected.
- the control center 13 is with the Machine system 1, 2 movable and generally with one Computer equipped.
- Fig. 1 shows the adjusting machine 1 and that Feeder portal 2 as a complete overview in the view.
- the Feeder portal 2 is in a transfer position to Adjustment machines 1 shown.
- the basic construction of the Adjustment machine 1 consists of a base frame 14 which is on a chassis 15 rests movably, which also Cornering and compensation controls for straight-ahead driving possible are.
- the control center 13 there is a Control station with the control system. Via a measuring system the measured data are recorded for the adjustment are required and all trips and movements of the Adjustment device set via the control system.
- Of the Base frame 14 also forms the supporting structure for the Adjustment frame 10 and the adjustment mechanism. These are in Longitudinally movably attached to the base frame 14.
- Prefers three fixing frames 5 are to form fixing frame groups
- Connection frame 16 can be summarized.
- the support frame is on the base frame 14 17 attached to the chain conveyor 9.
- the chain conveyor 9 is supported.
- the chain links are longitudinally movable e.g. on gears stored.
- the chain conveyor 9 is with positive locking elements equipped that are able to adjust the adjustment frame 10 in to promote the installation position.
- transfer arms 12 stored, which in turn are telescopic and thus in Direction of the adjustment frame 10 are extended and retracted can. After the fixing frame 5 on the chain conveyor 9th and the transfer arms 12 have reached the adjustment position, these are taken over by the adjustment frame 10 and the Transfer arms 12 are retracted. Thus the Adjustment section 1 unlocked and the fixing frame 5 can be lowered and fixed.
- the feeder portal 2 consists of a rigid Base frame 20, which forms the support for a crane runway. With the help of crane hooks on trolleys 21, the Hand over the fixing frame 5 to the chain conveyor 9. in the As a rule, 5 formwork elements 22 are attached to the fixing frame fixed immovably.
- the formwork elements 22 form the Formwork for the rail support points 6.
- you can 5 mounting tools for the fixing frame of course the fixation of precast base parts, steel base plates or also mounting pliers for rail mounting become.
- the fixing frames 5 are thus very variable applicable.
- the manufacturing cycle can be according to the following summarize the manufacturing steps described. First the fixing frame units 5 through the feeder portal 2 raised and thus the rail support points 6 switched off. In a cleaning position Base formwork cleaned and for the new Concreting process prepared. Then the fixing frame 5 further raised and forward to the automatic adjustment machine 1 hazards. The length over which the process must be carried out judges of course according to the number of Fixing frame units 5, which in turn is dependent on the Construction speed and the hardening time of the concrete or Mortar that the rail bases 6 need. After that the fixing frames 5 are placed on the chain conveyor 9, and the feeder portal 2 can be in the starting position be reduced. The chain conveyor 9 now brings the Fixing frame 5 in the installation or adjustment position, namely with the addition of the described transfer arm 12, which too extended for this purpose.
- the fixing frame 5 remain held in position until the support points 6 a have achieved sufficient stripping strength.
- the adjustment frame 10 in cross section.
- the Concrete carriageway slab 3 with the longitudinal grooves for receiving the later rail support points 6 or rails are preferred on a hydraulically bound base layer.
- Of the Fixing frame 5 is on the left side on the Chain conveyor 9 shown. In this shown here Conveying position, the fixing frame 5 is in the installation position move under the adjustment frame 10.
- the chain conveyor 9 is shown.
- the Conveyor chain rests on conveyor wheels, which in turn over Axle bearings are supported on the support frame 17.
- the conveyor chain moves the fixing frame 5 in the Adjustment position.
- the fixing frame 5 are one Unit summarized.
- Fig. 4 shows a possible one in detailed form lateral fixation of the fixing frame 5 on the Road slab 3 over an inclined, towards the top protruding carriageway formwork and correspondingly wedge-shaped Jaws. Alignment, fixing and releasing is done via the control center.
- FIG. 5 shows an embodiment variant.
- a rail base 6 in the form of the fixing frame 5 of a finished part with millimeter accuracy in the planned position held.
- the fixing tool is in the form of a Transfer plate 23 to the surface of the rail base 6 adjusted.
- the finished part is held over Assembly screws 24. After the grouting mortar has set the mounting screws 24 are loosened and the fixing frame 5 can be implemented.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Repair (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
- Road Paving Machines (AREA)
- Automatic Assembly (AREA)
- Spinning Or Twisting Of Yarns (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
- Escalators And Moving Walkways (AREA)
- Catching Or Destruction (AREA)
- Radiation-Therapy Devices (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren zur positionsgenauen Herstellung oder Einrichtung von Schienenstützpunkten für die Aufnahme von Eisenbahnschienen auf vorbetonierten Betonfahrbahnen mit Hilfe von Schienenstützpunkt-Elementen im Zuge der Herstellung von Einsenbahnstrecken, insbesondere von Hochgeschwindigkeits-Eisenbahnstrecken, welche Betonierfahrbahnen Auskammerungen für die Aufnahme der in Fahrbahn- längsrichtung beabstandet gereiht anzuordnenden Schienenstützpunkte aufweisen. Die Auskammerungen können in Fahrbahnlängsrichtung durchlaufend, gleichsam als Nuten, angeordnet sein. Sie können aber auch als einzelne Auskammerungen mit Abstand gereiht sein. Die Erfindung betrifft fernerhin ein Maschinensystem zur Durchführung eines solchen Verfahrens.The invention relates to a method for precise position Manufacture or installation of rail bases for the Recording of railroad tracks on pre-concrete Concrete roadways with the help of rail base elements in the In the course of the production of railway lines, in particular of High-speed railroad tracks, which concrete lanes Cavities for the inclusion of in-road longitudinally spaced rail support points to be arranged exhibit. The cavities can be in Continuous longitudinal direction, as it were as grooves, be arranged. But you can also as an individual Cavities should be arranged at a distance. The invention furthermore relates to a machine system for carrying out a such procedure.
Die Erfindung insgesamt gehört zur Technologie des schotterlosen Gleisoberbaus. Die Betonfahrbahn ist im allgemeinen auf eine hydraulisch gebundene Tragschicht betoniert. Sie ist bevorzugt, aber nicht beschränkend, so aufgebaut, wie es in der nicht vorreröffentlichten DE 44 42 497 A1 beschrieben ist. Schienenstützpunkt bezeichnet die Bauteile, welche die Schienen der Gleise mit der Betonfahrbahn verbinden. Im allgemeinen sind die Schienen mit Hilfe von Schienenbefestigungsvorrichtungen an den Schienenstützpunkten befestigt. Im klassischen Gleisbau befinden sich die Schienenstützpunkte auf den Schwellen. The invention as a whole belongs to the technology of ballastless track superstructure. The concrete road is in generally on a hydraulically bound base layer concreted. It is preferred, but not restrictive constructed as it is in the unpublished DE 44 42 497 A1 is described. Rail base denotes the components which the rails of the tracks with the concrete carriageway connect. In general, the rails are made using Rail fastening devices at the rail bases attached. They are in classic track construction Rail bases on the sleepers.
Die Erfindung geht aus von einem schotterlosen Oberbausystem, wie es z.B. in der schon genannten DE 44 42 497 A1 beschrieben ist. Zu diesem Oberbausystem gehören eine Tragschicht, eine kontinuierlich gefertigte Betonfahrbahn und Aufnahmeeinrichtungen für die einzelnen Eisenbahnschienen, wobei die Eisenbahnschienen mit Schienenbefestigungsvorrichtungen in den Aufnahmeeinrichtungen befestigt sind. Die Betonfahrbahn dieses Oberbausystems kann als einschichtige Betonfahrbahn aufgebaut sein. Vorzugsweise besteht die Betonfahrbahn aus zwei aufeinandergefertigten Betonschichten, zwischen denen eine Bewehrung aus in Gleisrichtung laufenden und quer dazu laufenden Bewehrungsstäben angeordnet ist. Die beiden Schichten stehen in monolithischem Verbund. Als Aufnahmeeinrichtungen für die Eisenbahnschienen dienen die Schienenstützpunkte, die in die Betonfahrbahn einbetoniert und mit Bewehrungsbauteilen in Form von Bewehrungsschlaufen oder Bewehrungskörben in der Betonfahrbahn verankert sind. Die Schienenstützpunkte besitzen in ihrer Oberseite Auskammerungen, in denen die Schienenbefestigungsvorrichtungen und darin befestigte Schienenfüße der einzelnen Eisenbahnschienen angeordnet sind. Die Schienenbefestigungsvorrichtungen und damit die Schienenfüße sind in Form von Schienenbefestigungsschrauben nach Art von Schwellenschrauben, die in die Schienenstützpunkte eingeschraubt sind, in den Auskammerungen gehalten. Die Tragschicht ist nach den Regeln der Baukunst zur Aufnahme der statischen und dynamischen Beanspruchungen eingerichtet. Das gilt auch für die Schienenstützpunkte. Das vorstehend beschriebene Oberbausystem hat viele Vorteile in herstellungstechnischer Hinsicht. Die Betonfahrbahn mit den Auskammerungen kann mit Fahrbahnfertigern, wie sie im Straßenbau üblich und bewährt sind, einfach gefertigt werden. Demgegenüber ist ein anderes bekanntes Oberbausystem, zu dem auf die DE 39 01 347 A1 verwiesen wird, in fertigungstechnischer Hinsicht aufwendig. Bei diesen bekannten Maßnahmen wird die Betonfahrbahn im Schnitt quer zur Längsrichtung wie ein Betontrog mit entsprechenden Randelementen gefertigt. Gleisjoche, die aus zwei Eisenbahnschienen und Schwellen bestehen, werden in den Betontrog gelegt und über eine Justiereinrichtung in die geplante Lage gehoben. In diesem Zwischenzustand werden die Gleisjoche mit Mörtel oder Beton untergossen und dadurch fixiert. Im Anschluß daran wird in einem weiteren Arbeitsgang das Gleisjoch mittels eines Betonierautomaten vollständig ausbetoniert. Ein monolithischer Verbund des Gleisjoches mit der Betonfahrbahnplatte kann so nicht hergestellt werden. Das Gleisjoch muß für den Unterguß beachtlich angehoben werden, um einen einwandfreien Unterguß der Schwellen zu ermöglichen. Hierzu ist eine Justiereinrichtung erforderlich, die in der Lage ist, die Eigensteifigkeit des Gleisjoches zu überwinden und Toleranzen auszugleichen.The invention is based on a ballastless track system, as it e.g. in the already mentioned DE 44 42 497 A1 is described. This superstructure system includes one Base course, a continuously manufactured concrete pavement and Reception facilities for the individual railroad tracks, the railroad tracks with rail fasteners are attached in the receiving devices. The Concrete roadway of this superstructure system can be used as a single layer Concrete roadway to be built. Preferably there is Concrete roadway made of two layers of concrete between which a reinforcement from running in the track direction and is arranged across reinforcement bars. The the two layers are monolithic. As The reception facilities for the railroad tracks serve Rail bases that are concreted into the concrete carriageway and with reinforcement components in the form of reinforcement loops or reinforcement cages are anchored in the concrete carriageway. The top of the rail support points Cavities in which the rail fasteners and rail feet of the individual fastened therein Railroad tracks are arranged. The rail fasteners and thus the rail feet are in the form of Rail fastening screws in the manner of sleeper screws, which are screwed into the rail bases, kept in the cavities. The base course is according to the Rules of architecture to include the static and dynamic loads set up. This also applies to the rail bases. The one described above Superstructure system has many advantages in terms of manufacturing technology Terms. The concrete track with the cavities can be used Road pavers, as usual and proven in road construction are easy to manufacture. In contrast, it is different Known track system, to which on DE 39 01 347 A1 is referred to, is complex in terms of production technology. With these known measures, the concrete road is in Cut across the longitudinal direction like a concrete trough corresponding edge elements manufactured. Track yokes coming out two railroad tracks and sleepers exist in the Concrete trough and placed in the planned location raised. In this intermediate state, the Pour grout or concrete under the track yokes and thereby fixed. This is followed by another work step the Gleisjoch completely using a concreting machine concreted. A monolithic composite of the Gleisjoches the concrete carriageway slab cannot be manufactured in this way. The Gleisjoch has to be raised considerably for the pouring, in order to allow a perfect under-molding of the sleepers There is an adjustment device for this required, which is capable of inherent rigidity to overcome the track yoke and tolerances balance.
Der Erfindung liegt das technische Problem zugrunde, bei einem Bauwerk des schotterlosen Gleisoberbaus, welches mit einer Betonfahrbahn und mit darin integrierten Schienenstützpunkten arbeitet, die Schienenstützpunkte einfach, positionsgenau und sicher herzustellen bzw. einzurichten. Der Erfindung liegt ferner das technische Problem zugrunde, ein Maschinensystem anzugeben, welches für ein solches Verfahren besonders geeignet ist. The invention is based on the technical problem a structure of the ballastless track superstructure, which with a concrete carriageway and with integrated rail bases works, the rail support points simply, precisely and to manufacture and set up safely. The invention is also based on the technical problem Machine system to specify which for such a process is particularly suitable.
Zur Lösung dieses technischen Problems lehrt die Erfindung
zunächst ein Verfahren zur positionsgenauen Herstellung oder
Einrichtung von Schienenstützpunkten für die Aufnahme von
Eisenbahnschienen auf vorbetonierten Betonfahrbahnen mit
Hilfe von Schienenstützpunkt-Elementen im Rahmen der
Herstellung von Eisenbahnstrecken, insbesondere von
Hochgeschwindigkeits-Eisenbahnstrecken, welche Betonfahrbahnen
Auskammerungen für die Aufnahme der in
Fahrbahnlängsrichtung beabstandet gereiht anzuordnenden
Schienenstützpunkte aufweisen, mit den Verfahrensschritten
Die Erfindung geht von der Erkenntnis aus, daß bei der Herstellung oder Einrichtung von Schienenstützpunkten für die Aufnahme von Eisenbahnschienen auf vorbetonierten Betonfahrbahnen die Verwirklichung eines Fertigungskreislaufs entsprechend den Merkmalen 1.1), 1.4) und 1.5) in bezug auf die Baugeschwindigkeit große Vorteile bringt, wobei in bezug auf die wichtige Positioniergenauigkeit der Schienenstützpunkte und damit der zum Gleis verlegten Eisenbahnschienen keinerlei Nachteile in Kauf genommen werden müssen, wenn im übrigen nach Maßgabe der Merkmale 1.2.) und 1.3) verfahren wird. Von Vorteil ist, daß dabei die Herstellung der Schienenstützpunkte oder das Einrichten der Schienenstützpunkte ebenfalls automatisch durchgeführt werden kann, wie noch erläutert wird. Die beschriebenen Verfahrensschritte können mit Hilfe der modernen Steuerungs- und Antriebstechnik von Maschinen und Maschinenteilen durchgeführt und von einem Maschinisten oder von einem Rechner programmierbar gesteuert werden. Insoweit lassen sich verschiedene Ausführungsformen verwirklichen. Es versteht sich, daß die Steuerung von modernen meßtechnischen Maßnahmen, z.B. der Laserstrahlmeßtechnik, begleitet werden.The invention is based on the knowledge that the Manufacture or installation of rail bases for the Recording of railroad tracks on pre-concreted concrete carriageways the realization of a manufacturing cycle according to features 1.1), 1.4) and 1.5) with regard to The speed of construction brings great advantages, with regard to on the important positioning accuracy of the rail bases and thus the one laid on the track Railroad tracks are no disadvantages must, if otherwise in accordance with characteristics 1.2.) and 1.3) is followed. The advantage is that the Manufacturing the rail bases or setting up the Rail bases are also carried out automatically can, as will be explained. The described Process steps can be done with the help of modern control and Drive technology for machines and machine parts performed and by a machinist or by one Computer can be controlled programmably. So far implement different embodiments. It understands themselves that the control of modern metrological Measures, e.g. laser beam measurement technology.
Im einzelnen bestehen im Rahmen der Erfindung mehrere Möglichkeiten der weiteren Ausbildung des Verfahrens. So können die Positionierstation einerseits und die Aufnahmestation andererseits synchron bewegt werden. Dabei können die beiden Stationen selbständige Stationen sein oder auch gleichsam zu einem Fahrzeug vereinigt oder zusammengekuppelt sein. Nach bevorzugter Ausführungsform werden die Positionierstation einerseits und die Aufnahmestation andererseits unabhängig voneinander bewegt und mit Hilfe einer Übergabeeinrichtung sowie einer Übernahmeeinrichtung gekoppelt. Im allgemeinen wird man im Rahmen des erfindungsgemäßen Verfahrens die Fixierrahmen bzw. die Fixierrahmengruppen an Anschlagkanten der Betonfahrbahn befestigen, die bei der Fertigung der Betonfahrbahn ausgebildet wurden und ausreichend maßgenau angeordnet sind. There are several in the scope of the invention Possibilities for further training of the procedure. So can the positioning station on the one hand and the Recording station on the other hand can be moved synchronously. Here can the two stations be independent stations or also united as it were into one vehicle or be coupled together. According to a preferred embodiment the positioning station on the one hand and the Recording station, on the other hand, moved independently of one another and with the help of a transfer device and a Takeover facility coupled. In general you will be in The fixing frame or the fixing frame groups on the stop edges of the concrete carriageway attach that in the manufacture of the concrete pavement were trained and are sufficiently dimensionally arranged.
Im Rahmen der Erfindung kann mit Schienenstützpunkt-Elementen gearbeitet werden, die als Schalungen für das Betonieren von Schienenstützpunkten ausgebildet sind. Werden die Schienenstützpunkte betoniert, so spricht die Erfindung von der Herstellung von Schienenstützpunkten. Es kann aber auch mit Schienenstützpunkt-Elementen gearbeitet werden, die ihrerseits als vorgefertigte Schienenstützpunkte ausgeführt sind und einbetoniert werden. Insoweit spricht die Erfindung von der Einrichtung der Schienenstützpunkte.Within the scope of the invention, rail base elements can be used to be worked as formwork for concreting Rail bases are formed. Will the Concrete rail bases, so the invention speaks of the production of rail bases. But it can also be worked with rail base elements that in turn designed as prefabricated rail bases are and are concreted. The invention speaks in this respect from the establishment of the rail bases.
Zur Lösung der technischen Probleme lehrt die Erfindung
fernerhin ein besonderes Maschinensystem, welches zur
Durchführung des Verfahrens eingerichtet ist. Dieses
Maschinensystem ist Gegenstand der Ansprüche 7 bis 10.The invention teaches to solve the technical problems
furthermore a special machine system, which for
Implementation of the procedure is set up. This
Machine system is the subject of
Im folgenden werden das erfindungsgemäße Verfahren sowie das Maschinensystem für die Durchführung des Verfahrens anhand einer lediglich ein Ausführungsbeispiel darstellenden Zeichnung ausführlicher erläutert. Es zeigen in schematischer Darstellung
- Fig. 1
- eine Seitenansicht des Maschinensystems,
- Fig. 2
- in einem Querschnitt durch den Gegenstand der Fig. 1 den Justierautomaten aus dem Gegenstand der Fig. 1,
- Fig. 3
- in gegenüber der Fig. 1 vergrößertem Maßstab und mit weiteren Details die Einrichtung für den Transport von Fixierrahmen oder Fixierrahmengruppen in dem Justierautomaten,
- Fig. 4
- in einem vergrößerten Ausschnitt aus dem Gegenstand der Fig. 2 die Maßnahmen zur Befestigung und Einrichtung eines Fixierrahmens und
- Fig. 5
- einen Ausschnitt aus der Fahrbahnplatte mit einem Schienenbefestigungspunkt.
- Fig. 1
- a side view of the machine system,
- Fig. 2
- in a cross section through the object of FIG. 1, the automatic adjustment from the object of FIG. 1,
- Fig. 3
- on an enlarged scale compared to FIG. 1 and with further details, the device for the transport of fixing frames or fixing frame groups in the adjusting machine,
- Fig. 4
- in an enlarged detail from the subject of FIG. 2, the measures for fastening and setting up a fixing frame and
- Fig. 5
- a section of the carriageway slab with a rail attachment point.
Betrachtet man zunächst die Fig. 1, so erkennt man einen
Justierautomaten 1 und ein Zubringerportal 2. Der
Justierautomat 1 bildet eine längs der Betonfahrbahn
verfahrbare Positionierstation. Er besitzt eine Einrichtung
für den Transport von Fixierrahmen oder von
Fixierrahmengruppen in Fertigungsrichtung sowie eine
Justiereinrichtung für die Justierung der Fixierrahmen oder
Fixierrahmengruppen. Diese werden vorübergehend an der
Betonfahrbahnplatte 3 befestigt. Das Zubringerportal 2 bildet
eine Aufnahmestation. Im folgenden werden auch für die
Positionierstation bzw. die Aufnahmestation die Bezugszeichen
1 bzw. 2 verwendet.If one first looks at FIG. 1, one recognizes one
Die Aufnahmestation 2 besteht aus dem verfahrbaren Zubringerportal
2 und ist mit Hub- und Fördereinrichtungen 4 für die
Fixierrahmen 5 bzw. die Fixierrahmengruppen ausgerüstet. Das
Zubringerportal 2 nimmt nach der Herstellung oder Einrichtung
der Schienenstützpunkte 6, in Fertigungsrichtung hinter dem
Justierautomaten 1, die Fixierrahmen 5 bzw. Fixierrahmengruppen
auf und führt sie in den Fertigungskreislauf wieder
ein. Man erkennt in der Fig. 1, daß der Justierautomat 1
zubringerportalseitig und das Zubringerportal 2
justierautomatseitig mit Übernahmevorrichtungen 7 bzw.
Übergabevorrichtungen 8 für die Fixierrahmen 5 oder für die
Fixierrahmengruppen versehen ist. Zur Einrichtung des
Justierautomaten 1 für den Transport von Fixierrahmen 5 oder
von Fixierrahmengruppen gehört ein Kettenförderer 9 und
gehören auf horizontalen Maschinenrahmenteilen verschiebbare
Justierrahmen 10 mit Justiermechanik 11. Zwischen Kettenförderer
9 und Justierrahmen 10 sind Übergabearme 12
angeordnet, die ein- und ausfahrbar sind.The receiving
Die Hub- und Fördereinrichtung 4 des Zubringerportals 2
besteht aus einem Hebezeug, an welches die Fixierrahmen 5
oder Fixierrahmengruppen anschließbar sind und welches in
Fixierrichtung und zurück verfahrbar ist. Man erkennt in der
Fig. 1 eine Steuerzentrale 13. An diese Steuerzentrale 13
sind sowohl der Justierautomat 1 als auch das Zubringerportal
2 angeschlossen. Die Steuerzentrale 13 ist mit dem
Maschinensystem 1, 2 verfahrbar und im allgemeinen mit einem
Rechner ausgerüstet.The lifting and conveying
Die Fig. 1 zeigt den Justierautomaten 1 und das
Zubringerportal 2 als Gesamtübersicht in der Ansicht. Das
Zubringerportal 2 ist in einer Übergabeposition zum
Justierautomaten 1 dargestellt. Die Grundkonstruktion des
Justierautomaten 1 besteht aus einem Grundrahmen 14, der auf
einem Fahrwerk 15 beweglich aufliegt, wodurch auch
Kurvenfahrten und Ausgleichssteuerungen der Geradeausfahrt
möglich sind. In der Steuerzentrale 13 befindet sich ein
Steuerstand mit dem Steuerleitsystem. Über ein Meßsystem
werden die Meßdaten erfaßt, die für die Justierung
erforderlich sind und alle Fahrten und Bewegungen der
Justiereinrichtung über das Steuerleitsystem festgelegt. Der
Grundrahmen 14 bildet gleichzeitig das Traggerüst für die
Justierrahmen 10 und die Justiermechanik. Diese sind in
Längsrichtung beweglich am Grundrahmen 14 befestigt. Damit
besteht die Möglichkeit, die Justierrahmen 10 absolut
parallel, aber auch in eine radiale Position zueinander zu
bringen, wodurch auch Kurvenfahrten möglich sind. Bevorzugt
sollen drei Fixierrahmen 5 zu Fixierrahmengruppen durch
Verbindungsrahmen 16 zusammengefaßt werden.Fig. 1 shows the adjusting
Zusätzlich ist an dem Grundrahmen 14 der Unterstützungsrahmen
17 für den Kettenförderer 9 befestigt. Auf diesem
Unterstützungsrahmen 17 ist der Kettenförderer 9 aufgelagert.
Die Kettenglieder sind längsbeweglich z.B. auf Zahnrädern
gelagert. Der Kettenförderer 9 ist mit Formschlußelementen
ausgestattet, die in der Lage sind, die Justierrahmen 10 in
die Einbauposition zu fördern. Zusätzlich sind auf dem
Unterstützungsrahmen 17 des Kettenförderers 9 Übergabearme 12
aufgelagert, die wiederum teleskopierbar sind und somit in
Richtung der Justierrahmen 10 aus- und eingefahren werden
können. Nachdem die Fixierrahmen 5 über den Kettenförderer 9
und die Übergabearme 12 die Justierposition erreicht haben,
werden diese von den Justierrahmen 10 übernommen und die
Übergabearme 12 werden wieder eingefahren. Somit ist der
Justierabschnitt 1 freigeschaltet und die Fixierrahmen 5
können abgesenkt und fixiert werden. Das dem
Justierautomaten 1 nachgeschaltete Zubringerportal 2 wird
über eine seitlich neben der Fahrbahnplatte angeordnete
Schiene 18 oder über ein Gummi- oder Walzenfahrwerk 19
verfahren. Das Zubringerportal 2 besteht aus einem steifen
Grundrahmen 20, der das Auflager für eine Kranbahn bildet.
Mit Hilfe von Kranhaken an Laufkatzen 21 werden die
Fixierrahmen 5 an dem Kettenförderer 9 übergeben. Im
Regelfall werden an den Fixierrahmen 5 Schalungselemente 22
unverrückbar befestigt. Die Schalungselemente 22 bilden die
Schalform für die Schienenstützpunkte 6. Alternativ können
selbstverständlich an den Fixierrahmen 5 Montagewerkzeuge für
die Fixierung von Stützpunktfertigteilen, Stahlgrundplatten
oder auch Montagezangen für Schienenmontagen angeschlagen
werden. Somit sind die Fixierrahmen 5 sehr variabel
einsetzbar.In addition, the support frame is on the
Der Fertigungskreislauf läßt sich nach den nachfolgend
beschriebenen Fertigungsschritten zusammenfassen. Zuerst
werden die Fixierrahmeneinheiten 5 durch das Zubringerportal
2 angehoben und somit die Schienenstützpunkte 6
ausgeschalt. In einer Reinigungsposition wird die
Stützpunktschalung gereinigt und für den neuen
Betoniervorgang vorbereitet. Danach werden die Fixierrahmen 5
weiter angehoben und nach vorn zum Justierautomaten 1
gefahren. Die Länge, über die verfahren werden muß, richtet
sich selbstverständlich nach der Anzahl der
Fixierrahmeneinheiten 5, die wiederum abhängig ist von der
Baugeschwindigkeit und von der Erhärtungszeit des Betons oder
Mörtels, den die Schienenstützpunkte 6 benötigen. Danach
werden die Fixierrahmen 5 auf den Kettenförderer 9 abgelegt,
und das Zubringerportal 2 kann in die Ausgangsposition
zurückgefahren werden. Der Kettenförderer 9 bringt nun die
Fixierrahmen 5 in die Einbau- bzw. Justierposition, und zwar
unter Zuschaltung des beschriebenen Übergabearms 12, der zu
diesem Zweck ausgefahren ist. Es versteht sich, daß auf den
Übergabearm 12 auch verzichtet werden kann. In diesem Fall
wird die Fixierrahmeneinheit 5 von Justierrahmen 10 über den
Kettenförderer 9 aufgenommen und der Justierautomat 1 fährt
danach in die neue Einbauposition. Die Anzahl der
Justierrahmen 10 kann variiert werden. Bei Einsatz von zwei
Justierrahmen 10 ist für den Justiervorgang über die
zusätzliche Verbindung der Fixierrahmen 5 untereinander über
Verbindungsrahmen 16 eine höhere Montage- und
Justiergenauigkeit möglich. Unabhängig davon besteht die
Möglichkeit, durch Verlängerung des Kettenförderers 9 eine
größere Anzahl von Fixierrahmen 5 zu bevorraten. Nachdem die
Justierrahmen 10 die Fixierposition erreicht haben und die
Fixierrahmen 5 festgesetzt sind, kann der Justierautomat 1
in die neue Einbauposition verfahren werden. Hinter dem
Justierautomaten 1 ist eine Betoniereinheit nachgeschaltet,
die nicht dargestellt ist. Der Beton- bzw. Mörtelwagen mit
der Mischeinrichtung und den erforderlichen Betonpumpen kann
über die seitlich neben der Fahrbahnplatte angeordneten
Schienen oder separat auf Schienen, die direkt auf den
Fixierrahmen 5 installiert werden, mit der erforderlichen
Baugeschwindigkeit bewegt werden. Die Fixierrahmen 5 bleiben
so lange in Position gehalten, bis die Stützpunkte 6 eine
ausreichende Ausschalfestigkeit erreicht haben.The manufacturing cycle can be according to the following
summarize the manufacturing steps described. First
the fixing
Wird mit vorgefertigten Schienenstützpunkten gearbeitet, so
werden diese mit einer zusätzlichen Transporteinheit dem
Zubringerportal 2 zugeführt und in diesem Bereich mit den
Fixierrahmen 5 verbunden.If you work with prefabricated rail bases, see above
these are added to the with an additional transport
Die Fig. 2 zeigt den Justierrahmen 10 im Querschnitt. Die
Betonfahrbahnplatte 3 mit den Längsnuten für die Aufnahme der
späteren Schienenstützpunkte 6 bzw. Schienen liegt bevorzugt
auf einer hydraulich gebundenen Tragschicht. Der
Fixierrahmen 5 ist auf der linken Seite auf dem
Kettenförderer 9 dargestellt. In dieser hier gezeigten
Förderposition wird der Fixierrahmen 5 in die Einbauposition
unter die Justierrahmen 10 verfahren.2 shows the
In der Fig. 3 ist der Kettenförderer 9 gezeigt. Die
Förderkette liegt auf Förderrädern auf, die wiederum über
Achslager auf den Unterstützungsrahmen 17 aufgelagert sind.
Die Förderkette bewegt die Fixierrahmen 5 in die
Justierposition. In Fig. 3 sind die Fixierrahmen 5 zu einer
Einheit zusammengefaßt.3, the
Die Fig. 4 zeigt in detaillierter Form eine mögliche
seitliche Fixierung der Fixierrahmen 5 an der
Fahrbahnplatte 3 über eine geneigte, zur Oberseite hin
überstehende Fahrbahnabschalung und entsprechend keilförmige
Klemmbacken. Das Ausrichten, Festlegen und Lösen erfolgt über
die Steuerzentrale.Fig. 4 shows a possible one in detailed form
lateral fixation of the fixing
Die Fig. 5 zeigt eine Ausführungsvariante. In diesem Fall
wird über den Fixierrahmen 5 ein Schienenstützpunkt 6 in Form
eines Fertigteiles millimetergenau in der geplanten Lage
gehalten. Das Fixierwerkzeug ist in diesem Fall in Form einer
Übergabeplatte 23 an die Oberfläche des Schienenstützpunktes
6 angepaßt. Gehalten wird das Fertigteil über
Montageschrauben 24. Nach dem Abbinden des Vergußmörtels
werden die Montageschrauben 24 gelöst und der Fixierrahmen 5
kann umgesetzt werden.5 shows an embodiment variant. In this case
is a rail base 6 in the form of the fixing
Claims (10)
- A process for the positionally accurate fabrication or installation of rail support points (6) for the seating of railway rails on pre-concreted concrete trackways (3) with the aid of rail support point elements in the context of fabricating railway stretches, particularly high-speed railway stretches, which concrete trackways comprise chamber-like recesses for receiving rail support points (6) which are to be arranged spaced apart in rows in the longitudinal direction of the trackway, comprising the following process steps:1.1) a fabrication circuit is installed for a multiplicity of fixing frames (5) having rail support elements attached to them at predetermined locations, which fabrication circuit comprises a receiving station (2) with receiving devices and which, in the direction of fabrication and thus in the longitudinal direction of the trackway, leads to a positioning station (1) having adjusting devices,1.2) the individual fixing frames (5) or fixing frame groups are moved from the receiving station (2) to the positioning station (1) and are adjusted there in a positionally accurate manner, and thereafter are temporarily fixed to the concrete trackway at a spacing from each other, fixing frame after fixing frame or fixing frame group after fixing frame group, and are freed from the adjusting device,1.3) the rail support points (6) are fabricated or installed with the aid of fixing frames or fixing frame groups which are temporarily fixed to the concrete trackway and with the aid of the rail support point elements,1.4) whilst the rail support points are being fabricated or installed according to feature 1.3), the positioning station and the receiving station are moved further in the direction of fabrication, operating step by operating step.1.5) after the steps of further movement according to feature 1.4), the fixing frames or fixing frame groups which are fixed to the concrete trackway are released from the concrete trackway and are received by the receiving devices in the receiving station, and in the positioning station other fixing frames or fixing frame groups which are moved to the positioning station are adjusted according to feature 1.2), are temporarily fixed to the concrete trackway and are freed from the adjusting device - and feature 1.3) is thereafter repeated on these fixing frames or fixing frame groups,
- A process according to claim 1, wherein the positioning station on the one hand and the receiving station on the other hand are moved synchronously.
- A process according to claim 1, wherein the positioning station on the one hand and the receiving station on the other hand are moved independently of each other and are coupled by means of a feeder device (8) and by means of a take-over device (7).
- A process according to any one of claims 1 to 3, wherein the fixing frames or the fixing frame groups are fixed to stop edges of the concrete trackway.
- A process according to any one of claims 1 to 4, wherein rail support point elements are employed which are designed as shuttering elements (22) for the concreting of rail support points.
- A process according to any one of claims 1 to 4, wherein rail support point elements are employed which are designed as prefabricated rail support points and are concreted in.
- A system of machines for carrying out the process according to any one of claims 1 to 6, comprising7.1) an automatic adjusting machine (1) which can travel along the concrete trackway as a positioning station and which comprises a device for the transport of fixing frames (5) or of fixing frame groups in the direction of fabrication as well as an adjusting device for adjusting the fixing frames (5) or fixing frame groups which are fixed by the automatic adjusting machine (1) to the concrete trackway,7.2) a feeder gantry (2) which can travel along the concrete trackway as a receiving station and which comprises a lifting and conveying device (4) for the fixing frames (5) and fixing frame groups, which feeder gantry (2), after the fabrication or installation of the rail support points (6), receives the fixing frames (5) or fixing frame groups behind the automatic adjusting machine (1) in the direction of fabrication and re-introduces them into the fabrication circuit,
- A system of machines according to claim 7, wherein the design of the automatic adjusting machine (1) for the transport of fixing frames (5) or of fixing frame groups comprises a chain conveyor (9) and comprises adjusting frames (10) which have an adjusting mechanism (11) and which are displaceable on horizontal machine frame parts, and wherein feeder arms (12) are disposed between the chain conveyor (9) and the adjusting frame (10).
- A system of machines according to any one of claims 7 or 8, wherein the lifting and conveying device (4) of the feeder gantry (2) consists of a hoist to which the fixing frames (5) or fixing frame groups can be attached and which can travel in the direction of fabrication and back.
- A system of machines according to any one of claims 7 to 9, wherein the automatic adjusting machine (1) and the feeder gantry (2) are connected to a common control centre (13) which is equipped with a computer and which can travel with the system of machines.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE4442498 | 1994-11-30 | ||
DE4442498A DE4442498A1 (en) | 1994-11-30 | 1994-11-30 | Mobile concreting machine |
DE19506637 | 1995-02-25 | ||
DE19506637 | 1995-02-25 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0715022A1 EP0715022A1 (en) | 1996-06-05 |
EP0715022B1 true EP0715022B1 (en) | 1999-09-22 |
Family
ID=25942412
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP95104687A Expired - Lifetime EP0715022B1 (en) | 1994-11-30 | 1995-03-30 | Method of manufacture or installation of exactly positioned rail supporting points and machine-system for executing the method |
Country Status (9)
Country | Link |
---|---|
EP (1) | EP0715022B1 (en) |
CN (1) | CN1105808C (en) |
AT (1) | ATE184934T1 (en) |
CZ (1) | CZ289432B6 (en) |
DE (1) | DE59506887D1 (en) |
DK (1) | DK0715022T3 (en) |
ES (1) | ES2136758T3 (en) |
PL (1) | PL179340B1 (en) |
RU (1) | RU2151230C1 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19522478C2 (en) * | 1995-06-21 | 1999-04-22 | Hochtief Ag Hoch Tiefbauten | Process for precise and low-tolerance production of rail support points with high surface accuracy and formwork elements for carrying out the process |
FR2776683A1 (en) | 1998-03-27 | 1999-10-01 | Spie Batignolles Tp | RAIL TRACK CONSTRUCTION METHOD, UNIT TRACK PANEL, MACHINE FOR DEPOSITING SUCH PANELS, CONCRETE MACHINE, AND RAIL TRACK |
GB2453754A (en) * | 2007-10-17 | 2009-04-22 | W & D Mcculloch | Apparatus and methods for handling railway rails and ancillary components |
CN109898373B (en) * | 2019-04-16 | 2024-06-25 | 中铁十一局集团第三工程有限公司 | Compound line track ballasting equipment |
CN114934413B (en) * | 2022-06-29 | 2024-07-12 | 中核华辰建筑工程有限公司 | Group ground steel rail construction method |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3840795A1 (en) * | 1988-12-03 | 1990-06-07 | Zueblin Ag | Method for producing a ballastless railway superstructure, and precast parts and device for carrying out the method |
DE3901347A1 (en) * | 1989-01-18 | 1990-07-26 | Heilit & Woerner Bau Ag | METHOD AND DEVICE FOR MANUFACTURING A GRAVEL-FREE TRACK CONSTRUCTION |
-
1995
- 1995-03-30 AT AT95104687T patent/ATE184934T1/en not_active IP Right Cessation
- 1995-03-30 ES ES95104687T patent/ES2136758T3/en not_active Expired - Lifetime
- 1995-03-30 DK DK95104687T patent/DK0715022T3/en active
- 1995-03-30 EP EP95104687A patent/EP0715022B1/en not_active Expired - Lifetime
- 1995-03-30 DE DE59506887T patent/DE59506887D1/en not_active Expired - Fee Related
- 1995-11-27 CZ CZ19953127A patent/CZ289432B6/en not_active IP Right Cessation
- 1995-11-29 PL PL95311523A patent/PL179340B1/en not_active IP Right Cessation
- 1995-11-29 CN CN95120138A patent/CN1105808C/en not_active Expired - Fee Related
- 1995-11-30 RU RU95121079/28A patent/RU2151230C1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
CZ312795A3 (en) | 1996-06-12 |
DK0715022T3 (en) | 1999-12-20 |
DE59506887D1 (en) | 1999-10-28 |
EP0715022A1 (en) | 1996-06-05 |
ATE184934T1 (en) | 1999-10-15 |
PL311523A1 (en) | 1996-06-10 |
CN1139170A (en) | 1997-01-01 |
CN1105808C (en) | 2003-04-16 |
CZ289432B6 (en) | 2002-01-16 |
ES2136758T3 (en) | 1999-12-01 |
PL179340B1 (en) | 2000-08-31 |
RU2151230C1 (en) | 2000-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0379148B1 (en) | Method of and device for constructing a ballastless superstructure | |
EP1564331B1 (en) | Lifting device | |
EP0676504A1 (en) | Ballastless track superstructure for at least one railway track and method of performance | |
DE2754811A1 (en) | MOBILE DEVICE FOR LAYING THRESHOLDS | |
DE3825508C1 (en) | Method for adjusting and fastening functional surfaces of a guideway of an electromagnetic high-speed train and device for carrying out the method | |
DE19516163C1 (en) | Procedure for positionally accurate manufacture of arrangement of rail support points | |
EP0715023B1 (en) | Movable machine for concrete work | |
EP0715022B1 (en) | Method of manufacture or installation of exactly positioned rail supporting points and machine-system for executing the method | |
DE3425637A1 (en) | CONTINUOUSLY TRAVELABLE TRACK LEVELING AND LEVELING MACHINE | |
DE2257768A1 (en) | PLANT FOR PRODUCING PRE-FABRICATED CONCRETE PARTS | |
EP1882777B1 (en) | Method for making a balastless track for a railway | |
EP1169516B1 (en) | Method for renewing railway lines | |
DE10133607C5 (en) | Method and pallet for producing a precise precast concrete part | |
AT390288B (en) | DEVICE AND METHOD FOR CORRECTING THE POSITION OF A TRACK STRUCTURE POSSIBLE ON A LENGTH CONCRETE TAPE | |
AT500982B1 (en) | METHOD FOR LAYING A TRACK OF A FIXED RAILWAY | |
DE4232126C1 (en) | Process and system for bridge dismantling and bridge assembly | |
AT500950A4 (en) | METHOD FOR PRODUCING A TUNNEL TRACK FOR RAIL VEHICLES | |
DE19522478C2 (en) | Process for precise and low-tolerance production of rail support points with high surface accuracy and formwork elements for carrying out the process | |
EP1360397B2 (en) | Method and pallet for the production of a precise pre-cast concrete piece | |
EP1277916B1 (en) | Apparatus and method for constructing a reinforced concrete shuttering in a tunnel | |
EP2166149B2 (en) | Unit of railway structure part | |
EP1533420A2 (en) | Method for making a ballastless railway track | |
DE102022100899A1 (en) | PROCESS FOR MANUFACTURING A PAPER EDGE | |
AT413551B (en) | Production of a fixed track for rail vehicles comprises fixing in position a guide bar forming a guide/curve template, and making a rail support together with channels for the rails from concrete or profiling the channels | |
DE3516477C2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19950406 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE DK ES FR GB IT LI NL |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
17Q | First examination report despatched |
Effective date: 19990304 |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE DK ES FR GB IT LI NL |
|
REF | Corresponds to: |
Ref document number: 184934 Country of ref document: AT Date of ref document: 19991015 Kind code of ref document: T |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: KELLER & PARTNER PATENTANWAELTE AG Ref country code: CH Ref legal event code: EP |
|
ET | Fr: translation filed | ||
ITF | It: translation for a ep patent filed |
Owner name: ING. A. GIAMBROCONO & C. S.R.L. |
|
REF | Corresponds to: |
Ref document number: 59506887 Country of ref document: DE Date of ref document: 19991028 |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19991101 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2136758 Country of ref document: ES Kind code of ref document: T3 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20020325 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20020327 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030331 |
|
BERE | Be: lapsed |
Owner name: *HOCHTIEF A.G. VORM. GEBR. HELFMANN Effective date: 20030331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20031127 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20040123 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20040330 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20040331 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20040401 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20040414 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20040420 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20040421 Year of fee payment: 10 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050330 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050330 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050331 Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050331 Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050331 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20051001 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20051001 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20050330 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee |
Effective date: 20051001 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20050331 |