EP0035988A1 - Arrangement for separating a starter bar from a cast strand in a continuous casting plant - Google Patents

Arrangement for separating a starter bar from a cast strand in a continuous casting plant Download PDF

Info

Publication number
EP0035988A1
EP0035988A1 EP81890032A EP81890032A EP0035988A1 EP 0035988 A1 EP0035988 A1 EP 0035988A1 EP 81890032 A EP81890032 A EP 81890032A EP 81890032 A EP81890032 A EP 81890032A EP 0035988 A1 EP0035988 A1 EP 0035988A1
Authority
EP
European Patent Office
Prior art keywords
strand
guide
starting
cast
strand guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP81890032A
Other languages
German (de)
French (fr)
Other versions
EP0035988B1 (en
Inventor
Aktiengesellschaf Voest-Alpine
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Voestalpine AG
Original Assignee
Voestalpine AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=3508818&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP0035988(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Voestalpine AG filed Critical Voestalpine AG
Publication of EP0035988A1 publication Critical patent/EP0035988A1/en
Application granted granted Critical
Publication of EP0035988B1 publication Critical patent/EP0035988B1/en
Expired legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/08Accessories for starting the casting procedure
    • B22D11/081Starter bars
    • B22D11/083Starter bar head; Means for connecting or detaching starter bars and ingots

Definitions

  • a permanent head is known for example from DE-OS 2 748 690.
  • This reference also describes a device for separating the permanent head from the cast strand. With this device, the hook-shaped permanent head is moved transversely to the strand axis upward, whereby the hook-shaped permanent head disengages from the cast strand end. Thereafter, the starting strand is from the cast strand in the direction of the strand axis with the conveying speed of the Moving the cast strand exceeding speed and lowering the permanent head again, whereupon the start-up strand can run unimpeded along the strand guide until it is lifted by a crane etc. and placed on a shelf, or for example on a swiveling rocker serving as a shelf.
  • the starting strand is separated from the permanent head by releasing the hook-shaped coupling; the start-up line is then further conveyed out of the line guide along the path intended for it; the permanent head remains on the cast strand and is attached to it via the cutting device pointing strand guide part conveyed. It is removed from the cast strand together with the top of the cast strand.
  • the separating device it is possible to arrange the separating device after a last driving roller as seen in the direction in which the strand is pulled out, as a result of which a particularly early separation of the starting strand from the cast strand can be achieved.
  • a drive roller pair arranged above the strand guide and a starting strand guide leading to the drive roller pair and branching off from the strand guide and designed as a skid-like switch are provided as the lifting device.
  • the skid-like switch is formed in two parts, a part being pivotable on the approximately horizontal strand guide and a part is pivotally articulated above this strand guide and the part arranged above the horizontally arranged strand guide is pivotable from a position aligned with the part arranged in the strand guide over the vertical.
  • the device according to the invention in a system similar to the system described in AT-PS 343 835.
  • a system is provided with a transport carriage having a slide or roller conveyor, with which the start-up strand can be transported to an inlet part of the strand guide, the transport carriage carrying a conveying device for the start-up strand and the slide or roller conveyor having curved end parts, and furthermore on the Transport trolley the lifting device is provided for detecting and lifting the start-up line.
  • the trolley can only be moved from a threading position in the mold to a receiving position in front of the cutting device (seen in the direction in which the strand is pulled out) and back.
  • the device according to the invention can be provided , wherein the slide or roller track extends from the mold to (seen in the pulling direction of the strand) in front of the cutting device.
  • the hook-shaped coupling on the one hand has a bolt flattened on two opposite sides and on the other hand one the bolt-receiving bore and a slot extending from the bore and open to the top of the start-up strand to allow passage of the flattened bolt.
  • FIGS. 1, 3 and 4 each showing an overall view in a schematic representation of a continuous casting installation according to one embodiment.
  • Fig. 2 illustrates a detail of Fig. 1, namely the hook-shaped coupling, in section and on an enlarged scale.
  • Fig. 1, 1 is a continuous mold of a slab caster, to which a strand guide is connected at the bottom.
  • the liquid steel flows from an intermediate vessel 2 via a pouring tube 3 into the cavity of the mold.
  • 4 is the bending zone of the strand guide, in which the cast strand 5 is bent from the vertical into a circular arc.
  • Adjacent to the bending zone 4 is an arcuate strand guide part, the guide frame 6, in which the strand is supported on the top and bottom by support rollers 7, as in the bending zone 4.
  • a straightening zone 8 is provided next to the circular arch-shaped guide frame 6, in which the circular arch-shaped cast strand 5 is being straightened.
  • an approximately horizontally directed strand guide part 9 in which the strand is also still supported on the top and bottom by means of support rollers 7.
  • a last pair of driving rollers 10 is provided.
  • the last pair of drive rollers 10 is followed by an approximately horizontal strand guide part 11, which has a separating device 12 for separating of the starting strand 13 from the casting strand 5.
  • a further, also approximately horizontally arranged strand guide part 14 is provided, which has a cutting device 15 for cutting the cast strand 5 to length and severing the beginning and end of the cast strand 5.
  • This cutting device is designed as a flame cutter 17 which can be moved on rails 16.
  • This strand guide part is called 1'4 flame cutting roller table.
  • the separating device 12 has a roller 19 which can be raised and lowered by means of a pressure medium cylinder 18, by means of which the starting strand 13 can be raised as soon as the permanent head 20 of the starting strand 13 has passed the last pair of driving rollers 10.
  • a start-up strand head that can be used again and again is referred to, which has a recess, for example a dovetail-shaped groove 21, which is filled at the start of casting with liquid steel, so that a direct, but releasable by a transverse movement to the longitudinal axis 22, relative movement between permanent head and cast strand Cast composite with the cast strand 5 is formed.
  • the surfaces of the permanent head 20 involved in this cast composite are made in a known manner.
  • the dovetail-shaped groove 21 of the permanent head slides off the dovetail-shaped sprue of the cast strand 5.
  • the permanent head 20 is connected to the following link body 23 by link bodies 23, 24 Compound start-up line 13 by means of a hook-shaped, to the top of the start Strange open clutch 25 connected, which is shown in detail in Fig. 2.
  • a bolt 26 connecting the permanent head 20 to the following link body 23 is flattened on two opposite sides 27, 27 '.
  • a slot 30 which is open towards the top 29 of the starting strand 13 and whose width 31 is slightly larger than the thickness 32 of the flattened part of the bolt 26, so that the bolt , which is connected in a rotationally fixed manner to the link body 23, can slide out of the permanent head 20 by pivoting the link body 23 following the permanent head by approximately 90 ° into the position shown in FIG. 2 and moving in the direction of the arrow 33.
  • a lifting device for the starting line comprises a two-part, arcuate, skid-like switch 34, part 35 being articulated on the line guide part 11 and part 36 above this line guide part.
  • Each of these parts can be pivoted by means of its own pressure medium cylinder 37, 38 from the position A or B shown in broken lines in FIG. 1 to the position A 'or B' drawn in full lines in FIG two switch parts 35, 36 are aligned.
  • a pair of driving rollers 39 is provided for the starting strand 13, through which the starting strand g , as soon as it is gripped by it, can be conveyed upwards, where it is picked up, for example, by a crane or where it is on a shelf arrives.
  • Lifting the start-up line from the strand guide part 11 Lifting device, which is formed by the switch 34 and the pair of driving rollers 39, is arranged at a distance behind the separating device 12 which is smaller than the length of the starting line, so that the starting line is already covered by the lifting device when its permanent head reaches the separating device .
  • the skid-like switch parts 35, 36 become from the position A ', B' shown in full lines in FIG. 1 the dash-dotted layer A, B is pivoted back and the cast strand is conveyed further until it has reached the position shown in broken lines in FIG. 1.
  • the permanent head 20 still occupies a position aligned with the cast strand; the remaining part of the start-up line is directed approximately vertically upwards. It is held by the pair of driving rollers 39. In this position, the hook shown in detail in FIG.
  • the starting strand 13 can also be threaded into the strand guide.
  • the drive rollers 41 of the drive roller pair 39 are then driven in the opposite direction until at least the permanent head is gripped by the last drive roller pair 10 of the strand guide part 9, whereupon the starting strand is moved through the strand guide to the mold 1.
  • the continuous casting installation is essentially identical to the continuous casting installation shown in FIG. 1; corresponding parts are provided with the same reference numerals.
  • the lifting device 42 according to FIG. 3 comprises a fixed guide 43 which is attached to the frame 44 of the system.
  • a hook 46 fastened to a cross member 45 is guided vertically, the hook being able to be lifted by a lifting mechanism 48 by means of lifting ropes 47 or lifting chains.
  • a transport carriage 51 is guided on rails 50, which can be moved from the rear receiving position, which is drawn with full lines, into the threading position, shown in broken lines, on the mold 1.
  • a sliding or roller conveyor 52 On the trolley 51 is a sliding or roller conveyor 52 is arranged, the front end 53 and the rear end 54 of which are designed in the shape of a quarter circle.
  • a sliding device 55 can be moved back and forth along the slide or roller track 52 in the longitudinal direction of the transport carriage.
  • the displacement device is designed as a carriage which is guided on rails 57 of the transport carriage 51 by means of wheels 56.
  • the displacement device 55 contains a vertical guide 58 which is aligned with the stationary guide 43.
  • a driver device 59 is provided on the displacement device 55, which has a pin 60 that can be raised and lowered manually or by machine.
  • the starting strand is shown emerging from the last pair of driving rollers 10.
  • the foot part 40 extends straight to the hook 46 of the lifting device 42.
  • the lifting mechanism 48 of the displacement device located in the rear position is actuated and the starting strand 13 consisting of individual link bodies 23, 24 is raised.
  • the roller 19 which can be raised and lowered is lifted, as a result of which the starting strand 13 is separated from the casting strand 5.
  • the dummy bar is is then 'lifted until the hook 46 in the guide 58 of the slider 55 retracted.
  • the shifting device is now moved in the longitudinal direction of the transport carriage 51 to the mold 1, the starting strand being placed over the rear end 54 of the slide or roller track 52 in the shape of a quarter circle and being pulled over the horizontal part of this track. Then the hook is unhooked from the foot part 40 of the starting strand 13 and the transport carriage 51 is moved to the mold until it reaches the position shown in broken lines in FIG. 3. The displacement device 55 then moves back to the rear position.
  • the pin 60 of the driver device 59 is in an off Assumption is inserted near the permanent head 20 of the start-up line and the displacement device 55 is moved to the front end of the transport carriage 51 and the foot end of the start-up line is threaded into the mold 1 via the front end 53 of the roller conveyor 52 until the foot part 40 of the start-up line 13 is the first of the driven rollers, designated 61, has reached the strand guide and. is held by these. (This is shown in FIG. 3 with dashed lines.) After the pin 60 has been uncoupled, the starting strand is drawn into the mold until its head closes off the bottom of the mold. After the transport carriage 51 has moved away, the casting can be started.
  • the mold and possibly also a strand guide part can be removed, the starting strand being threaded into the strand guide and drawn in.
  • the start-up strand is brought into a position in which the permanent head 20 is still aligned horizontally with the cast strand, but the rest of the start-up strand part is directed at right angles to it, whereupon the hook-shaped coupling 25 of the permanent head 20 with the next following link body 23 of the starting strand is released by pulling up the starting strand in the direction of arrow 33.
  • the effort for the devices supplying the starting strand 13 of the mold 1 is significantly less than, for example, in a system in which the starting strand is only removed from the strand guide after the flame cutting roller table 14.
  • Fig. 4 is one of the system shown in Fig. 3 Similar continuous casting system is shown, however, the starting strand 13 is not conveyed to the mold by means of a transport carriage but rather by means of a slide or roller conveyor 63 after lifting by means of the lifting device 62.
  • a shifting device 64 for shifting the starting strand along the slide or roller track is designed similarly to the shifting device 55 shown in FIG. 3.
  • the rails 57 provided for them are arranged in a stationary manner above the casting platform 49.
  • the slideway or roller track leading to the mold for the starting strand has end parts 65, 66 in the form of a circular arc, the end part 65 in the form of a circular circle arranged in the mold is articulated on the frame 44 of the system by means of two links 67, 68 and by means of a pressure medium cylinder 69 from the one shown in FIG .. 4 position shown with full lines in the position shown in dash-dotted lines is pivotable.
  • the function of this system is similar to that shown in FIG. 3. (The threading of the start-up strand into the strand guide through the mold is shown with dashed lines.) In contrast to the system shown in FIG. 3, there is no need to move a transport carriage 51 when conveying the start-up strand to the mold.
  • the device feeding the starting strand to the mold can be designed to be considerably less complex than in a system in which the starting strand is only lifted off the strand guide after the flame cutting roller table.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

1. Arrangement for separating a starter bar (13) from a cast strand (5) in a continuous casting plant comprising an arcuate strand-guide part (6) and an approximately horizontal strand-guide part (11, 14) including a cutting means (15) for the cast strand, in particular in a steel-slab continuous casting plant, the starter bar comprising a starter bar head (20) that is connectable with the cast strand in a direct cast-connection and reusable, i.e. a socalled <<permanent head>>, which is detachable from the cast strand by a separating means (12) arranged in the strand guide, and the starter bar being conveyable out of the strand guide by a lifting means (34, 39 ; 42 ; 62), characterized in that - the separating means (12) is provided in front of the strand guide part (14) comprising the cutting means (15), - the lifting means (34, 39 ; 42 ; 62) also is arranged in front of the strand-guide part (14) comprising the cutting means (15), at a short distance behind the separating means (12), i.e. at a distance that is shorter than the length of the starter bar (13), - and as the connection between the permanent head (20) and the remaining starter bar (23, 24) a hook shaped coupling (25) that is open towards the upper side (29) of the starter bar is provided.

Description

Die Erfindung betrifft eine Einrichtung zum Trennen eines Anfahrstranges von einem Gußstrang an einer Stranggießanlage mit einem bogenförmigen Strangführungsteil und einem etwa horizontalen, eine Schneideinrichtung für den Gußstrang aufweisenden Strangführungsteil, insbesondere an einer Stahlbrammen-Stranggießanlage, wobei der Anfahrstrang einen in direktem Guß-Verbund mit dem Gußstrang verbindbaren, wiederverwendbaren Anfahrstrangkopf, einen sogenannten "Permanentkopf", aufweist, der mittels einer in der Strangführung angeordneten Trennvorrichtung vom Gußstrang lösbar ist, und der Anfahrstrang mittels einer Hubeinrichtung von der Strangführung ausförderbar ist.The invention relates to a device for separating a starting strand from a cast strand on a continuous casting plant with an arcuate strand guide part and an approximately horizontal strand guide part having a cutting device for the cast strand, in particular on a steel slab continuous casting installation, the starting strand being in a direct cast connection with the Cast strand connectable, reusable start strand head, a so-called "permanent head", which can be detached from the cast strand by means of a separating device arranged in the strand guide, and the start strand can be conveyed out of the strand guide by means of a lifting device.

Die Verwendung eines Permanentkopfes ist beispielsweise aus der DE-OS 2 748 690 bekannt. In dieser Literaturstelle ist auch eine Einrichtung zum Trennen des Permanentkopfes vom Gußstrang beschrieben. Mit dieser Einrichtung wird der hakenförmig ausgebildete Permanentkopf quer zur Strangachse nach oben bewegt, wodurch der hakenförmige Permanentkopf mit dem Gußstrangende außer Eingriff gelangt. Danach wird der Anfahrstrang vom Gußstrang in Richtung der Strangachse mit die Fördergeschwindigkeit des Gußstranges übersteigender Geschwindigkeit wegbewegt und der Permanentkopf wieder abgesenkt, worauf der Anfahrstrang entlang der Strangführung ungehindert ablaufen kann, bis er von einem Kran etc. abgehoben und auf eine Ablage abgelegt wird, oder auf beispielsweise eine schwenkbare, als Ablage dienende Wippe aufläuft.The use of a permanent head is known for example from DE-OS 2 748 690. This reference also describes a device for separating the permanent head from the cast strand. With this device, the hook-shaped permanent head is moved transversely to the strand axis upward, whereby the hook-shaped permanent head disengages from the cast strand end. Thereafter, the starting strand is from the cast strand in the direction of the strand axis with the conveying speed of the Moving the cast strand exceeding speed and lowering the permanent head again, whereupon the start-up strand can run unimpeded along the strand guide until it is lifted by a crane etc. and placed on a shelf, or for example on a swiveling rocker serving as a shelf.

Bei Verwendung eines Permanentkopfes kann es passieren, daß der Permanentkopf mit dem Gußstrang verschweißt, sodaß sich der Permanentkopf vom Gußstrang nicht mehr ohne weiteres lösen läßt. Man hat daher bisher bei mit Permanentkopf ausgerüsteten Stranggießanlagen dafür Sorge tragen müssen, daß auch im Falle des Verschweißens Permanentkopf - Gußstrang ein Trennen des Anfahrstranges vom Gußstrang möglich ist. Einer solchen Notsituation wurde in der Regel dadurch Rechnung getragen, indem man den Anfahrstrang vom Gußstrang mittels der für den Gußstrang vorgesehenen Schneideinrichtung getrennt hat. Es war also notwendig, den Anfahrstrang noch über den mit der Schneideinrichtung für den Gußstrang vorgesehenen Strangführungsteil, der bei Brammenstranggießanlagen als Brennschneidrollgang ausgebildet ist, zu führen. Dadurch ergibt sich einerseits, wenn man zu Gießbeginn den Anfahrstrang von unten durch die Strangführung in die Kokille einfädeln will, ein langer Transportweg für den Anfahrstrang und damit eine lange Rüstzeit vor Gießbeginn, oder anderseits, wenn der Anfahrstrang mittels einer Hubeinrichtung vom Auslaufrollgang abgehoben und von oben in die Kokille eingefädelt wird, eine aufwendige Konstruktion für eine Einrichtung zum Zuführen des Anfahrstranges in die Kokille. Wollte man den Anfahrstrang bei Verwendung eines Permanentkopfes schon vor dem eine Schneideinrichtung aufweisenden Strangführungsteil aus der Strangführung entfernen, beispielsweise mittels einer in die Strangführung reichenden Wippe etc., so wäre man gezwungen, bei Verschweißen oder Verklemmen des Permanentkopfes mit dem Schopfanfang des Gußstranges das Gießen abzubrechen, da sonst der Gußstrang dem Anfahrstrang auf die Wippe folgen müßte.When using a permanent head, it can happen that the permanent head is welded to the cast strand, so that the permanent head can no longer be easily detached from the cast strand. So far, it has been necessary in the case of continuous casting plants equipped with a permanent head to ensure that even in the case of welding the permanent head-cast strand, it is possible to separate the starting strand from the cast strand. Such an emergency situation was generally taken into account by separating the starting strand from the cast strand by means of the cutting device provided for the cast strand. It was therefore necessary to guide the start-up strand over the strand guide part provided with the cutting device for the cast strand, which is designed as a flame cutting roller table in slab caster systems. On the one hand, this results in a long transport route for the start-up strand and thus a long set-up time before the start of casting, or on the other hand, if the start-up strand is lifted from the run-out roller table and lifted by a lifting device when you want to thread the start-up strand from below through the strand guide into the mold is threaded into the mold at the top, a complex construction for a device for feeding the starting strand into the mold. If you wanted to remove the starting strand from the strand guide before using the strand guide part that has a cutting device, for example by means of a rocker extending into the strand guide, one would be forced to weld or jam the permanent head with the Abort the pouring of the casting strand, otherwise the casting strand would have to follow the starting strand on the rocker.

Die Erfindung bezweckt die Vermeidung dieser Nachteile und Schwierigkeiten und stellt sich die Aufgabe, eine Einrichtung der eingangs beschriebenen Art zu schaffen, die eine kurze Rüstzeit bei Gießbeginn einzuhalten gestattet und bei der die den Anfahrstrang zur Kokille führenden Einrichtungsnmöglichst wenig aufwendig gestaltet werden können, wobei jedoch, auch wenn sich der Permanentkopf nicht vom Gußstrang trennen läßt, ein Gießabbruch vermieden wird und auch in diesem Fall Gußstrang und Anfahrstrang von der Trennstelle an getrennte Wege laufen können.The invention aims at avoiding these disadvantages and difficulties and has as its object to create a device of the type described in the introduction, which allows a short set-up time to be observed at the start of casting and in which the devices leading the start-up line to the mold can be made as inexpensively as possible, however , even if the permanent head cannot be separated from the cast strand, a casting stop is avoided and in this case the cast strand and the start strand can also run separately from the separation point.

Diese Aufgabe wird erfindungsgemäß bei einer Einrichtung der eingangs beschriebenen Art durch die Kombination folgender Merkmale gelöst:

  • - die Trennvorrichtung ist vor dem die Schneideinrichtung aufweisenden Strangführungsteil vorgesehen,
  • - die Hubeinrichtung ist ebenfalls vor dem die Schneideinrichtung aufweisenden Strangführungsteil in kurzer Distanz hinter der Trennvorrichtung angeordnet, u.zw. in einer Distanz die kürzer ist als die Länge des Anfahrstranges
  • - und als Verbindung zwischen dem Permanentkopf und dem restlichen Anfahrstrang ist eine zur Anfahrstrangoberseite zu offene hakenförmige Kupplung vorgesehen.
This object is achieved according to the invention in a device of the type described in the introduction by combining the following features:
  • the separating device is provided in front of the strand guide part having the cutting device,
  • - The lifting device is also arranged in front of the strand guide part having the cutting device at a short distance behind the separating device, etc. at a distance that is shorter than the length of the start-up line
  • - And as a connection between the permanent head and the rest of the start-up line, a hook-shaped coupling that is open to the top of the start-up line is provided.

Tritt der Fall des Verschweißens oder Verklemmens des Permanentkopfes mit dem Gußstrang ein, so wird der Anfahrstrang vom Permanentkopf durch Lösen der hakenförmigen Kupplung getrennt; der Anfahrstrang wird dann weiter aus der Strangführung entlang des für ihn vorgesehenen Weges ausgefördert; der Permanentkopf verbleibt am Gußstrang und wird mit diesem über den die Schneideinrichtung aufweisenden Strangführungsteil ausgefördert. Er wird gemeinsam mit dem Schopfanfang des Gußstranges vom Gußstrang entfernt.If the permanent head is welded or jammed with the cast strand, the starting strand is separated from the permanent head by releasing the hook-shaped coupling; the start-up line is then further conveyed out of the line guide along the path intended for it; the permanent head remains on the cast strand and is attached to it via the cutting device pointing strand guide part conveyed. It is removed from the cast strand together with the top of the cast strand.

Mit der erfindungsgemäßen Einrichtung ist es möglich, die Trennvorrichtung'nach einer in Ausziehrichtung des Stranges gesehen letzten Treibrolle anzuordnen, wodurch eine besonders frühzeitige Trennung des Anfahrstranges vom Gußstrang bewerkstelligt werden kann.With the device according to the invention, it is possible to arrange the separating device after a last driving roller as seen in the direction in which the strand is pulled out, as a result of which a particularly early separation of the starting strand from the cast strand can be achieved.

Es ist aus der DE-PS 1 210 140 zwar bekannt, an dieser Stelle den Anfahrstrang vom Gußstrang aus der Strangführung mittels einer in diese einschwenkbaren Wippe zu entfernen, jedoch ist bei der in dieser Patentschrift beschriebenen Anlage die Verwendung eines Permanentkopfes nicht möglich. Es verbleibt der Anfahrstrangkopf stets am Gußstrang und bildet mit diesem einen unlösbaren Teil. Der Anfahrkopf hängt mit dem restlichen Anfahrstrang mittels einer klauenartigen Verbindung zusammen, die beim Trennen des Anfahrstranges vom Gußstrang gelöst wird. Wollte man bei dieser bekannten Anlage einen Permanentkopf verwenden, so müßte man, wie bereits weiter oben beschrieben, im Falle des Nichtlösens des Permanentkopfes vom Gußstrang das Gießen abbrechen, da ja der Gußstrang nicht dem bereits auf der Wippe befindlichen Anfahrstrang folgen kann.It is known from DE-PS 1 210 140, at this point, to remove the starting strand from the cast strand from the strand guide by means of a rocker which can be pivoted into it, but the use of a permanent head is not possible in the system described in this patent. The start-up strand head always remains on the cast strand and forms an inseparable part with it. The start-up head is connected to the rest of the start-up line by means of a claw-like connection, which is released when the start-up line is separated from the cast line. If you wanted to use a permanent head in this known system, you would have to, as already described above, stop the casting from the cast strand if the permanent head did not detach, since the cast strand cannot follow the start-up strand already on the rocker.

Zweckmäßig ist als Hubeinrichtung ein oberhalb der Strangführung angeordnetes Treibrollenpaar sowie eine von der Strangführung abzweigende, als kufenartige Weiche ausgebildete, zu dem Treibrollenpaar führende Anfahrstrangführung vorgesehen.Appropriately, a drive roller pair arranged above the strand guide and a starting strand guide leading to the drive roller pair and branching off from the strand guide and designed as a skid-like switch are provided as the lifting device.

Nach einer bevorzugten Ausführungsform ist dabei die kufenartige.Weiche zweigeteilt ausgebildet, wobei ein Teil an der etwa horizontalen Strangführung verschwenkbar und ein Teil oberhalb dieser Strangführung verschwenkbar angelenkt ist und wobei der oberhalb der horizontal angeordneten Strangführung angeordnete Teil aus einer mit dem in der Strangführung angeordneten Teil fluchtenden Stellung über die Vertikale verschwenkbar ist.According to a preferred embodiment, the skid-like switch is formed in two parts, a part being pivotable on the approximately horizontal strand guide and a part is pivotally articulated above this strand guide and the part arranged above the horizontally arranged strand guide is pivotable from a position aligned with the part arranged in the strand guide over the vertical.

Es ist jedoch auch möglich, die erfindungsgemäße Einrichtung bei einer Anlage ähnlich der in der AT-PS 343 835 beschriebenen Anlage vorzusehen. Eine solche Anlage ist mit einem eine Gleit- oder Rollenbahn aufweisenden Transportwagen versehen, mit dem der Anfahrstrang zu einem Einlaufteil der Strangführung transportierbar ist, wobei der Transportwagen eine Fördereinrichtung für den Anfahrstrang trägt und die Gleit- oder Rollenbahn bogenförmige Endteile aufweist und wobei weiters auf dem Transportwagen die Hubeinrichtung zum Erfassen und Anheben des Anfahrstranges vorgesehen ist. Bei einer solchen Anlage ist erfindungsgemäß der Transportwagen nur von einer Einfädelstellung bei der Kokille bis in.eine Aufnahmestellung vor der Schneideinrichtung (in Ausziehrichtung des Stranges gesehen) und retour verfahrbar.However, it is also possible to provide the device according to the invention in a system similar to the system described in AT-PS 343 835. Such a system is provided with a transport carriage having a slide or roller conveyor, with which the start-up strand can be transported to an inlet part of the strand guide, the transport carriage carrying a conveying device for the start-up strand and the slide or roller conveyor having curved end parts, and furthermore on the Transport trolley the lifting device is provided for detecting and lifting the start-up line. In such a system, according to the invention the trolley can only be moved from a threading position in the mold to a receiving position in front of the cutting device (seen in the direction in which the strand is pulled out) and back.

Auch bei einer Anlage,ähnlich der in der AT-PS. 343 834 beschriebenen,mit einer horizontalen Gleit- oder Rollenbahn zum Einbringen des Anfahrstranges, wobei die Gleit-oder Rollenbahn einen vorderen und hinteren, bogenförmig ausgebildeten Endteil aufweist und wobei entlang der Gleit- oder Rollenbahn eine Verschiebeeinrichtung verfahrbar ist, läßt sich die erfindungsgemäße Einrichtung vorsehen, wobei die Gleit- oder Rollenbahn von der Kokille bis (in Ausziehrichtung des Stranges gesehen) vor die Schneideinrichtung reicht.Even with a system similar to that in the AT-PS. 343 834 described, with a horizontal slide or roller track for introducing the start-up strand, the slide or roller track having a front and rear, arcuate end part and wherein a displacement device can be moved along the slide or roller track, the device according to the invention can be provided , wherein the slide or roller track extends from the mold to (seen in the pulling direction of the strand) in front of the cutting device.

Nach einer bevorzugten Ausführungsform weist die hakenförmige Kupplung einerseits einen an zwei einander gegenüberliegenden Seiten abgeflachten Bolzen und anderseits eine den Bolzen aufnehmende Bohrung sowie einen von der Bohrung ausgehenden,zur Oberseite des Anfahrstranges hin offenen Schlitz zum Durchlaß des abgeflachten Bolzens auf.According to a preferred embodiment, the hook-shaped coupling on the one hand has a bolt flattened on two opposite sides and on the other hand one the bolt-receiving bore and a slot extending from the bore and open to the top of the start-up strand to allow passage of the flattened bolt.

Die Erfindung ist nachfolgend anhand dreier in der Zeichnung dargestellter Ausführungsbeispiele näher erläutert, wobei die Fig. 1, 3 und 4 jeweils eine Gesamtansicht in schematischer Darstellung einer Stranggießanlage nach je einer Ausführungsform zeigen. Fig. 2 veranschaulicht ein Detail der Fig. 1, nämlich die hakenförmige Kupplung, im Schnitt und in vergrößertem Maßstab.The invention is explained in more detail below with reference to three exemplary embodiments shown in the drawing, FIGS. 1, 3 and 4 each showing an overall view in a schematic representation of a continuous casting installation according to one embodiment. Fig. 2 illustrates a detail of Fig. 1, namely the hook-shaped coupling, in section and on an enlarged scale.

In Fig. 1 ist mit 1 eine Durchlaufkokille einer Brammenstranggießanlage bezeichnet, an die nach unten zu eine Strangführung anschließt. Der flüssige Stahl fließt aus einem Zwischengefäß 2 über ein Gießrohr 3 in den Hohlraum der Kokille. 4 ist die Biegezone der Strangführung, in der der gegossene Strang 5 aus der Vertikalen in einen Kreisbogen gebogen-wird. An die Biegezone 4 anschließend ist ein kreisbogenförmiger Strangführungsteil, das Führungsgerüst 6, vorgesehen, in dem der Strang so wie in der Biegezone 4 an der Ober- und Unterseite durch Stützrollen 7 abgestützt ist. Anschließend an das kreisbogenförmige Führungsgerüst 6 ist eine Richtzone 8 vorgesehen, in der der kreisbogenförmige Gußstrang 5 gerade gerichtet wird. Danach folgt noch ein etwa horizontal gerichteter Strangführungsteil 9, in dem der Strang ebenfalls noch an der Ober- und Unterseite mittels Stützrollen 7 abgestützt ist. Anschließend an diesen Strangführungsteil ist ein letztes Treibrollenpaar 10 vorgesehen. (Sowohl im kreisbogenförmigen Führungsgerüst als auch in der Richtzone und im etwa horizontal gerichteten Strangführungsteil können ebenfalls Treibrollen angeordnet sein.) Dem letzten Treibrollenpaar 10 folgt ein etwa horizontaler Strangführungsteil 11, der eine Trennvorrichtung 12 zum Trennen des Anfahrstranges 13 vom Gußstrang 5 aufweist. Nach diesem Strangführungsteil 11 ist ein weiterer, ebenfalls etwa horizontal angeordneter Strangführungsteil 14, der eine Schneideinrichtung 15 zum Ablängen des Gußstranges 5 und Abtrennen des Schopfanfanges und -endes des Gußstranges 5 aufweist, vorgesehen. Diese Schneideinrichtung ist als auf Schienen 16 verfahrbarer Brennschneider 17 ausgebildet. Nachfolgend ist dieser Strangführungsteil 1'4 Brennschneidrollgang genannt. Nach dem Brennschneidrollgang 14 folgt der bei Stranggießanlagen übliche, nicht dargestellte Auslaufrollgang, von dem die vom Gußstrang abgelängten Brammen mittels eines Kranes etc. abgehoben werden.In Fig. 1, 1 is a continuous mold of a slab caster, to which a strand guide is connected at the bottom. The liquid steel flows from an intermediate vessel 2 via a pouring tube 3 into the cavity of the mold. 4 is the bending zone of the strand guide, in which the cast strand 5 is bent from the vertical into a circular arc. Adjacent to the bending zone 4 is an arcuate strand guide part, the guide frame 6, in which the strand is supported on the top and bottom by support rollers 7, as in the bending zone 4. A straightening zone 8 is provided next to the circular arch-shaped guide frame 6, in which the circular arch-shaped cast strand 5 is being straightened. This is followed by an approximately horizontally directed strand guide part 9, in which the strand is also still supported on the top and bottom by means of support rollers 7. Following this strand guide part, a last pair of driving rollers 10 is provided. (Drive rollers can also be arranged both in the circular guide frame and in the straightening zone and in the approximately horizontally directed strand guide part.) The last pair of drive rollers 10 is followed by an approximately horizontal strand guide part 11, which has a separating device 12 for separating of the starting strand 13 from the casting strand 5. After this strand guide part 11, a further, also approximately horizontally arranged strand guide part 14 is provided, which has a cutting device 15 for cutting the cast strand 5 to length and severing the beginning and end of the cast strand 5. This cutting device is designed as a flame cutter 17 which can be moved on rails 16. This strand guide part is called 1'4 flame cutting roller table. After the flame cutting roller table 14 there follows the outlet roller table, not shown in the case of continuous casting plants, from which the slabs cut to length from the cast strand are lifted by means of a crane etc.

Die Trennvorrichtung 12 weist eine mittels eines Druckmittelzylinders 18 heb- und senkbare Rolle 19 auf, mittels der der Anfahrstrang 13, sobald der Permanentkopf 20 des Anfahrstranges 13 das letzte Treibrollenpaar 10 passiert hat, angehoben werden kann. Mit Permanentkopf 20 wird ein immer wieder verwendbarer Anfahrstrangkopf bezeichnet, der eine Ausnehmung, z.B. eine schwalbenschwanzförmige Nut 21, aufweist, die zu Gießbeginn von flüssigem Stahl ausgefüllt wird, sodaß ein direkter, jedoch durch eine quer zur Längsachse 22 gerichtete Relativbewegung zwischen Permanentkopf und Gußstrang lösbarer Guß-Verbund mit dem Gußstrang 5 entsteht. Die an diesem Guß-Verbund beteiligten Flächen des Permanentkopfes 20 werden in bekannter Weise . vorbereitet, um ein Verschweißen mit dem Gußstrang 5 zu verhindern. Durch Anheben des Anfahrstranges im Bereich seines kopfseitigen Endes in die in Fig. 1 strichpunktiert dargestellte Lage kommt es zum Abgleiten der schwalbenschwanzförmigen Nut 21 des Permanentkopfes vom schwalbenschwanzförmigen Anguß des Gußstranges 5. Der Permanentkopf 20 ist mit dem nachfolgenden Gliederkörper 23 des aus Gliederkörpern 23, 24 zusammengesetzten Anfahrstranges 13 mittels einer hakenförmigen, zur Oberseite des Anfahrstranges hin offenen Kupplung 25 verbunden, die im Detail in Fig. 2 dargestellt ist.The separating device 12 has a roller 19 which can be raised and lowered by means of a pressure medium cylinder 18, by means of which the starting strand 13 can be raised as soon as the permanent head 20 of the starting strand 13 has passed the last pair of driving rollers 10. With permanent head 20, a start-up strand head that can be used again and again is referred to, which has a recess, for example a dovetail-shaped groove 21, which is filled at the start of casting with liquid steel, so that a direct, but releasable by a transverse movement to the longitudinal axis 22, relative movement between permanent head and cast strand Cast composite with the cast strand 5 is formed. The surfaces of the permanent head 20 involved in this cast composite are made in a known manner. prepared to prevent welding to the cast strand 5. By lifting the start-up strand in the region of its head-side end into the position shown in dash-dotted lines in FIG. 1, the dovetail-shaped groove 21 of the permanent head slides off the dovetail-shaped sprue of the cast strand 5. The permanent head 20 is connected to the following link body 23 by link bodies 23, 24 Compound start-up line 13 by means of a hook-shaped, to the top of the start Strange open clutch 25 connected, which is shown in detail in Fig. 2.

Wie aus Fig. 2 erkennbar, ist ein den Permanentkopf 20 mit dem nachfolgenden Gliederkörper 23 verbindender Bolzen 26 an zwei einander gegenüberliegenden Seiten 27, 27' abgeflacht ausgebildet. Von der im Permanentkopf 20 vorgesehenen Bohrung 28 zur Aufnahme dieses Bolzens 26 geht ein zur Oberseite 29 des Anfahrstranges 13 hin offener Schlitz 30 aus, dessen Breite 31 um ein geringes Maß größer ist als die Dicke 32 des abgeflachten Teiles des Bolzens 26, sodaß der Bolzen, der mit dem Gliederkörper 23 drehfest verbunden ist, durch Schwenken des dem Permanentkopf nachfolgenden Gliederkörpers 23 um etwa 90° in die in Fig. 2 dargestellte Lage und Bewegen in Richtung des Pfeiles 33 aus dem Permanentkopf 20 hinausgleiten kann.As can be seen from FIG. 2, a bolt 26 connecting the permanent head 20 to the following link body 23 is flattened on two opposite sides 27, 27 '. From the bore 28 provided in the permanent head 20 for receiving this bolt 26 there is a slot 30 which is open towards the top 29 of the starting strand 13 and whose width 31 is slightly larger than the thickness 32 of the flattened part of the bolt 26, so that the bolt , which is connected in a rotationally fixed manner to the link body 23, can slide out of the permanent head 20 by pivoting the link body 23 following the permanent head by approximately 90 ° into the position shown in FIG. 2 and moving in the direction of the arrow 33.

Eine Hubeinrichtung für den Anfahrstrang umfaßt eine zweigeteilte, kreisbogenförmige, kufenartige Weiche 34, wobei ein Teil 35 an dem Strangführungsteil 11 und ein Teil 36 oberhalb dieses Strangführungsteiles gelenkig gelagert ist. Jeder dieser Teile kann mittels eines eigenen Druckmittelzylinders 37, 38 aus der in Fig. 1 strichpunktiert dargestellten Lage A bzw. B in die in Fig. 1 mit vollen Linien gezeichnete Lage A' bzw. B' geschwenkt werden, in der die zueinandergerichteten Enden dieser beiden Weichenteile 35, 36 miteinander fluchten. Oberhalb des über dem Strangführungsteil 11 angelenkten Weichenteiles 36 ist ein Treibrollenpaar 39 für den Anfahrstrang 13 vorgesehen, durch welches der Anfahrstrang, sobald er von diesem erfaßt ist, nach oben gefördert werden kann, wo er beispielsweise von einem Kran aufgenommen wird oder wo er auf eine Ablage gelangt.A lifting device for the starting line comprises a two-part, arcuate, skid-like switch 34, part 35 being articulated on the line guide part 11 and part 36 above this line guide part. Each of these parts can be pivoted by means of its own pressure medium cylinder 37, 38 from the position A or B shown in broken lines in FIG. 1 to the position A 'or B' drawn in full lines in FIG two switch parts 35, 36 are aligned. Above the flexible part 36 articulated above the strand guide part 11, a pair of driving rollers 39 is provided for the starting strand 13, through which the starting strand g , as soon as it is gripped by it, can be conveyed upwards, where it is picked up, for example, by a crane or where it is on a shelf arrives.

Die den Anfahrstrang vom Strangführungsteil 11 abhebende Hubeinrichtung, die von der Weiche 34 und dem Treibrollenpaar 39 gebildet wird, ist in einer Distanz hinter der Trenneinrichtung 12 angeordnet, die kleiner ist als die Länge des Anfahrstranges, sodaß der Anfahrstrang, wenn sein Permanentkopf zur Trenneinrichtung gelangt, bereits von der Hubeinrichtung erfaßt ist.Lifting the start-up line from the strand guide part 11 Lifting device, which is formed by the switch 34 and the pair of driving rollers 39, is arranged at a distance behind the separating device 12 which is smaller than the length of the starting line, so that the starting line is already covered by the lifting device when its permanent head reaches the separating device .

Die Funktion der Einrichtung ist folgende: Noch bevor der Anfahrstrang 13 mit seinem Fußteil 40 die Trennvorrichtung 12 erreicht, werden die Weichenteile 35, 36 in die in Fig. 1 voll ausgezogene Lage geschwenkt, sodaß der Fußteil 40 des Anfahrstranges über diese Weichenteile gleitet bis er von den Treibrollen 41 des Treibrollenpaares 39 erfaßt wird. Nachdem der Permanentkopf 20 durch Anheben der Rolle 19 vom Gußstrang gelöst ist, wird der Anfahrstrang 13 mit einer Geschwindigkeit, die größer ist als die Fördergeschwindigkeit des Gußstranges 5, hochgefördert, die verschwenkbare Rolle 19 wird durch Zurückschwenken wieder abgesenkt und der Gußstrang 5 gelangt zum Brennschneidrollgang 14, wo zunächst der Schopfanfang abgetrennt und der Gußstrang in Brammen vorgegebener Länge unterteilt wird.The function of the device is as follows: Even before the start-up strand 13 reaches the separating device 12 with its foot part 40, the switch parts 35, 36 are pivoted into the fully extended position in FIG. 1, so that the foot part 40 of the start-up strand slides over these switch parts until it slides is detected by the drive rollers 41 of the drive roller pair 39. After the permanent head is dissolved 20 by lifting the roller 19 from the cast strand, the dummy bar 13 with a speed which is greater, is highly promoted as the conveying speed of the cast strand 5, the pivotable roller 19 is lowered again by swinging back and Gußstran g 5 reaches the Flame cutting roller table 14, where the beginning of the crimp is first cut off and the cast strand is divided into slabs of a predetermined length.

Sollte sich der Permanentkopf 20 vom Gußstrang 5 nicht lösen lassen, was z.B. infolge mangelhafter Vorbereitung des Permanentkopfes oder durch Verklemmen eintreten kann, so werden die kufenartigen Weichenteile 35, 36 aus der in Fig. 1 mit vollen Linien dargestellten Lage A', B' in die strichpunktierte Lage A, B zurückverschwenkt und der Gußstrang wird weiter ausgefördert,bis er die in Fig. 1 strichliert dargestellte Lage erreicht hat. In dieser Lage nimmt der Permanentkopf 20 noch eine mit dem Gußstrang fluchtende Stellung ein; der restliche Teil des Anfahrstranges ist etwa vertikal nach oben gerichtet. Er wird von dem Treibrollenpaar 39 gehalten. In dieser Stellung läßt sich die in Fig. 2 im Detail dargestellte, hakenförmige Kupplung zwischen Permanentkopf und dem diesem Kopf folgenden Gliederkörper 23 des Anfahrstranges durch Hochfahren des Anfahrstranges in Richtung des Pfeiles 33 lösen, worauf der Gußstrang 5 weiter ausgefördert wird bis der Schopfanfang vom Brennschneider 17 am Brennschneidrollgang 14 abgetrennt werden kann. Es ist also nicht notwendig, in einer solchen Notsituation das Gießen abzubrechen, obwohl der Anfahrstrang 13 und der Gußstrang 5 von einer Stelle an (bei 12), die vor der Schneideinrichtung 15 liegt, auf getrennten Wegen ausgefördert werden.If the permanent head 20 cannot be detached from the cast strand 5, which can occur, for example, as a result of inadequate preparation of the permanent head or due to jamming, the skid-like switch parts 35, 36 become from the position A ', B' shown in full lines in FIG. 1 the dash-dotted layer A, B is pivoted back and the cast strand is conveyed further until it has reached the position shown in broken lines in FIG. 1. In this position, the permanent head 20 still occupies a position aligned with the cast strand; the remaining part of the start-up line is directed approximately vertically upwards. It is held by the pair of driving rollers 39. In this position, the hook shown in detail in FIG. 2 can be hooked Loosen the shaped coupling between the permanent head and the link body 23 of the starting strand following this head by raising the starting strand in the direction of arrow 33, whereupon the cast strand 5 is further conveyed until the beginning of the crimp can be separated from the flame cutter 17 on the flame cutting roller table 14. It is therefore not necessary to stop the casting in such an emergency situation, although the starting strand 13 and the casting strand 5 are discharged from one point (at 12), which lies in front of the cutting device 15, in separate ways.

Mit der in Fig. 1 dargestellten Einrichtung läßt sich der Anfahrstrang 13 auch in die Strangführung einfädeln. Die Treibrollen 41 des Treibrollenpaares 39 werden dann in umgekehrter Richtung-so lange angetrieben, bis mindestens der Permanentkopf von dem letzten Treibrollenpaar-10 des Strangführungsteiles 9 erfaßt ist, worauf der Anfahrstrang durch die Strangführung hindurch bis zur Kokille 1 fortbewegt wird.With the device shown in Fig. 1, the starting strand 13 can also be threaded into the strand guide. The drive rollers 41 of the drive roller pair 39 are then driven in the opposite direction until at least the permanent head is gripped by the last drive roller pair 10 of the strand guide part 9, whereupon the starting strand is moved through the strand guide to the mold 1.

Bei der in Fig. 3 dargestellten Ausführungsform ist die Stranggießanlage im wesentlichen gleich zu der in Fig. 1 dargestellten Stranggießanlage ausgebildet; einander entsprechende Teile sind mit gleichen Bezugszeichen versehen. Ein Unterschied ist bei der den Anfahrstrang 13 von der Strangführung 11 abhebenden Hubeinrichtung vorhanden. Die Hubeinrichtung 42 gemäß Fig. 3 umfaßt eine ortsfeste Führung 43, die am Gerüst 44 der Anlage befestigt ist. In dieser Führung ist ein an einer Traverse 45 befestigter Haken 46 vertikal geführt, wobei der Haken mittels Hubseilen 47 oder Hubketten von einem Hubwerk 48 angehoben werden kann. Auf der Gießbühne 49 ist auf Schienen 50 ein Transportwagen 51 geführt, der von der hinteren Aufnahmestellung, die mit vollen Linien gezeichnet ist, in die strichliert gezeichnete Einfädelstellung an die Kokille 1 verfahrbar ist. Auf dem Transportwagen 51 ist eine Gleit-oder Rollenbahn 52 angeordnet, deren vorderes Ende 53 und deren hinteres Ende 54 viertelkreisbogenförmig ausgebildet sind. Entlang der Gleit- bzw. Rollenbahn 52 ist in Längsrichtung des Transportwagens eine Verschiebeeinrichtung 55 hin- und herbewegbar. Im dargestellten Beispiel ist die Verschiebeeinrichtung als Wagen ausgebildet, der mittels Rädern 56 auf Schienen 57 des Transportwagens 51 geführt ist. Die Verschiebeeinrichtung 55 enthält eine Vertikalführung 58, die mit der ortsfesten Führung 43 fluchtet. Weiters ist an der Verschiebeeinrichtung 55 eine Mitnehmereinrichtung 59 vorgesehen, die einen händisch oder maschinell heb- und senkbaren Stift 60 aufweist.In the embodiment shown in FIG. 3, the continuous casting installation is essentially identical to the continuous casting installation shown in FIG. 1; corresponding parts are provided with the same reference numerals. There is a difference in the lifting device lifting the starting strand 13 from the strand guide 11. The lifting device 42 according to FIG. 3 comprises a fixed guide 43 which is attached to the frame 44 of the system. In this guide, a hook 46 fastened to a cross member 45 is guided vertically, the hook being able to be lifted by a lifting mechanism 48 by means of lifting ropes 47 or lifting chains. On the casting platform 49, a transport carriage 51 is guided on rails 50, which can be moved from the rear receiving position, which is drawn with full lines, into the threading position, shown in broken lines, on the mold 1. On the trolley 51 is a sliding or roller conveyor 52 is arranged, the front end 53 and the rear end 54 of which are designed in the shape of a quarter circle. A sliding device 55 can be moved back and forth along the slide or roller track 52 in the longitudinal direction of the transport carriage. In the example shown, the displacement device is designed as a carriage which is guided on rails 57 of the transport carriage 51 by means of wheels 56. The displacement device 55 contains a vertical guide 58 which is aligned with the stationary guide 43. Furthermore, a driver device 59 is provided on the displacement device 55, which has a pin 60 that can be raised and lowered manually or by machine.

In Fig. 3 ist der Anfahrstrang aus dem letzten Treibrol= lenpaar 10 austretend dargestellt. Der Fußteil 40 reicht gerade bis zum Haken 46 der Hubeinrichtung 42. In dieser Stellung wird das Hubwerk 48 der in hinterer Position befindlichen Verschiebeeinrichtung betätigt und der aus einzelnen Gliederkörpern 23, 24 bestehende Anfahrstrang 13 angehoben. Sobald der Permanentkopf 20 das letzte Treibrollenpaar 10 verlassen hat, wird die heb- und senkbare Rolle 19 gehoben, wodurch der Anfahrstrang 13 vom Gußstrang 5 getrennt wird. Der Anfahrstrang wird sodann ' gehoben bis der Haken 46 in die Führung 58 der Verschiebeeinrichtung 55 eingezogen ist. Die Verschiebeeinrichtung wird nunmehr in Längsrichtung des Transportwagens 51 zur Kokille 1 bewegt, wobei der Anfahrstrang über das viertelkreisbogenförmige hintere Ende 54 der Gleit- bzw. Rollenbahn 52 gelegt und über dem horizontalen Teil dieser Bahn gezogen wird. Dann wird der Haken vom Fußteil 40 des Anfahrstranges 13 ausgehängt und der Transportwagen 51 bis zur Kokille gefahren, bis er die in Fig. 3 strichliert dargestellte Stellung erreicht. Die Verschiebeeinrichtung 55 fährt anschließend wieder in die hintere Position. Der Stift 60 der Mitnehmereinrichtung 59 wird in eine Ausnehmung nahe dem Permanentkopf 20 des Anfahrstranges ein-' gesetzt und die Verschiebeeinrichtung 55 bis zum vorderen Ende des Transportwagens 51 gefahren und das Fußende des Anfahrstranges über das vordere Ende 53 der Rollenbahn 52 in die Kokille 1 eingefädelt bis der Fußteil 40 des Anfahrstranges 13 die ersten der angetriebenen Rollen, die mit 61 bezeichnet sind, der Strangführung erreicht hat und. von diesen gehalten wird. (Dies ist in Fig. 3 mit strichlierten Linien dargestellt.) Nach Entkuppeln des Stiftes 60 wird der Anfahrstrang in die Kokille eingezogen bis sein Kopf den Boden der Kokille abschließt. Nach Wegfahren des Transportwagens 51 kann mit dem Abguß begonnen werden.In Fig. 3, the starting strand is shown emerging from the last pair of driving rollers 10. The foot part 40 extends straight to the hook 46 of the lifting device 42. In this position, the lifting mechanism 48 of the displacement device located in the rear position is actuated and the starting strand 13 consisting of individual link bodies 23, 24 is raised. As soon as the permanent head 20 has left the last pair of driving rollers 10, the roller 19 which can be raised and lowered is lifted, as a result of which the starting strand 13 is separated from the casting strand 5. The dummy bar is is then 'lifted until the hook 46 in the guide 58 of the slider 55 retracted. The shifting device is now moved in the longitudinal direction of the transport carriage 51 to the mold 1, the starting strand being placed over the rear end 54 of the slide or roller track 52 in the shape of a quarter circle and being pulled over the horizontal part of this track. Then the hook is unhooked from the foot part 40 of the starting strand 13 and the transport carriage 51 is moved to the mold until it reaches the position shown in broken lines in FIG. 3. The displacement device 55 then moves back to the rear position. The pin 60 of the driver device 59 is in an off Assumption is inserted near the permanent head 20 of the start-up line and the displacement device 55 is moved to the front end of the transport carriage 51 and the foot end of the start-up line is threaded into the mold 1 via the front end 53 of the roller conveyor 52 until the foot part 40 of the start-up line 13 is the first of the driven rollers, designated 61, has reached the strand guide and. is held by these. (This is shown in FIG. 3 with dashed lines.) After the pin 60 has been uncoupled, the starting strand is drawn into the mold until its head closes off the bottom of the mold. After the transport carriage 51 has moved away, the casting can be started.

Nach einer abgewandelten Ausführungsform können Kokille und gegebenenfalls auch ein Strangführungsteil entfernt werden, wobei der Anfahrstrang in die Strangführung eingefädelt und eingezogen wird.According to a modified embodiment, the mold and possibly also a strand guide part can be removed, the starting strand being threaded into the strand guide and drawn in.

Sollte ein Trennen des Permanentkopfes vom Gußstrang nicht möglich sein, z.B. wegen eines Verschweißens des Gußstranges mit dem Permanentkopf, wird der Anfahrstrang,wie bei der Ausführungsform gemäß Fig. 1, in eine Position gebracht, bei der der Permanentkopf 20 noch horizontal fluchtend mit dem Gußstrang, der restliche Anfahrstrangteil jedoch rechtwinkelig dazu gerichtet ist, worauf die hakenförmige Kupplung 25-des Permanentkopfes 20 mit dem nächstfolgenden Gliederkörper 23 des Anfahrstranges durch Hochziehen des Anfahrstranges in Richtung des Pfeiles 33 gelöst wird. Bei der in Fig. 3 dargestellten Anlage ist erkennbar, daß der Aufwand für die den Anfahrstrang 13 der Kokille 1 zuführenden Einrichtungen wesentlich geringer ist als etwa bei einer Anlage, bei der der Anfahrstrang erst nach dem Brennschneidrollgang 14 von der Strangführung entfernt wird.If it is not possible to separate the permanent head from the cast strand, e.g. because of a welding of the cast strand to the permanent head, the start-up strand, as in the embodiment according to FIG. 1, is brought into a position in which the permanent head 20 is still aligned horizontally with the cast strand, but the rest of the start-up strand part is directed at right angles to it, whereupon the hook-shaped coupling 25 of the permanent head 20 with the next following link body 23 of the starting strand is released by pulling up the starting strand in the direction of arrow 33. In the system shown in Fig. 3 it can be seen that the effort for the devices supplying the starting strand 13 of the mold 1 is significantly less than, for example, in a system in which the starting strand is only removed from the strand guide after the flame cutting roller table 14.

In Fig. 4 ist eine der in Fig. 3 dargestellten Anlage
ähnliche Stranggießanlage dargestellt, wobei jedoch der Anfahrstrang 13 nach Hochheben mittels der Hubeinrichtung 62 nicht mittels eines Transportwagens sondern mittels einer Gleit- bzw. Rollenbahn 63 zur Kokille gefördert wird. Eine Verschiebeeinrichtung 64 zum Verschieben des Anfahrstranges entlang der Gleit- oder Rollenbahn ist ähnlich der in Fig. 3 dargestellten Verschiebeeinrichtung 55 ausgebildet. Die für sie vorgesehenen Schienen 57 sind ortsfest oberhalb der Gießbühne 49 angeordnet. Die zur Kokille führende Gleit- oder Rollenbahn für den Anfahrstrang weist viertelkreisbogenförmige Endteile 65, 66 auf, wobei der bei der Kokille angeordnete viertelkreisbogenförmige Endteil 65 mittels zweier Lenker 67, 68 am Gerüst 44 der Anlage angelenkt ist und mittels eines Druckmittelzylinders 69 von der in Fig.. 4 mit vollen Linien dargestellten Lage in die strichpunktiert dargestellte Lage verschwenkbar ist. Die Funktion dieser Anlage ist ähnlich der in Fig. 3 dargestellten Anlage. (Das Einfädeln des Anfahrstranges in die Strangführung durch die Kokille ist mit strichlierten Linien dargestellt.) Es entfällt jedoch im Unterschied zu der in Fig. 3 dargestellten Anlage beim Fördern des Anfahrstranges zur Kokille das Verfahren eines Transportwagens 51.
In Fig. 4 is one of the system shown in Fig. 3
Similar continuous casting system is shown, however, the starting strand 13 is not conveyed to the mold by means of a transport carriage but rather by means of a slide or roller conveyor 63 after lifting by means of the lifting device 62. A shifting device 64 for shifting the starting strand along the slide or roller track is designed similarly to the shifting device 55 shown in FIG. 3. The rails 57 provided for them are arranged in a stationary manner above the casting platform 49. The slideway or roller track leading to the mold for the starting strand has end parts 65, 66 in the form of a circular arc, the end part 65 in the form of a circular circle arranged in the mold is articulated on the frame 44 of the system by means of two links 67, 68 and by means of a pressure medium cylinder 69 from the one shown in FIG .. 4 position shown with full lines in the position shown in dash-dotted lines is pivotable. The function of this system is similar to that shown in FIG. 3. (The threading of the start-up strand into the strand guide through the mold is shown with dashed lines.) In contrast to the system shown in FIG. 3, there is no need to move a transport carriage 51 when conveying the start-up strand to the mold.

Auch bei der Ausführungsform gemäß Fig. 4 ist deutlich erkennbar, daß die den Anfahrstrang zur Kokille zuführende Einrichtung wesentlich weniger aufwendig gestaltet werden kann als bei einer Anlage, bei der der Anfahrstrang erst nach dem Brennschneidrollgang von der Strangführung abgehoben wird.Also in the embodiment according to FIG. 4 it can be clearly seen that the device feeding the starting strand to the mold can be designed to be considerably less complex than in a system in which the starting strand is only lifted off the strand guide after the flame cutting roller table.

Claims (7)

1. Einrichtung zum Trennen eines Anfahrstranges (23, 24) von einem Gußstrang (5) an einer Stranggießanlage mit einem bogenförmigen Strangführungsteil (6) und einem etwa horizontalen, eine Schneideinrichtung (15) für den Gußstrang aufweisenden Strangführungsteil (11, 14), insbesondere an einer Stahlbrammen-Stranggießanlage, wobei der Anfahrstrang einen in direktem Guß-Verbund mit dem Gußstrang verbindbaren, wiederverwendbaren Anfahrstrangkopf (20), einen sogenannten "Permanentkopf" aufweist, der mittels einer in der Strangführung angeordneten Trennvorrichtung (12) vom Gußstrang lösbar ist, und der Anfahrstrang mittels einer Hubeinrichtung (34; 39; 42; 62) von der Strangführung ausförderbar ist, dadurch gekennzeichnet, - daß die Trennvorrichtung (12) vor dem die Schneideinrichtung (15) aufweisenden Strangführungsteil (14) vorgesehen ist, - daß die Hubeinrichtung (34, 39; 42; 62) ebenfalls vor dem die Schneideinrichtung (15) aufweisenden Strangführungsteil (14) in kurzer Distanz hinter der Trennvorrichtung (12) angeordnet ist, u.zw. in einer Distanz die kürzer ist als die Länge des Anfahrstranges (13) - und daß als Verbindung zwischen dem Permanentkopf (20) und dem restlichen Anfahrstrang (23, 24) eine zur Anfahrstrangoberseite (29) zu offene hakenförmige Kupplung (25) vorgesehen ist. 1. A device for separating a starting strand (23, 24) from a cast strand (5) on a continuous casting installation with an arcuate strand guide part (6) and an approximately horizontal, a cutting device (15) for the cast strand having strand guide part (11, 14), in particular on a continuous steel slab caster, the starting strand having a reusable starting strand head (20) which can be connected in a direct cast connection with the casting strand, a so-called "permanent head", which can be detached from the casting strand by means of a separating device (12) arranged in the strand guide, and the starting strand can be removed from the strand guide by means of a lifting device (34; 39; 42; 62), characterized in that - That the separating device (12) is provided in front of the strand guide part (14) having the cutting device (15), - That the lifting device (34, 39; 42; 62) is also arranged in front of the strand guide part (14) having the cutting device (15) at a short distance behind the separating device (12), etc. at a distance that is shorter than the length of the starting strand (13) - And that as a connection between the permanent head (20) and the rest of the start-up line (23, 24) a hook-shaped coupling (25) which is open to the start-up line top (29) is provided. 2. Einrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Trennvorrichtung (12) nach einer in Ausziehrichtung des Stranges gesehen letzten Treibrolle (10) angeordnet ist.2. Device according to claim 1, characterized in that the separating device (12) is arranged after a last driving roller (10) seen in the pull-out direction of the strand. 3. Einrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß als Hubeinrichtung ein oberhalb der Strangführung angeordnetes Treibrollenpaar (39) sowie eine von der Strangführung (bei 11) abzweigende, als kufenartige Weiche (34) ausgebildete, zu dem Treibrollenpaar (39) führende Anfahrstrangführung vorgesehen ist (Fig. 1).3. Device according to claim 1 or 2, characterized in that a lifting device above the A pair of drive rollers (39) arranged in the strand guide and a start-up strand guide leading to the pair of drive rollers (39) and branching off from the strand guide (at 11) and designed as a skid-like switch (34) are provided (FIG. 1). 4. Einrichtung nach Anspruch 3, dadurch gekennzeichnet, daß die kufenartige Weiche (34) zweigeteilt ausgebildet ist, wobei ein Teil (35) an der etwa horizontalen Strangführung (bei 11) verschwenkbar und ein Teil (36) oberhalb dieser Strangführung (bei 11) verschwenkbar angelenkt ist und wobei der oberhalb der horizontal angeordneten Strangführung angeordnete Teil (36) aus einer mit dem in der Strangführung angeordneten Teil (35) fluchtenden Stellung über die Vertikale verschwenkbar ist (Fig. 1).4. Device according to claim 3, characterized in that the skid-like switch (34) is formed in two parts, a part (35) on the approximately horizontal strand guide (at 11) pivotable and a part (36) above this strand guide (at 11) is pivotably articulated and the part (36) arranged above the horizontally arranged strand guide can be pivoted from the vertical position (FIG. 1) from a position aligned with the part (35) arranged in the strand guide. 5. Einrichtung nach Anspruch 1 oder 2 mit einem eine Gleit- oder Rollenbahn aufweisenden Transportwagen, mit dem der Anfahrstrang zu einem Einlaufteil der Strangführung transportierbar ist, wobei der Transportwagen eine Fördereinrichtung für den Anfahrstrang trägt und die Gleit- oder Rollenbahn bogenförmige Endteile aufweist und wobei weiters auf dem Transportwagen die Hubeinrichtung zum Erfassen und Anheben des Anfahrstranges vorgesehen ist, dadurch gekennzeichnet, daß der Transportwagen (51) nur von einer Einfädelstellung bei der Kokille (1) bis in eine Aufnahmestellung vor der Schneideinrichtung (15) (in Ausziehrichtung des Stranges gesehen) und retour verfahrbar ist (Fig. 3).5. Device according to claim 1 or 2 with a transport carriage having a slide or roller conveyor, with which the start-up strand can be transported to an inlet part of the strand guide, the transport carriage carrying a conveyor for the start-up strand and the slide or roller conveyor having arcuate end parts, and wherein furthermore, the lifting device is provided on the transport carriage for grasping and lifting the starting strand, characterized in that the transport carriage (51) is only seen from a threading position in the mold (1) to a receiving position in front of the cutting device (15) (in the direction of pulling out the strand ) and can be moved back (Fig. 3). 6. Einrichtung nach Anspruch 1 oder 2 mit einer horizontalen Gleit- oder Rollenbahn zum Einbringen des Anfahrstranges, wobei die Gleit- oder Rollenbahn einen vorderen und hinteren, bogenförmig ausgebildeten Endteil aufweist und wobei entlang der Gleit- oder Rollenbahn eine Verschiebeeinrichtung verfahrbar ist, dadurch gekennzeichnet, daß die Gleit- oder Rollenbahn (63) von der Kokille (1) bis (in Ausziehrichtung des Stranges gesehen) vor die Schneideinrichtung (15) reicht (Fig. 4).6. Device according to claim 1 or 2 with a horizontal slide or roller track for introducing the start-up line, wherein the slide or roller track has a front and rear, arcuate end portion and along the slide or rollers a displacement device can be moved, characterized in that the slide or roller track (63) extends from the mold (1) to (viewed in the direction of pulling out the strand) in front of the cutting device (15) (FIG. 4). 7. Einrichtung nach den Ansprüchen 1 bis 6, dadurch gekennzeichnet, daß die hakenförmige Kupplung (25) einerseits einen an zwei einander gegenüberliegenden Seiten (27, 27') abgeflachten Bolzen (26) und anderseits eine den Bolzen aufnehmende Bohrung (28) sowie einen von der Bohrung ausgehenden, zur Oberseite (29) des Anfahrstranges (13) hin offenen Schlitz (30) zum Durchlaß des abgeflachten Bolzens (26) aufweist (Fig. 2).7. Device according to claims 1 to 6, characterized in that the hook-shaped coupling (25) on the one hand on two opposite sides (27, 27 ') flattened bolt (26) and on the other hand a bolt-receiving bore (28) and one from the bore, to the upper side (29) of the starting strand (13) open slot (30) for the passage of the flattened bolt (26) (Fig. 2).
EP81890032A 1980-03-05 1981-02-24 Arrangement for separating a starter bar from a cast strand in a continuous casting plant Expired EP0035988B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AT1202/80 1980-03-05
AT120280A AT365104B (en) 1980-03-05 1980-03-05 DEVICE FOR SEPARATING A START-UP HEAD HEAD COUPLABLE TO A START-UP STRAND FROM A CAST-STRING IN A CONTINUOUS CASTING SYSTEM

Publications (2)

Publication Number Publication Date
EP0035988A1 true EP0035988A1 (en) 1981-09-16
EP0035988B1 EP0035988B1 (en) 1983-07-13

Family

ID=3508818

Family Applications (1)

Application Number Title Priority Date Filing Date
EP81890032A Expired EP0035988B1 (en) 1980-03-05 1981-02-24 Arrangement for separating a starter bar from a cast strand in a continuous casting plant

Country Status (7)

Country Link
EP (1) EP0035988B1 (en)
JP (1) JPS56136259A (en)
AT (1) AT365104B (en)
BR (1) BR8101236A (en)
CA (1) CA1174829A (en)
DE (1) DE3160585D1 (en)
ES (1) ES500086A0 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0128328A1 (en) * 1983-05-11 1984-12-19 Concast Service Union Ag Method of separating the crop end of a cast strand by a shear in a continuous-casting plant
US4590984A (en) * 1981-11-27 1986-05-27 Sms Concast Inc. Dummy bar disconnecting arrangement
WO2017084880A1 (en) * 2015-11-18 2017-05-26 Primetals Technologies Austria GmbH Casting device of a continuous casting line and operation thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110039018A (en) * 2019-04-28 2019-07-23 中冶南方连铸技术工程有限责任公司 The online storing unit of flexible dummy bar

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU468819B2 (en) * 1973-08-08 1976-01-22 Uss Engineers And Consultants, Inc Method and apparatus for handling and top-charging a starter bar
DE2707735A1 (en) * 1976-02-26 1977-09-01 Voest Ag DEVICE FOR SEPARATING THE STARTING LINE FROM THE HOT LINE IN A CONTINUOUS CASTING PLANT
DE2744770A1 (en) * 1976-10-07 1978-04-13 Concast Ag EXTRACTION DEVICE FOR STUDDERS OR BLOCKS OF A MULTI-STRAND CASTING PLANT FOR STEEL AND A PROCESS FOR OPERATION
AT343834B (en) * 1976-02-26 1978-06-26 Voest Ag DEVICE FOR INTRODUCING A FLEXIBLE DRIVING LINE EQUIPPED WITH A TRAINING HEAD INTO A CONTINUOUS CASTING PLANT
DE2928783A1 (en) * 1978-08-04 1980-02-14 Voest Alpine Ag DEVICE FOR SEPARATING THE STARTING STRAND FROM THE WARM STRING IN THE STRAND GUIDE OF A CONTINUOUS CASTING SYSTEM

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5242404B2 (en) * 1974-02-07 1977-10-24
CH622194A5 (en) * 1977-06-09 1981-03-31 Concast Ag
JPS5914033Y2 (en) * 1978-03-28 1984-04-25 日立造船株式会社 Dummy bar storage device in continuous casting equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU468819B2 (en) * 1973-08-08 1976-01-22 Uss Engineers And Consultants, Inc Method and apparatus for handling and top-charging a starter bar
DE2707735A1 (en) * 1976-02-26 1977-09-01 Voest Ag DEVICE FOR SEPARATING THE STARTING LINE FROM THE HOT LINE IN A CONTINUOUS CASTING PLANT
AT340624B (en) * 1976-02-26 1977-12-27 Voest Ag DEVICE FOR SEPARATING THE STARTING LINE FROM THE HOT LINE IN A CONTINUOUS CASTING PLANT
AT343834B (en) * 1976-02-26 1978-06-26 Voest Ag DEVICE FOR INTRODUCING A FLEXIBLE DRIVING LINE EQUIPPED WITH A TRAINING HEAD INTO A CONTINUOUS CASTING PLANT
DE2744770A1 (en) * 1976-10-07 1978-04-13 Concast Ag EXTRACTION DEVICE FOR STUDDERS OR BLOCKS OF A MULTI-STRAND CASTING PLANT FOR STEEL AND A PROCESS FOR OPERATION
DE2928783A1 (en) * 1978-08-04 1980-02-14 Voest Alpine Ag DEVICE FOR SEPARATING THE STARTING STRAND FROM THE WARM STRING IN THE STRAND GUIDE OF A CONTINUOUS CASTING SYSTEM

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4590984A (en) * 1981-11-27 1986-05-27 Sms Concast Inc. Dummy bar disconnecting arrangement
EP0128328A1 (en) * 1983-05-11 1984-12-19 Concast Service Union Ag Method of separating the crop end of a cast strand by a shear in a continuous-casting plant
WO2017084880A1 (en) * 2015-11-18 2017-05-26 Primetals Technologies Austria GmbH Casting device of a continuous casting line and operation thereof
AT517976A1 (en) * 2015-11-18 2017-06-15 Primetals Technologies Austria GmbH Angießvorrichtung a continuous casting and its operation
AT517976B1 (en) * 2015-11-18 2019-11-15 Primetals Technologies Austria GmbH Angießvorrichtung a continuous casting and its operation

Also Published As

Publication number Publication date
CA1174829A (en) 1984-09-25
EP0035988B1 (en) 1983-07-13
JPH0224620B2 (en) 1990-05-30
BR8101236A (en) 1981-09-08
AT365104B (en) 1981-12-10
ATA120280A (en) 1981-05-15
JPS56136259A (en) 1981-10-24
ES8207003A1 (en) 1982-09-01
DE3160585D1 (en) 1983-08-18
ES500086A0 (en) 1982-09-01

Similar Documents

Publication Publication Date Title
DE3332022C2 (en)
DE2014915C3 (en) Drag chain conveyor system
DE3433685A1 (en) DEVICE FOR DEBURRING WORKPIECES
EP0035988B1 (en) Arrangement for separating a starter bar from a cast strand in a continuous casting plant
DE2143106A1 (en) Start-up device for a continuous caster
DE1815049B1 (en) Device for introducing and discharging a starting strand of a continuous casting plant
DE2208635B2 (en) METHOD AND DEVICE FOR RETRACTING THE DRIVE LINE INTO A CONTINUOUS CASTING GRILL
DE2710739C2 (en)
DE2625758C3 (en) Flame cutting machine
DE2714338C3 (en) Start-up line transport device
DE1297821B (en) Device for loosening the starting strand from the cast strand or for introducing it into a continuous casting mold
DE1921312B2 (en) APPROACH FOR A APPROACH DURING CONTINUOUS STEEL CASTING
DE2707734A1 (en) DEVICE FOR INTRODUCING A FLEXIBLE DRIVING LINE EQUIPPED WITH A TRAINING HEAD INTO A CONTINUOUS CASTING PLANT
EP3377245B1 (en) Casting starting device of a continuous casting line and operation thereof
DE2902788A1 (en) METHOD FOR ROLLING WIRE OR RODS
EP0060484B1 (en) Installation for guiding a rigid starting bar
DE102006023503B3 (en) Start-up chain assembly for continuous casting plant, comprises head and tapered transition section forming interchangeable component with limited-swing hinged joint
DE2262764C2 (en) Cast strand cutting device
EP0173218B1 (en) Extraction roller table of a bloom heating installation
DE1918191A1 (en) Start-up bolt head for continuous casting - plant
DE840753C (en) Process and device for the production of composite metal blocks in the continuous casting process
AT377934B (en) DEVICE FOR INTRODUCING A FLEXIBLE STARTING STRAND PROVIDED WITH A STARTING HEAD IN A CONTINUOUS CASTING SYSTEM
DE60100418T2 (en) Bending machine for metal bars with a length-adjustable support table
DE3504784A1 (en) METHOD AND DEVICE FOR CLEARING THE REMAINS IN STRING CASTING PLANTS, ESPECIALLY FOR STEEL STRIPS
DE3150175A1 (en) Apparatus for the continuous casting of metals

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): BE CH DE FR GB IT LU NL SE

17P Request for examination filed

Effective date: 19811021

ITF It: translation for a ep patent filed

Owner name: SOCIETA' ITALIANA BREVETTI S.P.A.

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): BE CH DE FR GB IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19830713

Ref country code: CH

Effective date: 19830713

REF Corresponds to:

Ref document number: 3160585

Country of ref document: DE

Date of ref document: 19830818

ET Fr: translation filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19831221

Year of fee payment: 4

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19831222

Year of fee payment: 4

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19840229

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19840229

Year of fee payment: 4

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

26 Opposition filed

Opponent name: MANNESMANN AKTIENGESELLSCHAFT

Effective date: 19840413

RDAG Patent revoked

Free format text: ORIGINAL CODE: 0009271

PLBN Opposition rejected

Free format text: ORIGINAL CODE: 0009273

RDAC Information related to revocation of patent modified

Free format text: ORIGINAL CODE: 0009299REVO

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: OPPOSITION REJECTED

27W Patent revoked

Effective date: 19850204

GBPR Gb: patent revoked under art. 102 of the ep convention designating the uk as contracting state
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19850901

27O Opposition rejected

Effective date: 19850204

D27W Patent revoked (deleted)
NLR2 Nl: decision of opposition
NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
GBPC Gb: european patent ceased through non-payment of renewal fee
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19871030

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19881118

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19900119

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19900120

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 19900122

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 19900123

Year of fee payment: 10

ITTA It: last paid annual fee
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Effective date: 19910225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Effective date: 19910228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19911101

EUG Se: european patent has lapsed

Ref document number: 81890032.6

Effective date: 19911002