DE549160C - Formwork holder - Google Patents

Formwork holder

Info

Publication number
DE549160C
DE549160C DE1930549160D DE549160DD DE549160C DE 549160 C DE549160 C DE 549160C DE 1930549160 D DE1930549160 D DE 1930549160D DE 549160D D DE549160D D DE 549160DD DE 549160 C DE549160 C DE 549160C
Authority
DE
Germany
Prior art keywords
formwork
formwork holder
ceiling
holder
support bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1930549160D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of DE549160C publication Critical patent/DE549160C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/18Devices for suspending or anchoring form elements to girders placed in ceilings, e.g. hangers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

Schalungshalter Die Erfindung betrifft einen an Deckenträgern anhängbaren gabligen Schalungshalter.Formwork holder The invention relates to one that can be attached to ceiling beams forked formwork holder.

Das Neue besteht darin, daß ein Auflagewinkel auf dem Gelenkbolzen der Haltearme des Schalungshalters durch eine auf dem Gelenkbolzen gelagerte Hubscheibe senkrecht verschiebbar ist. Im Scheitel des Auflagewinkels ist weiter ein vorspringender Anschlag und mit dem waagerechten Winkelschenkel des Auflagewinkels eine Auflageschiene verschiebbar verbunden, auf welche seitlich des Schalungshalters Dachlatten und Schalplatten auflegbar sind.The new thing is that a support bracket on the hinge pin the holding arms of the formwork holder by a lifting disc mounted on the hinge pin is vertically displaceable. At the apex of the support angle there is also a protruding one Stop and a support rail with the horizontal angle leg of the support bracket slidably connected, on which side of the formwork holder roof battens and Formwork panels can be placed.

Durch Anziehen der Hubscheibe können diese dann gegen die Eisenträger der Decken, insbesondere von Wohnhausdecken, angeklemmt werden. Als Schalung kanr. Holz verwendet werden, welches nach erfolgtem Betonverguß wieder zu entfernen ist, oder es können schlecht wärmeleitende Platten als Schalungsplatten benutzt werden, die mit dem aufgebrachten Beton fest binden und als Wärmeschutzplatten in der Decke verbleiben.By tightening the lifting disc, these can then be pressed against the iron girders the ceilings, especially those of residential buildings, are clamped on. As formwork canr. Wood is used, which has to be removed after the concrete has been poured, or poorly thermally conductive panels can be used as shuttering panels, which bind tightly with the applied concrete and act as thermal insulation panels in the ceiling remain.

Die gabligen Schalungshalter sind infolge ihrer Vorstellbarkeit dem jeweiligen Deckenträger sehr leicht anzupassen. Sie können nach erfolgtem Betonverguß wieder entfernt und stets neu verwendet werden. Dieses wird durch Schutzkappen erreicht, die über die freien Enden der Haltearme beim Ansetzen der Halter an die Deckenträger geschoben werden und die in ihrem unteren Teil offen sind und seitliche Aussparungen aufweisen. Die Haltearme sind gegeneinander verschränkt und liegen, obgleich sie zu jeder Seite der Hubscheibe angeordnet sind, mit ihren freien Enden in einer Ebene. Die Hubscheibe ist durch einen geeigneten Schlüssel zu verstellen. Die auf dem waagerechten Winkelschenkel verschiebbare Auflageschiene ist an beiden Seiten mit Stiften versehen, die zur Sicherung derselben dienen.The forked formwork holders are due to their imaginability very easy to adapt to the respective ceiling beam. You can after the concrete pouring can be removed again and used again and again. This is achieved by protective caps, the over the free ends of the retaining arms when attaching the holder to the ceiling beam be pushed and which are open in their lower part and lateral recesses exhibit. The holding arms are crossed against each other and lie, although they are arranged on each side of the lifting disc, with their free ends in one plane. The lifting disc can be adjusted with a suitable key. The one on the horizontal The angle leg of the sliding support rail is provided with pins on both sides, which serve to secure the same.

Auf der Zeichnung ist ein Ausführungsbeispiel des Erfindungsgegenstandes veranschaulicht, es zeigen: Abb. i den Schalungshalter in Ansicht, Abb. 2 einen Schnitt nach Linie A-B der Abb. i, Abb. 3 eine Abwicklung der auf die freien Ender_ der Haltearme aufsetzbaren Schutzkappe, Abb.4 einen Längsschnitt durch eine Betondecken einschalung, Abb. 5 einen Schnitt nach Linie C-D der Abb. i in vergrößertem Maßstabe, Abb.6 den Grundriß einer Deckeneinschalung mit Lage der Schalungshalter.The drawing shows an embodiment of the subject matter of the invention illustrates, it shows: Fig. i the formwork holder in view, Fig. 2 a Section along line A-B of Fig. I, Fig. 3 a development of the on the free Ender_ The protective cap that can be attached to the retaining arms, Fig. 4 shows a longitudinal section through a concrete ceiling shuttering, Fig. 5 a section along line C-D of Fig. i on an enlarged scale, Fig.6 the floor plan of a ceiling formwork with the position of the formwork holder.

Der Schalungshalter besteht aus zwei Haltearmen i, 2, die um einen Gelenkbolzen 3 schwenkbar sind. Ihre freien Enden sind durch Einschnitte 4 als Haken 5 ausgebildet. Zum Verstellen des Abstandes zwischen den Haltearmen i, 2 dient eine Schiene 6, welche einen Langschlitz 7 aufweist, in dem ein zum Festsetzen der Haltearme dienender Bolzen 8 geführt ist. Die Haltearme sind ferner verschränkt und tragen auf ihrem Gelenkbolzen 3 eine Hubscheibe 9 und einen senkrecht verschiebbaren Auflagewinkel io. Im Scheitel des Auflagewinkels io ist ein vorspringender Anschlag 18 - vorgesehen. Auf dem waagerechten Schenkel ii des Auflagewinkels io ist eine Auflageschiene 12 zum Tragen der Schalungsplatten 15 bzw. der Unterzughölzer 13 aufgelagert. Bei der Anordnung des Schalungshalters neben einer Wand wird die Auflageschiene 12 nur einseitig. aufgelagert, so =daß=ebenfal-ls=mttels _eines Unterzugholzes 13 die Schalungsplatten gegen die Deckenträger 16 anklemmbar sind.The formwork holder consists of two holding arms i, 2, around one Hinge pins 3 are pivotable. Their free ends are hooked through incisions 4 5 trained. To adjust the distance between the holding arms i, 2 is used Rail 6, which has an elongated slot 7 in which a for fixing the retaining arms Serving bolt 8 is performed. The holding arms are also crossed and carry on their hinge pin 3 a lifting disc 9 and a vertically displaceable one Support bracket ok In the vertex of the support bracket io there is a protruding stop 18 - provided. On the horizontal leg ii of the support bracket io is one Support rail 12 for supporting the formwork panels 15 or the supporting timbers 13 superimposed. When arranging the formwork holder next to a wall, the support rail 12 only one-sided. supported so = that = also = by means of a supporting timber 13 the formwork panels can be clamped against the ceiling girders 16.

Die Hubscheibe 9 besitzt eine Ausnehmung 14 und ist mittels eines Schlüssels zu verstellen. Der Schlüssel besitzt zu diesem Zweck einen Stift, der in die besagte Ausnehmung einfaßt. Durch Drehen der Hubscheibe 9 wird der Auflagewinkel io gehoben und klemmt die Unterzughölzer 13 mit den Schalungsplatten 15 fest gegen die Deckenträger 16 an.The lifting disc 9 has a recess 14 and is by means of a To adjust the key. For this purpose, the key has a pin that engages in said recess. By turning the cam 9, the support angle io lifted and clamps the joists 13 with the formwork panels 15 firmly against the ceiling beams 16.

Um nach erfolgter Erhärtung des Betons die Schalungshalter wieder entfernen zu können, sind Schutzkappen 17 auf die freien Enden der Haltearme 1, 2 gesetzt, die ,über den unteren Flansch der Deckenträger 16 zu liegen kommen. Die Schutzkappen sind nach oben und den Seiten geschlossen, so daß nichts von der Gußmasse der Decke in diese hineinlaufen kann. Die Abwicklung einer Schutzkappe ist in der Abb.3 dargestellt. Die Schutzkappen 17 verbleiben in der Decke, die später an der Unterseite geputzt wird. Das Herausnehmen der Schalungshalter aus den an beiden Seiten auf den freien Enden der Haltearme 1, 2 sitzenden Schutzkappen ist leicht durchzuführen, wobei nur die Feststellschraube 8 zu lösen ist und die Haltearme auseinanderzuspreizen sind.After the concrete has hardened, the formwork brackets again To be able to remove, protective caps 17 are on the free ends of the holding arms 1, 2 set, which come to rest over the lower flange of the ceiling support 16. the Protective caps are closed at the top and the sides, so that nothing of the casting compound the ceiling can run into it. The handling of a protective cap is in the Fig.3 shown. The protective caps 17 remain in the ceiling, which is later attached to the The underside is cleaned. Removing the formwork holder from both Pages on the free ends of the holding arms 1, 2 seated protective caps is easy carry out, whereby only the locking screw 8 is to be loosened and the retaining arms are to be spread apart.

Claims (2)

PATENTANSPRÜCFIE: i. An Deckenträgern anhängbarer gabliger Schalungshalter, dadurch gekennzeichnet, daß auf dem Gelenkbolzen (3) der Haltearme (i, 2) des Scralungshaltets ein Auflagewinkel (io) durch eine auf dem Gelenkbolzen (3) gelagerte Hubscheibe (9) senkrecht verschiebbar ist. PATENT CLAIM: i. Forked formwork holder that can be attached to ceiling beams, characterized in that on the hinge pin (3) of the holding arms (i, 2) of the Scralungshaltets a support bracket (io) through a lifting disc mounted on the hinge pin (3) (9) is vertically displaceable. 2. Schalungshalter nach Anspruch i, gekennzeichnet durch einen vorspringenden Anschlag (18) im Scheitel des Auflagewinkels (io) und durch eine auf dem waagerechten Winkelschenkel (ii) verschiebbare Auflageschiene (12).2. formwork holder according to claim i, characterized by a projecting stop (18) in the apex of the support bracket (io) and by a support rail that can be moved on the horizontal angle leg (ii) (12).
DE1930549160D 1930-08-26 1930-08-26 Formwork holder Expired DE549160C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE549160T 1930-08-26

Publications (1)

Publication Number Publication Date
DE549160C true DE549160C (en) 1932-04-27

Family

ID=6562200

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1930549160D Expired DE549160C (en) 1930-08-26 1930-08-26 Formwork holder

Country Status (1)

Country Link
DE (1) DE549160C (en)

Similar Documents

Publication Publication Date Title
DE3117409A1 (en) "CLIMBING FORMWORK"
DE2123351C3 (en) Formwork device for a reusable formwork of a composite floor
DE2624518B2 (en) Formwork scaffolding
DE2217584C3 (en) Climbing formwork for a concrete wall formwork
DE10127641A1 (en) Shuttering holder clamping to beam centers round threaded bar with top clamp nut to draw holding arms tight onto beam for all-round grip and security.
DE6603496U (en) FORMWORK FOR THE PRODUCTION OF CONTAINER-SHAPED CONCRETE STRUCTURES, SUCH AS SILOS OR THE LIKE.
DE2910325A1 (en) Reusable building site guard-rail holder - has clamp with mutually movable jaws at base of support bar
DE549160C (en) Formwork holder
EP0245704B1 (en) Height adjustable steel shore for forms for ceilings and the like
DE4204773A1 (en) Ceiling shuttering strut head with drop sleeve - is completely located below shuttering surface,with strut head part abutted by shuttering element(s)
EP0801188B1 (en) Overhang falsework for constructions
DE826971C (en) Work platform for the construction of factory chimneys
DE19922005A1 (en) Ledge working arrangement has working platform fixed to frame via crossbeam; platform bottom is rigidly attached via supporting elements to bracket for attachment to underside of ledge
DE19951457A1 (en) Covering for wall, particularly for upper side of brickwork, to which it is fixed, and has U-shaped cross-section, with legs of U engaging over top of wall
US3143328A (en) Scaffolding device
DE4412594A1 (en) Horizontal load-bearing member for structures
DE527114C (en) Hiking circuit
DE2012556C3 (en) Device for creating the formwork for concrete cornice caps, roadway edges or the like. on deck slabs of bridges
DE501759C (en) Formwork framework for ceilings with a level soffit
EP4183951A1 (en) Platform securing element, scaffolding and method for securing scaffolding platforms against lifting off
DE3445267A1 (en) Apparatus for supporting a freshly concreted ceiling
DE805311C (en) Sheet steel cladding
DE1921986A1 (en) Clamping device for supporting columns of prefabricated buildings
DE384698C (en) Truss-like formwork scaffolding
DE597937C (en) Circuit for concrete masonry