DE4445165A1 - Method of erecting electric grid pylons esp. for HV overhead power lines - Google Patents
Method of erecting electric grid pylons esp. for HV overhead power linesInfo
- Publication number
- DE4445165A1 DE4445165A1 DE19944445165 DE4445165A DE4445165A1 DE 4445165 A1 DE4445165 A1 DE 4445165A1 DE 19944445165 DE19944445165 DE 19944445165 DE 4445165 A DE4445165 A DE 4445165A DE 4445165 A1 DE4445165 A1 DE 4445165A1
- Authority
- DE
- Germany
- Prior art keywords
- stick
- quiver
- sliding part
- tree
- gripping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Supports For Plants (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren und eine Vorrichtung zum Errichten von Gittermasten, insbesondere für Hochspanungsfrei leitungen, mit aus einzelnen Teilstücken zusammengesetzten Schüssen und einer Höhe von wenigstens 100 Metern, bei welchen die einzelnen Teilstücke der jeweiligen Schüsse mittels Greif zügen in die jeweilige ihnen zugeordnete Position gebracht wer den und dort mit dem bereits bestehenden Mastschaft verbunden werden.The invention relates to a method and an apparatus for Erecting lattice masts, especially for high-voltage free lines, with composed of individual sections Shots and a height of at least 100 meters, at which the individual sections of the respective shots by gripping moves to their respective positions the and there connected to the existing mast mast will.
Es ist allgemein bekannt, bei der Errichtung von Gittermasten, insbesondere bei Gittermasten für Hochspannungsfreileitungen, Hebezeuge wie Krane, zum Beispiel Turmdrehkrane oder Autokrane, zu verwenden, um hiermit die für die einzelnen Mastschüsse benö tigten Einzelteile oder gegebenenfalls die jeweiligen Mast schüsse im Stück an den jeweiligen Einbauort zu heben.It is common knowledge when erecting lattice masts, especially for lattice towers for high-voltage overhead lines, Lifting devices such as cranes, for example tower cranes or mobile cranes, to be used in order to use the individual mast shots individual parts or, if applicable, the respective mast to lift shots in one piece to the respective installation location.
Die Verwendung von Kranen verursacht jedoch zusätzlichen Aufwand sowohl hinsichtlich der Kosten als auch bezüglich ihres Trans ports zu dein jeweiligen Errichtungsort des Gittermastes. Auch muß der Untergrund in der Umgebung des zu errichtenden Gitter mastes die auftretenden Bodenbelastungen aufnehmen können, was häufig die Verwendung speziell ausgerüsteter Autokrane erforder lich macht, die nicht immer verfügbar sind und daher die Errich tungsdauer und damit die Verfügbarkeit des Mastes und der zum Beispiel hieran zu inontierenden Freileitung beeinflussen.However, the use of cranes causes additional effort both in terms of costs and their trans ports to your respective erection site of the lattice tower. Also the subsurface must be in the vicinity of the lattice to be erected mastes can absorb the occurring soil loads what often requires the use of specially equipped mobile cranes that are not always available and therefore the Errich duration and thus the availability of the mast and the Influence the example of the overhead line to be installed.
Ausgehend von diesem Stand der Technik ist es Aufgabe der Erfin dung ein Verfahren der eingangs genannten Art anzugeben, welches die Errichtung eines Gittermastes ohne wesentliche Einschränkun gen auf einfache und vorteilhafte Weise ermöglicht. Auch soll eine Vorrichtung zur Durchführung des Verfahrens geschaffen wer den.Based on this state of the art, it is the task of the inventor to specify a procedure of the type mentioned at the beginning, which the erection of a lattice mast without significant restrictions conditions in a simple and advantageous manner. Also supposed to created a device for performing the method the.
Diese Aufgabe wird erfindungsgemäß durch die kennzeichnenden Merkmale des Patentanspruches 1 gelöst. Demgemäß ist erfindungs gemäß vorgesehen, daß die einzelnen Teilstücke jedes Mastschus ses mittels längeneinstellbarer Stockbäume, die mit den Greifzü gen zusammenarbeiten, an die ihnen zugeordnete Position gehoben werden, daß die Fußenden der Stockbäume unterhalb der Anschluße bene des neuen zu inontierenden Schusses von mit Greifzügen ge spannten Seilen gehalten werden, daß deren Mittelbereich am obersten bereits montierten Mastschuß befestigt wird und daß de ren Kopf ende soweit ausgefahren wird, daß es sich oberhalb der Anschlußebene des neu zu inontierenden Mastschusses befindet.This object is achieved by the characterizing Features of claim 1 solved. Accordingly, is fiction provided that the individual sections of each mast section ses by means of length-adjustable stick trees, which with the Grifzü working together, raised to their assigned position that the foot ends of the stick trees below the connections level of the new shot to be installed with grabs Tensioned ropes are held that the middle area on top mounted mast section is attached and that de Ren head end is extended so far that it is above the Connection level of the mast section to be newly installed is located.
Entsprechend einer bevorzugten Ausführungsform des erfin dungsgeinäßen Verfahrens kann ferner vorgesehen sein, daß der je weilige aus wenigstens einem Köcherteil und wenigstens einem darin geführten Schiebeteil gebildete Stockbaum im zusammenge schobenen Zustand in seine für die Bearbeitung des vorgesehenen Mastschusses erforderliche Montagestellung gebracht wird, daß nach Erreichen seiner Montagestellung der Stockbaum am bereits bestehenden Mastschaft derart befestigt wird, daß der obere Rand seines Köcherteils im Bereich des Eckstiels des Mastschaftes verankert wird und das Fußende des Köcherteils mittels Spannsei len stabilisiert wird, daß anschließend das Schiebeteil in die vorgesehene Arbeitsstellung ausgefahren wird, so daß sein Kopf ende den bereits bestehenden Mastschaft überragt, daß das Schiebeteil mit dem Köcherteil des Stockbaums in dieser Position verriegelt wird und daß am Kopfende des Schiebeteils Greifzüge angeschlossen werden für den Transport der zur Montage vorge sehenen Teilstücke des neuen zu inontierenden Mastschusses. According to a preferred embodiment of the invent Appropriate method can also be provided that the depending because of at least one quiver part and at least one guided sliding part formed in the stick tree together pushed condition in its intended for processing Mast shot required assembly position is brought that after reaching its assembly position, the stick tree on existing mast shaft is attached so that the upper edge its quiver part in the area of the corner stem of the mast shaft is anchored and the foot end of the quiver part by means of a tension cable len is stabilized that then the sliding part in the intended working position is extended so that its Head end of the already existing mast shaft towers over that Sliding part with the quiver part of the stick in this position is locked and that grips at the head of the sliding part be connected for the transport of the pre-assembled see sections of the new mast section to be installed.
Entsprechend einer vorteilhafter Weiterbildung des erfin dungsgeinäßen Verfahrens kann das Schiebeteil mittels wenigstens eines am oberen Rand des Köcherteils umgelenkten Seiles eines am Fußende angreifenden Greifzuges ausgefahren werden.According to an advantageous development of the inventor appropriate method, the sliding part by means of at least a rope deflected at the upper edge of the quiver part Attacking foot end are extended.
Eine andere bevorzugte Ausführungsform der Erfindung zeichnet sich dadurch aus, daß der Stockbauin mittels unterschiedlicher an seinem Fuß- und Kopfende angreifender Spannseile verschwenkt werden kann, um so das Kopfteil in die zur Positionierung des daran angehängten jeweiligen Teilstückes des neuen Mastschusses erforderliche Stellung zu bringen.Another preferred embodiment of the invention draws is characterized in that the Stockbauin by means of different his foot and head end attacking tension cables swiveled can be used to position the headboard in the position of the attached to each section of the new mast section to bring the required position.
Eine weitere Ausgestaltung des erfindungsgeinäßen Verfahrens sieht vor, daß zum Verlagern (Klettern) des Stockbaums in die Höhe dessen Kopf ende mittels Greifzügen in die höchstmögliche Position gezogen und dort verankert wird, daß die Verriegelung des Schiebeteils mit dein Köcherteil gelöst wird, daß das Köcher teil mittels am Kopf ende angeordneter Greifzüge nach oben bis gegen einen Anschlag gezogen und in dieser Stellung verankert wird und daß das Schiebeteil wieder auf die erforderliche Länge ausgefahren wird mit Hilfe wenigstens eines Seiles, das durch einen am Köcherteil angreifenden Greifzug beaufschlagt und am oberen Rand des Köcherteils umgelenkt wird.Another embodiment of the method according to the invention provides that for moving (climbing) the stick tree into the The height of its head end is reached by means of grabs in the highest possible Position is pulled and anchored there that the locking the sliding part with your quiver part is released that the quiver partly by means of grips arranged at the head end up to pulled against a stop and anchored in this position and that the sliding part back to the required length is extended with the help of at least one rope that goes through a gripping pull acting on the quiver part acted upon and the upper edge of the quiver part is deflected.
Eine Vorrichtung zur Durchführung des vorbeschriebenen erfin dungsgemäßen Verfahrens besteht aus einem Stockbaum, der aus wenigstens zwei teleskopartig ineinandergreifenden Teilen gebil det ist, die in jeder Stellung zueinander verriegelbar sind und über Greifzüge mit dein bereits errichteten Mastschaft zusam menarbeiten.A device for performing the above-described inventions The inventive method consists of a stick tree, which gebil at least two telescopically interlocking parts is det, which can be locked to each other in any position and together with your already erected mast shaft men work.
Um den Stockbaum auf die gewünschte Länge einstellen zu können, ist es erforderlich, den Stockbaum auf den Boden abzusenken, wo er dann au die vorgesehene Länge eingestellt und verriegelt wird. Diese umständliche und sehr zeitraubende Handhabung führt insbesondere bei großen Längen zu Problemen, da der Einsatz des Stockbaums im Mastinnern erfolgt und das Aufrichten des ausge fahrenen Stockbaums unter Umständen nicht möglich ist wegen feh lenden Freiraums.In order to be able to adjust the stick tree to the desired length, it is necessary to lower the cane to the floor where it is then set to the intended length and locked becomes. This cumbersome and very time-consuming handling leads problems with long lengths in particular, since the use of the Stick tree takes place inside the mast and the erection of the out can not be driven due to wrong lumbar free space.
Ausgehend hiervon ist es daher Aufgabe der Erfindung, eine Vor richtung zu schaffen, die eine einfachere Handhabung erlaubt.Based on this, it is an object of the invention to provide a create direction that allows easier handling.
Diese Aufgabe wird entsprechend Anspruch 6 erfindungsgemäß da durch gelöst, daß wenigstens je ein Köcherteil und ein Schiebe teil vorgesehen sind, das im Köcherteil geführt ist, daß ein am Fußende des Köcherteils angeordneter Greifzug über den oberen Rand des Köcherteils umgelenkt ist und mit dein Fußende des darin geführten Schiebeteils zusammenarbeitet und daß hierdurch das Schiebeteil betätigbar ist, das heißt, auf eine beliebige Aus fahrlänge einstellbar ist. Diese Handhabung erfolgt erfindungs gemäß vor Ort, das heißt bodenfern, im jeweiligen Montageab schnitt des zu inontierenden Mastes.This object is there according to claim 6 according to the invention solved by that at least one quiver part and a slide Are provided part that is guided in the quiver part that a Grip pull arranged at the foot end of the quiver part over the upper one Edge of the quiver part is deflected and with your foot end of it guided sliding part works together and that this Sliding part is actuated, that is, on any off travel length is adjustable. This handling is fiction according to on-site, i.e. away from the ground, in the respective assembly cut the mast to be installed.
Dabei ist der erfindungsgeinäße Stockbaum in vorteilhafter Weise derart ausgestaltet, daß in wenigstens einem Köcherteil jeweils ein Schiebeteil längsverschieblich geführt und mittels zweier am Fußende des außen befindlichen Köcherteils angreifender Greif züge betätigbar ist, daß das jeweilige Schiebeteil gegen unge wolltes Verschieben verriegelbar ist, daß am Fußende des außen befindlichen Köcherteils und am Kopfteil des innen befindlichen Schiebeteils jeweils wenigstens zwei Greifzug-Antriebe angeord net sind, welche mittels den Greifzug-Antrieben zugeordneter Seile den Stockbaum sowie daran angehängte Lasten halten.The stick tree according to the invention is advantageous designed such that in each case at least one quiver part a sliding part guided longitudinally and by means of two Gryphon attacking the foot end of the outside quiver part trains can be operated that the respective sliding part against unge want to move is lockable that at the foot of the outside located quiver part and on the head part of the inside Sliding part each arranged at least two gripping train drives net, which are assigned by means of the gripping train drives Ropes hold the stick and the loads attached to it.
Vorteilhafterweise kann hierbei vorgesehen sein, daß der Stock baum sich in an seinem Fußende angreifenden Seilen abstützt und durch unterschiedliche Änderung der Spannlänge dieser Seile ver schwenkbar ist, wobei das Köcherteil des Stockbaums auf das überragende, örtlich fixierte Schiebeteil im entlasteten Zustand aufschiebbar ist und in dieser neuen Stellung seinerseits fi xierbar ist.It can advantageously be provided that the stick tree is supported in ropes attacking its foot end and by changing the span length of these ropes is pivotable, the quiver part of the stick on the outstanding, locally fixed sliding part in the relieved state can be postponed and, in turn, fi in this new position is xizable.
Gemäß einer bevorzugten Ausführungsform der Erfindung ist der Stockbaum als Rohrkörper mit teleskopartig ineinandergreifenden Köcher- und Schiebeteilen ausgebildet. Dabei kann das Köcherteil und/oder das Schiebeteil als Hohlzylinder ausgebildet sein, aus welchen der Stockbaum zusammengesetzt ist.According to a preferred embodiment of the invention, the Stick tree as a tubular body with telescoping interlocking Quiver and sliding parts trained. The quiver part and / or the sliding part can be designed as a hollow cylinder which the stick tree is composed of.
Statt dessen kann der Stockbaum aber auch derart ausgebildet sein, daß das Köcherteil und/oder das Schiebeteil als Gitterrohr ausgebildet sind. So ist es gleichermaßen möglich, den komplet ten Stockbauin jeweils mit aus Vollrohren gebildeten Teleskoptei len zu bilden, wie auch den kompletten Stockbaum jeweils mit aus Vollrohren gebildetem Köcherteil und aus Gitterrohr gebildeten teleskopierbaren Schiebeteilen zu bilden, um hierdurch eine Gewichtsersparnis ohne Steifigkeitseinbuße zu erzielen.Instead, the stick tree can also be designed in this way be that the quiver part and / or the sliding part as a lattice tube are trained. So it is equally possible to complete the ten floors with telescopic parts made of solid tubes len, as well as the entire cane tree Solid tube formed quiver part and formed from tubular mesh telescopic sliding parts to form a To save weight without sacrificing rigidity.
Schließlich kann aber auch der komplette Stockbaum als Gitter konstruktion ausgebildet sein, das heißt mit Köcherteil und Schiebeteil aus Gitterrohr.Finally, the entire cane tree can be used as a grid be designed construction, that is, with quiver part and Sliding part made of tubular mesh.
Entsprechend einer vorteilhaften Weiterbildung der Erfindung kann ferner vorgesehen sein, daß der Stockbaum aus mehreren te leskopartig ineinandergreifenden Teilen zusammengesetzt ist. Dem gemäß besitzt der Stockbaum in seinem äußeren Köcherteil wenig stens ein weiteres Köcherteil, das gleichzeitig gegenüber dem äußeren Köcherteil verschiebbar ist und als Köcherteil für ein darin geführtes Schiebeteil dient.According to an advantageous development of the invention can also be provided that the stick tree from several te Interlocking parts are assembled like a telescope. The according to the stick tree has little in its outer quiver part Another quiver part that is at the same time opposite the outer quiver part is slidable and as quiver part for a sliding part guided therein serves.
Vorteilhafterweise weist die Länge des Stockbaums im aus gefahrenen Zustand wenigstens die Höhe eines Mastschusses auf. Dies kann sowohl mit einem zweiteiligen Stockbaum-Teleskop er reicht werden als auch mit einem mehrteiligen Stockbaum-Tele skop.The length of the stick tree advantageously shows in at least the height of a mast shot. This can be done with a two-part stock boom telescope be enough as well as with a multi-part stick tree telephoto skop.
Entsprechend einer zweckmäßigen Ausgestaltung der Erfindung er weist es sich als vorteilhaft, wenn der Stockbaum mit hydrau lisch betätigten Greifzügen versehen ist.According to an expedient embodiment of the invention, he it proves to be advantageous if the stick with hydrau lisch actuated pulls is provided.
Diese und weitere vorteilhafte Ausgestaltungen und Verbesserun gen der Erfindung sind Gegenstand der Unteransprüche. These and other advantageous refinements and improvements gene of the invention are the subject of the dependent claims.
Anhand der schematischen Zeichnung, in welcher ein Ausführungs beispiel der Erfindung dargestellt ist, sollen die Erfindung, vorteilhafte Ausgestaltungen und Verbesserungen der Erfindung sowie besondere Vorteile der Erfindung näher erläutert und beschrieben werden.Using the schematic drawing, in which an execution example of the invention is shown, the invention, advantageous refinements and improvements of the invention as well as special advantages of the invention explained in more detail and to be discribed.
Es zeigenShow it
Fig. 1 den oberen Teil eines Mastschaftes des zu errichtenden Mastes in Seitenansicht, Fig. 1 shows the upper part of a shaft of the mast, to be erected mast in a side view
Fig. 2 einen Stockbaum im zusammengeschobenen Zustand in Seiten ansicht, Fig. 2 view of a stick tree in collapsed condition into pages,
Fig. 3 den Stockbaum gemäß Fig. 2 im teilausgefahrenen Zustand. Fig. 3 shows the stick tree of FIG. 2 in the partially extended state.
In Fig. 1 ist ein oberer Abschnitt eines Mastes 10 in Seitenan sicht dargestellt, wobei es sich hier genauer gesagt um einen Mastschaft 18 handelt, der aus einzelnen Schüssen 12 gebildet ist. Jeder Schuß 12 ist hierbei aus einzelnen Teilstücke 13 zu sammen gesetzt, die aus entsprechenden Profilen, vorzugsweise Winkelprofilen, gebildet sind und als Eckstiele, Haut- und Ne benstegen Verwendung finden.In Fig. 1, an upper portion of a mast 10 is shown in Seitenan view, which is more specifically a mast shaft 18 , which is formed from individual shots 12 . Each shot 12 is here composed of individual sections 13 , which are formed from corresponding profiles, preferably angle profiles, and are used as corner posts, skin and ne benegen.
In Knotenpunkten 15 des Mastes 10 sind Seile 14 angelenkt, wel che mit Greifzügen 16 zusammenarbeiten, die an einem Stockbaum 20 angeordnet sind, der an den Seilen 14 hängend in dem Mast schaft 18 angeordnet ist. In dem in Fig. 1 gezeigten Mastschaft 18 befinden sich zwei baugleiche Stockbäume 20, von denen der linke Stockbaum 20 zusammen geschoben ist, wie er auch in Fig. 2 für sich allein dargestellt ist. Der rechte Stockbaum 20 in dem in Fig. 1 gezeigten Mastschaft 18 hingegen befindet sich im aus gefahrenen Zustand, wie er auch in Fig. 3 wiedergegeben ist. Zur Veranschaulichung der Größenverhältnisse sei noch darauf hinge wiesen, daß der Mast 10, in welchem der Stockbaum 20 angeordnet ist eine Höhe von ca. 250 m aufweist, daß ein einzelner Mast schuß 12 eine Höhe von etwa 20 m aufweist und daß der teilausge fahrene Stockbaum 20 etwa 35 m lang ist. In nodes 15 of the mast 10 , ropes 14 are articulated, which work with grips 16 , which are arranged on a stick tree 20, which is arranged on the ropes 14 hanging in the mast shaft 18 . In the example shown in Fig. 1 Mast shaft 18 are two identical Stock trees 20, of which the left Stock tree 20 is pushed together, as shown also in Fig. 2 on its own. The right stick tree 20 in the mast shaft 18 shown in FIG. 1, however, is in the extended state, as is also shown in FIG. 3. To illustrate the proportions, it should be pointed out that the mast 10 , in which the stick tree 20 is arranged has a height of about 250 m, that a single mast shot 12 has a height of about 20 m and that the partially extended stick tree 20 is about 35 m long.
In Fig. 2 ist, wie bereits angesprochen, ein einzelner Stockbaum 20 im zusammengeschobenen Zustand gezeigt, der als Gitterrohr- Konstruktion ausgebildet ist und aus einem äußeren Köcherteil 22 und einem darin verschiebbar und in jeder beliebigen Stellung fixierbaren, z. B. mittels Sperrgliedern, Steckbolzen, Keilen, Schrauben oder ähnliches, Schiebeteil 24. Am Fußende 25 und am Kopfende 26 des Stockbaums sind jeweils Anschlagpunkte für die Seile 14 vorgesehen beziehungsweise Greifzüge 16 angeordnet, welche die Seile 14 entsprechend beaufschlagen und führen.In Fig. 2, as already mentioned, a single stick tree 20 is shown in the pushed-together state, which is designed as a tubular structure and consists of an outer quiver part 22 and a slidable therein and fixable in any position, for. B. by means of locking members, socket pins, wedges, screws or the like, sliding part 24th At the foot end 25 and at the head end 26 of the stick tree, attachment points are provided for the ropes 14 and gripping pulls 16 are arranged which act on and guide the ropes 14 accordingly.
In Fig. 3 ist der Stockbaum gemäß Fig. 2 im teilausgefahrenen Zustand dargestellt, wobei für gleiche Teile sinnvoller Weise die gleichen Bezugsziffern verwendet wurden. Dabei zeigt sich, daß der Stockbaum 20 im maximal ausgefahrenen Zustand auf das etwa 1,5-fache der Grundlänge des Stockbaums, das heißt im zu sammen geschobenen Zustand, kommt. FIG. 3 shows the stick tree according to FIG. 2 in the partially extended state, the same reference numbers being used in a sensible manner for the same parts. It shows that the stick tree 20 comes to about 1.5 times the basic length of the stick tree in the maximum extended state, that is to say in the pushed-together state.
Hier nicht erkennbar kann der erfindungsgemäße Stockbaum 20 auch aus mehr als nur zwei relativ zueinander verschieblichen Teilen 22, 23, 24 bestehen. In diesen Fällen ist in das Köcherteil 22 ein weiteres Köcherteil 23 verschiebbar eingesetzt, welches sei nerseits das bereits erwähnte Schiebeteil 24 aufnimmt. Die Hand habung der Stockbäume 20 ist, wie nachfolgend erläutert, sehr einfach.Not recognizable here, the cane tree 20 according to the invention can also consist of more than just two parts 22 , 23 , 24 which are displaceable relative to one another. In these cases, a further quiver part 23 is slidably inserted into the quiver part 22 , which on the other hand accommodates the already mentioned sliding part 24 . The handling of the stick trees 20 is, as explained below, very simple.
Der Stockbaum 20 wird zunächst am Mastfuß in das Innere des zu errichtenden Mastes 10 eingebracht, dort aufgerichtet und an die am oberen Rand des Mastschaftes 18 befestigten Seile 14 ange hängt. Mit Hilfe der vorzugsweise am Stockbaum 20 angeordneten Greifzüge 16 wird der Stockbaum auf die vorgesehene Arbeitshöhe gehievt, und dort verankert. Dabei wird der Stockbaum 20 auf ge hängt, indem an seinem Fußende 25 Seile 14 befestigt sind, die mit Knotenpunkten im bereits errichteten Mastschaft 18 verbunden sind. Das obere Ende des Köcherteils 22 wird ebenfalls mit Hilfe von Seilen 14 mit dem Mastschaft 18 verbunden. Dabei sind pro Stockbaum vorzugsweise je vier Greifzüge 16 am Fußende 25 und am oberen Teil des Köcherteils 22 oder am Kopfende 24 vorgesehen, die vorteilhafterweise von hydraulischen Greifzugantrieben 28 beaufschlagt werden.The stick tree 20 is first introduced into the interior of the mast 10 to be erected on the mast foot, erected there and attached to the cables 14 fastened to the upper edge of the mast shaft 18 . With the help of the gripping cables 16 , which are preferably arranged on the cane 20 , the cane is lifted to the intended working height and anchored there. The stick tree 20 is suspended on ge by 25 ropes 14 are attached to its foot end, which are connected to nodes in the mast shaft 18 already erected. The upper end of the quiver part 22 is also connected to the mast shaft 18 with the aid of ropes 14 . Four stick trains 16 are preferably provided per stick tree at the foot end 25 and at the upper part of the quiver part 22 or at the head end 24 , which are advantageously acted upon by hydraulic grip train drives 28 .
Hier, das heißt vor Ort, wird anschließend der Stockbaum 20 auf die erforderliche Länge ausgefahren, wobei das Schiebeteil 24 mit Hilfe eines am oberen Rand des Köcherteils umgelenkten Sei les 14, das am unteren Ende des Schiebeteils 24 befestigt ist, aus dein Köcherteil 22 quasi herausgezogen wird.Here, that means on site, the stick tree 20 is then extended to the required length, the sliding part 24 with the aid of a deflected at the upper edge of the quiver part 14 , which is fastened to the lower end of the sliding part 24 , quasi from your quiver part 22 is pulled out.
Am Kopfende 26 des Stockbaums 20 kann nun ein Förderseil ange lenkt werden, mit welchem die einzelnen Teilstücke 13 des Mastes 10 hochgezogen werden können. Durch Einstellen unterschiedlicher Längen der den Stockbaum haltenden Seile 14 kann der Stockbaum 20 verlagert werden, so daß er beispielsweise von einem Eckstiel des Mastes 10 zu einem anderen Eckstiel versetzt werden kann.At the head end 26 of the cane 20 , a conveyor rope can now be steered, with which the individual sections 13 of the mast 10 can be pulled up. By setting different lengths of the ropes 14 holding the cane tree, the cane tree 20 can be displaced so that it can be moved, for example, from one corner post of the mast 10 to another corner post.
Insbesondere im Vergleich zu der bisher bekannten Möglichkeit, Masten 10 mittels zusätzlicher Hebezeuge, wie Krane, zu errich ten, zeigt sich der besondere Vorteil des neuen Verfahrens mit dem neuen Stockbaum 20, da hiermit keinerlei Begrenzung der Bau höhe des Mastes 10 verbunden ist, oberhalb welcher ein Einsatz eines Kranes nicht mehr möglich ist. Vielmehr ist es mit Hilfe der vorliegenden Erfindung möglich, Leitungsinasten oder gegebe nenfalls auch Sendeinasten oder ähnliches jeglicher Bauhöhe, das heißt mehrere hundert Meter hoch, zu errichten.Especially in comparison to the previously known option to errich masts 10 by means of additional hoists, such as cranes, shows the particular advantage of the new method with the new stick tree 20 , since this does not imply any limitation on the height of the mast 10 above which is no longer possible to use a crane. Rather, with the help of the present invention it is possible to set up line inputs or, where appropriate, also transmit inputs or the like of any overall height, that is to say several hundred meters high.
Das besondere der vorliegenden Erfindung beruht darauf, daß der Stockbaum in seiner Länge variabel einstellbar gestaltet ist, so daß er stets an die jeweiligen geometrischen Gegebenheiten vor Ort, das heißt in der Höhe, angepaßt werden kann. Er muß also nicht zur Änderung seiner Länge jedesmal auf den Boden abgelas sen werden, wo Teile angefügt oder entfernt werden, sondern durch die teleskopartige Verschiebbarkeit der ineinander grei fenden Köcherteile 22 und Schiebeteile 23, 24 kann jede belie bige Länge zwischen einer Grundlänge des Stockbaums 20 im zusam mengeschobenen Zustand und einer Größtlänge im maximal ausgefah renen Zustand verstellt und an die jeweiligen Erfordernisse an gepaßt werden.The special feature of the present invention is based on the fact that the length of the stick tree is designed to be variably adjustable, so that it can always be adapted to the respective geometrical conditions on site, that is to say in height. So it does not have to be changed to change its length each time on the floor where parts are added or removed, but due to the telescopic displaceability of the interlocking quiver parts 22 and sliding parts 23 , 24 , any length between a basic length of the stick tree 20th adjusted in the pushed together state and a maximum length in the maximum extended state and adapted to the respective requirements.
Claims (15)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19944445165 DE4445165C2 (en) | 1994-12-17 | 1994-12-17 | Method and stick tree for erecting lattice masts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19944445165 DE4445165C2 (en) | 1994-12-17 | 1994-12-17 | Method and stick tree for erecting lattice masts |
Publications (2)
Publication Number | Publication Date |
---|---|
DE4445165A1 true DE4445165A1 (en) | 1996-06-20 |
DE4445165C2 DE4445165C2 (en) | 2000-02-17 |
Family
ID=6536180
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19944445165 Expired - Fee Related DE4445165C2 (en) | 1994-12-17 | 1994-12-17 | Method and stick tree for erecting lattice masts |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE4445165C2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19803954A1 (en) * | 1998-02-02 | 1999-08-05 | Alstom Energietechnik Gmbh | Mast raising procedure for use in high voltage overhead line construction |
EP0942119A3 (en) * | 1998-03-11 | 2000-07-05 | ABBPATENT GmbH | Device for increasing the height of a high tension cable mast |
DE102013104797A1 (en) | 2013-05-08 | 2014-11-13 | Günter Rimmele | Device and method for pole mounting with an inner tree trunk |
AT524042B1 (en) * | 2020-11-17 | 2022-02-15 | European Trans Energy Gmbh | Cane tree tour |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1932768A (en) * | 1930-09-29 | 1933-10-31 | Frederick W Coffing | Method of and apparatus for line pole replacement |
DE1937275A1 (en) * | 1968-07-25 | 1970-01-29 | Harnischfeger Corp | Telescopic boom for cranes |
DE2101505A1 (en) * | 1971-01-14 | 1972-08-03 | Fuchs Fa Johannes | Jib crane |
DE2155446A1 (en) * | 1971-11-08 | 1973-05-30 | Kurt Guenter Immeyer | TELESCOPIC BOOM |
DE1531160B2 (en) * | 1967-08-03 | 1974-05-30 | Ruston-Bucyrus Ltd., Lincoln (Grossbritannien) | crane |
DE3343343A1 (en) * | 1982-12-15 | 1984-06-20 | Hiab-Foco AB, Hudiksvall | Crane jib |
DE3608771A1 (en) * | 1986-03-15 | 1987-09-24 | Bbc Brown Boveri & Cie | Inner tiered pole |
DE3744393A1 (en) * | 1987-03-12 | 1988-09-22 | Takraf Schwermasch | LOCKING A TELESCOPIC BOOM |
DE4301467A1 (en) * | 1993-01-21 | 1994-07-28 | Abb Patent Gmbh | Method and device for extending an overhead line mast in operation |
-
1994
- 1994-12-17 DE DE19944445165 patent/DE4445165C2/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1932768A (en) * | 1930-09-29 | 1933-10-31 | Frederick W Coffing | Method of and apparatus for line pole replacement |
DE1531160B2 (en) * | 1967-08-03 | 1974-05-30 | Ruston-Bucyrus Ltd., Lincoln (Grossbritannien) | crane |
DE1937275A1 (en) * | 1968-07-25 | 1970-01-29 | Harnischfeger Corp | Telescopic boom for cranes |
DE2101505A1 (en) * | 1971-01-14 | 1972-08-03 | Fuchs Fa Johannes | Jib crane |
DE2155446A1 (en) * | 1971-11-08 | 1973-05-30 | Kurt Guenter Immeyer | TELESCOPIC BOOM |
DE3343343A1 (en) * | 1982-12-15 | 1984-06-20 | Hiab-Foco AB, Hudiksvall | Crane jib |
DE3608771A1 (en) * | 1986-03-15 | 1987-09-24 | Bbc Brown Boveri & Cie | Inner tiered pole |
DE3744393A1 (en) * | 1987-03-12 | 1988-09-22 | Takraf Schwermasch | LOCKING A TELESCOPIC BOOM |
DE4301467A1 (en) * | 1993-01-21 | 1994-07-28 | Abb Patent Gmbh | Method and device for extending an overhead line mast in operation |
Non-Patent Citations (1)
Title |
---|
ACIER-STAHL-STEEL, Nr.5, 1968, S.242,243 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19803954A1 (en) * | 1998-02-02 | 1999-08-05 | Alstom Energietechnik Gmbh | Mast raising procedure for use in high voltage overhead line construction |
DE19803954B4 (en) * | 1998-02-02 | 2008-02-14 | Edi.Son Energietechnik Gmbh | Method and device for raising masts |
EP0942119A3 (en) * | 1998-03-11 | 2000-07-05 | ABBPATENT GmbH | Device for increasing the height of a high tension cable mast |
DE102013104797A1 (en) | 2013-05-08 | 2014-11-13 | Günter Rimmele | Device and method for pole mounting with an inner tree trunk |
AT524042B1 (en) * | 2020-11-17 | 2022-02-15 | European Trans Energy Gmbh | Cane tree tour |
AT524042A4 (en) * | 2020-11-17 | 2022-02-15 | European Trans Energy Gmbh | Cane tree tour |
Also Published As
Publication number | Publication date |
---|---|
DE4445165C2 (en) | 2000-02-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1861564B1 (en) | Working platform | |
DE2806081C2 (en) | Mast, especially for wind turbines | |
EP3658482A1 (en) | Rotary tower crane | |
DE9414643U1 (en) | Device for assembling building sections on top of each other | |
WO2009118198A2 (en) | Device for demolishing constructions | |
DE202016005419U1 (en) | Crane and counterweight for a crane | |
DE4445165A1 (en) | Method of erecting electric grid pylons esp. for HV overhead power lines | |
DE3201067C2 (en) | Telescopic mast | |
AT506952B1 (en) | MAINTENANCE SYSTEM | |
DE102004060653B4 (en) | Formwork arrangement and method for constructing a formwork arrangement | |
DE102011010042A1 (en) | Three boom for e.g. displacing tombs, has leg divided into two leg sections, which are guided into each other and provided with adjusting device that mechanically continuously telescopes total leg length under load | |
DE1481809A1 (en) | Device for erecting and folding down masts or lattice masts, particularly applicable to cranes and hoists | |
DE3329210A1 (en) | Inclined hoist | |
EP2025859A1 (en) | Deep drilling device and method for mounting a deep drilling device | |
DE1198981B (en) | Assembly device for tube antenna elements and mast structures | |
DE2742417A1 (en) | Tubular electric steel cable mast - has pair of arms extending from two sides, with tubular, interfitting frusto-conical sections | |
DE102014110824B4 (en) | A tower-like amusement device and method for constructing an amusement device | |
DE1291079B (en) | Collapsible crane with a telescopic mast | |
DE102013202235A1 (en) | Crane with a kit for the removal of a jib of crane in height | |
DE2628016A1 (en) | MOBILE CRANE WITH TELESCOPIC BOOM AND EQUIPMENT WITH ADDITIONAL BOOM DEVICES | |
DE2157669A1 (en) | PROCEDURE AND DEVICE FOR ASSEMBLING A STRUCTURE, IN PARTICULAR A GENTLE CRANE | |
DE1759014A1 (en) | Drill rig | |
DE2064511A1 (en) | Method for erecting a mast structure or the like | |
DE3911044C2 (en) | ||
DE1949674U (en) | DEVICE FOR MANIPULATING ROOM-LARGE STRUCTURES, IN PARTICULAR PRE-FABRICATED GARAGES. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
8110 | Request for examination paragraph 44 | ||
D2 | Grant after examination | ||
8320 | Willingness to grant licenses declared (paragraph 23) | ||
8364 | No opposition during term of opposition | ||
8327 | Change in the person/name/address of the patent owner |
Owner name: ABB PATENT GMBH, 68526 LADENBURG, DE |
|
8327 | Change in the person/name/address of the patent owner |
Owner name: ABB LEITUNGSBAU GMBH, 68309 MANNHEIM, DE |
|
8327 | Change in the person/name/address of the patent owner |
Owner name: LTB LEITUNGSDAU GMBH, 01139 DRESDEN, DE |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |