DE3517724A1 - LAYING SYSTEM FOR BRIDGE ELEMENTS - Google Patents
LAYING SYSTEM FOR BRIDGE ELEMENTSInfo
- Publication number
- DE3517724A1 DE3517724A1 DE19853517724 DE3517724A DE3517724A1 DE 3517724 A1 DE3517724 A1 DE 3517724A1 DE 19853517724 DE19853517724 DE 19853517724 DE 3517724 A DE3517724 A DE 3517724A DE 3517724 A1 DE3517724 A1 DE 3517724A1
- Authority
- DE
- Germany
- Prior art keywords
- bridge
- laying system
- boom
- short
- laying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/12—Portable or sectional bridges
- E01D15/127—Portable or sectional bridges combined with ground-supported vehicles for the transport, handling or placing of such bridges or of sections thereof
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Description
Y 83Y 83
Verlegesystem für BrückenelementeLaying system for bridge elements
Die Erfindung bezieht sich auf ein Verlegesystem für übereinander auf einem Fahrzeug angeordnete Brückenelemente nach dem Oberbegriff des Anspruchs 1.The invention relates to a laying system for bridge elements arranged one above the other on a vehicle the preamble of claim 1.
Es ist ein Brückenlegepanzer bekannt (Zeitschrift 'Soldat und Technik' 2/1976 Seiten 62 bis 68), der Einrichtungen zum Verlegen einer Brücke aufweist, die aus zwei Brückenelementen besteht und langer als das Fahrzeug ausgeführt ist. Die beiden Brückenelemente sind auf dem Fahrzeug zum Transport übereinander angeordnet und werden zum Verlegen auf dem Fahrzeug zu einer einzigen durchgehenden, fahrbereiten Brücke zusammengesetzt, die über einen fahrzeugseitigen Hauptausleger und einen weiteren Heckauslegerarm am Boden absetzbar ist. Die Einrichtung zum Verlegen, wie z.B. ein Hauptausleger, eine Vorschubeinrichtung und Stützrollen am Hauptausleger, Hilfsarmen und dergleichen arbeiten beim Kuppelvorgang der Brücken elemente sowie beim eigentlichen Verlegevorgang mit entsprechenden Einrichtungen an der Brücke zusammen. Bei diesem Konzept eines Brückenlegepanzer ist jeweils auf dem Panzer nur eine Brücke angeordnet und somit nur eine Brücke zu verlegen, so daß bei einer weiteren überquerung eines Flusses oder dergleichen der Verlegepanzer entweder eine neue Brücke aufnehmen muß oder ein weiterer Verlegepanzer mit Brücke zur Verfügung steht. Es ist zwar ein Brückenlegepanzer mit zwei aufeinander angeordneten Brücken bekannt (DE-OS 32 05 563), die aber nur gemeinsam abgelegt werden können. Die obenliegende Brücke muß nachfolgend zu einem weiteren Einsatz wieder aufgenommen werden, was zeitlich relativ aufwendig ist.There is a bridge laying tank known (magazine 'Soldat und Technik' 2/1976 pages 62 to 68), the facilities for Has laying a bridge, which consists of two bridge elements and is designed to be longer than the vehicle. The two Bridge elements are arranged one above the other on the vehicle for transport and are used for laying on the vehicle a single continuous, ready-to-drive bridge, which has a main boom on the vehicle and another tail boom arm can be set down on the ground. the Equipment for laying, such as a main boom, a feed device and support rollers on the main boom, auxiliary arms and the like work during the coupling process of the bridge elements and during the actual laying process with appropriate Facilities on the bridge together. With this concept a bridge-laying tank is only on the tank arranged a bridge and thus only one bridge to be laid, so that when another crossing of a river or like the armored armored personnel carrier either has to accommodate a new bridge or another armored armored vehicle with a bridge for Available. Although there is a bridge armor with two bridges arranged on top of one another known (DE-OS 32 05 563), the but can only be filed together. The overhead bridge must then be used again for another use be recorded, which is relatively time-consuming.
Aufgabe der Erfindung ist es, ein Verlegesystem für einen Brückenlegepanzer der eingangs genannten Art zu schaffen, mit dem überfahrbare Brücken verlegbar sind.The object of the invention is to create a laying system for a bridge armor of the type mentioned at the outset, with the bridges that can be traversed can be laid.
- -4- - Y 83- -4- - Y 83
Diese Aufgabe wird erfindungsgemäß durch die Merkmale des Anspruchs 1 gelöst. Weitere vorteilhafte Merkmale beinhalten die Unteransprüche.According to the invention, this object is achieved by the features of Claim 1 solved. The subclaims contain further advantageous features.
Die mit der Erfindung hauptsächlich erzielten Vorteile bestehen darin, daß zwei überfahrbereite Kurzbrücken, etwa in der Länge einer bekannten Brückenhälfte, aus einer übereinander angeordneten Stellung einzeln und nacheinander verlegt werden. Die Verlegeeinrichtung des Brückenlegepanzers "Biber" gemäß der Zeitschrift 'Soldat und Technik1 kann mit wenigen Modifikationen zum Absetzen der Kurzbrücken mit entsprechend konstruktiven Anpassungen an der Kurzbrücke verwendet werden. Das Verlegen der Biberbrücke bleibt uneingeschränkt erhalten. Hierdurch ergibt sich in vorteilhafter Weise eine Erweiterung des Verwendungsbereiches des bekannten Brückenlegepanzers. The main advantages achieved by the invention are that two short bridges ready to be driven over, approximately the length of a known bridge half, are laid individually and one after the other from a position one above the other. The laying device of the bridge-laying tank "Biber" according to the magazine 'Soldat und Technik 1' can be used with a few modifications to lower the short bridges with corresponding structural adjustments to the short bridge. The laying of the beaver bridge remains unrestricted. This advantageously results in an expansion of the range of use of the known bridge-laying armor.
Ein Ausführungsbeispiel der Erfindung ist in der Zeichnung dargestellt und wird im folgenden näher beschrieben.An embodiment of the invention is shown in the drawing and is described in more detail below.
Es zeigtIt shows
Fig. 1 eine Seitenansicht eines Brückenlegepanzers mit aufgesattelten Einzelbrücken in Transportstellung,1 shows a side view of a bridge-laying tank with saddled-on individual bridges in the transport position,
Fig. 2 ein vorderes Rampenende einer Kurzbrücke mit Einfahrtaschen und der Anordnung von Stützrollen eines Hauptauslegers,2 shows a front end of the ramp of a short bridge with entry pockets and the arrangement of support rollers of a main boom,
Fig. 3 eine Verriegelungseinrichtung am heckseitigen Auslegerarm,3 shows a locking device on the rear arm,
Fig. 3a eine schematische Darstellung des Anlenkungsschemas der Sicherungskappe,3a shows a schematic representation of the articulation scheme of the securing cap,
Fig. 4 ein quer verstellbares Ritzel einer Vorschubeinrichtung, 4 shows a transversely adjustable pinion of a feed device,
Fig. 4a eine fliegend gelagerte Kolben-Zylinder-Einheit als Verstellglied,4a shows an overhung piston-cylinder unit as an adjusting member,
12 ein Verlegeablauf der beiden Kurzbrücken, eine Seitenansicht der Kurzbrücken mit Laufrollen, eine Anordnung der Brücken in Transportstellung mit einer in der Tasche angeordneten Laufrolle, und12 a laying sequence of the two short bridges, a side view of the short bridges with rollers, an arrangement of the bridges in the transport position with a roller arranged in the pocket, and
Fig. 15 einen Querschnitt in schematischer Darstellung der in Transportstellung gemäß Fig. 14 angeordneten Brücken.15 shows a cross section in a schematic representation of the bridges arranged in the transport position according to FIG.
- & - Y 83 - & - Y 83
Auf einem Kettenfahrzeug 1 sind zwei Kurzbrücken 2 und 3 übereinander in einer bereiten Verlegeposition gehalten. Am Fahrzeug 1 ist vorderseitig ein schwenkbarer Hauptausleger 4 vorgesehen, der zur Aufnahme der unteren Brücke 3 mit Stützrollen 5, 6 aufweisenden Rollwagen versehen ist, die in Laufschienen 7 der Brücke 3 angeordnet sind. Heckseitig des Fahrzeugs 1 ist ein weiterer Auslegerarm 8 angelenkt, der das andere Ende der Brücke 3 hält. Die obenliegende Brücke 2 stützt sich mit ihrem vorderen Bereich a auf der unteren Brücke 3 ab. über den heckseitigen Auslegerarm 8 erfolgt eine weitere Abstützung des hinteren Endes der Brücke 3. Desweiteren ist am Hauptausleger 4 noch ein Hilfsarm 8a angelenkt.On a tracked vehicle 1 there are two short bridges 2 and 3 one above the other held in a ready laying position. On the front of the vehicle 1 is a pivotable main boom 4 provided, which is provided for receiving the lower bridge 3 with support rollers 5, 6 having trolleys, which in Running rails 7 of the bridge 3 are arranged. At the rear of the vehicle 1, a further extension arm 8 is articulated, which other end of bridge 3 holds. The overhead bridge 2 is supported with its front area a on the lower bridge 3. The rear end of the bridge 3 is further supported via the rear cantilever arm 8 Main boom 4 is also articulated an auxiliary arm 8a.
Die Brücken 2 und 3 sind in der Weise aufeinander liegend angeordnet, daß die obenliegende Brücke 2 mit dem Bereich 9 ihrer planen ünterflache 10 auf der vorderen Auffahrrampe 11 der am Fahrzeug 1 gehaltenen unteren Brücke 3 aufliegt. Durch eine baugleiche Ausbildung kann die Brücke 3 auch auf der Brücke 2 liegen. Das hintere Ende der obenliegenden Brücke 2 ist über eine Halteeinrichtung 12 mit dem heckseitigen Auslegerarm 8 verbunden.The bridges 2 and 3 are arranged one on top of the other in such a way that the overhead bridge 2 with the area 9 their flat surface 10 on the front ramp 11 the lower bridge 3 held on the vehicle 1 rests. Due to an identical training, the bridge 3 can also be on the Bridge 2 lie. The rear end of the overhead bridge 2 is connected to the rear end via a holding device 12 Cantilever arm 8 connected.
Zum Ablegen arbeiten die Brücken mit einer Vorschubeinrichtung zusammen. Diese umfaßt im wesentlichen zu beiden Seiten des Hauptauslegers 4 angeordnete Ritzel 14, die mit einer Leiterverzahnung 15 an der Brücke in Eingriff stehen (Fig. 2 und 4).The bridges work together with a feed device for depositing. This essentially comprises on both sides of the Main boom 4 arranged pinion 14 with a ladder toothing 15 are engaged on the bridge (Figs. 2 and 4).
Wie Fig. 4a näher zeigt, ist der Stellzylinder 22 fliegend an einer Wand des Hauptauslegers 4 gelagert. Die Kolbenstange 22a des Zylinders ist mit einem Haltering 22b des Ritzels 14 verbunden, so daß bei einer Ansteuerung des Stellzylinders eine Verstellung des Ritzels erfolgt.As FIG. 4a shows in more detail, the adjusting cylinder 22 is overhung on a wall of the main boom 4. The piston rod 22a of the cylinder is connected to a retaining ring 22b of the pinion 14, so that when the actuating cylinder is activated the pinion is adjusted.
Zum Verlegen der Brücke 3 aus einer Transportstellung A in eine Arbeitsstellung B wird diese gemäß Fig. 6 in Fahrtrichtung F über den Vorschubantrieb 14, 15 auf den Stützrollen 5, 6 vorgeschoben. Die Rampenspitze der oberen Brücke rollt dabei über eine Laufrolle 3 0 auf dem außenliegenden Schrammbord 31 derTo move the bridge 3 from a transport position A to a working position B, it is moved in the direction of travel F according to FIG advanced on the support rollers 5, 6 via the feed drive 14, 15. The top of the ramp of the upper bridge rolls over a roller 3 0 on the outer flange 31 of the
Y 83Y 83
unteren Brücke, wie Fig. 13 zeigt. Nach einem Freigang zum Fahrzeug 1 hin wird die Brücke 3 in vorkragend gehaltener Anordnung am Hauptausleger 4 zum Boden abgesenkt (Fig. 8). Die Stützrollen 5, 6 treten nach dem Ablegen durch Zurückfahren des Fahrzeuges bzw. durch Schwenken des Hauptauslegers 4 aus den Laufschienen 7 über sogenannte Einfahrtaschen 16 aus, wodurch die Brücke freigegeben wird.lower bridge, as Fig. 13 shows. After a release to the Vehicle 1, the bridge 3 is lowered to the ground in a cantilevered arrangement on the main boom 4 (FIG. 8). the Support rollers 5, 6 emerge after they have been put down by moving the vehicle back or by pivoting the main boom 4 Running rails 7 from so-called entry pockets 16, whereby the bridge is released.
Die obenliegende Brücke 2 wird mittels des Hilfsausiegers 8a in eine zur weiteren Brücke 3 freien Lage angehoben und über den heckseitigen Auslegearm 8 entgegen der Fahrtrichtung F verschwenkt. Dies ist erforderlich, damit ein vorderer Einlauf der Stützrolle 6 in die Einfahrtasche 16 und somit in die Laufschiene 7 erfolgen kann (Fig. 2). Zu diesem Zweck schwenkt der heckseitige Auslegerarm 8 in Fahrtrichtung F. Er weist einen derartigen Schwenkwinkel °<C auf, daß die Stützrollen 5 in den brückenseitigen Laufschienen zu liegen kommen. Zum Abstützen des in bezug auf die Fahrtrichtung F hinteren Endes der Brücke 2 ist an der Brücke ein Halter 17 vorgesehen, der mit einer Rolle 18 am Auslegerarm 8 zusammenarbeitet; d.h., die Brücke stützt sich über den Halter 17 an der Rolle 18 ab. Zur Sicherung gegen ein Lösen der Verbindung bei Erschütterungen usw. ist eine Sicherungskappe 19 oder dergleichen vorgesehen, die den Halter 17 beim Verlegevorgang sowie in der Transportstellung übergreift. Wie Fig. 3a näher darstellt, ist die Sicherungskappe 19 über ein Gestänge 36 mit einem Betätigungselement 37, das als zweiarmiger Hebel ausgeführt ist, verbunden. Das Element 37 wird über eine Zugfeder 38 in einer Übertotpunktsteilung gehalten, wie der Pfeil 39 in Fig. 3a zeigt. Diese Stellung wird bei einem Transport der Brücke eingenommen.The overhead bridge 2 is lifted by means of the auxiliary separator 8a into a free position for the further bridge 3 and over the The rear extension arm 8 is pivoted against the direction of travel F. This is necessary for an anterior enema Support roller 6 in the entry pocket 16 and thus in the running rail 7 can be done (Fig. 2). For this purpose, the rear arm 8 pivots in the direction of travel F. It has a such pivot angle ° <C that the support rollers 5 in the bridge-side rails come to rest. To support the rear end of the bridge in relation to the direction of travel F 2, a holder 17 is provided on the bridge which cooperates with a roller 18 on the cantilever arm 8; i.e., the bridge is supported on the roller 18 via the holder 17. To protect against loosening of the connection in the event of vibrations etc. a safety cap 19 or the like is provided, the holder 17 during the laying process and in the transport position overlaps. As Fig. 3a shows in more detail, the securing cap 19 is via a linkage 36 with an actuating element 37, which is designed as a two-armed lever, connected. The element 37 is via a tension spring 38 in a Over-center division held, as the arrow 39 in Fig. 3a shows. This position is assumed when the bridge is transported.
Mit dem Betätigungselement 37 ist ein bewegungsübertragendes Stellglied 40 verbunden, das zu einem am Heckausleger 8 gelagerten Winkelhebel 41 führt, der sich an seinem einen Ende am Fahrzeug abstützt. Bei einer Bewegung des Heckauslegers 8 in Pfeilrichtung 42 (in Fahrtrichtung F) verlagert sich derA movement-transmitting actuator 40 is connected to the actuating element 37 and is connected to a control element on the tail boom 8 mounted angle lever 41 leads, which is supported at one end on the vehicle. When the tail boom moves 8 is shifted in the direction of arrow 42 (in the direction of travel F)
Y 83Y 83
Winkelhebel 41 in der Weise, daß ein Zug auf das Stellglied erfolgt und das Betätigungselement aus seiner Ubertotpunktstellung verschwenkt und die Kappe 19 sich in Pfeilrichtung bewegt und die Rolle 18 freigibt.Angle lever 41 in such a way that a train takes place on the actuator and the actuating element out of its top dead center position pivoted and the cap 19 moves in the direction of the arrow and the roller 18 releases.
Statt einer mechanischen Bewegungsübertragung wäre auch eine elektrische Ansteuerung der Kappe möglich. In diesem Fall ist die Kappe 19 z.B. mit einem Stellmotor oder dergleichen Mittel verbunden, der seine Steuersignale entsprechend dem Neigungswinkel des Heckauslegers 8 bekommt. Auch eine Verschwenkung der Kappe 19 über hydraulisch arbeitende Elemente ist möglich, wobei eine Ansteuerung z.B. eines Stellzylinders über elektrische Signale erfolgt, die entsprechend dem Neigungswinkel des Auslegers abgegeben werden und eine dementsprechende Ansteuerung des Stellzylinders bewirken.Instead of a mechanical transmission of movement, an electrical control of the cap would also be possible. In this case the cap 19 is connected, for example, to a servomotor or similar means, which its control signals according to Angle of inclination of the tail boom 8 gets. A pivoting of the cap 19 via hydraulically operating elements is possible, whereby e.g. an actuating cylinder is controlled via electrical signals that correspond to the The angle of inclination of the boom are output and cause a corresponding control of the actuating cylinder.
Die Fig. 9 und 10 zeigen den Vorgang des Längseinschiebens der oberen Brücke in den Ausleger, wobei in der dargestellten Position die Kurzbrücke 2 auf dem Hauptausleger 4 mit den Ritzeln 14 in Eingriff zu den Triebstockverzahnungen 15 an der Brücke gebracht werden. Hierzu werden die Ritzel 14 in Querrichtung aus einer eingefahrenen Stellung 20, wie strichpunktiert dargestellt, in die ausgefahrene Stellung 21 verschoben (Fig. 4). Diese Verschiebung erfolgt z. B. über einen Stellzylinder 22, der mit den Ritzeln 14 verbunden ist bzw. auf diese entsprechend einwirkt, so daß eine Verstellung in die Pfeilrichtungen 28 möglich ist. Über die Vorschubeinrichtung 14, wird die Brücke 2 in eine solche frei vorragende Stellung geschoben, daß ein Ablegen vor dem Fahrzeug 1 möglich wird.9 and 10 show the process of longitudinally pushing the upper bridge into the boom, which is shown in FIG Position the short bridge 2 on the main boom 4 with the pinions 14 in engagement with the rack teeth 15 on the bridge to be brought. For this purpose, the pinion 14 in the transverse direction from a retracted position 20, as shown in phantom, moved into the extended position 21 (Fig. 4). This shift takes place z. B. via an adjusting cylinder 22 which is connected to the pinions 14 or on this acts accordingly, so that an adjustment in the arrow directions 28 is possible. About the feed device 14, the bridge 2 is pushed into such a freely projecting position that it can be deposited in front of the vehicle 1.
Ein Aufnahmevorgang der Brücken 2 und 3 erfolgt in der Weise, daß zuerst die obere Brücke 2 und nachfolgend die untere Brücke 3 aufgenommen wird, wobei die Brücken von jeder Seite mit dem Hauptausleger 4 verbindbar sind, indem die Stützrollen 5, 6 in die Einfahrtaschen 16 soweit einfahren, bis ein Anheben der Brücke freikragend möglich wird.The bridges 2 and 3 are picked up in such a way that first the upper bridge 2 and then the lower bridge 3, the bridges being connectable to the main boom 4 from each side by the support rollers 5, 6 in retract the entry pockets 16 until the cantilevered lifting of the bridge is possible.
Wie die Fig. 13 bis 15 näher zeigen, weisen die Brücken 2, 3 im Bereich ihrer Rampen Laufrollen 30 auf. Diese rollen beim Verschieben der Brücke 2 auf einem Schrammbord 31. In der Transportstellung A (Fig. 13) sind die Laufrollen 30 in einer Tasche 34 des Schrammbords 31 gehalten, wobei ein Untergurt (33) der Brücke einen Steg 32 des Schrammbords untergreift, so daß die obere Brücke 2 sich in dieser Stellung A nicht von der unteren Brücke 3 abheben kann.As FIGS. 13 to 15 show in more detail, the bridges 2, 3 have rollers 30 in the region of their ramps. These roll at Moving the bridge 2 on a Schrammbord 31. In the transport position A (Fig. 13), the rollers 30 are in a Pocket 34 of the Schrammbord 31 held, wherein a lower chord (33) of the bridge engages under a web 32 of the Schrammbord, so that the upper bridge 2 cannot stand out from the lower bridge 3 in this position A.
- Leerseite - - blank page -
Claims (15)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19853517724 DE3517724A1 (en) | 1984-09-10 | 1985-05-17 | LAYING SYSTEM FOR BRIDGE ELEMENTS |
GB08521885A GB2164377B (en) | 1984-09-10 | 1985-09-03 | Laying system for bridge elements |
FR8513396A FR2575499B1 (en) | 1984-09-10 | 1985-09-10 | INSTALLATION OF LAYING BRIDGE ELEMENTS |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE3433216 | 1984-09-10 | ||
DE19853517724 DE3517724A1 (en) | 1984-09-10 | 1985-05-17 | LAYING SYSTEM FOR BRIDGE ELEMENTS |
Publications (1)
Publication Number | Publication Date |
---|---|
DE3517724A1 true DE3517724A1 (en) | 1986-03-20 |
Family
ID=25824587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19853517724 Withdrawn DE3517724A1 (en) | 1984-09-10 | 1985-05-17 | LAYING SYSTEM FOR BRIDGE ELEMENTS |
Country Status (3)
Country | Link |
---|---|
DE (1) | DE3517724A1 (en) |
FR (1) | FR2575499B1 (en) |
GB (1) | GB2164377B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0256446A2 (en) * | 1986-08-20 | 1988-02-24 | Fried. Krupp AG Hoesch-Krupp | Positioning system for a dismountable bridge |
DE3719508A1 (en) * | 1987-06-11 | 1988-12-22 | Krupp Gmbh | Device for lowering or raising bridge sections |
DE3837122A1 (en) * | 1988-11-02 | 1990-05-03 | Krupp Industrietech | VEHICLE FOR LAYING DISASSEMBLABLE BRIDGES |
EP0609731A1 (en) * | 1993-02-04 | 1994-08-10 | Krupp Fördertechnik GmbH | Laying vehicle for portable bridges |
FR2715415A1 (en) * | 1994-01-24 | 1995-07-28 | Krupp Foerdertechnik Gmbh | Drive mounted on a removal device for moving sections of bridge. |
EP3660217A1 (en) | 2018-11-29 | 2020-06-03 | FFG Flensburger Fahrzeugbau Gesellschaft mbH | Adapter for the boom of a vehicle for receiving, transporting and laying a bridge or a bridge element |
DE102020105463B3 (en) * | 2020-03-02 | 2021-04-15 | Ffg Flensburger Fahrzeugbau Gesellschaft Mbh | Adapter for a bridge element for picking up, transporting and storing the bridge element by an arm of a vehicle |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3604621A1 (en) * | 1986-02-14 | 1987-08-20 | Salzgitter Ag | TRANSPORT VEHICLE FOR BRIDGE PARTS |
US5067191A (en) * | 1988-11-12 | 1991-11-26 | Man Gutehoffnungshutte Ag | Bridge layer |
FR2649426B1 (en) * | 1989-07-06 | 1992-03-20 | Mediterranee Const Navales Ind | BRIDGE SYSTEM FOR VEHICLES TO CROSS BRACES |
DE102006042251A1 (en) * | 2006-09-08 | 2008-03-27 | General Dynamics Santa Bárbara Sistemas GmbH | bridge element |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1658623C3 (en) * | 1967-03-31 | 1975-10-23 | Dr.-Ing.H.C. F. Porsche Ag, 7000 Stuttgart | Device for transporting and laying track bridges |
DE3205563A1 (en) * | 1982-02-17 | 1983-08-25 | Dr.Ing.H.C. F. Porsche Ag, 7000 Stuttgart | Bridge-laying appliance |
DE3320633A1 (en) * | 1983-06-08 | 1984-12-13 | Dornier System Gmbh, 7990 Friedrichshafen | Bridge-laying device |
-
1985
- 1985-05-17 DE DE19853517724 patent/DE3517724A1/en not_active Withdrawn
- 1985-09-03 GB GB08521885A patent/GB2164377B/en not_active Expired
- 1985-09-10 FR FR8513396A patent/FR2575499B1/en not_active Expired
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0256446A2 (en) * | 1986-08-20 | 1988-02-24 | Fried. Krupp AG Hoesch-Krupp | Positioning system for a dismountable bridge |
EP0256446A3 (en) * | 1986-08-20 | 1989-07-26 | Fried. Krupp Gmbh | Positioning system for a dismountable bridge |
DE3719508A1 (en) * | 1987-06-11 | 1988-12-22 | Krupp Gmbh | Device for lowering or raising bridge sections |
DE3837122A1 (en) * | 1988-11-02 | 1990-05-03 | Krupp Industrietech | VEHICLE FOR LAYING DISASSEMBLABLE BRIDGES |
US5179751A (en) * | 1988-11-02 | 1993-01-19 | Krupp Industrietechnik Gmbh | Vehicle for laying dismountable bridges |
EP0609731A1 (en) * | 1993-02-04 | 1994-08-10 | Krupp Fördertechnik GmbH | Laying vehicle for portable bridges |
DE4303222A1 (en) * | 1993-02-04 | 1994-08-11 | Krupp Foerdertechnik Gmbh | Laying vehicle for layable bridges |
US5443584A (en) * | 1993-02-04 | 1995-08-22 | Krupp Fordertechnik Gmbh | Deployment vehicle for a deployable bridge |
DE4401768A1 (en) * | 1994-01-24 | 1995-08-03 | Krupp Foerdertechnik Gmbh | Drive mounted on a laying device for moving bridge sections |
FR2715415A1 (en) * | 1994-01-24 | 1995-07-28 | Krupp Foerdertechnik Gmbh | Drive mounted on a removal device for moving sections of bridge. |
US5507057A (en) * | 1994-01-24 | 1996-04-16 | Krupp Fordertechnik Gmbh | Bridge section shifting drive for a bridge laying apparatus |
EP3660217A1 (en) | 2018-11-29 | 2020-06-03 | FFG Flensburger Fahrzeugbau Gesellschaft mbH | Adapter for the boom of a vehicle for receiving, transporting and laying a bridge or a bridge element |
DE102018130235A1 (en) | 2018-11-29 | 2020-06-04 | Ffg Flensburger Fahrzeugbau Gesellschaft Mbh | Adapter for the boom of a vehicle for picking up, transporting and laying down a bridge or a bridge element |
DE102018130235B4 (en) * | 2018-11-29 | 2021-04-15 | Ffg Flensburger Fahrzeugbau Gesellschaft Mbh | Adapter for the boom of a vehicle for picking up, transporting and storing a bridge or a bridge element |
DE102020105463B3 (en) * | 2020-03-02 | 2021-04-15 | Ffg Flensburger Fahrzeugbau Gesellschaft Mbh | Adapter for a bridge element for picking up, transporting and storing the bridge element by an arm of a vehicle |
EP3875688A1 (en) | 2020-03-02 | 2021-09-08 | FFG Flensburger Fahrzeugbau Gesellschaft mbH | Adapter for a bridge element for receiving, transporting and depositing the bridge element through a boom of a vehicle |
Also Published As
Publication number | Publication date |
---|---|
FR2575499B1 (en) | 1989-04-07 |
GB2164377B (en) | 1987-09-09 |
FR2575499A1 (en) | 1986-07-04 |
GB8521885D0 (en) | 1985-10-09 |
GB2164377A (en) | 1986-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2616573C2 (en) | Embankment concreting machine for producing a concrete strip on a slope side of a drainage ditch or the like. | |
EP0854237B1 (en) | Laying vehicle and process for placing dismountable bridges | |
EP0093873A1 (en) | Bridge transporting and laying vehicle | |
EP0256446B1 (en) | Positioning system for a dismountable bridge | |
DE3517724A1 (en) | LAYING SYSTEM FOR BRIDGE ELEMENTS | |
DE2906024A1 (en) | MOBILE MACHINE, INCLUDING A FRAME WITH A STABILIZING DEVICE | |
DE1236451B (en) | Guide element that can be used between two adjacent expansion units | |
DE2116120A1 (en) | Bridge-laying device | |
DE3419205C2 (en) | Track construction machine for laying and removing assembled track sections or track connections | |
DE3541588C2 (en) | ||
DE9311520U1 (en) | Adjustment device for the headrest of a bed frame | |
DE19610440C2 (en) | Device for assembling and laying track carrier and stem sections to form a bridge structure | |
DE2945082C2 (en) | Mat laying device | |
EP1558409B1 (en) | Rolling mill comprising support plates | |
DE4108993C2 (en) | Auxiliary lifting device for railroad tracks | |
DE3719508C2 (en) | ||
DE2547480A1 (en) | DEVICE FOR TRANSPORTING LINE STRUCTURAL ELEMENTS | |
DE2355153A1 (en) | Mechanical car parking assembly - with pick-up mechanisms swivelled to sloping positions and moved across to parking area | |
DE2629603C3 (en) | Rake cleaner with rake | |
EP1138200B2 (en) | Mobile apparatus for distributing a liquid | |
DE2329827C3 (en) | Method for laying paving stones in rows and device for carrying out the method | |
DE2117791C3 (en) | Method and device for lifting a track | |
DE4008769C2 (en) | Motor vehicle for laying a fixed bridge | |
DE2606147C2 (en) | ||
DE1452016A1 (en) | Setting up and moving device for roll bars, especially profiles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8120 | Willingness to grant licences paragraph 23 | ||
8141 | Disposal/no request for examination |