DE3400392A1 - Process and apparatus for establishing reference points and for establishing distances and directions - Google Patents

Process and apparatus for establishing reference points and for establishing distances and directions

Info

Publication number
DE3400392A1
DE3400392A1 DE19843400392 DE3400392A DE3400392A1 DE 3400392 A1 DE3400392 A1 DE 3400392A1 DE 19843400392 DE19843400392 DE 19843400392 DE 3400392 A DE3400392 A DE 3400392A DE 3400392 A1 DE3400392 A1 DE 3400392A1
Authority
DE
Germany
Prior art keywords
pipe section
marking
floor
attached
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19843400392
Other languages
German (de)
Other versions
DE3400392C2 (en
Inventor
Petrus Antonius Johannes van Geldrop Hoof
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HOOF PETRUS ANTONIUS JOHANNES VAN
Original Assignee
HOOF PETRUS ANTONIUS JOHANNES VAN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HOOF PETRUS ANTONIUS JOHANNES VAN filed Critical HOOF PETRUS ANTONIUS JOHANNES VAN
Publication of DE3400392A1 publication Critical patent/DE3400392A1/en
Application granted granted Critical
Publication of DE3400392C2 publication Critical patent/DE3400392C2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/02Means for marking measuring points

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A process for establishing reference points and for establishing distances and directions when erecting a multi-storey building is described, in which a marker in the form of a pipe piece (4) is arranged in at least one location on the floor or a similar horizontal structure, which has been provided first of all, and a passageway is arranged over this pipe piece (4), by means of a pipe piece (4) arranged coaxially with the first pipe piece (4), in each floor (57) located over the first in the multi-storey building. Moreover, a marking device for use when carrying out this process and a marking element for use in this process are described. <IMAGE>

Description

23 815/6-70/pf23 815 / 6-70 / pf

Petrus Antonius Johannes van Hoof Waleweinlaan 281
5 665 CJ Geldrop
Niederlande
Petrus Antonius Johannes van Hoof Waleweinlaan 281
5 665 CJ Geldrop
Netherlands

Verfahren und Vorrichtung zum Festlegen von Messpunkten und zur Festlegung von Abständen und Rich- Method and device for defining measuring points and for defining distances and directions

tungenservices

Die Erfindung betrifft ein Verfahren zum Festlegen von Messpunkten und zur Festlegung von Abständen und Richtungen beim Errichten eines mehrstöckigen Gebäudes, sowie eine Vorrichtung zur Durchführung des Verfahrens.The invention relates to a method for defining measuring points and for defining distances and Directions when erecting a multi-storey building, as well as a device for carrying out the Procedure.

Bisher hat es beim Errichten von Gebäuden in Bezug auf die Ausführung von Messungen meistens keine festen Richtlinien gegeben. Die Festlegung bestimmter Stellen zum Anbringen von Bauteilen oder dgl. erfolgt mittels Markierungen, welche mit Nägeln, Sägeschnitten und/ oder Bleistiftstrichen auf bereits vorhandenen fertigen Teilen des Gebäudes oder auf Brettern,Balken oder dgl. die in bekannter Weise angebrachL werden. Die Verwendung solcher Markierungen ergibt jedoch Ungenauigkeiten, da die Stellen solcher Markierungen nicht gut gesichert sind .und/oder da/3 die MarkierungenSo far, when erecting buildings, there has mostly been no fixed in relation to the execution of measurements Guidelines given. The definition of certain points for attaching components or the like. Is done by means of Markings made with nails, saw cuts and / or pencil lines on existing ones Parts of the building or on boards, beams or the like that are attached in a known manner. The usage however, such markings result in inaccuracies because the locations of such markings are not are well secured. and / or there / 3 the markings

während der Bauarbeit völlig verloren gehen. Andererseits stellt die zunehmende Anwendung vorgefertigter Einzelteile an deren Maßgenauigkeit hohe Anforderungen, da sonst beim Montieren der vorgefertigten Einzelteile Schwierigkeiten auftreten können.get completely lost during construction. On the other hand, the increasing use makes prefabricated Individual parts make high demands on their dimensional accuracy, otherwise when assembling the prefabricated individual parts Difficulties can arise.

Deshalb liegt der vorliegenden Erfindung die Aufgabe zugrunde, ein Verfahren der eingangs genannten Art zu schaffen, mit dem in einfacher Weise während der ganzen Bauarbeit eine gute Maßgenauigkeit gewährleistet werden kann.The present invention is therefore based on the object of providing a method of the type mentioned at the outset create, with which a good dimensional accuracy is ensured in a simple manner during the entire construction work can be.

Diese Aufgabe wird erfindungsgemäß dadurch gelöst,daß auf dem zunächst angebrachten Fußboden oder auf einer ähnlichen horizontalen Konstruktion an mindestens einer bestimmten Stelle eine Markierung in Form eines Rohrstückes und in jedem darüberliegenden Fußboden oder einer ähnlichen horizontalen Konstruktion des mehrstöckigen Gebäudes über diesem Rohrstück im Fußboden ein Durchgang mittels eines mit dem ersten Rohrstück koaxial angeordneten Rohrstücks angeordnet wird.This object is achieved according to the invention in that on the first floor or on a similar horizontal structure on at least one a certain point a marking in the form of a piece of pipe and in each floor above or a similar horizontal construction of the multi-storey building above this pipe in the floor a passage is arranged by means of a pipe section arranged coaxially with the first pipe section.

Das zunächst z.B. auf dem unteren Fußboden angebrachte Rohrstück bildet dabei einen während der ganzen Bauarbeit aufrecht zu erhaltenden Ausgangspunkt, während auf jedem darüberliegenden Etagenboden ein lotrecht darüberliegender Hilfsausgangspunkt vorgesehen wird, von dem ausgehend in der entsprechenden horizontalen Ebene eines darüberliegenden Etagenbodens Messungen durchgeführt werden können. Solche in den Fußböden untergebrachte Markierstellen gehen in vorteilhafter Weise während der Bau" arbeit nicht verloren und lassen sich somit wiederholt als Ausgangspunkt zum Durchführen von Messungen benutzen.The piece of pipe initially attached to the lower floor, for example, forms a part of the entire construction work starting point to be maintained upright, while on each floor above there is a perpendicular above one Auxiliary starting point is provided, starting from which one in the corresponding horizontal plane measurements can be carried out on the floor above. Such marking points placed in the floors are advantageously not lost during construction work and can therefore be used repeatedly as Use the starting point to take measurements.

COPYCOPY

Eine vorzugsweise anwendbare Markiereinrichtung weist; eine runde Platte mit einem in Bezug auf den PlatLonmittelpunkt exzentrischen Loch auf, in dessen Rand vier um 90° gegeneinander versetzte Einkerbungen vorgesehen sind, wobei das Rohrstück koaxial mit der Mittellinie des Loches an"der Platte befestigt ist.A preferably applicable marking device has; a round plate with a center point in relation to the PlatLon eccentric hole, provided in the edge of four notches offset from one another by 90 ° with the piece of tubing attached to "the plate" coaxially with the center line of the hole.

Die zuerst anzubringende Markiereinrichtung kann unter Anwendung der Einkerbungen z.B. genau auf zwei zueinander senkrechten Messlinien aufgelegt werden, während bei darüberliegenden Fußböden infolge der exzentrischen Lage der das Rohrstück tragenden Platte die Platte möglichst derart aufgestellt wird, daß das unter dieser Platte liegende Loch möglichst verschlossen wird.The marking device to be applied first can, using the notches, e.g. exactly on two of each other vertical measuring lines are placed, while with overlying floors due to the eccentric Position of the plate carrying the pipe section, the plate is set up in such a way that the under this plate lying hole is closed as possible.

Weitere Einzelheiten, Merkmale und Vorteile dergeben sich aus der nachfolgenden Beschreibung von in der Zeich- l nung dargestellten Ausführungsbeispielen der Erfindung. Es zeigen:Further details, features and advantages dergeben from the following description of l voltage shown in the drawing embodiments of the invention. Show it:

Fig. 1 eine Markiereinrichtung in einer perspektivischen Ansicht,1 shows a marking device in a perspective view,

Fig. 2 eine Draufsicht auf die Einrichtung nach Fig. 1 mit einer auf einem Einzelteil des Gebäudes angebrachten Messlinie,FIG. 2 is a plan view of the device according to FIG. 1 with one attached to an individual part of the building Measuring line,

Fig. 3 eine perspektivische Darstellung einer Markiereinrichtung mit einer Klemmeinrichtung, mittels der die Markiereinrichtung zeitweise festgesetzt werden kann,3 shows a perspective illustration of a marking device with a clamping device by means of which the marking device can be temporarily fixed,

Fig. 4 eine perspektivische Ansicht eines erfindungsgemäßen Markierelementes,4 shows a perspective view of a marking element according to the invention,

Fig. 5 eine räumliche und teilweise aufgeschnittene Ansicht des in Fig. 4 dargestellten Markierclementes in einer um 180° umgedrehten Stellung,Fig. 5 is a spatial and partially cut away View of the marking element shown in FIG. 4 in a position rotated by 180 °,

Fig. 6 eine Draufsicht auf ein erfindungsgemäßes Markjerelement, das mit einem Messband gemeinsam anwendbar ist,6 shows a plan view of a marker element according to the invention, which can be used together with a measuring tape,

Fig. 7 einen Schnitt durch das Markierelement gemä ß Fig. 67 shows a section through the marking element according to FIG. 6

Fig. 8 ein Markierelement gemä ß den Figuren 6 und 7 mit einem Teil eines an diesem Markierelement festgeklemmten Messbandes,8 shows a marking element according to FIGS. 6 and 7 with part of a marking element which is clamped to this marking element Measuring tape,

Fig. 9 eine räumliche Darstellung eines Teiles einer Bodenverschalung und eine daran zu befestigende Platte mit dem dabei benutzten Markierelement,9 shows a three-dimensional representation of part of a floor formwork and one to be attached to it Plate with the marking element used,

Fig. 9Λ eine Draufsicht auf das in Fig. 9 dargestellte Markierelement,FIG. 9Λ is a plan view of that shown in FIG Marking element,

Fig. 10 eine räumliche Darstellung der zur Bildung eines Durchgangs in einem Etagenboden verwendeten Einrichtungen, 10 shows a three-dimensional representation of the devices used to form a passage in a floor,

Fig. 11 den durch die in Fig. 10 dargestellten Einrichtungen hergestellten Durchgang mit Ausnehmung in einem Etagenboden,FIG. 11 by the devices shown in FIG produced passage with recess in a floor,

Fig. 12 eine Draufsicht auf eine Einstellvorrichtung zum Einstellen eines Rohrstückes an der richtigen Stelle eines Etagenbodens,Fig. 12 is a plan view of an adjusting device for adjusting a pipe section on the correct one Place of a floor,

Fig. 13 einen Schnitt durch das Rohrstück längs der Linie XITI-XIII in Fig. 12 gemeinsam mit einer anzu-13 shows a section through the pipe section along the line XITI-XIII in FIG.

bringenden Markiereinrichtung und dem dabei zu verwendenden Markierelcmcnt,Bringing marking device and the marking element to be used for it,

Fig. 14 einen Schnitt längs der Linie XIV-XIV in Fig. 12,14 shows a section along the line XIV-XIV in FIG. 12,

Fig. 15 einen Schnitt" längs der Linie XV-XV in Fig. 12,15 shows a section "along the line XV-XV in FIG. 12,

Fig. 16 eine Draufsicht auf einen Sperr- und Markierpfropfen, 16 shows a plan view of a blocking and marking stopper,

Fig. 17 einen Schnitt längs der Linie XVII-XVII in Fig.16,FIG. 17 shows a section along the line XVII-XVII in FIG. 16,

Fig. 18 eine Draufsicht auf ein. Markierelernent zum Anbringen eines Durchgangs in einer auf einem Boden anzubringenden Abdeckschicht,Fig. 18 is a plan view of a. Marking element for attachment a passage in a covering layer to be applied to a floor,

Fig. 19 einen Schnitt längs der Linie XIX-XIX in Fig. 18, l 19 shows a section along the line XIX-XIX in FIG. 18, l

Fig. 20 einen Schnitt durch einen Teil eines Bodens mit einer darauf angebrachten Abdeckschicht, in der ein Durchgang vorgesehen ist,20 shows a section through part of a floor with a covering layer applied thereon, in which a passage is provided,

Fig. 21 eine Ansicht eines im erfindungsgemäßen Verfahren anzuwendenden Stativs nach der Erfindung,21 shows a view of a method according to the invention applicable tripod according to the invention,

Fig. 22 eine Seitenansicht des Stativs nach Fig. 21 mit einem darauf angebrachten Theodoliten,22 shows a side view of the stand according to FIG. 21 with a theodolite attached to it,

Fig. 23 eine Draufsicht auf das Stativ nach Fig. 21.23 shows a plan view of the stand according to FIG. 21.

Zum Durchführen des Verfahrens nach der Erfindung wird auf einem zuerst hergestellten, horizontalen Konstruktionsteil des Gebäudes z.B. auf dom unteren Fußboden mindestens eine Markierstelle mittels der in den Figuren 1 und 2 dargestellten Markiereinrichtung angebracht.To carry out the method according to the invention, on a first produced, horizontal structural part of the building, e.g. on the lower floor, at least one marking point using the one shown in the figures 1 and 2 shown marking device attached.

- 4(9-- 4 (9-

Diese Markiereinrichtung besteht aus einer dünnen, runden Platte 1, in der ein Loch 2 vorgesehen ist. Aus den Figuren 1■und 2 geht hervor, daß das Loch 2 zum Mittelpunkt der Platte 1 exzentrisch angeordnet ist. Im Begrenzungsrand des Loches 2 sind vier V-förmige Einkerbungen 3 derart vorgesehen, daß diese um einen Winkel von 90° gegeneinander versetzt sind. Ferner ist an der Platte 1 ein Rohrstück 4 befestigt, das zur Mittellinie des Loches 2 koaxial angeordnet ist.This marking device consists of a thin, round plate 1 in which a hole 2 is provided. From the figures 1 ■ and 2 it can be seen that the hole 2 is the center the plate 1 is arranged eccentrically. In the boundary edge of the hole 2 there are four V-shaped notches 3 provided in such a way that they are offset from one another by an angle of 90 °. Furthermore, at the Plate 1, a piece of pipe 4 is attached, which is arranged coaxially to the center line of the hole 2.

Die Fig. 2 zeigt, daß die Mitte des Ausgangspunktes für die Messungen mit zwei zueinander senkrechten Markierlinien 5 und 6 angegeben werden kann , wobei mittels der Einkerbungen 3 die in den Figuren 1 und 2 dargestellten Markiereinrichtung derart eingestellt werden kann, daß die Mitte des Loches 2 und die Mittellinie des Rohrstückes 4 lotrecht über dem Schnittpunkt der Linien 5 und 6 zur Anlage kommen.Fig. 2 shows that the center of the starting point for the measurements with two mutually perpendicular marking lines 5 and 6 can be specified, with the notches 3 shown in Figures 1 and 2 Marking device can be adjusted so that the center of the hole 2 and the center line of the pipe section 4 come to rest perpendicularly above the intersection of lines 5 and 6.

Für eine gute Fixierung der Markiereinrichtung kann ein L-förmiger Klemmstreifen 7 benutzt werden , der an einem Ende eine Ausnehmung zur Aufnahme des oberen Endes des Rohres 4 aufweist. Durch ein im horizontalen Schenkel des Klemmstreifens 7 vorgesehenes Langloch 8 ist eine Klemmschraube 9 geführt, die z.B. in eine im unteren Betonboden vorhandene Buchse eingeschraubt ist. Wenn durch Verdrehung und Verschiebung des Klemmstreifens 7 in Bezug zum Bolzen 9 das Rohr 4 in die richtige Stellung geführt ist, kann das Rohr 4 in dieser Stellung durch Festziehen der Klemmschraube 9 fixiert werden. Anschließend kann rings um die Platte 1 und das Rohr 4 Mörtel angebracht werden. Nach dem Erhärten des Mörtels ist das Rohr 4 an der gewünschten Stelle im Gebäude fixiert, worauf die Klemmschraube 9 und der Klemmstreifen 7 entfernt werdenFor a good fixation of the marking device, an L-shaped clamping strip 7 can be used, which is attached to a End has a recess for receiving the upper end of the tube 4. Through one in the horizontal leg of the clamping strip 7 provided elongated hole 8, a clamping screw 9 is guided, for example in a in the lower concrete floor existing socket is screwed in. If by twisting and shifting the clamping strip 7 in relation to the bolt 9, the tube 4 is guided into the correct position is, the tube 4 can be fixed in this position by tightening the clamping screw 9. Then can mortar must be applied around the plate 1 and the pipe 4. After the mortar has hardened, the pipe 4 is on fixed in the desired location in the building, whereupon the clamping screw 9 and the clamping strip 7 are removed

COPYCOPY

können.can.

Meistens werden mehrere solcher Markiereinrichtungen am unteren Fußboden oder dgl. an vorgewählten Punkten angebracht.Usually there are several such marking devices attached to the lower floor or the like at preselected points.

Zum Durchführen von von diesen durch die Rohrstücke 4 gebildeten Markierstellen ausgehenden Messungen kann z.B. ein Markiorolcniont nach den Figuren 4 und 5 benutzt werden. Dieses Markierelement weist einen ringförmigen Körper 10 auf, der an einem Ende durch eine Querwand 11 abgeschlossen ist, in deren Mitte ein kleiner Durchgang 12 vorgesehen ist. Der ringförmige Körper 10 ist derart ausgebildet, daß der Durchmesser seines Außenumfangs wenigstens nahezu gleich dem Innendurchmesser des Rohrstücks 4' ist, so daß der Körper 10 im Rohrstück 4 eng passend verschiebbar ist. Zwischen den Enden ist der Körper 10 noch mit einem umlaufenden vorstehenden Kragen 13 versehen, so daß es möglich ist, den ringförmigen Körper in zwei um 180° umgedrehten Stellungen in das offene obere Ende des Rohrstückes 4 zu schieben, bis der als Anschlag wirkende ringförmige Kragen 13 auf dem oberen Rand des Rohrstückes 4 anliegt.In order to carry out measurements originating from these marking points formed by the pipe sections 4 E.g. a marker according to Figures 4 and 5 is used will. This marking element has an annular body 10, which is closed at one end by a transverse wall 11 is, in the middle of which a small passage 12 is provided. The annular body 10 is designed in such a way that that the diameter of its outer circumference is at least almost equal to the inner diameter of the pipe section 4 ' is, so that the body 10 is slidable in the pipe section 4 to fit closely. The body 10 is still between the ends provided with a circumferential protruding collar 13, so that it is possible to the annular body in two to 180 ° inverted positions in the open upper end of the Push the pipe section 4 until the ring-shaped collar 13 acting as a stop on the upper edge of the pipe section 4 is present.

Das in den Figuren 4 und 5 dargestellte Markierelement ist ferner mit einem über die Wand überstehenden Ansatz 14 versehen, von dem sich eine Begrenzungsfläche 15 diametral durch die Mittellinie des ringförmigen Körpers 10 und durch die damit zusammenfallende Mittellinie des Loches 12 erstreckt. Auf der Begrenzungsfläche 15 sind Markierzeichen 16 angebracht.The marking element shown in Figures 4 and 5 is furthermore provided with a projection 14 projecting beyond the wall, from which a boundary surface 15 extends diametrically through the center line of the annular body 10 and through the coincident center line of the hole 12 extends. There are marking symbols on the delimitation surface 15 16 attached.

Der Ansatz 14 ist ferner mit zwei vorstehenden Nasen 1.7 versehen, die eine V-förmige Einkerbung 18 begrenzen, dieThe approach 14 is also provided with two protruding lugs 1.7 which delimit a V-shaped notch 18 which

« V«V

sich senkrecht zur Begrenzungsfläche 16 erstreckt.extends perpendicular to the boundary surface 16.

Das in den Figuren 4 und 5 dargestellte Markierelement kann mit dem nach Fig. 4 unteren Teil des zylinderförmigen Körpers TO in ein im Boden festgesetztes Rohrstück 4 geschoben werden, wobei der Ansatz 14 über die Bodenfläche herausragt. Die Markierungen 16 können z.B. zum Festlegen von Richtungen mittels eines auf dem betreffenden Boden angebrachten Theodoliten benutzt werden. Durch die Einkerbung 18 kann auch ein Messdraht geführt werden.The marking element shown in FIGS. 4 and 5 can with the FIG. 4 lower part of the cylindrical Body TO be pushed into a fixed in the ground pipe section 4, the approach 14 on the Floor area protrudes. The markings 16 can e.g. can be used to set directions by means of a theodolite attached to the relevant floor. A measuring wire can also pass through the notch 18 be guided.

Wenn das Markierelement in der in Fig. 5 angegebenen Stellung auf ein Rohrstück 4 gesetzt wird, kommt der Ansatz 14 in diesem Rohrstück zur Anlage, worauf der dann im Blickfeld liegende Durchgang 12 als Zentrierpunkt zur Aufstellung von Messinstrumenten z.B. zum Aufstellen eines Theodoliten benutzt werden kann. Dabei kann zweckmäßig das in den Figuren 21 bis 23 dargestellte Stativ für den Theodoliten verwendet werden. Aus diesen Figuren geht hervor, daß dieses Stativ ein Hauptbein 19 mit einem an dessen unteren Ende befestigten Zentrierstift 20 aufweist. Ferner ist nahe dem unteren Ende des zentralen Beines 19 eine Wasserwaage 21 angebracht. Am oberen Ende erstreckt sich das Bein 19 bis zu einem Gewindeende 28. Von diesem oberen Ende verläuft schräg nach unten ein Arm 22. Am unteren Ende des Armes 22 ist eine zum Bein senkrechte Achse 23 angeordnet. An den beiden gegenüberliegenden Enden der Achse 23 sind einstellbare Zentrierstifte 24 angeordnet. Am oberen Ende des Armes 22 ist ein Handgriff 25 befestigt. Der Arm 22 ist einstückig mit einer zur Mittellinie des Beines 19 senkrechten Stützplatte 26 versehen, auf die ein Theodolit 27 gestellt werden kann, was schematisch in Fig. 22 dargestellt ist.When the marking element is placed on a pipe section 4 in the position indicated in FIG. 5, the projection 14 comes in this piece of pipe to the plant, whereupon the passage 12, which is then in the field of view, as a centering point for the installation can be used by measuring instruments e.g. to set up a theodolite. This can be useful The tripod shown in FIGS. 21 to 23 can be used for the theodolite. From these figures goes show that this tripod has a main leg 19 with a has centering pin 20 attached to its lower end. Further is near the lower end of the central A spirit level 21 is attached to the leg 19. At the upper end, the leg 19 extends to a threaded end 28. An arm 22 extends obliquely downward from this upper end. At the lower end of the arm 22 there is one to the leg vertical axis 23 arranged. At the two opposite ends of the axle 23 there are adjustable centering pins 24 arranged. A handle 25 is attached to the upper end of the arm 22. The arm 22 is integral with a support plate 26 which is perpendicular to the center line of the leg 19 and on which a theodolite 27 is placed can be, which is shown schematically in FIG.

η-η-

Die Zentrierung dieses Theodoliten in Bezug zur Längsachse des Beines 19 erfolgt mittels des über die Stützplatte 26 vorstehenden Gewindeendes 28.This theodolite is centered in relation to the longitudinal axis of the leg 19 by means of the support plate 26 protruding thread end 28.

Zum Aufstellen des Theodoliten mittels des in den Figuren 21 bis 23 dargestellten Stativs wird der Zentrierstift 2 0 in ein Loch 12 gebracht, nachdem das in den Figuren 4 und 5 dargestellte '>larkierelement in ein Rohrstück 4 gedrückt ist. Mittels der Stifte 24 wird der Theodolit dann horizontal ausgerichtet, so daß er lotrecht über der durch das Rohrstück 4 bestimmten Mitte liegt.To set up the theodolite by means of the tripod shown in FIGS. 21 to 23, the centering pin 2 0 brought into a hole 12 after the marking element shown in FIGS. 4 and 5 has been pressed into a pipe section 4 is. By means of the pins 24, the theodolite is then aligned horizontally so that it is perpendicular to the through the pipe section 4 is certain center.

Ein anderes Markierelement nach der Erfindung, das vorzugsweise bei der Durchführung des Verfahrens nach der Erfindung anwendbar ist, ist" in den Figuren 6 bis 8 dargestellt.Another marking element according to the invention, which is preferably used when carrying out the method according to the invention is applicable, "is shown in FIGS. 6 to 8.

Dieses Markierelement ist aus einer runden Scheibe 29 aufgebaut, deren Außendurchmesser an den Innendurchmessers eines Rohrstückes 4 angepaßt ist, so daß die Scheibe 29 in ein Rohrstück 4 einpassbar ist. Die Scheibe 29 hat eine zentrale Bohrung 3 0. und zwei dazu parallele GewindebohrungenThis marking element is made up of a round disc 29, whose outer diameter is adapted to the inner diameter of a pipe section 4, so that the disc 29 in a Pipe section 4 can be fitted. The disk 29 has a central bore 30 and two parallel threaded bores

31 zur Aufnahme von Flügelschrauben 32.31 to accommodate wing screws 32.

Mittels der Flügelschrauben 32 ist auf der Oberseite der Scheibe 29 ein Ring 33 angeordnet, dessen Außendurchmesser größer ist als der Außendurchmesser der Scheibe 29, so daß der Ring 33 als Anschlag wirksam ist und beim Einschieben der Scheibe 29 in das Rohrstück 4 auf dem oberen Rand des Rohrstückes 4 zur Anlage kommt.By means of the wing screws 32, a ring 33 is arranged on the top of the disk 29, the outer diameter of which is larger than the outer diameter of the disc 29, so that the ring 33 acts as a stop and when it is pushed in the disk 29 comes to rest in the pipe section 4 on the upper edge of the pipe section 4.

Eine Flügelschraube 22 ist durch ein in der Scheibe 29 vorgesehenes Langloch 34 und die andere FlügelschraubeA wing screw 22 is through one in the washer 29 provided slot 34 and the other wing screw

32 ist durch ein weiteres, an einem Ende am Außenumfang des Ringes 33 ausmündendes Langloch 35 geführt. Nach dem Lösen der Flügelschrauben 32 kann der Ring 33 relativ gegen die Scheibe 29 verdreht und in eine Stellung ver-32 is guided through a further elongated hole 35 opening out at one end on the outer circumference of ring 33. After this Loosening the wing screws 32 can rotate the ring 33 relatively against the disk 29 and move it into a position.

schoben werden, in' welcher der Ring 33 wenigstens
größtenteils neben der Scheibe 29 liegt, während der
Ring 33 dennoch mit der Scheibe 29 verbunden ist.
be pushed, in 'which the ring 33 at least
largely next to the disc 29, while the
Ring 33 is nevertheless connected to disk 29.

Fig. 8 zeigt, daß zwischen dem Ring 33 und der Scheibe 29 das Ende einer Meßschnur 36 festgeklemmt werden kann, so daß z.B. . der Nullpunkt der Messchnur 36 sich mit
der Mittellinie der Scheibe 29 und der Bohrung 30
deckt. Nach dem Einstecken der Scheibe 29 in ein Rohrstück 4 können mittels dieser Messchnur ab dieser eine Fixlage einnehmenden, durch das Rohrstück 4 gebildeten Markierstelle Abstände genau festgelegt werden.
Fig. 8 shows that between the ring 33 and the disc 29, the end of a measuring cord 36 can be clamped so that, for example. the zero point of the measuring cord 36 is with
the center line of the disc 29 and the bore 30
covers. After the disc 29 has been inserted into a pipe section 4, distances can be precisely determined by means of this measuring cord from this point onwards, which occupies a fixed position and is formed by the pipe section 4.

Ausgehend von den z.B. auf dem unteren Fußboden angebrachten Markierstellen können ähnliche Markierstellen lotrecht über den auf dem unteren Boden angeordneten
Markierstellen angebracht werden. Dazu wird z.B. an der Verschalungsplatte 37 eines über dem unteren Boden anzubringenden Etagenbodens im Bereich der in diesem Boden anzubringenden Markierung ein Loch 38 vorgesehen. Dieses Loch 38 wird mittels einer Platte 39 abgedeckt, die mit einer unterhalb der Platte 39 herausragenden Buchse 40 versehen ist. In die Buchse 40 kann ein Markierelement 41 geschoben werden. Das Markierelement41 weist einen zylinderformigen Körper 42,der mit enger Passung in das Rohrstück 4 0 eingesteckt werden kann und der am oberen Rand mit einem vorstehenden Kragen 43 versehen ist, der die Abwärtsbewegung des zylinderformigen Körpers 42 im Rohrstück 40 begrenzt.
Starting from the marking points attached, for example, on the lower floor, similar marking points can be perpendicular to the one arranged on the lower floor
Marking points are attached. For this purpose, a hole 38 is provided, for example, on the cladding plate 37 of a tier floor to be attached above the lower floor in the area of the marking to be made in this floor. This hole 38 is covered by a plate 39 which is provided with a bushing 40 protruding below the plate 39. A marking element 41 can be pushed into the socket 40. The marking element 41 has a cylindrical body 42 which can be inserted into the pipe section 40 with a tight fit and which is provided on the upper edge with a protruding collar 43 which limits the downward movement of the cylindrical body 42 in the pipe section 40.

Im zylinderformigen Körper 43 sind zwei durchsichtige Scheiben 44 und 45 untergebracht. Die Scheibe 45 ist mit Markierungszeichen versehen, zwischen denen ein die Mitte des zylinderformigen Körpers 43 andeutendes KreuzIn the cylindrical body 43 are two transparent disks 44 and 45 housed. The disc 45 is provided with markings, between which a center of the cylindrical body 43 suggestive cross

(Fig. 9A) liegt.(Fig. 9A).

In der vorstehend beschriebenen Weise kann dann an einer z.B. auf dem unteren Boden angebrachten Markierstelle ein Theodolit derart aufgestellt werden, daß die Visierlinie des Theodoliten vertikal steht. Die Platte 39 wird dann solange verschoben, bis die Mitte des Messelementes 41 in der Visierlinie des Theodoliten liegt. Anschließend wird die Platte 39 z.B. mit Nägeln an der Verschalungsplatte 37 befestigt.In the manner described above, it can then be applied to a marking point, for example on the lower floor a theodolite can be set up in such a way that the line of sight of the theodolite is vertical. the Plate 39 is then shifted until the center of the measuring element 41 is in the line of sight of the theodolite lies. The panel 39 is then attached to the shuttering panel 37, for example with nails.

An der Verschalungsplatte 37 kann mit den Markierelementen nach den Figuren 4 bis 8 und den Figuren 21 bis 2 3 gemessen werden.Measurements can be made on the cladding plate 37 with the marking elements according to FIGS. 4 to 8 and FIGS. 21 to 23 will.

Auf der Platte 39 wird ein Rohr z.B. ein Rohr 47 aus PVC angeordnet. Dazu wird die in Fig. 10 dargestellte, mit einem Gewinde versehene Stange 48 verwendet, an der zwei Scheiben 49 nahe den Enden des anzubringenden Rohres 47 angeordnet sind. Die Länge des Rohres 4 7 wird entsprechend der Dicke des zu gießenden Betonbodens gewählt.On the plate 39 a pipe, for example a pipe 47 made of PVC, is placed. For this purpose, the shown in Fig. 10, uses threaded rod 48 to attach two washers 49 near the ends of the Tube 47 are arranged. The length of the pipe 4 7 will be according to the thickness of the concrete floor to be poured chosen.

Dabei kann das Rohr 47 dadurch an der Platte festgeklemmt werden, daß eine auf das untere Ende der Stange 48 geschraubte Mutter 50 gegen ein unter der Verschalungsplatte 37 liegendes Klemmprofil 51 festgezogen wird, das ein Langloch 52 aufweist, durch welches das untere Ende der Gewindestange 48 hindurchgefürht ist.The tube 47 can be clamped to the plate by screwing one onto the lower end of the rod 48 Nut 50 is tightened against a clamping profile 51 located under the cladding plate 37, which has an elongated hole 52 through which the lower end of the threaded rod 48 is guided.

Auf dem oberen Ende des Rohres 47 ruht eine runde, quadratische oder rechteckige, dicke Platte 53, an deren oberer Fläche eine quadratische oder rechteckige Platte größerer Abmessungen befestigt ist. An dem außerhalb der Platte 53 liegenden Teil der Platte 54 sind an deren Unterseite mittels Bolzen 55 Buchsen 56 mit InnengewindeA round, square one rests on the upper end of the tube 47 or rectangular thick plate 53, on the upper surface of which a square or rectangular plate larger dimensions is attached. On the part of the plate 54 lying outside the plate 53 are on the underside thereof by means of bolts 55 sockets 56 with internal thread

festgeklemmt.clamped.

Nachdem an den gewählten Markierstellen in der beschriebenen Weise die Rohrstücke 47 und die Platten 53, 54 angebracht sind, kann der betreffende Etagenboden gegossen werden. Nach ausreichender Erhärtung des Betons können die Platten 53 und 54 und die Gewindestange 48 mit dem Klemmprofil 51 entfernt werden. Dabei wird, wie in Fig. dargestellt ist, im fertigen Boden 57 ein Durchgang gebildet, der durch das Rohr 47 und das unter der Platte herausragende Rohrstück 40 festgelegt ist. Dabei endet das Rohrstück 47 nahe dem oberen Ende in der durch die Platten 53 und 54 im Boden gebildeten Ausnehmung 58, in der auch die Enden der Gewindebuchsen 56 liegen.After the pipe sections 47 and the plates 53, 54 have been attached to the selected marking points in the manner described the floor in question can be poured. After the concrete has hardened sufficiently, you can the plates 53 and 54 and the threaded rod 48 with the clamping profile 51 are removed. As shown in Fig. is shown, a passage is formed in the finished floor 57, through the tube 47 and that under the plate protruding pipe section 40 is set. The pipe section 47 ends near the upper end in the through Plates 53 and 54 in the bottom formed recess 58 in which the ends of the threaded sockets 56 are located.

In dieser Ausnehmung 58 kann wieder eine Markiereinrichtung gemäß den Figuren 1 und 2 angebracht werden, worauf die Ausnehmung zum Fixieren dieser Markiereinrichtung mit Mörtel oder dgl. gefüllt werden kann.In this recess 58 a marking device according to Figures 1 and 2 can again be attached, whereupon the Recess for fixing this marking device can be filled with mortar or the like.

Infolge von Bewegungen beim Gießen des Etagenbodens 5 7 kann jedoch nicht gewährleistet werden, daß die Mittellinie des Rohrstücks 40 und/oder die Mittellinie des Rohres 47 noch genau fluchtend zur Mitte des auf dem darunter liegenden Boden angebrachten Rohrstückes verlaufen, das auf diesem darunterliegenden Boden eine Markierstelle aufweist. Zum ortsgenauen Anbringen-der Markiereinrichtung in der Ausnehmung 58 ist es zweckdienlich, die in den Figuren 12 bis 15 dargestellte Einstellvorrichtung zu verwenden.As a result of movements when pouring the tier floor 5 7, however, it cannot be guaranteed that the center line of the pipe section 40 and / or the center line of the pipe 47 is still exactly aligned with the center of the one below running floor attached pipe section, which has a marking point on this underlying floor. For the precise attachment of the marking device in the recess 58, it is expedient to use the Figures 12 to 15 shown adjusting device to use.

Diese Einstellvorrichtung enthält eine Basisplatte 59, die mittels in die Gewindebuchsen 56 einschraubbaren Schraubbolzen 60 auf dem betreffenden Boden befestigtThis adjustment device includes a base plate 59, which is fastened to the relevant floor by means of screw bolts 60 which can be screwed into the threaded sockets 56

COPYCOPY

werden kann. Dabei stützt die Basisplatte 59 eine horizontale runde Stange 61 ab, die durch eine Bohrung in einem Schiebestück 62 geführt ist. In weiteren Bohrungen in diesem Schiebestück 62 sind zwei zueinander parallele , zur Stange 62 senkrechte Stangen 63 und 64 angeordnet. Die Stangen 63 und 64 dienen zum Abstützen eines Tragstücks 65, welches ein rundes Loch 66 aufweist.can be. The base plate 59 supports a horizontal round rod 61, which through a hole in a sliding piece 62 is guided. In further bores in this sliding piece 62 are two mutually parallel, Rods 63 and 64 perpendicular to rod 62 are arranged. The rods 63 and 64 serve to support a support piece 65, which has a round hole 66.

Aus Fig. 14 ist ersichtlich, daß die Stange 61 sich durch eine Ausnehmung in einem im Schiebestück 62 angebrachten, über einen Teil seiner Länge mit Gewinde versehenen Stift 67'örstreckt. Wird eine auf den Stift 67'aufgeschraubte Mutter 67 gelöst, so kann das Schiebestück 62 längs der Stange 61 verschoben werden. Wenn das Schiebestück 62 in die gewünschte Stellung gebracht ist, kann es in Bezug zur Basisplatte 59 festgeklemmt werden, indem die Mutter 67 festgezogen wird. Wenn die Mutter 67 gelöst ist, kann das Schiebestück 62 nicht nur längs der Stange 61 verschoben, sondern mittels eines Bolzens 68 auch um die Mittellinie der Stange 61 verdreht werden, der in ein Schraubloch im Schiebestück 62 eingeschraubt ist und dessen unteres Ende auf der Basisplatte 59 aufliegt.From Fig. 14 it can be seen that the rod 61 extends through a recess in a pin mounted in the sliding piece 62 and provided with a thread over part of its length 67 'disturbed. Is one screwed onto the pin 67 ' If the nut 67 is loosened, the sliding piece 62 can be moved along the rod 61. When the sliding piece 62 in is brought into the desired position, it can be clamped in relation to the base plate 59 by means of the nut 67 is tightened. When the nut 67 is loosened, the sliding piece 62 can not only be displaced along the rod 61, but can also be rotated around the center line of the rod 61 by means of a bolt 68, which is inserted into a screw hole is screwed into the sliding piece 62 and the lower end of which rests on the base plate 59.

Wie aus Fig. 15 ersichtlich ist, ist .die Stange 64 durch eine Ausnehmung in einem im Schiebestück 62 angebrachten Stift 69 geführt, der; über einen Teil seiner Länge mit einem Gewinde versehen ist. Wenn eine auf den Stift 69' aufgeschraubte Mutter 69 gelöst wird, können die Stangen 63 und 64 in ihrer Längsrichtung relativ zum Schiebestück 62 verschoben werden, wobei die Stangen 63 und 64 und das an diesen befestigte Tragstück 65 in der gewünschten Stellung in Bezug zum Schiebestück 62 durch Festziehen der Mutter 69 festgeklemmt werden können.As can be seen from FIG. 15, the rod 64 is guided through a recess in a pin 69 mounted in the sliding piece 62, which ; is threaded over part of its length. When a nut 69 screwed onto the pin 69 'is loosened, the rods 63 and 64 can be displaced in their longitudinal direction relative to the sliding piece 62, the rods 63 and 64 and the support piece 65 attached to them in the desired position in relation to the sliding piece 62 can be clamped by tightening the nut 69.

Im Loch 66 des Tragstücks 65 kann ein rohrförmiger Körper 7 0 (Fig. 13) angebracht werden, der mit einem herausragenden Kragen 71 zur Begrenzung der Abwärtsbewegung des Körpers 7 0 versehen ist. Im unteren Ende des Körpers 70 ist_eine durchsichtige, mit Markierzeichen versehene Platte 72 angebracht, die der in Fig.9A dargestellten Platte 45 entspricht.In the hole 66 of the support piece 65 can be a tubular Body 7 0 (Fig. 13) are attached, with a protruding collar 71 to limit the downward movement of the body 7 0 is provided. In the lower end of the body 70 there is a transparent one with markings provided plate 72 attached, which corresponds to the plate 45 shown in Figure 9A.

Die Fig. 13 zeigt ferner, daß das untere Ende des zylin-Fig. 13 also shows that the lower end of the cylindrical

derförmigen Körpers 70 eng in das Rohrstück 4 einerthe shaped body 70 tightly into the pipe section 4 a

Markiereinrichtung hineinpaßt, deren Platte 1 auf den Boden der Ausnehmung 58 gelegt ist.Marking device fits into it, the plate 1 of which is placed on the bottom of the recess 58.

Durch Verschiebung des Schiebestücks 62 in Bezug zur fest angeordneten Basisplatte 59 und durch Verschiebung des Tragstückes 65 im Bezug zum Schiebestück 62 kann der Körper 7 0 der Markiereinrichtung 1,4 bis in die Stellung geschoben werden, in der die Mitte der durchsichtigen Platte 72 und somit die Mittellinie des Rohres 4 genau mit dem auf dem darunterliegenden Boden befestigten Markierrohr 4 fluchtet, wobei ein Theodolit benutzt wird, der in der vorstehend beschriebenen Weise über dem auf dem darunterliegenden Boden angeordneten Rohr 4 angeordnet ist.By moving the sliding piece 62 in relation to the fixed base plate 59 and by moving the Carrying piece 65 in relation to the sliding piece 62, the body 7 0 of the marking device 1, 4 up to the position be pushed, in which the center of the transparent plate 72 and thus the center line of the tube 4 exactly is aligned with the marking tube 4 attached to the floor below, using a theodolite, which is arranged in the manner described above above the tube 4 arranged on the floor below is.

Nachdem das Rohr 4 in die gewünschte Stellung gebracht ist, kann das Rohr und somit die Platte 1 um die Mittellinie des Rohres 4 bis in eine Stellung gedreht werden, in der die Platte den Durchgang eines darunterliegenden Rohres 47 möglichst absperrt. Anschließend kann die Ausnehmung 58 mit Mörtel oder einem ähnlichen Material gefüllt werden, so daß nach dem Erhärten dieses Materials an dem betreffenden Boden eine neue Markierstelle gegeben ist, deren Ausführungsform der vorstehend beschriebenen, im unteren Boden ausgebildeten Markierstelle entsprichtAfter the tube 4 has been brought into the desired position, the tube and thus the plate 1 can around the center line of the tube 4 can be rotated into a position in which the plate allows the passage of an underlying tube 47 shut off if possible. Then the recess 58 can be filled with mortar or a similar material, so that after this material has hardened there is a new marking point on the floor concerned, whose embodiment corresponds to the above-described marking point formed in the lower base

und die lotrecht über dieser am unteren Boden ausgebildeten Markierstelle angeordnet ist.and which is arranged vertically above this marking point formed on the lower floor.

Auf diese Weise können durch die Ausführung des erfindungsgemäßen Verfahrens auf den übereinanderliegenden Etagenböden mehrere lotrecht übereinanderliegende, iden- tische Markierstellen gebildet werden, von denen ausgehend weitere Messungen in den einzelnen horizontalenIn this way, by performing the method according to the invention on the superimposed Floor several vertically one above the other, identical marking points are formed, starting from which further measurements in each horizontal

Ebenen durchgeführt werden können. jLevels can be done. j

Die auf den unter'schiedlichen Böden angebrachten Rohre 4 j werden im allgemeinen nur im Bedarfsfall zur Durchführung \ von Messungen benutzt. Zum Abschirmen dieser , Buchsen in den Zeiten, in denen keine Messungen durchgeführt werden, können zweckdienlich Abdeckkappen nach j den Figuren 16 und 17 benutzt werden. Eine solche Kappe . ! ist mit einem gestuften Rohrstück 73 versehen, von dem das untere Teil mit dem kleineren Durchmesser eng passend in ein Rohrstück 4 einschiebbar ist. An das obere Ende des Rohrstückes 73 schließt sich eine von diesem Rohrstück außen vorstehende, ringförmige Wand 74 an, die zur Längsachse des Rohrstückes 73 senkrecht ist und die an dem von dem Rohrstück 73 abgewandten Umfangsrand in einen schräg nach unten verlaufenden Wandteil 75 übergeht, der zwei diametral einander gegenüberliegende Ausnehmungen \ 76 aufweist. Der Außenrand des Wandteiles 75 ist kon- I zentrisch mit der Mittellinie des Rohrtciles 73 und der ; untere Rand des Wandteiles 75 liegt in der gleichen Ebene \ wie die Schulter, die am übergang zwischen den Teilen des Rohres 73 verschiedenen Durchmessers gebildet wird.Affixed on the floors unter'schiedlichen tubes 4 are j generally used only when necessary to carry out \ of measurements. Cover caps according to FIGS. 16 and 17 can expediently be used to shield these sockets during the times when measurements are not being carried out. Such a cap. ! is provided with a stepped pipe section 73, of which the lower part with the smaller diameter can be pushed into a pipe section 4 to fit closely. The upper end of the pipe section 73 is followed by an annular wall 74 projecting outwardly from this pipe section, which is perpendicular to the longitudinal axis of the pipe section 73 and which merges at the peripheral edge facing away from the pipe section 73 into a wall part 75 which extends obliquely downwards has two diametrically opposite recesses \ 76. The outer edge of the wall part 75 is concentric with the center line of the Rohrtciles 73 and the; lower edge of the wall part 75 is \ as the shoulder in the same plane, which is formed at the transition 73 of different diameters between the parts of the tube.

Die Kappe deckt die an der Markierstelle gebildete öffnung im Boden vor abfließendem Wasser ab, während die Innenwand des Rohrteiles 4 rein gehalten wird. Es wird dabeiThe cap covers the opening formed at the marking point in the ground in front of draining water, while the inner wall of the pipe part 4 is kept clean. It will be there

ein freier Durchgang der Markierstelle beibehalten. Der Durchgang in der Kappe kann im Bedarfsfall noch mit einem nicht dargestellten Pfropfen abgedichtet werden.Maintain a free passage of the marking point. The passage in the cap can still be used if necessary be sealed with a plug, not shown.

Eine auffallende Farbe der Kappe hat den Vorteil, die Markierstelle deutlich darzustellen, was von Bedeutung sein kann, um unwillkürliche Beschädigung dieser Markierstellen während der Bauarbeit zu vermeiden.A conspicuous color of the cap has the advantage of clearly showing the marking point, which is important can be in order to avoid involuntary damage to these marking points during the construction work.

Während einer bestimmten Phase im Bau werden - wie dies in Fig. 20 dargestellt ist - auf den verschiedenen Böden z.B. auf dem Etagenboden 57 häufig Abdeckschichten oder Abdeckböden 77 angebracht. Wenn die Markierstellen erhalten bleiben sollen, können die in den Figuren 18 und 19 dargestellten Hilfsmittel benutzt werden. Diese Hilfsmittel enthalten ein erstes Rohrstück 78 mit einem Muffenende 79, an dessen■ Außemiv^ang vorstehende Rippen 80 angebracht sind. In dieses Muffenende 79 ist ein Ende eines weiteren Rohrstücks eingeschoben, dessen Außendurchmesser gleich dem Innendurchmesser des Rohrstückes 4 ist. Das Rohrstück 78 passt eng in das Rohrstück 4 hinein.During a certain phase of construction - as shown in Fig. 20 - on the various floors For example, cover layers or cover floors 77 are often attached to the tier floor 57. When the marking points received should remain, the aids shown in Figures 18 and 19 can be used. These tools contain a first pipe section 78 with a socket end 79 on whose outer joint protruding ribs 80 are attached. In this socket end 79, one end of a further pipe section is pushed, the outside diameter of which is equal to the inner diameter of the pipe section 4. The pipe section 78 fits snugly into the pipe section 4 into it.

Wie in Fig.2 0 dargestellt ist, kann das Rohrstück 78 in das Rohrstück 4 so tief eingeschoben werden, daß das obere Ende des Rohrstückes 81, das im Muffenende des Rohrstücks 78 festgeleimt sein kann, mit der oberen Begrenzungsfläche der anzubringenden Abdeckschicht 77 flächig abschließt. Auf diese Weise wird in der Abdeckschicht 77 wieder mittels eines Rohrstückes eine Markierstellc gebildet, deren innere Abmessung gleich derAs shown in FIG. 20, the pipe section 78 be pushed so deep into the pipe section 4 that the upper end of the pipe section 81, which is in the socket end of the pipe section 78 can be glued to the upper boundary surface of the cover layer 77 to be applied closes flat. In this way, a marking position is again made in the covering layer 77 by means of a piece of pipe formed, the inner dimension of which is equal to that

inneren Abmessung der übrigen, Markierstellen bildenden Rohrstücke 4 ist.inner dimension of the remaining marking points forming Pipe sections 4 is.

- Leerseite - Blank page

COPYCOPY

Claims (13)

23 815/6-70/pf Petrus Antonius Johannes van Hoof Waleweinlaan 281 665 CJ Geldrop Niederlande Ansprüche:23 815 / 6-70 / pf Petrus Antonius Johannes van Hoof Waleweinlaan 281 665 CJ Geldrop Netherlands Claims: 1. Verfahren zum Festlegen von Messpunkten und zur Festlegung von Abständen und Richtungen beim Errichten eines mehrstöckigen Gebäudes,1. Procedure for defining measuring points and defining distances and directions when erecting of a multi-storey building, dadurch gekennzeichnet, daß auf dem zunächst angebrachten fußboden oder einer ähnlichen horizontalen Konstruktion an mindestens einer bestimmten Stelle eine Markierung in Form eines Rohrstückes (4) und in jedem darüber liegenden Fuß-characterized in that on the first attached floor or one Similar horizontal construction a marking in the form of a at least one specific point Pipe section (4) and in each overlying foot boden (57) oder einer ähnlichen horizontalen Konstruktion des mehrstöckigen Gebäudes über diesem Rohrstück (4) ein Durchgang mittels eines mit dem ersten Rohrstück (4) koaxial angeordneten Rohrstückes (4) angeordnet wird.floor (57) or a similar horizontal construction of the multi-storey building above this pipe section (4) a passage by means of a pipe section arranged coaxially with the first pipe section (4) (4) is ordered. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet., daß zum Anbringen eines Rohrstückes (4) in einem darüberliegenden Fußboden (57) oder einer ähnlichen Konstruktion an diesem darüberliegenden Fußboden (57) oder dgl. eine Vorrichtung befestigt wird, mittels der das Rohrstück (4) in zwei miteinander einen Winkel einschließenden Richtungen verstellbar ist, während ein darunterliegendes Rohrstück (4) zum Zen-2. The method according to claim 1, characterized., that for attaching a pipe section (4) in an overlying floor (57) or a similar one Construction on this overlying floor (57) or the like. A device is attached by means which the pipe section (4) is adjustable in two directions enclosing an angle with one another, while an underlying pipe section (4) to the center BAD ORIGINALBATH ORIGINAL trieren eines Theodoliten (27) benutzt wird, mittels welchem die Lage des anzubringenden Rohrstückes (4) kontrolliert wird.trieren a theodolite (27) is used, by means of which the position of the pipe section to be attached (4) is controlled. 3. Verfahren nach Anspruch 2, dadurch gekennzeichnet,3. The method according to claim 2, characterized in that daß in das anzubringende Rohrstück (4) ein Markierelement geschoben--wird, das mit in der Mitte des Rohrstückes (4) liegenden Markierzeichen versehen ist.that a marker element is pushed into the pipe section (4) to be attached - that is placed in the middle of the pipe section (4) is provided with marking marks. 4. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß von einem Rohrstück (4) ausgehend Messungen in einer horizontalen Ebene dadurch durchgeführt werden-, daß in das Rohrstück (4) eine Scheibe eingebracht wird, an der ein Messpunkt vorgesehen ist.4. The method according to any one of the preceding claims, characterized in that a pipe section (4) starting from measurements in a horizontal plane, that in the pipe section (4) a disc is introduced at which a measuring point is provided. 5. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß in das Rohrstück (4) zum Durchführen von Messungen ein mit einer Zentrieröffnung versehenes Markierelement eingebracht wird.5. The method according to any one of the preceding claims, characterized in that in the pipe section (4) for Carrying out measurements a marking element provided with a centering opening is introduced. 6. Markiereinrichtung zur Verwendung bei der Durchführung des Verfahrens nach einem der vorhergehenden Ansprüche dadurch gekennzeichnet, daß die Markiereinrichtung eine runde Platte (1) mit einem bezüglich der Mitte der Platte (1) exzentrischen Loch (2) aufweist, in dessen Rand vier um 90° gegeneinander versetzte Einkerbungen (3) vorgesehen sind, wobei das Rohrstück6. Marking device for use in carrying out the method according to one of the preceding claims characterized in that the marking device is a round plate (1) with one with respect to the center the plate (1) has an eccentric hole (2), in the edge of which there are four notches offset from one another by 90 ° (3) are provided, the pipe section (4) koaxial mit der Mittellinie des Loches (2) an der Platte (1) befestigt ist.(4) is fixed to the plate (1) coaxially with the center line of the hole (2). 7. Markierelementv insbesondere zur Verwendung beim Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß das Markierelerrentmit einem ringförmigen Körper versehen ist, der zwischen seinen Enden mit einem vorstehenden Kragen (13) versehen ist, und nahe einem Ende einer Querwand (11) mit einer Zen-7. Marking element in particular for use in the process according to any one of claims 1 to 5, characterized in that the marking element has an annular shape Body is provided which is provided with a protruding collar (13) between its ends, and near one end of a transverse wall (11) with a center trieröffnung (12) und mit einem Ansatz (14) mit einer diametral verlaufenden Begrenzungsfläche (15), auf der Markierzeichen (16) vorgesehen sind, versehen ist.trier opening (12) and with a shoulder (14) with a diametrically extending boundary surface (15), are provided on the markers (16). 8- Markierelement nach Anspruch 7, dadurch gekennzeichnet, daß es mit zwei vorstehenden Nasen (17). versehen ist, die eine V-förmige Einkerbung (18) begrenzen, die zur diametral verlaufenden Begrenzungsfläche (15) senkrecht steht.8- marking element according to claim 7, characterized in that that it has two protruding lugs (17). is provided, which limit a V-shaped notch (18), the to the diametrically extending boundary surface (15) is perpendicular. 9. Markierelement zur Verwendung beim Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß das Markierelement eine ringförmige Scheibe (29) und einen abnehmbar mit der Scheibe (29) verbundenen Ring (33) enthält, der einen größeren Außendurchmesser als. die Scheibe (29) aufweist, wobei in der Scheibe (29) eine Zentrierbohrung (3D) vorgesehen ist.9. Marking element for use in the method according to a of claims 1 to 5, characterized in that the marking element has an annular disc (29) and a contains ring (33) which is detachably connected to the disc (29) and which has a larger outer diameter than. the Has disc (29), a centering bore (3D) being provided in the disc (29). 10. Markierelement nach Anspruch 9, dadurch gekennzeichnet,10. Marking element according to claim 9, characterized in that daß der Ring (33) mittels zweier Flügelschrauben (32) mit der Scheibe (29) verbunden ist, von denen eine in einem im Ring(33) vorgesehenen geschlossenen Langloch (3 4) und die andere in einem in Ring (3 3) vorgesehenen, an einem Ende offenen Langloch (35) angeordnet ist.that the ring (33) is connected to the disc (29) by means of two wing screws (32), one of which in a closed elongated hole (3 4) provided in the ring (33) and the other in one provided in the ring (3 3), is arranged at one end open slot (35). 11. Einstellvorrichtung zum Durchführen des Verfahrens nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß die Einstellvorrichtung eine Basisplatte (59) und ein bezüglich dieser Basisplatte (59) verschiebbares, in jede gewünschte Stellung einstellbares Schiebestück (62) aufweist, das ein eine öffnung11. Adjustment device for performing the method according to one of claims 1 to 5, characterized in that the adjusting device is a base plate (59) and one which can be displaced with respect to this base plate (59) and can be adjusted to any desired position Has a sliding piece (62) which has an opening (66) aufweisendes Tragstück (65) abstützt, das in Bezug zum Schiebestück (62) verschiebbar und in einer Richtung senkrecht zur Richtung,in der das Schiebestück (62) in Bezug zur Basisplatte (59) verstell-(66) having support piece (65) which is displaceable in relation to the sliding piece (62) and in a Direction perpendicular to the direction in which the sliding piece (62) can be adjusted in relation to the base plate (59). bar ist, in jede gewünschte Stellung einstellbar ist.bar is adjustable in any desired position. 12. Einstellvorrichtung .nach Anspruch 11, dadurch gekennzeichnet, daß das Schiebestück (62) um die Achse (61) verschwenkbar ist, längs der das Schiebe-· stück (62) in-.Bezug auf die Basisplatte (59) verschiebbar ist.12. Adjustment device .according to claim 11, characterized in that that the sliding piece (62) can be pivoted about the axis (61) along which the sliding · piece (62) in relation to the base plate (59) is. 13. Stativ zum Abstützen eines Messgerätes, beispielsweise eines Theodoliten, dadurch gekennzeichnet , daß das Stativ ein zentrales Bein (19), das am unteren Ende mit einem Zentrierstift (20) versehen ist, und zwei mit dem zentralen Bein (19) verbundene einstellbare Zentrierstifte (24) aufweist, wobei am oberen Ende des zentralen Beines (19) eine Tragplatte (26) zum Abstützen des Messgerätes (27) angebracht ist.13. Stand for supporting a measuring device, for example a theodolite, characterized in that that the tripod has a central leg (19) which is provided at the lower end with a centering pin (20), and two adjustable ones connected to the central leg (19) Centering pins (24), with a support plate (26) at the upper end of the central leg (19) is attached to support the measuring device (27).
DE19843400392 1983-01-15 1984-01-07 Device for setting measuring points and for setting distances and directions Expired - Fee Related DE3400392C2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL8300153A NL8300153A (en) 1983-01-15 1983-01-15 METHOD AND MEANS FOR DETERMINING MEASURING POINTS AND SETTING DISTANCES AND DIRECTION.

Publications (2)

Publication Number Publication Date
DE3400392A1 true DE3400392A1 (en) 1984-07-19
DE3400392C2 DE3400392C2 (en) 1993-10-07

Family

ID=19841241

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19843400392 Expired - Fee Related DE3400392C2 (en) 1983-01-15 1984-01-07 Device for setting measuring points and for setting distances and directions

Country Status (3)

Country Link
BE (1) BE898651A (en)
DE (1) DE3400392C2 (en)
NL (1) NL8300153A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000009832A1 (en) * 1998-08-10 2000-02-24 Membranskydd As Method of laying a floor in a wet room and use of a marking plate
NL2004473C2 (en) * 2010-03-29 2011-10-03 Stephen James Bates METHOD FOR DETERMINING THE PLACE OF A MASON PROFILE TO BE ESTABLISHED AND A SOCLE TO BE USED IN THAT METHOD FOR THAT PROFILE.
CN117171853A (en) * 2023-09-15 2023-12-05 中建七局建筑装饰工程有限公司 BIM+C# based lower hanging plate forward design and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
DE-Z.: Vermessungstechnik, 25. Jg. (1977), H. 12, 420-422 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000009832A1 (en) * 1998-08-10 2000-02-24 Membranskydd As Method of laying a floor in a wet room and use of a marking plate
NL2004473C2 (en) * 2010-03-29 2011-10-03 Stephen James Bates METHOD FOR DETERMINING THE PLACE OF A MASON PROFILE TO BE ESTABLISHED AND A SOCLE TO BE USED IN THAT METHOD FOR THAT PROFILE.
CN117171853A (en) * 2023-09-15 2023-12-05 中建七局建筑装饰工程有限公司 BIM+C# based lower hanging plate forward design and construction method
CN117171853B (en) * 2023-09-15 2024-04-26 中建七局建筑装饰工程有限公司 BIM+C# based lower hanging plate forward design and construction method

Also Published As

Publication number Publication date
BE898651A (en) 1984-05-02
NL8300153A (en) 1984-08-01
DE3400392C2 (en) 1993-10-07

Similar Documents

Publication Publication Date Title
EP0633971B1 (en) Adjustable-height support for shuttering in the building trade
DE112010003523T5 (en) Embedded height adjustment mechanism for double-walled construction panels
DE102018127557A1 (en) Carrier system for placing reference markings
DE2602145A1 (en) SUPPORT FOR CONCRETE FORMWORKS
DE3400392A1 (en) Process and apparatus for establishing reference points and for establishing distances and directions
DE2828812C2 (en) Clamping device for clamping workpieces on the work table of a machine tool
EP0862047B1 (en) Device for levelling a measuring device
DE3427343A1 (en) Apparatus for producing walls
DE2921405C2 (en) Coverable ground sleeve for holding a flagpole
DE2348506C3 (en) Marking tool
DE9405383U1 (en) Device for positioning holes
DE4006759C2 (en) Device for delimiting and removing a screed to be poured
DE2716085A1 (en) Tile, stone slab, paving stone etc. cutting tool - has parallel guide tubes for carriage and stops for achieving precision cutting
DE19751812A1 (en) Adjustment element for coordinate measuring machines
DE3438924A1 (en) Process for establishing corner points of structures to be erected, and instrument for carrying out this process
DE2441002A1 (en) Shuttering for concrete walls - prop adjustable for length and vertically
DE1434469C (en) Longitudinally adjustable support for trimming formwork supports
AT244572B (en) Device for setting end plates on pre-concreted flights of stairs
EP0915219A1 (en) Column base
DE7207572U (en) Alignment device for the prefabrication of pipeline systems
DE3818895A1 (en) False-floor panel and support therefor
DE3830756A1 (en) Device for fastening a beam
DE10246237A1 (en) Tile-laying tool has angle member with two arms at right angles and with first fixed tile cross in one corner and with further cross movable along longitudinal guide for accurate positioning
DE9408768U1 (en) Device for holding plates
DE4411041A1 (en) Installation device for glass plate of balcony and stair banisters

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8125 Change of the main classification

Ipc: G01C 15/00

D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee