DE3311243A1 DE19833311243 DE3311243A DE3311243A1 DE 3311243 A1 DE3311243 A1 DE 3311243A1 DE 19833311243 DE19833311243 DE 19833311243 DE 3311243 A DE3311243 A DE 3311243A DE 3311243 A1 DE3311243 A1 DE 3311243A1
Authority
DE
Germany
Prior art keywords
formwork
parts
transport frame
shuttering
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19833311243
Other languages
German (de)
Inventor
Klaus Herve Goebel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19833311243 priority Critical patent/DE3311243A1/en
Publication of DE3311243A1 publication Critical patent/DE3311243A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices
    • E04G19/003Arrangements for stabilising the forms or for moving the forms from one place to another

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

When constructing buildings in which firstly the vertical loadbearing walls are constructed and only then the ceilings are put up, it is proposed to use foldable shuttering units (1, 2) for the shuttering of the ceilings and to move these shuttering units, folded up, on a mobile transporting frame (3) through prepared door openings (4) from a room just provided with a ceiling to a neighbouring room to be provided with a ceiling. The transporting frame (3) has a lifting device for lifting the shuttering parts (1, 2) to the ceiling and pivotable arms (7) for unfolding the shuttering parts. Fold-out feet (6) prevent the transporting frame from tipping over when the shuttering parts are being unfolded and folded up. <IMAGE>

Description

Verfahren zur Herstellung von Massivdecken aus BetonProcess for the production of solid concrete slabs

sowie Schalungs-Transportgestell zu seiner Durchführung Beschreibunq Es sind Schalungsgerüste bekannt geworden, die in Form von Tunnelschalungen in einem Stück Wände- und Deckenschalung bilden. Diese werden im Deckenbereich eingeknickt und können dann mit einem Auslegerarm am Haken eines Krsnes durch raumgroße Öffnungen ins Freie befördert werden.as well as formwork transport frame for its implementation Description There are formwork scaffolding become known that in the form of tunnel formwork in one Form a piece of wall and ceiling formwork. These are buckled in the ceiling area and can then with a cantilever arm on the hook of a crane through room-sized openings be transported outdoors.

Sind die tragenden Konstruktionsteile eines Bauwerkes in Gleitschalung oder ähnlichen Verfahren hergestellt, so kommen Vorrichtungen zur Anwendung, bei denen Deckenschalung und Stützen eine Einheit bilden. Dabei wird die gesamte Einheit mit Fußspindeln auf Räder abgesetzt und kann somit verschoben werden. Dieses Verfahren wird bei großen Flächen angewandt, wie zum Beispiel bei Großraumbüros. Zwischenwände werden bei diesem Verfahren später erstellt.Are the load-bearing structural parts of a building in sliding formwork or similar processes, devices are used where slab formwork and columns form a unit. Thereby the whole unit with foot spindles placed on wheels and can therefore be moved. This method is used for large areas, such as open-plan offices. Partitions are created later in this procedure.

Im sozialen Wohnungsbau kommen durch Rationalisierung gleiche Wohnungsgrundrisse und Raumgrößen in mehreren Wiederholungen vor, so daß hier gut eine Gleitschalung zur Anwendung kommen kann, was auch den Vorteil hat, daß man Doppelwände zur Wärmehnd Schallisolierung herstellen kann. DieMaßgenauigkeit der Diagonalen in den Raumausmaßen ist bei.diesem Vorgehen besonders gut.In social housing construction, rationalization results in the same floor plans and room sizes in several repetitions, so that a sliding formwork is good here can be used, which also has the advantage that you have double walls for heat Can produce sound insulation. The dimensional accuracy of the diagonals in the dimensions of the room is particularly good at this approach.

Durch die vorliegende Erfindung soll ein Verfahren zur Herstellung von Massiv decken aus Beton und ein Schalungstransportgestell zu seiner Durchführung angegeben werden, welche bei vorgefertigten tragenden Wänden ein rasches und einfaches Schalen der Decke in benachbarten, durch tragende Wände getrennten Teilen des Bauwerkes gestatten.The present invention aims to provide a method of manufacturing of solid concrete ceilings and a formwork transport frame for its implementation can be specified which, in the case of prefabricated load-bearing walls, is quick and easy Shells of the ceiling in adjacent parts of the building separated by load-bearing walls allow.

Diese Aufgabe ist erfindungsgemäß gelöst durch einen VerFahren gemäß Anspruch 1 bzw. ein Schalungstransportgestell gemäß Anspruch 3.This object is achieved according to the invention by a method according to Claim 1 or a formwork transport frame according to Claim 3.

Dem erfindungsgemäßen Verfahren liegt der Gedanke zugrunde, nach dem Erhärten des Betons eines erstellten Deckenabschnittes die zur Erzeugung dieses Deckenabschnittes verwendete Schalung zu falten und auf einem biegesteifen Transportgestell abzulegen, so daß sie durch eine in einer tragenden Wand schon vorbereitete Türöffnung zu einem anderen Einsatzplatz bewegt werden kann. Die Schalungseinheit bleibt hierbei erhalten, während man beim herkömmlichen Schalen die Schalung wieder abbaut und in handhabungsgerechte Teile zerlegt, welche dann an anderer Stelle wieder zusammengesetzt werden, und zwar auch dann, wenn dort die Schalung an sich dieselben Grundmasse haben soll.The inventive method is based on the idea, according to which Hardening of the concrete of a ceiling section created for the creation of this Ceiling section used to fold formwork and on a rigid transport frame so that they can be opened through a door opening already prepared in a load-bearing wall can be moved to another location. The formwork unit remains here received, while the formwork is dismantled again with conventional formwork and disassembled into easy-to-use parts, which are then reassembled elsewhere even if the formwork itself has the same basic mass should have.

Bei Verwendung des erfindungsgemäßen Verfahrens ist die Zeit zum Aufbauen einer Schalung in einem mit einer Decke zu versehenden Raum erheblich verkürzt.Using the method of the invention is the time to build a formwork in a room to be provided with a ceiling.

Vorteilhafte Weiterbildungen der Erfindung sind in Unteransprüchen angegeben.Advantageous further developments of the invention are set out in the subclaims specified.

Nachstehend wird die Erfindung anhand eines Ausführungsbeispieles unter Bezugnahme auf die beiliegende Zeichnung näher erläutert. In dieser zeigen: Figur 1: Eine Aufsicht auf die Schmalseite einer zusammengefalteten Schalungseinheit beim Transport durch eine Türöffnung; Figur 2: Eine ähnliche Ansicht wie Figur 1, in welcher die erste Phase des Aufbaus der Schalungseinheit am Einsatzort wiedergegeben ist (Ausklappen von Stützfüßen des Transportgestells); Figur 3: Eine ähnliche Ansicht wie Figur 2, in welcher eine zweite Phase des Aufstellens am Einsatzort wiedergegeben ist (Nachobenfahren des oben liegenden Tragabschnittes des Transportgestelles); Figur 4: Eine ähnliche Ansicht wie Figur 3, in welcher nun eines der zur Schalungseinheit gehörenden Schalungsteile ausgeklappt und durch Stützen gesichert ist; und Figur 5: Eine perspektivische Ansicht eines Gebäudeteiles, in welchem die vertikalen tragenden Wände schon erstellt sind und nun Decken in den verschiedenen Räumen eingezogen werden, wobei eine Mehrzahl von Schalungseinheiten bündig nebeneinanderstoßend gezeigt ist.The invention is described below using an exemplary embodiment explained in more detail with reference to the accompanying drawing. In this show: Figure 1: A plan view of the narrow side of a folded formwork unit during transport through a doorway; Figure 2: A view similar to Figure 1, in which the first phase of the construction of the formwork unit is reproduced on site is (folding out support legs of the transport frame); Figure 3: A view similar to Figure 2, in which a second phase of erection is reproduced at the place of use (upward movement of the supporting section above of the transport frame); Figure 4: A view similar to Figure 3, in which Now one of the formwork parts belonging to the formwork unit is unfolded and through Supports is secured; and FIG. 5: a perspective view of a part of the building, in which the vertical load-bearing walls have already been created and now ceilings in the various rooms are drawn in, with a plurality of formwork units is shown flush with each other.

Figur 1 zeigt eine zusammengefaltete Schalungseinheit, welche als Hauptbestandteile zwei rechteckige Schalungsteile 1, 2 aufweist und auf einem bockförmigen Transportgestell 3 ruht.Figure 1 shows a folded formwork unit, which as Main components has two rectangular formwork parts 1, 2 and on a trestle-shaped Transport frame 3 rests.

Die Abmessuntgen der in zusammengefaltetem Zustand im wesentlichen dreieckig prismatischen Schalungseinheit und des entsprechend keilförmigen Transportgestelles 3 sind so gewählt, daß sie durch eine Türöffnung 4 eines Raumes 5 durchgeschoben werden können.The dimensions in the folded state are essentially triangular prismatic formwork unit and the corresponding wedge-shaped transport frame 3 are chosen so that they are pushed through a door opening 4 of a room 5 can be.

Das bockförmige Transportgestell 3 hat einen unteren Fußabschnitt 3a, welcher auf Rollen 3b auf einer schon erstellten Gebäudedecke verschoben werden kann. Am Fußabschnitt 3a sind ausklappbare Stützfüße 6 angebracht, welche das biegesteife Transportgestell 3 verkippsicher auf der Aufstellfläche abstützen. Die Stütz füße 6 werden auf der einen und der anderen Seite des Transportgestelles 3 herausgeklappt, wenn die Schalungseinheit in dem mit einer Decke zu versehenden Raum an den Einsatzort bewegt worden ist. Dieser- Zustand ist in Figur 2 wiedergegeben.The trestle-shaped transport frame 3 has a lower foot section 3a, which can be moved onto rollers 3b on a building ceiling that has already been created can. Fold-out support feet 6 are attached to the foot section 3a, which make the rigid Support the transport frame 3 on the installation surface so that it does not tip over. The support feet 6 are folded out on one and the other side of the transport frame 3, if the Formwork unit in the one to be provided with a ceiling Room has been moved to the site. This state is shown in FIG.

Zum Transportgestell 3 gehört ferner ein oberer keilförmiger 3b Tragabschnitt/welcher durch eine nicht näher gezeigte Hubeinrichtung (z.B. eine Schraubspindel oder einen Druckmittel-Arbeitszylinder) vom Fußabschnitt 3a getragen ist. Am Tragabschnitt 3c hängen die Schalungsteile 1,2, welche über einen Verbindungsträger 2a und Gelenkbolzen 2b verbunden sind. Die Lage der Gelenkbolzen 2b ist so gewählt, daß die Schalungsteile 1,2 nach dem Aufklappen in eine zur Aufstellfläche parallele Ebene eine glatt durchgehende Schalfläche vorgeben.The transport frame 3 also includes an upper wedge-shaped 3b support section / which by a lifting device not shown in detail (e.g. a screw spindle or a Pressure medium working cylinder) is carried by the foot section 3a. On the support section 3c hang the formwork parts 1, 2, which are connected via a connection beam 2 a and hinge pins 2b are connected. The position of the hinge pin 2b is chosen so that the formwork parts 1.2 after opening into a plane parallel to the installation surface, a smooth, continuous plane Specify the button area.

Als nächster Schritt beim Aufstellen der Schalungseinheit am Einsatzort wird der Tragabschnitt 3c über die Hubeinrichtung soweit angehoben, bis man die für die Decke gewünschte Höhe erreicht hat. Dieser Zustand ist in Figur 3 der Zeichnung wiedergegeben.As the next step in setting up the formwork unit on site the support section 3c is raised on the lifting device until you get the has reached the desired height for the ceiling. This state is shown in Figure 3 of the drawing reproduced.

Am Transportgestell 3 sind ferner bewegliche Arme 7 angebracht, welche die Schalungsteile 1,2 nacheinander auffalten, derart, daß sie horizontal ausgerichtet in eine gemeinsame Ebene gelangen. Diese Phase des Aufstellens der Schalungseinheit am Einsatzort ist in Figur 4 wiedergegeben.Movable arms 7 are also attached to the transport frame 3, which Unfold the formwork parts 1, 2 one after the other so that they are aligned horizontally get into a common plane. This phase of setting up the formwork unit at the place of use is shown in FIG.

Hernach werden dem Transportgestell 3 zugeordnete Stützen 8 aufgestellt, welche die Schalungsteile auf der Aufstellfläche abstützen. Man kann dann das fahrbare Tr.ansportgestell wegziehen und es zum Herbeiführen weiterer Schalungseinheiten in gefaltetem Zustand in den mit einer Decke zu versehenden Raum verwenden.After that, supports 8 assigned to the transport frame 3 are set up, which support the formwork parts on the installation surface. You can then do the drivable Pull the transport frame away and use it to bring in further formwork units Use when folded in the room to be provided with a ceiling.

Figur 5 zeigt zwei schon aufgefaltete und im mit einer Decke zu versehenden Raum aufgestellte Schalungseinheiten 1,2 und 1,2', während auf dem fahrbaren Transportgestell durch die Türöffnung 4 gerade eine weitere Schalungseinheit 1", 2" in gefaltetem Zustand hereingefahren wird.Figure 5 shows two already unfolded and to be provided with a blanket Formwork units 1,2 and 1,2 'while on the mobile caddy through the door opening 4 just another formwork unit 1 ", 2" is driven in in the folded state.

- Leerseite -- blank page -

Claims (5)

Patentansprüche 1 Verfahren zum Herstellen von Decken aus Beton, dadurch gekennzeichnet, daß nach dem Festwerden des Betons die Deckenschalung gefaltet und auf einem biegesteifen Transportgestell abgelegt wird; daß das Transportgestell zusammen mit der zusammengefalteten Schalung durch eine Türöffnung zum nächsten Einsatzort bewegt wird; daß dort das Transportgestell nach oben ausgefahren wird, bis die für die Decke gewünschte Höhe erreicht ist; und daß schließlich die zusammengefalteten Schalungsteile wieder aufgefaltet werden, so daß sie in horizontaler Ausrichtung in eine gemeinsame Ebene gebracht werden. Claims 1 method for producing concrete ceilings, characterized in that the ceiling formwork is folded after the concrete has set and is placed on a rigid transport frame; that the caddy together with the folded formwork through one door opening to the next Location is moved; that there the transport frame is extended upwards, until the desired height for the ceiling is reached; and that finally the folded Formwork parts are unfolded again so that they are in a horizontal orientation be brought into a common plane. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß unter die an den Einsatzort gebrachten und aufgefalteten Schalungsteile Stützen gestellt werden, so daß man das Transportgestell entfernen und erneut verwenden kann.2. The method according to claim 1, characterized in that under the Formwork parts brought to the place of use and unfolded, supports are placed, so that you can remove the caddy and use it again. 3. Transportgestell zur Durchführung des Verfahrens nach Anspruch 1 oder 2, gekennzeichnet durch einen Fußabschnitt (3a), einen über eine Hubeinrichtung am Fußabschnitt (3a) abgestützten Tragabschnitt (3c), zu beide.n Sei.ten des Transportgestelles ausklappbare Stützfüße (6) und verschwenkbare Arme (7) zum Auffalten der Teile einer vom Transportgestell getragenen Schalungseinheit (1,2).3. Caddy for carrying out the method according to claim 1 or 2, characterized by a foot section (3a), one via a lifting device the support section (3c) supported on the foot section (3a), on both sides of the transport frame Fold-out support feet (6) and pivotable arms (7) for unfolding the parts of a Formwork unit (1,2) carried by the transport frame. 4..Transportgestell nach Anspruch 3, dadurch gekennzeichnet, daß-ihm Stützen (8) zugeordnet sind, welche unter die aufgefalteten Teile der von ihm getragenen Schalungseinheit zu stellen sind.4..Transportrahmen according to claim 3, characterized in that-him Supports (8) are assigned, which are under the unfolded parts of the carried by him Formwork unit are to be provided. 5. Transportgestell nach Anspruch 3 oder 4 zur Verwendung mit Schalungseinheiten, welche zwei gelenkig verbundene Schalungsteile aufweisen, dadurch gekennzeichnet, daß der Tragabschnitt (3c) keilförmig ist, wobei die Spitze des Keiles nach oben weist.5. Transport frame according to claim 3 or 4 for use with formwork units, which have two articulated formwork parts, characterized in that that the support section (3c) is wedge-shaped, with the tip of the wedge facing upwards shows.
DE19833311243 1983-03-28 1983-03-28 Method for producing solid concrete ceilings and shuttering-transporting frame for carrying out the method Withdrawn DE3311243A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19833311243 DE3311243A1 (en) 1983-03-28 1983-03-28 Method for producing solid concrete ceilings and shuttering-transporting frame for carrying out the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19833311243 DE3311243A1 (en) 1983-03-28 1983-03-28 Method for producing solid concrete ceilings and shuttering-transporting frame for carrying out the method

Publications (1)

Publication Number Publication Date
DE3311243A1 true DE3311243A1 (en) 1984-10-04

Family

ID=6194872

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19833311243 Withdrawn DE3311243A1 (en) 1983-03-28 1983-03-28 Method for producing solid concrete ceilings and shuttering-transporting frame for carrying out the method

Country Status (1)

Country Link
DE (1) DE3311243A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2723758A1 (en) * 1994-06-29 1996-02-23 Dingler Gerhard DEVICE FOR SUPPORTING CEILING FORM TABLES
FR2730513A1 (en) * 1995-02-10 1996-08-14 Lee Wen Yuan PROCESS FOR CONSTRUCTION OF A CONCRETE FLOOR OF A STRUCTURE AND DEVICE USED THEREFOR
FR2867497A1 (en) * 2004-03-09 2005-09-16 Const De La Cote D Emeraude Concrete block stripping assistance device for use in building construction, has base mounted on wheels for carrying support mast, and mast head to be stopped against nearby stripping plate or concrete slab during lifting of telescopic mast
GB2454453A (en) * 2007-09-22 2009-05-13 Tony Priddle Support apparatus and formwork used in casting concrete floors
DE102021122337B3 (en) 2021-08-30 2022-11-03 Redima Ag Support device for concrete ceilings

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1924118U (en) * 1965-07-13 1965-09-23 Leopold Mueller MOBILE CONCRETE PLATFORM OR FORMING TROLLEY FOR THE PRODUCTION OF REINFORCED CONCRETE CONSTRUCTIONS.
DE1759423A1 (en) * 1968-04-29 1971-06-09 Laurenz Kistler Method and device for stripping of circuits from concrete ceilings
DE2037360B2 (en) * 1970-07-21 1974-06-06 Wolfgang 1000 Berlin Beisse Large area formwork and method for its formwork
DE2634699C2 (en) * 1976-08-02 1982-12-30 Ulrich Eugen 5000 Köln Milbradt-Lojda Suspended large area formwork for concrete ceilings

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1924118U (en) * 1965-07-13 1965-09-23 Leopold Mueller MOBILE CONCRETE PLATFORM OR FORMING TROLLEY FOR THE PRODUCTION OF REINFORCED CONCRETE CONSTRUCTIONS.
DE1759423A1 (en) * 1968-04-29 1971-06-09 Laurenz Kistler Method and device for stripping of circuits from concrete ceilings
DE2037360B2 (en) * 1970-07-21 1974-06-06 Wolfgang 1000 Berlin Beisse Large area formwork and method for its formwork
DE2634699C2 (en) * 1976-08-02 1982-12-30 Ulrich Eugen 5000 Köln Milbradt-Lojda Suspended large area formwork for concrete ceilings

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2723758A1 (en) * 1994-06-29 1996-02-23 Dingler Gerhard DEVICE FOR SUPPORTING CEILING FORM TABLES
FR2730513A1 (en) * 1995-02-10 1996-08-14 Lee Wen Yuan PROCESS FOR CONSTRUCTION OF A CONCRETE FLOOR OF A STRUCTURE AND DEVICE USED THEREFOR
FR2867497A1 (en) * 2004-03-09 2005-09-16 Const De La Cote D Emeraude Concrete block stripping assistance device for use in building construction, has base mounted on wheels for carrying support mast, and mast head to be stopped against nearby stripping plate or concrete slab during lifting of telescopic mast
GB2454453A (en) * 2007-09-22 2009-05-13 Tony Priddle Support apparatus and formwork used in casting concrete floors
DE102021122337B3 (en) 2021-08-30 2022-11-03 Redima Ag Support device for concrete ceilings

Similar Documents

Publication Publication Date Title
DE60024077T2 (en) MODULAR BUILDING STRUCTURE AND METHOD FOR THE PRODUCTION THEREOF
DE1784905A1 (en) Building in box construction
DE68920754T2 (en) Construction equipment and process.
DE2354316A1 (en) CONSTRUCTION PROCEDURE AND EQUIPMENT FOR ITS IMPLEMENTATION
DE2241589A1 (en) METHOD AND DEVICE FOR MANUFACTURING A CONCRETE BUILDING ON THE SITE
DE2720198B2 (en) Building made up of load-bearing containers in a modular manner
DE3311243A1 (en) Method for producing solid concrete ceilings and shuttering-transporting frame for carrying out the method
DE598730C (en) Construction process using components produced in the workshop
DE3537754A1 (en) Process for producing a prefabricated residential building, and set of structural elements for carrying out the process
DE3312582A1 (en) FORMWORK FOR PRODUCING SIDES ON CONCRETE CEILINGS
DE2462352C3 (en) Process for the production of a room cell from reinforced concrete and device for carrying out the process
DE3722849A1 (en) Quick-construction partition wall for fitting up cubicles and partitions in sanitary areas and wet rooms
DE9300735U1 (en) Ceiling folding table
DE1759316A1 (en) Process for the construction of a multi-storey building and device for carrying out the process
DE1684137A1 (en) Method for building houses and devices for carrying out the method
DE2400390B2 (en) METHOD FOR PRODUCING A ROOM FROM REINFORCED CONCRETE AND DEVICE FOR CARRYING OUT THE METHOD
DE804245C (en) Method and apparatus for the manufacture of cast-in-place masonry
DE815693C (en) Teaching scaffolding for building walls
DE2817745A1 (en) Mobile covering with assembled framework - has hinged connecting pieces with sliding shoes or rollers at base assigned to ground anchors
DE2322920B2 (en) PRE-FABRICATED COMPONENT FOR THE MANUFACTURE OF BUILDINGS
DE938987C (en) Device for the production of structures, in particular masonry made of loose concrete and. like
DE2812974A1 (en) Rapid erection concrete formwork - has corner paired angle plates hinged to walls, with movement permitted
DE4316568C1 (en) Method and device for manufacturing rectangular concrete parts preferably provided with recesses
DE2942944A1 (en) Prefab. house collar beam cable roof components - have folding units embracing rafter panel and valley bottom element
AT413123B (en) FRAME IN FOLDING DESIGN

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
8141 Disposal/no request for examination