DE598730C - Construction process using components produced in the workshop - Google Patents

Construction process using components produced in the workshop

Info

Publication number
DE598730C
DE598730C DEL79708D DEL0079708D DE598730C DE 598730 C DE598730 C DE 598730C DE L79708 D DEL79708 D DE L79708D DE L0079708 D DEL0079708 D DE L0079708D DE 598730 C DE598730 C DE 598730C
Authority
DE
Germany
Prior art keywords
wall parts
construction
joints
wall
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEL79708D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Carl Ludowici K A A
Original Assignee
Carl Ludowici K A A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Carl Ludowici K A A filed Critical Carl Ludowici K A A
Priority to DEL79708D priority Critical patent/DE598730C/en
Application granted granted Critical
Publication of DE598730C publication Critical patent/DE598730C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/041Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres composed of a number of smaller elements, e.g. bricks, also combined with a slab of hardenable material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2002/001Mechanical features of panels
    • E04C2002/002Panels with integrated lifting means, e.g. with hoisting lugs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Bauverfahren 'unter Verwendung von werkstattmäßig hergestellten Bauteilen Die Erfindung betrifft ein Verfahren zur Errichtung von Gebäuden unter Verwendung von werkstattmäßig hergestellten Wandteilen.Construction process' using workshop-made components The invention relates to a method for erecting buildings using of workshop-made wall parts.

Die bisherigen Bauverfahren unterscheidet man im wesentlichen in Mas.sivbauweisen und Skelettbauweisen. Bei den Massivbauweisen wird ein wertvoller leistungsfähiger Baustoff mit verhältnismäßig großem Material- und Zeitaufwand an der Baustelle verarbeitet. Die Skelettbauweisen haben zwar demgegenüber den Vorteil, daß sie eine schnellere Montage des Baues ermöglichen und mit billigeren Füllbaustoffen arbeiten können. Sie ergeben jedoch verhältnismäßig hohe Kosten für den Baustahl. Außerdem sind die wirklich guten Füllbaustoffe meistens auch statisch so leistungsfähig, daß sie einen großen Teil oder sogar die ganze Baulast schon allein ohne das Skelett tragen können. Diese Tragfähigkeit wird jedoch beim Skelettbau nicht ausgenutzt, so daß auch hierdurch eine teuere Bauweise entsteht, wodurch der Vorteil der Skelett- und Rahmenbauweisen, welcher gegenüber dem Massiv'bau in dem werkstattgemäßen Montageverfahren liegt, zum Teil wieder aufgehoben wird.The previous construction methods are essentially divided into mas.siv construction methods and skeleton constructions. With the solid construction methods, a valuable one becomes more efficient Construction material processed at the construction site with a relatively large amount of material and time. The skeleton structures have the advantage that they are faster Enable assembly of the structure and be able to work with cheaper filler materials. However, they result in a relatively high cost for the structural steel. Besides, they are really good filler materials are usually so statically efficient that they have a be able to carry a large part or even all of the construction load alone without the skeleton. However, this load-bearing capacity is not used in skeleton construction, so that too an expensive construction is created, whereby the advantage of the skeleton and frame construction, which is in the workshop-appropriate assembly process compared to the solid construction, is partially repealed.

Diese Nachteile werden erfindungsgemäß dadurch vermieden, daß massiv aufgemauerte Wandteile in besonderen Stahlrahmen transportiert--und zusammengefügt werden, und daß die Fugen durch Vermauerung oder Beton geschlossen; werden, wobei die Transportrahmen ganz oder zum Teil zur Verstärkung des. so entstehenden Fugenskeletts in diesem verbleiben. Wandteile mit Hilfe später wieder zu entfernender Stahlrahmenteile an ihre Einbaustelle zu bringen, ist an sich bekannt.These disadvantages are avoided according to the invention in that massive Bricked-up wall parts transported in special steel frames - and put together and that the joints are closed by brickwork or concrete; be, where the transport frame in whole or in part to reinforce the resulting joint skeleton remain in this. Wall parts with the help of steel frame parts to be removed later Bringing them to their place of installation is known per se.

Durch das neue Bauverfahren entsteht jedoch eine Art Eisenbetonskelettbau, der als solcher nicht nur eine restlose Ausnutzung der verwendeten Baustoffe, sondern auch transporttechnisch und bautechnisch eine Verbesserung gegenüber den bisherigen Verfahren mit sich bringt und somit im ganzen, zu einer entsprechenden Verbilligung beiträgt.However, the new construction method creates a kind of reinforced concrete skeleton structure, as such, not only a complete utilization of the building materials used, but also in terms of transport and construction an improvement over the previous ones Procedure brings with it, and thus on the whole, to a corresponding reduction in price contributes.

Das Verfahren kann auch so ausgeführt werden, daß ein Rahmen oder Gestell zum Transport und zum Aufrichten und Zusammenfügen der aus Massiv- oder Hohlbausteinen oder -platten zusammengesetzten Wandteile verwendet wird und nach gegenseitiger Befestigung derselben bzw. nach Erhärten der Fugenfüllstoffe herausgezogen wird, so daß die Wand als Mas.sivbau bzw. Betonskelettbau entsteht.The method can also be carried out so that a frame or Frame for transporting and for erecting and assembling the solid or Hollow bricks or panels assembled wall parts is used and after mutual fastening of the same or pulled out after the joint fillers have hardened so that the wall is created as a mas.sivbau or concrete skeleton construction.

Es können ferner die nach der erstgenannteil Ausführung teilweise in den Fugen zwischen Alen neben- bzw. übereinander errichteten Wandteilen belassenen Transportgestelle untereinander verbunden werden und so zur Versteifung des ganzen Baues dienen.It can also be partially implemented according to the first-mentioned part left in the joints between wall parts erected next to or on top of each other Transport racks are connected to each other and so to stiffen the whole Serve building.

Im F4lle eines Massivbaues wird eine Wandplatte in der Werkstatt mit Hilfe eines Rahmens hergestellt, der so konstruiert ist, daß er nur die Funktion des Transportes von der Werkstatt bis zur Baustelle zu übernehmen hat. Solche Rahmen sind an sich bekannt. Der untere Teil dieses Rahmens kann als eine Art Fuß ausgebildet werden, so daß die Wand an der Baustelle ohne besondere Hilfmittel aufgestellt werden kann. Für die Standfestigkeit der Wand kann auch unmittelbar durch eine zweckmäßige Unterstützung an der Wand oder im Fundament gesorgt werden, die auch leicht die Entfernung des Transportrahmens gestattet. Wenn der Rahmen seine eigentliche Aufgabe erfüllt hat, kann er gemäß seiner Konstruktion mühelos von der Wandplatte entfernt werden.In the case of a solid building, a Wall plate in made in the workshop with the aid of a frame designed so that he only to take over the function of transport from the workshop to the construction site Has. Such frames are known per se. The lower part of this frame can be used as a a kind of foot can be formed so that the wall on the construction site without special Aids can be set up. For the stability of the wall can also directly provided by appropriate support on the wall or in the foundation, which also allows easy removal of the transport frame. If the frame is its has fulfilled the actual task, it can be effortlessly removed from the Wall plate can be removed.

Die Bauwand selbst besteht hierbei aus Baustoff, welcher die statischen Beanspruchungen vollständig aufnehmen kann. Die Montage der anschließenden Wand erfolgt in derselben Art. Der Raum zwischen den Wandteilen wird durch einen entsprechenden Körper ausgefüllt, der den gesamten Bau zu einem Massivbau zusammenschließt. Je nachdem auf welche Weise dieser Füllkörper in die Fugenhohlräume eingebracht wird, werden die eisernen Traggerüste Sonderformen annehmen, z. B. kann ein eigens dazu hergestelltes Traggerüst für den Fall, daß der Raum vergossen wird, sofort als Verschalung dienen.The building wall itself consists of building material, which the static Can absorb stresses completely. The assembly of the adjoining wall takes place in the same way. The space between the wall parts is created by a corresponding Filled body that unites the entire building into a solid structure. Ever after which way this filling body is introduced into the joint cavities, the iron shoring will take on special forms, e.g. B. can be specially designed for this Manufactured support structure in the event that the room is potted, immediately as a cladding to serve.

Für höhere Beanspruchungen findet vorteilhaft die obenerwähnte zweite Ausführungsart Anwendung. Die Eiseneinlagen können hierbei an der Baustelle quer durch die Hohlwand in verschiedener Verteilung durchgeschoben werden oder auch bereits in der Werkstatt an bestimmten Stellen der Wand einmontiert sein. Die dazugehörigen Längseisen werden dann in den senkrechten Fugen verlegt, oder die Transportgestelle besitzen eine hierfür geeignete Form und werden mit den Quereisen beispielsweise durch Draht verbunden. Durch Ausgießen der so bewehrten Fugen mit Beton entsteht auf diese Weise ein Eisenbetonskelett, welches gemeinsam mit dem vollwertigen übrigen Wandbaustoff die statischen Beanspruchungen aufnimmt.The second mentioned above is advantageous for higher loads Application type. The iron inlays can be used across the construction site be pushed through the cavity wall in various distributions or already be installed at certain points on the wall in the workshop. The associated Longitudinal bars are then laid in the vertical joints, or the transport racks have a suitable shape and are used with the crossbars, for example connected by wire. By pouring the reinforced joints with concrete in this way a reinforced concrete skeleton, which together with the full-fledged rest Wall building material absorbs the static loads.

Der Unterschied gegenüber der bisherigen Eisenbetonskelettbauweise besteht darin, daß die Füllkörper zuerst und zuletzt das Skelett hergestellt wird, Die Zeichnungen zeigen einige Beispiele der zur Anwendung gelangenden Transport-bzw. Montagegestelle.The difference compared to the previous reinforced concrete skeleton construction consists in that the filling body is made first and the skeleton last, The drawings show some examples of the used transport or. Assembly frames.

Abb. i zeigt ein dreiteiliges mit zwei Gelenkeng verbundenes Transportgestell y, Abb. z dasselbe in einem Mauerstück montiert.Fig. I shows a three-part transport frame that is closely connected with two joints y, fig. z the same mounted in a piece of wall.

Dieses Gestell kann durch Herausnehmen der Gelenkbolzen getrennt und dann zwischen den einzelnen Wandteilen herausgezogen werden.This frame can be separated by removing the hinge pin and can then be pulled out between the individual wall parts.

Abb.3 zeigt Traggestelle mit Verschalungsblechen b und die vergossene Fuge f. Abb. q. zeigt zwei miteinander verbundene Mauerteile mit vergossener Fuge, in welcher die Eisenbewehrung e angedeutet ist.Fig.3 shows support frames with cladding sheets b and the cast joint f. Fig. Q. shows two interconnected parts of the wall with a grouted joint, in which the iron reinforcement e is indicated.

Abb.5 und 6 lassen erkennen, daß entweder auf dem Fundament a oder unter dem Fuß der Wand eine Aussparung c vorgesehen ist, die das Herausziehen des unteren Rahinenteiles r gestattet.Fig.5 and 6 show that either on the foundation a or a recess c is provided under the foot of the wall, which allows the pulling out of the lower frame part r permitted.

Abb. 7 und 8 zeigen die mit Füßen. zt versehenen Gestelle für schmale Wände. Die Tragstangen s, welche hier wie in Abb. 3 mit Verschalungsblechen versehen sein; können, sind um Gelenke lt drehbar unrl können in diesen vom Fuß u gelöst werden.Figs. 7 and 8 show those with feet. partially provided frames for narrow Walls. The support rods s, which are provided here with cladding sheets as in Fig. 3 be; can, are rotatable around joints and can be loosened in these from the foot will.

Abb. 9 stellt einen aus Hohlsteinen zusammengesetzten Wandteil m mit Quereisen q dar. Abb. io und ii zeigen eine andere Form des Trag- und Montagegestells, welches aus Flach- und Winkeleisen zusammengesetzt ist. Die Ausführung des neuen Bauverfahrens ist jedoch keineswegs an diese dargestellten Hilfsmittel gebunden, die je nach Art der Bauwände und Verwendungsart verschiedene Formen annehmen können..Fig. 9 shows a wall part m composed of hollow stones with cross bars q . Figs. Io and ii show another form of the support and assembly frame, which is composed of flat and angle iron. However, the execution of the new construction method is in no way tied to the aids shown, which can take different forms depending on the type of building walls and the type of use.

Claims (1)

PATENTANSPRÜCHE: i. Bauverfahren unter Verwendung von werkstattmäßig hergestellten Wandteilen, dadurch gekennzeichnet, daß massiv aufgemauerte Wandteile in besonderen Stahlrahmen zur Baustelle transportiert und dort zusammengefügt werden, und daß die Fugen zwischen den, einzelnen Wandteilen durch Vermauerung oder Ausbetonierung geschlossen werden, wobei die Transportrahmen ganz oder zum Teil zur Verstärkung des so entstehenden Fugenskeletts in diesem verbleiben. z. Bauverfahren nach dem Anspruch i, dadurch gekennzeichnet, daß zwecks Herstellung eines Massivbaues die Transportgestelle beim Zusammenfügen der einzelnen Wandteile vor dem Vermauern oder Ausgießen der Fugen mit Beton vollständig entfernt werden. 3. Bauverfahren mit im Bauwerk verbleibenden: Rahmenteilen nach Anspruch i, dadurch gekennzeichnet, daß die zwischen den zusammengefügten Wandteilen verbleibenden Transportrahmenteile vor dem Ausgießen der Fugen mit Beton untereinander zu einem Skelett verbunden werden. q.. zur Ausführung des Verfahrens nach den Ansprüchen i bis 3, gekennzeichnet durch drei lösbar aneinander angelenkte Schenkel aus .Profileisen, von denen der mittlere der Länge bzw. der Breite und die beiden äußeren etwa der Höhe des zu transportierenden und einzubauenden Wandteils entsprechen. 5. Transportrahmen zur Ausführung des Verfahrens nach den Ansprüchen z und q., dadurch gekennzeichnet, daß an den Tragschenkeln die angrenzende Fuge überdeckende Bleche als abnehmbare Verschalung vorgesehen sind.PATENT CLAIMS: i. Construction method using workshop-like manufactured wall parts, characterized in that massively bricked up wall parts are transported to the construction site in special steel frames and assembled there, and that the joints between the individual wall parts by bricking or concreting are closed, with the transport frame wholly or partly for reinforcement the resulting joint skeleton remain in it. z. Construction method according to the Claim i, characterized in that for the purpose of producing a solid structure Transport racks when assembling the individual wall parts before bricking or Pouring the joints with concrete must be completely removed. 3. Construction process with im Structure remaining: frame parts according to claim i, characterized in that the transport frame parts remaining between the joined wall parts be connected to one another to form a skeleton before the joints are poured with concrete. q .. for carrying out the method according to claims i to 3, characterized by three releasably hinged legs made of .Profile iron, from those of the middle of the length or the width and the two outer ones about the height of the wall part to be transported and installed. 5. Transport frame for carrying out the method according to claims z and q., characterized in that that on the support legs the adjacent joint covering sheets as removable Formwork are provided.
DEL79708D 1931-11-03 1931-11-03 Construction process using components produced in the workshop Expired DE598730C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEL79708D DE598730C (en) 1931-11-03 1931-11-03 Construction process using components produced in the workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEL79708D DE598730C (en) 1931-11-03 1931-11-03 Construction process using components produced in the workshop

Publications (1)

Publication Number Publication Date
DE598730C true DE598730C (en) 1934-06-16

Family

ID=7284687

Family Applications (1)

Application Number Title Priority Date Filing Date
DEL79708D Expired DE598730C (en) 1931-11-03 1931-11-03 Construction process using components produced in the workshop

Country Status (1)

Country Link
DE (1) DE598730C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1280722B (en) * 1962-08-06 1968-10-17 Georges Schaeffer Scaffolding for the production of building panels made of bricks or the like.
DE1708755B1 (en) * 1962-09-22 1971-12-02 Rensch Eberhard Connection of prefabricated building panels to flat components
DE1409139B1 (en) * 1959-08-06 1973-07-12 Franz Hinse STORAGE-HIGH WALL, COMPOSED OF ARTIFICIAL BUILDING BLOCKS WITH PLUMB-RIGHT CAVITIES
DE2608848A1 (en) * 1976-03-04 1977-09-08 Kasamentbau Gmbh & Co Multi storeyed building prefabricated wall elements - consist of units of assembled lime bricks superimposed in rows (NL 6.9.77)
US4148165A (en) * 1976-12-03 1979-04-10 Kyushu Taikarenga Kabushiki Kaisha Fire brick unit
DE4406920A1 (en) * 1994-02-28 1995-08-31 Rolf Schoch Method of lifting and transporting prefabricated brick wall
DE4435509C1 (en) * 1994-10-04 1996-01-25 Fuchs Gmbh Reinhard Fabricated wall in block design for lifting and transport
NL2002641C2 (en) * 2009-03-19 2010-09-22 Calduran Kalkzandsteen B V Hoisting system for wall panels having an assembly of flexible elongate hoisting elements and a carrier foot.

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1409139B1 (en) * 1959-08-06 1973-07-12 Franz Hinse STORAGE-HIGH WALL, COMPOSED OF ARTIFICIAL BUILDING BLOCKS WITH PLUMB-RIGHT CAVITIES
DE1280722B (en) * 1962-08-06 1968-10-17 Georges Schaeffer Scaffolding for the production of building panels made of bricks or the like.
DE1708755B1 (en) * 1962-09-22 1971-12-02 Rensch Eberhard Connection of prefabricated building panels to flat components
DE2608848A1 (en) * 1976-03-04 1977-09-08 Kasamentbau Gmbh & Co Multi storeyed building prefabricated wall elements - consist of units of assembled lime bricks superimposed in rows (NL 6.9.77)
US4148165A (en) * 1976-12-03 1979-04-10 Kyushu Taikarenga Kabushiki Kaisha Fire brick unit
DE4406920A1 (en) * 1994-02-28 1995-08-31 Rolf Schoch Method of lifting and transporting prefabricated brick wall
DE4435509C1 (en) * 1994-10-04 1996-01-25 Fuchs Gmbh Reinhard Fabricated wall in block design for lifting and transport
NL2002641C2 (en) * 2009-03-19 2010-09-22 Calduran Kalkzandsteen B V Hoisting system for wall panels having an assembly of flexible elongate hoisting elements and a carrier foot.

Similar Documents

Publication Publication Date Title
DE3003446A1 (en) Prefabricated concrete load bearing wall or ceiling construction - involves casting concrete in row of hollow boxes with linked cavities
DE598730C (en) Construction process using components produced in the workshop
DE1905341A1 (en) Formwork system
DE2728544A1 (en) FINISHED COMPONENT IN THE FORM OF A CLOSED BOX WITH GRID DIMENSIONS
EP1210485B1 (en) Reinforced concrete part for producing foundations of buildings
DE2608848A1 (en) Multi storeyed building prefabricated wall elements - consist of units of assembled lime bricks superimposed in rows (NL 6.9.77)
DE2644316B1 (en) SPACE CELL, PRE-FABRICATED GARAGE O.DGL. IN REINFORCED CONCRETE
DE2158489C3 (en) Process for the production of a multi-purpose pavilion in prefabricated construction as well as a steel column with an anchoring leg for carrying out the process
DE820068C (en) Process for the production of monolithic masonry between removable formwork and formwork supports for this purpose
DE1804657A1 (en) Process for the production of concrete or reinforced concrete walls and concrete or reinforced concrete wall produced using this process
DE856215C (en) Process for the production of structures from prefabricated parts and prefabricated parts for the implementation of the process
DE2051002C3 (en) Frame construction, consisting of prefabricated reinforced concrete parts
DE2636168A1 (en) Frame integrated prefabricated component assembly building - has lost template frame for wall, ceiling and concrete type mass insertion
DE822607C (en) Procedure for the erection of buildings
DE804031C (en) Method of making ceilings of various spans
DE638584C (en) A wall consisting of two wall shells reinforced by a wire mesh or reinforcement layers of any kind, as well as a method and device for producing the same
DE2011145A1 (en) Process for the manufacture of prefabricated buildings
DE804033C (en) Method and device for producing a building ceiling
DE809100C (en) Reinforced concrete skeleton structure
AT105225B (en) Process for the production of reinforced concrete arches with an inner reinforcement consisting of iron pipes filled with concrete.
DE638344C (en) Building in stone clay construction
DE1271351B (en) Process and elements for manufacturing hall frames from reinforced concrete
DE2057922A1 (en) Wall for building
DE2044722A1 (en) Procedure for erecting a building shell
DE2535705A1 (en) Reinforced concrete wall cornice prefabricated formwork - comprising parallel concrete sidewall beams joined by spacers and tension members