DE3247326C2 - Process and falsework for the construction of reinforced concrete bridges in sections - Google Patents
Process and falsework for the construction of reinforced concrete bridges in sectionsInfo
- Publication number
- DE3247326C2 DE3247326C2 DE19823247326 DE3247326A DE3247326C2 DE 3247326 C2 DE3247326 C2 DE 3247326C2 DE 19823247326 DE19823247326 DE 19823247326 DE 3247326 A DE3247326 A DE 3247326A DE 3247326 C2 DE3247326 C2 DE 3247326C2
- Authority
- DE
- Germany
- Prior art keywords
- falsework
- bridge
- main
- section
- sections
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Description
5 65 6
Hilfsstütze zu verhindern. Wie aus den F i g. 4 und 6 läßt sich dann das Lehrgerüst um ein Stützenfeld vorersichtlich ist, ruhen die Hauptträger 34 mit ihren U- fahren.Prevent auxiliary support. As shown in FIGS. 4 and 6, the falsework around a field of supports can be seen in advance is, the main girders 34 rest with their U- drives.
44, die von mit Teflon beschichteten Bauteilen gebildet Fahrbahnabschnittes die Hauptlängsträger 34 gerade44, the track section formed by Teflon-coated components, the main longitudinal members 34 straight
sind. Anstelle dieser Gleitlager 44 könnten auch Rollen- s verlaufen, müssen die Hilfsstützen im Kurvenabschnittare. Instead of these plain bearings 44, rollers could also run, and the auxiliary supports must be in the curve section
lager eingesetzt werden. Die Pressen 42 sind ihrerseits aufihren Hilfsfundamenten seitlich auswandern können,bearings are used. The presses 42 are in turn able to migrate to the side on their auxiliary foundations,
auf einem konsolenartigen Stahlgerüst 46 querver- was über die Lager 48 möglich ist. Ebenso sind die Pres-on a bracket-like steel frame 46 transversely, which is possible via the bearings 48. Likewise, the press
schieblich aufgebaut, das auf beiden Seiten des Pfeilers sen 42 mit den Gleitlagern 44 auf den Konsolen 46 derSlidably constructed, the sen on both sides of the pillar 42 with the plain bearings 44 on the consoles 46 of the
16 an diesem verankert ist. Die Abstützung der Haupt- Brückenpfeiler seitenverschieblich angeordnet Die16 is anchored to this. The support of the main bridge piers is laterally displaceable
träger 34 erfolgt außerdem über die Hilfsstütze 28, die to Hilfsstützen 28 sind, um sie setzungsunabhängig zu ma·The carrier 34 is also carried out via the auxiliary support 28, which are auxiliary supports 28, in order to make them independent of settlement.
aus F i g. 5 ersichtlich ist. Diese Hilfsstütze 28 weist wie- chcn, mit lastkonstanten Hydraulikpressen oder mecha-from Fig. 5 can be seen. This auxiliary support 28 has like- chcn, with load-constant hydraulic presses or mechanical
derum Pressen 43 und Gleitlager 44 auf, die an dem nischcn Einrichtungen so ausgerüstet, das eventuelleIn turn, presses 43 and plain bearings 44, which are equipped on the nischcn facilities so that the eventual
ze 28 sind auf den Hilfsfundamenten 30 querverschieb- geglichen werden können. Damit ist auch bei schlech-ze 28 are on the auxiliary foundations 30 can be cross-displaced. This means that even with poor
lich über Lager 48 abgestützt. Die Querverschieblich- 15 lern Untergrund keine teure Pfahlgründung notwendig,Lich supported by bearing 48. The transversely displaceable subsoil does not require expensive pile foundations,
keit bei Pfeiiern und Hilfsstützenauflagerung ist not- Nachdem beim Vorschub das Lehrgerüst 20 die hinte-after the falsework 20 moves the rear
wendig, da bei Brücken mit Radien im Grundriß sich die rc Hilfsstütze 28 verlassen hat, kann diese aufgestocktmanoeuvrable, since the rc auxiliary support 28 has left itself in the case of bridges with radii in the plan, this can be increased
bewegen. Die Hilfsstützen sind ferner derart ausgcbil- ten zeitweilig unterstützen, und zwar mit der gleichenmove. The auxiliary supports are also designed to provide temporary support with the same
det, daß sie nach Vorfahren des Lehrgerüstes oben auf- 20 lastkonstanten Hydraulikpresse, bis die volle Vorspan-det that after the falsework has been moved upwards, the hydraulic press with a constant load until the full preload
gestockt werden können, so daß sie direkt den Brücken- nung in diesem Brückenfeld wirksam geworden ist.can be stacked so that it is directly effective at the bridging in this bridge field.
überbau an den Kragplatten 38 abstützen können. Das Fachwerksystem der Hauptlängsträger 34 ist socan support the superstructure on the cantilever plates 38. The framework system of the main side members 34 is like this
Die die Biegesteifigkeit des Lehrgerüstes bewirken- konstruiert, daß die senkrechte Strebe des Fachwerks den Hauptlängsträger 34 sind durch Lehrgerüst-Haupt- stets als Doppelpfosten ausgebildet ist. Zwischen diesen querträger verbunden, die in zwei äußere bewegliche 7; Doppclpfosten ist eine biegesteife Führung 76 für die Teile 50 und einen festen Mittelquerträgerteil 52 unter- beweglichen Querträgerabschnitte 50 angeordnet. Das teilt sind. Die äußeren Querträger 50 können durch Mittelteil des Lehrgerüsibodens im Bereich der Haupt-Schraubverbindungen 54 mit dem jeweiligen Mittelteil querträger ist ein auf die gesamte Länge des Lehrgerü-52 biegesteif verbunden werden. Der Mittelteil 52 er- stes durch Längs- und Diagonalverbände versteiftes streckt sich jeweils im Bereich der lichten Höhe zwi- jo Element, das einschließlich Schalbelag und einschließschen der Profiloberkante 32 des Pfeilers und der Brük- lieh Absenkhöhe des Lehrgerüstes eine Bauhöhe aufkenüberbauunterkante 56 des Brückenhauptträgers 36, weist, die kleiner ist als der Abstand zwischen Brückensowie seitlich zwischen den Brückenhauptlagcrn 18. Die pfcileroberkante 32 und Brückenüberbau-Unterkante Mittelteile 52 der Querträger sind durch Längsverbände 56.Which effect the bending stiffness of the falsework, that constructs the vertical strut of the framework the main side members 34 are always designed as double posts by falsework-main. Between these cross member connected, which in two outer movable 7; Doppclpfosten is a rigid guide 76 for the Parts 50 and a fixed central cross member part 52 are arranged under movable cross member sections 50. That are divided. The outer cross members 50 can through the middle part of the frame floor in the area of the main screw connections 54 with the respective middle part is a cross member over the entire length of the teaching framework 52 be rigidly connected. The middle part 52 is first stiffened by longitudinal and diagonal braces extends in each case in the area of the clear height between the element, including the formwork covering and including the upper edge of the profile 32 of the pillar and the bridge lowering height of the falsework an overall height of the lower edge of the superstructure 56 of the bridge main girder 36, which is smaller than the distance between bridges and laterally between the main bridge bearings 18. The upper edge of the pillar 32 and the lower edge of the bridge superstructure Middle parts 52 of the cross members are formed by longitudinal braces 56.
58 verbunden und bilden eine in sich starre Platte, die 3"> Die an dieses Mittelteil biegesteif angeschraubten,58 connected and form a rigid plate, the 3 "> The rigidly screwed to this middle part,
die Schalungselemente 60 trägt und zwischen den Brük- äußeren Qucrirägerabschnitte 50 werden, wenn siethe formwork elements 60 and between the bridge outer cross-beam sections 50 are when they
kenhauptlagern 18 und der Pfeileroberkante 32 sowie beim Vorschub in den Bereich der Brückenhauptlagerken main bearings 18 and the upper edge of the pillar 32 as well as the feed into the area of the bridge main bearings
die seitlichen Abschnitte 50 der Querträger, wie in der nach beiden Seiten bis zur Hälfte des Abstandesthe lateral sections 50 of the cross members, as in the one on both sides up to half the distance
d. h. aus dem Querschnitt der Brückcnhauptlager 18 schoben und nach Überfahren des Pfeilers 16 sofortd. H. pushed out of the cross-section of the main bridge bearing 18 and immediately after driving over the pillar 16
heraus. wieder geschlossen und verschraubt. Im allgemeinenout. closed and screwed again. In general
legt, die eine Handwinde 64 tragen, deren Antriebszahn· den, wobei der Abstand der Querträger etwa 1.5 m bisthat carry a hand winch 64, the drive teeth of which, the distance between the cross members about 1.5 m to
rad mit einer Zahnstange an der Unterseite des oberen 43 2,0 m beträgt.wheel with a rack at the bottom of the upper 43 is 2.0 m.
Flansches der äußeren Querträgerabschnitte 50 in Ein- Die Querträgergleitauflagerung auf den Hauptlängsgriff gebracht werden kann, trägern 34 ist mittels einer höhenverstellbaren TascheFlange of the outer cross member sections 50 in one The cross member slide support on the main longitudinal handle can be brought, carriers 34 is by means of a height-adjustable bag
An den Hauptlängsträgern 34 sind außerdem die En- so gelöst, daß jede erforderliche Querneigung der Querden von Nebenquerträgern 66 angelenkt, die die Scha- träger eingestellt und diese Einstellung durch Keile ΚΙ ungs träger 68 für die Kragplatten 38 tragen. Diese Ne- 50 xiert werden kann. On the main longitudinal members 34, the ends are also solved in such a way that any required transverse inclination of the transverse sides hinged by secondary cross members 66, which set the scraper and carry this setting by means of wedge beams 68 for the cantilever plates 38. This ne- 50 can be xed.
benquerträger werden über längenverstellbare Spindel- Das Lehrgerüst kann, wie insbesondere süs F i g. 4 stützen 70 in ihrem äußeren Bereich abgestützt, so daß ersichtlich, durch Neigungsverstellung der Seitenschadie Schräglage der Nebenquerträger 66 veränderbar ist, lung der Brückenhauptträger. durch seitliche Verstelwobei der Anlenkpunkt der Nebenquerträger 66, wie lung für entsprechende Brückenradien im Grundriß und aus Fig. 3 ersichtlich,am Hauptträger34 höhenverstell- 5$ durch Höhen- und Neigungsverstellung der Kragplatbar ist Die Spindelstützen 70 sind ihrerseits am Rahmen tcnschalung den jeweiligen Gegebenheiten des Brük-62 angelenkt Der Rahmen 62 trägt außerdem ein be- kcnqucrschnitts angepaßt werden, ohne jeweiligen Umgehbares Hängegerüst mit Laufstegen 7Z An den Rah- bau der Schalung.benquerträger are via length-adjustable spindle The falsework can, as in particular süs F i g. 4th support 70 supported in their outer area, so that it can be seen by adjusting the inclination of the side damage The inclination of the secondary transverse girders 66 can be changed, development of the main bridge girder. through lateral adjustment the articulation point of the secondary cross member 66, such as ment for corresponding bridge radii in the plan and can be seen from Fig. 3, on the main beam 34 adjustable in height by adjusting the height and inclination of the Kragplatbar The spindle supports 70 are in turn on the frame tcnformung the respective conditions of the bridge 62 articulated The frame 62 also has a cross-section that can be adapted without any bypassing Suspended scaffolding with catwalks 7Z On the frame construction of the formwork.
men 62 sind ferner die Schalungsträger 74 für die seitli- Durch die Integrierung der Hauptträger 34 in den zuMen 62 are also the formwork girders 74 for the side By integrating the main girders 34 into the
chen Wände des Brückenhauptträgers 36 über Spindeln to erstellenden Brückenbauquerschnitt unter den Krag-chen walls of the bridge main girder 36 over spindles to create bridge construction cross-section under the cantilever
71 abgestützt platten 38 sind keine besonderen Aufbauten für die71 supported plates 38 are no special structures for the
Durch diese Konstruktion wird es möglich, die Scha- Schalung mehr erforderlich, wie diese bei einem gelung entsprechend dem gewünschten Profil des Brük- trennten Traggerüst notwendig sind. Sämtliche Bediekenüberbaus einzurichten, wobei SchrägstcUungen und nungen für das Ablassen und Anheben, für das Vorfah-Krümmungsbögen ohne weiteres bcrücksicht werden 65 ren. für das Ausfahren von Querträgern im Pfeilerbekönnen, reich können von oben von Laufstegen 72 des begehba-This construction makes it possible to require the formwork more like this in the case of a gelung are necessary according to the desired profile of the bridge-separated shoring. All control superstructures to set up, with inclines and openings for lowering and lifting, for the anterior curvature arches 65 ren are taken into account without further ado. from above from catwalks 72 of the accessible
Nach Absenken der Pressen und schrittweisem Her- ren Hängegerüstes oder einer Pfeilerkopf-Einrüstung ausfahren der seitlichen Hauptquerträgerabschnitte aus vorgenommen werden. Wegen der Hilfsstütze istAfter lowering the presses and gradually pulling in the hanging scaffolding or a pier head scaffolding extend the lateral main cross member sections. Because of the auxiliary support is
am Lehrgerüst kein Vor- oder Nachlaufschnabel erforderlich. Am vorderen Ende des Lehrgerüstes 20 kann jedoch, wie aus Fig. 1 ersichtlich, eine Arbeitsbühne 78 angeordnet werden, die das Vorspannen und Verpressen der Vorspannkabel nach Fertigstellung jedes Brükkenabschnitts erleichtert und zugleich das Aufstellen der Hilfsstützen und der vorübergehenden Pfeilerkopfkonstruktionen für die Gleitlager des Lehrgerüstes und die sie tragenden Pressen ohne zusätzlichen Kran ermöglicht. No leading or trailing beak required on the falsework. At the front end of the falsework 20 can however, as can be seen from FIG. 1, a working platform 78 are arranged, which the prestressing and pressing of the prestressing cables after completion of each bridge section facilitates and at the same time the erection of the auxiliary supports and the temporary pier head constructions for the sliding bearings of the falsework and the presses supporting them without an additional crane.
Die Ausführungsform gemäß Fig. b entspricht der Ausführungsform gemäß Fig. I bis 5, mit dem Unterschied, daß der Brückenüberbau nicht aus einem Hohlkastenträger besteht, sondern zwei parallel zueinander verlaufende Brückenhauptträger80mit seitlichen Krag- is platten 38 und einer Miueipiatte 82 aufweist. Der Schalungsträgeraufbau 84 unter der Mittelplattc kann hierbei nach Absenken des Lehrgerüstes in dem freien Raum ohne weiteres mit vorgefahren werden.The embodiment according to FIG. B corresponds to the embodiment according to FIGS. 1 to 5, with the difference that the bridge superstructure does not consist of a box girder, but two parallel to each other running bridge main girders 80 with lateral cantilever plates 38 and a Miueipiatte 82 has. The formwork beam structure 84 under the Mittelplattc can here after lowering the falsework in the free Space can easily be driven up.
2020th
2525th
3535
4040
4545
5050
5555
6060
Claims (16)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19823247326 DE3247326C2 (en) | 1982-12-21 | 1982-12-21 | Process and falsework for the construction of reinforced concrete bridges in sections |
CH682983A CH663236A5 (en) | 1982-12-21 | 1983-12-21 | METHOD AND TEACHING DEVICE FOR THE SECTIONAL PRODUCTION OF STEEL CONCRETE BRIDGES. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19823247326 DE3247326C2 (en) | 1982-12-21 | 1982-12-21 | Process and falsework for the construction of reinforced concrete bridges in sections |
Publications (2)
Publication Number | Publication Date |
---|---|
DE3247326A1 DE3247326A1 (en) | 1984-07-19 |
DE3247326C2 true DE3247326C2 (en) | 1984-11-22 |
Family
ID=6181300
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19823247326 Expired DE3247326C2 (en) | 1982-12-21 | 1982-12-21 | Process and falsework for the construction of reinforced concrete bridges in sections |
Country Status (2)
Country | Link |
---|---|
CH (1) | CH663236A5 (en) |
DE (1) | DE3247326C2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005002331B3 (en) * | 2005-01-17 | 2006-08-03 | Kronotec Ag | Shuttering panel for liquid concrete during casting and curing processes has skin with integral pressure nipples |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3836568C2 (en) * | 1988-10-27 | 1999-03-18 | Reiner Dipl Ing Schweer | Teaching scaffold for reinforced concrete bridges for universal use as a stationary and sliding scaffold |
DE102007047438B4 (en) * | 2007-10-04 | 2022-11-24 | Doka Gmbh | Formwork arrangement for the cantilever construction of bridges |
DE102007047443A1 (en) * | 2007-10-04 | 2009-04-16 | Doka Industrie Gmbh | Formwork arrangement for the cantilever construction of bridges |
ES2338618B1 (en) * | 2008-01-24 | 2011-03-11 | Sistemas Tecnicos De Encofrados Sa | BRACKET SUPPORT FOR TRAFFIC BRIDGES. |
CN101736699B (en) * | 2009-12-15 | 2011-04-20 | 中交路桥华北工程有限公司 | Accurate positioning method of sliding of full-support frame steel box girder |
ES2398177B1 (en) * | 2010-02-08 | 2014-01-16 | Rubrica Ingeniería Y Arquitectura, S.L. | IMPROVEMENTS INTRODUCED IN A PROGRESSIVE ADVANCE CART FOR BRIDGE CONSTRUCTION. |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH460844A (en) * | 1963-12-03 | 1968-08-15 | Polensky & Zoellner | Device for shuttering and concreting a bridge or a similar structure extending over several fields |
DE2848536A1 (en) * | 1978-11-09 | 1980-05-22 | Zueblin Ag | Concrete bridge phased advance section form carriage - has sliding side pieces linking height adjustable transverse frame, between flanges |
ATE6878T1 (en) * | 1980-01-18 | 1984-04-15 | Emil Steidle Gmbh. & Co. | METHOD AND STRUCTURE OF TOOLING GEAR FOR THE MANUFACTURE OF PRE-PRESSED CONCRETE BRIDGES. |
-
1982
- 1982-12-21 DE DE19823247326 patent/DE3247326C2/en not_active Expired
-
1983
- 1983-12-21 CH CH682983A patent/CH663236A5/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005002331B3 (en) * | 2005-01-17 | 2006-08-03 | Kronotec Ag | Shuttering panel for liquid concrete during casting and curing processes has skin with integral pressure nipples |
Also Published As
Publication number | Publication date |
---|---|
CH663236A5 (en) | 1987-11-30 |
DE3247326A1 (en) | 1984-07-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2607805C3 (en) | Device for the section-by-section, free front construction of multi-span bridge structures made of reinforced or prestressed concrete | |
DE2240678C3 (en) | Device for the section-by-section front construction of bridge structures made of reinforced or prestressed concrete | |
DE1255695B (en) | Method and device for the construction of multi-span bridges or similar structures in sections | |
EP0133850A1 (en) | Method and apparatus for constructing a prestressed concrete superstructure of a bridge | |
CH637443A5 (en) | METHOD FOR THE SECTIONAL PRODUCTION OF AN ORIGINAL CONCRETE PLATE AND DEVICE WITH A SHELVED FLOOR AND A REINFORCEMENT FLOOR FOR IMPLEMENTING THE METHOD. | |
DE3247326C2 (en) | Process and falsework for the construction of reinforced concrete bridges in sections | |
EP0032959B1 (en) | Method and falsework for constructing bridges of prestressed concrete | |
DE2743273B1 (en) | Method for producing elongated supporting structures, in particular multi-span bridge superstructures made of reinforced or prestressed concrete | |
DE3527470C2 (en) | ||
DE2555311C3 (en) | Device for the section-by-section, free pre-construction of bridge structures made of reinforced or prestressed concrete | |
DE2510015C2 (en) | Device and method for the sectional production of the individual fields of the superstructure of pier bridges or similar structures | |
DE3733627A1 (en) | Method and apparatus for the sectional construction of prestressed-concrete bridges independently of terrain | |
DE2533734A1 (en) | Concrete bridge construction using formwork support - has frame-like supports with transverse beams and intermediary hydraulic presses | |
DE3836568C2 (en) | Teaching scaffold for reinforced concrete bridges for universal use as a stationary and sliding scaffold | |
DE1041408B (en) | Device for producing curved and / or twisted concrete beams | |
AT298553B (en) | Device for the section-wise production of a structure supported on pillars, in particular a multi-span bridge made of reinforced or prestressed concrete | |
EP0134823B1 (en) | Apparatus for the section-by-section construction of a prestressed concrete superstructure of a bridge | |
DE2618259A1 (en) | Multi field concrete bridge girder - has sectioned structure forwarded with latest section supported outside clearance area during frame carrier movement | |
EP0056422A1 (en) | Process and falsework for constructing bridges of reinforced concrete | |
EP0133849B1 (en) | System for retaining stencil printing master on printing drum | |
DE3719508C2 (en) | ||
WO1981002032A1 (en) | Method and centering for the construction of reinforced concrete bridges | |
DE3400987A1 (en) | Self-supporting advancing equipment with compression-proof base plate | |
DE2445029C3 (en) | Method for producing the superstructure of a bridge or the like structure from prestressed concrete as well as supporting scaffolding for carrying out the method | |
DE2207737C2 (en) | Scaffolding girders for forming reinforced concrete or prestressed concrete bridges and similar structures with a superstructure that is curved in plan |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
D2 | Grant after examination | ||
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |