DE29602264U1 - Support part - Google Patents
Support partInfo
- Publication number
- DE29602264U1 DE29602264U1 DE29602264U DE29602264U DE29602264U1 DE 29602264 U1 DE29602264 U1 DE 29602264U1 DE 29602264 U DE29602264 U DE 29602264U DE 29602264 U DE29602264 U DE 29602264U DE 29602264 U1 DE29602264 U1 DE 29602264U1
- Authority
- DE
- Germany
- Prior art keywords
- support part
- concrete
- formwork
- part according
- coupling element
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009415 formwork Methods 0.000 claims description 52
- 238000003466 welding Methods 0.000 claims description 28
- 230000008878 coupling Effects 0.000 claims description 23
- 238000010168 coupling process Methods 0.000 claims description 23
- 238000005859 coupling reaction Methods 0.000 claims description 23
- 238000010276 construction Methods 0.000 claims description 8
- 239000002184 metal Substances 0.000 claims description 5
- 125000006850 spacer group Chemical group 0.000 claims description 3
- 210000000078 claw Anatomy 0.000 claims description 2
- 238000009434 installation Methods 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/365—Stop-end shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/20—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups of material other than metal or with only additional metal parts, e.g. concrete or plastics spacers with metal binding wires
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Piezo-Electric Or Mechanical Vibrators, Or Delay Or Filter Circuits (AREA)
- Finger-Pressure Massage (AREA)
- Polishing Bodies And Polishing Tools (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
StützteilSupport part
Die Erfindung bezieht sich auf ein Stützteil aus Beton, insbesondere einen Abstandshalter oder eine Aufständerung, für den Aufbau einer Schalung im Betonbau.The invention relates to a support part made of concrete, in particular a spacer or a support, for the construction of a formwork in concrete construction.
Beim Aufbau von Schalungen im Betonbau müssen insbesondere flächige Schalungen durch Aufständerungen unterstützt werden, damit sie auf der einen Seite die Form der gewünschten Schalung bilden können und diese Form auf der anderen Seite unter Wirkung des eingefüllten Betons auch beibehalten können. Schalungen werden mit den unterschiedlichsten Mitteln, wie sie gerade auf der Baustelle zur Verfügung stehen, abgestützt. So zeigt beispielsweise die EP 0 093 697 A3 eine Schalung aus flächigen Schalungselementen, die durch eine Mehrzahl von Holzkeilen abgestützt werden. Die Holzkeile werden zunächst auf eine Unterschalung aufgenagelt. Anschließend werden dann die Schalungselemente an die Holzkeile genagelt. Vor dem Vergießen des zweiten Betonierabschnittes müssen die Holzkeile wieder entfernt werden.When constructing formwork in concrete construction, flat formwork in particular must be supported by supports so that it can form the desired formwork on the one hand and also maintain this shape on the other hand under the effect of the poured concrete. Formwork is supported using a wide variety of means, as are available on the construction site. For example, EP 0 093 697 A3 shows a formwork made of flat formwork elements that are supported by a number of wooden wedges. The wooden wedges are first nailed onto a sub-formwork. The formwork elements are then nailed to the wooden wedges. Before pouring the second concrete section, the wooden wedges must be removed again.
Eine weiteres Problem beim Aufbau von Schalungen mittels verlorener Schalungselemente besteht darin, daß die verlorenen, d.h. im Betonbau bleibenden Schalungselemente, beim fertigen Betonteil nicht an der Oberfläche erscheinen dürfen. Zu diesem Zweck werden Betondeckungsleisten als Abstandshalter eingesetzt, die die Kanten der Schalungselemente von den Oberflächen des fertigen Betonteils im Abstand halten. Es ist nun bereits aus dem DE-GM 93 01 565 und dem DE-GM 93 01 566 bekannt, Betondeckungsleisten, die selbst aus Beton bestehen, direkt an die flächigen Schalungselemente oder an Teile der flächigen Schalungselemente anzuformen und die Betondeckungsleisten auch zum Aufstellen der Schalungen zu verwenden. Nachteilig an dieser Konstruktion ist jedoch die recht sperrige Ausführung, die den Transport erschwert, und die aufwendige Herstellung, da die Schalungselemente oder Schalungsele-Another problem when constructing formwork using lost formwork elements is that the lost formwork elements, i.e. those that remain in the concrete structure, must not appear on the surface of the finished concrete part. For this purpose, concrete cover strips are used as spacers, which keep the edges of the formwork elements at a distance from the surfaces of the finished concrete part. It is already known from DE-GM 93 01 565 and DE-GM 93 01 566 to mold concrete cover strips, which themselves consist of concrete, directly onto the flat formwork elements or parts of the flat formwork elements and to use the concrete cover strips to set up the formwork. The disadvantage of this construction, however, is the rather bulky design, which makes transport difficult, and the complex production, since the formwork elements or formwork elements
mentteile bis zum Aushärten des Betons in der gewünschten Stellung fixiert werden müssen.ment parts must be fixed in the desired position until the concrete hardens.
Der Erfindung liegt die Aufgabe zugrunde, ein einfach handhabbares und einfach herstellbares Stützteil für Schalungselemente zum Aufbau einer Schalung im Betonbau zu schaffen.The invention is based on the object of creating an easy-to-handle and easy-to-manufacture support part for formwork elements for constructing a formwork in concrete construction.
Die Aufgabe wird durch die im Anspruch 1 angegebenen Merkmale gelöst.The problem is solved by the features specified in claim 1.
Durch Verwendung eines in den weichen Beton beim Herstellen des Stützteils eindrückbaren Koppelungselement zum nachträglichen Befestigen von Schalungselementen, wird einerseits die Herstellung vereinfacht, da insbesondere flächige Schalungs elemente nicht mehr in einer senkrechten Stellung gehalten werden müssen, bis der Beton des Stützteiles ausgehärtet ist, andererseits können das Stützteil und die Schalungselemente getrennt transportiert werden, so daß sie wesentlich weniger Transportkapazität erfordern.By using a coupling element that can be pressed into the soft concrete during the production of the support part for the subsequent fastening of formwork elements, on the one hand, production is simplified because flat formwork elements in particular no longer have to be held in a vertical position until the concrete of the support part has hardened, on the other hand, the support part and the formwork elements can be transported separately, so that they require significantly less transport capacity.
Anspruch 2 beschreibt eine besonders bevorzugte Ausgestaltung des Koppelungselementes, mit dem dieses in den Beton eindrückbar ist. Der Ankerstift hat weiterhin den Vorteil, daß er nur einen vergleichsweise geringen Bereich des Volumens des Stützteiles einnimmt, so daß die notwendige Betondeckung gewährleistet ist und die Gefahr von Rißbildung herabgesetzt wird.Claim 2 describes a particularly preferred embodiment of the coupling element, with which it can be pressed into the concrete. The anchor pin also has the advantage that it only takes up a comparatively small area of the volume of the support part, so that the necessary concrete cover is guaranteed and the risk of cracking is reduced.
Durch die Ausgestaltung nach Anspruch 3 kann das Koppelungselement noch besser im Beton verankert werden.The design according to claim 3 allows the coupling element to be anchored even better in the concrete.
Die Ausgestaltung nach Anspruch 4 verbessert die Anbindung des Stützteils an den Beton des Betonsteils.The embodiment according to claim 4 improves the connection of the support part to the concrete of the concrete part.
Schweißbare Schalungselemente werden bevorzugt an das Koppelungselement angeschweißt, wobei sich die Ausbildung einerWeldable formwork elements are preferably welded to the coupling element, whereby the formation of a
Schweißplatte gemäß Anspruch 5 für das Herstellen einer Schweißverbindung besonders eignet.Welding plate according to claim 5 is particularly suitable for producing a welded joint.
Durch die Ausgestaltung nach Anspruch 6 wird sichergestellt, daß sich möglichst kein Abstand zwischen dem angeschweißten Schalungselement und dem Stützteil befindet, durch den unkontrolliert Beton austreten kann.The design according to claim 6 ensures that there is as little gap as possible between the welded formwork element and the support part through which concrete can escape in an uncontrolled manner.
Anspruch 7 beschreibt ein besonders bevorzugtes Ausführungsbeispiel für die Form des Stützteils, das den Aufbau der Schalung stärkt vereinfacht.Claim 7 describes a particularly preferred embodiment for the shape of the support part, which greatly simplifies the construction of the formwork.
Anspruch 8 beschreibt ein weiteres Ausführungsbeispiel der Form des Stützteils, das insbesondere dort eingesetzt werden kann, wo eine durchgehende Betonleiste nicht gewünscht ist.Claim 8 describes a further embodiment of the shape of the support part, which can be used in particular where a continuous concrete strip is not desired.
Anspruch 9 beschreibt eine besonders bevorzugte Ausbildung des Koppelungselementes, die sicherstellt, daß sich im Beton des Stützteils so wenig wie möglich Metall befindet.Claim 9 describes a particularly preferred embodiment of the coupling element, which ensures that there is as little metal as possible in the concrete of the support part.
Anspruch 10 beschreibt ein Ausführungsbeispiel des Koppelungsselementes, das besonders einfach mit dem Beton des Stützteils verbunden werden kann.Claim 10 describes an embodiment of the coupling element, which can be connected particularly easily to the concrete of the support part.
Die Ausgestaltung nach Anspruch 11 wird besonders dort bevorzugt, wo die Unterseite des herzustellenden Betonteils in Sichtbeton ausgebildet werden muß, beispielsweise zum Abschalen von Decken.The embodiment according to claim 11 is particularly preferred where the underside of the concrete part to be produced must be made of exposed concrete, for example for forming the formwork of ceilings.
Die Ansprüche 12 und 13 beschreiben besonders bevorzugte Schalungselemente, die sich speziell zur Verwendung mit dem erfindungsgemäßen Stützteil eignen.Claims 12 and 13 describe particularly preferred formwork elements which are particularly suitable for use with the support part according to the invention.
Die Ansprüche 14 und 15 beschreiben zwei besonders bevorzugte, konstruktive Ausgestaltungen des erfindungsgemäßen Stützteils. Claims 14 and 15 describe two particularly preferred structural designs of the support part according to the invention.
Ausführungsbeispiele der Erfindung werden nachfolgend anhand der Zeichnungen näher erläutert. Es zeigen:Embodiments of the invention are explained in more detail below with reference to the drawings. They show:
Fig. 1 ein erstes Ausführungsbeispiel eines erfindungsgemäßen Stützteils in perspektivischer, teilweise geschnittener Darstellung,Fig. 1 shows a first embodiment of a support part according to the invention in a perspective, partially sectioned view,
Fig. 2 eine perspektivische Darstellung eines zweiten Ausführungsbeispiels, undFig. 2 is a perspective view of a second embodiment, and
Fig. 3 eine perspektivische Darstellung eines dritten Ausführungsbeispiels .Fig. 3 is a perspective view of a third embodiment.
Fig. 1 zeigt ein erstes Ausführungsbeispiel eines Stützteils 1, das aus herkömmlichem Beton besteht, leistenartig ausgebildet ist und im Querschnitt etwa Trapezform aufweist. Die längere Seite der Trapezform bildet eine Oberseite 2, während die kürzere Seite der Trapezform eine Standfläche 3 bildet. Die Standfläche 3 ist über die gesamte Länge des leistenförmigen Stützteiles 1 in der Mitte nach innen gewölbt, so daß tatsächlich nur zwei Standlinien 3a und 3b vorhanden sind, mit denen das Stützteil 1 auf eine nicht gezeichnete Unterschalung aufgesetzt werden kann.Fig. 1 shows a first embodiment of a support part 1, which consists of conventional concrete, is designed like a strip and has an approximately trapezoidal shape in cross section. The longer side of the trapezoidal shape forms an upper side 2, while the shorter side of the trapezoidal shape forms a base 3. The base 3 is curved inwards in the middle over the entire length of the strip-shaped support part 1, so that there are actually only two base lines 3a and 3b, with which the support part 1 can be placed on a sub-formwork (not shown).
Das Stützteil 1 wird in einer Form vergossen oder stranggepreßt, wobei kurz vor dem vollständigen Aushärten des Betons in die Mitte der Oberseite 2 und im gleichmäßigen Abstand über die Längserstreckung des Stützteiles 1 verteilt, Koppelungselemente 4 in den noch weichen Beton eingedrückt werden. Jedes der Koppelungselemente 4 besteht aus einer im wesentlichen quadratischen (oder runden) Schweißplatte 5 aus schweißbarem Metall und einem Ankerstift 6, der etwa in der Mitte der Schweißplatte 5 befestigt ist und von dieser vorsteht. Am Ankerstift 5 sind Verkrallelemente 7, beispielsweise in FormThe support part 1 is cast or extruded in a mold, whereby shortly before the concrete has completely hardened, coupling elements 4 are pressed into the still soft concrete in the middle of the top 2 and at equal distances over the length of the support part 1. Each of the coupling elements 4 consists of an essentially square (or round) welding plate 5 made of weldable metal and an anchor pin 6 which is attached approximately in the middle of the welding plate 5 and protrudes from it. Claw elements 7, for example in the form of
nach oben abstehender Vorsprünge oder in Form keilförmiger Einschnitte oder dgl. vorgesehen.upwardly projecting projections or in the form of wedge-shaped incisions or the like.
Das Kopplungselement 4 wird dann in die Oberseite 2 des Stützteiles 1 eingedrückt,bis die Schweißplatte 5 auf oder in der Oberseite 2 aufliegt. Die Abmessungen der Schweißplatte 5 parallel zur Oberseite 2 sind so bemessen, daß die Schweißplatte 5 zwar ein bequemes Verschweißen gestattet, jedoch die Oberseite 2 nur über einen geringen Teilbereich bedeckt. Der Ankerstift 6 kann relativ gering im Durchmesser sein und erstreckt sich nur so weit in Richtung der Standfläche 3 in das Stützteil 1 hinein, wie es zum Aufnehmen des Betonierdrucks unbedingt notwendig ist. Dadurch wird sichergestellt, daß einerseits die Anbindung des Stützteiles 1 an den Beton des Betonteils nicht gestört wird und andererseits genügend Betonüberdeckung in Richtung auf die Standfläche 3 vorhanden ist, daß Korrosion verhindert und die Festigkeit nicht vermindert wird.The coupling element 4 is then pressed into the top 2 of the support part 1 until the welding plate 5 rests on or in the top 2. The dimensions of the welding plate 5 parallel to the top 2 are such that the welding plate 5 allows for easy welding, but only covers the top 2 over a small part. The anchor pin 6 can be relatively small in diameter and only extends into the support part 1 in the direction of the base 3 as far as is absolutely necessary to absorb the concreting pressure. This ensures that on the one hand the connection of the support part 1 to the concrete of the concrete part is not disturbed and on the other hand there is sufficient concrete cover in the direction of the base 3 to prevent corrosion and not reduce the strength.
Nach dem Aushärten des Betons des Stützteiles 1 werden dann auf die Schweißplatten 5 schweißbare Schalungselemente 8 in Form eines Schalungsstreifens durch Schweißstellen 9 so aufgeschweißt, daß das Schalungselement 8 im wesentlichen senkrecht zur Oberseite 2 des Stützteiles 1 verläuft. Das Schalungselement 8 besteht bevorzugt aus einem Streifen eines Schalungsmaterials, wie es in der DE-PS 41 11 062 beschrieben ist. Dieses Schalungsmaterial enthält eine zwischen Längsstäbe 8a und Querstäbe 8b eines Gitterwerks eingeschweißte Streckmetalltafel 8c. Alle Bestandteile bestehen aus Baustahl und sind somit gut schweißbar. Das Schalungselement 8 sollte so zugeschnitten werden, daß sich ein Längsstab 8a an der der Oberseite 2 gegenüberliegenden Begrenzungskante des Schalungselements 8 befindet, so daß die Verschweißung 9 zwischen diesem Längsstab 8a und den Schweißplatten 5 der Koppelungs elemente 4 vorgenommen werden kann.After the concrete of the support part 1 has hardened, weldable formwork elements 8 in the form of a formwork strip are welded onto the welding plates 5 by welding points 9 so that the formwork element 8 runs essentially perpendicular to the top 2 of the support part 1. The formwork element 8 preferably consists of a strip of formwork material as described in DE-PS 41 11 062. This formwork material contains an expanded metal panel 8c welded between longitudinal bars 8a and transverse bars 8b of a latticework. All components are made of structural steel and are therefore easy to weld. The formwork element 8 should be cut so that a longitudinal bar 8a is located on the edge of the formwork element 8 opposite the top 2, so that the welding 9 can be carried out between this longitudinal bar 8a and the welding plates 5 of the coupling elements 4.
::■■.:::■■.:
Fig. 2 zeigt ein weiteres Ausführungsbeispiel eines Stützteiles 10,. das sich vom Stützteil 1 dadurch unterscheidet, daß es eine ebene Standfläche 13 aufweist, die jedoch wiederum als kleinere Seite eines trapezförmigen Querschnittes ausgebildet ist. Weiterhin enthält das Stützteil 10 ein abgewandeltes Koppelungselement 14, bei dem sich eine streifenförmige Schweißplatte 15 über die gesamte Längserstreckung des Stützteiles 10 erstreckt. An der Unterseite dieser streifenförmigen Schweißplatte 15 sind jedoch eine Vielzahl einzelner, im Abstand zueinander angeordneter Ankerstifte 16 angeordnet, mit denen auch das Koppelungselement 14 in den noch weichen Beton des Stützteiles 10 eingedrückt werden kann, wie dies anhand der Koppelungselemente 4 bereits beschrieben wurde. Das Schalungselement 18 entspricht dem Schalungselement 8, kann jedoch durch eine durchgehende Schweißnaht 19 mit der streifenförmigen Schweißplatte 15 verbunden werden.Fig. 2 shows a further embodiment of a support part 10, which differs from the support part 1 in that it has a flat base 13, which is, however, again designed as the smaller side of a trapezoidal cross-section. The support part 10 also contains a modified coupling element 14, in which a strip-shaped welding plate 15 extends over the entire longitudinal extent of the support part 10. On the underside of this strip-shaped welding plate 15, however, a large number of individual anchor pins 16 are arranged at a distance from one another, with which the coupling element 14 can also be pressed into the still soft concrete of the support part 10, as has already been described with reference to the coupling elements 4. The formwork element 18 corresponds to the formwork element 8, but can be connected to the strip-shaped welding plate 15 by a continuous weld seam 19.
Fig. 3 zeigt zwei Stützteile 2 0 in einem dritten Ausführungsbeispiel, die sich von den Stützteilen nach Fig. 1 und 2 durch ihre Ausbildung als Block unterscheiden. Die Stützteile 20 haben Quader- oder Würfelform oder können mit einer gegenüber ihrer Oberseite 22 verkleinerten Standfläche 23 ausgebildet sein. Auch können die Standflächen 23, wie dies gestrichelt angedeutet ist, in der Mitte nach innen eingewölbt sein, so daß sich eine umfangsseitige Standlinie 23a ergibt. In jedes Stützteil 20 ist von der Oberseite 22 her ein Koppelungselement 24 eingedrückt, das dem Koppelungselement 4 der Fig. 1 entspricht. Das Koppelungselement 24 enthält demnach eine im wesentlichen quadratische Schweißplatte 25 und einen Ankerstift 26. Je nach Verwendungszweck, kann zum Aufstellen eines Schalungselementes 28, das wiederum dem Schalungselement 8 nach Fig. 1 entspricht, ein einziges Stützteil 20 verwendet werden, an dessen Schweißplatte 2 5 das Schalungselement 28 über einen Schweißpunkt 29 angeschweißt wird, oder es können, wie Fig. 3 zeigt, mehrere der blockförmigen Stützteile 20 in Reihe und mit Abstand zueinander aufgestellt werden,Fig. 3 shows two support parts 20 in a third embodiment, which differ from the support parts according to Fig. 1 and 2 in that they are designed as blocks. The support parts 20 have a cuboid or cube shape or can be designed with a base surface 23 that is smaller than their top side 22. The base surfaces 23 can also be curved inwards in the middle, as indicated by dashed lines, so that a circumferential base line 23a is formed. A coupling element 24, which corresponds to the coupling element 4 in Fig. 1, is pressed into each support part 20 from the top side 22. The coupling element 24 therefore contains an essentially square welding plate 25 and an anchor pin 26. Depending on the intended use, a single support part 20 can be used to set up a formwork element 28, which in turn corresponds to the formwork element 8 according to Fig. 1, to whose welding plate 25 the formwork element 28 is welded via a welding point 29, or, as Fig. 3 shows, several of the block-shaped support parts 20 can be set up in a row and at a distance from one another.
wobei die Schalungswandung 28 mit allen Stützteilen 20 verschweißt wird.whereby the formwork wall 28 is welded to all support parts 20.
In Abwandlung der beschriebenen und gezeichneten Ausführungsformen können die in den Fig. beschriebenen Einzelheiten untereinander ausgetauscht werden. So kann beispielsweise auch das blockförmige Stützteil mit einer streifenförmigen Schweißplatte oder eine quadratische Schweißplatte mit mehreren Ankerstiften versehen werden. Die Schweißplatten können jede geeignete Form aufweisen. Weiterhin ist es möglich, an die Befestigungselement, z.B. Klemmeinrichtungen, Anbindeösen oder dgl. vorzusehen. Auch ein Gewinde für eine Verschraubung der Schalungselemente mit dem Stützteil kann vorgesehen werden. Die Stützteile können andere geeignete Querschnitte und die Standflächen der Stützteile die unterschiedlichsten Formen aufweisen, beispielsweise nach unten vorgewölbt sein. Schließlich können auch anders geformte Schalungselemente bzw. Schalungselemente aus anderen Werkstoffen mit dem Stützteil verbunden werden.In a modification of the described and drawn embodiments, the details described in the figures can be interchanged. For example, the block-shaped support part can be provided with a strip-shaped welding plate or a square welding plate with several anchor pins. The welding plates can have any suitable shape. It is also possible to provide fastening elements, e.g. clamping devices, tie-down eyes or the like. A thread for screwing the formwork elements to the support part can also be provided. The support parts can have other suitable cross-sections and the bases of the support parts can have a wide variety of shapes, for example they can be curved downwards. Finally, differently shaped formwork elements or formwork elements made of other materials can also be connected to the support part.
Claims (13)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29602264U DE29602264U1 (en) | 1996-02-09 | 1996-02-09 | Support part |
EP96120678A EP0789117A1 (en) | 1996-02-09 | 1996-12-20 | Support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29602264U DE29602264U1 (en) | 1996-02-09 | 1996-02-09 | Support part |
Publications (1)
Publication Number | Publication Date |
---|---|
DE29602264U1 true DE29602264U1 (en) | 1997-06-05 |
Family
ID=8019242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE29602264U Expired - Lifetime DE29602264U1 (en) | 1996-02-09 | 1996-02-09 | Support part |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0789117A1 (en) |
DE (1) | DE29602264U1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004040274A1 (en) * | 2004-08-19 | 2006-02-23 | Fwr Solutions Gmbh | An element |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH655872A5 (en) | 1982-05-04 | 1986-05-30 | Witschi H | METHOD AND SYSTEM FOR PRODUCING A PROFILE ELEMENT TO BE USED AS LOST SHUTTERING. |
EP0182935A1 (en) * | 1984-11-29 | 1986-06-04 | Betomax Kunststoff- und Metallwarenfabrik GmbH. & Co. KG. | Spacer for reinforcements in concrete constructions or the like |
DE8813789U1 (en) * | 1988-11-04 | 1989-01-12 | Döllen, Heinz von, 5840 Schwerte | Spacers for concrete reinforcement bars made of concrete or plastic |
DE9301566U1 (en) | 1992-09-08 | 1994-01-20 | Peca-Verbundtechnik Gmbh, 84130 Dingolfing | Shuttering element |
DE9301565U1 (en) | 1993-02-04 | 1994-06-01 | Peca-Verbundtechnik Gmbh, 84130 Dingolfing | Formwork element |
-
1996
- 1996-02-09 DE DE29602264U patent/DE29602264U1/en not_active Expired - Lifetime
- 1996-12-20 EP EP96120678A patent/EP0789117A1/en not_active Withdrawn
Also Published As
Publication number | Publication date |
---|---|
EP0789117A1 (en) | 1997-08-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3013710C2 (en) | Device for storing reinforcing bars to be anchored in a concrete wall | |
EP0026803B1 (en) | Construction joint shuttering comprising a former for supporting connecting bars | |
EP1146180A1 (en) | Process for constructing a concrete floor element and concrete floor element | |
AT411474B (en) | METHOD AND DEVICE FOR PRODUCING A PRECAST ELEMENT FROM CAST CONCRETE | |
DE2407753A1 (en) | METHOD AND DEVICE FOR THE PRODUCTION OF COMPONENTS AND ELEMENTS PRODUCED THEREOF | |
EP0927796B1 (en) | Form panel and system | |
EP0410079A1 (en) | Connecting casing for linked concrete slabs | |
DE4037438A1 (en) | Portable reinforced concrete foundation for post - is for post and has narrow shaft with baseplate, and basket | |
DE2832295A1 (en) | MOLDING TABLE FOR PRECAST PLATES | |
DE1017765B (en) | Process for the production of a wall formwork for infill concrete masonry as well as spacers and formwork panels for this | |
DE7120078U (en) | Formwork element of clad concrete walls | |
DE2802032A1 (en) | FLOOR OR BUILDING PLATE | |
DE29602264U1 (en) | Support part | |
DE3502415A1 (en) | Device and process for producing shuttering units | |
EP0071832B1 (en) | Feeding trough device | |
EP1101883A1 (en) | Device for the execution of a reinforcement connection between a concrete construction element and a connected construction element | |
EP2175079B1 (en) | Method for forming a rigid corner reinforcement for reinforced concrete construction, reinforcement element and rigid corner reinforcement | |
EP0104262A1 (en) | Composite self-supporting slab - product - method - device - application | |
DE8501877U1 (en) | Component designed as formwork | |
DE19720637C1 (en) | Process for producing a component from reinforced concrete and formwork for carrying out the process | |
CH417005A (en) | Component set for the creation of all kinds of buildings | |
DE1559530A1 (en) | Wall construction, especially reinforcement unit | |
DE2547145C3 (en) | Clad concrete wall | |
CH368292A (en) | Grating and process for its production and device for carrying out the process | |
CH718328B1 (en) | Formwork strip, covering formwork, formwork element, formwork arrangement, method for constructing a formwork arrangement and method for producing a formwork strip. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R207 | Utility model specification |
Effective date: 19970717 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 19990127 |
|
R151 | Utility model maintained after payment of second maintenance fee after six years |
Effective date: 20020426 |
|
R152 | Utility model maintained after payment of third maintenance fee after eight years |
Effective date: 20040322 |
|
R071 | Expiry of right |