DE2838431B1 - Folding gate to block rivers, canals, docks, etc. - Google Patents

Folding gate to block rivers, canals, docks, etc.

Info

Publication number
DE2838431B1
DE2838431B1 DE19782838431 DE2838431A DE2838431B1 DE 2838431 B1 DE2838431 B1 DE 2838431B1 DE 19782838431 DE19782838431 DE 19782838431 DE 2838431 A DE2838431 A DE 2838431A DE 2838431 B1 DE2838431 B1 DE 2838431B1
Authority
DE
Germany
Prior art keywords
gate body
locked position
gate
area
pivot axis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19782838431
Other languages
German (de)
Other versions
DE2838431C2 (en
Inventor
Manfred Dipl-Ing Buseke
Walter Dr-Ing Rodatz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MEERESTECH SEEBAU ING IMS
SELLHORN BODO DIPL ING
Original Assignee
MEERESTECH SEEBAU ING IMS
SELLHORN BODO DIPL ING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MEERESTECH SEEBAU ING IMS, SELLHORN BODO DIPL ING filed Critical MEERESTECH SEEBAU ING IMS
Priority to DE19782838431 priority Critical patent/DE2838431C2/en
Publication of DE2838431B1 publication Critical patent/DE2838431B1/en
Application granted granted Critical
Publication of DE2838431C2 publication Critical patent/DE2838431C2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Barrages (AREA)

Description

fest mit dem Boden verbunden, sondern rollt bei Bewegung von der einen Betriebsstellung in die andere Betriebsstellung auf dem Boden ab, wobei sich die im Torkörper liegende imaginäre Schwenkachse verlagert Durch eine solche Lagerung ist es möglich, den Torkörper zumindest außerhalb der Sperrstellung ohne weiteres anzuheben bzw. aufzuschwimmen, um ihn zur Durchführung von Reparaturen zu verschleppen, ohne daß arbeitsaufwendige Arbeiten unter Wasser durchge-'führt werden. Entsprechend läßt sich der Torkörper auch ohne Schwierigkeiten in die gewünschte Stellung absenken, und er gelangt in seine Betriebsstellung, ohne daß eine komplizierte Verbindung von Bolzen und Lagern hergestellt werden müßte.firmly attached to the ground, but rolls from one when it is moved Operating position in the other operating position on the ground, with the Imaginary pivot axis lying in the gate body displaced by such a bearing it is possible to easily open the gate body at least outside of the locked position to lift or float up in order to use it Carrying out repairs to carry off without labor-intensive work carried out under water will. Correspondingly, the gate body can also be turned into the desired one without difficulty Lower position, and it gets into its operating position without a complicated Connection of bolts and bearings would have to be made.

Um während des Aufrichtens und Absenkens eines auf dem Boden abrollenden Torkörpers und des sich dabei ergebenden Abrollvorganges eine zuverlässige Führung zu erreichen, können im Bodenbereich, auf dem der Torkörper abrollt, sowie im in Berührung mit diesem Bodenbereich kommenden Bereich des Torkörpers mindestens eine Führungsverzahnung vorgesehen sein, die den Torkörper in jeder Zwischenstellung in der gewünschten Lage hält, ohne daß die freie Anhebbarkeit des Torkörpers beeinträchtigt wird. Diese Führungsverzahnung kann in zwei Bereiche unterteilt sein, die sich jeweils nahe einer Seite des Torkörpers befinden, so daß sich also die Führungsverzahnung nicht über die gesamte Breite des Torkörpers erstreckt. To during the raising and lowering of a rolling on the floor Goal body and the resulting rolling process a reliable guide can be reached in the floor area on which the goal body rolls, as well as in the in At least one area of the goal body coming into contact with this floor area Guide teeth may be provided that the gate body in each intermediate position holds in the desired position without affecting the free liftability of the door body will. This guide toothing can be divided into two areas, each one located near one side of the goal body, so that the guide teeth does not extend over the entire width of the goal body.

Bei einer anderen Lösung der vorstehend genannten Aufgabe wird ein Klapptor der eingangs erwähnten Art erfindungsgemäß derart ausgestaltet, daß der Torkörper zumindest außerhalb der Sperrstellung frei aus seiner Lage anhebbar ist und daß die Schwenkachse durch eine Zapfen und teilweise offenen Lagerschalen aufweisenden Lageranordnung gebildet ist, wobei die Öffnung der Lagerschale größer ist als der Durchmesser des Zapfens im jeweiligen Öffnungsbereich. In another solution to the above problem, a Folding gate of the type mentioned according to the invention designed such that the Gate body can be raised freely from its position at least outside of the blocked position and that the pivot axis has a pin and partially open bearing shells Bearing arrangement is formed, wherein the opening of the bearing shell is larger than that Diameter of the pin in the respective opening area.

Auch bei dieser Lösung ist also der Torkörper frei gelagert und nicht über die Drehbolzen fest mit dem Boden verbunden. Vielmehr erfolgt die Schwenkbewegung um eine durch Anheben des Torkörpers trennbare Lageranordnung aus Zapfen und teilweise offenen Lagerschalen, so daß sich die gleichen Vorteile für die Montage und eventuelle Reparaturen ergeben, wie vorstehend in Zusammenhang mit der ersten Lösung erläutert. In this solution, too, the gate body is freely supported and not Firmly connected to the floor via the pivot pin. Rather, the pivoting movement takes place around a bearing arrangement made of journals and partially separable by lifting the door body open bearing shells, so that the same advantages for the assembly and eventual Repairs result as explained above in connection with the first solution.

Bei einem solchen Klapptor mit Lageranordnung sind vorzugsweise ein Zapfen und eine Lagerschale jeweils nahe einer Seite des Torkörpers angeordnet, wobei die Zapfen einen Teil des Torkörpers bilden und die offenen Lagerschalen im oder am Boden vorgesehen sein können. Um eine Verlagerung des Torkörpers zu verhindern, können die Zapfen in axialer Richtung zumindest teilweise kegelstumpfförmig oder doppel-kegelstumpfförmig ausgebildet sein, so daß sie in den entsprechend geformten Lagerschalen nicht axial verschiebbar sind. In such a folding door with a bearing arrangement are preferably a Pin and a bearing shell each arranged near one side of the goal body, wherein the pins form part of the goal body and the open bearing shells in the or can be provided on the floor. To prevent the gate body from shifting, the pin can be at least partially frustoconical or in the axial direction be double-frustoconical, so that they are in the correspondingly shaped Bearing shells are not axially displaceable.

Der Torkörper der erfindungsgemäßen Klapptore liegt, wie bei dem vorbekannten Klapptor, in seiner Sperrstellung an einem Fundamentanschlag an und steht zur Festlegung seiner Lage vorzugsweise in formschlüssigem Eingriff mit dem Boden, so daß er also in aufgerichtetem Zustand einerseits durch den Fundamentanschlag und andererseits durch den formschlüssigen Eingriff in stabiler Lage gehalten wird und den Wasserdruck aufnehmen kann. Zur Herstellung eines derartigen formschlüssigen Eingriffes kann im Boden oder am Torkörper eine horizontale Rippe und im Torkörper bzw. im Boden eine entsprechende Vertiefung vorgesehen sein, die in der Sperrstellung in Eingriff miteinander stehen. The gate body of the folding gate according to the invention is, as in the known folding gate, in its locked position on a foundation stop and is preferably in positive engagement with the to determine its position So that it is in an upright state on the one hand by the foundation stop and on the other hand is held in a stable position by the form-fitting engagement and can absorb the water pressure. To produce such a form-fitting Intervention can be a horizontal rib in the ground or on the gate body and in the gate body or a corresponding recess can be provided in the bottom, which is in the locked position are in engagement with each other.

Wie bei dem bekannten Klapptor kann eine Schleppabdeckung vorgesehen sein, die in der Öffnungsstellung das Einspülen von Sand in den Schwenk-bzw. Abrollbereich des Klapptores verhindert und als Ankerungsschutz dient. Am Fundamentanschlag kann eine Dichtung angeordnet werden, um in der Sperrstellung eine Abdichtung zwischen Ober- und Unterwasser zu bewirken. As with the known folding door, a towing cover can be provided be that in the open position, the flushing of sand into the swivel or. Roll-off area of the folding gate and as Anchoring protection is used. At the foundation stop can a seal can be arranged to provide a seal between in the blocking position To effect upper and lower water.

Das Bewegen des Torkörpers kann beispielsweise über mechanische Gestänge- oder Seilzüge erfolgen oder aber vorteilhafterweise durch Verwendung eines Torkörpers mit im von der Schwenkachse entfernten Bereich vorgesehenen flut- und lenzbaren Kammern, durch deren Befüllung mit Wasser oder Luft auf einfache Weise eine Steuerung der Bewegung des Torkörpers erreicht wird. Der Torkörper kann durch weitere flut- und lenzbare Kammern auch schwimmfähig ausgebildet sein, um ihn auf einfache Weise verschleppen zu können. The door body can be moved, for example, via mechanical linkage or cables are carried out or, advantageously, by using a gate body with floodable and drainable ones provided in the area remote from the pivot axis Chambers, which can easily be controlled by filling them with water or air the movement of the goal body is achieved. The gate body can be flooded by further and bilge chambers can also be designed to be buoyant in order to make it easy to float to be able to carry off.

Es sei darauf hingewiesen, daß ein erfindungsgemäß aufgebautes Klapptor auch mehrere nebeneinander angeordnete Torkörper aufweisen kann. Dadurch läßt sich die Form der Torkörper entsprechend den Fertigungsmöglichkeiten an Land wählen, ohne daß die Montage und Wartung zusätzliche Schwierigkeiten verursachen würde. It should be noted that a folding gate constructed according to the invention can also have several door bodies arranged next to one another. This allows choose the shape of the gate body according to the production possibilities on land, without that the assembly and maintenance would cause additional difficulties.

Die Erfindung wird im folgenden anhand der schematisch und vereinfacht Ausführungsbeispiele zeigenden Figuren näher erläutert. The invention is schematically and simplified below with reference to FIG Embodiments showing figures explained in more detail.

Fig. 1 zeigt in einer Seitenansicht ein Klapptor gemäß der Erfindung in der Öffnungsstellung; F i g. 2 zeigt das Klapptor aus F i g. 1 mit sich in der Sperrstellung befindendem Torkörper; Fig. 3 zeigt eine Ausgestaltung des Klapptores gemäß Fig. 1 und 2; F i g. 4 zeigt in einer Darstellung entsprechend F i g. 2 ein anderes Ausführungsbeispiel der Erfindung; Fig. 5 zeigt einen Teilschnitt entlang der Linie A-A ausFig.6; F i g. 6 zeigt einen Teilschnitt entlang der Linie B-B aus F i g 5. Fig. 1 shows a side view of a folding door according to the invention in the open position; F i g. 2 shows the folding door from FIG. 1 with itself in the Locked position gate body; Fig. 3 shows an embodiment of the folding door according to FIGS. 1 and 2; F i g. 4 shows in a representation corresponding to FIG. 2 a another embodiment of the invention; Fig. 5 shows a partial section along the line A-A from Fig. 6; F i g. 6 shows a partial section along the line B-B from FIG F i g 5.

Das in den F i g. 1 und 2 dargestellte Klapptor hat einen Torkörper 4, der aus Beton oder Stahl bestehen kann, und der in der Öffnungsstellung in einer Vertiefung 3 im Boden 1 liegt. Diese Vertiefung kann entweder im Boden vorbereitet werden oder von einem Gründungskörper, etwa aus Beton, gebildet sein, der in den Boden abgesenkt wird. The in the F i g. 1 and 2 illustrated folding gate has a gate body 4, which can be made of concrete or steel, and in the open position in a Well 3 in the bottom 1 is located. This recess can either be prepared in the ground be or be formed by a foundation body, such as concrete, which is in the The ground is lowered.

Um zu verhindern, daß in der Öffnungsstellung gemäß F i g. 1 Sand od. ä. in die Vertiefung 3 eingespült wird, liegt der Torkörper 4 mit einem Vorsprung die in F i g. 1 rechte Kante der Vertiefung überdeckend auf dieser Kante auf, und der Zwischenraum zwischen der in Fig. 1 linken Kante der Vertiefung 3 und dem Torkörper ist von einer Schleppabdeckung 10, etwa aus Blech oder Kautschuk abgedeckt, die einerseits auf dem Boden 1 aufliegt und andererseits bei 23 schwenkbar am Torkörper 4 befestigt ist. Gegebenenfalls können auch besondere Spüleinrichtungen vorgesehen werden, die eindringenden Sand u. ä., insbesondere aus dem in F i g. 1 linken Bereich der Vertiefung 3 entfernen, um die Bewegungen des Torkörpers nicht zu beeinträchtigen. In order to prevent that in the open position according to FIG. 1 sand od. Ä. Is flushed into the recess 3, the gate body 4 lies with a projection the in F i g. 1 right edge of the recess overlapping on this edge, and the space between the left edge of the recess 3 in FIG. 1 and the gate body is covered by a towing cover 10, for example made of sheet metal or rubber, the on the one hand rests on the floor 1 and on the other hand at 23 pivotable on the gate body 4 is attached. If necessary, special flushing devices can also be provided the penetrating sand and the like, in particular from the one shown in FIG. 1 left area remove the recess 3 so as not to interfere with the movement of the goal body.

Im übrigen bilden die Auflagekante und die Schleppabdeckung einen Schutz gegen Anker, und durch die fluchtende Lage von Torkörperoberfläche und Gewässerboden werden Ablagerungen und Ausspülungen weitgehend vermieden.In addition, the support edge and the drag cover form one Protection against anchors and the flush position of the gate body surface and the bottom of the water deposits and washouts are largely avoided.

Soll der Torkörper 4 aus seiner Öffnungsstellung gemäß F i g. 1 in die Sperrstellung gemäß F i g. 2 bewegt werden, so werden die Kammern 6, 7, 8 durch gesteuertes Einpressen von Luft gelenzt, und der Torkörper 4 schwenkt um die Achse 5 nach oben, wobei der Torkörper auf der in den F i g. 1 und 2 linken Bodenfläche der Vertiefung 3 abrollt, so daß sich die Schwenkachse 5 aus ihrer Lage gemäß Fig. 1 nach links in die Lage gemäß Fig.2 bewegt. Während dieser Bewegung durchdringt der Torkörper die Wasseroberfläche 2 und gelangt dann in die Stellung gemäß Fig. 2, in der der Torkörper einerseits am Fundamentanschlag 9 im Bereich der Oberkante der linken Seitenwand der Vertiefung 3 anliegt und andererseits mit seiner Vertiefung 12, die sich parallel zur Schwenkachse 5 erstreckt, in Eingriff mit der unterhalb des Fundamentanschlages am Boden der Vertiefung 3 vorgesehenen Rippe 11 kommt, die zur Seite des Fundamentanschlages hin geneigt ist. Auf diese Weise wird eine stabile Sperrstellung des Torkörpers erreicht, der durch den höheren Wasserstand gemäß Wasseroberfläche 2' in F i g. 2 verglichen mit dem Wasserstand 2" gegen den Fundamentanschlag 9 und die Rippe 11 gepreßt wird. If the gate body 4 is to be moved out of its open position according to FIG. 1 in the locked position according to FIG. 2 are moved, the chambers 6, 7, 8 are through controlled injection of air bleed, and the gate body 4 pivots about the axis 5 up, where the gate body on the in the F i g. 1 and 2 left The bottom surface of the recess 3 rolls off, so that the pivot axis 5 moves out of its position 1 moved to the left in the position shown in FIG. During this movement the gate body penetrates the water surface 2 and then arrives at the position according to FIG. 2, in which the gate body on the one hand on the foundation stop 9 in the area the upper edge of the left side wall of the recess 3 rests and on the other hand with its recess 12, which extends parallel to the pivot axis 5, in engagement with the one provided below the foundation stop on the bottom of the recess 3 Rib 11 comes, which is inclined to the side of the foundation stop. To this Way, a stable locking position of the gate body is achieved, which is due to the higher Water level according to water surface 2 'in FIG. 2 compared to the water level 2 "is pressed against the foundation stop 9 and the rib 11.

Bei der Bewegung des Torkörpers von der Öffnungsstellung gemäß F i g. 1 in die Sperrstellung gemäß F i g. 2 gleitet die Schleppabdeckung über den Boden 1 und wird um die Achse 23 verschwenkt, so daß sie die Bewegung des Torkörpers nicht beeinträchtigt sowie bei Rückkehr in die Öffnungsstellung wieder in die Lage gemäß F i g. 1 gezogen wird. When moving the gate body from the open position according to F i g. 1 in the locked position according to FIG. 2 the towing cover slides over the Floor 1 and is pivoted about the axis 23, so that they the movement of the goal body not impaired, as well as back into position on return to the open position according to FIG. 1 is drawn.

Es ist ohne weiteres klar, daß sich der Torkörper 4 in der Öffnungsstellung gemäß F i g. 1 oder auch in einer teilweise geschwenkten Stellung aus der Vertiefung 3 herausheben und zur Durchführung von Reparaturen verschleppen läßt, ohne daß unter Wasser Drehbolzen oder andere Schwenkverbindungen gelöst werden müßten. Somit brauchen also unter Umständen sehr arbeitsaufwendige Reparaturen nicht mehr unter Wasser durchgeführt zu werden. Darüber hinaus ermöglicht der Aufbau des erfindungsgemäßen Klapptores auch den sehr schnellen Ersatz eines schadhaften Torkörpers durch einen anderen, da dieser neue Torkörper lediglich in die Stellung gemäß Fig. 1 abgesenkt zu werden braucht und dann voll funktionsfähigist. It is readily apparent that the gate body 4 is in the open position according to FIG. 1 or in a partially pivoted position out of the recess 3 can be lifted out and carried away to carry out repairs without being underneath Water pivot bolts or other swivel connections would have to be loosened. So need so under certain circumstances very labor-intensive repairs no longer under water to be carried out. In addition, the structure of the invention allows Folding gates also allow a damaged gate body to be replaced very quickly with one others, since this new gate body is only lowered into the position shown in FIG needs to be and is then fully functional.

Um die Führung des Torkörpers bei seiner Bewegung von der Öffnungsstellung in die Sperrstellung und zurück in die Öffnungsstellung zu verbessern, können im Bodenbereich der den Torkörper aufnehmenden Vertiefung, wie in F i g. 3 angedeutet, Rippen 13, 15, 17, 19, 21 ausgehil.let werden, die zusammen mit entsprechenden Vertiefunlren 14, 16, 18, 20, 22 im Torkörper 4' eine »Verzahnung« bilden, und die bei Bewegung von der Öffnungsstellung in die Sperrstellung, also beim Abrollen des Torkörpers 4' auf dem Boden nacheinander in Eingriff kommen und so eine zuverlässige Positionierung des Torkörpers 4' bezüglich des Bodens bewirken. In der Sperrstellung kommt dann die Rippe 11' in Eingriff mit der Vertiefung 12', wobei die Rippe 11' entsprechend den übrigen Rippen 13, 15, 17, 19, 21 der Verzahnung oder aber auch zur Aufnahme der in der Sperrstellung auftretenden Kräfte in anderer Form oder Neigung ausgebildet sein kann. To guide the gate body as it moves from the open position to improve in the locked position and back to the open position, can in Bottom area of the recess receiving the goal body, as shown in FIG. 3 indicated, Ribs 13, 15, 17, 19, 21 are healed, which together with corresponding indentations 14, 16, 18, 20, 22 form a "toothing" in the door body 4 ', and that when moving from the open position to the locked position, i.e. when the door body rolls off 4 'engage on the floor one by one and so reliable positioning of the goal body 4 'with respect to the ground. Then comes in the locked position the rib 11 'in engagement with the recess 12', the rib 11 'correspondingly the remaining ribs 13, 15, 17, 19, 21 of the toothing or also for receiving the forces occurring in the locking position are designed in a different shape or inclination can be.

Das in den F i g. 4 bis 6 gezeigte Ausführungsbeispiel ähnelt weitgehend dem Ausführungsbeispiel gemäß F i g. 1 und 2, jedoch ist der Torkörper 54 anders am Boden der Vertiefung 53 gelagert. The in the F i g. The embodiment shown in 4 to 6 is largely similar the embodiment according to FIG. 1 and 2, however, the gate body 54 is different stored at the bottom of the recess 53.

Wie dargestellt, dient der in F i g. 4 in der Sperrstellung befindliche Torkörper 54 zur Trennung von Oberwasser 52' und Unterwasser 52", und er steht in der Sperrstellung mit einer am Boden der Vertiefung 53 vorgesehenen Rippe 61 entsprechend der Rippe 11 gemäß F i g. 1 und 2 in Eingriff. Darüber hinaus liegt er an dem als Dichtung wirkenden Fundamentanschlag 59 an, der dem Fundamentanschlag 9 gemäß F i g. 1 und 2 entspricht. Eine Schleppabdeckung 60 ist schwenkbar am Torkörper 54 befestigt und auf dem Boden 51 verschiebbar. As shown, the one in FIG. 4 located in the locked position Gate body 54 for the separation of upper water 52 'and lower water 52 ", and he is in corresponding to the locking position with a rib 61 provided on the bottom of the recess 53 of the rib 11 according to FIG. 1 and 2 engaged. In addition, it is due to the as Seal acting foundation stop 59, which is the foundation stop 9 according to F i g. 1 and 2 corresponds. A towing cover 60 is pivotable on the gate body 54 attached and slidable on the floor 51.

Während der Torkörper gemäß Fig.l und 2 zur Bewegung in die und aus der Sperrstellung am Boden der Vertiefung 3 abrollend verschwenkt wird, sind am Boden der Vertiefung 53 Lagerschalen ausgebildet, die aus etwa halbkreisförmigen, nach oben offenen Vertiefungen bestehen, die sich in Lagerböcken 56 befinden. Während in den Figuren nur eine einzige Lagerschale dargestellt ist, befindet sich vorzugsweise an jeder Seite des Torkörpers eine derartige Lagerschale, und diese Lagerschalen dienen zur Aufnahme von Zapfen 55, die im unteren Bereich am Torkörper 54 vorgesehen sind, und zwar im Bereich von im Torkörper vorhandenen Aussparungen 57. Die Breite dieser Aussparungen ist etwas größer als die Breite der Lagerböcke 56. During the gate body according to Fig.l and 2 to move in and out the locking position is pivoted rolling at the bottom of the recess 3, are on Bottom of the recess 53 bearing shells formed, which consist of approximately semicircular, There are recesses that are open at the top and are located in bearing blocks 56. While only a single bearing shell is shown in the figures, is preferably located on each side of the goal body such a bearing shell, and these bearing shells serve to accommodate pins 55, which are provided in the lower area on the gate body 54 are, specifically in the area of recesses 57 in the gate body. The width these cutouts are somewhat larger than the width of the bearing blocks 56.

Wie insbesondere in Fig. 6 zu erkennen ist, weist der Zapfen 55 zwei zylindrische Endbereiche auf, die über kegelstumpfförmig verlaufende Übergangsbereiche in einen zylindrischen Mittelbereich größeren Durchmessers übergehen. Entsprechend ist die Lagerschale ausgebildet, so daß der Zapfen 55 und damit der Torkörper 54 nicht in Richtung der Längsachse des Zapfens 55 bewegt werden kann. As can be seen in particular in FIG. 6, the pin 55 has two cylindrical end regions, which extend over frustoconical transition regions merge into a cylindrical central area of larger diameter. Corresponding the bearing shell is formed so that the pin 55 and thus the gate body 54 cannot be moved in the direction of the longitudinal axis of the pin 55.

Um die Zapfen 55 des Torkörpers 54 durch einfaches Absenken bzw. Anheben in die Lagerschalen einzusetzen und aus ihnen herauszunehmen, hat die Lagerschale jeweils einen Öffnungsbereich, der größer ist, als der Durchmesser des Zapfens 55 in diesem Bereich. To the pin 55 of the gate body 54 by simply lowering or Lifting to insert into and out of the bearing shells has the bearing shell each has an opening area that is larger than the diameter of the pin 55 in this area.

Dadurch läßt sich der Torkörper zu Reparaturarbeiten ohne weiteres anheben und abtransportieren sowie gegen einen anderen Torkörper austauschen, ohne daß hierzu Taucherarbeiten erforderlich wären.This allows the gate body to be easily repaired lift and transport away as well as exchange for another gate body without that this would require diving work.

Wie bei dem Torkörper gemäß F i g. 1 und 2 erfolgt beim Torkörper 54 das Anheben und Absenken durch Lenzen bzw. Fluten von entsprechenden Kammern, die in Fig. 4 angedeutet sind. Es sei darauf hingewiesen, daß zu diesem Zweck die Sperrstellung des Torkörpers vorzugsweise so gewählt wird, daß sein Gewichtsschwerpunkt rechts (F i g. 4) vom Zapfen 55 liegt, da dann im allgemeinen eine Bewegung des Torkörpers 54 in die Öffnungsstellung durch Fluten der Kammer möglich ist, ohne daß äußere Hilfsmittel erforderlich wären. As with the gate body according to FIG. 1 and 2 take place at the gate body 54 raising and lowering by draining or flooding corresponding chambers, which are indicated in FIG. 4. It should be noted that for this purpose the Locked position of the gate body is preferably chosen so that its center of gravity to the right (F i g. 4) of the pin 55, since then in general a movement of the Gate body 54 in the open position by flooding the chamber is possible without that external resources would be required.

Claims (9)

Patentansprüche: 1. Klapptor zum Sperren von Flüssen, Kanälen, Docks u. ä. mit einem Torkörper, der zwischen einer Öffnungsstellung, in der er sich in einer in etwa horizontalen Lage befindet, und einer aufgerichteten Sperrstellung um eine sich in der Sperrstellung im unteren Bereich des Torkörpers befindende horizontale Schwenkachse schwenkbar ist und der in der Sperrstellung in seinem unteren, oberhalb der Schwenkachse liegenden Bereich an einem Fundamentanschlag anliegt, d a d u r c h g e k e n n -z e i c h n e t, daß der Torkörper (4) zumindest außerhalb der Sperrstellung frei aus seiner Lage anhebbar ist und daß der Torkörper (4) bei Bewegung in die und aus der Sperrstellung in Berührung mit dem Boden steht und auf diesem abrollt, wobei sich seine Schwenkachse (5) in Richtung auf den Fundamentanschlag (9) bzw. von diesem weg verlagert. Claims: 1. Folding gate to block rivers, canals, docks u. Ä. With a gate body, which between an open position in which he is in an approximately horizontal position, and an upright locked position around a horizontal one located in the locked position in the lower area of the goal body The pivot axis is pivotable and in the locked position in its lower, above the area lying on the swivel axis rests against a foundation stop, which means that c h g e k e n n -z e i c h n e t that the gate body (4) at least outside the Locked position can be raised freely from its position and that the gate body (4) when moving in and out of the locked position is in contact with the ground and on this unrolls, with its pivot axis (5) in the direction of the foundation stop (9) or shifted away from it. 2. Klapptor nach Anspruch 1, gekennzeichnet durch mindestens eine Führungsverzahnung (13, 15, 17, 19, 21; 14, 16, 18, 20, 21) im Bodenbereich, auf dem der Torkörper (4') abrollt, sowie im in Berührung mit diesem Bodenbereich kommenden Bereich des Torkörpers (4'). 2. Folding door according to claim 1, characterized by at least one Guide teeth (13, 15, 17, 19, 21; 14, 16, 18, 20, 21) in the bottom area which the gate body (4 ') rolls off, as well as in coming into contact with this floor area Area of the gate body (4 '). 3. Klapptor zum Sperren von Flüssen, Kanälen, Docks u. ä. mit einem Torkörper, der zwischen einer Öffnungsstellung, in der er sich in einer in etwa horizontalen Lage befindet, und einer aufgerichteten Sperrstellung um eine sich in der Sperrstellung im unteren Bereich des Torkörpers befindende horizontale Schwenkachse schwenkbar ist und der in der Sperrstellung in seinem unteren, oberhalb der Schwenkachse liegenden Bereich an einem Fundamentanschlag anliegt, dadurch gekennzeichnet, daß der Torkörper (54) zumindest außerhalb der Sperrstellung frei aus seiner Lage anhebbar ist und daß die Schwenkachse durch eine Zapfen (55) und teilweise offenen Lagerschalen aufweisenden Lageranordnung gebildet ist, wobei die Öffnung der Lagerschale größer ist als der Durchmesser des Zapfens (55) im jeweiligen Öffnungsbereich. 3. Folding gate to block rivers, canals, docks and the like with a Gate body, which is between an open position in which he is in an approximately horizontal position, and an upright locking position around a horizontal pivot axis located in the locked position in the lower area of the gate body is pivotable and in the locked position in its lower, above the pivot axis lying area rests against a foundation stop, characterized in that the gate body (54) can be freely lifted out of its position at least outside of the blocking position is and that the pivot axis through a pin (55) and partially open bearing shells having bearing arrangement is formed, wherein the opening of the bearing shell is larger is than the diameter of the pin (55) in the respective opening area. 4. Klapptor nach Anspruch 3, dadurch gekennzeichnet, daß der Durchmesser des Zapfens (55) bzw. 4. folding door according to claim 3, characterized in that the diameter of the pin (55) or der Zapfen von zumindest einem Ende in axialer Richtung zunimmt.the pin increases from at least one end in the axial direction. 5. Klapptor nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß der Bodenbereich, auf dem der Torkörper (4; 54) abrollt bzw. ruht, und der Torkörper (4; 54) zumindest in der Sperrstellung in im wesentlichen in Richtung der Verlagerung der Schwenkachse (5) bzw. in Richtung der Schwenkbewegung in die Sperrstellung wirksamen, formschlüssigen Eingriff miteinander stehen. 5. folding door according to one of claims 1 to 4, characterized in that that the floor area on which the gate body (4; 54) rolls or rests, and the gate body (4; 54), at least in the blocking position, essentially in the direction of displacement the swivel axis (5) or in the direction of the swivel movement into the locked position, positive engagement with each other. 6. Klapptor nach Anspruch 5, gekennzeichnet durch zumindest eine horizontale Rippe (11) im Boden bzw. am Torkörper und eine entsprechende Vertiefung (12) im Torkörper bzw. im Boden, die in der Sperrstellung in Eingriff miteinander stehen. 6. folding door according to claim 5, characterized by at least one horizontal rib (11) in the bottom or on the gate body and a corresponding recess (12) in the gate body or in the floor, which in the locked position in engagement with one another stand. 7. Klapptor nach einem der Ansprüche 1 bis 6, gekennzeichnet durch eine Schleppabdeckung (10; 60), die an der dem Torkörper (4; 54) abgewandten Seite des Fundamentanschlages auf dem Boden (1; 51) aufliegt und die den Raum zwischen Fundamentanschlag (9; 59) und Torkörper (4; 54) überdeckend am Torkörper schwenkbar befestigt ist. 7. Folding door according to one of claims 1 to 6, characterized by a towing cover (10; 60) on the side facing away from the gate body (4; 54) of the foundation stop on the ground (1; 51) rests and the space between Foundation stop (9; 59) and gate body (4; 54) can be swiveled overlapping on the gate body is attached. 8. Klapptor nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß im von der Schwenkachse entfernten Bereich des Torkörpers (4) flut-und lenzbare Kammern (6,7,8) vorgesehen sind. 8. folding door according to one of claims 1 to 7, characterized in that that in the area of the door body (4) remote from the pivot axis, floodable and bilge ble Chambers (6,7,8) are provided. 9. Klapptor nach einem der Ansprüche 1 bis 8, gekennzeichnet durch einen Gründungskörper mit einer Vertiefung (3; 53) zur Aufnahme des Torkörpers (4; 54), welcher im oberen Bereich einer Begrenzungswand der Vertiefung den Fundamentanschlag(9;59) aufweist. 9. folding door according to one of claims 1 to 8, characterized by a foundation body with a recess (3; 53) for receiving the gate body (4; 54), which in the upper area of a boundary wall of the recess, the foundation stop (9; 59) having. Die Erfindung bezieht sich auf ein Klapptor zum Sperren von Flüssen, Kanälen, Docks u. ä. mit einem Torkörper, der zwischen einer Öffnungsstellung, in der er sich in einer in etwa horizontalen Lage befindet, und einer aufgerichteten Sperrstellung um eine sich in der Sperrstellung im unteren Bereich des Torkörpers befindende horizontale Schwenkachse schwenkbar ist und der in der Sperrstellung in seinem unteren, oberhalb der Schwenkachse liegenden Bereich an einem Fundamentanschlag anliegt. The invention relates to a flap gate for blocking rivers, Channels, docks and the like with a gate body, which is between an open position, in which he is in an approximately horizontal position, and an upright position Locked position to be in the locked position in the lower area of the gate body located horizontal pivot axis is pivotable and in the locked position in its lower area above the pivot axis on a foundation stop is applied. Bei einem bekannten Klapptor dieser Art (»Construction Industry International(<, Vol. 3, No. 12, Dezember 77, Seite 28), das zum Verschließen eines Trockendocks dient, ist der Torkörper mittels einer Schwenkachse in Form von koaxial angeordneten Drehbolzen mit dem Boden verbunden, wobei sich diese Drehbolzen einerseits durch am Boden befestigte Lagerböcke und andererseits durch entsprechende, am unteren Endbereich des Torkörpers angebrachte Lagerelemente erstrecken. Diese Drehbolzen liegen in etwa senkrecht unterhalb des Fundamentanschlages und im wesentlichen außerhalb des eigentlichen Torkörpers. In a known flap door of this type (»Construction Industry International (<, Vol. 3, No. 12, Dec 77, page 28) that is used to seal a dry dock is used, the gate body is arranged by means of a pivot axis in the form of coaxially Pivot pin connected to the ground, this pivot pin on the one hand through bearing blocks attached to the ground and, on the other hand, by corresponding ones on the lower End portion of the goal body attached bearing elements extend. These pivot pins are approximately vertically below the foundation stop and essentially outside of the actual goal body. Dieses bekannte Klapptor arbeitet in zufriedenstellender Weise, hat jedoch den Nachteil, daß bei Schäden an den Drehbolzen oder den Lager- und Verbindungseinrichtungen eine Reparatur unter Wasser vorgenommen werden muß oder aber, falls die Reparatur nicht ohne weiteres durch Taucher ausgeführt werden kann, Taucher die Drehbolzen lösen müssen, um so ein Anheben und Reparieren des Torkörpers zu ermöglichen. This known flap door works in a satisfactory manner, has however, the disadvantage that if the pivot pin or the bearing and connecting devices are damaged a repair must be made underwater or, if the repair can not be easily performed by divers, divers use the pivot pin have to solve in order to enable lifting and repairing of the goal body. Es ist daher Aufgabe der Erfindung, ein Klapptor zu schaffen, das sich sehr einfach reparieren und warten läßt und bei dem insbesondere für die Reparatur von Schäden im Schwenkbereich des Torkörpers keine Taucher eingesetzt zu werden brauchen. It is therefore the object of the invention to create a folding door that can be repaired and maintained very easily and especially for the repair not to use divers from damage in the pivoting range of the gate body to need. Bei einer Lösung dieser Aufgabe wird ein Klapptor der eingangs erwähnten Art erfindungsgemäß derart ausgestaltet, daß der Torkörper zumindest außerhalb der Sperrstellung frei aus seiner Lage anhebbar ist und daß der Torkörper bei Bewegung in die und aus der Sperrstellung in Berührung mit dem Boden steht und auf diesem abrollt, wobei sich seine Schwenkachse in Richtung auf den Fundamentanschlag bzw. von diesem weg verlagert. In a solution to this problem, a folding door is the one mentioned at the beginning Art designed according to the invention such that the gate body at least outside of the Locked position can be raised freely from its position and that the gate body when moving in and out of the locked position is in contact with the ground and on this unrolls, with its pivot axis in the direction of the foundation stop or shifted away from this. Bei diesem erfindungsgemäßen Klapptor ist also der Torkörper frei gelagert, d. h. nicht über Drehbolzen o. ä. In this folding door according to the invention, the door body is therefore free stored, d. H. not via pivot pins or similar
DE19782838431 1978-09-02 1978-09-02 Folding gate to block rivers, canals, docks and the like Expired DE2838431C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19782838431 DE2838431C2 (en) 1978-09-02 1978-09-02 Folding gate to block rivers, canals, docks and the like

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19782838431 DE2838431C2 (en) 1978-09-02 1978-09-02 Folding gate to block rivers, canals, docks and the like

Publications (2)

Publication Number Publication Date
DE2838431B1 true DE2838431B1 (en) 1979-09-20
DE2838431C2 DE2838431C2 (en) 1980-06-04

Family

ID=6048595

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19782838431 Expired DE2838431C2 (en) 1978-09-02 1978-09-02 Folding gate to block rivers, canals, docks and the like

Country Status (1)

Country Link
DE (1) DE2838431C2 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0045053A1 (en) * 1980-07-29 1982-02-03 PIRELLI/FURLANIS APPLICAZIONI IDRAULICHE-AGRICOLE GOMMA S.p.A. Swinging dam
DE3502243A1 (en) * 1985-01-24 1986-07-24 Philipp Holzmann Ag, 6000 Frankfurt Arrangement for closing stretches of water
EP0802285A2 (en) * 1996-04-15 1997-10-22 Karl-Hermann Trainer High water protection system
EP0839963A2 (en) * 1996-10-31 1998-05-06 ABS Pump Center GmbH Self cleaning device for lock gate installations
DE19651389A1 (en) * 1996-12-11 1998-06-25 Ingbuero Heinrich Quante Flood prevention construction for rivers, lakes, sea, etc
CN102102354A (en) * 2011-01-11 2011-06-22 中国水利水电科学研究院 Hydraulic vibration gate
WO2016110438A1 (en) * 2015-01-08 2016-07-14 Universität Für Bodenkultur Wien Flood protection system
EP3199706A1 (en) * 2016-01-28 2017-08-02 Wintec Holding ApS Pre-fabricated water control sluice gate system
WO2018177489A1 (en) * 2017-03-30 2018-10-04 Steen Olsen Invest Aps Flood protection

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0045053A1 (en) * 1980-07-29 1982-02-03 PIRELLI/FURLANIS APPLICAZIONI IDRAULICHE-AGRICOLE GOMMA S.p.A. Swinging dam
DE3502243A1 (en) * 1985-01-24 1986-07-24 Philipp Holzmann Ag, 6000 Frankfurt Arrangement for closing stretches of water
EP0802285A3 (en) * 1996-04-15 1998-12-23 Karl-Hermann Trainer High water protection system
EP0802285A2 (en) * 1996-04-15 1997-10-22 Karl-Hermann Trainer High water protection system
EP0839963A2 (en) * 1996-10-31 1998-05-06 ABS Pump Center GmbH Self cleaning device for lock gate installations
EP0839963A3 (en) * 1996-10-31 1998-09-30 ABS Pump Center GmbH Self cleaning device for lock gate installations
DE19651389A1 (en) * 1996-12-11 1998-06-25 Ingbuero Heinrich Quante Flood prevention construction for rivers, lakes, sea, etc
CN102102354A (en) * 2011-01-11 2011-06-22 中国水利水电科学研究院 Hydraulic vibration gate
WO2016110438A1 (en) * 2015-01-08 2016-07-14 Universität Für Bodenkultur Wien Flood protection system
EP3199706A1 (en) * 2016-01-28 2017-08-02 Wintec Holding ApS Pre-fabricated water control sluice gate system
WO2018177489A1 (en) * 2017-03-30 2018-10-04 Steen Olsen Invest Aps Flood protection
CN110678608A (en) * 2017-03-30 2020-01-10 丹麦史丁奥神投资有限公司 Flood control device
EP3601679A4 (en) * 2017-03-30 2021-01-13 Steen Olsen Invest ApS Flood protection
US11629469B2 (en) 2017-03-30 2023-04-18 Steen Olsen Invest Aps Flood protection

Also Published As

Publication number Publication date
DE2838431C2 (en) 1980-06-04

Similar Documents

Publication Publication Date Title
DE2831732C2 (en) Ramp arrangement for a pipelayer designed as a semi-submersible for laying pipelines
DE2400805C3 (en) Drill rod storage facility
DE2818293A1 (en) SEMI-TRAILER
DE2812996A1 (en) LANDING BRIDGE
DE2838431C2 (en) Folding gate to block rivers, canals, docks and the like
DE2130987C3 (en) Procedure for operating and building a weir in waterways
EP1328687B1 (en) Device and method for producing columns of particulate matter in the ground of bodies of water
DE102005026542A1 (en) Lock gate for inland waterway has vertical torsion bar drive extending above the maximum waterline
AT516309B1 (en) Automatically closing hinged partition
DE3140752A1 (en) METHOD FOR PRODUCING DAMS AND DAM DONE BY THIS METHOD
DE2757704C3 (en) Water barrier, especially flood barrier
DE10048999B4 (en) Method for continuously and reversibly changing the draft of a watercraft
DE10125946B4 (en) Flood protection device
DE2941043A1 (en) River or coast closable flood defence work - has watertight chambers in submerged base, housing hoist for supported lock
DE1941608B2 (en) Cargo space for watercraft
DE2901957C2 (en) Method of making an artificial island
AT526665B1 (en) Fluid retention system and method for triggering a fluid retention system and for establishing a standby position
EP0841436B1 (en) High water protection barrier
DE202006016148U1 (en) Pontoon Bridge
DE811100C (en) Method and device for inserting an emergency seal for hydraulic systems
WO2012140076A2 (en) Method and device for encasing a borehole
EP1273712A1 (en) Mobile flood protection system
DE2550621C3 (en) A pillar bearing a surface above the water
EP3409838B1 (en) Buoyant body for forming of bridge sections
DE2538520C3 (en) Retaining wall and swimming pool provided with such a retaining wall

Legal Events

Date Code Title Description
8339 Ceased/non-payment of the annual fee