DE2838431B1 - Folding gate to block rivers, canals, docks, etc. - Google Patents
Folding gate to block rivers, canals, docks, etc.Info
- Publication number
- DE2838431B1 DE2838431B1 DE19782838431 DE2838431A DE2838431B1 DE 2838431 B1 DE2838431 B1 DE 2838431B1 DE 19782838431 DE19782838431 DE 19782838431 DE 2838431 A DE2838431 A DE 2838431A DE 2838431 B1 DE2838431 B1 DE 2838431B1
- Authority
- DE
- Germany
- Prior art keywords
- gate body
- locked position
- gate
- area
- pivot axis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Barrages (AREA)
Description
fest mit dem Boden verbunden, sondern rollt bei Bewegung von der einen Betriebsstellung in die andere Betriebsstellung auf dem Boden ab, wobei sich die im Torkörper liegende imaginäre Schwenkachse verlagert Durch eine solche Lagerung ist es möglich, den Torkörper zumindest außerhalb der Sperrstellung ohne weiteres anzuheben bzw. aufzuschwimmen, um ihn zur Durchführung von Reparaturen zu verschleppen, ohne daß arbeitsaufwendige Arbeiten unter Wasser durchge-'führt werden. Entsprechend läßt sich der Torkörper auch ohne Schwierigkeiten in die gewünschte Stellung absenken, und er gelangt in seine Betriebsstellung, ohne daß eine komplizierte Verbindung von Bolzen und Lagern hergestellt werden müßte.firmly attached to the ground, but rolls from one when it is moved Operating position in the other operating position on the ground, with the Imaginary pivot axis lying in the gate body displaced by such a bearing it is possible to easily open the gate body at least outside of the locked position to lift or float up in order to use it Carrying out repairs to carry off without labor-intensive work carried out under water will. Correspondingly, the gate body can also be turned into the desired one without difficulty Lower position, and it gets into its operating position without a complicated Connection of bolts and bearings would have to be made.
Um während des Aufrichtens und Absenkens eines auf dem Boden abrollenden Torkörpers und des sich dabei ergebenden Abrollvorganges eine zuverlässige Führung zu erreichen, können im Bodenbereich, auf dem der Torkörper abrollt, sowie im in Berührung mit diesem Bodenbereich kommenden Bereich des Torkörpers mindestens eine Führungsverzahnung vorgesehen sein, die den Torkörper in jeder Zwischenstellung in der gewünschten Lage hält, ohne daß die freie Anhebbarkeit des Torkörpers beeinträchtigt wird. Diese Führungsverzahnung kann in zwei Bereiche unterteilt sein, die sich jeweils nahe einer Seite des Torkörpers befinden, so daß sich also die Führungsverzahnung nicht über die gesamte Breite des Torkörpers erstreckt. To during the raising and lowering of a rolling on the floor Goal body and the resulting rolling process a reliable guide can be reached in the floor area on which the goal body rolls, as well as in the in At least one area of the goal body coming into contact with this floor area Guide teeth may be provided that the gate body in each intermediate position holds in the desired position without affecting the free liftability of the door body will. This guide toothing can be divided into two areas, each one located near one side of the goal body, so that the guide teeth does not extend over the entire width of the goal body.
Bei einer anderen Lösung der vorstehend genannten Aufgabe wird ein Klapptor der eingangs erwähnten Art erfindungsgemäß derart ausgestaltet, daß der Torkörper zumindest außerhalb der Sperrstellung frei aus seiner Lage anhebbar ist und daß die Schwenkachse durch eine Zapfen und teilweise offenen Lagerschalen aufweisenden Lageranordnung gebildet ist, wobei die Öffnung der Lagerschale größer ist als der Durchmesser des Zapfens im jeweiligen Öffnungsbereich. In another solution to the above problem, a Folding gate of the type mentioned according to the invention designed such that the Gate body can be raised freely from its position at least outside of the blocked position and that the pivot axis has a pin and partially open bearing shells Bearing arrangement is formed, wherein the opening of the bearing shell is larger than that Diameter of the pin in the respective opening area.
Auch bei dieser Lösung ist also der Torkörper frei gelagert und nicht über die Drehbolzen fest mit dem Boden verbunden. Vielmehr erfolgt die Schwenkbewegung um eine durch Anheben des Torkörpers trennbare Lageranordnung aus Zapfen und teilweise offenen Lagerschalen, so daß sich die gleichen Vorteile für die Montage und eventuelle Reparaturen ergeben, wie vorstehend in Zusammenhang mit der ersten Lösung erläutert. In this solution, too, the gate body is freely supported and not Firmly connected to the floor via the pivot pin. Rather, the pivoting movement takes place around a bearing arrangement made of journals and partially separable by lifting the door body open bearing shells, so that the same advantages for the assembly and eventual Repairs result as explained above in connection with the first solution.
Bei einem solchen Klapptor mit Lageranordnung sind vorzugsweise ein Zapfen und eine Lagerschale jeweils nahe einer Seite des Torkörpers angeordnet, wobei die Zapfen einen Teil des Torkörpers bilden und die offenen Lagerschalen im oder am Boden vorgesehen sein können. Um eine Verlagerung des Torkörpers zu verhindern, können die Zapfen in axialer Richtung zumindest teilweise kegelstumpfförmig oder doppel-kegelstumpfförmig ausgebildet sein, so daß sie in den entsprechend geformten Lagerschalen nicht axial verschiebbar sind. In such a folding door with a bearing arrangement are preferably a Pin and a bearing shell each arranged near one side of the goal body, wherein the pins form part of the goal body and the open bearing shells in the or can be provided on the floor. To prevent the gate body from shifting, the pin can be at least partially frustoconical or in the axial direction be double-frustoconical, so that they are in the correspondingly shaped Bearing shells are not axially displaceable.
Der Torkörper der erfindungsgemäßen Klapptore liegt, wie bei dem vorbekannten Klapptor, in seiner Sperrstellung an einem Fundamentanschlag an und steht zur Festlegung seiner Lage vorzugsweise in formschlüssigem Eingriff mit dem Boden, so daß er also in aufgerichtetem Zustand einerseits durch den Fundamentanschlag und andererseits durch den formschlüssigen Eingriff in stabiler Lage gehalten wird und den Wasserdruck aufnehmen kann. Zur Herstellung eines derartigen formschlüssigen Eingriffes kann im Boden oder am Torkörper eine horizontale Rippe und im Torkörper bzw. im Boden eine entsprechende Vertiefung vorgesehen sein, die in der Sperrstellung in Eingriff miteinander stehen. The gate body of the folding gate according to the invention is, as in the known folding gate, in its locked position on a foundation stop and is preferably in positive engagement with the to determine its position So that it is in an upright state on the one hand by the foundation stop and on the other hand is held in a stable position by the form-fitting engagement and can absorb the water pressure. To produce such a form-fitting Intervention can be a horizontal rib in the ground or on the gate body and in the gate body or a corresponding recess can be provided in the bottom, which is in the locked position are in engagement with each other.
Wie bei dem bekannten Klapptor kann eine Schleppabdeckung vorgesehen sein, die in der Öffnungsstellung das Einspülen von Sand in den Schwenk-bzw. Abrollbereich des Klapptores verhindert und als Ankerungsschutz dient. Am Fundamentanschlag kann eine Dichtung angeordnet werden, um in der Sperrstellung eine Abdichtung zwischen Ober- und Unterwasser zu bewirken. As with the known folding door, a towing cover can be provided be that in the open position, the flushing of sand into the swivel or. Roll-off area of the folding gate and as Anchoring protection is used. At the foundation stop can a seal can be arranged to provide a seal between in the blocking position To effect upper and lower water.
Das Bewegen des Torkörpers kann beispielsweise über mechanische Gestänge- oder Seilzüge erfolgen oder aber vorteilhafterweise durch Verwendung eines Torkörpers mit im von der Schwenkachse entfernten Bereich vorgesehenen flut- und lenzbaren Kammern, durch deren Befüllung mit Wasser oder Luft auf einfache Weise eine Steuerung der Bewegung des Torkörpers erreicht wird. Der Torkörper kann durch weitere flut- und lenzbare Kammern auch schwimmfähig ausgebildet sein, um ihn auf einfache Weise verschleppen zu können. The door body can be moved, for example, via mechanical linkage or cables are carried out or, advantageously, by using a gate body with floodable and drainable ones provided in the area remote from the pivot axis Chambers, which can easily be controlled by filling them with water or air the movement of the goal body is achieved. The gate body can be flooded by further and bilge chambers can also be designed to be buoyant in order to make it easy to float to be able to carry off.
Es sei darauf hingewiesen, daß ein erfindungsgemäß aufgebautes Klapptor auch mehrere nebeneinander angeordnete Torkörper aufweisen kann. Dadurch läßt sich die Form der Torkörper entsprechend den Fertigungsmöglichkeiten an Land wählen, ohne daß die Montage und Wartung zusätzliche Schwierigkeiten verursachen würde. It should be noted that a folding gate constructed according to the invention can also have several door bodies arranged next to one another. This allows choose the shape of the gate body according to the production possibilities on land, without that the assembly and maintenance would cause additional difficulties.
Die Erfindung wird im folgenden anhand der schematisch und vereinfacht Ausführungsbeispiele zeigenden Figuren näher erläutert. The invention is schematically and simplified below with reference to FIG Embodiments showing figures explained in more detail.
Fig. 1 zeigt in einer Seitenansicht ein Klapptor gemäß der Erfindung in der Öffnungsstellung; F i g. 2 zeigt das Klapptor aus F i g. 1 mit sich in der Sperrstellung befindendem Torkörper; Fig. 3 zeigt eine Ausgestaltung des Klapptores gemäß Fig. 1 und 2; F i g. 4 zeigt in einer Darstellung entsprechend F i g. 2 ein anderes Ausführungsbeispiel der Erfindung; Fig. 5 zeigt einen Teilschnitt entlang der Linie A-A ausFig.6; F i g. 6 zeigt einen Teilschnitt entlang der Linie B-B aus F i g 5. Fig. 1 shows a side view of a folding door according to the invention in the open position; F i g. 2 shows the folding door from FIG. 1 with itself in the Locked position gate body; Fig. 3 shows an embodiment of the folding door according to FIGS. 1 and 2; F i g. 4 shows in a representation corresponding to FIG. 2 a another embodiment of the invention; Fig. 5 shows a partial section along the line A-A from Fig. 6; F i g. 6 shows a partial section along the line B-B from FIG F i g 5.
Das in den F i g. 1 und 2 dargestellte Klapptor hat einen Torkörper 4, der aus Beton oder Stahl bestehen kann, und der in der Öffnungsstellung in einer Vertiefung 3 im Boden 1 liegt. Diese Vertiefung kann entweder im Boden vorbereitet werden oder von einem Gründungskörper, etwa aus Beton, gebildet sein, der in den Boden abgesenkt wird. The in the F i g. 1 and 2 illustrated folding gate has a gate body 4, which can be made of concrete or steel, and in the open position in a Well 3 in the bottom 1 is located. This recess can either be prepared in the ground be or be formed by a foundation body, such as concrete, which is in the The ground is lowered.
Um zu verhindern, daß in der Öffnungsstellung gemäß F i g. 1 Sand od. ä. in die Vertiefung 3 eingespült wird, liegt der Torkörper 4 mit einem Vorsprung die in F i g. 1 rechte Kante der Vertiefung überdeckend auf dieser Kante auf, und der Zwischenraum zwischen der in Fig. 1 linken Kante der Vertiefung 3 und dem Torkörper ist von einer Schleppabdeckung 10, etwa aus Blech oder Kautschuk abgedeckt, die einerseits auf dem Boden 1 aufliegt und andererseits bei 23 schwenkbar am Torkörper 4 befestigt ist. Gegebenenfalls können auch besondere Spüleinrichtungen vorgesehen werden, die eindringenden Sand u. ä., insbesondere aus dem in F i g. 1 linken Bereich der Vertiefung 3 entfernen, um die Bewegungen des Torkörpers nicht zu beeinträchtigen. In order to prevent that in the open position according to FIG. 1 sand od. Ä. Is flushed into the recess 3, the gate body 4 lies with a projection the in F i g. 1 right edge of the recess overlapping on this edge, and the space between the left edge of the recess 3 in FIG. 1 and the gate body is covered by a towing cover 10, for example made of sheet metal or rubber, the on the one hand rests on the floor 1 and on the other hand at 23 pivotable on the gate body 4 is attached. If necessary, special flushing devices can also be provided the penetrating sand and the like, in particular from the one shown in FIG. 1 left area remove the recess 3 so as not to interfere with the movement of the goal body.
Im übrigen bilden die Auflagekante und die Schleppabdeckung einen Schutz gegen Anker, und durch die fluchtende Lage von Torkörperoberfläche und Gewässerboden werden Ablagerungen und Ausspülungen weitgehend vermieden.In addition, the support edge and the drag cover form one Protection against anchors and the flush position of the gate body surface and the bottom of the water deposits and washouts are largely avoided.
Soll der Torkörper 4 aus seiner Öffnungsstellung gemäß F i g. 1 in die Sperrstellung gemäß F i g. 2 bewegt werden, so werden die Kammern 6, 7, 8 durch gesteuertes Einpressen von Luft gelenzt, und der Torkörper 4 schwenkt um die Achse 5 nach oben, wobei der Torkörper auf der in den F i g. 1 und 2 linken Bodenfläche der Vertiefung 3 abrollt, so daß sich die Schwenkachse 5 aus ihrer Lage gemäß Fig. 1 nach links in die Lage gemäß Fig.2 bewegt. Während dieser Bewegung durchdringt der Torkörper die Wasseroberfläche 2 und gelangt dann in die Stellung gemäß Fig. 2, in der der Torkörper einerseits am Fundamentanschlag 9 im Bereich der Oberkante der linken Seitenwand der Vertiefung 3 anliegt und andererseits mit seiner Vertiefung 12, die sich parallel zur Schwenkachse 5 erstreckt, in Eingriff mit der unterhalb des Fundamentanschlages am Boden der Vertiefung 3 vorgesehenen Rippe 11 kommt, die zur Seite des Fundamentanschlages hin geneigt ist. Auf diese Weise wird eine stabile Sperrstellung des Torkörpers erreicht, der durch den höheren Wasserstand gemäß Wasseroberfläche 2' in F i g. 2 verglichen mit dem Wasserstand 2" gegen den Fundamentanschlag 9 und die Rippe 11 gepreßt wird. If the gate body 4 is to be moved out of its open position according to FIG. 1 in the locked position according to FIG. 2 are moved, the chambers 6, 7, 8 are through controlled injection of air bleed, and the gate body 4 pivots about the axis 5 up, where the gate body on the in the F i g. 1 and 2 left The bottom surface of the recess 3 rolls off, so that the pivot axis 5 moves out of its position 1 moved to the left in the position shown in FIG. During this movement the gate body penetrates the water surface 2 and then arrives at the position according to FIG. 2, in which the gate body on the one hand on the foundation stop 9 in the area the upper edge of the left side wall of the recess 3 rests and on the other hand with its recess 12, which extends parallel to the pivot axis 5, in engagement with the one provided below the foundation stop on the bottom of the recess 3 Rib 11 comes, which is inclined to the side of the foundation stop. To this Way, a stable locking position of the gate body is achieved, which is due to the higher Water level according to water surface 2 'in FIG. 2 compared to the water level 2 "is pressed against the foundation stop 9 and the rib 11.
Bei der Bewegung des Torkörpers von der Öffnungsstellung gemäß F i g. 1 in die Sperrstellung gemäß F i g. 2 gleitet die Schleppabdeckung über den Boden 1 und wird um die Achse 23 verschwenkt, so daß sie die Bewegung des Torkörpers nicht beeinträchtigt sowie bei Rückkehr in die Öffnungsstellung wieder in die Lage gemäß F i g. 1 gezogen wird. When moving the gate body from the open position according to F i g. 1 in the locked position according to FIG. 2 the towing cover slides over the Floor 1 and is pivoted about the axis 23, so that they the movement of the goal body not impaired, as well as back into position on return to the open position according to FIG. 1 is drawn.
Es ist ohne weiteres klar, daß sich der Torkörper 4 in der Öffnungsstellung gemäß F i g. 1 oder auch in einer teilweise geschwenkten Stellung aus der Vertiefung 3 herausheben und zur Durchführung von Reparaturen verschleppen läßt, ohne daß unter Wasser Drehbolzen oder andere Schwenkverbindungen gelöst werden müßten. Somit brauchen also unter Umständen sehr arbeitsaufwendige Reparaturen nicht mehr unter Wasser durchgeführt zu werden. Darüber hinaus ermöglicht der Aufbau des erfindungsgemäßen Klapptores auch den sehr schnellen Ersatz eines schadhaften Torkörpers durch einen anderen, da dieser neue Torkörper lediglich in die Stellung gemäß Fig. 1 abgesenkt zu werden braucht und dann voll funktionsfähigist. It is readily apparent that the gate body 4 is in the open position according to FIG. 1 or in a partially pivoted position out of the recess 3 can be lifted out and carried away to carry out repairs without being underneath Water pivot bolts or other swivel connections would have to be loosened. So need so under certain circumstances very labor-intensive repairs no longer under water to be carried out. In addition, the structure of the invention allows Folding gates also allow a damaged gate body to be replaced very quickly with one others, since this new gate body is only lowered into the position shown in FIG needs to be and is then fully functional.
Um die Führung des Torkörpers bei seiner Bewegung von der Öffnungsstellung in die Sperrstellung und zurück in die Öffnungsstellung zu verbessern, können im Bodenbereich der den Torkörper aufnehmenden Vertiefung, wie in F i g. 3 angedeutet, Rippen 13, 15, 17, 19, 21 ausgehil.let werden, die zusammen mit entsprechenden Vertiefunlren 14, 16, 18, 20, 22 im Torkörper 4' eine »Verzahnung« bilden, und die bei Bewegung von der Öffnungsstellung in die Sperrstellung, also beim Abrollen des Torkörpers 4' auf dem Boden nacheinander in Eingriff kommen und so eine zuverlässige Positionierung des Torkörpers 4' bezüglich des Bodens bewirken. In der Sperrstellung kommt dann die Rippe 11' in Eingriff mit der Vertiefung 12', wobei die Rippe 11' entsprechend den übrigen Rippen 13, 15, 17, 19, 21 der Verzahnung oder aber auch zur Aufnahme der in der Sperrstellung auftretenden Kräfte in anderer Form oder Neigung ausgebildet sein kann. To guide the gate body as it moves from the open position to improve in the locked position and back to the open position, can in Bottom area of the recess receiving the goal body, as shown in FIG. 3 indicated, Ribs 13, 15, 17, 19, 21 are healed, which together with corresponding indentations 14, 16, 18, 20, 22 form a "toothing" in the door body 4 ', and that when moving from the open position to the locked position, i.e. when the door body rolls off 4 'engage on the floor one by one and so reliable positioning of the goal body 4 'with respect to the ground. Then comes in the locked position the rib 11 'in engagement with the recess 12', the rib 11 'correspondingly the remaining ribs 13, 15, 17, 19, 21 of the toothing or also for receiving the forces occurring in the locking position are designed in a different shape or inclination can be.
Das in den F i g. 4 bis 6 gezeigte Ausführungsbeispiel ähnelt weitgehend dem Ausführungsbeispiel gemäß F i g. 1 und 2, jedoch ist der Torkörper 54 anders am Boden der Vertiefung 53 gelagert. The in the F i g. The embodiment shown in 4 to 6 is largely similar the embodiment according to FIG. 1 and 2, however, the gate body 54 is different stored at the bottom of the recess 53.
Wie dargestellt, dient der in F i g. 4 in der Sperrstellung befindliche Torkörper 54 zur Trennung von Oberwasser 52' und Unterwasser 52", und er steht in der Sperrstellung mit einer am Boden der Vertiefung 53 vorgesehenen Rippe 61 entsprechend der Rippe 11 gemäß F i g. 1 und 2 in Eingriff. Darüber hinaus liegt er an dem als Dichtung wirkenden Fundamentanschlag 59 an, der dem Fundamentanschlag 9 gemäß F i g. 1 und 2 entspricht. Eine Schleppabdeckung 60 ist schwenkbar am Torkörper 54 befestigt und auf dem Boden 51 verschiebbar. As shown, the one in FIG. 4 located in the locked position Gate body 54 for the separation of upper water 52 'and lower water 52 ", and he is in corresponding to the locking position with a rib 61 provided on the bottom of the recess 53 of the rib 11 according to FIG. 1 and 2 engaged. In addition, it is due to the as Seal acting foundation stop 59, which is the foundation stop 9 according to F i g. 1 and 2 corresponds. A towing cover 60 is pivotable on the gate body 54 attached and slidable on the floor 51.
Während der Torkörper gemäß Fig.l und 2 zur Bewegung in die und aus der Sperrstellung am Boden der Vertiefung 3 abrollend verschwenkt wird, sind am Boden der Vertiefung 53 Lagerschalen ausgebildet, die aus etwa halbkreisförmigen, nach oben offenen Vertiefungen bestehen, die sich in Lagerböcken 56 befinden. Während in den Figuren nur eine einzige Lagerschale dargestellt ist, befindet sich vorzugsweise an jeder Seite des Torkörpers eine derartige Lagerschale, und diese Lagerschalen dienen zur Aufnahme von Zapfen 55, die im unteren Bereich am Torkörper 54 vorgesehen sind, und zwar im Bereich von im Torkörper vorhandenen Aussparungen 57. Die Breite dieser Aussparungen ist etwas größer als die Breite der Lagerböcke 56. During the gate body according to Fig.l and 2 to move in and out the locking position is pivoted rolling at the bottom of the recess 3, are on Bottom of the recess 53 bearing shells formed, which consist of approximately semicircular, There are recesses that are open at the top and are located in bearing blocks 56. While only a single bearing shell is shown in the figures, is preferably located on each side of the goal body such a bearing shell, and these bearing shells serve to accommodate pins 55, which are provided in the lower area on the gate body 54 are, specifically in the area of recesses 57 in the gate body. The width these cutouts are somewhat larger than the width of the bearing blocks 56.
Wie insbesondere in Fig. 6 zu erkennen ist, weist der Zapfen 55 zwei zylindrische Endbereiche auf, die über kegelstumpfförmig verlaufende Übergangsbereiche in einen zylindrischen Mittelbereich größeren Durchmessers übergehen. Entsprechend ist die Lagerschale ausgebildet, so daß der Zapfen 55 und damit der Torkörper 54 nicht in Richtung der Längsachse des Zapfens 55 bewegt werden kann. As can be seen in particular in FIG. 6, the pin 55 has two cylindrical end regions, which extend over frustoconical transition regions merge into a cylindrical central area of larger diameter. Corresponding the bearing shell is formed so that the pin 55 and thus the gate body 54 cannot be moved in the direction of the longitudinal axis of the pin 55.
Um die Zapfen 55 des Torkörpers 54 durch einfaches Absenken bzw. Anheben in die Lagerschalen einzusetzen und aus ihnen herauszunehmen, hat die Lagerschale jeweils einen Öffnungsbereich, der größer ist, als der Durchmesser des Zapfens 55 in diesem Bereich. To the pin 55 of the gate body 54 by simply lowering or Lifting to insert into and out of the bearing shells has the bearing shell each has an opening area that is larger than the diameter of the pin 55 in this area.
Dadurch läßt sich der Torkörper zu Reparaturarbeiten ohne weiteres anheben und abtransportieren sowie gegen einen anderen Torkörper austauschen, ohne daß hierzu Taucherarbeiten erforderlich wären.This allows the gate body to be easily repaired lift and transport away as well as exchange for another gate body without that this would require diving work.
Wie bei dem Torkörper gemäß F i g. 1 und 2 erfolgt beim Torkörper 54 das Anheben und Absenken durch Lenzen bzw. Fluten von entsprechenden Kammern, die in Fig. 4 angedeutet sind. Es sei darauf hingewiesen, daß zu diesem Zweck die Sperrstellung des Torkörpers vorzugsweise so gewählt wird, daß sein Gewichtsschwerpunkt rechts (F i g. 4) vom Zapfen 55 liegt, da dann im allgemeinen eine Bewegung des Torkörpers 54 in die Öffnungsstellung durch Fluten der Kammer möglich ist, ohne daß äußere Hilfsmittel erforderlich wären. As with the gate body according to FIG. 1 and 2 take place at the gate body 54 raising and lowering by draining or flooding corresponding chambers, which are indicated in FIG. 4. It should be noted that for this purpose the Locked position of the gate body is preferably chosen so that its center of gravity to the right (F i g. 4) of the pin 55, since then in general a movement of the Gate body 54 in the open position by flooding the chamber is possible without that external resources would be required.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19782838431 DE2838431C2 (en) | 1978-09-02 | 1978-09-02 | Folding gate to block rivers, canals, docks and the like |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19782838431 DE2838431C2 (en) | 1978-09-02 | 1978-09-02 | Folding gate to block rivers, canals, docks and the like |
Publications (2)
Publication Number | Publication Date |
---|---|
DE2838431B1 true DE2838431B1 (en) | 1979-09-20 |
DE2838431C2 DE2838431C2 (en) | 1980-06-04 |
Family
ID=6048595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19782838431 Expired DE2838431C2 (en) | 1978-09-02 | 1978-09-02 | Folding gate to block rivers, canals, docks and the like |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2838431C2 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0045053A1 (en) * | 1980-07-29 | 1982-02-03 | PIRELLI/FURLANIS APPLICAZIONI IDRAULICHE-AGRICOLE GOMMA S.p.A. | Swinging dam |
DE3502243A1 (en) * | 1985-01-24 | 1986-07-24 | Philipp Holzmann Ag, 6000 Frankfurt | Arrangement for closing stretches of water |
EP0802285A2 (en) * | 1996-04-15 | 1997-10-22 | Karl-Hermann Trainer | High water protection system |
EP0839963A2 (en) * | 1996-10-31 | 1998-05-06 | ABS Pump Center GmbH | Self cleaning device for lock gate installations |
DE19651389A1 (en) * | 1996-12-11 | 1998-06-25 | Ingbuero Heinrich Quante | Flood prevention construction for rivers, lakes, sea, etc |
CN102102354A (en) * | 2011-01-11 | 2011-06-22 | 中国水利水电科学研究院 | Hydraulic vibration gate |
WO2016110438A1 (en) * | 2015-01-08 | 2016-07-14 | Universität Für Bodenkultur Wien | Flood protection system |
EP3199706A1 (en) * | 2016-01-28 | 2017-08-02 | Wintec Holding ApS | Pre-fabricated water control sluice gate system |
WO2018177489A1 (en) * | 2017-03-30 | 2018-10-04 | Steen Olsen Invest Aps | Flood protection |
-
1978
- 1978-09-02 DE DE19782838431 patent/DE2838431C2/en not_active Expired
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0045053A1 (en) * | 1980-07-29 | 1982-02-03 | PIRELLI/FURLANIS APPLICAZIONI IDRAULICHE-AGRICOLE GOMMA S.p.A. | Swinging dam |
DE3502243A1 (en) * | 1985-01-24 | 1986-07-24 | Philipp Holzmann Ag, 6000 Frankfurt | Arrangement for closing stretches of water |
EP0802285A3 (en) * | 1996-04-15 | 1998-12-23 | Karl-Hermann Trainer | High water protection system |
EP0802285A2 (en) * | 1996-04-15 | 1997-10-22 | Karl-Hermann Trainer | High water protection system |
EP0839963A2 (en) * | 1996-10-31 | 1998-05-06 | ABS Pump Center GmbH | Self cleaning device for lock gate installations |
EP0839963A3 (en) * | 1996-10-31 | 1998-09-30 | ABS Pump Center GmbH | Self cleaning device for lock gate installations |
DE19651389A1 (en) * | 1996-12-11 | 1998-06-25 | Ingbuero Heinrich Quante | Flood prevention construction for rivers, lakes, sea, etc |
CN102102354A (en) * | 2011-01-11 | 2011-06-22 | 中国水利水电科学研究院 | Hydraulic vibration gate |
WO2016110438A1 (en) * | 2015-01-08 | 2016-07-14 | Universität Für Bodenkultur Wien | Flood protection system |
EP3199706A1 (en) * | 2016-01-28 | 2017-08-02 | Wintec Holding ApS | Pre-fabricated water control sluice gate system |
WO2018177489A1 (en) * | 2017-03-30 | 2018-10-04 | Steen Olsen Invest Aps | Flood protection |
CN110678608A (en) * | 2017-03-30 | 2020-01-10 | 丹麦史丁奥神投资有限公司 | Flood control device |
EP3601679A4 (en) * | 2017-03-30 | 2021-01-13 | Steen Olsen Invest ApS | Flood protection |
US11629469B2 (en) | 2017-03-30 | 2023-04-18 | Steen Olsen Invest Aps | Flood protection |
Also Published As
Publication number | Publication date |
---|---|
DE2838431C2 (en) | 1980-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2831732C2 (en) | Ramp arrangement for a pipelayer designed as a semi-submersible for laying pipelines | |
DE2400805C3 (en) | Drill rod storage facility | |
DE2818293A1 (en) | SEMI-TRAILER | |
DE2812996A1 (en) | LANDING BRIDGE | |
DE2838431C2 (en) | Folding gate to block rivers, canals, docks and the like | |
DE2130987C3 (en) | Procedure for operating and building a weir in waterways | |
EP1328687B1 (en) | Device and method for producing columns of particulate matter in the ground of bodies of water | |
DE102005026542A1 (en) | Lock gate for inland waterway has vertical torsion bar drive extending above the maximum waterline | |
AT516309B1 (en) | Automatically closing hinged partition | |
DE3140752A1 (en) | METHOD FOR PRODUCING DAMS AND DAM DONE BY THIS METHOD | |
DE2757704C3 (en) | Water barrier, especially flood barrier | |
DE10048999B4 (en) | Method for continuously and reversibly changing the draft of a watercraft | |
DE10125946B4 (en) | Flood protection device | |
DE2941043A1 (en) | River or coast closable flood defence work - has watertight chambers in submerged base, housing hoist for supported lock | |
DE1941608B2 (en) | Cargo space for watercraft | |
DE2901957C2 (en) | Method of making an artificial island | |
AT526665B1 (en) | Fluid retention system and method for triggering a fluid retention system and for establishing a standby position | |
EP0841436B1 (en) | High water protection barrier | |
DE202006016148U1 (en) | Pontoon Bridge | |
DE811100C (en) | Method and device for inserting an emergency seal for hydraulic systems | |
WO2012140076A2 (en) | Method and device for encasing a borehole | |
EP1273712A1 (en) | Mobile flood protection system | |
DE2550621C3 (en) | A pillar bearing a surface above the water | |
EP3409838B1 (en) | Buoyant body for forming of bridge sections | |
DE2538520C3 (en) | Retaining wall and swimming pool provided with such a retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8339 | Ceased/non-payment of the annual fee |