DE202007017037U1 - Device for removing and loading track ballast - Google Patents
Device for removing and loading track ballast Download PDFInfo
- Publication number
- DE202007017037U1 DE202007017037U1 DE202007017037U DE202007017037U DE202007017037U1 DE 202007017037 U1 DE202007017037 U1 DE 202007017037U1 DE 202007017037 U DE202007017037 U DE 202007017037U DE 202007017037 U DE202007017037 U DE 202007017037U DE 202007017037 U1 DE202007017037 U1 DE 202007017037U1
- Authority
- DE
- Germany
- Prior art keywords
- conveyor belt
- ballast
- track
- track ballast
- collecting container
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/04—Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
Vorrichtung
zum Ausbauen und Verladen von Gleisschotter, mit
– einem
als Kettenlaufwerk ausgebildeten Fahrwerk (10);
– einer
Schotteraufnahmerampe (12), die am vorderen Ende der Vorrichtung
angeordnet ist, sich in Querrichtung der Vorrichtung wenigstens über die
Breite eines einspurigen Gleisschotterbettes erstreckt und einen
Ausbaukeil (14) zum Lösen
und Anheben des Gleisschotters durch eine Vorwärtsbewegung der Vorrichtung
und ein sich direkt hinter dem Ausbaukeil (14) vorgesehenes erstes
Förderband
(16) zum Transportieren des ausgebauten Gleisschotters vom Ausbaukeil
nach hinten aufweist;
– einem
vorderen Auffangbehälter
(22) zum Aufnehmen des Gleisschotters vom ersten Förderband
(16) der Schotteraufnahmerampe (12), der im vorderen Bereich der
Vorrichtung angeordnet ist und mit einem zweiten Förderband (24)
versehen ist, das in Querrichtung verläuft, um den Gleisschotter zu
einer Seite des vorderen Auffangbehälters (22) zu transportieren;
– einem
dritten Förderband
(26) zum Transportieren des Gleisschotters von der einen Seite des
vorderen Auffangbehälters
(22) zum hinteren Bereich der...Device for removing and loading track ballast, with
- Designed as a chain drive chassis (10);
A ballast pickup ramp (12) located at the front end of the device extends transversely across the device at least the width of a single track ballast bed and a disassembly wedge (14) for disengaging and lifting the track ballast by forward movement of the device and directly behind the expansion wedge (14) provided first conveyor belt (16) for transporting the removed track ballast from the expansion wedge to the rear;
- A front collecting container (22) for receiving the track ballast from the first conveyor belt (16) of the ballast pickup lamp (12), which is arranged in the front region of the device and with a second conveyor belt (24) which extends in the transverse direction to the track ballast to transport to one side of the front collecting container (22);
- A third conveyor belt (26) for transporting the track ballast from one side of the front collecting container (22) to the rear region of the ...
Description
HINTERGRUND DER ERFINDUNGBACKGROUND OF THE INVENTION
1. Gebiet der Erfindung1. Field of the invention
Die vorliegende Erfindung betrifft eine Vorrichtung zum Ausbauen von Gleisschotter und Verladen des ausgebauten Gleisschotters auf Transportmittel.The The present invention relates to a device for removing Track ballast and loading of the removed track ballast on means of transport.
2. Technischer Hintergrund2. Technical background
Gleisstrecken bestehen in der Regel aus einem Gleisschotterunterbau, einem Gleisschotterbett, Gleisschwellen, einem Schienestrang mit Weichen, Signalen und elektrischen Leitungen. Dabei wird ferner unterschieden zwischen eingleisigen und mehrgleisigen, elektrisch und nicht elektrisch befahrbaren Strecken.railway tracks usually consist of a track ballast, a ballast track, sleepers, a rail track with switches, signals and electrical lines. A distinction is also made between single-track and multi-track, electrically and not electrically passable routes.
In bestimmten Zeitintervallen werden die Gleisstrecken auf Schäden und ihre Befahrbarkeit untersucht. Werden dabei zu hohe Reparaturkosten festgestellt, muss die Gleisstrecke ertüchtigt werden. Bei der Ertüchtigung von Gleisstrecken werden derzeit zwei Verfahren angewendet: die Ertüchtigung mit einem Gleisumbauzug und die Ertüchtigung mit Baumaschinen.In At certain time intervals, the track tracks are on damage and examined their trafficability. If too high repair costs are found, the track has to be upgraded become. In the exercise There are currently two types of track: the toughening up with a track renewal train and the upgrading with construction machinery.
Bei der Ertüchtigung mit einem Gleisumbauzug wird am Anfang des Zuges der Schienenstrang durchtrennt und aufgenommen. Als nächstes werden die Gleisschwellen entfernt und der Gleisschotter aufgenommen. Der aufgenommene Gleisschotter wird über eine im Zug eingebaute Sieb- und Brecheranlage gereinigt und angeprallt und dann am Ende des Zuges wieder ausgebracht. Auf das neue Gleisschotterbett werden dann neue Gleisschwellen und ein neuer Schienenstrang verlegt. Abschließend wird mit einer Gleisschotterstopfmaschine der neu verlegte Schienenstrang auf Höhe und Richtung gebracht, Signale und Weichen werden an die Steuerkabel und elektrischen Leitungen angeschlossen. Mit einem Schotterpflug wird dann der überschüssige Gleisschotter verteilt. Nach der bautechnischen Abnahme und Freigabe ist die so ertüchtigte Strecke wieder befahrbar.at the training With a track renewal train, the rail track is severed at the beginning of the train and recorded. Next the sleepers are removed and the track ballast taken. The recorded track ballast is over a built-in train Screening and crushing plant cleaned and impacted and then at the end of Train deployed again. Be on the new track ballast bed then laid new sleepers and a new track. Finally, with a track ballast tamping machine the newly laid track at height and direction, signals and switches are sent to the control cables and electrical lines connected. With a gravel plow then becomes the excess track ballast distributed. After the technical acceptance and release is the like upgrading, Track again passable.
Für ein solches
Ertüchtigungsverfahren
geeignete Gleisumbauzüge
sind beispielsweise aus den deutschen Patentschriften
Durch die hohen Vorhaltekosten eines Gleisumbauzuges wird allerdings immer häufiger die Ertüchtigungsmethode durch Baumaschinen bevorzugt, da Baumaschinen viel geringere Vorhaltekosten aufweisen und individueller eingesetzt werden können.By However, the high maintenance costs of a track renewal train is always frequently the training method preferred by construction machinery because construction machines much lower storage costs and can be used individually.
Bei der Ertüchtigung mit Baumaschinen werden zunächst Schienenstrang, Gleisschwellen, Weichen, Signale und elektrische Leitungen demontiert. Anschließend wird der Gleisschotter zum Beispiel mit Baggern aufgenommen und auf Lastwagen oder Züge verladen, um nach einer Reinigung zwischengelagert zu werden. Ist der Untergrund für die zu ertüchtigende Gleisstrecke hergestellt, wird der gereinigte und angeprallte Gleisschotter wieder aufgebracht, woraufhin vorgefertigte Schienenelemente verlegt und mit weiterem Gleisschotter verfüllt werden können. Analog zur Ertüchtigung mit einem Gleisumbauzug werden vor der bautechnischen Abnahme und Freigabe der ertüchtigten Strecke der Schienenstrang mittels einer Gleisschotterstopfmaschine auf Höhe und Richtung gebracht, der überschüssige Gleisschotter mit einem Schotterpflug verteilt sowie Signale und Weichen an Steuerkabel und elektrische Leitungen angeschlossen.at the training with construction machines are first Rail track, sleepers, switches, signals and electrical Dismantled lines. Subsequently For example, the track ballast is taken with excavators and on trucks or trains loaded to be stored after a cleaning. is the underground for the one to be trained Track track is made, the cleaned and impacted track ballast applied again, whereupon laid prefabricated rail elements and can be filled with more track ballast. Analogous for work with a track renewal train are before the construction acceptance and Release of the skilled Route of the rail track by means of a track ballast tamping machine at height and direction, the excess track ballast distributed with a ballast plow and signals and points on control cable and electrical lines connected.
Ein
auf dem Schienenstrang fahrender Schotterpflug zum Verteilen des
Gleisschotters ist beispielsweise in der
Der Ausbau und das Verladen des Gleisschotters mit Baggern, wie oben beschrieben, beinhalten allerdings verschiedene Schwierigkeiten und Risiken. Das Verladen des Gleisschotters auf Lastwagen gestaltet sich meist schwierig, da durch den Bagger jederzeit die Gefahr des Durchtrennens einer Oberleitung besteht. Bei mehrgleisigen Strecken entsteht zudem die Gefahr, mit einem am Nachbargleis vorbei fahrenden Zug zu kollidieren. Ferner können die schweren Baumaschinen und Lastwagen zwar gut auf einem befestigten Gleisschotterbett fahren, häufig (z.B. je nach Witterungsverhältnissen) aber nicht mehr auf dem Unterbau, von dem der Gleisschotter bereits entfernt worden ist.Of the Removal and loading of the track ballast with excavators, as above described, however, involve various difficulties and risks. The loading of the track ballast on trucks designed usually difficult, because at any time by the excavator the risk of Cutting a catenary exists. For multi-track routes In addition, the danger arises, with one on the neighboring track passing Train to collide. Furthermore, the heavy construction machinery and trucks though good on a fortified Track ballast bed driving, often (depending on weather conditions) but not on the substructure, of which the track ballast already has been removed.
Um die Probleme beim Ertüchtigen einer Gleisstrecke mittels Baumaschinen zu vermindern, wurden bereits verschiedene Vorrichtungen zum Ausbauen und Verladen von Gleisschotter vorgeschlagen.Around the problems with the skills to reduce a track distance by means of construction machines, already became various devices for removing and loading track ballast proposed.
So
zeigt zum Beispiel die
Die
In
dem
ZUSAMMENFASSUNG DER ERFINDUNGSUMMARY OF THE INVENTION
Der vorliegenden Erfindung liegt die Aufgabe zugrunde, eine Vorrichtung zum Ausbauen und Verladen von Gleisschotter zu schaffen, die beim Ertüchtigen von Gleisstrecken eingesetzt werden kann, und dies unabhängig von der Beschaffenheit des Gleisschotterunterbaus und der Anzahl paralleler Schienenstränge.Of the present invention is based on the object, a device to dismantle and load track ballast, which is used in the toughen up can be used on track sections, and this regardless of the nature of the track ballast foundation and the number of parallel ones Rail tracks.
Diese Aufgabe wird durch eine Vorrichtung zum Ausbauen und Verladen von Gleisschotter mit den Merkmalen des Anspruchs 1 gelöst. Vorteilhafte Ausgestaltungen und Weiterbildungen der Erfindung sind in den abhängigen Ansprüchen angegeben.These The object is achieved by a device for removing and loading Track ballast with the features of claim 1 solved. Advantageous embodiments and further developments of the invention are specified in the dependent claims.
Die Vorrichtung zum Ausbauen und Verladen von Gleisschotter gemäß der Erfindung enthält
- – ein als Kettenlaufwerk ausgebildetes Fahrwerk;
- – eine Schotteraufnahmerampe, die am vorderen Ende der Vorrichtung angeordnet ist, sich in Querrichtung der Vorrichtung im Wesentlichen über wenigstens die Breite eines einspurigen Gleisschotterbettes erstreckt und einen Ausbaukeil zum Lösen und Anheben des Gleisschotters durch eine Vorwärtsbewegung der Vorrichtung und ein sich direkt hinter dem Ausbaukeil vorgesehenes erstes Förderband zum Transportieren des ausgebauten Gleisschotters vom Ausbaukeil nach hinten aufweist;
- – einen vorderen Auffangbehälter zum Aufnehmen des Gleisschotters vom ersten Förderband der Schotteraufnahmerampe, der im vorderen Bereich der Vorrichtung angeordnet ist und mit einem zweiten Förderband versehen ist, das in Querrichtung verläuft, um den Gleisschotter zu einer Seite des vorderen Auffangbehälters zu transportieren;
- – ein drittes Förderband zum Transportieren des Gleisschotters von der einen Seite des vorderen Auffangbehälters zum hinteren Bereich der Vorrichtung;
- – einen hinteren Auffangbehälter, der im hinteren Bereich der Vorrichtung angeordnet ist, zum Aufnehmen des Gleisschotters vom dritten Förderband; und
- – ein viertes Förderband, das sich vom hinteren Auffangbehälter nach vorne erstreckt, zum Transportieren des Gleisschotters aus dem hinteren Auffangbehälter zu einem Transportmittel, wobei das vierte Förderband um eine vertikale Achse im Bereich des hinteren Auffangbehälters schwenkbar ist.
- - Trained as a chain drive chassis;
- A ballast pick-up ramp located at the front end of the apparatus extends transversely across the apparatus substantially over at least the width of a single-track ballast bed and a disassembling wedge for disengaging and lifting the track ballast by forward movement of the apparatus and directly behind the disassembling wedge first conveyor belt for transporting the removed track ballast from the expansion wedge to the rear;
- A front collecting box for receiving the track ballast from the first conveyor belt of the ballast receiving ramp, which is disposed at the front of the apparatus and provided with a second conveyor belt extending transversely to transport the ballast to one side of the front receiving box;
- A third conveyor belt for transporting the track ballast from the one side of the front collection container to the rear region of the device;
- - A rear collecting container, which is arranged in the rear region of the device, for receiving the track ballast from the third conveyor belt; and
- - A fourth conveyor belt, which extends from the rear collecting container to the front, for transporting the track ballast from the rear collecting container to a transport means, wherein the fourth conveyor belt is pivotable about a vertical axis in the region of the rear collecting container.
Durch eine direkte und im Wesentlichen geradlinige Verladung des Ausbaumaterials, d.h. insbesondere ohne Schwenkbewegungen in den Bereich des Nachbargleises, wird die Arbeitssicherheit insbesondere bei Arbeiten an mehrspurigen Gleisstrecken deutlich erhöht. Auch ist die Gefahr des Durchtrennens von Oberleitungen durch Bagger nicht mehr vorhanden. Da das Ausbaumaterial schließlich über das vierte Förderband zum Verladen nach vorne transportiert wird, können die Lastwagen bzw. Transportmittel problemlos auf dem noch vorhandenen Gleisschotterbett fahren. Insgesamt wird durch die Vorrichtung ein effektiverer und sicherer Ausbau von Gleisschotter erzielt. Die Kosten für die Ertüchtigung von Gleisstrecken können signifikant gesenkt werden und der Verladezyklus des Ausbaumaterials wird stark verbessert.By a direct and essentially straight-line loading of the expansion material, i.e. in particular without pivoting movements in the area of the neighboring track, Safety at work, especially when working on multi-lane Track distances significantly increased. Also, the danger of severing overhead lines by excavators not available anymore. As the finishing material finally on the fourth conveyor belt transported to the front for loading, the trucks or means of transport easily drive on the remaining track ballast bed. All in all becomes a more effective and safe removal by the device scored by track ballast. The cost of upgrading track tracks can be significantly reduced and the loading cycle of the expansion material is greatly improved.
In einer Ausgestaltung der Erfindung bilden die Schotteraufnahmerampe und der vordere Auffangbehälter eine Einheit, die zum Beispiel zu Transportzwecken demontierbar ist. Diese Einheit ist vorzugsweise über eine Kippeinheit, die ein seitliches Verkippen/Neigen der Einheit ermöglicht, befestigt.In An embodiment of the invention form the ballast pick-up lamp and the front sump a unit that can be dismantled for transport purposes, for example is. This unit is preferably a tilting unit, the one allows lateral tilting / tilting of the unit, fastened.
In einer Ausgestaltung der Erfindung ist die Schotteraufnahmerampe höhenverstellbar ausgebildet und/oder an ihren beiden Seiten in Querrichtung jeweils mit einer Seitenräumklappe zum Führen von seitlich abrollendem Ausbaumaterial auf die Schotteraufnahmerampe versehen. Diese Seitenräumklappen können wahlweise auch als im Wesentlichen vertikal ausgerichtete, zahnbesetzte Seitenräumfräsbänder ausgebildet werden, die zum seitlichen Lösen und Führen größerer Materialschichten auf die Schotteraufnahmerampe dienen. Die Seitenräumklappen sind in beiden Fällen vorzugsweise hydraulisch in horizontaler Richtung bewegbar.In An embodiment of the invention is the ballast pick-up lamp height adjustable formed and / or on its two sides in the transverse direction respectively with a side cleaning flap to lead from laterally rolling expansion material on the gravel receiving lamp Mistake. These side cleaners can optionally also as substantially vertically aligned, tooth-occupied Seitenräumfräsbänder trained which are for lateral release and To lead larger material layers to serve on the gravel receiving ramp. The side cleaners are in both cases preferably hydraulically movable in the horizontal direction.
In einer weiteren Ausgestaltung der Erfindung ist der vordere Auffangbehälter mit wenigstens einer Stützstrebe zu seiner Formstabilisierung in Längsrichtung der Vorrichtung versehen.In a further embodiment of the invention, the front collecting container with at least one support strut for its shape stabilization in Provided longitudinally of the device.
In einer weiteren Ausgestaltung der Erfindung ist das dritte Förderband zum Beispiel zu Transportzwecken einschwenkbar ausgebildet.In Another embodiment of the invention is the third conveyor belt designed, for example, for transport purposes swivel.
In einer noch weiteren Ausgestaltung der Erfindung sind der vordere Auffangbehälter mit dem zweiten Förderband und das dritte Förderband links/rechts-symmetrisch umbaubar ausgebildet.In a still further embodiment of the invention are the front receptacle with the second conveyor belt and the third conveyor left / right symmetric convertible trained.
In einer Ausgestaltung der Erfindung ist die Vorrichtung in ihrem hinteren Bereich mit einem Kontergewicht versehen, das gemeinsam mit dem hinteren Auffangbehälter und dem vierten Förderband eine Einheit bildet, die auf einer Drehvorrichtung montiert ist. In diesem Fall kann das vierte Förderband vorzugsweise mittels einer Verstellvorrichtung im mittleren bis vorderen Bereich der Vorrichtung in Querrichtung schwenkbar sein oder mittels einer der Drehvorrichtung zugeordneten Antriebsvorrichtung um eine vertikale Achse geschwenkt werden.In In one embodiment of the invention, the device is in its rear Provided with a counterweight area, which together with the rear collection bin and the fourth conveyor belt one Unit that is mounted on a turning device. In this Case may be the fourth conveyor preferably by means of an adjusting device in the middle to be pivoted in the transverse direction of the front portion of the device or by means of a drive device associated with the rotary device a vertical axis are pivoted.
In einer weiteren Ausgestaltung der Erfindung ist das vierte Förderband in seinem vorderen Teil zum Beispiel zu Transportzwecken einklappbar ausgebildet.In Another embodiment of the invention is the fourth conveyor belt formed folded in his front part, for example, for transport purposes.
In einer noch weiteren Ausgestaltung der Erfindung weist die Vorrichtung ferner Abspannseile oder dergleichen für das vierte Förderband auf, um ein Abknicken des vierten Förderbandes nach unten zu verhindern.In a still further embodiment of the invention, the device also guy ropes or the like for the fourth conveyor belt on to prevent kinking of the fourth conveyor belt down.
In einer Ausgestaltung der Erfindung verläuft das vierte Förderband in seiner Förderrichtung ansteigend und ist höhenverstellbar gelagert.In an embodiment of the invention, the fourth conveyor belt runs in its conveying direction rising and is height adjustable stored.
In einer Ausgestaltung der Erfindung funktionieren sämtliche Aggregate und das Fahrwerk der Vorrichtung hydraulisch.In An embodiment of the invention all work Aggregates and the chassis of the device hydraulically.
In einer weiteren Ausgestaltung der Erfindung weist die Vorrichtung ferner einen höhenverstellbaren Führerstand auf.In a further embodiment of the invention, the device Furthermore, a height-adjustable cab on.
In einer weiteren Ausgestaltung der Erfindung weist das Kettenlaufwerk Kettenplatten variabel anpassbarer Breite auf.In a further embodiment of the invention, the chain drive Chain plates variably adjustable width on.
KURZBESCHREIBUNG DER ZEICHNUNGENBRIEF DESCRIPTION OF THE DRAWINGS
Obige sowie weitere Aufgaben, Merkmale und Vorteile der vorliegenden Erfindung werden aus der nachfolgenden Beschreibung eines derzeit bevorzugten, nicht einschränkenden Ausführungsbeispiels unter Bezug auf die beiliegenden Zeichnungen besser verständlich. Darin zeigen:Above and other objects, features and advantages of the present invention will be apparent from the following description of a currently preferred, not restrictive embodiment better understood with reference to the accompanying drawings. Show:
DETAILLIERTE BESCHREIBUNG DER DERZEIT BEVORZUGTEN AUSFÜHRUNGSBEISPIELEDETAILED DESCRIPTION OF THE PRESENTLY PREFERRED EMBODIMENTS
Bezug
nehmend auf
Die
Gleisschotterverladeraupe fährt
auf einem als Kettenlaufwerk ausgebildeten Fahrwerk
In
Fahrtrichtung der Raupe vorne (rechts in
In
einer alternativen Ausführungsform
können
die Seitenräumklappen
Der
Ausbaukeil
Die
beiden Seitenräumklappen
Das
erste Förderband
In
einer bevorzugten Ausführungsform
bilden die Schotteraufnahmerampe
In
einer bevorzugten Ausgestaltung der Erfindung, die in
Durch
das zweite Förderband
Aus
dem hinteren Auffangbehälter
Der
hintere Auffangbehälter
Das
vierte Förderband
Ein
Abknicken des vierten Förderbandes
Wie
in
Die
in
Wie
in
Die
gesamte Gleisschotterverladeraupe wird vorzugsweise von einem höhenverstellbaren
Führerstand
Durch
einen Motorblock
Die
Antriebsmotoren für
das erste, das dritte und das vierte Förderband
Die Gleisschotterverladeraupe ist je nach Kundenwunsch auch mit einem ATS- und/oder einem GPS-System ausrüstbar, die ein niveau- und richtungsgenaues Arbeiten im Gleisbett ermöglichen.The Gleisschotterverladereupe is also according to customer requirement with one ATS and / or a GPS system be equipped, which enable level and directional work in the track bed.
Durch eine direkte und im Wesentlichen geradlinige Verladung des Ausbaumaterials, d.h. insbesondere ohne Schwenkbewegungen in den Bereich des Nachbargleises, wird die Arbeitssicherheit insbesondere bei Arbeiten an mehrspurigen Gleisstrecken deutlich erhöht. Auch ist die Gefahr des Durchtrennens von Oberleitungen durch Bagger nicht mehr vorhanden. Da das Ausbaumaterial schließlich über das vierte Förderband zum Verladen nach vorne transportiert wird, können die Lastwagen bzw. Transportmittel problemlos auf dem noch vorhandenen Gleisschotterbett fahren.By a direct and essentially straight-line loading of the expansion material, i.e. in particular without pivoting movements in the area of the neighboring track, Safety at work, especially when working on multi-lane Track distances significantly increased. Also, the danger of severing overhead lines by excavators not available anymore. As the finishing material finally on the fourth conveyor belt transported to the front for loading, the trucks or means of transport easily drive on the remaining track ballast bed.
Insgesamt wird durch die oben beschriebene Vorrichtung ein effektiverer und sicherer Ausbau von Gleisschotter erzielt. Die Kosten für die Ertüchtigung von Gleisstrecken können signifikant gesenkt werden und der Verladezyklus des Ausbaumaterials wird stark verbessert.All in all becomes more effective by the apparatus described above safe removal of track ballast achieved. The cost of upgrading Track routes can be significantly reduced and the loading cycle of the expansion material is greatly improved.
- 1010
- Fahrwerklanding gear
- 1212
- SchotteraufnahmerampeTaking up ballast ramp
- 1414
- Ausbaukeilexpanding wedge
- 1616
- erstes Förderbandfirst conveyor belt
- 1818
- SeitenräumklappenSeitenräumklappen
- 2020
- Hydraulikantriebhydraulic drive
- 2222
- vorderer Auffangbehälterfront receptacle
- 2323
- Kippeinheittilting unit
- 2424
- zweites Förderbandsecond conveyor belt
- 2525
- Stützstrebesupport strut
- 2626
- drittes Förderbandthird conveyor belt
- 2727
- Auflagestützesupport bracket
- 2828
- hinterer Auffangbehälterrear receptacle
- 2929
- AuflagekeilRest wedge
- 3030
- viertes Förderbandfourth conveyor belt
- 3232
- Kontergewichtcounterweight
- 3333
- Aufnahme für Hydraulikzylinderadmission for hydraulic cylinders
- 3434
- Drehkranzslewing ring
- 3535
- Tragplattesupport plate
- 3636
- Auflagestützesupport bracket
- 3737
- Abspannseileguy wires
- 3838
- Hydraulikzylinderhydraulic cylinders
- 4040
- Führerstandcab
- 4242
- Motorblockblock
- 4444
- Fahrgestellchassis
- 4646
- Trägercarrier
- 4848
- Hydraulikzylinderhydraulic cylinders
Claims (19)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202007017037U DE202007017037U1 (en) | 2007-02-15 | 2007-12-06 | Device for removing and loading track ballast |
EP08707212A EP2122056A1 (en) | 2007-02-15 | 2008-01-23 | Apparatus for removing and loading track ballast |
PCT/EP2008/000499 WO2008098665A1 (en) | 2007-02-15 | 2008-01-23 | Apparatus for removing and loading track ballast |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102007007479.6 | 2007-02-15 | ||
DE200710007479 DE102007007479A1 (en) | 2007-02-15 | 2007-02-15 | Device for removal and loading of track ballast has ballast receiving ramp extending transversely over ballast bed, removal wedge for loosening and lifting track ballast, and first conveyor belt for transporting ballast rearwards |
DE202007017037U DE202007017037U1 (en) | 2007-02-15 | 2007-12-06 | Device for removing and loading track ballast |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202007017037U1 true DE202007017037U1 (en) | 2008-04-30 |
Family
ID=39338519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE202007017037U Expired - Lifetime DE202007017037U1 (en) | 2007-02-15 | 2007-12-06 | Device for removing and loading track ballast |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2122056A1 (en) |
DE (1) | DE202007017037U1 (en) |
WO (1) | WO2008098665A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102008003951A1 (en) * | 2008-01-11 | 2009-07-16 | Werner Stark | Device for transferring building materials for a substructure and / or superstructure of a roadway |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH528634A (en) * | 1971-06-02 | 1972-09-30 | Matisa Materiel Ind Sa | Construction machine for treating railroad ballast |
WO1992003617A1 (en) * | 1990-08-15 | 1992-03-05 | Kershaw Manufacturing Company, Inc. | Rotary ballast wagon |
AU7663894A (en) * | 1994-08-31 | 1996-03-22 | Harsco Corporation | Ballast machine |
SE518700C2 (en) * | 2001-03-28 | 2002-11-05 | Railcare Ab | Ways and machines to clear or excavate embankment banquets |
-
2007
- 2007-12-06 DE DE202007017037U patent/DE202007017037U1/en not_active Expired - Lifetime
-
2008
- 2008-01-23 EP EP08707212A patent/EP2122056A1/en not_active Withdrawn
- 2008-01-23 WO PCT/EP2008/000499 patent/WO2008098665A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2008098665A1 (en) | 2008-08-21 |
EP2122056A1 (en) | 2009-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0255564B1 (en) | Machine for replacing or renewing the rails and sleepers of an existing track | |
DE2550391A1 (en) | METHOD OF REMOVING BED MATERIAL FROM GRAPH BEDS | |
EP1964973B1 (en) | Method for manufacturing a supply line channel and train consisting of vehicles for executing the method | |
EP2054552B1 (en) | Method and device for renewing a ballast bed | |
AT16387U2 (en) | Cable laying equipment | |
EP1253248B1 (en) | Ballast cleaning machine and method | |
CH616472A5 (en) | ||
EP0771909B1 (en) | Machine for dismantling old and installing new railway tracks | |
EP0056497A1 (en) | Frame wagon in a train for the subsoil stabilization of railway tracks | |
EP3412827B1 (en) | Railway vehicle for track construction remediation | |
DE202008003589U1 (en) | Track rehabilitation machine with base layer milling machine | |
DE8817049U1 (en) | Device for producing a track ballast subgrade | |
DE202007017037U1 (en) | Device for removing and loading track ballast | |
DE60130254T2 (en) | DEVICE AND METHOD FOR REMOVING SCRATCH BEDING | |
WO2012103859A1 (en) | Device and method for constructing and treating railway tracks | |
DE10008986A1 (en) | Reconstruction/modification method for railway track uses appliance to remove/ regenerated old track materials and construct new track, in one single working phase and one direction only | |
DD154226A5 (en) | METHOD AND DEVICE FOR UNDERGROUND ARMING OF RAILWAY RAILS | |
DE102006059639A1 (en) | Laying and renovating a railway permanent way lays the rail on a protective layer, to be lifted for the ballast to be spread under it before the rail is crammed into place | |
EP2848736B1 (en) | Railway track working train for removing and installing ballast and portable track sections | |
DE102007007479A1 (en) | Device for removal and loading of track ballast has ballast receiving ramp extending transversely over ballast bed, removal wedge for loosening and lifting track ballast, and first conveyor belt for transporting ballast rearwards | |
EP2374931A2 (en) | Refurbishment method for multi-layer substructure of rail sections | |
EP3636834B1 (en) | Method for creating a new building line layout for a stretch of track | |
DE202008003997U1 (en) | Device for renewing the multi-layer substructure of tracks | |
EP1300516A2 (en) | Device and method for removing the railway track bed | |
AT370799B (en) | MOBILE PLANT FOR RENOVATION |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R207 | Utility model specification |
Effective date: 20080605 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20110225 |
|
R157 | Lapse of ip right after 6 years | ||
R157 | Lapse of ip right after 6 years |
Effective date: 20140701 |