DE19625037C2 - Earth moving equipment - Google Patents
Earth moving equipmentInfo
- Publication number
- DE19625037C2 DE19625037C2 DE1996125037 DE19625037A DE19625037C2 DE 19625037 C2 DE19625037 C2 DE 19625037C2 DE 1996125037 DE1996125037 DE 1996125037 DE 19625037 A DE19625037 A DE 19625037A DE 19625037 C2 DE19625037 C2 DE 19625037C2
- Authority
- DE
- Germany
- Prior art keywords
- earth
- carrier
- undercarriage
- equipment
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004519 manufacturing process Methods 0.000 claims description 8
- 230000007246 mechanism Effects 0.000 claims description 8
- 238000003801 milling Methods 0.000 description 5
- 239000007787 solid Substances 0.000 description 3
- 238000000926 separation method Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 239000002574 poison Substances 0.000 description 1
- 231100000614 poison Toxicity 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Earth Drilling (AREA)
Description
Es sind Großdrehbohrgeräte bekannt, bei denen das Grundgerät ein Hydraulik bagger oder ein Hydraulikseilbagger ist. Zum Einbau von Rohren größeren Durchmessers besitzen diese Erdbaugeräte Verrohrungsmaschinen, welche am Unterwagen des Baggers angeordnet sind. Bekannt sind weiter Erdbaugeräte zur Herstellung von Erdschlitzen mit einem Bagger als Grundgerät. Die DD 146 981 beschreibt einen Schürfkübelbagger zum Herstellen tiefer Erdschlitze, bei dem am Unterwagen eine Arbeitsplattform angelenkt ist, welche Baugrup pen der Anlage trägt. Gemeinsames Merkmal aller bekannten technischen Lösungen ist die Anordnung von Anlagenteilen am Unterwagen des Baggers. Dadurch wird die Mobilität der Erdbaugeräte erheblich eingeschränkt. Das Arbeitsplanum für die Erdbaugeräte muß entsprechend vorbereitet werden. Auch sind bestimmte Arbeiten, wie erforderliche Einstellungen, kompliziert und zeitaufwendig.Large rotary drilling rigs are known in which the basic device is hydraulic excavator or a hydraulic cable excavator. For installing larger pipes Diameter these earthworks have piping machines, which on The excavator's undercarriage are arranged. Earthmoving equipment is also known for the production of earth slots with an excavator as the basic device. The DD 146 981 describes a scraper excavator for producing deep earth slots, where a work platform is hinged to the undercarriage, which assembly group pen of the plant. Common feature of all known technical The solution is the arrangement of system parts on the undercarriage of the excavator. This considerably limits the mobility of earth-moving equipment. The Work plan for earthworks equipment must be prepared accordingly. Certain tasks, such as required settings, are also complicated and time consuming.
Der Erfindung liegt die Aufgabe zugrunde, ein Erdbaugerät zur Herstellung von Bohrungen für Pfahlgründungen oder Schlitzwände zu schaffen, das für die Ausführung dieser oder ähnlicher Arbeiten eine hohe Mobilität besitzt und sich durch eine kompakte Bauweise auszeichnet.The invention is based, an earth-moving device for manufacturing the task of holes for pile foundations or diaphragm walls to create that for the execution of this or similar work is highly mobile and is characterized by a compact design.
Das Grundgerät, ein Hydraulikbagger oder Hydraulikseilbagger, besitzt zwi schen dem Unterwagen und dem Oberwagen einen in der vertikalen Ebene schwenkbaren Geräteträger bzw. auf dem bestimmte Baugruppen des Erdbau gerätes angeordnet sind. Die Erfindung ist bei Erdbaugeräten zu nutzen, die bei Arbeiten wie der Her stellung von Pfahlwänden, Schlitzwänden u. dgl. im Bergbau, der Wasserwirt schaft, dem Spezialtiefbau und in der Deponietechnik eingesetzt werden.The basic device, a hydraulic excavator or hydraulic cable excavator, has two between the undercarriage and the superstructure one in the vertical plane swiveling equipment carrier or on the specific assemblies of earthworks device are arranged. The invention is to be used in earth-moving equipment that is used for work such as the Her position of pile walls, diaphragm walls and. Like in mining, the water manager shaft, foundation engineering and landfill technology.
Durch die Erfindung, bei der Abfangvorrichtungen oder Verrohrungsmaschi nen an bzw. auf dem Geräteträger, der sich zwischen dem Unterwagen und Oberwagen eines Baggers befindet, angeordnet sind, wird die Ausführung von Erdbauarbeiten, wie die Herstellung von Pfahlgründungen und Pfahlwänden oder Schlitzwänden, unter beengten Verhältnissen ermöglicht. Der Geräteträ ger kann bei geringem Platzbedarf weitere Anlagenteile, wie Verdichter oder Separieranlagen aufnehmen. Die Mobilität des Anlagenkomplexes ist im Ver gleich zu den bekannten technischen Lösungen dadurch kaum eingeschränkt. Durch den um 360° schwenkbaren Geräteträger kann beispielsweise eine Pfahlwand für ein Silo ohne Fahrbewegungen des Baggers hergestellt werden.By the invention, in the interception devices or piping machines NEN on or on the equipment carrier, which is between the undercarriage and Superstructure of an excavator is located, the execution of Earthworks, such as the manufacture of pile foundations and pile walls or diaphragm walls, made possible in tight spaces. The device ger can with small space requirements other system parts, such as compressors or Take up separation systems. The mobility of the plant complex is in ver hardly any restrictions compared to the known technical solutions. The device carrier can be swiveled through 360 °, for example Pile wall for a silo can be made without the excavator moving.
Ein Ausführungsbeispiel der Erfindung ist in der Zeichnung dargestellt und wird im folgenden näher beschrieben.An embodiment of the invention is shown in the drawing and is described in more detail below.
Es zeigen:Show it:
Fig. 1 die Seitenansicht des erfindungsgemäßen Erdbaugerätes mit einer Ausrüstung zur Herstellung von Schlitzwänden, Fig. 1 is a side view of the Erdbaugerätes invention with an equipment for the production of trench walls,
Fig. 2 die Draufsicht zur Fig. 1, Fig. 2 is a plan view of Fig. 1,
Fig. 3 die Seitenansicht des erfindungsgemäßen Erdbaugerätes mit einer Ausrüstung zur Herstellung von Pfahlgründungen oder Pfahlwänden. Fig. 3 is a side view of the earth moving device according to the invention with equipment for the manufacture of pile foundations or pile walls.
Das Erdbaugerät 1 besitzt zwischen dem Unterwagen 2 und dem Oberwagen 4 den Geräteträger 3. Sowohl der Geräteträger 3 als auch der Oberwagen 4 sind unabhängig voneinander um 360° schwenkbar. Die Schwenkbewegung des Oberwagens 3 wird mit dem oberen Schwenkwerk 5 und die Schwenkbewe gung des Geräteträgers 3 mit dem unteren Schwenkwerk 6 ausgeführt. Soll der Geräteträger 3 geschwenkt werden und der Oberwagen 4 in seiner Position zum Unterwagen 2 bleiben, so läßt man das obere Schwenkwerk 5 und das untere Schwenkwerk 6 gegenläufig arbeiten. Im Beispiel, das Fig. 1 zeigt, wird das Erdbaugerät 1 zur Herstellung von Schlitzwänden eingesetzt. Dazu ist am Geräteträger 3 die Arbeitsbühne 9 angeordnet. Auf der Arbeitsbühne 9 befin den sich der Verdichter 15 für die Air-Lift-Förderanlage des Erdbaugerätes 1 , eine Separieranlage 16 zum Aushalten von Feststoff, die Förderpumpe 17 zum Transport der mit Feststoff aufgeladenen Suspension, die Abfangvorrich tung 13 für den Führungs- und Förderpfahl 18 sowie der Ausleger 10 mit Aus legerwinde 11 und Schwenkzylinder 12 zum Heben und Senken aber auch zum Halten des Führungs- und Förderpfahles 18. Zum Auffahren des Erd schlitzes 26 für die Herstellung einer Schlitzwand wird der Führungs- und För derpfahl 18, der aus einzelnen Schüssen besteht, in einen suspensionsgestütz ten Startschacht eingebaut. Die Schüsse werden an das über den Giftermast ausleger 7 geführte Windenseil gehängt und in die Abfangvorrichtung 13 ge setzt. Die nachfolgend einzubauenden Schüsse werden jeweils aufgesetzt und mit dem Führungs- und Förderpfahl 18 verschraubt. Nach dem Einbau wird der Führungs- und Förderpfahl 18 an den auf der Arbeitsbühne 9 angeordneten Ausleger 10 gehangen. Anschließend werden die Schlitzfräse 20 und der Füh rungswagen 19 mit dem Oberwagen 4 aufgenommen und an den Führungs- und Förderpfahl 18 gesetzt und die Versorgungs-, Steuer- und Meßleitungen des Leitungsstranges der Energieleitungstrommel 8 angeschlossen. The earth-moving device 1 has the implement carrier 3 between the undercarriage 2 and the superstructure 4 . Both the equipment carrier 3 and the superstructure 4 can be pivoted through 360 ° independently of one another. The pivoting movement of the superstructure 3 is carried out with the upper pivoting mechanism 5 and the pivoting movement of the device carrier 3 with the lower pivoting mechanism 6 . If the implement carrier 3 is to be pivoted and the superstructure 4 remains in its position relative to the undercarriage 2 , the upper pivot mechanism 5 and the lower pivot mechanism 6 are allowed to work in opposite directions. In the example shown in FIG. 1, the earth-moving device 1 is used to produce diaphragm walls. For this purpose, the work platform 9 is arranged on the equipment carrier 3 . On the work platform 9 are the compressor 15 for the air-lift conveyor system of the earth moving device 1 , a separating system 16 for holding solid, the feed pump 17 for transporting the suspension loaded with solid, the interception device 13 for the guide and support piles 18 and the boom 10 with off winch 11 and swivel cylinder 12 for lifting and lowering but also for holding the guide and support pile 18th To open the earth slot 26 for the manufacture of a diaphragm wall, the guide and för derpfahl 18 , which consists of individual shots, is installed in a suspension-supported starting shaft. The shots are hung on the outrigger boom 7 guided over the poison mast and placed in the interceptor 13 ge. The shots to be installed below are each attached and screwed to the guide and support pile 18 . After installation, the guide and conveyor pile 18 is hung on the boom 10 arranged on the work platform 9 . Then the trencher 20 and the Füh approximately 19 carriage with the superstructure 4 are added and placed on the guide and support pile 18 and the supply, control and measurement lines of the wiring harness of the power cable drum 8 connected.
Nachdem die Air-Lift-Förderanlage in Betrieb genommen wurde und der An trieb der Schlitzfräse 20 eingeschaltet ist, kann mit der Herstellung des ersten Frässchnittes begonnen werden. Die Abförderung des gelösten Feststoffes er folgt mit der Suspension über den Führungs- und Förderpfahl 18. Mit der Separieranlage 16 wird grobstückiges Fördergut aus dem Förderstrom aus gehalten. Ist der erste Frässchnitt hergestellt und die Schlitzfräse 20 über die Arbeitsbühne 9 durch die Bühnenöffnung 14 aufgeholt, so wird der am Aus leger 10 angeschlagene Führungs- und Förderpfahl 18 angehoben und das Erdbaugerät 1 rückt in die Position des im folgenden herzustellenden Fräs schnittes.After the air lift conveyor system has been put into operation and the drive to the slot milling machine 20 is switched on, the production of the first milling cut can begin. The removal of the dissolved solids is carried out with the suspension via the guide and conveyor piles 18 . With the separating system 16 large pieces of material are kept out of the flow. If the first milling cut is made and the trencher 20 is brought up via the work platform 9 through the stage opening 14 , the guide and support pole 18 struck on the off leg 10 is raised and the earth-moving device 1 moves into the position of the milling cut to be produced below.
In der Fig. 3 ist am Geräteträger 3 die Arbeitsbühne 9 angeordnet, auf der sich die Verrohrungseinrichtung 22 befindet. Die Arbeitsbühne 9 stützt sich in ihrer Arbeitsstellung mit der Stütze 21 auf dem Arbeitsplanum 25 ab. Die ein zelnen Schüsse der Rohrtour 23 werden an den Gittermastausleger 7 des Ober wagens 4 angehängt und in die Verrohrungseinrichtung 22 gehoben. Anschlie ßend wird der Rohrgreifer 24 am Windenseil der Winde des Oberwagens 4 befestigt und die Bohrung gegreifert. Ist eine Pfahlwand für ein Silo herzustel len, so können die Bohrpfähle in der Schrittfolge 1, 3, 5 usw. und 2, 4, 6 usw. hergestellt werden, indem nur der Geräteträger 3 und der Oberwagen 4 ge schwenkt werden und der Unterwagen 2 in seiner Position verbleibt.In FIG. 3 on the device carrier 3, the stage 9 is arranged, the casing means is on of the 22. The work platform 9 is supported in its working position with the support 21 on the work floor 25 . The individual shots of the tube tour 23 are attached to the lattice boom 7 of the upper carriage 4 and lifted into the piping 22 . Subsequently, the pipe gripper 24 is attached to the winch rope of the winch of the superstructure 4 and the hole is gripped. If a pile wall for a silo is to be produced, the bored piles can be produced in the sequence of steps 1, 3, 5 etc. and 2, 4, 6 etc. by only pivoting the equipment carrier 3 and the superstructure 4 and the undercarriage 2 remains in its position.
11
Erdbaugerät
Earth moving equipment
22nd
Unterwagen
Undercarriage
33rd
Geräteträger
Equipment carrier
44th
Oberwagen
Superstructure
55
oberes Schwenkwerk
upper slewing gear
66
unteres Schwenkwerk
lower swing mechanism
77
Gittermastausleger
Lattice boom
88th
Energieleitungstrommel
Power line drum
99
Arbeitsbühne
Working platform
1010th
Ausleger
boom
1111
Auslegerwinde
Outrigger winch
1212th
Schwenkzylinder
Swivel cylinder
1313
Abfangvorrichtung
Interception device
1414
Bühnenöffnung
Stage opening
1515
Verdichter
compressor
1616
Separieranlage
Separation plant
1717th
Förderpumpe
Feed pump
1818th
Führungs- und Förderpfahl
Guide and support stake
1919th
Führungswagen
Carriage
2020th
Schlitzfräse
Slot milling machine
2121
Stütze
support
2222
Verrohrungseinrichtung
Piping equipment
2323
Rohrtour
Pipe tour
2424th
Rohrgreifer
Pipe grab
2525th
Arbeitsplanum
Work plan
2626
Erdschlitz
Earth slot
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1996125037 DE19625037C2 (en) | 1996-06-22 | 1996-06-22 | Earth moving equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1996125037 DE19625037C2 (en) | 1996-06-22 | 1996-06-22 | Earth moving equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
DE19625037A1 DE19625037A1 (en) | 1998-01-02 |
DE19625037C2 true DE19625037C2 (en) | 1998-07-09 |
Family
ID=7797728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1996125037 Expired - Lifetime DE19625037C2 (en) | 1996-06-22 | 1996-06-22 | Earth moving equipment |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE19625037C2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1010820A4 (en) * | 1997-07-11 | 2002-07-31 | Komatsu Mfg Co Ltd | Work machine |
CN110409997B (en) * | 2019-08-06 | 2020-11-10 | 东阳市琰安建筑工程有限公司 | A forming device for soft soil foundation stake hole |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1928712A1 (en) * | 1968-06-07 | 1969-12-11 | Poclain Sa | Construction machine, in particular civil engineering machine |
DD146981A1 (en) * | 1979-11-09 | 1981-03-11 | Klaus Vetterick | SCHUERFKUEBELBAGGER FOR MANUFACTURING DEEP ERATCHELITZE |
FR2608188A1 (en) * | 1986-12-15 | 1988-06-17 | Fournier Drainage Sa | Machine for digging and filling a trench |
-
1996
- 1996-06-22 DE DE1996125037 patent/DE19625037C2/en not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1928712A1 (en) * | 1968-06-07 | 1969-12-11 | Poclain Sa | Construction machine, in particular civil engineering machine |
DD146981A1 (en) * | 1979-11-09 | 1981-03-11 | Klaus Vetterick | SCHUERFKUEBELBAGGER FOR MANUFACTURING DEEP ERATCHELITZE |
FR2608188A1 (en) * | 1986-12-15 | 1988-06-17 | Fournier Drainage Sa | Machine for digging and filling a trench |
Non-Patent Citations (1)
Title |
---|
Patent Abstracts of Japan, JP 6-173295 A * |
Also Published As
Publication number | Publication date |
---|---|
DE19625037A1 (en) | 1998-01-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1108110B1 (en) | Drilling device and method for drilling a well | |
DE102009056245B4 (en) | Wind turbine with lifting device | |
DE102014204874B4 (en) | Boom device and crawler crane | |
WO2008080572A1 (en) | Method and device for laying pipes in the ground | |
DE10044469A1 (en) | Crawler crane for pit excavation work, has weight functioning as spacer between swivel base and crawler frame | |
DE19814021A1 (en) | Device for introducing a foreign substance into soils or for compacting the soil | |
DE3519109A1 (en) | METHOD AND DEVICE FOR DRILLING VERTICAL SHAFTS | |
DE102014011878B4 (en) | Ground milling machine, method of dismantling and method of installing a milling device | |
DE19625037C2 (en) | Earth moving equipment | |
DE3919824C2 (en) | Rotary drilling device | |
DE102019220195B4 (en) | LOW OVERHEAD DRILL AND METHOD OF INSTALLATION | |
DE2263067A1 (en) | ALIGNMENT SYSTEM FOR HANGING LOADS | |
DE102022125525A1 (en) | PIPELAYER WITH REAR ENGINE CONFIGURATION | |
EP0716190A1 (en) | Slotting mill | |
DD231922A3 (en) | DEVICE FOR SLOTTING STUBBS | |
AT524611B1 (en) | Load transport system for transporting a load in a work area | |
EP2439164A1 (en) | Work machine with chisel function | |
DE8033352U1 (en) | "SWIMMING EXCAVATOR" | |
DE3721526A1 (en) | Rotary drilling rig for producing cased boreholes | |
EP1577253B1 (en) | Power winch | |
EP3440268A1 (en) | Pile driver | |
US20210002849A1 (en) | Drill Adaptor | |
WO2023025341A1 (en) | Shaft excavator | |
EP4392646A1 (en) | Shaft excavator | |
AT17622U1 (en) | Load transport system for transporting a load in a work area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
D2 | Grant after examination | ||
8364 | No opposition during term of opposition | ||
R071 | Expiry of right |