DE1434494C - Formwork carriage - Google Patents
Formwork carriageInfo
- Publication number
- DE1434494C DE1434494C DE19621434494 DE1434494A DE1434494C DE 1434494 C DE1434494 C DE 1434494C DE 19621434494 DE19621434494 DE 19621434494 DE 1434494 A DE1434494 A DE 1434494A DE 1434494 C DE1434494 C DE 1434494C
- Authority
- DE
- Germany
- Prior art keywords
- formwork
- side wall
- carriage
- corner
- movement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000009415 formwork Methods 0.000 title claims description 58
- 230000000875 corresponding Effects 0.000 claims description 2
- 230000036633 rest Effects 0.000 claims description 2
- 238000005452 bending Methods 0.000 claims 3
- 238000005253 cladding Methods 0.000 claims 2
- 238000010276 construction Methods 0.000 claims 2
- 238000006073 displacement reaction Methods 0.000 claims 2
- 230000035882 stress Effects 0.000 claims 2
- 210000001503 Joints Anatomy 0.000 claims 1
- 210000004072 Lung Anatomy 0.000 claims 1
- 230000001070 adhesive Effects 0.000 claims 1
- 239000000853 adhesive Substances 0.000 claims 1
- 238000007906 compression Methods 0.000 claims 1
- 230000018109 developmental process Effects 0.000 claims 1
- 239000007788 liquid Substances 0.000 claims 1
- 238000000034 method Methods 0.000 claims 1
- 240000004282 Grewia occidentalis Species 0.000 description 1
- 239000000969 carrier Substances 0.000 description 1
Description
3 43 4
ter Deckenschalung 3 und nach innen und unten be- durch ein Gelenk 28 in zwei Arme 27, 29 unterteilwegten
Seitenwandschalungen 4 nach dem Ausfahren ten Schwenkarm auf, der bei 26 an dem Träger 12
aus einem Teilstück 2 des zu errichtenden Tunnels. und bei 24 an dem Eckpfosten 5 angelenkt ist.
Der Schalungswagen weist vier Eckpfosten 5 auf, die An dem Arm 27 ist eine Aussparung 27 a und an
mittels Versteifungsrohre 6 verstrebt sind. Jeder der 5 dem Arm 29 eine Aussparung 29 α vorgesehen, die
Eckpfosten 5 ruht auf einer Hebevorrichtung 7 an der sich beide miteinander decken, wenn die Arme 27
ein Rad 8 vorgesehen ist, das auf einer Schiene 9 und 29 miteinander fluchten, wie dies in F i g. 3 darrollt,
gestellt ist. In dieser Lage können diese Arme 27 undter ceiling formwork 3 and inward and downward by a joint 28 in two arms 27, 29 divided sidewall formwork 4 after the extension th swivel arm, which at 26 on the support 12 from a section 2 of the tunnel to be built. and is hinged at 24 to the corner post 5.
The formwork carriage has four corner posts 5, which are braced on the arm 27 a recess 27 a and by means of stiffening tubes 6. Each of the 5 arm 29 a recess 29 α is provided, the corner posts 5 rests on a lifting device 7 on which both coincide with each other, when the arms 27 a wheel 8 is provided, which are aligned on a rail 9 and 29 with each other, as shown in FIG F i g. 3 is presented. In this position, these arms 27 and
Auf dem Eckpfosten ruhen zwei Traversen 10, auf 29 mittels eines Bolzens 30 verriegelt werden. In die-Two cross members 10 rest on the corner post and are locked on 29 by means of a bolt 30. In the-
denen sich die Versteifungsstege 11 der Decken- io ser in F i g. 3 dargestellten Stellung ist der Träger 12which the stiffening webs 11 of the ceiling ios in FIG. The position shown in FIG. 3 is the carrier 12
schalung 3 abstützen. Mittels der Hebevorrichtung 7 seitlich ausgefahren und gleichzeitig angehoben,Support formwork 3. Laterally extended by means of the lifting device 7 and raised at the same time,
werden die Eckpfosten 5 und damit die Deckenscha- Die Verstellung des Gelenkviereckes aus der inthe corner posts 5 and thus the ceiling panels are The adjustment of the hinge square from the in
lung 3 angehoben bzw. abgesenkt. . F i g. 2 gezeigten Stellung in die in Fig. 3 gezeigtement 3 raised or lowered. . F i g. 2 into the position shown in FIG
An den Eckpfosten 5 sind, wie insbesondere aus Stellung erfolgt mittels einer Stange 31, die an der
den F i g. 2 und 3 ersichtlich ist, Gelenkvierecke an- 15 Gelenkachse 28 angreift. Die Verstellung der Stange
geordnet, mittels derer die Schalungsplatten 4 der 31 erfolgt mittels eines Kniehebels 32, der bei 33 an
Seitenwandschalungen in horizontaler und vertikaler der Stange 31 angreift und bei 34 an dem Eck-Richtung
bewegt werden. Diese Gelenkvierecke grei- pfosten 5 gelagert ist. Am Ende des Kniehebels 32
fen an je einem Träger 12 an, an dem die Verstei- ist ein Handgriff 35 angebracht,
fungsstege 13 der Seitenwandschalungen 4 befestigt 20 Da die Eckpfosten 5 und die Deckenschalung 3
sind. schon vorher mittels der Vorrichtungen 7 angehobenOn the corner posts 5, as is done in particular from the position, by means of a rod 31 which is attached to the FIG. 2 and 3 can be seen, articulation quadrilaterals 15 articulation axis 28 acts. The adjustment of the rod, by means of which the formwork panels 4 of 31 takes place by means of a toggle lever 32, which at 33 engages the side wall formwork in the horizontal and vertical direction of the rod 31 and is moved at 34 in the corner direction. This four-bar linkage gripping post 5 is mounted. At the end of the toggle lever 32, a support 12 is attached to each of the supports, on which a handle 35 is attached,
Fungsstege 13 of the side wall formwork 4 attached 20 Since the corner posts 5 and the ceiling formwork 3 are. raised beforehand by means of the devices 7
Um den Schalungswagen in seine Arbeitsstellung wurden, stoßen die Seitenwandschalungen 4 nachIn order to put the formwork carriage in its working position, the side wall formwork 4 pushes through
zu bringen, wird zuerst die Deckenschalung 3 mittels ihrer Verschwenkung gegen die Deckenschalung 3 an.to bring the ceiling formwork 3 by means of its pivoting against the ceiling formwork 3 first.
der an den Eckpfosten 5 vorgesehenen Hebevorrich- Die Seitenwandschalungen 4 weisen zu diesem Zweckof the lifting device provided on the corner post 5 The side wall formwork 4 has for this purpose
tungen 7 angehoben, worauf durch Betätigung der 25 einen oberen, nach innen abgebogenen und abge-lines 7 raised, whereupon by actuating the 25 an upper, inwardly bent and angled
Gelenkvierecke die Seitenwandschalungen 4 ausge- schrägten Rand 4 α auf, der bei ausgeschwenktenArticulated quadrilaterals on the side wall formwork 4 inclined edge 4 α , the one when swiveled out
fahren und so weit angehoben werden, daß sie gegen Schalungsplatten 4 gegen eine entsprechende Schräg-drive and are raised so far that they are against formwork panels 4 against a corresponding inclined
die Deckenschalung 3 anstoßen. kante 45 der waagerechten Schalungsplatte 3 derbutt the ceiling formwork 3. edge 45 of the horizontal formwork panel 3 of the
An jedem Eckpfosjen sind zwei Gelenkvierecke Deckenschalung anliegt. Um ein sicheres und dichtes angebracht, deren Einzelteile mit denselben Bezugs- 3° Anliegen der Seitenwandschalungen 4 an der Deckenziffern bezeichnet sind. Jedes Gelenkviereck weist schalung 3 zu gewährleisten, werden diese im Bereich einen Lenker 25 auf, der bei 23 an dem Eckpfosten 5 der aneinanderstoßenden Schrägkanten miteinander und bei 26 an dem Träger 12 angelenkt ist, und einen verriegelt.At each corner post there are two hinged four-cornered slab formwork. To a safe and tight attached, their items with the same reference 3 ° concern of the side wall formwork 4 on the ceiling numbers are designated. Each four-bar linkage has formwork 3 to ensure these are in the area a handlebar 25, which at 23 on the corner post 5 of the abutting sloping edges with each other and hinged at 26 to the bracket 12 and locked one.
Hierzu 1 Blatt Zeichnungen1 sheet of drawings
Claims (5)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR900192 | 1962-06-08 | ||
FR900192A FR1345570A (en) | 1962-06-08 | 1962-06-08 | Tunnel formwork |
DEST019652 | 1962-08-30 |
Publications (2)
Publication Number | Publication Date |
---|---|
DE1434494A1 DE1434494A1 (en) | 1968-12-19 |
DE1434494C true DE1434494C (en) | 1973-04-26 |
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2052118B1 (en) | Climbing formwork for concreting a wall of a structure | |
EP0670399A1 (en) | Lifting scaffold platform | |
EP0457171B1 (en) | Arrangement at a form for erecting walls | |
DE1928196C3 (en) | Movable space formwork for concrete and reinforced concrete structures | |
WO1997033509A1 (en) | Automatic cleaning device with moveable support legs | |
DE1584525B1 (en) | Battery formwork | |
DE1434494C (en) | Formwork carriage | |
DE1808989B2 (en) | Device for the production of monolithic reinforced concrete room cells with one open side pointing downwards, in particular prefabricated garages, under the corridor | |
DE202019000575U1 (en) | Device for walking through photovoltaic modules | |
DE202015008972U1 (en) | Drilling rig with a pivotable between a transport position and a working position drilling mast | |
DE2015940B2 (en) | DEVICE FOR ADJUSTING SLIDING FORMS | |
DE2510015C2 (en) | Device and method for the sectional production of the individual fields of the superstructure of pier bridges or similar structures | |
DE3153022C2 (en) | Device used as an expansion aid for tunneling in mining and tunneling | |
DE10135748C1 (en) | Reinforced concrete tunnel lining formation device has positioning carriage between concrete reinforcement carriage and shuttering carriage | |
DE2461251C3 (en) | Device for pre-assembly, transport and installation of a route or tunnel extension | |
DE2829863C2 (en) | Device for the production of vertical wall panels from masonry stones | |
DE2323811B2 (en) | ||
DE1434494B (en) | Formwork carriage | |
DE2601001C2 (en) | ||
DE870020C (en) | Gantry crane-like scaffolding | |
DE2423953C2 (en) | Movable formwork device for concreting tunnel tubes | |
DE1534604C (en) | Formwork equipment for concreting tunnel walls and ceilings for large tunnel cross-sections | |
DE2008396C3 (en) | Transport pallet truck for hot vessels, especially for steel works converters | |
DE1534461C3 (en) | Device for the construction of multi-span bridges or similar structures in sections | |
DE2134631C3 (en) | Collapsible shoring, especially for tents |