CN217205242U - High altitude construction platform is used in building engineering construction - Google Patents
High altitude construction platform is used in building engineering construction Download PDFInfo
- Publication number
- CN217205242U CN217205242U CN202220433174.7U CN202220433174U CN217205242U CN 217205242 U CN217205242 U CN 217205242U CN 202220433174 U CN202220433174 U CN 202220433174U CN 217205242 U CN217205242 U CN 217205242U
- Authority
- CN
- China
- Prior art keywords
- threaded rod
- rotary threaded
- lifting seat
- hanging
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses an aerial work platform for construction engineering construction, which comprises a hanging basket (1), wherein both ends of the upper part of the hanging basket (1) are provided with hangers (2); the hanging basket (1) comprises an upper hanging bracket (3), a height adjusting mechanism (4) is arranged below the upper hanging bracket (3), and a hanging basket main body (5) is arranged below the height adjusting mechanism (4); the height adjusting mechanism (4) comprises a rotary threaded rod (401) fixed in the middle of the upper hanging bracket (3), a lifting seat (402) is arranged on the rotary threaded rod (401), a guide rod (403) is arranged between the lifting seat (402) and the upper hanging bracket (3), and a rotary handle (404) is arranged at the lower end of the rotary threaded rod (401). The utility model has the characteristics of can effectively reduce and set up the cost, reduce and set up the time and reduce the place restriction.
Description
Technical Field
The utility model relates to a building field aerial working structure, especially an aerial working platform is used in building engineering construction.
Background
Compared with the traditional concrete building, the steel plate or the section steel replaces reinforced concrete, so that the steel structure building has higher strength and better shock resistance. And because the components can be manufactured in factories and installed on site, the construction period is greatly reduced. Because the steel can be repeatedly used, the construction waste can be greatly reduced, and the steel is more environment-friendly, so the steel is widely adopted by all countries in the world and is applied to industrial buildings and civil buildings. At present, the application of steel structure buildings on high-rise and super high-rise buildings is mature day by day, and the steel structure buildings gradually become mainstream building processes, and are the development direction of buildings in the future. In the process of steel structure construction, overhead operation is often required; however, the existing operating platform for workers to work and stand during aloft work only has two modes of erecting scaffolds or using truck cranes. However, the scaffold erection is limited by the operation field, the cost is high, the erection time is long, and the construction period is influenced; the rented truck crane has high cost, and some operation parts of the truck crane cannot operate. Therefore, the prior art has the problems of high erection cost, long time and easy site limitation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high altitude construction platform is used in building engineering construction. The utility model has the characteristics of can effectively reduce and set up the cost, reduce and set up the time and reduce the place restriction.
The technical scheme of the utility model: an aerial working platform for construction engineering comprises a hanging basket, wherein hanging lugs are arranged at two ends of the upper part of the hanging basket; the hanging basket comprises an upper hanging bracket, a height adjusting mechanism is arranged below the upper hanging bracket, and a hanging basket main body is arranged below the height adjusting mechanism; the height adjusting mechanism comprises a rotary threaded rod fixed in the middle of the upper hanger, a lifting seat is arranged on the rotary threaded rod, a guide rod is arranged between the lifting seat and the upper hanger, and a rotary handle is arranged at the lower end of the rotary threaded rod.
In the aerial work platform for building engineering construction, the lifting seat is provided with a threaded hole matched with the rotary threaded rod, and two ends of the lifting seat are provided with guide holes matched with the guide rods; the lower end of the guide rod is provided with a stop plate; the middle of the upper hanger is provided with a through hole matched with the rotary threaded rod, the upper end of the through hole is provided with a stop mounting hole, a bearing is arranged in the stop mounting hole, and the upper end of the rotary threaded rod is provided with a stop rotating base matched with the bearing.
In the aerial work platform for building engineering construction, a reinforcing plate is arranged between the two hangers; the reinforcing plate comprises a base connecting plate, a mounting plate is arranged on the inner side of the base connecting plate, and a telescopic rod and a spring are arranged between the base connecting plate and the mounting plate; the mounting panel medial surface is equipped with the slipmat, and the middle part of slipmat is equipped with vertical anti-skidding sawtooth, and vertical anti-skidding sawtooth both sides are equipped with horizontal anti-skidding sawtooth.
Compared with the prior art, the utility model discloses by last gallows, the hanging flower basket that height regulating mechanism and hanging flower basket main part constitute and set up the hangers at hanging flower basket upper portion both ends and constitute, only need hang this aerial working platform and establish on the steel construction in operation district during the use, the workman carry out aerial working in the hanging flower basket can, replace traditional two kinds of aerial working platforms of scaffold frame or automobile crane of setting up with this, not only can save engineering cost and save the time limit for a project by a large margin, and convenient to use, swiftly, still not restricted by the place. Meanwhile, the utility model discloses a set up height adjusting mechanism for the workman can make things convenient for the workman's operation according to the height of the operation altitude mixture control hanging flower basket of reality. In addition, the utility model also can improve the whole structural strength of the hangers by arranging the reinforcing plate between the two hangers; the reinforcing plate comprises basic connecting plate, mounting panel and telescopic link, reset spring again to set up vertical anti-skidding sawtooth and horizontal anti-skidding sawtooth in the mounting panel inboard, improve the stability that the work platform hung, also can prevent effectively that it from taking place to rock, guarantee operation safety. To sum up, the utility model has the characteristics of can effectively reduce and set up the cost, reduce and set up the time and reduce the place restriction.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is an enlarged partial view of the hanger and reinforcement plate;
FIG. 3 is a side view of the cleat;
fig. 4 is a partially enlarged view of the height adjusting mechanism.
The labels in the figures are: 1-hanging basket, 2-hanging lugs, 3-upper hanging bracket, 4-height adjusting mechanism, 5-hanging basket main body, 401-rotating threaded rod, 402-lifting seat, 403-guide rod, 404-rotating handle, 405-stop plate, 406-through hole, 407-stop mounting hole, 408-bearing, 409-stop rotating base, 6-reinforcing plate, 601-base connecting plate, 602-mounting plate, 603-telescopic rod, 604-spring, 605-anti-slip pad, 606-vertical anti-slip sawtooth and 607-transverse anti-slip sawtooth.
Detailed Description
The following description is made with reference to the accompanying drawings and examples, but not to be construed as limiting the invention.
Examples are given. An aerial work platform for construction engineering construction is shown in figures 1 to 4 and comprises a hanging basket 1, wherein hanging lugs 2 are arranged at two ends of the upper part of the hanging basket 1; the hanging basket 1 comprises an upper hanging bracket 3, a height adjusting mechanism 4 is arranged below the upper hanging bracket 3, and a hanging basket main body 5 is arranged below the height adjusting mechanism 4; the height adjusting mechanism 4 comprises a rotary threaded rod 401 fixed in the middle of the upper hanger 3, a lifting seat 402 is arranged on the rotary threaded rod 401, a guide rod 403 is arranged between the lifting seat 402 and the upper hanger 3, and a rotary handle 404 is arranged at the lower end of the rotary threaded rod 401.
A threaded hole matched with the rotary threaded rod 401 is formed in the lifting seat 402, and guide holes matched with the guide rods 403 are formed in the two ends of the lifting seat 402; a stop plate 405 is arranged at the lower end of the guide rod 403; the middle part of the upper hanger 3 is provided with a through hole 406 matched with the rotary threaded rod 401, the upper end of the through hole 406 is provided with a stop mounting hole 407, the stop mounting hole 407 is internally provided with a bearing 408, and the upper end of the rotary threaded rod 401 is provided with a stop rotary base 409 matched with the bearing 408.
A reinforcing plate 6 is arranged between the two hanging lugs 2; the reinforcing plate 6 comprises a base connecting plate 601, a mounting plate 602 is arranged on the inner side of the base connecting plate 601, and a telescopic rod 603 and a spring 604 are arranged between the base connecting plate 601 and the mounting plate 602; the medial surface of mounting panel 602 is equipped with slipmat 605, and the middle part of slipmat 605 is equipped with vertical anti-skidding sawtooth 606, and vertical anti-skidding sawtooth 606 both sides are equipped with horizontal anti-skidding sawtooth 607.
An anti-drop baffle is arranged above the bearing.
The hanging basket main body is also provided with an escalator structure.
The hanging basket main body is fixed on the lifting seat.
The utility model discloses an installation: the hanging lugs are hung on an installed steel structure, then an operator enters the hanging basket body, the rotating handle is rotated, the rotating threaded rod is rotated, the lifting seat is driven to move up and down, and the lifting seat can drive the hanging basket body to move up and down due to the fact that the lifting seat moves up and down.
Aerial working platform hangs establishes the back on the steel construction, and the reinforcing plate closely laminates with the steel construction side, and the spring receives the extrusion, produces the extrusion force to the mounting panel, and vertical anti-skidding sawtooth and horizontal anti-skidding sawtooth closely laminate with the steel construction, play vertical and horizontal skid-proof purpose, take place to rock and remove when preventing aerial working platform.
Claims (3)
1. The utility model provides a high altitude construction platform is used in building engineering construction which characterized in that: comprises a hanging basket (1), wherein hanging lugs (2) are arranged at two ends of the upper part of the hanging basket (1); the hanging basket (1) comprises an upper hanging bracket (3), a height adjusting mechanism (4) is arranged below the upper hanging bracket (3), and a hanging basket main body (5) is arranged below the height adjusting mechanism (4); the height adjusting mechanism (4) comprises a rotary threaded rod (401) fixed in the middle of the upper hanger (3), a lifting seat (402) is arranged on the rotary threaded rod (401), a guide rod (403) is arranged between the lifting seat (402) and the upper hanger (3), and a rotary handle (404) is arranged at the lower end of the rotary threaded rod (401).
2. The aerial work platform for constructional engineering construction as claimed in claim 1, wherein: a threaded hole matched with the rotary threaded rod (401) is formed in the lifting seat (402), and guide holes matched with the guide rods (403) are formed in the two ends of the lifting seat (402); a stop plate (405) is arranged at the lower end of the guide rod (403); the middle of the upper hanger (3) is provided with a through hole (406) matched with the rotary threaded rod (401), the upper end of the through hole (406) is provided with a stop mounting hole (407), a bearing (408) is arranged in the stop mounting hole (407), and the upper end of the rotary threaded rod (401) is provided with a stop rotating base (409) matched with the bearing (408).
3. The aerial work platform for constructional engineering construction as claimed in claim 1, wherein: a reinforcing plate (6) is arranged between the two hangers (2); the reinforcing plate (6) comprises a base connecting plate (601), a mounting plate (602) is arranged on the inner side of the base connecting plate (601), and a telescopic rod (603) and a spring (604) are arranged between the base connecting plate (601) and the mounting plate (602); the inner side surface of the mounting plate (602) is provided with an anti-slip pad (605), the middle part of the anti-slip pad (605) is provided with vertical anti-slip saw teeth (606), and the two sides of the vertical anti-slip saw teeth (606) are provided with horizontal anti-slip saw teeth (607).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220433174.7U CN217205242U (en) | 2022-02-28 | 2022-02-28 | High altitude construction platform is used in building engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220433174.7U CN217205242U (en) | 2022-02-28 | 2022-02-28 | High altitude construction platform is used in building engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217205242U true CN217205242U (en) | 2022-08-16 |
Family
ID=82753308
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220433174.7U Active CN217205242U (en) | 2022-02-28 | 2022-02-28 | High altitude construction platform is used in building engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217205242U (en) |
-
2022
- 2022-02-28 CN CN202220433174.7U patent/CN217205242U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN104453197B (en) | High Large Cantilever concrete structural steel shape supports platform | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN101503908B (en) | Construction method for spacing suspension cable structural template support platform | |
CN202324574U (en) | Lifting scaffold with simple and convenient operations | |
CN205188839U (en) | Movably -assembled anti -collision bridge wall construction hanging basket | |
CN217205242U (en) | High altitude construction platform is used in building engineering construction | |
CN205857026U (en) | A kind of movable type bridge anticollision barrier construction operation chassis | |
CN105776092B (en) | A kind of extended position nacelle device | |
CN211647239U (en) | Lower hanging device for steel platform | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN208362905U (en) | A kind of bridge concrete guardrail pours trolley | |
CN103922231B (en) | The method of climbing of high-rise building Inner climbing tower machine | |
CN212249184U (en) | Electric creeping formwork device for building construction | |
CN211776076U (en) | Steel construction retractable cat ladder of going to people for elevator well | |
CN209227391U (en) | Self-propelled bridge-collision-avoidance wall form trolley | |
CN107059654A (en) | The compound overlength Hanging basket on front support of single cable plane and its installation method | |
CN209780229U (en) | Jacking platform system of integrated tower crane | |
CN210366717U (en) | Be applied to console mode and from climbing formula whole construction work platform | |
CN209339010U (en) | Walking bridge floor faces side barrel structure | |
CN208088150U (en) | Cantilever type movable type bridge repairing stage apparatus | |
CN207109614U (en) | A kind of Hanging Basket for building | |
CN201292656Y (en) | Inner formwork construction support of shaft | |
CN106760464B (en) | Elevator shaft operating platform and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |