CN103922231B - The method of climbing of high-rise building Inner climbing tower machine - Google Patents
The method of climbing of high-rise building Inner climbing tower machine Download PDFInfo
- Publication number
- CN103922231B CN103922231B CN201410147130.8A CN201410147130A CN103922231B CN 103922231 B CN103922231 B CN 103922231B CN 201410147130 A CN201410147130 A CN 201410147130A CN 103922231 B CN103922231 B CN 103922231B
- Authority
- CN
- China
- Prior art keywords
- climbing
- tower
- tower machine
- tower body
- jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The invention discloses a kind of method of climbing of high-rise building Inner climbing tower machine, comprise the following steps: installation the 3rd road Inner climbs support steel beam and Inner climbs frame: on tower machine tower body, install an interim hoisting mechanism, vertical handling support steel beam in limited space, Hanging Basket is fixed in Inner climbing tower machine topside, operating personal is had a stable service platform; Hydraulic jacking device is installed; The trim of tower machine; The jacking of tower machine; Complete and climb.Tower machine tower body installs an interim hoisting mechanism, without the need to Inner climbing tower auger mouth reserved in building, can in limited space vertical handling girder steel; Hanging Basket is fixed in Inner climbing tower machine topside, operating personal is had a stable service platform, without the need to scaffolding.Whole technological process is by original three days time decreased by one day, and efficiency of climbing improves, and meanwhile, the safety of operating personal also obtains failure-free and ensures.
Description
Technical field
The present invention relates to a kind of method of climbing of high-rise building Inner climbing tower machine.
Background technology
Inner climbing tower machine is when the high-rise building of construction height more than 100m, usually two-layer support steel beam has only been installed and Inner climbs frame, when Inner climbing tower machine climbs, installation the 3rd road Inner is needed to climb support steel beam and Inner climbs frame, namely need one, the bottom support steel beam of movement when last time, Inner climbed to be moved to topmost, climb frame with fixing Inner; Afterwards hydraulic jacking device is installed; The trim of tower machine; The jacking of tower machine; Complete and climb.The movement of girder steel has following several mode: (1), the Inner climbing tower auger mouth reserved by building, tower machine is utilized to move, this kind of mode is minimum because tower machine exists hangs width, require that reserved opening is larger, and the structural limitations of often building, the requirement of reserved opening out of reach, thus cause abuse pull and hang sideling, even cannot move; (2), on building floor, first girder steel is moved horizontally to building outer rim, recycling tower machine is lifted to building top, be installed to the desired location of the 3rd road girder steel by the reserved opening of Inner climbing tower machine, this kind method operating sequence is more, the time is longer, floor passage that girder steel passes through need be cleared up, require that reserved opening is larger simultaneously.
At present, because of the reason of project construction technique, cannot reserve enough large space to Inner climbing tower machine, support steel beam directly adopts steel corbel to be fixed on shear wall, and the construction of floor plates lags far behind the construction of shear wall.When tower machine Inner climbs operation, cannot set up scaffold, operating personal is without operation planar space, and the vertical of support steel beam moves without passage, and meanwhile, parallel motion, also without service platform, like this, cannot use tower machine handling support steel beam.When Inner climbing tower machine climbs, also need scaffolding, so that the operation of personnel, because support steel beam adopts steel corbel to be fixed on shear wall, whole connection all adopts the type of attachment of welding, so person works's amount when removing and install is very large, because of the reason of project construction technique, enough large space cannot be reserved to Inner climbing tower machine, so scaffold cannot be set up in scene.
Summary of the invention
The object of the invention is to overcome above deficiency, a kind of method of climbing of easy to operate, high-rise building Inner climbing tower machine that efficiency is high, safe and reliable is provided.
Object of the present invention is achieved through the following technical solutions: a kind of method of climbing of high-rise building Inner climbing tower machine, comprises the following steps:
A, the 3rd road Inner is installed climbs support steel beam and Inner climbs frame: on tower machine tower body, an interim hoisting mechanism is installed, vertical handling support steel beam in limited space, Hanging Basket is fixed in Inner climbing tower machine topside, operating personal is had a stable service platform;
B, hydraulic jacking device is installed: the Inner on second support steel beam climbs and Inner installed by frame climbs hydraulic jacking device;
C, the trim of tower machine, be divided into movable arm type tower machine and the trim of hammerhead tower machine, be specially:
The trim mode of movable arm type tower machine: adjustment center-of-gravity position, makes climbing support drop on the position of jacking cylinder with the center of gravity on top, the method for balance-seeking, can realize by regulating the tilt angle of crane arm, this angle can regulate within the scope of 50 ~ 55 degree.Concrete adjustment can carry out according to actual conditions the center-of-gravity position regulating crane arm.Then unclamp the tie bolt of undersetting and tower body, a little jack-up climbing support, the four rolling observed on climbing support does not contact with tower-body standard section substantially, observes tower body joint chord member locating dowel pin simultaneously and does not depart from undersetting pin-and-hole, be ideal position;
The trim mode of hammerhead tower machine: hang a joint standard knot with loading trolley and run to trim reference position in tower machine service instructions, then remove the connection bearing pin of undersetting four legs and standard knot.Hydraulic jacking system joystick is pushed into jacking direction, makes climbing support jacking just depart from the position of the main chord of tower body to undersetting leg.Whether the inspection leg that is connected with standard knot of undersetting and tower body main chord be on a perpendicular line, and whether observe 16 track adjusting wheels on climbing support substantially identical with tower body main chord gap, to check whether tower machine balances, as overbalance, then adjust the trim position of loading trolley, until balance, tower machine upper center of gravity is dropped on the position of jacking cross beam.
D, the jacking of tower machine: 1), by jacking cross beam withstand on hithermost tower body and to mark time lower prong, control hydraulic system, by tower body jack-up 1.4-1.8m, then interior climbing on framework in four is climbed strut and be supported on tower body marks time, in case the degeneration of tower machine, then regain oil cylinder, on jacking cross beam support is marked time at lower a pair, handle oil cylinder upwards jacking 1.4-1.8m, and then prop up another to marking time with strut, go round and begin again like this;
2), when climbing plane on framework in interior four semi-girders of climbing base section exceed, pulling out four semi-girders and then regaining piston rod, climbing on framework in four semi-girders allowing tower crane save are located in;
3), interior lifting body of climbing is removed and installed in last layer and climbs on frame, and the push rod of climbing in mounting and adjusting on framework is in middle frame place, push rod is contacted with tower body chord member, adjustment tower body center requires within 0.0015 horizontal plane degree, climb frame plane by mounting stay in tower body and hold out against going up most in one, then adjust each 8 jacking blocks of lower work framework, tower body is held out against.
4), as continued climb, repeat said process.
E, complete and climb.
The present invention compared with prior art has the following advantages: on tower machine tower body, install an interim hoisting mechanism, without the need to larger Inner climbing tower auger mouth reserved in building, can in limited space vertical handling girder steel; Hanging Basket is fixed in Inner climbing tower machine topside, operating personal is had a stable service platform, without the need to scaffolding.Whole technological process is by original three days time decreased by one day, and efficiency of climbing improves, and meanwhile, the safety of operating personal also obtains failure-free and ensures.
detailed description of the invention:
In order to deepen the understanding of the present invention, below in conjunction with embodiment, the invention will be further described, and this embodiment only for explaining the present invention, does not form limiting the scope of the present invention.
A kind of detailed description of the invention of the method for climbing of high-rise building Inner climbing tower machine of the present invention, comprise the following steps: A, the 3rd road Inner is installed climbs support steel beam and Inner climbs frame: on tower machine tower body, an interim hoisting mechanism is installed, vertical handling support steel beam in limited space, Hanging Basket is fixed in Inner climbing tower machine topside, operating personal is had a stable service platform;
B, hydraulic jacking device is installed: the Inner on second support steel beam climbs and Inner installed by frame climbs hydraulic jacking device;
C, the trim of tower machine, be divided into movable arm type tower machine and the trim of hammerhead tower machine, be specially:
The trim mode of movable arm type tower machine: adjustment center-of-gravity position, makes climbing support drop on the position of jacking cylinder with the center of gravity on top, the method for balance-seeking, can realize by regulating the tilt angle of crane arm, this angle can regulate within the scope of 50 ~ 55 degree.Concrete adjustment can carry out according to actual conditions the center-of-gravity position regulating crane arm.Then unclamp the tie bolt of undersetting and tower body, a little jack-up climbing support, the four rolling observed on climbing support does not contact with tower-body standard section substantially, observes tower body joint chord member locating dowel pin simultaneously and does not depart from undersetting pin-and-hole, be ideal position;
The trim mode of hammerhead tower machine: hang a joint standard knot with loading trolley and run to trim reference position in tower machine service instructions, then remove the connection bearing pin of undersetting four legs and standard knot.Hydraulic jacking system joystick is pushed into jacking direction, makes climbing support jacking just depart from the position of the main chord of tower body to undersetting leg.Whether the inspection leg that is connected with standard knot of undersetting and tower body main chord be on a perpendicular line, and whether observe 16 track adjusting wheels on climbing support substantially identical with tower body main chord gap, to check whether tower machine balances, as overbalance, then adjust the trim position of loading trolley, until balance, tower machine upper center of gravity is dropped on the position of jacking cross beam.
D, the jacking of tower machine: 1), by jacking cross beam withstand on hithermost tower body and to mark time lower prong, control hydraulic system, by tower body jack-up 1.4-1.8m, then interior climbing on framework in four is climbed strut and be supported on tower body marks time, in case the degeneration of tower machine, then regain oil cylinder, on jacking cross beam support is marked time at lower a pair, handle oil cylinder upwards jacking 1.4-1.8m, and then prop up another to marking time with strut, go round and begin again like this;
2), when climbing plane on framework in interior four semi-girders of climbing base section exceed, pulling out four semi-girders and then regaining piston rod, climbing on framework in four semi-girders allowing tower crane save are located in;
3), interior lifting body of climbing is removed and installed in last layer and climbs on frame, and the push rod of climbing in mounting and adjusting on framework is in middle frame place, push rod is contacted with tower body chord member, adjustment tower body center requires within 0.0015 horizontal plane degree, climb frame plane by mounting stay in tower body and hold out against going up most in one, then adjust each 8 jacking blocks of lower work framework, tower body is held out against.
4) climb as continued, repeat said process.
E, complete and climb.
Tower machine tower body installs an interim hoisting mechanism, without the need to larger Inner climbing tower auger mouth reserved in building, can in limited space vertical handling girder steel; Hanging Basket is fixed in Inner climbing tower machine topside, operating personal is had a stable service platform, without the need to scaffolding.Whole technological process is by original three days time decreased by one day, and efficiency of climbing improves, and meanwhile, the safety of operating personal also obtains failure-free and ensures.
Claims (1)
1. a method of climbing for high-rise building internally climbing tower crane, is characterized in that: comprise the following steps:
A, install the 3rd road support steel beam and in climb frame: on tower machine tower body install an interim hoisting mechanism, vertical handling support steel beam in limited space, Hanging Basket is fixed in internally climbing tower crane topside, operating personal is had a stable service platform;
B, installation hydraulic jacking device: climb on second support steel beam on frame and climb hydraulic jacking device in installation;
C, the trim of tower machine, be divided into movable arm type tower machine and the trim of hammerhead tower machine, be specially:
The trim mode of movable arm type tower machine: adjustment center-of-gravity position, climbing support is made to drop on the position of hydraulic jacking device with the center of gravity on top, the method of balance-seeking, can realize by regulating the tilt angle of crane arm, this angle can regulate within the scope of 50 ~ 55 degree, concrete adjustment can carry out according to actual conditions the center-of-gravity position regulating crane arm, then the tie bolt of undersetting and tower body is unclamped, jack-up climbing support a little, the four rolling observed on climbing support does not contact with tower-body standard section substantially, observe tower body joint chord member locating dowel pin simultaneously and do not depart from undersetting pin-and-hole, be ideal position,
The trim mode of hammerhead tower machine: hang a joint standard knot with loading trolley and run to trim reference position in tower machine service instructions, then the connection bearing pin of undersetting four legs and standard knot is removed, hydraulic jacking device joystick is pushed into jacking direction, climbing support jacking is made just to have departed from the position of the main chord of tower body to undersetting leg, whether the inspection leg that is connected with standard knot of undersetting and tower body main chord be on a perpendicular line, and whether observe 16 track adjusting wheels on climbing support substantially identical with tower body main chord gap, to check whether tower machine balances, as overbalance, then adjust the trim position of loading trolley, until balance, tower machine upper center of gravity is made to drop on the position of jacking cross beam,
D, the jacking of tower machine: 1), by jacking cross beam withstand on hithermost tower body and to mark time lower prong, operating hydraulically operated jacking apparatus, by tower body jack-up 1.4-1.8m, then being supported on tower body marks time by climbing strut in interior four of climbing on frame, in case the degeneration of tower machine, then regaining oil cylinder, on jacking cross beam support is marked time at lower a pair, handle oil cylinder upwards jacking 1.4-1.8m, and then prop up another to marking time with strut, go round and begin again like this;
2), when climbing plane on frame in interior four semi-girders of climbing base section exceed, pulling out four semi-girders and then regaining piston rod, climbing on frame in four semi-girders allowing tower crane save are located in;
3), hydraulic jacking device is removed and installed in last layer climb on frame, and the push rod of climbing in mounting and adjusting on frame is in middle frame place, push rod is contacted with tower body chord member, adjustment tower body center, horizontal plane degree is required within 0.0015, climb frame plane by mounting stay in tower body and hold out against going up most in one, then climb each 8 jacking blocks of frame in adjustment up and down, tower body is held out against;
4) climb as continued, repeat said process;
E, complete and climb.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410147130.8A CN103922231B (en) | 2014-04-14 | 2014-04-14 | The method of climbing of high-rise building Inner climbing tower machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410147130.8A CN103922231B (en) | 2014-04-14 | 2014-04-14 | The method of climbing of high-rise building Inner climbing tower machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103922231A CN103922231A (en) | 2014-07-16 |
CN103922231B true CN103922231B (en) | 2016-04-20 |
Family
ID=51140671
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410147130.8A Active CN103922231B (en) | 2014-04-14 | 2014-04-14 | The method of climbing of high-rise building Inner climbing tower machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103922231B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652813A (en) * | 2015-01-30 | 2015-05-27 | 上海绿地建设(集团)有限公司 | Tower crane construction technology used for super high-rise building steel structure |
CN110589690B (en) * | 2019-08-06 | 2021-03-26 | 上海宝冶集团有限公司 | Climbing method of internal climbing tower crane in narrow space |
CN111039197B (en) * | 2019-12-30 | 2021-04-23 | 广州市第三建筑工程有限公司 | Construction method for reverse-order joint addition of jacking of internal-climbing tower crane |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201501750U (en) * | 2009-09-18 | 2010-06-09 | 中国建筑第四工程局有限公司 | Climbing mechanism of self-climbing type tower machine |
CN202000658U (en) * | 2011-01-30 | 2011-10-05 | 中建三局建设工程股份有限公司 | Hydraulic climbing system for wall-attached support frame |
JP5294104B2 (en) * | 2008-03-13 | 2013-09-18 | 清水建設株式会社 | Tower crane support structure |
CN203295079U (en) * | 2013-04-26 | 2013-11-20 | 中昇建机(南京)重工有限公司 | External mounting type inner climbing support device of tower crane for super high-rise building |
CN103420274A (en) * | 2012-05-18 | 2013-12-04 | 李宜君 | Tower crane with liftable climbing cage structure |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009286531A (en) * | 2008-05-27 | 2009-12-10 | Arai Gumi Ltd | Dismantling method of tower crane |
-
2014
- 2014-04-14 CN CN201410147130.8A patent/CN103922231B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5294104B2 (en) * | 2008-03-13 | 2013-09-18 | 清水建設株式会社 | Tower crane support structure |
CN201501750U (en) * | 2009-09-18 | 2010-06-09 | 中国建筑第四工程局有限公司 | Climbing mechanism of self-climbing type tower machine |
CN202000658U (en) * | 2011-01-30 | 2011-10-05 | 中建三局建设工程股份有限公司 | Hydraulic climbing system for wall-attached support frame |
CN103420274A (en) * | 2012-05-18 | 2013-12-04 | 李宜君 | Tower crane with liftable climbing cage structure |
CN203295079U (en) * | 2013-04-26 | 2013-11-20 | 中昇建机(南京)重工有限公司 | External mounting type inner climbing support device of tower crane for super high-rise building |
Also Published As
Publication number | Publication date |
---|---|
CN103922231A (en) | 2014-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102071798B (en) | Hydraulic climbing system for wall-attached support frame | |
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN100365237C (en) | Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof | |
CN203820379U (en) | Fine adjusting and anti-falling device of aerial working platform | |
CN103758341A (en) | Steel column drum rack support type hydraulic lifting overall steel platform cross truss layer construction method | |
CN109113320A (en) | Construction operation method in a kind of elevator | |
CN105317205B (en) | The construction method and equipment therefor of a kind of elevator | |
CN103922231B (en) | The method of climbing of high-rise building Inner climbing tower machine | |
CN204781927U (en) | Elevartor shaft formwork and elevartor shaft concrete placement operation platform | |
CN202000658U (en) | Hydraulic climbing system for wall-attached support frame | |
CN205348727U (en) | A promote formula operation platform for in shaft | |
CN104989111B (en) | Steel construction high level construction method for hanging | |
CN202324574U (en) | Lifting scaffold with simple and convenient operations | |
CN110565937A (en) | Door type integral lifting steel platform | |
CN106012824A (en) | Movable bridge anti-collision guardrail construction operation trolley | |
CN106522541B (en) | A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system | |
CN205857026U (en) | A kind of movable type bridge anticollision barrier construction operation chassis | |
CN211447720U (en) | Climbing type elevator shaft construction operation platform | |
CN104499706A (en) | Elevator well template platform and construction method thereof | |
CN106351441A (en) | Chimney creeping formwork construction device and construction method | |
WO2023070257A1 (en) | Intelligent hoisting robot | |
CN216129981U (en) | Integrated integral multifunctional construction platform for pier and towering structure | |
CN104847108A (en) | Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure | |
JP5356091B2 (en) | Crane girder exchanging method and crane girder exchanging apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |