CN209339010U - Walking bridge floor faces side barrel structure - Google Patents
Walking bridge floor faces side barrel structure Download PDFInfo
- Publication number
- CN209339010U CN209339010U CN201821886940.5U CN201821886940U CN209339010U CN 209339010 U CN209339010 U CN 209339010U CN 201821886940 U CN201821886940 U CN 201821886940U CN 209339010 U CN209339010 U CN 209339010U
- Authority
- CN
- China
- Prior art keywords
- bridge
- walking
- walking dolly
- poured
- bridge floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of walking bridge floor and faces side barrel structure, comprising: walking dolly, the walking dolly is placed on the bridge floor for having poured bridge, and the Extension support of walking dolly side installation stretches out in this and has poured bridge lateral outer, balance tripod is installed between the walking dolly upper end and Extension support, the walking dolly other side is provided with clump weight, and safety structure is equipped between walking dolly bottom and the bridge floor for having poured bridge;Hanging basket, it includes being installed on the vertical hanger of the Extension support end and state in a vertical shape and being installed on vertical hanger lower end and have the bottom basket of standing room, the bottom basket is in a horizontal state to be positioned at and pour below bridge, and bottom basket is located at the lower section of walking dolly, which is equipped with ladder.The utility model overall structure is stablized, and bottom basket is in a horizontal state to be positioned at and pour below bridge, constructs extremely convenient, safe and reliable, and walked using walking dolly, achievees the purpose that the installation and movement that facilitate tubular arch sunpender bridge lower end surface.
Description
Technical field:
The utility model relates to technical field of buildings, refers in particular to a kind of walking bridge floor and face side barrel structure.
Background technique:
Hanging basket is the building machinery of architectural engineering high altitude operation, acts on curtain wall installation, outside Wall Cleaning.Hanging basket is a kind of energy
It is enough to substitute traditional scaffold, it can reduce labor intensity, improve working efficiency, and the novel high-rise working that can be reused is set
It is standby.The use of building hanging basket has been increasingly becoming a kind of trend, external wall construction, curtain wall installation, guarantor in high layer multi-layer high building
Temperature construction and maintenance cleaning exterior wall etc., which are higher by operation, to be widely recognized, while can be used for large tank, bridge and dam etc.
The operation of engineering.
CFST Arch Bridge belongs to one of steel-concrete combined structure.CFST Arch Bridge is will be in steel pipe
Fill concrete, due to steel pipe radial constraint and limit the expansion of compression concrete, so that concrete is in three dimension stress state,
To significantly improve the compression strength of concrete.Tubular arch has the effect of lengthways main steel bar and lateral cuff concurrently simultaneously, while can make
For construction formwork, facilitating concreting, in work progress, tubular arch can be used as stiffness load-bearing skeleton, and welding is simple,
Lift it is light-weight, so as to simplify construction technology, shorten the construction period.
Existing steel pipe arch bridge often uses installation method, mainly has sleeping vertical transfer method of spelling to construct and construction with brackets in situ, is applying
Installation sunpender is required to during work, and tubular arch span is big (up to 180m or more than 180m), cross a river span is big, under sunpender bridge
Face that side is difficult to install, in order to facilitate the installation and movement of tubular arch sunpender bridge lower end surface, generallys use truck crane and mention small hanging basket
Operation on the outside, carrying out operation using automobile not only will increase cost, but also be easy to shake, and constructs dangerous, grasps for irregularity
Make, especially in strong wind, constructs extremely dangerous.
In view of this, the present inventor proposes following technical scheme.
Utility model content:
The purpose of the utility model is to overcome the deficiencies in the prior art, a kind of walking bridge floor is provided and faces side hanging basket knot
Structure.
In order to solve the above-mentioned technical problem, the utility model uses following technical proposals: the walking bridge floor faces side and hangs
Basket structure includes: walking dolly, which is placed on the bridge floor for having poured bridge, and the extension of walking dolly side installation
Frame stretches out in this and has poured bridge lateral outer, is equipped with balance tripod between the walking dolly upper end and Extension support, the walking
The trolley other side is provided with clump weight, and is provided with safety structure between the walking dolly bottom and the bridge floor for having poured bridge;It hangs
Basket comprising be installed on the vertical hanger of the Extension support end and state in a vertical shape and be installed on vertical hanger lower end and have
There is the bottom basket of standing room, which is in a horizontal state to be positioned at and pour below bridge, and the bottom basket is located under walking dolly
It is square, ladder is provided on the vertical hanger.
Furthermore, in above-mentioned technical proposal, the walking dolly upper end is provided with fence, and the clump weight is set to
In the fence.
Furthermore, in above-mentioned technical proposal, the balance tripod includes the column being installed on the walking dolly
And after being connected to the front tension bar of the upper end of the column and Extension support end and being connected to the upper end of the column and the walking dolly other side
Pull rod.
Furthermore, in above-mentioned technical proposal, reinforcing rib is also equipped between the vertical hanger and bottom basket.
Furthermore, in above-mentioned technical proposal, the bottom basket include be installed on vertical hanger lower end chassis and
The bamboo slab rubber being layed on the chassis and the guardrail for being installed on the chassis periphery upper end.
Furthermore, in above-mentioned technical proposal, the walking dolly includes walking dolly main body and is installed on row
The first wheel carrier and the second wheel carrier of trolley lower body are walked, first wheel carrier and the second wheel carrier lower end are separately installed with the first wheel
With the second wheel, first wheel and the second wheel are placed in described poured on the bridge floor of bridge.
Furthermore, in above-mentioned technical proposal, the safety structure includes wirerope or chain block, the wirerope or
Chain block is connected between the walking dolly bottom and the bridge floor for having poured bridge.
Furthermore, in above-mentioned technical proposal, described poured has poured the first straight wall on bridge, the wirerope or hand
Cucurbit is drawn to be connected between the walking dolly bottom and the first straight wall.
Furthermore, in above-mentioned technical proposal, described poured has poured the second straight wall and protecting wall on bridge, and described
One straight wall is formed between second straight wall and protecting wall and walks for the walking dolly between the second straight wall and protecting wall
Space.
After adopting the above technical scheme, the utility model have the following beneficial effects: compared with prior art it is practical
Novel overall structure is stablized, and bottom basket is in a horizontal state to be positioned at and pour below bridge, constructs extremely convenient, safe and reliable, and
The utility model uses walking dolly, to be moved to the position for needing to construct, to use very in the bridge floor walking for having poured bridge
It is convenient, and the utility model is also using balance tripod and clump weight control overall structure balance, and walking dolly bottom with
Poured and be provided with safety structure between the bridge floor of bridge, with this guarantee walking dolly do not need with for walking when stable position in
It has poured on the bridge floor of bridge, greatly strengthening safety and the external force such as Anti-Typhoon influences, and is further ensured that the safety of construction, reaches
To the purpose for the installation and movement for facilitating tubular arch sunpender bridge lower end surface, enable the utility model that there is extremely strong market competition
Power.
Detailed description of the invention:
Fig. 1 is the utility model and the installation diagram for having poured bridge.
Specific embodiment:
The present invention will be further described with attached drawing combined with specific embodiments below.
As shown in Figure 1, face side barrel structure for a kind of walking bridge floor comprising: walking dolly 1, the walking dolly 1 are set
In on the bridge floor for having poured bridge 100, and the Extension support 2 of 1 side of walking dolly installation stretches out in this and has poured outside 100 side of bridge
Portion is equipped with balance tripod 3 between 1 upper end of walking dolly and Extension support 2, which is provided with counterweight
Block 4, and safety structure 5 is provided between 1 bottom of walking dolly and the bridge floor for having poured bridge 100;Hanging basket 6 comprising installation
In 2 end of Extension support and the vertical hanger 61 of state in a vertical shape and be installed on vertical 61 lower end of hanger and having stand it is empty
Between bottom basket 62, which, which is in a horizontal state to be positioned at, has poured the lower section of bridge 100, and the bottom basket 62 is located at walking dolly 1
Lower section is provided with ladder on the vertical hanger 61, for safety, vertical 61 periphery of hanger is provided with annular guardrail, the ring
Shape guardrail is placed in ladder periphery.The utility model overall structure is stablized, and bottom basket 62 is in a horizontal state to be positioned at and has poured bridge
100 lower sections, construct extremely convenient, safe and reliable, and the utility model uses walking dolly 1 in the bridge floor row for having poured bridge 100
It walks to be moved to the position for needing to construct, it is very convenient to use, and the utility model is also using balance tripod 3 and counterweight
Block 4 controls overall structure balance, and is provided with safety structure 5 between 1 bottom of walking dolly and the bridge floor for having poured bridge 100,
Guarantee that the stable position when not needing with to walk of walking dolly 1 greatly strengthens peace on the bridge floor for having poured bridge 100 with this
Full property and the external force such as Anti-Typhoon influence, and are further ensured that the safety of construction, the utility model is enabled to have extremely strong market competition
Power.
1 upper end of walking dolly is provided with fence 11, and the clump weight 4 is set in the fence 11, prevents from matching with this
Pouring weight 4 undesirably falls off walking dolly, guarantees construction safety.
The balance tripod 3 include the column 31 that is installed on the walking dolly 1 and be connected to 31 upper end of column with
The front tension bar 32 of 2 end of Extension support and the back stay 33 for being connected to 31 upper end of column Yu 1 other side of walking dolly, the back stay
33 lower ends are located at 4 side of clump weight, and Extension support 2 can effectively be fixed together by this balance tripod 3 with walking dolly, guarantee
The stability of structure.
It is also equipped with reinforcing rib 63 between the vertical hanger 61 and bottom basket 62, guarantees the stabilization of entire barrel structure with this
Property.The bottom basket 62 includes the bamboo slab rubber for being installed on the chassis 621 of vertical 61 lower end of hanger and being layed on the chassis 621
622 and it is installed on the guardrail 623 of the peripheral upper end of the chassis 621, the station is formed between the guardrail 623 and bamboo slab rubber 622
Vertical space, the standing room are stood for construction personnel.
The walking dolly 1 includes walking dolly main body 12 and the first round for being installed on 12 lower end of walking dolly main body
Frame 13 and the second wheel carrier 14, first wheel carrier 13 and 14 lower end of the second wheel carrier are separately installed with the first wheel 131 and the second wheel
141, first wheel 131 and the second wheel 141 are placed in described poured on the bridge floor of bridge 100.
The safety structure 5 includes wirerope or chain block, and it is small that the wirerope or chain block are connected to the walking
Between 1 bottom of vehicle and the bridge floor for having poured bridge 100, the wirerope or chain block pass through drag hook and have poured the bridge of bridge 100
The pull ring being arranged on face is caught on, and tenses positioning.
Described poured has poured the first straight wall 101 on bridge 100, the wirerope or chain block are connected to the walking
Between 1 bottom of trolley and the first straight wall 101, pull ring is set on the first straight wall 101.
Described poured has poured the second straight wall 102 and protecting wall 103 on bridge 100, first straight wall 101 is located at second
Between straight wall 102 and protecting wall 103, it is formed between second straight wall 102 and protecting wall 103 and walks for the walking dolly 1
Space.
In conclusion the utility model overall structure is stablized, and bottom basket 62 is in a horizontal state to be positioned at and pour under bridge 100
Side constructs extremely convenient, safe and reliable, and the utility model uses walking dolly 1 to walk in the bridge floor for having poured bridge 100 to move
The position for needing to construct is moved, it is very convenient to use, and the utility model is also controlled using balance tripod 3 and clump weight 4
Overall structure balance processed, and it is provided with safety structure 5 between 1 bottom of walking dolly and the bridge floor for having poured bridge 100, it is protected with this
Card walking dolly 1 do not need with for walking when stable position on the bridge floor for having poured bridge 100, greatly strengthen safety with
The external force such as Anti-Typhoon influence, and are further ensured that the safety of construction, reach the installation for facilitating tubular arch sunpender bridge lower end surface and
Mobile purpose enables the utility model have the extremely strong market competitiveness.
It certainly, is not to limit the utility model and implement the foregoing is merely specific embodiment of the utility model
Range, all equivalent change or modifications done according to structure, feature and principle described in present utility model application the scope of the patents, should all wrap
It includes in present utility model application the scope of the patents.
Claims (9)
1. walking bridge floor faces side barrel structure, it is characterised in that: comprising:
Walking dolly (1), the walking dolly (1) are placed on the bridge floor for having poured bridge (100), and walking dolly (1) side is pacified
The Extension support (2) of dress stretches out in this and has poured bridge (100) lateral outer, pacifies between walking dolly (1) upper end and Extension support (2)
Equipped with balance tripod (3), which is provided with clump weight (4), and walking dolly (1) bottom with
It pours and is provided with safety structure (5) between the bridge floor of bridge (100);
Hanging basket (6) comprising be installed on the vertical hanger (61) of the Extension support (2) end and state in a vertical shape and be installed on
Vertical hanger (61) lower end and the bottom basket (62) with standing room, which, which is in a horizontal state to be positioned at, has poured bridge
(100) lower section, and the bottom basket (62) is located at the lower section of walking dolly (1), is provided with ladder on the vertical hanger (61).
2. walking bridge floor according to claim 1 faces side barrel structure, it is characterised in that: on the walking dolly (1)
End is provided with fence (11), and the clump weight (4) is set in the fence (11).
3. walking bridge floor according to claim 1 faces side barrel structure, it is characterised in that: the balance tripod (3)
Including the column (31) being installed on the walking dolly (1) and before being connected to column (31) upper end and Extension support (2) end
Pull rod (32) and the back stay (33) for being connected to column (31) upper end Yu walking dolly (1) other side.
4. walking bridge floor according to claim 1 faces side barrel structure, it is characterised in that: the vertical hanger (61) with
Reinforcing rib (63) are also equipped between bottom basket (62).
5. walking bridge floor according to claim 1 faces side barrel structure, it is characterised in that: the bottom basket (62) includes
It is installed on the chassis (621) of vertical hanger (61) lower end and the bamboo slab rubber (622) that is layed on the chassis (621) and is installed on
The guardrail (623) of the chassis (621) periphery upper end.
6. walking bridge floor described in -5 any one faces side barrel structure according to claim 1, it is characterised in that: the walking
Trolley (1) includes walking dolly main body (12) and the first wheel carrier (13) for being installed on walking dolly main body (12) lower end and
Two wheel carriers (14), first wheel carrier (13) and the second wheel carrier (14) lower end are separately installed with the first wheel (131) and the second wheel
(141), first wheel (131) and the second wheel (141) are placed in described poured on the bridge floor of bridge (100).
7. walking bridge floor described in -5 any one faces side barrel structure according to claim 1, it is characterised in that: the insurance
Structure (5) includes wirerope or chain block, and the wirerope or chain block are connected to the walking dolly (1) bottom and have poured
Between the bridge floor of bridge (100).
8. walking bridge floor according to claim 7 faces side barrel structure, it is characterised in that: described to have poured bridge (100)
On poured the first straight wall (101), the wirerope or chain block are connected to the walking dolly (1) bottom and the first straight wall
(101) between.
9. walking bridge floor according to claim 8 faces side barrel structure, it is characterised in that: described to have poured bridge (100)
On poured the second straight wall (102) and protecting wall (103), first straight wall (101) is located at the second straight wall (102) and protecting wall
(103) between, the space for the walking dolly (1) walking is formed between second straight wall (102) and protecting wall (103).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821886940.5U CN209339010U (en) | 2018-11-15 | 2018-11-15 | Walking bridge floor faces side barrel structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821886940.5U CN209339010U (en) | 2018-11-15 | 2018-11-15 | Walking bridge floor faces side barrel structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209339010U true CN209339010U (en) | 2019-09-03 |
Family
ID=67747550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821886940.5U Active CN209339010U (en) | 2018-11-15 | 2018-11-15 | Walking bridge floor faces side barrel structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209339010U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847031A (en) * | 2019-11-28 | 2020-02-28 | 北京市政路桥股份有限公司 | Movable hanging basket for bridge construction |
-
2018
- 2018-11-15 CN CN201821886940.5U patent/CN209339010U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847031A (en) * | 2019-11-28 | 2020-02-28 | 北京市政路桥股份有限公司 | Movable hanging basket for bridge construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102661054B (en) | Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN106400951B (en) | A kind of level and vertical structure method for synchronously constructing of super high-rise building | |
CN104310165A (en) | Guide rail type adhesion construction lifter and construction method thereof | |
CN102661019B (en) | Heat preservation and decoration integrated construction method for outer wall of building | |
CN102912996B (en) | Steel tube concrete column high-altitude construction safety protection system | |
CN101503908B (en) | Construction method for spacing suspension cable structural template support platform | |
CN102877637A (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
CN102251483A (en) | Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane | |
CN103485574B (en) | A kind of granulation tower tower top structure of reinforced concrete method | |
CN107419746A (en) | A kind of mobile formwork system and its construction method | |
CN102733608B (en) | Construction method for spray head layer of granulation tower | |
CN209339010U (en) | Walking bridge floor faces side barrel structure | |
CN107575032A (en) | A kind of bolt-ball net frame roofing installation method | |
CN107386119A (en) | A kind of variable cross-section beam sections type variable framework of steel reinforcement construction moulding bed device | |
CN202483154U (en) | High bearing capacity suspending scaffold | |
CN202689496U (en) | Moving platform for steel pipe concrete post concrete casing | |
CN205857026U (en) | A kind of movable type bridge anticollision barrier construction operation chassis | |
CN111705677A (en) | A smooth frame that rises for high pier stud turns over mould construction | |
CN201972095U (en) | Chain block lifting platform for thin-walled hollow piers of bridges | |
CN106639303A (en) | Hydraulic climbing formwork frame special for lift | |
CN203755173U (en) | Formwork device used for hydraulic climbing of bridge high pier | |
CN206158146U (en) | Novel building section of thick bamboo well construction operation platform | |
CN205894715U (en) | Light steel structure is semi -automatic under enclosed construction constructs from hoisting machine that climbs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |