CN215878256U - Garbage crushing device for building construction - Google Patents

Garbage crushing device for building construction Download PDF

Info

Publication number
CN215878256U
CN215878256U CN202121340439.0U CN202121340439U CN215878256U CN 215878256 U CN215878256 U CN 215878256U CN 202121340439 U CN202121340439 U CN 202121340439U CN 215878256 U CN215878256 U CN 215878256U
Authority
CN
China
Prior art keywords
stock
fixed mounting
install bin
crushing
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121340439.0U
Other languages
Chinese (zh)
Inventor
黄启伟
许春红
王超
温绍方
朱大列
杨志平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Weiyu Construction Engineering Group Co ltd
Original Assignee
Yunnan Weiyu Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Weiyu Construction Engineering Group Co ltd filed Critical Yunnan Weiyu Construction Engineering Group Co ltd
Priority to CN202121340439.0U priority Critical patent/CN215878256U/en
Application granted granted Critical
Publication of CN215878256U publication Critical patent/CN215878256U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Crushing And Pulverization Processes (AREA)

Abstract

The utility model relates to the technical field of building construction, and discloses a garbage crushing device for building construction, which comprises an installation box, wherein a feed hopper with one end extending to the inside is fixedly installed at the top of the installation box, a fixed plate is fixedly installed between the left side and the right side of the inner wall of the installation box, and a blanking collection frame positioned below the fixed plate is placed on the inner bottom wall of the installation box. This rubbish reducing mechanism for construction, through starting driving motor, driving motor's output shaft drives the dwang and rotates, the dwang drives the carousel and rotates, start the telescopic link simultaneously, make two crushing boards with smash piece intermeshing or keep away from each other, thereby carry out the primary crushing to construction waste, the dwang passes through belt drive with the stock and is connected, thereby drive two crushing gear relative rotations, thereby carry out the regrinding to construction waste, kibbling more thoroughly, the waste of manpower and materials has been reduced, crushing efficiency has been improved.

Description

Garbage crushing device for building construction
Technical Field
The utility model relates to the technical field of building construction, in particular to a garbage crushing device for building construction.
Background
The construction work is a work performed by people to construct various kinds of construction products in a certain space and time according to a specific design blueprint using various construction materials and mechanical equipment, and includes all production processes from construction preparation, earth breaking work to completion acceptance.
Need handle building rubbish at the in-process of construction, need smash building rubbish when handling, but some building rubbish kibbling thoroughly inadequately, need carry out the regrinding, efficiency is lower, has caused the waste of great manpower and materials, so has proposed a rubbish reducing mechanism for construction for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a garbage crushing device for building construction, which has the advantages of more thorough crushing, high crushing efficiency and the like, and solves the problems that the building garbage needs to be crushed during treatment, but the crushing of some building garbage is not thorough enough, secondary crushing is needed, the efficiency is low, and the waste of manpower and material resources is great.
(II) technical scheme
In order to achieve the purposes of more thorough crushing and high crushing efficiency, the utility model provides the following technical scheme: a garbage crushing device for building construction comprises an installation box, wherein a feed hopper with one end extending to the inside is fixedly installed at the top of the installation box, a fixed plate is fixedly installed between the left side and the right side of the inner wall of the installation box, a blanking collecting frame positioned below the fixed plate is placed on the inner bottom wall of the installation box, a crushing block positioned above the fixed plate is fixedly installed between the front side and the rear side of the inner wall of the installation box, telescopic rods positioned at the left side and the right side of the crushing block are fixedly installed at the left side and the right side of the inner wall of the installation box, blanking plates positioned between the telescopic rods and the fixed plate are fixedly installed at the left side and the right side of the inner wall of the installation box, a mounting plate is fixedly installed at the rear side of the inner wall of the installation box, driving motors are fixedly installed at the left side and the right side of the bottom of the mounting plate, rotating rods with one ends extending to the inside of the installation box are fixedly installed at the output shafts of the two driving motors, two the equal fixed mounting in front of dwang has the carousel, two the equal fixed mounting in front of carousel has the installation piece, two the output of telescopic link all rotates the crushing sheet that is connected with one end and the outside swing joint of installation piece, the inner wall front side of install bin rotates and is connected with quantity for two and the stock that one end all extends to its rear side, the stock is located between blanking plate and the fixed plate, two the equal fixed mounting in outside of stock has the crushing gear that is located the inside and intermeshing of install bin, left side between dwang and the left side stock and between right side dwang and the right side stock equal transmission be connected with the belt that is located between install bin and the driving motor.
Preferably, the crushing plate is internally provided with a moving hole matched with the motion track of the mounting block, and the inner side wall of the moving hole is designed to be smooth.
Preferably, the front side of the inner wall of the installation box is hinged with a box door, and the size of the box door is matched with that of the blanking collection frame.
Preferably, a blanking hole is formed in the fixing plate, and the diameter of the blanking hole is larger than the distance between the two long rods.
Preferably, the through-hole with stock looks adaptation is opened to the inner wall rear side of install bin, the downthehole lateral wall fixed mounting of through-hole has the bearing, the bearing rotates with the stock to be connected.
Preferably, the bottom of the installation box is fixedly provided with a stable cushion block, and the bottom of the stable cushion block is fixedly provided with an anti-skid gasket.
(III) advantageous effects
Compared with the prior art, the utility model provides a garbage crushing device for building construction, which has the following beneficial effects:
this rubbish reducing mechanism for construction, through starting driving motor, driving motor's output shaft drives the dwang and rotates, the dwang drives the carousel and rotates, start the telescopic link simultaneously, make two crushing boards with smash piece intermeshing or keep away from each other, thereby carry out the primary crushing to construction rubbish, the dwang passes through belt drive with the stock and is connected, thereby drive two crushing gear relative rotations, thereby carry out the regrinding to construction rubbish, kibbling more thoroughly, crushing efficiency has been improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side cross-sectional view of the present invention.
In the figure: 1 install bin, 2 fixed plates, 3 blanking plates, 4 telescopic rods, 5 turntables, 6 feed hoppers, 7 crushing blocks, 8 installing blocks, 9 crushing plates, 10 long rods, 11 crushing gears, 12 blanking collecting frames, 13 rotating rods, 14 installing plates, 15 driving motors and 16 belts.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a garbage crushing device for building construction comprises an installation box 1, a feed hopper 6 with one end extending into the installation box 1 is fixedly installed at the top of the installation box 1, a stabilizing cushion block is fixedly installed at the bottom of the installation box 1, an anti-skid gasket is fixedly installed at the bottom of the stabilizing cushion block, a fixed plate 2 is fixedly installed between the left side and the right side of the inner wall of the installation box 1, a blanking collecting frame 12 positioned below the fixed plate 2 is placed on the inner bottom wall of the installation box 1, a box door is hinged to the front side of the inner wall of the installation box 1, the size of the box door is matched with the size of the blanking collecting frame 12, a crushing block 7 positioned above the fixed plate 2 is fixedly installed between the front side and the rear side of the inner wall of the installation box 1, telescopic rods 4 positioned at the left side and the right side of the inner wall of the installation box 1 are fixedly installed at the left side and the right side of the inner wall of the installation box 1, blanking plates 3 positioned between the telescopic rods 4 and the fixed plate 2 are fixedly installed at the left side and the left side of the inner wall of the installation box 1, the rear side of the inner wall of the installation box 1 is fixedly provided with an installation plate 14, the left side and the right side of the bottom of the installation plate 14 are both fixedly provided with a driving motor 15, by starting the driving motor 15, the output shaft of the driving motor 15 drives a rotating rod 13 to rotate, the rotating rod 13 drives a rotating disc 5 to rotate, and simultaneously, a telescopic rod 4 is started, so that two crushing plates 9 and crushing blocks 7 are meshed with each other or separated from each other, thereby performing primary crushing on construction waste, the output shafts of the two driving motors 15 are both fixedly provided with a rotating rod 13, one end of which extends into the installation box 1, the front sides of the two rotating rods 13 are both fixedly provided with rotating discs 5, the front sides of the two rotating discs 5 are both fixedly provided with installation blocks 8, the output ends of the two telescopic rods 4 are both rotatably connected with the crushing plates 9, one end of which is movably connected with the outer part of the installation blocks 8, the inner part of the crushing plates 9 is provided with a moving hole matched with the moving track of the installation blocks 8, the downthehole lateral wall that removes the hole is smooth design, install bin 1's inner wall front side rotation is connected with quantity and all extends to the stock 10 of its rear side for two and one end, the blanking hole has been seted up to fixed plate 2's inside, the diameter in blanking hole is greater than the distance between two stock 10, install bin 1's inner wall rear side is opened and is equipped with the through-hole with stock 10 looks adaptation, the downthehole lateral wall fixed mounting of through-hole has the bearing, the bearing rotates with stock 10 to be connected, stock 10 is located between blanking plate 3 and fixed plate 2, dwang 13 passes through belt 16 transmission with stock 10 and is connected, thereby drive two crushing gear 11 relative rotations, thereby carry out the regrinding to construction rubbish, kibbling is more thorough, crushing efficiency has been improved, the equal fixed mounting in outside of two stock 10 has the crushing gear 11 that is located install bin 1 inside and intermeshing, equal transmission is connected with between left side dwang 13 and the left side stock 10 and is located install bin 1 and drive stock 10 A belt 16 between the motors 15.
To sum up, this rubbish reducing mechanism for construction, through starting driving motor 15, driving motor 15's output shaft drives dwang 13 and rotates, dwang 13 drives carousel 5 and rotates, start telescopic link 4 simultaneously, make two smash board 9 and smash 7 intermeshing or keep away from each other, thereby carry out the primary crushing to construction rubbish, dwang 13 passes through the belt 16 transmission with stock 10 and is connected, thereby drive two crushing gear 11 and rotate relatively, thereby carry out the regrinding to construction rubbish, kibbling more thoroughly, crushing efficiency has been improved, it needs to smash construction rubbish when handling to have solved, some kibbling not thorough inadequately of construction rubbish, need carry out the regrinding, efficiency is lower, the problem of the waste of great manpower and materials has been caused.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a rubbish reducing mechanism for construction, includes install bin (1), its characterized in that: the top fixed mounting of install bin (1) has one end to extend to its inside feeder hopper (6), fixed mounting has fixed plate (2) between the inner wall left and right sides of install bin (1), the blanking collection frame (12) that is located fixed plate (2) below has been placed to the inner diapire of install bin (1), fixed mounting has the crushing piece (7) that is located fixed plate (2) top between the inner wall front and back both sides of install bin (1), the equal fixed mounting in inner wall left and right sides of install bin (1) has telescopic link (4) that is located crushing piece (7) left and right sides, the equal fixed mounting in inner wall left and right sides of install bin (1) has blanking plate (3) that is located between telescopic link (4) and fixed plate (2), the inner wall rear side fixed mounting of install bin (1) has mounting panel (14), the equal fixed mounting in the bottom left and right sides of mounting panel (14) has driving motor (15), two the equal fixed mounting of output shaft of driving motor (15) has one end to extend to inside dwang (13), two of install bin (1) the equal fixed mounting in front side of dwang (13) has carousel (5), two the equal fixed mounting in front side of carousel (5) has installation piece (8), two the output of telescopic link (4) is all rotated and is connected with one end and the outside swing joint's of installation piece (8) crushing board (9), the inner wall front side of install bin (1) is rotated and is connected with stock (10) that quantity is two and one end all extends to its rear side, stock (10) are located between blanking board (3) and fixed plate (2), two the equal fixed mounting in outside of stock (10) has the crushing gear (11) that are located install bin (1) inside and intermeshing, and left side equal transmission is connected with between dwang (13) and the right side stock (10) and is located between stock (13) and the right side stock (10) between dwang (13) and the left side stock (10) A belt (16) between the installation box (1) and the driving motor (15).
2. The construction waste crushing apparatus according to claim 1, wherein: the crushing plate (9) is internally provided with a moving hole matched with the motion track of the mounting block (8), and the inner side wall of the moving hole is designed to be smooth.
3. The construction waste crushing apparatus according to claim 1, wherein: the front side of the inner wall of the installation box (1) is hinged with a box door, and the size of the box door is matched with that of the blanking collection frame (12).
4. The construction waste crushing apparatus according to claim 1, wherein: the inside of fixed plate (2) is seted up the blanking hole, the diameter in blanking hole is greater than the distance between two stock (10).
5. The construction waste crushing apparatus according to claim 1, wherein: the inner wall rear side of install bin (1) is opened and is equipped with the through-hole with stock (10) looks adaptation, the downthehole lateral wall fixed mounting of through-hole has the bearing, the bearing rotates with stock (10) to be connected.
6. The construction waste crushing apparatus according to claim 1, wherein: the bottom fixed mounting of install bin (1) has the stabilization cushion, the bottom fixed mounting of stabilizing the cushion has anti-skidding gasket.
CN202121340439.0U 2021-06-17 2021-06-17 Garbage crushing device for building construction Expired - Fee Related CN215878256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121340439.0U CN215878256U (en) 2021-06-17 2021-06-17 Garbage crushing device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121340439.0U CN215878256U (en) 2021-06-17 2021-06-17 Garbage crushing device for building construction

Publications (1)

Publication Number Publication Date
CN215878256U true CN215878256U (en) 2022-02-22

Family

ID=80346415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121340439.0U Expired - Fee Related CN215878256U (en) 2021-06-17 2021-06-17 Garbage crushing device for building construction

Country Status (1)

Country Link
CN (1) CN215878256U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116393229A (en) * 2023-05-16 2023-07-07 林鸿斌 Cement clinker crusher

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116393229A (en) * 2023-05-16 2023-07-07 林鸿斌 Cement clinker crusher

Similar Documents

Publication Publication Date Title
CN215878256U (en) Garbage crushing device for building construction
CN107790220A (en) A kind of litter decoration apparatus for crushing and treating
CN110883058A (en) Environment-friendly solid waste treatment device
CN220091636U (en) Glass crushing apparatus is used based on glass processing
CN218191687U (en) Useless board recovery unit on thistle board production line
CN111484263A (en) Method for preparing novel sintered brick from construction waste
CN112795393B (en) Environment-friendly garbage regeneration oil refining equipment and method
CN207931143U (en) A kind of solid waste crushing device
CN216230266U (en) Broken recovery unit of usefulness is remolded to plastic products
CN216260972U (en) Kitchen waste treatment device with treatment tank mechanism
CN214881281U (en) Cracking gasification device for efficient environment-friendly solid waste treatment
CN214051804U (en) Crushing and collecting device for solid waste
CN215945625U (en) A garbage bin for surplus preparation fertilizer that handles in kitchen
CN215586563U (en) Multistage reducing mechanism of building rubbish recovery usefulness
CN211563148U (en) Novel construction waste treatment equipment
CN211159969U (en) Solid garbage crushing device for environmental protection engineering
CN112169989A (en) Portable construction waste breaker
CN219540531U (en) Waste paper box crushing and recycling device for logistics
CN221382370U (en) Bone crusher for mutton soup can production
CN219150262U (en) Building rubbish reducing mechanism for green building
CN215743672U (en) Environment-friendly construction waste treatment device
CN212142909U (en) Enterprise is with useless treatment facility entirely admittedly
CN220837168U (en) Building rubbish smashes recovery unit
CN216063477U (en) Civil engineering construction waste treatment device
CN219596754U (en) Construction waste breaker

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220222