CN215253986U - Concrete pouring construction appurtenance - Google Patents
Concrete pouring construction appurtenance Download PDFInfo
- Publication number
- CN215253986U CN215253986U CN202121076971.6U CN202121076971U CN215253986U CN 215253986 U CN215253986 U CN 215253986U CN 202121076971 U CN202121076971 U CN 202121076971U CN 215253986 U CN215253986 U CN 215253986U
- Authority
- CN
- China
- Prior art keywords
- protective layer
- support rod
- rod
- main support
- threaded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
A concrete pouring construction auxiliary tool comprises a main support rod, wherein two ends of the main support rod are respectively provided with a support rod vertically connected with the main support rod, and an F-shaped steel bar clamp is formed by the two support rods and the main support rod; threaded rods are arranged at two ends of the main support rod and are in threaded connection with the protective layer cushion blocks. The utility model discloses a concrete placement construction's of having combined two F shaped steel muscle fixtures and concrete protective layer cushion appurtenance both can guarantee the reinforcing bar interval, makes it not take place whole skew, dislocation or warp, also can make reinforcing bar protective layer thickness obtain effective control.
Description
Technical Field
The utility model belongs to concrete placement construction field, in particular to concrete placement construction appurtenance.
Background
During concrete pouring construction, the condition of integral deviation, dislocation or deformation of the steel bars often occurs, and the condition of too thin or too thick protective layer thickness of the reinforced concrete often occurs, so that the service performance and the durability of the structure are influenced.
In engineering, a reinforcing steel bar clamp is generally used for fixing the relative distance of reinforcing steel bars, but the integral offset of the reinforcing steel bars cannot be limited; generally, the thickness of the steel bar protection layer is ensured by using the protection layer cushion block, but the problem of over-thickness of the steel bar protection layer cannot be avoided. Therefore, an auxiliary tool with two structures of a reinforcing steel bar fixture and a protective layer pad is lacked.
Disclosure of Invention
In view of the technical problem that the background art exists, the utility model provides a concrete placement construction appurtenance combines reinforcing bar fixture and protective layer cushion, can guarantee the thickness of reinforcing bar protective layer when guaranteeing the reinforcing bar interval, has played the multi-purpose of an instrument.
In order to solve the technical problem, the utility model discloses following technical scheme has been taken and has been realized:
a concrete pouring construction auxiliary tool comprises a main support rod, wherein two ends of the main support rod are respectively provided with a support rod vertically connected with the main support rod, and an F-shaped steel bar clamp is formed by the two support rods and the main support rod; threaded rods are arranged at two ends of the main support rod and are in threaded connection with the protective layer cushion blocks.
In a preferred scheme, the protective layer cushion block is a square block.
In a preferred scheme, the protective layer cushion block is provided with a square column or a hexagonal prism column, the square column or the hexagonal prism column is provided with an internal thread hole, and the internal thread hole is in threaded connection with a threaded rod; the outer end of the square column or the hexagonal prism column is connected with the protective layer body.
In a preferred scheme, the main support rod comprises a hollow rod, a plurality of radial insertion holes are formed in the hollow rod, the two ends of the hollow rod are inserted with the side support rods, a plurality of through holes are formed in the support rods, and the hollow rod is connected with the side support rods through bolts; the supporting rod and the threaded rod are connected with the side supporting rod.
In the preferred scheme, the F-shaped steel bar clamp is used for being clamped on two main steel bars, and the protective layer cushion block is used for being in contact with the template.
This patent can reach following beneficial effect:
the utility model discloses a concrete placement construction's of having combined two F shaped steel muscle fixtures and concrete protective layer cushion appurtenance, this appurtenance both can guarantee the reinforcing bar interval, makes it not take place whole skew, dislocation or warp, also can make reinforcing bar protective layer thickness obtain effective control, avoids too thin or too thick to have advantages such as reliable and stable, easy and simple to handle, low cost.
Drawings
The invention will be further explained with reference to the following figures and examples:
FIG. 1 is a diagram showing the effect of the present invention in example 1;
FIG. 2 is a schematic structural view of the present invention in example 1;
fig. 3 is a schematic diagram of the structure of the present invention in embodiment 2.
In the figure: the steel plate protective layer comprises a main supporting rod 1, a hollow rod 101, a supporting rod 102, radial insertion holes 103, supporting rods 2, a threaded rod 3, a protective layer cushion block 4, a hexagonal prism column 401, a protective layer body 402, a plug pin 5, a main steel bar 6 and a template 7.
Detailed Description
Example 1:
as shown in fig. 1 to 2, a concrete pouring construction auxiliary tool includes a main support rod 1, wherein two ends of the main support rod 1 are respectively provided with a support rod 2 vertically connected with the main support rod 1, and the two support rods 2 and the main support rod 1 form an "F" -shaped steel bar fixture; two ends of the main support rod 1 are respectively provided with a threaded rod 3, and the threaded rods 3 are in threaded connection with the protective layer cushion blocks 4. The F-shaped steel bar clamp is used for being clamped on two main steel bars 6, and the protective layer cushion block 4 is used for being in contact with the template 7.
The threaded rod 3 can adopt a pointed bolt, so that the installation is convenient. The protective layer cushion block 4 can adopt a concrete block, when the concrete block is adopted, an internal thread pipe can be embedded in the concrete block, and the distance between the two protective layer cushion blocks 4 can be changed by rotating the protective layer cushion block 4. Can adopt the spanner when rotatory protective layer cushion 4, for the convenience of spanner operation, protective layer cushion 4 can adopt following two kinds of forms:
first, the protective layer pad 4 is a square block. The square protective layer cushion block 4 is directly rotated by a spanner for adjustment. The size of the protective layer cushion block 4 is not easily made too large due to the size of the wrench.
Secondly, the protective layer cushion block 4 is provided with a square column or a hexagonal column 401, the square column or the hexagonal column 401 is provided with an internal thread hole, and the internal thread hole is in threaded connection with the threaded rod 3; the outer ends of the square pillars or hexagonal pillars 401 are connected to the protection layer body 402. The size of the protective layer body 402 can be increased by the design, and the position of the protective layer cushion block 4 can be adjusted by rotating the hexagonal prism column 401 with a wrench.
The using method comprises the following steps:
1. determining the size of the reinforcing steel bar clamp according to the thickness of the concrete structure, the diameter and the interval of the main reinforcing steel bars, the thickness requirement of the protective layer of the reinforcing steel bars and the like, and processing the reinforcing steel bar clamp in batches; the reinforcing bar fixture comprises a main support rod 1 and a support rod 2.
2. Manufacturing a protective layer cushion block and drilling holes; or holes are reserved when the protective layer cushion block is manufactured; or pre-burying an internal threaded pipe;
3. and rotating the protective layer cushion block to a proper position according to the thickness requirement of the protective layer.
4. The tool is installed in the mesh reinforcement.
Example 2:
on the basis of embodiment 1, the structure of the main support rod 1 is improved:
as shown in fig. 3, the main support rod 1 preferably includes a hollow rod 101, the hollow rod 101 is provided with a plurality of radial insertion holes 103, two ends of the hollow rod 101 are inserted with side support rods 102, the support rods 102 are provided with a plurality of through holes, and the hollow rod 101 is connected with the side support rods 102 through pins 5; the support bar 2 and the threaded bar 3 are connected to the side support bar 102.
Since in embodiment 1 the spacing between the two "F" shaped rebar clips is fixed, i.e. determined by the spacing between the two main rebars 6. No adjustment is possible. The interval between two "F" shaped steel muscle clamps in this embodiment can be adjusted, and the suitability is stronger.
The above-mentioned embodiments are merely preferred embodiments of the present invention, and should not be considered as limitations of the present invention, and the protection scope of the present invention should be defined by the technical solutions described in the claims, and includes equivalent alternatives of technical features in the technical solutions described in the claims. Namely, equivalent alterations and modifications within the scope of the invention are also within the scope of the invention.
Claims (5)
1. The utility model provides a concrete placement construction appurtenance which characterized in that: the steel bar clamp comprises a main support rod (1), wherein two ends of the main support rod (1) are respectively provided with a support rod (2) vertically connected with the main support rod (1), and the two support rods (2) and the main support rod (1) form an F-shaped steel bar clamp; threaded rods (3) are arranged at two ends of the main support rod (1), and the threaded rods (3) are in threaded connection with the protective layer cushion blocks (4).
2. The concrete pouring construction auxiliary tool according to claim 1, wherein: the protective layer cushion block (4) is a square block.
3. The concrete pouring construction auxiliary tool according to claim 1, wherein: the protective layer cushion block (4) is provided with a square column or a hexagonal column (401), the square column or the hexagonal column (401) is provided with an internal threaded hole, and the internal threaded hole is in threaded connection with the threaded rod (3); the outer end of the square column or the hexagonal column (401) is connected with the protective layer body (402).
4. The concrete pouring construction auxiliary tool according to claim 1, wherein: the main support rod (1) comprises a hollow rod (101), a plurality of radial insertion holes (103) are formed in the hollow rod (101), side support rods (102) are inserted into two ends of the hollow rod (101), a plurality of through holes are formed in the support rods (102), and the hollow rod (101) is connected with the side support rods (102) through bolts (5); the supporting rod (2) and the threaded rod (3) are connected with the side supporting rod (102).
5. The concrete pouring construction auxiliary tool according to claim 1, wherein: the F-shaped steel bar clamp is used for being clamped on two main steel bars (6), and the protective layer cushion block (4) is used for being in contact with the template (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121076971.6U CN215253986U (en) | 2021-05-19 | 2021-05-19 | Concrete pouring construction appurtenance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121076971.6U CN215253986U (en) | 2021-05-19 | 2021-05-19 | Concrete pouring construction appurtenance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215253986U true CN215253986U (en) | 2021-12-21 |
Family
ID=79457468
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121076971.6U Active CN215253986U (en) | 2021-05-19 | 2021-05-19 | Concrete pouring construction appurtenance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215253986U (en) |
-
2021
- 2021-05-19 CN CN202121076971.6U patent/CN215253986U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203296175U (en) | Rectangular steel pipe column assembly type column foot | |
KR100685862B1 (en) | Reinforced structure of pile | |
CN112459468A (en) | Template for building pouring construction | |
CN215253986U (en) | Concrete pouring construction appurtenance | |
CN201024591Y (en) | Stretching compensation bracing strut device | |
CN217205333U (en) | Clamp for large concrete beam formwork | |
CN211973855U (en) | Pipe gallery embedded part | |
CN202248286U (en) | Mounting structure of wall body built-in fitting | |
CN215482930U (en) | Position-adjustable anchorage device for PSB finish-rolled deformed steel bar prestressed anti-floating anchor rod | |
KR200414639Y1 (en) | Slab sheeting support for bridge | |
CN220539258U (en) | Positioning and reinforcing device for embedded pipeline | |
CN102094461A (en) | Embedded bolt cleading | |
CN211622589U (en) | Shear wall end template reinforcing apparatus | |
CN216076319U (en) | Cast in situ concrete floor water and electricity reserves hole template | |
CN219908477U (en) | Tie fixing device for inclined road shoulder wall template | |
CN220580495U (en) | Connecting rod | |
CN217840332U (en) | Pre-support for concrete beam | |
CN219863362U (en) | Connecting device for steel bar and steel structure | |
CN211231869U (en) | Water supply and drainage pipeline fixing device | |
CN216615519U (en) | Support arrangement for steel reinforcement cage preapre for an unfavorable turn of events shape | |
CN219547587U (en) | Prestress steel bundle pipeline positioning device | |
CN213234020U (en) | Movable small fixture suitable for positioning main reinforcement of reinforcement cage | |
CN217871840U (en) | Building templates reinforcement | |
CN217617924U (en) | Auxiliary positioning device for cylindrical surface drilling | |
CN220398670U (en) | Open-air vertical type water gauge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |