CN215105458U - High cantilever pile foundation joist - Google Patents

High cantilever pile foundation joist Download PDF

Info

Publication number
CN215105458U
CN215105458U CN202121178449.9U CN202121178449U CN215105458U CN 215105458 U CN215105458 U CN 215105458U CN 202121178449 U CN202121178449 U CN 202121178449U CN 215105458 U CN215105458 U CN 215105458U
Authority
CN
China
Prior art keywords
joist
pile foundation
pile
foundation
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121178449.9U
Other languages
Chinese (zh)
Inventor
叶文科
张蕊
张大可
张贵斌
赵利奎
李雪松
张添豪
周若尘
郑定亮
沙松
赵填椋
杨沈熹
孙希望
王志伟
杜高翔
冯立红
李晓丽
杜高琴
石有权
王玉云
朱加荣
陶石岗
赵海燕
陈雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CREEC Kunming Survey Design and Research Co Ltd
Original Assignee
CREEC Kunming Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREEC Kunming Survey Design and Research Co Ltd filed Critical CREEC Kunming Survey Design and Research Co Ltd
Priority to CN202121178449.9U priority Critical patent/CN215105458U/en
Application granted granted Critical
Publication of CN215105458U publication Critical patent/CN215105458U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a high cantilever pile foundation joist, belonging to the technical field of roadbed retaining, comprising a pile foundation (5), a joist (2) and a weighing barricade (1); the pile foundations (5) are fixed in the foundation at intervals, the joists (2) are transversely fixed at the top of each pile foundation (5), and the constant-weight retaining walls (1) are fixed on the joists (2); the pile foundation (5) is connected with the joist (2) in a pouring manner, and the joist (2) is connected with the constant weight retaining wall (1) in a pouring manner; the utility model discloses an off-load effect of weighing type barricade (1) has reduced the height of cantilever, makes the very big reduction of pile bolck displacement, and the anchor length of pile foundation (5) is corresponding to be reduced, has guaranteed a fender height simultaneously, effectively receives the slope, and the practicality is strong.

Description

High cantilever pile foundation joist
Technical Field
The utility model belongs to the technical field of the road bed fender, specific theory relates to a high cantilever pile foundation joist.
Background
In railway, municipal and highway engineering construction, a slope-collecting retaining measure is often set for a filling roadbed or a steep slope roadbed section, and the common modes at present mainly comprise a retaining wall, a pile foundation joist retaining wall, a pile plate wall and the like. For a section with a large height difference, if a pile plate wall is arranged, the cantilever of the anti-slide pile is high, the displacement of the pile top is large, and in order to solve the problems, a large section pile diameter is needed, so that the method is poor in economy; if the pile foundation joist retaining wall is adopted, the height of the retaining wall is larger, and the masonry amount is also larger.
Disclosure of Invention
In order to overcome the problems in the prior art, the utility model provides a high-cantilever pile foundation joist,
through the unloading effect of the weight-balanced retaining wall, the height of the cantilever is reduced, the displacement of the pile top is greatly reduced, the anchoring length of the slide-resistant pile is correspondingly reduced, the supporting height is ensured, the slope is effectively collected, and the practicability is high.
In order to achieve the above purpose, the utility model is realized by the following technical scheme:
a high cantilever pile foundation joist comprises a pile foundation, a joist and a balance weight type retaining wall; the pile foundations are anchored in the foundation at equal intervals, the joist is transversely fixed at the top of each pile foundation, and the constant-weight retaining wall is fixed on the joist; and the pile foundation is connected with the joist, the joist and the constant weight retaining wall in a pouring manner.
Preferably, a soil guard plate is provided between the ground line and the joist between two adjacent piles.
Preferably, the steel bars at the top of the pile foundation are inserted into the joists and connected in a pouring mode.
Preferably, the top of the joist is provided with a connecting steel bar which is connected with the balance weight type retaining wall in a pouring way.
The utility model has the advantages that:
the utility model discloses a structure, through the off-load effect of weighing apparatus formula barricade, has reduced the height of cantilever, makes the very big reduction of pile bolck displacement, and the anchor length of friction pile correspondingly reduces, has guaranteed a fender height simultaneously, effectively receives the slope, and the cost is lower, and can reach comparable engineering effect, and the practicality is strong.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a left side view of fig. 1.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the following will explain in detail a preferred embodiment of the present invention with reference to the accompanying drawings to facilitate understanding of the skilled person.
As shown in fig. 1-2, the embodiment of the present invention provides a high cantilever pile foundation joist, which comprises a pile foundation 5, a joist 2, a constant weight retaining wall 1 and a retaining plate 3. The pile foundations 5 are fixed in foundation rock soil at equal intervals, the joist 2 is transversely fixed at the top of each pile foundation 5, and the constant weight type retaining wall 1 is fixed on the joist 2. And the pile foundation 5 is connected with the joist 2, the joist 2 and the balance weight type retaining wall 1 in a pouring manner. The cantilever length of the pile foundation 5 is reduced to the top of the joist by the retaining wall top, the cantilever length of the pile foundation 5 is effectively reduced, the displacement of the pile top is reduced, the partial soil pressure of the height of the cantilever is reduced, and the downward pressing effect of soil filling on the weighing platform and the backward movement of the gravity center of the whole wall are facilitated through the upper wall of the weighing retaining wall 1.
The pile foundations 5 are arranged in parallel at the road shoulder, and a soil blocking plate 3 is arranged between the two adjacent pile foundations 5 and between the ground line 4 and the joist 2.
The top steel bar of the pile foundation 5 is inserted into the joist 2 for pouring connection, so that the connection structure is more stable. The top of the joist 2 is provided with a connecting steel bar to be poured and connected with the balance weight type retaining wall 1, so that the friction force is increased, and the stability of the balance weight type retaining wall 1 is facilitated.
The utility model discloses a work progress:
firstly, the pile foundation 5 is positioned in a plane, a pile well is excavated, the pile foundation 5 reinforced concrete is poured, the ground part is poured by synchronous vertical templates after the underground part is poured, and the reserved extension steel bar is connected with the joist 2.
Secondly, binding a joist 2 reinforcement cage after the pile foundation 5 concrete reaches 75% of the design strength; the steel bars of the joist 2 are fixedly connected with the exposed main steel bars of the pile foundation 5.
Thirdly, inserting the connecting steel bars after pouring concrete on the joist 2 for 1-2 h, and taking the condition that the steel bars are not sunk as the standard;
and fourthly, pouring the weight-balancing retaining wall 1 by using a vertical mold.
Finally, it is noted that the above-mentioned preferred embodiments illustrate rather than limit the invention, and that, although the invention has been described in detail with reference to the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the scope of the invention as defined by the appended claims.

Claims (4)

1. The utility model provides a high cantilever pile foundation joist which characterized in that: comprises a pile foundation (5), a joist (2) and a balance weight type retaining wall (1); the pile foundations (5) are anchored in the foundation, the joists (2) are transversely fixed at the tops of the pile foundations (5), and the balance weight type retaining walls (1) are fixed on the joists (2); the pile foundation (5) is connected with the joist (2), the joist (2) is connected with the constant weight retaining wall (1) in a pouring mode.
2. The high cantilever pile foundation joist of claim 1, wherein: and a soil retaining plate (3) is arranged between the two adjacent pile foundations (5) and between the ground line (4) and the joist (2).
3. A high-cantilever pile foundation joist according to claim 1 or 2, characterised in that: and top steel bars of the pile foundation (5) are inserted into the joist (2) for pouring connection.
4. The high cantilever pile foundation joist of claim 1, wherein: the top of the joist (2) is provided with a connecting steel bar which is connected with the constant weight retaining wall (1) in a pouring way.
CN202121178449.9U 2021-05-29 2021-05-29 High cantilever pile foundation joist Active CN215105458U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121178449.9U CN215105458U (en) 2021-05-29 2021-05-29 High cantilever pile foundation joist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121178449.9U CN215105458U (en) 2021-05-29 2021-05-29 High cantilever pile foundation joist

Publications (1)

Publication Number Publication Date
CN215105458U true CN215105458U (en) 2021-12-10

Family

ID=79301444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121178449.9U Active CN215105458U (en) 2021-05-29 2021-05-29 High cantilever pile foundation joist

Country Status (1)

Country Link
CN (1) CN215105458U (en)

Similar Documents

Publication Publication Date Title
CN201915422U (en) Counterfort retaining wall on high slope
CN110700291A (en) Combined retaining structure and construction method thereof
CN203452092U (en) T-shaped pile retaining wall
CN111910660A (en) Ultrahigh slope supporting structure and construction method thereof
CN103452130A (en) Prestressing force reinforcing mesh ribbing earth pillar plate type retaining wall
CN111441343A (en) Mountain photovoltaic support micropore cast-in-place pile foundation system, construction method and application
CN201770942U (en) Support for soft soil foundation cast-in-place concrete continuous beam bridge
CN205894089U (en) Native supporting construction of environmental fender of prefabricated assembled
CN107975062B (en) Steep slope embankment light combined retaining structure and construction method
CN105649106A (en) Earth-retaining wall structure with steel tube reinforcing ribs and construction method for earth-retaining wall structure
CN215105458U (en) High cantilever pile foundation joist
CN207597914U (en) Add the construction stress structure for building multi-layer underground space under a kind of existing building group
CN203498863U (en) Three-dimensional continuous-frame-type reinforced concrete structural retaining wall
CN202767281U (en) Assembly type reinforced concrete combination back wall
CN211948542U (en) Anti-skid weight-balancing retaining wall assembly and retaining wall system
CN210737587U (en) Cantilever type retaining wall structure
CN204940310U (en) A kind of combination retaining structure
CN211006716U (en) Combined retaining structure
CN210104765U (en) High and large retaining structure of soft geological side slope
CN205369298U (en) Board -like retaining wall of prefabricated N type stake
CN212175363U (en) Frame-type anti-skidding structure with road system
CN107974876A (en) Existing railway increases road construction dike multiline pile earth-retaining construction
CN209854763U (en) Road shoulder retaining wall
CN214460592U (en) Improved generation buttress formula barricade of can encorbelmenting
CN211714009U (en) Subway foundation stabilization strutting arrangement

Legal Events

Date Code Title Description
GR01 Patent grant