CN204940310U - A kind of combination retaining structure - Google Patents

A kind of combination retaining structure Download PDF

Info

Publication number
CN204940310U
CN204940310U CN201520758168.9U CN201520758168U CN204940310U CN 204940310 U CN204940310 U CN 204940310U CN 201520758168 U CN201520758168 U CN 201520758168U CN 204940310 U CN204940310 U CN 204940310U
Authority
CN
China
Prior art keywords
rigid panel
reinforced earth
geo
grid
antislide pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520758168.9U
Other languages
Chinese (zh)
Inventor
曹文昭
郑俊杰
吕思祺
薛鹏鹏
郭震山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
Original Assignee
Huazhong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology filed Critical Huazhong University of Science and Technology
Priority to CN201520758168.9U priority Critical patent/CN204940310U/en
Application granted granted Critical
Publication of CN204940310U publication Critical patent/CN204940310U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a kind of combination retaining structure, and this combination retaining structure comprises antislide pile, linking beam, reinforced earth bulkhead, rigid panel and connecting elements; Described antislide pile is punched overlying soil and is anchored in good ground; Described antislide pile is many parallel settings, and the top of antislide pile is provided with linking beam; The top of described linking beam is provided with rigid panel; Build after described rigid panel and have reinforced earth bulkhead; Described connecting elements is arranged between rigid panel with reinforced earth bulkhead and is also connected with rigid panel and reinforced earth bulkhead respectively.The utility model to the strong adaptability in ground and place, integral rigidity is comparatively large, stability is good, easy construction, construction height is large and anti-seismic performance is good, is applicable to the high roadbed engineering in the complicated landform in western mountainous areas.

Description

A kind of combination retaining structure
Technical field
The utility model belongs to geotechnical engineering stability of slope supporting field, relates to a kind of combination retaining structure, particularly relates to a kind of combination retaining structure being applicable to high roadbed engineering in the complicated landform in western mountainous areas.
Background technology
In recent years, along with building on a large scale of western China traffic infrastructure, occurred the high roadbed engineering in the complicated landform in a large amount of mountain area, this type of high roadbed engineering often has following characteristics: (1) height of embankment is large, reach tens to hundreds of rice, post-construction deformation is large; (2) be positioned in the landform such as cheuch, abrupt slope, narrow space, large-scale construction equipment is marched into the arena difficulty; (3) slope body is comparatively steep, overlying soil less stable, and bearing capacity is lower, and good ground buries darker; (4) have inconvenient traffic, material service cost is higher.Now, adopt tradition, single retaining structure, due to the restriction of the factors such as construction costs, difficulty of construction, construction plant and environmental protection, be difficult to meet Practical Project demand.
Antislide pile, by pile body being inserted the good ground under slide plane, utilizes the anchorage effect of good ground and passive resisting force to balance Thrust of Landslide, is applicable to the improvement on shallow-layer and medium bed landslide.Antislide pile have construction fast, the advantage such as stake position is flexible, earth volume is little and cling property is good, can with other slope treatment measures flexibly with the use of, when for settling relocation of people from reservoir areas to administer come down " exploration " carried out, antislide pile formation platform is often utilized to provide project site for migration and relocation.For providing enough skid resistances, the degree of depth that antislide pile is anchored in good ground be about stake long 1/3 ~ 2/5, and stake is long is generally not more than 35m.Therefore, for the high roadbed engineering in the complicated landform in western mountainous areas, single employing antislide pile can cause stake long excessive with building-in depth, and then greatly increases pile body sectional area, increases difficulty of construction, promotes construction costs.
Reinforced earth bulkhead belongs to light-duty, point supporting system,, easy construction relatively low to ground requirement for bearing capacity, be applicable to narrow and do not allow to put slope excavation place, take up an area less, cost is low, especially, on construction height, there is the advantage that conventional rigid retaining structure is incomparable.Meanwhile, there is the good bulk deformation coordination ability under external force, not only can adapt to larger foundation deformation, and there is good anti-seismic performance.Weak point is: (1) should not be used for the Unfavorable Conditions such as landslide, current scour; (2) traditional anti-package formula and the panel rigidity of modular reinforced earth bulkhead less, single-stage wall is high general at below 10m, and too Gao Zeyi produces larger metope distortion or overall collapse, simultaneously easily produces caving in a big way because local lacing wire fracture; (3) even if adopt integral cast-in-situ steel concrete panel, conventional processes is banketed for first building panel again, now can cause rolling earth behind retaining wall compacting difficulty, between panel and reinforced earth body, relative settlement is comparatively large, and reinforcement material to be directly connected on panel also easy because of fill compaction construction and too greatly base relative settlement and continuous damage occurs.
Utility model content
The utility model is for the deficiencies in the prior art, in conjunction with the advantage of antislide pile and reinforced earth bulkhead, and conventional reinforced earth barricade is improved, propose a kind of combination retaining structure, to the strong adaptability in ground and place, integral rigidity is comparatively large, stability is good, easy construction, construction height is large and anti-seismic performance is good, is applicable to the high roadbed engineering in the complicated landform in western mountainous areas.
For achieving the above object, the utility model adopts following technical scheme:
A kind of combination retaining structure, is characterized in that: described combination retaining structure comprises antislide pile, linking beam, reinforced earth bulkhead, rigid panel and connecting elements; Described antislide pile is punched overlying soil and is anchored in good ground; Described antislide pile is many parallel settings, and the top of antislide pile is provided with linking beam; The top of described linking beam is provided with rigid panel; Described rigid panel and reinforced earth bulkhead walk abreast and arrange; Described connecting elements is arranged between rigid panel with reinforced earth bulkhead and is also connected with rigid panel and reinforced earth bulkhead respectively.
As preferably, the reinforced earth bulkhead that the utility model adopts is anti-package formula Geogrid Reinforced Earth Retaining Wall; Described reinforced earth bulkhead comprises metope, geo-grid and is filled in banketing between geo-grid; Described metope forms by packed rubble is stacking; One end anti-package of described geo-grid lives packed rubble, and the other end passes through fill compaction; Also be connected with banketing with rigid panel respectively between described connecting elements is arranged on rigid panel and bankets.
As preferably, the geo-grid that the utility model adopts is high-strength unidirectional geo-grid; Described geo-grid is the multilayer geogrids layer of laying successively from top to bottom; Banket and to be arranged alternately with geo-grid; Vertical spacing between geo-grid is 0.6 ~ 1.5m; The ultimate tensile strength of described geo-grid is not less than 150kN/m, and limit elongation is not more than 10%, fabric width 1 ~ 3m; Every layer of minimum laying length of geo-grid is not less than 2m; Described banketing includes but not limited to gravelly soil, gravelly soil and sandy soil; The described particle diameter that bankets is not more than 100mm; The described particulate earth material being less than 0.075mm that bankets is less than 15%.
As preferably, the rigid panel that the utility model adopts is cast-in-situ reinforced concrete slab; The built-in reinforcing bar of described rigid panel and the drain hole connected with reinforced earth bulkhead; Described rigid panel is provided with settlement joint and shrinkage joint every 20 ~ 30m or along wall High variation place along its length; The seam at described settlement joint and shrinkage joint is wide is all 1 ~ 2cm; In described settlement joint and shrinkage joint, filling has asphalt jute, pitch plank or microdilatancy rubber strip; The thickness of slab of described rigid panel is not less than 30cm.
As preferably, the angle steel that the connecting elements that the utility model adopts comprises pre-buried anchor bar and is connected with pre-buried anchor bar; Described pre-buried anchor bar is connected with the steel mesh reinforcement in rigid panel; Described angle steel is anchored in banketing in reinforced earth bulkhead; Described pre-buried anchor bar length is not less than 120cm, and diameter is not less than 16mm, and the vertical spacing of described pre-buried anchor bar is not more than 120cm, and the level interval of described pre-buried anchor bar is not more than 60cm, and described angle steel is wide is not less than 50mm.
As preferably, the stake of the antislide pile that the utility model adopts is failed to grow up in 35m, pile spacing 6 ~ 10m; The described antislide pile anchoring depth be anchored in good ground be antislide pile stake long 1/3 ~ 2/5; The pile body cross section of described antislide pile is rectangle.
As preferably, the cross section of the linking beam that the utility model adopts is rectangle, and the width of described linking beam is consistent with antislide pile cross-sectional length, described in link depth of beam be 1 ~ 2m.
Compared with prior art, the utility model has following outstanding advantages:
The combination retaining structure that the utility model provides, comprises antislide pile, linking beam, reinforced earth bulkhead, rigid panel and connecting elements.Antislide pile punches overlying soil, is anchored in good ground, and linking beam is established on stake top; Reinforced earth bulkhead is anti-package formula Geogrid Reinforced Earth Retaining Wall, and metope adopts that packed rubble is stacking to be formed, gradable construction; Rigid panel is after casting type armored concrete slab, monobloc cast again after this grade of reinforced earth bulkhead builds up; Connecting elements comprises pre-buried anchor bar and angle steel, and anchor bar one end is connected with rigid panel, and the other end is anchored in reinforced earth bulkhead.The utility model is by punching overlying soil by antislide pile and being anchored in good ground, solve the lower and good ground of mountain area overlying soil less stable, bearing capacity and bury darker problem, for rigid panel provides firm basis, light-duty, point supporting system reinforced earth bulkhead is adopted to also reduce requirement to bearing capacity of foundation soil and settlement Control; By arranging rigid panel, effective opposing and deliver the lateral earth pressure of anti-package formula reinforced earth bulkhead, homogenizing and reduce metope horizontal distortion, banketing between geo-grid is prevented to extrude or local slump, prevent surface erosion, corrode and peel off, enhance the globality of reinforced earth bulkhead, stability, durability and anti-seismic performance; Meanwhile, for curb formula retaining structure, rigid panel can also as the basis of highway and railway ancillary facility, as guardrail, sound barrier, catenary mast and sign board etc.; By first building flexible anti-package formula reinforced earth bulkhead after-pouring concrete slab, thus allow reinforced earth bulkhead ground and barricade, from during construction and after completion, sufficient sedimentation and deformation occurs, reduce the requirement to bearing capacity of foundation soil and permissible settlement on the one hand, decrease basement process work amount, also reduce the requirement to reinforced earth bulkhead self compressibilty of banketing used on the other hand, good economy performance; After reinforced earth bulkhead settlement stability, building rigid panel again, avoid the difficulty of rolling earth behind retaining wall compacting, it also avoid when geo-grid is directly connected with rigid panel easily because filling out soil compaction construction and too greatly base relative settlement and the continuous damage that causes; By pre-buried anchor bar and angle steel, and rigid panel construction period cement mortar is through anti-package geo-grid, enters in packed rubble and produces the solid effect of slurry, effectively ensure that the connection between rigid panel and reinforced earth bulkhead.The utility model provide a kind of comparatively large to ground and place strong adaptability, integral rigidity, stability is good, easy construction, construction height are large and the combination retaining structure that anti-seismic performance is good, are applicable to the high roadbed engineering in the complicated landform in western mountainous areas.
Accompanying drawing explanation
Fig. 1 is combination retaining structure provided by the utility model structural representation in use;
The structural representation of the rigid panel reinforced earth bulkhead that Fig. 2 adopts for the utility model;
The connection diagram of the pre-buried anchor bar that Fig. 3 adopts for the utility model and angle steel;
In figure, mark is described as follows:
1-good ground; 2-overlying soil; 3-antislide pile; 4-linking beam; 5-geo-grid; 6-bankets; The packed rubble of 7-; 8-anchor bar; 9-angle steel; 10-cast in place concrete plate; 11-drain hole; 12-steel mesh reinforcement; 13-concrete continuous footing.
Detailed description of the invention
Below in conjunction with accompanying drawing and case study on implementation, the utility model is described further.
A kind of combination retaining structure, as shown in FIG. 1 to 3, comprise antislide pile 3, linking beam 4, reinforced earth bulkhead (by geo-grid 5, banket 6 and packed rubble 7 jointly form), rigid panel (being jointly made up of cast in place concrete plate 10, drain hole 11 and steel mesh reinforcement 12) and connecting elements (comprising anchor bar 8 and angle steel 9).Antislide pile 3 punches overlying soil 2, is anchored in good ground 1; Linking beam 4 is positioned at antislide pile 3 top, contacts at the bottom of beam with overlying soil 2; Reinforced earth bulkhead is anti-package formula Geogrid Reinforced Earth Retaining Wall, and metope adopts that packed rubble is stacking to be formed, gradable construction; Rigid panel is after casting type armored concrete slab, monobloc cast again after this grade of reinforced earth bulkhead builds up; Connecting elements comprises pre-buried anchor bar 8 and angle steel 9, and anchor bar 8 one end is connected with rigid panel, and the other end is connected with angle steel 9 and is anchored in reinforced earth bulkhead.
The long 12m of stake of antislide pile 3, pile spacing 6m, anchoring segment length 5m, pile body cross section is rectangle, stressed face width 1.8m, the wide 2.4m in side.
The beam section of linking beam 4 is rectangle, wide 2.4m, high 1.2m.
Reinforced earth bulkhead is anti-package formula Geogrid Reinforced Earth Retaining Wall, and geo-grid 5 and banketing 6 is alternately laid, compactings, and the vertical spacing of geo-grid 5 is 1.2m, and metope adopts that packed rubble 7 is stacking to be formed, wall height 15m.
Further, geo-grid 5 is high-strength unidirectional geo-grid, and ultimate tensile strength is 200kN/m, limit elongation is 8%, fabric width 2m, lives packed rubble 7 in metope place anti-package, the section of turning back is pressed in upper strata and bankets under 6, adopts pitman to connect between upper and lower layer geo-grid 5; Banket 6 for gravelly soil, maximum packing material size is 50mm, and the particulate earth material being less than 0.075mm is less than 15%.
Rigid panel is cast-in-situ reinforced concrete slab, is positioned on linking beam 4, monobloc cast again after reinforced earth bulkhead builds up, inside establish steel mesh reinforcement 12, thickness of slab 40cm, reserved drain hole 11 in plate, along its length settlement joint and shrinkage joint are set every 30m, stitch wide 2cm, in seam, adopt asphalt jute filling.
Connecting elements comprises pre-buried anchor bar 8 and angle steel 9, the long 150cm of anchor bar 8, diameter 16mm, vertical spacing 120cm, level interval 60cm, be connected with rigid panel after one end bends up, the other end is connected with angle steel 9 and is anchored in reinforced earth bulkhead, the wide 50mm of angle steel.
Combinations thereof retaining structure is applied in the newly-built expressway works in mountain area, Guizhou Province, original scheme is viaduct, is the digestion of the excavation side of abandoning and Tunnel slag that are conducive to adjacent segment roadbed afterwards, saves cost of transportation, accelerating construction progress, changes to filled-up ground scheme by viaduct scheme then.Owing to being positioned at long and narrow cheuch area, slope body is comparatively steep, and overlying soil bearing capacity and stability are all lower, cannot direct filling, need arrange retaining structure.
The construction method of combinations thereof retaining structure mainly comprises the following steps: and preparation of construction → antislide pile 3 constructs → and linking beam 4 constructs → Construction of Reinforced Earth Retaining Walls → rigid panel construction.
Combination retaining structure provided by the utility model, when Specific construction, comprises the following steps:
1) preparation of construction, comprises surveying setting-out, levelling of the land, and equipment is marched into the arena, and determines the stake position of antislide pile 3.
2) antislide pile 3 is constructed, and comprises pore digging and supporting, reinforcing cage colligation and installation, filling concrete and maintenance.Merogenesis excavation stake holes, often saving cutting depth is 1m, carries out supporting immediately after excavation; Longitudinal tensile reinforcing bar is HRB400, diameter 22mm, clear distance 150mm, and outermost layer concrete cover to reinforcement thickness is 70mm, and reinforcing bar adopts and is welded to connect; Antislide pile 3 both sides and by flanging configuration longitudinal structure reinforcing bar, clear distance 300mm, diameter 12mm, by flanging both sides configuration handling reinforcement, diameter 16mm; Concrete strength of pile grade is C30, continous pouring, and vertical reinforcement is reserved on stake top, and length is not less than 30cm.
3) at antislide pile 3 top formwork, pouring reinforcement concrete linking beam 4, natural curing, reserved vertical reinforcement in the back 40cm width range of body side, slope, length is not less than 30cm.
4) Construction of Reinforced Earth Retaining Walls
4.1) the thick sand cushion of 30cm is laid on overlying soil 2 surface, first floor geo-grid 5 is laid at assigned address by design length, reserve anti-package and carry out being connected Len req with second layer geo-grid 5 after turning back, as required, staple is adopted to overlap, transverse lap width is 15cm, and longitudinal lap joint width is 20cm;
4.2) wall locations is being closed on, packed rubble 7 is successively stacked in geo-grid 5, then placement in layers, compacting filling soil 6, lift height is 30cm, to second layer geo-grid 5 laying height time, first floor geo-grid 5 anti-package is lived packed rubble 7, and the section of turning back adopts pitman to be connected with second layer geo-grid 5 and tensioning;
4.3) when construct the height to pre-buried anchor bar 8 and angle steel 9 time, undertaken pre-buried by designing requirement;
4.4) step 4.1 is repeated) ~ 4.3), until the high anti-package formula reinforced earth bulkhead of 15m has been built;
4.5) the 6 thick 60cm that banket in most top layer geo-grid 5,6 can provide enough restraint forcess to this layer of geo-grid 5 to ensure to banket.
5) rigid panel construction.After reinforced earth bulkhead settlement stability, assembling reinforcement net 12 outside barricade, formwork, pre-buried pvc pipe, as spilled water hole 11, then adopts integral cast-in-situ the natural curing piecemeal of C30 concrete.
Operating principle of the present utility model: the utility model is by punching overlying soil 2 by antislide pile 3 and being anchored in good ground 1, solve the lower and good ground 1 of mountain area overlying soil 2 less stable, bearing capacity and bury darker problem, for rigid panel provides firm basis, light-duty, point supporting system reinforced earth bulkhead is adopted to also reduce requirement to bearing capacity of foundation soil and settlement Control; By arranging rigid panel, effective opposing and deliver the lateral earth pressure of anti-package formula reinforced earth bulkhead, homogenizing and reduce metope horizontal distortion, prevent between geo-grid 5 banket 6 extrude or local slump, prevent surface erosion, corrode and peel off, enhance the globality of reinforced earth bulkhead, stability, durability and anti-seismic performance; By first building flexible anti-package formula reinforced earth bulkhead after-pouring concrete slab, thus allow reinforced earth bulkhead ground and barricade, from during construction and after completion, sufficient sedimentation and deformation occurs, reduce the requirement to bearing capacity of foundation soil and permissible settlement on the one hand, decrease basement process work amount, also reduce the requirement to reinforced earth bulkhead self 6 compressibilty of banketing used on the other hand, good economy performance; After reinforced earth bulkhead settlement stability, build rigid panel again, avoid the difficulty of rolling earth behind retaining wall 6 compacting, to it also avoid when geo-grid 5 is directly connected with rigid panel easily because of the compacting construction of 6 and too greatly base relative settlement and the continuous damage that causes of banketing; By pre-buried anchor bar 8 and angle steel 9, and rigid panel construction period cement mortar is through anti-package geo-grid 5, enters in packed rubble 7 and produces the solid effect of slurry, effectively ensure that the connection between rigid panel and reinforced earth bulkhead.
Above-described embodiment is only in order to illustrate detailed description of the invention of the present utility model; it is not the restriction to the utility model protection domain; ir will be understood by those skilled in the art that; all on the basis of technical solutions of the utility model; do not need to pay amendment that creative work can carry out or various equivalence is replaced, all should be encompassed within protection domain of the present utility model.

Claims (7)

1. combine a retaining structure, it is characterized in that: described combination retaining structure comprises antislide pile, linking beam, reinforced earth bulkhead, rigid panel and connecting elements; Described antislide pile is punched overlying soil and is anchored in good ground; Described antislide pile is many parallel settings, and the top of antislide pile is provided with linking beam; The top of described linking beam is provided with rigid panel; Described rigid panel and reinforced earth bulkhead walk abreast and arrange; Described connecting elements is arranged between rigid panel with reinforced earth bulkhead and is also connected with rigid panel and reinforced earth bulkhead respectively.
2. combination retaining structure according to claim 1, is characterized in that: described reinforced earth bulkhead is anti-package formula Geogrid Reinforced Earth Retaining Wall; Described reinforced earth bulkhead comprises metope, geo-grid and is filled in banketing between geo-grid; Described metope forms by packed rubble is stacking; One end anti-package of described geo-grid lives packed rubble, and the other end passes through fill compaction; Also be connected with banketing with rigid panel respectively between described connecting elements is arranged on rigid panel and bankets.
3. combination retaining structure according to claim 2, is characterized in that: described geo-grid is high-strength unidirectional geo-grid; Described geo-grid is the multilayer geogrids layer of laying successively from top to bottom; Banket and to be arranged alternately with geo-grid; Vertical spacing between geo-grid is 0.6 ~ 1.5m; The ultimate tensile strength of described geo-grid is not less than 150kN/m, and limit elongation is not more than 10%, fabric width 1 ~ 3m; Every layer of minimum laying length of geo-grid is not less than 2m; Described banketing includes but not limited to gravelly soil, gravelly soil and sandy soil; The described particle diameter that bankets is not more than 100mm; The described particulate earth material being less than 0.075mm that bankets is less than 15%.
4. combination retaining structure according to claim 3, is characterized in that: described rigid panel is cast-in-situ reinforced concrete slab, the built-in steel mesh reinforcement of described rigid panel and the drain hole connected with reinforced earth bulkhead; Described rigid panel is provided with settlement joint and shrinkage joint every 20 ~ 30m or along wall High variation place along its length; The seam at described settlement joint and shrinkage joint is wide is all 1 ~ 2cm; In described settlement joint and shrinkage joint, filling has asphalt jute, pitch plank or microdilatancy rubber strip; The thickness of slab of described rigid panel is not less than 30cm.
5. combination retaining structure according to claim 4, is characterized in that: the angle steel that described connecting elements comprises pre-buried anchor bar and is connected with pre-buried anchor bar; Described pre-buried anchor bar is connected with the steel mesh reinforcement in rigid panel; Described angle steel is anchored in banketing in reinforced earth bulkhead; Described pre-buried anchor bar length is not less than 120cm, and diameter is not less than 16mm, and the vertical spacing of described pre-buried anchor bar is not more than 120cm, and the level interval of described pre-buried anchor bar is not more than 60cm, and described angle steel is wide is not less than 50mm.
6. combination retaining structure according to claim 5, is characterized in that: the stake of described antislide pile is failed to grow up in 35m, pile spacing 6 ~ 10m, the described antislide pile anchoring depth be anchored in good ground be antislide pile stake long 1/3 ~ 2/5; The pile body cross section of described antislide pile is rectangle.
7. combination retaining structure according to claim 6, is characterized in that: the cross section of described linking beam is rectangle, and the width of described linking beam is consistent with antislide pile cross-sectional length; The described depth of beam that links is 1 ~ 2m.
CN201520758168.9U 2015-09-28 2015-09-28 A kind of combination retaining structure Expired - Fee Related CN204940310U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520758168.9U CN204940310U (en) 2015-09-28 2015-09-28 A kind of combination retaining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520758168.9U CN204940310U (en) 2015-09-28 2015-09-28 A kind of combination retaining structure

Publications (1)

Publication Number Publication Date
CN204940310U true CN204940310U (en) 2016-01-06

Family

ID=55007752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520758168.9U Expired - Fee Related CN204940310U (en) 2015-09-28 2015-09-28 A kind of combination retaining structure

Country Status (1)

Country Link
CN (1) CN204940310U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100195A (en) * 2017-06-26 2017-08-29 中铁十六局集团第三工程有限公司 A kind of soft stratum spoil disposal area supporting and retaining system construction of prevention work structure
CN113104414A (en) * 2021-03-16 2021-07-13 山东京博控股集团有限公司 Full earthing structure of vertical jar of body

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100195A (en) * 2017-06-26 2017-08-29 中铁十六局集团第三工程有限公司 A kind of soft stratum spoil disposal area supporting and retaining system construction of prevention work structure
CN107100195B (en) * 2017-06-26 2023-01-31 中铁十六局集团第三工程有限公司 Retaining protection construction structure for soft stratum waste residue field
CN113104414A (en) * 2021-03-16 2021-07-13 山东京博控股集团有限公司 Full earthing structure of vertical jar of body
US11702277B2 (en) 2021-03-16 2023-07-18 Shandong Chambroad Equipment Manufacture Installation Co., Ltd. Fully soil-covered structure of vertical tank body

Similar Documents

Publication Publication Date Title
CN105155558A (en) Combined retaining structure and construction method thereof
CN102966119B (en) Geogrid reinforced wall and construction method thereof
CN109371989B (en) A kind of combined type retaining structure and its construction method suitable for stability of slope supporting
CN104846840B (en) A kind of shallow embedding reinforcement of soft soil integrated pipe canal device and construction method
CN103669399A (en) Concrete panel reinforced retaining wall and construction method thereof
CN102359046A (en) High fill subgrade connection method
CN110374111B (en) Slope releasing and steel pipe pile anchor cooperative supporting system
CN110700291A (en) Combined retaining structure and construction method thereof
CN105525627A (en) Two-way anchorage plate retaining wall and construction method thereof
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN103452130A (en) Prestressing force reinforcing mesh ribbing earth pillar plate type retaining wall
CN215976664U (en) Rigid pile composite foundation treatment structure of lower horizontal pipe gallery structure
CN105804101A (en) Load-reducing retaining system capable of reducing stress of retaining structure, construction method and applications
CN204940310U (en) A kind of combination retaining structure
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN219410355U (en) Flexible side-width structure of high-fill embankment of existing railway
CN111705576A (en) Steep slope high-filling roadbed structure adopting high-density EPS filler
CN110939142A (en) Roadbed structure for side slope
CN215977211U (en) Structure is handled to compound foundation of tubular pile combination cement mixing pile
CN115506382A (en) Construction method for pile plate wall of island building platform
CN216688857U (en) Side width structure of existing line embankment
CN215165533U (en) Anchoring structure for side slope of solid waste landfill
CN212316951U (en) Roadbed structure for side slope
CN210315650U (en) Anchor rod reinforced composite retaining wall
CN112323816A (en) Unloading type combined retaining structure and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

Termination date: 20170928