CN214575489U - Climbing type scaffold for municipal construction - Google Patents

Climbing type scaffold for municipal construction Download PDF

Info

Publication number
CN214575489U
CN214575489U CN202023096788.0U CN202023096788U CN214575489U CN 214575489 U CN214575489 U CN 214575489U CN 202023096788 U CN202023096788 U CN 202023096788U CN 214575489 U CN214575489 U CN 214575489U
Authority
CN
China
Prior art keywords
fixedly connected
screw rod
motor
supporting plates
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023096788.0U
Other languages
Chinese (zh)
Inventor
张耀华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Fangwang Building Materials Co ltd
Original Assignee
Yunnan Fangwang Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Fangwang Building Materials Co ltd filed Critical Yunnan Fangwang Building Materials Co ltd
Priority to CN202023096788.0U priority Critical patent/CN214575489U/en
Application granted granted Critical
Publication of CN214575489U publication Critical patent/CN214575489U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model belongs to the field of municipal construction equipment, in particular to a climbing scaffold for municipal construction, which comprises four struts which are distributed in a rectangular shape, four connecting plates are fixedly connected between the struts, four supporting plates are slidably arranged between the struts, four through holes which are distributed in a rectangular shape are arranged inside the supporting plates, and four supporting plates are respectively positioned at the inner sides of the four through holes, when the climbing scaffold is in use, a motor is started to rotate a screw rod in a screw hole, the supporting plates can move up and down between the four struts along the direction of the screw rod under the matching of the screw hole and the screw rod, the automatic adjustment work and the fixing work of the position of the supporting plates can be realized, when in use, the supporting plates can automatically drive workers to the construction position, the safety and the work efficiency are improved, when in use, the position of the supporting plates can be adjusted according to the construction requirements, so as to carry out the construction work of different positions, the application range of the device is enlarged, and the applicability is improved.

Description

Climbing type scaffold for municipal construction
Technical Field
The utility model relates to a municipal administration construction equipment field specifically is a climb formula scaffold frame for municipal construction.
Background
Municipal construction, that is, municipal engineering, refers to municipal infrastructure construction engineering, and municipal facilities refer to various buildings, structures, equipment and the like which are arranged in urban areas and town planning construction ranges and provide paid or unpaid public products and services for residents based on government responsibilities and obligations, such as common urban roads, subways and the like.
Present scaffold is when using, generally is the equipment work of carrying out the scaffold frame at the job site, puts the footboard on the support body after assembling, and the operation is comparatively loaded down with trivial details, has increased workman's intensity of labour, and after the scaffold frame equipment was accomplished in addition, the height of scaffold frame and the rigidity of footboard can't adjust the position of footboard according to the construction demand, can influence the normal clear of construction work, have reduced work efficiency.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a climb formula scaffold frame for municipal construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a climbing scaffold for municipal construction comprises four pillars which are distributed in a rectangular shape, a connecting plate is fixedly connected among the four pillars, a supporting plate is slidably mounted among the four pillars, four through holes which are distributed in a rectangular shape are formed in the supporting plate, and the four pillars are respectively positioned on the inner sides of the four through holes; the equal fixedly connected with stand of connecting plate left and right sides wall, stand top fixedly connected with installing frame, installing frame top fixedly connected with motor, motor and external power source electric connection, motor output end fixedly connected with screw rod, the screw rod is located inside the motor, just the screw rod other end with the installing frame bottom inner wall rotates to be connected, layer board and two screw rod threaded connection.
As a further aspect of the present invention: the upright posts are positioned in the middle of the side wall of the connecting plate.
As a further aspect of the present invention: the mounting frame is of a U-shaped structure.
As a further aspect of the present invention: two through grooves which are symmetrically distributed are formed in the supporting plate, and the mounting frames are respectively located in the through grooves.
As a further aspect of the present invention: two screw holes which are symmetrically distributed are formed in the supporting plate, and the two screw holes are respectively in threaded connection with the outer sides of the two screw rods.
As a further aspect of the present invention: a pedal is arranged inside the top end of the supporting plate.
As a further aspect of the present invention: the equal fixedly connected with connecting rod of both sides wall around the installing frame, the connecting rod other end with pillar fixed connection.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses a four pillars and connecting plate combination form the support body of scaffold frame, the layer board that the top has the footboard is slidable mounting in four pillar outsides, the installing frame at the stand top on the wall of connecting plate left and right sides is located the corresponding logical inslot on the layer board, the screw rod threaded connection of installing frame top motor output is inside the corresponding screw hole on the layer board, during operation start motor can make the screw rod rotate in the screw hole, under the cooperation between screw hole and screw rod, can make the layer board reciprocate between four pillars along the direction of screw rod, adjust the position of layer board, the operation is simple, can realize the automatic adjustment work and the fixed work of layer board position, during operation the layer board can automatically drive the workman to the position of construction, do not need the workman to climb slowly upwards, the security and the work efficiency are improved, during operation can come from the position of adjusting the layer board according to the construction demand, the supporting plate is adjusted to different positions to carry out construction work at different positions, so that the application range of the device is enlarged, and the applicability is improved.
Drawings
Fig. 1 is a schematic structural view of a climbing scaffold for municipal construction;
FIG. 2 is an enlarged view of portion A of FIG. 1;
fig. 3 is a schematic sectional view of a climbing scaffold for municipal construction from above;
fig. 4 is a schematic structural view of a vertical column and a mounting frame of a climbing scaffold for municipal construction.
In the figure: 1. a pillar; 11. a connecting plate; 111. a column; 2. a support plate; 21. a through hole; 22. a through groove; 23. a screw hole; 24. a pedal; 3. installing a frame; 31. a motor; 311. a screw; 4. a connecting rod.
Detailed Description
Please refer to fig. 1-4, in the embodiment of the utility model, a climb formula scaffold frame for municipal construction, including four pillars 1 that are the rectangular distribution, fixedly connected with connecting plate 11 between four pillars 1, slidable mounting has layer board 2 between four pillars 1, layer board 2 is inside to be offered four through-holes 21 that are the rectangular distribution, four pillars 1 are located four through-holes 21 inboards respectively, the equal fixedly connected with stand 111 of the wall of the connecting plate 11 left and right sides, stand 111 top fixedly connected with installing frame 3, 3 top fixedly connected with motors 31 of installing frame, motors 31 and external power source electric connection, motor 31 output end fixedly connected with screw rod 311, screw rod 311 is located inside motors 31, and the screw rod 311 other end is connected with the rotation of the inner wall in the installing frame 3 bottom, layer board 2 and two screw rod 311 threaded connection.
In fig. 1 and 3: the combination forms the support body between four pillar 1 and the connecting plate 11, and connecting plate 11 links together four pillar 1, has improved the fastness of device structure and the stability when using, and 2 slidable mounting of layer board are between four pillar 1, and layer board 2 can reciprocate between four pillar 1, and four through-holes 21 of layer board 2 inside are located four pillar 1 outsides respectively, can not influence layer board 2 and reciprocate between four pillar 1, have improved the smoothness nature when layer board 2 removes.
In fig. 1, 2, 3 and 4: the upright posts 111 with the top provided with the mounting frame 3 are fixed on the left side wall and the right side wall of the connecting plate 11, the screw 311 at the output end of the motor 31 at the top of the mounting frame 3 is rotationally connected inside the mounting frame 3, the motor 31 is started during operation, the screw 311 is driven to rotate inside the mounting frame 3 after the motor 31 is started, the other end of the screw 311 is rotationally connected with the inner wall at the bottom of the mounting frame 3, the stability of the screw 311 during rotation is improved, two screw holes 23 which are symmetrically distributed are formed inside the supporting plate 2, the two screw holes 23 are respectively in threaded connection with the outer sides of the two screw holes 311, the screw 311 is driven by the motor 31 to rotate inside the screw holes 23, under the matching between the screw holes 23 and the screw 311, the supporting plate 2 can rotate up and down between the four supporting posts 1 along the direction of the screw holes 311, the motor 31 is closed after adjustment to fix the position of the supporting plate 2, the operation is simple, and the automatic adjustment and fixing work of the position of the supporting plate 2 can be realized, the working efficiency is improved, a worker stands on the supporting plate 2 during working, then the motor 31 is started, the supporting plate 2 can automatically drive the worker to a construction position, the worker does not need to climb upwards slowly, the labor intensity of the worker is reduced, the safety and the working efficiency are improved, the position of the supporting plate 2 can be adjusted according to construction requirements during working, the supporting plate 2 is adjusted to different positions to carry out construction work at different positions, the application range of the device is enlarged, the applicability is improved, two through grooves 22 which are distributed symmetrically are formed in the supporting plate 2, two mounting frames 3 are respectively positioned in the two through grooves 22, when the supporting plate 2 moves among the four pillars 1, the two mounting frames 3 move in the two through grooves 22 in the supporting plate 2, the normal moving work of the supporting plate 2 is ensured, the position of the supporting plate 2 is adjusted, and after the motor 31 is closed to fix the position of the supporting plate 2, the inside wall of through-hole 21 can contact with the lateral wall of pillar 1 on layer board 2, the inside wall that leads to groove 22 can contact with the lateral wall of installing frame 3, can be further fix a position fixed work to layer board 2, can improve the fastness behind the layer board 2 fixed position and the stability when using, security when guaranteeing workman's construction, installing frame 3 is the U-shaped structure, can make layer board 2 smooth move between four pillars 1 along screw rod 311, the smoothness nature when having improved layer board 2 adjustment position.
In fig. 1 and 3: upright 111 is located 11 lateral wall intermediate positions departments of connecting plate, consequently two installing frames 3 are located the intermediate position department of the 2 left and right sides of layer board respectively, then with four rectangle between the pillar 1 that distribute, stability when improvement layer board 2 that can be further removed, guarantee the normal clear of 2 position adjustment work of layer board, footboard 24 has been seted up to 2 tops of layer board, the during operation workman stands on footboard 24, footboard 24 top has the lug that protrudes to layer board 2 top, can improve the stability of workman standing on footboard 24, and then can improve the security during construction.
In fig. 3: the equal fixedly connected with connecting rod 4 of both sides wall around the installing frame 3, the connecting rod 4 other end and pillar 1 fixed connection, connecting rod 4 is together fixed installing frame 3 and pillar 1, has improved the fastness of device structure, security during consequently can improve the construction.
The utility model discloses a theory of operation is: the during operation workman stands on the footboard 24 at layer board 2 top, then the starter motor 31 makes screw rod 311 rotate at screw 23 inside, under the cooperation between screw 23 and screw rod 311, can make layer board 2 along the direction of screw rod 311 rebound between four pillars 1, drive workman rebound, drive workman's rebound, close motor 31 after driving the workman to the construction position, come to the rigidity of layer board 2, moreover, the steam generator is simple in operation, can realize the automatic adjustment work and the fixed work of layer board 2 position, can drive the position of construction with the workman automatically, do not need the workman slowly to climb upwards, the security and work efficiency have been improved, the during operation can also adjust layer board 2 to different positions according to the construction demand, carry out the construction work of different positions, the application range of device has been increased, the suitability has been improved.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The climbing scaffold for municipal construction is characterized by comprising four support columns (1) which are distributed in a rectangular shape, connecting plates (11) are fixedly connected among the four support columns (1), supporting plates (2) are slidably mounted among the four support columns (1), four through holes (21) which are distributed in a rectangular shape are formed in the supporting plates (2), and the four support columns (1) are respectively positioned on the inner sides of the four through holes (21);
the utility model discloses a motor, including connecting plate (11), the equal fixedly connected with stand (111) of connecting plate (11) left and right sides wall, stand (111) top fixedly connected with installing frame (3), installing frame (3) top fixedly connected with motor (31), motor (31) and external power source electric connection, motor (31) output end fixedly connected with screw rod (311), screw rod (311) are located inside motor (31), just screw rod (311) other end with installing frame (3) bottom inner wall rotates to be connected, layer board (2) and two screw rod (311) threaded connection.
2. A scaffolding according to claim 1, wherein the uprights (111) are located at the side walls of the connector plate (11) in a central position.
3. A scaffolding according to claim 1, wherein the frame (3) is of U-shaped configuration.
4. The climbing scaffold for municipal construction according to claim 1, wherein two through grooves (22) are symmetrically formed in the supporting plate (2), and the two mounting frames (3) are respectively located in the two through grooves (22).
5. The climbing scaffold for municipal construction according to claim 1, wherein the supporting plate (2) has two symmetrically distributed screw holes (23) formed therein, and the two screw holes (23) are respectively screwed to the outer sides of the two screws (311).
6. The scaffold for civil engineering according to claim 1, characterized in that the top of the supporting board (2) is equipped with a pedal (24) inside.
7. The climbing scaffold for municipal construction according to claim 1, wherein the mounting frame (3) is fixedly connected with a connecting rod (4) at both the front and rear side walls, and the other end of the connecting rod (4) is fixedly connected with the support column (1).
CN202023096788.0U 2020-12-21 2020-12-21 Climbing type scaffold for municipal construction Expired - Fee Related CN214575489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023096788.0U CN214575489U (en) 2020-12-21 2020-12-21 Climbing type scaffold for municipal construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023096788.0U CN214575489U (en) 2020-12-21 2020-12-21 Climbing type scaffold for municipal construction

Publications (1)

Publication Number Publication Date
CN214575489U true CN214575489U (en) 2021-11-02

Family

ID=78333861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023096788.0U Expired - Fee Related CN214575489U (en) 2020-12-21 2020-12-21 Climbing type scaffold for municipal construction

Country Status (1)

Country Link
CN (1) CN214575489U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892934A (en) * 2022-05-26 2022-08-12 国网安徽省电力有限公司六安供电公司 Electrician who can automatic adjustment construction position auxiliary device that ascends a height for electric power system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892934A (en) * 2022-05-26 2022-08-12 国网安徽省电力有限公司六安供电公司 Electrician who can automatic adjustment construction position auxiliary device that ascends a height for electric power system
CN114892934B (en) * 2022-05-26 2024-03-26 国网安徽省电力有限公司六安供电公司 Electrician climbing auxiliary device capable of automatically adjusting construction position for electric power system

Similar Documents

Publication Publication Date Title
CN214834701U (en) Assembled aluminum mould plate device for building
CN214575489U (en) Climbing type scaffold for municipal construction
CN112343318A (en) Anti-tilting scaffold for building
CN201186864Y (en) Self-climbing type hydraulic jacking device for mounting large-sized equipment
CN211143684U (en) A remove scaffold frame for building engineering
CN212389004U (en) Detachable support for construction of constructional engineering
CN212053675U (en) High-safety building construction platform
CN210264006U (en) Building faces limit structure post construction protection frame
CN116498051B (en) Construction platform and assembling and using method thereof
CN219863956U (en) Adjustable construction platform
CN216476230U (en) Portable scaffold frame convenient to installation
CN219491667U (en) Climbing frame for building construction
CN220451363U (en) Climbing scaffold for building construction
CN216616801U (en) Multifunctional movable type pool wall decoration hanging ladder platform structure
CN220889399U (en) Building engineering building climbing frame
CN115199138B (en) Protective fence for building
CN219587331U (en) Stable strong splicing fixed prefabricated component
CN212507263U (en) Multifunctional construction platform
CN213740597U (en) Novel template support frame is used in public road bridge roof beam construction
CN211548710U (en) Movable outrigger for high-altitude construction of constructional engineering
CN219431313U (en) Floor type double-row scaffold
CN214144616U (en) Building construction platform convenient to adjust
CN218343513U (en) Urban rail vehicle door overhauling platform
CN215858959U (en) Building scaffold that security performance is good
CN218205569U (en) Construction scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102