CN219491667U - Climbing frame for building construction - Google Patents

Climbing frame for building construction Download PDF

Info

Publication number
CN219491667U
CN219491667U CN202222953787.6U CN202222953787U CN219491667U CN 219491667 U CN219491667 U CN 219491667U CN 202222953787 U CN202222953787 U CN 202222953787U CN 219491667 U CN219491667 U CN 219491667U
Authority
CN
China
Prior art keywords
climbing frame
mounting
box body
plate
frame box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222953787.6U
Other languages
Chinese (zh)
Inventor
马建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Hengrui Yiyang Construction Engineering Co ltd
Original Assignee
Xinjiang Hengrui Yiyang Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Hengrui Yiyang Construction Engineering Co ltd filed Critical Xinjiang Hengrui Yiyang Construction Engineering Co ltd
Priority to CN202222953787.6U priority Critical patent/CN219491667U/en
Application granted granted Critical
Publication of CN219491667U publication Critical patent/CN219491667U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a climbing frame for building construction, comprising: the outer side of the mounting frame is fixedly mounted on the outer wall of the building through a wall mounting piece; a lifting component is arranged in the mounting frame; the lifting component is provided with a climbing frame box body; at least two groups of gear assemblies are further arranged on one side wall of the climbing frame box body, and the climbing frame box body is rotatably arranged on rack plates arranged in the installation frame through the gear assemblies; the outer wall of the climbing frame box body is fixedly provided with an anti-falling baffle; the bottom of one side of the climbing frame box body far away from the rack plate is provided with a supporting component and a transition plate; the top of the transition plate is fixedly connected with the side wall of the anti-falling baffle plate. The rack plate and the gear assembly are meshed to move to serve as auxiliary parts for auxiliary stabilization in the lifting process of the climbing frame box body, lifting of the climbing frame box body is achieved jointly through lifting assemblies arranged on two sides of the mounting frame, and stability is high; and the anti-falling baffle is arranged on the periphery of the climbing frame box body to protect workers, so that the practicability is high.

Description

Climbing frame for building construction
Technical Field
The utility model relates to the technical field of climbing frames, in particular to a climbing frame for building construction.
Background
The climbing frame is called a lifting frame, and can be divided into hydraulic, electric and manual lifting frames according to the power source. The novel scaffold system is developed in recent years and is mainly applied to high-rise shear wall type building trays. It can climb up or down along the building. This system allows a complete improvement of the scaffold technology: firstly, the frame does not need to be turned over; secondly, the disassembly and assembly process of the scaffold (the scaffold is used until the construction is finished after one-time assembly) is avoided, the scaffold is not limited by the height of a building, and the manpower and materials are greatly saved. And also has a great improvement over traditional scaffolds in terms of safety. Has great development advantages in high-rise buildings.
The existing climbing frame is poor in stability in the lifting process and easy to shake, so that a large psychological burden is formed on a worker, and the worker can be increased to stand unstably and fall; therefore, there is a need to design a climbing frame for building construction.
Disclosure of Invention
The utility model aims to provide a climbing frame for building construction, which solves the problems in the prior art.
In order to achieve the above object, the present utility model provides the following solutions: the utility model provides a climbing frame for building construction, comprising: the outer side of the mounting frame is fixedly mounted on the outer wall of the building through a wall mounting piece; a lifting assembly is arranged in the mounting frame; the lifting assembly is provided with a climbing frame box body; at least two groups of gear assemblies are further arranged on one side wall of the climbing frame box body, and the climbing frame box body is rotatably arranged on rack plates arranged in the mounting frame through the gear assemblies; the outer wall of the climbing frame box body is fixedly provided with an anti-falling baffle; the bottom of one side of the climbing frame box body far away from the rack plate is provided with a supporting component and a transition plate; the top of the transition plate is fixedly connected with the side wall of the anti-falling baffle plate.
A guide post is also arranged in the mounting frame; at least four guide posts are arranged; and the top end and the bottom end of each guide post are respectively and fixedly arranged at the top cross beam bottom end and the bottom cross beam top end of the mounting frame.
The lifting assembly comprises a driving motor; the two driving motors are arranged and are respectively arranged at two ends of the cross beam at the top of the mounting frame; each driving motor is in transmission connection with the screw rod through a coupler; the screw rod penetrates through the top cross beam of the installation frame and is installed on the bottom cross beam of the installation frame; each screw rod is provided with an installation table; at least two guide posts are arranged on each mounting table in a penetrating way; the two mounting tables are jointly mounted with the climbing frame box body.
The top surface of one side of the climbing frame box body extends to form a mounting plate; the mounting plate is arranged in the mounting frame; mounting rods are formed at two ends of the mounting plate in an extending mode towards the two mounting tables; the movable ends of the two mounting rods respectively extend into clamping grooves formed in the opposite surfaces of the two mounting tables.
The top surface of the anti-falling baffle plate is downwards sunken to form an anti-falling groove.
The gear assembly comprises a supporting seat and a gear; the gear is arranged in the supporting seat through the rotating shaft; the supporting seat is arranged on one side of the climbing frame box body, which is close to the rack plate; the two groups of the supporting seats are arranged along the horizontal direction; the rack plates correspond to the same positions as the gears in number; the gear is meshed with a rack on the rack plate.
The support assembly comprises an electric push rod and a pressing plate arranged at the top of the electric push rod; the electric push rod is fixedly arranged on the supporting plate; the support plate and the bottom surface of one side, which is away from the rack plate, of the climbing frame box body are fixedly arranged; the pressing plate is abutted with the bottom of the anti-falling baffle.
A plurality of pedals with different lengths are arranged on the transition plate along the vertical direction; the length of the pedal gradually increases from top to bottom.
The utility model discloses the following technical effects: the rack plate and the gear assembly are meshed to move to serve as auxiliary parts for auxiliary stabilization in the lifting process of the climbing frame box body, lifting of the climbing frame box body is achieved jointly through lifting assemblies arranged on two sides of the mounting frame, and stability is high; and the anti-falling baffle is arranged on the periphery of the climbing frame box body to protect workers, so that the practicability is high.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure;
FIG. 2 is a top view of the overall structure;
FIG. 3 is a side view of the structure of the climbing frame box;
1, installing a frame; 2. a wall mount; 3. a climbing frame box body; 4. rack plate; 5. an anti-falling baffle; 6. a transition plate; 7. an electric push rod; 8. a pressing plate; 9. a support plate; 10. a support base; 11. a driving motor; 12. a coupling; 13. a screw rod; 14. a guide post; 15. a mounting table; 16. a gear; 31. a mounting plate; 32. and (5) mounting a rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In order that the above-recited objects, features and advantages of the present utility model will become more readily apparent, a more particular description of the utility model will be rendered by reference to the appended drawings and appended detailed description.
The utility model provides a climbing frame for building construction, comprising: the outer side of the mounting frame 1 is fixedly mounted on the outer wall of the building through a wall mounting piece 2; a lifting component is arranged in the mounting frame 1; the lifting component is provided with a climbing frame box body 3; at least two groups of gear assemblies are further arranged on one side wall of the climbing frame box body 3, and the climbing frame box body 3 is rotatably arranged on a rack plate 4 arranged in the installation frame 1 through the gear assemblies; the outer wall of the climbing frame box body 3 is fixedly provided with an anti-falling baffle 5; the bottom of one side of the climbing frame box body 3 far away from the rack plate 4 is provided with a supporting component and a transition plate 6; the top of the transition plate 6 is fixedly connected with the side wall of the anti-falling baffle 5.
A guide post 14 is also arranged in the mounting frame 1; the guide posts 14 are provided with at least four; the top and bottom ends of each guide post 14 are fixedly mounted to the top and bottom beam ends of the mounting frame 1, respectively.
The lifting assembly comprises a driving motor 11; the two driving motors 11 are respectively arranged at two ends of the top beam of the mounting frame 1; each driving motor 11 is in transmission connection with a screw rod 13 through a coupler 12; the screw rod 13 penetrates through the top beam of the mounting frame 1 and is mounted on the bottom beam of the mounting frame 1; each screw rod 13 is provided with a mounting table 15; at least two guide posts 14 are arranged on each mounting table 15 in a penetrating manner; the two mounting tables 15 are jointly provided with the climbing frame box body 3.
The top surface of one side of the climbing frame box body 3 extends to form a mounting plate 31; the mounting plate 31 is placed in the mounting frame 1; mounting plates 31 are provided with mounting rods 32 extending towards the two mounting tables at both ends; the movable ends of the two mounting rods 32 respectively extend into clamping grooves formed on the opposite surfaces of the two mounting tables 15.
The top surface of the anti-falling baffle plate 5 is downwards sunken to form an anti-falling groove.
The gear assembly comprises a support base 10 and a gear 16; the gear 16 is arranged in the supporting seat 10 through a rotating shaft; the supporting seat 10 is arranged on one side of the climbing frame box body 3 close to the rack plate 4; and the support seat 10 is provided with two groups along the horizontal direction; the rack plate 4 corresponds to the same positions as the gears 16 in number; the gear 16 is engaged with the rack on the rack plate 4.
The support assembly comprises an electric push rod 7 and a pressing plate 8 arranged at the top of the electric push rod 7; the electric push rod 7 is fixedly arranged on the supporting plate 9; the supporting plate 9 is fixedly arranged on the bottom surface of one side of the climbing frame box body 3 far away from the rack plate 4; the pressing plate 8 is abutted with the bottom of the anti-falling baffle plate 5.
A plurality of pedals with different lengths are arranged on the transition plate 6 along the vertical direction; the pedal length gradually increases from top to bottom.
In one embodiment of the utility model, tools can be placed in the anti-falling groove, so that the anti-falling box is convenient to use, and the anti-falling box can be lifted and is convenient for taking tools to use.
In one embodiment of the utility model, the application forms a lifting platform by connecting the mounting rod 32 on the mounting plate 31 with the mounting table 15; the two mounting tables 15 are driven to ascend or descend along the vertical direction by the screw rod 13; and the gear 16 is meshed with the rack plate 4, so that the transmission process is stable, and shaking is not easy to generate.
In one embodiment of the present utility model, guide posts 14 are further disposed in the mounting tables 15 in a penetrating manner, and at least two guide posts 14 are disposed on each mounting table 15; so that the mounting table 15 can not shake by itself, and further, due to the stable transmission of the screw rod, when the staff moves in the climbing frame box 3, the climbing frame box 3 can not shake greatly.
In the description of the present utility model, it should be understood that the terms "longitudinal," "transverse," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate or are based on the orientation or positional relationship shown in the drawings, merely to facilitate description of the present utility model, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present utility model.
The above embodiments are only illustrative of the preferred embodiments of the present utility model and are not intended to limit the scope of the present utility model, and various modifications and improvements made by those skilled in the art to the technical solutions of the present utility model should fall within the protection scope defined by the claims of the present utility model without departing from the design spirit of the present utility model.

Claims (8)

1. The utility model provides a building construction is with climbing frame which characterized in that includes: the outer side of the mounting frame (1) is fixedly mounted on the outer wall of the building through a wall mounting piece (2); a lifting assembly is arranged in the mounting frame (1); the lifting assembly is provided with a climbing frame box body (3); at least two groups of gear assemblies are further arranged on one side wall of the climbing frame box body (3), and the climbing frame box body (3) is rotatably arranged on a rack plate (4) arranged in the installation frame (1) through the gear assemblies; the outer wall of the climbing frame box body (3) is fixedly provided with an anti-falling baffle (5); the bottom of one side, far away from the rack plate (4), of the climbing frame box body (3) is provided with a supporting component and a transition plate (6); the top of the transition plate (6) is fixedly connected with the side wall of the anti-falling baffle (5).
2. The climbing frame for building construction according to claim 1, wherein: a guide column (14) is also arranged in the mounting frame (1); at least four guide posts (14) are arranged; the top end and the bottom end of each guide column (14) are respectively and fixedly arranged at the top beam bottom end and the bottom beam top end of the mounting frame (1).
3. The climbing frame for building construction according to claim 2, wherein: the lifting assembly comprises a driving motor (11); the two driving motors (11) are arranged and are respectively arranged at two ends of the top cross beam of the mounting frame (1); each driving motor (11) is in transmission connection with a screw rod (13) through a coupler (12); the screw rod (13) penetrates through the top cross beam of the mounting frame (1) and is mounted on the bottom cross beam of the mounting frame (1); each screw rod (13) is provided with an installation table (15); at least two guide posts (14) are arranged on each mounting table (15) in a penetrating manner; the two mounting tables (15) are jointly mounted with the climbing frame box body (3).
4. A climbing frame for building construction according to claim 3, wherein: the top surface of one side of the climbing frame box body (3) extends to form a mounting plate (31); the mounting plate (31) is arranged in the mounting frame (1); mounting rods (32) are formed at two ends of the mounting plate (31) in an extending mode towards the two mounting tables; the movable ends of the two mounting rods (32) respectively extend into clamping grooves formed in the opposite surfaces of the two mounting tables (15).
5. The climbing frame for building construction according to claim 1, wherein: the top surface of the anti-falling baffle plate (5) is downwards sunken to form an anti-falling groove.
6. The climbing frame for building construction according to claim 1, wherein: the gear assembly comprises a support seat (10) and a gear (16); the gear (16) is arranged in the supporting seat (10) through a rotating shaft; the supporting seat (10) is arranged on one side, close to the rack plate (4), of the climbing frame box body (3); and the supporting seat (10) is provided with two groups along the horizontal direction; the rack plates (4) are corresponding to the same number of the gears (16); the gear (16) is meshed with a rack on the rack plate (4).
7. The climbing frame for building construction according to claim 1, wherein: the support component comprises an electric push rod (7) and a pressing plate (8) arranged at the top of the electric push rod (7); the electric push rod (7) is fixedly arranged on the supporting plate (9); the supporting plate (9) and the bottom surface of one side, far away from the rack plate (4), of the climbing frame box body (3) are fixedly arranged; the pressing plate (8) is abutted with the bottom of the anti-falling baffle plate (5).
8. The climbing frame for building construction according to claim 1, wherein: a plurality of pedals with different lengths are arranged on the transition plate (6) along the vertical direction; the length of the pedal gradually increases from top to bottom.
CN202222953787.6U 2022-11-07 2022-11-07 Climbing frame for building construction Active CN219491667U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222953787.6U CN219491667U (en) 2022-11-07 2022-11-07 Climbing frame for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222953787.6U CN219491667U (en) 2022-11-07 2022-11-07 Climbing frame for building construction

Publications (1)

Publication Number Publication Date
CN219491667U true CN219491667U (en) 2023-08-08

Family

ID=87476877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222953787.6U Active CN219491667U (en) 2022-11-07 2022-11-07 Climbing frame for building construction

Country Status (1)

Country Link
CN (1) CN219491667U (en)

Similar Documents

Publication Publication Date Title
CN214834701U (en) Assembled aluminum mould plate device for building
CN219491667U (en) Climbing frame for building construction
CN214575489U (en) Climbing type scaffold for municipal construction
CN215331364U (en) Anti-falling climbing frame device with connecting seat structure for building construction
CN112096037B (en) Scaffold frame that can safe location construction
CN213710286U (en) Adjustable scaffold
CN211143684U (en) A remove scaffold frame for building engineering
CN219471488U (en) Scaffold for indoor decoration construction
CN210460064U (en) Novel building structure supports device
CN116537509B (en) Attached lifting scaffold
CN212836364U (en) Stair safety protective guard for building engineering
CN219604809U (en) Building construction frame
CN217205240U (en) Novel climbing frame
CN219451444U (en) Building climbing frame
CN216042535U (en) Climbing frame for building construction
CN219343916U (en) Scaffold for building construction
CN218205569U (en) Construction scaffold
CN218058348U (en) Stable lifting device for steel structure machining
CN214531893U (en) Creeping formwork mechanism adopting lifting type operating platform
CN215331301U (en) Scaffold for building
CN213015385U (en) Advance and retreat of climbing frame touches device
CN214658643U (en) Mobile platform for multi-use architecture construction
CN209855694U (en) Ascending device for maintaining communication equipment
CN219298706U (en) Lifting scaffold
CN215519842U (en) Construction equipment scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant